Publication number
NL2024928B1
NL2024928B1 NL2024928A NL2024928A NL2024928B1 NL 2024928 B1 NL2024928 B1 NL 2024928B1 NL 2024928 A NL2024928 A NL 2024928A NL 2024928 A NL2024928 A NL 2024928A NL 2024928 B1 NL2024928 B1 NL 2024928B1
Authority
NL
Netherlands
Prior art keywords
carrier
working deck
swell
hull
top drive
Prior art date
Application number
NL2024928A
Other languages
Dutch (nl)
Inventor
Bernardus Wijning Diederick
Original Assignee
Itrec Bv
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Itrec Bv filed Critical Itrec Bv
Priority to NL2024928A priority Critical patent/NL2024928B1/en
Priority to PCT/EP2021/053353 priority patent/WO2021165143A1/en
Priority to EP21703735.7A priority patent/EP4107359A1/en
Application granted granted Critical
Publication of NL2024928B1 publication Critical patent/NL2024928B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/08Apparatus for feeding the rods or cables; Apparatus for increasing or decreasing the pressure on the drilling tool; Apparatus for counterbalancing the weight of the rods
    • E21B19/09Apparatus for feeding the rods or cables; Apparatus for increasing or decreasing the pressure on the drilling tool; Apparatus for counterbalancing the weight of the rods specially adapted for drilling underwater formations from a floating support using heave compensators supporting the drill string

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

An offshore drilling vessel comprises a floating hull, a moonpool, and a drilling tower. A main hoisting device comprises a travelling top drive carrier, a top sheave assembly with carrier suspension cable sheaves, and vertically oriented hydraulic piston-and-cylinder type lift devices. Carrier suspension cables have one end secured to the carrier and extend over a respective sheave to another end connected to one of an anchor or to a winch fixed in relation to the hull. A vertically mobile working deck is provided with a slip device that is configured to suspend a tubulars string in the firing line. The working deck is suspended from a working deck suspension cable which is reeved independent from the lift devices. An integrated heave compensation system is provided that is configured to establish, in operation thereof, a heave compensated motion of the working deck and a synchronous heave compensated motion of the carrier in order to obtain synchronous heave compensated motions of the working deck and the carrier. The system comprises a common heave compensation device that acts on both the carrier suspension cables and the working deck suspension cables so that when a load formed by a tubulars string initially suspended from the carrier is transferred to the slip device or vice versa, the load on the common heave compensation device remains substantially the same.

Description

P34446NL00
OFFSHORE DRILLING VESSEL AND INSTALLATION FOR PERFORMING SUBSEA WELLBORE RELATED ACTIVITIES.
The invention relates to an offshore drilling vessel and installation for performing subsea wellbore related activities. In the field some offshore drilling vessels are in use that are provided with a drilling installation that is known under the tradename RamRig, originally developed by the company Maritime Hydraulics AS in Norway.
For example, US6095501 and US6094910, disclose an offshore drilling vessel with a RamRig drilling installation having tower that is positioned on the floating hull over or adjacent to the moonpool and with a main hoisting device. This main hoisting device comprises: - a travelling top drive carrier adapted to support a top drive and a drilling tubulars string extending along a firing line through said moonpool; - a top sheave assembly that is guided vertically relative to an elevated portion of the tower and comprises carrier suspension cable sheaves, - vertically oriented hydraulic piston-and-cylinder type lift devices, each having a cylinder body and a piston rod, said lift devices each having one of the cylinder and the piston rod thereof fixed in relation to the hull and the other one of the cylinder and the piston rod supporting the top sheave assembly thereon so as to be vertically mobile relative to the tower, - carrier suspension cables, each carrier suspension cable having one end thereof secured to the travelling top drive carrier and extending over a respective sheave of the top sheave assembly to another end of the carrier suspension cable, said other end being connected to one of an anchor that is fixed in relation to the hull, - a hydraulic circuit connected to said lift devices and including a hydraulic pump, said hydraulic circuit being configured to lift and lower the travelling top drive carrier by extension and retraction of the one or more lift devices.
A prior art RamRig embodiment is represented in figures 1a,b and 2a,b of the present document.
In the operational RamRig installations, a set of hydraulic pumps in the hydraulic circuit to provide a desired hydraulic liquid flow to the lift devices. The heave compensation of the
2. travelling top drive carrier is achieved by means of these lift devices. The hydraulic circuit includes a pressurized gas buffer connected via a piston accumulator to the hydraulic circuit. Active heave compensation is obtained by control of the hydraulic pumps on the basis of a heave sensor, which results in controlled extension and retraction of the lift devices. Passive heave compensation is done on the basis of the pressurized gas buffer as is known in the art. Effectively the piston rods of the lift devices rest on a gas spring. Hoisting and lowering is possible by means of control of the pumps. In WO2017/1920486, a further development of the RamRig installation is disclosed. Herein, the main difference is that the other ends of the carrier suspension cables are not connected to a respective anchor. Instead, the ends of these cables are connected to a winch that is fixed in relation to the hull. In more detail, all carrier suspension cables are wound on a common drum of the winch, all in a single layer. This document explains that in addition to the carrier suspension cables being connected to the winch, operable anchor devices can be provided that are fixed in relation to the hull and are selectively engageable with these cables to provide an anchor like in US6095501 and US6094910, e.g. allowing when hoisting heavy loads by means of the lift devices only or when performing maintenance on the winch. Concerning heave compensation W(02017/192046 discloses that the winch can be embodied as the winch and/or the lift devices can be provided with heave compensation functionality. It is explained that, in an embodiment, the heave compensation as disclosed in US6095501 and US6094910 can be used for the lift devices, e.g. when handling a heavy load, whereas the winch can be operated to provide heave compensation when handling a lighter load.
In the known vessel having a RamRig installation, as also shown in US6095501, US6094910, and WO2017/192048, a drill floor is stationary arranged above the moonpool, with a slip device being mounted on the drill floor as is common in the field. The slip device is configured to suspend a tubulars string in the firing line, e.g. when tripping in or tripping out a drill string from a subsea wellbore, or during an actual drilling process. The present invention aims to provide an enhanced drilling vessel, e.g. in view of enhanced performance in operations that required or would benefit from heave motion compensation.
The present invention provides an offshore drilling vessel for performing subsea wellbore related activities according to the preamble of claim 1, which is characterized in that a vertically mobile working deck is provided, which is vertically movable with respect to the
-3- tower and to the hull along the firing line within a motion range including a heave compensation motion range, wherein the working deck is provided with a slip device that is configured to suspend a tubulars string in said firing line, wherein the vertically mobile working deck is suspended from at least one working deck suspension cable, wherein said at least one working deck suspension cable is reeved independent from the one or more lift devices, so that vertical position and vertical motion of the working deck are independent of the operation of said one of more lift devices, and in that an integrated heave compensation system is provided that is configured to establish, in operation thereof, a heave compensated mation of the vertically mobile working deck relative to the tower and to the hull within said heave compensation motion range and a synchronous heave compensated motion of the travelling top drive carrier in order to obtain synchronous heave compensated motions of the vertically mobile working deck and the travelling top drive carrier, wherein the integrated heave compensation system comprises a common heave compensation device that acts on both the one or more carrier suspension cables and the one or more working deck suspension cables so that when a load formed by a tubulars string initially suspended from the travelling top drive carrier is transferred to the slip device or vice versa, the load on the common heave compensation device remains substantially the same. For example, tripping a drill string into a wellbore can now be performed in full heave compensation mode, avoiding undue vertical motion of the drill string in the wellbore, e.g. thereby avoiding undue pressure variations in the wellbore which may occur when the slip device would not be heave compensated.
It is noted that, the common heave compensation device is distinct from any heave compensation functionality of the one or more vertically oriented hydraulic piston-and- cylinder type lift devices as the one or more carrier suspension cables are reeved independent from the one or more lift devices, so that vertical position and vertical motion of the working deck are independent of the operation of said one of more lift devices.
-4- In an embodiment, the common heave compensation device is directly connected to a common anchor for both the end(s) of the one or more carrier suspension cables and for the end(s) of the one or more working deck suspension cables. For example, the common heave compensation device comprises one or more hydraulic piston-and-cylinder type compensator devices, each having a cylinder body and a piston rod, said compensator devices each having one of the cylinder and the piston rod thereof fixed in relation to the hull and the other one of the cylinder and the piston rod supporting the common anchor thereon. These one or more compensator devices are connected to a hydraulic circuit that includes a pressurized gas buffer as is known in the art.
In another embodiment, the integrated heave compensation system comprises a first heave compensation sheave assembly, distinct from the top sheave assembly, said first heave compensation sheave assembly comprising one or more sheaves along which the one or more carrier suspension cables pass, and a second heave compensation sheave assembly, comprising one or more sheaves along which the one or more working deck suspension cables pass, wherein the first heave compensation sheave assembly and the second heave compensation sheave assembly are mechanically interconnected and connected to the common heave compensation device so as to allow for synchronous motion thereof.
In another embodiment, the common heave compensation device is embodied as a winch that is common for all of the ends of the one or more carrier suspension cables and for the ends of the one or more working deck suspension cables. For example, the winch is a single layer drum type winch, wherein all carrier suspension and working deck suspension cables are wound in a single layer, each onto a corresponding section of the drum.
In an embodiment, each working deck suspension cable has an end portion connected to the working deck that is suspended from a departure sheave that is mounted at a fixed height on the tower, preferably lower than the top sheave assembly.
In an embodiment, each working deck suspension cable has an end portion connected to the working deck that is suspended from a departure sheave that is mounted in the moonpool, e.g. with the working deck having a vertically extending support structure, e.g. as a hollow tube, that extends upward through the moonpool, e.g. to above the main drilling deck of the installation, with the slip device being mounted on top of said vertically extending support structure.
-5. It is noted that, in embodiments, the working deck may be rather small, e.g. just big enough to support the slip device thereon. In other, more preferred, embodiments, the working deck simulates a drill floor, e.g. accessible for drilling personnel, e.g. with an iron roughneck device and/or other well center related equipment arranged thereon or arrangeable thereon.
In an embodiment, the vessel is provided with a heave motion compensating racker system comprising at least one racker device that is adapted to move a tubulars section, e.g. a drill pipe section, between a tubulars storage rack - that is mounted on the hull or tower vessel and subjected to heave motion - and a position wherein the tubulars section is in said firing line and between the vertically mobile working deck and the travelling top drive carrier, wherein said racker device comprises multiple racker assemblies, each of said racker assemblies having a motion arm and a gripper member at an end of said motion arm, said gripper member being adapted to grip a tubulars section, wherein said racker device further comprises an associated heave motion synchronization system configured to bring, in operation thereof, said racker assemblies in a heave compensation mode with respect to the tower so that a tubular section that has been retrieved from the storage rack by means of said racker assemblies of said racker device is brought into a vertical motion that is synchronous with the heave motion of the mobile working deck and of the slip device provided on said mobile working deck. For example, a heave motion compensating racker system as disclosed in WO2015/133895 is provided for. The present invention also relates to a drilling installation comprising a tower, main hoisting device, and mobile working deck as described herein, configured for installation on the floating hull of a drilling vessel, e.g. in view of retrofitting existing drilling vessels.
The present invention also relates to a method for performing a subsea wellbore related activity, wherein use is made of a vessel according to the invention. For example, the activity is one of tripping in or tripping out a tubulars string. The invention will now be discussed with reference to the drawings. In the drawings: - figs. 1a,b show an offshore drilling vessel provided with a drilling installation according to the prior art, - figs. 2a, b show the prior art offshore drilling vessel of figures 1a, b more schematically, - figs. 3a, b show an offshore drilling vessel provided with a drilling installation according to the invention, - figs. 4a, b illustrate the operation of the integrated heave compensation system of the vessel of figures 3a, b,
-B- - figs. 5a, b illustrate a stage of tripping in a drill string with the vessel of figures 3a,b, - figs. Ga, b illustrate a later stage of tripping in a drill string with the vessel of figures 3a,b, - figs. 7a, b illustrate a later stage of tripping in a drill string with the vessel of figures 3a,b, - fig. 8 shows an alternative embodiment of an offshore drilling vessel provided with a drilling installation according to the invention, - fig. 9 shows another alternative embodiment of an offshore drilling vessel provided with a drilling installation according to the invention.
With reference to figures 1a,b, and the more schematic figures 2a,b, first a prior art offshore drilling vessel for performing subsea wellbore related activities will be discussed. This vessel is equipped with a prior art RamRig drilling installation.
The vessel 1 has a floating hull 2 subjected to heave motion during drilling, here a mono-hull, comprising a moonpool 3. In another embodiment, for example, the vessel is a semi- submersible vessel having submergible pontoons (possibly an annular pontoon) with columns thereon that support an above-waterline deck box structure. The moonpool may then be arranged in the deck box structure.
The figures 1a,b and 2a,b show a cross-section of the vessel 1 across the moonpool 3.
A drilling tower 10 is positioned on the hull at or near the moonpool 3, so as to perform wellbore related operation along a firing line 4 through the moonpool 3.
The vessel is equipped with a drilling tower 10 at or near the moonpool. Here the tower 10 is a gantry structure over the moonpool having two legs 11, 12 on opposite sides of the moonpool 3 and a gantry top over the moonpool 3. The tower 10 is embodied as a latticework.
As shown in, for example, W02017/192046, the tower could also be embodied as a singular structure along a side of the moonpool. In the WO2017/192046 this embodiment is provided as a latticework tower.
In another embodiment, the tower is a singular mast having a closed outer wall and having a top and a base. The base of the mast is secured to the hull.
In the figures 1a,b, and 2a,b it is shown that a drill floor 15 is stationary arranged above the moonpool 3.
-7- A slip device 20 is mounted on the drill floor 15 as is common in the field. The slip device 20 is configured to suspend a tubulars string in the firing line 4, e.g. when tripping in or tripping out a drill string from a subsea wellbore, or during an actual drilling process.
The figures 1a,b and 2a,b show a main hoisting device 30 comprising a travelling top drive carrier 35 that is adapted to support a top drive 36 and a drilling tubulars string, e.g. via an elevator that is suspended from the top drive 36 or from the carrier 35 directly. The string extends along the firing line 4 through the moonpool 3.
The carrier 35 is guided vertically along the tower 10 over one or more vertical guide rails 14, 15, e.g. one guide rail along each leg 11, 12 of the gantry type tower.
The figures 1a,b and 2a,b show a top sheave assembly 40 that is guided vertically, e.g. on the same guide rails 14,15, relative to an elevated portion of the tower 10. The assembly 40 comprises one or more carrier suspension cable sheaves 41.
The figures 1a,b and 2a,b show vertically oriented hydraulic piston-and-cylinder type lift devices 50, each having a cylinder body 51 and a piston rod 52. These lift devices 50 each having one of the cylinder and the piston rod thereof fixed in relation to the hull 2 and the other one of the cylinder and the piston rod supports the top sheave assembly 40 thereon so as to be vertically mobile relative to the tower.
The figures 1a,b and 2a,b show carrier suspension cables 55, each carrier suspension cable having one end 56 thereof secured to the travelling top drive carrier 35. The cables 55 each extend over a respective sheave 41 of the top sheave assembly 40 to another end 57 of the carrier suspension cable. This other end 57 is connected to an anchor 80 that is fixed in relation to the hull, e.g. embodied as an equalizing anchor as described in US6095501.
Asis known in the art, and for example as described in any of US6095501, US6094910, and/or WO2017/192046, a hydraulic circuit 80 is connected to the lift devices 50. This circuit includes a hydraulic pump, e.g. multiple pumps in parallel, and is configured to lift and lower the travelling top drive carrier 35 by extension and retraction of the lift devices 50.
The figures 1a, 2a show the lift devices 50 when fully retracted, and the figures 1b, 2b show the lift devices in extended position thereof.
-8- As is known in the art, and for example as described in any of US6095501, US6094910, and/or WO2017/192048, the lift devices 50 and the hydraulic circuit 80 form also a heave compensation system acting on the carrier suspension cables 55 and configured to provide for heave compensating motion of the travelling top drive carrier 35. In more detail, the lift devices 50 can be operated in passive or active heave compensation mode by suitable operation of the circuit 80, and thereby the assembly 40 is heave compensated, which results in the carrier 35 being heave compensated.
With reference to figures 3a,b — 7a,b now an offshore drilling vessel for performing subsea wellbore related activities will be discussed. This vessel 1’ is equipped with an installation that includes many of the components as discussed above with reference to figures 1a,b and 2a,b. These components have been denoted with the same reference numerals.
The drilling installation is provided with a vertically mobile working deck 70, which is vertically movable with respect to the tower 10 and to the hull 2 along the firing line 4 within a motion range including a heave compensation motion range. For example, as preferred, the deck 70 is guided by one or more vertical guide rails mounted on the tower and/or the hull, e.g. the same rails 14, 15 that are employed for the carrier 35.
The slip device 20 is mounted on the working deck 70, e.g. recessed in the deck. For example, multiple slip devices are arranged on the working deck, each displaceable between an operative position in the firing line and a remote, parked position.
The vertically mobile working deck 70 is suspended from working deck suspension cables
75.
Each of these working deck suspension cables 75 is reeved independent from the lift devices 50, so that vertical position and vertical motion of the working deck 70 are independent of the operation of the lift devices 50.
The figures 3a, b show that, as an example, each of the cables 75 has an end portion connected to the working deck 70 that is suspended from a departure sheave 76 that is mounted at a fixed height on the tower 10, preferably lower than the motion range of the top sheave assembly 40.
An integrated heave compensation system is provided that is configured to establish, in operation thereof, a heave compensated motion of the vertically mobile working deck 70
-9- relative to the tower 10 and to the hull 2 within the associated heave compensation motion range and a synchronous heave compensated motion of the travelling top drive carrier 35 in order to obtain synchronous heave compensated mations of the vertically mobile working deck 70 and the travelling top drive carrier 35.
The heave compensation system is an integrated heave compensation system which comprises a common heave compensation device 90 that acts on both the carrier suspension cables 36 and the working deck suspension cables 75, so that when a load formed by a tubulars string 100 initially suspended from the travelling top drive carrier 35 is transferred to the slip device 20 or vice versa, the load on the common heave compensation device 90 remains substantially the same.
In the figures 3a,b — 7a,b the common heave compensation device 90 is embodied as one or more hydraulic piston-and-cylinder type compensator devices 91, 92, each having a cylinder body and a piston rod. These compensator devices 91, 92 each have one of the cylinder and the piston rod thereof fixed in relation to the hull and the other one of the cylinder and the piston rod supporting a common anchor 95 thereon.
Each common anchor 95 is connected to an end of the one or more carrier suspension cables 36 and to an end of the one or more working deck suspension cables 75.
As is known in the art the compensator devices 91, 92 are connected to a hydraulic circuit that includes a pressurized gas buffer.
Figures 4a,b illustrate that the synchronized heave motion compensation of the carrier 35 and of the working deck 70 does not involve the lift devices 50. Figure 4a illustrates a situation wherein the compensator devices 91, 92 are fully extended, and in figure 4b these devices are fully retracted, thereby providing a heave compensation motion range for both of the carrier 35 and the working deck (including the slip device 20 thereon) in synchronicity with one another.
Figures 5a,b, 8a, b, 7a, b will now be discussed in order to elucidate that this arrangement is such that, e.g. during tripping in of a drilling tubulars string as shown here, the load on the common heave compensation device 90, that is devices 91, 92, remains substantially the same in case of transfer of a load formed by a tubulars string 100 initially suspended from the travelling top drive carrier 35 is transferred to the slip device 20 or vice versa. In this figures, for sake of simplicity, the presence of heave motion is not depicted, yet the
-10- operations described herein can be, and will be, performed whilst the device 90 provides for synchronized compensating motions of both the carrier 35 and the working deck 70 with slip device 20 thereon.
In figure 5a a tubulars string 100 is suspended from slip device 20, e.g. the string 100 passing through a riser into the wellbore. A new section 101, e.g. a multi-joint stand of drill pipes, is to be added to the string 100.
The new section 101 is presented, see figure 5a, by a racker device into alignment with the firing line 4, above the top end of the string 100 held by the slip device 20. The carrier 35 has been moved, by operation of the lift devices 50, sufficiently high to place the new section 101 between the working deck 70 and the carrier 35 and top drive 36 and/or elevator carried thereby.
Figure 5b illustrates that the new section 101 has been connected, e.g. screwed, onto the string 100 at its lower end. This may involve the use of a roughneck device as is known in the art, e.g. mounted on the working deck 70. Figure 6a corresponds to figure 5b. In a next stage, the carrier 35 is lowered so as to allow the top end of new section 101 to become connected thereto, e.g. to the top drive 36 or to an elevator that is connected to the top drive 36 or that is directly connected to the carrier 35. The lowering of the carrier 35 is done by means of suitable operation of hydraulic circuit 80 so as to retract the lift devices 50. This does not have an effect on the support of the working deck 70.
Once the top end of new section 101 is connected to the carrier 35, the slip device 20 can be released from the tubulars string 100 to which the new section 101 has been connected, see the figure 7a. In practice this involves transfer of the load of the string 100 from the slip device 20 to the carrier 35, e.g. by means of slightly raising the carrier 35. Once the transfer of load has been done and the slip device 20 disengaged, the lift devices 50 are operated to lower the entire string 100, now including new section 101, along the firing line 4. This is done until the slip device 20 can be brought into engagement with an upper end portion of the string 100. The lowering is shown in figure 7b.
The above cycle is repeated during tripping in until the string 100 has reached the desired depth.
-11- As explained herein, the integrated heave compensation system is operable, e.g. in a passive heave compensation mode, during the entirety of the cycle described above, with synchronized heave compensation of the carrier 35 and the working deck 70.
As the compensator device 91, 92 are each loaded by both the carrier 35 and the working deck 70, and by any vertical load on the carrier 35 and the working deck 70, the moments of transfer of load between the carrier 35 and the working deck 70 do not have a noticeable effect on the load on the compensator devices 91, 92. This is very advantageous, e.g. in view of speed of tripping, e.g. as it avoids the need to adjust settings (e.g. pressure settings) at each time a load transfer is made. As preferred, the vessel is provided with a heave motion compensating pipe racker system comprising at least one racker device that is adapted to move a tubulars section 101, e.g. a drill pipe section, between a tubulars storage rack - that is mounted on the hull or tower vessel and subjected to heave motion - and a position wherein the tubulars section is in said firing line and between the vertically mobile working deck 70 and the travelling top drive carrier 35. The racker device comprises multiple racker assemblies, each of said racker assemblies having a motion arm and a gripper member at an end of said motion arm, said gripper member being adapted to grip a tubulars section. The racker device further comprises an associated heave motion synchronization system configured to bring, in operation thereof, the racker assemblies in a heave compensation mode with respect to the tower so that a tubular section 101 that has been retrieved from the storage rack by means of the racker assemblies of the racker device is brought into a vertical motion that is synchronous with the heave motion of the mobile working deck and of the slip device provided on said mobile working deck. Embodiments hereof are, for example, disclosed in WO2015/133895. It will be appreciated that a similar cycle can be performed during drilling or during tripping out a tubulars string from a wellbore.
Figure 8 illustrates an embodiment, wherein the ends of the cables 55, 70 are connected to a fixedly arranged anchor 60’ on the hull, or the tower, of the vessel. The depicted integrated heave compensation system comprises a first heave compensation sheave assembly, distinct from the top sheave assembly, said first heave compensation sheave assembly comprising one or more sheaves 96 along which the one or more carrier suspension cables 55 pass, and a second heave compensation sheave assembly,
-12- comprising one or more sheaves 97 along which the one or more working deck suspension cables 75 pass. The first heave compensation sheave assembly and the second heave compensation sheave assembly are mechanically interconnected, e.g. one set of sheaves 96 above another set of sheaves 97, and are connected to the common heave compensation device, here devices 91, 92, so as to allow for synchronous motion thereof.
It will be appreciated that this arrangement, compared to the one shown in figures 3 — 7, doubles the effective heave compensation range of both the carrier 35 and deck 70 with the effective stroke of compensator device 90 being the same.
Figure 9 illustrates an embodiment, wherein the common heave compensation device is embodied as one or more heave compensated winches 200, e.g. having electronic and/or hydraulic control having heave motion compensation functionality. Herein each of said winches 200 is common for the ends of the one or more carrier suspension cables 55 and for the ends of the one or more working deck suspension cables 70 so that each winch is loaded by both the carrier 35 and the deck 70. As preferred, each winch 200 is embodied as a single layer drum type winch, wherein all carrier suspension and working deck suspension cables are wound in a single layer, each onto a corresponding section of the drum.
If desired, as explained in WO2017/192046, one or more operable anchoring devices can be combined with the embodiment of figure 9, allowing to retain the cables 55, 75 intermediate the winch 200 and the carrier 35 and deck 70. As the winches 200 are each loaded by both the carrier 35 and the working deck 70, and by any vertical load on the carrier 35 and the working deck 70, the moments of transfer of load between the carrier 35 and the working deck 70 do not have a noticeable effect on the load on the winches 200. This is very advantageous, e.g. in view of speed of tripping, e.g. as it avoids the need to adjust settings (e.g. pressure settings) at each time a load transfer is made.
The carrier 35 can be raised and lowered independently by operation of the one or more pumps in hydraulic circuit 80.

Claims (8)

-13- P34446NL00 CONCLUSIES-13- P34446NL00 CONCLUSIONS 1. Offshore boorvaartuig (1,1) voor het uitvoeren van bij een onderzees boorgat behorende activiteiten, waarbij het vaartuig omvat: een drijvende romp (2) omvattende een moonpool (3); een boortoren (10) die op de romp is geplaatst bij of nabij de moonpool; een hoofdhijsinrichting (30) omvattende: - een verplaatsende topdrive-drager (35) ingericht om een topdrive en een boorbuizenstreng (100) die zich langs een vuurlijn (4) door de moonpool uitstrekt te dragen; - een topschijvensamenstel (4) dat verticaal is geleid ten opzichte van een hoger gelegen deel van de toren en een of meer dragerophangkabel-schijven (41) omvat, - een of meer verticaal georiënteerde hydraulische zuiger-en-cilinder type hefinrichtingen (50}, die elk een cilinderlichaam (51) en een zuigerstang (52) hebben, welke hefinrichtingen elk één van de cilinder en de zuigerstang daarvan vastgezet hebben ten opzichte van de romp en waarbij de andere van de cilinder en de zuigerstang het topschijvensamenstel (40) daarop draagt om zo verticaal beweegbaar te zijn ten opzichte van de toren, - een of meer dragerophangkabels (55), waarbij elke dragerophangkabel een einde (56) heeft dat bevestigd is aan de verplaatsende topdrive-drager (35) en zich uitstrekt over een bijbehorende schijf (41) van het topschijvensamenstel naar een ander einde (57) van de dragerophangkabel, waarbij het andere einde verbonden is met één van een anker (60;90;95) dat vast is ten opzichte van de romp of met een lier (200) die vast is ten opzichte van de romp, - een hydraulisch circuit (80) verbonden met de een of meer hefinrichtingen (50) en omvattende een hydraulische pomp, waarbij het hydraulische circuit ingericht is om de verplaatsende topdrive-drager (35) te heffen en te laten zakken door het uitschuiven en intrekken van de een of meer hefinrichtingen (50), - een deiningscompensatiesysteem (90,91,982:200} dat op de een of meer dragerophangkabels werkt en is ingericht om een deiningscompensatiebeweging te verschaffen van de verplaatsende topdrive-drager,An offshore drilling vessel (1,1) for performing activities associated with a subsea borehole, the vessel comprising: a floating hull (2) comprising a moonpool (3); a derrick (10) located on the hull at or near the moonpool; a main hoist (30) comprising: - a moving top drive carrier (35) adapted to carry a top drive and a string of casing (100) extending along a firing line (4) through the moon pool; - a top sheaves assembly (4) guided vertically with respect to an upper part of the tower and comprising one or more carrier suspension cable sheaves (41), - one or more vertically oriented hydraulic piston and cylinder type lifting devices (50}, each having a cylinder body (51) and a piston rod (52), the lifting devices each having fixed one of the cylinder and the piston rod thereof relative to the hull and the other of the cylinder and the piston rod carrying the top disc assembly (40) thereon so as to be vertically movable relative to the tower, - one or more carrier suspension cables (55), each carrier suspension cable having an end (56) attached to the moving top drive carrier (35) and extending over an associated sheave ( 41) from the top sheaves assembly to another end (57) of the carrier suspension cable, the other end being connected to one of an anchor (60;90;95) fixed to the hull or to a winch (200) fixed relative to the hull, - a hydraulic circuit (80) connected to the one or more lifting devices (50) and comprising a hydraulic pump, the hydraulic circuit being arranged to move the moving top drive carrier (35 ) to be raised and lowered by extending and retracting the one or more lifting devices (50), - a heave compensation system (90,91,982:200} acting on the one or more carrier suspension cables and arranged to provide heave compensating movement of the moving top drive carrier, -14 - met het kenmerk, dat een verticaal beweegbaar werkdek (70) is voorzien, dat langs de vuurlijn verticaal beweegbaar is ten opzichte van de toren (10) en van de romp (2) binnen een bewegingsbereik dat een deiningscompensatiebewegingsbereik omvat, waarbij het werkdek (70) is voorzien van een slipinrichting (20) die is ingericht om een buizenstreng (100) in de vuurlijn af te hangen, waarbij het verticaal beweegbare werkdek (7) is afgehangen van ten minste een werkdekophangkabel (75), waarbij de ten minste ene werkdekophangkabel (75) onafhankelijk van de een of meer hefinrichtingen (50) is geleid, zodat verticale positie en verticale beweging van het werkdek onafhankelijk zijn van de werking van de een of meer hefinrichtingen (50), en dat een geïntegreerd deiningscompensatiesysteem (90,91,92;200) is voorzien dat is ingericht om, in bedrijf daarvan, een deiningscompensatiebeweging te bewerkstelligen van het verticaal beweegbare werkdek (70) ten opzichte van de toren en van de romp binnen genoemd deiningscompensatiebewegingsbereik en een synchrone deiningscompensatiebeweging van de verplaatsende topdrive-drager (35) om synchrone deiningscompensatiebewegingen van het verticaal beweegbare werkdek en de verplaatsende topdrive-drager te verkrijgen, waarbij het geïntegreerd deiningscompensatiesysteem een gemeenschappelijke deiningscompensatie-inrichting (90,91,92;200) omvat die zowel op de een of meer dragerophangkabels (55) als op de een of meer werkdekophangkabels (75) werkt, zodat wanneer een last gevormd door een buizenstreng (100) die initieel was afgehangen van de verplaatsende topdrive-drager (35) wordt overgebracht naar de slipinrichting (20) of omgekeerd, de last op de gemeenschappelijke deiningscompensatie-inrichting (90,91,92;200) in hoofdzaak dezelfde blijft.-14 - characterized in that a vertically movable working deck (70) is provided, which is movable vertically along the line of fire with respect to the turret (10) and of the hull (2) within a range of motion including a swell compensation range of motion, the working deck (70) is provided with a slip device (20) adapted to suspend a tubular string (100) in the firing line, the vertically movable working deck (7) being suspended from at least one working deck suspension cable (75), the at least one working deck suspension cable (75) is routed independently of the one or more lifting devices (50) such that vertical position and vertical movement of the working deck are independent of the operation of the one or more lifting devices (50), and that an integrated heave compensation system (90 ,91,92;200) arranged to effect, in operation thereof, a swell compensating movement of the vertically movable working deck (70) relative to the turret and of the hull within and said swell compensation movement range and a synchronous swell compensation movement of the moving top drive carrier (35) to obtain synchronous swell compensation movements of the vertically movable working deck and the moving top drive carrier, the integrated swell compensation system a common swell compensation device (90,91,92;200 ) which acts on both the one or more carrier suspension cables (55) and the one or more working deck suspension cables (75), such that when a load formed by a tubing string (100) that was initially suspended from the moving top drive carrier (35) is transferred to the slip device (20) or vice versa, the load on the common swell compensation device (90,91,92;200) remains substantially the same. 2. Offshore boorvaartuig volgens conclusie 1, waarbij de gemeenschappelijke deiningscompensatie-inrichting (90,91,92;200) direct verbonden is met een gemeenschappelijk anker (95) voor zowel de einde(n) van de een of meer dragerophangkabels (55) als voor de einde(n) van de een of meer dekophangkabels (75), bijvoorbeeld waarbij de gemeenschappelijke deiningscompensatie-inrichting een of meer hydraulische zuiger-en-cilinder compensatorinrichtingen (91,92) omvat, die elk een cilinderlichaam en een zuigerstang hebben, waarbij de compensatorinrichtingen één van de cilinder en de zuigerstang daarvan vast hebben ten opzichte van de romp en de andere van de cilinder en de zuigerstand het gemeenschappelijk anker (95) steunt.The offshore drilling vessel of claim 1, wherein the common swell compensation device (90,91,92;200) is directly connected to a common anchor (95) for both the end(s) of the one or more carrier suspension cables (55) and for the end(s) of the one or more deck suspension cables (75), e.g. wherein the common swell compensation device comprises one or more hydraulic piston-and-cylinder compensator devices (91,92), each having a cylinder body and a piston rod, wherein the compensator devices have one of the cylinder and its piston rod fixed relative to the hull and the other of the cylinder and the piston position supports the common armature (95). - 15 -- 15 - 3. Offshore boorvaartuig volgens conclusie 1 of 2, waarbij het geintegreerd deiningscompensatiesysteem een eerste deiningsbeweging-kabelschijvensamenstel omvat, onderscheidenlijk van het topschijvensamenstel, welk eerste deiningsbeweging- kabelschijvensamenstel een of meer schijven (96) omvat waar de een of meer dragerophangkabels (55) langs passeren, en een tweede deiningsbeweging- kabelschijvensamenstel omvattende een of meer schijven (97) waar de een of meer werkdekophangkabels (75) langs passeren, waarbij het eerste deiningsbeweging- kabelschijvensamenstel en het tweede deiningsbeweging-kabelschijvensamenstel mechanisch onderling verbonden zijn en verbonden met de gemeenschappelijke deiningscompensatie-inrichting (91,92) om synchrone beweging daarvan mogelijk te maken.The offshore drilling vessel of claim 1 or 2, wherein the integrated swell compensation system comprises a first swell motion rope pulley assembly, respectively of the top pulley assembly, said first swell motion rope pulley assembly comprising one or more pulleys (96) through which the one or more carrier suspension cables (55) pass. and a second swell motion rope pulley assembly comprising one or more sheaves (97) through which the one or more working deck suspension cables (75) pass, wherein the first swell motion rope pulley assembly and the second swell motion rope pulley assembly are mechanically interconnected and connected to the common swell compensating member. device (91,92) to allow synchronous movement thereof. 4. Offshore boorvaartuig volgens conclusie 1, waarbij de gemeenschappelijke deiningscompensatie-inrichting een deiningscompenserende lier (200) omvat, die gemeenschappelijk is voor de einden van de een of meer dragerophangkabels (55) en voor de einden van de een of meer werkdekophangkabels (75), bijvoorbeeld waarbij de lier een enkellaags-trommel type lier is, waarbij de dragerophangkabels (55) en de werkdekophangkabels (75) in een enkele laag zijn gewikkeld, elk op een bijbehorende sectie van de trommel.The offshore drilling vessel of claim 1, wherein the common swell compensation device comprises a swell compensating winch (200) common to the ends of the one or more carrier suspension cables (55) and to the ends of the one or more working deck suspension cables (75) for example, where the winch is a single ply drum type winch, wherein the carrier suspension cables (55) and the working deck suspension cables (75) are wound in a single layer, each on a corresponding section of the drum. 5. Offshore boorvaartuig volgens een of meer van de conclusies 1 - 4, waarbij elke werkdekophangkabel (75) een eindgedeelte heeft dat verbonden is met het werkdek dat is afgehangen van een vertrekschijf (76) die op een vaste hoogte op de toren is aangebracht, bij voorkeur lager dan het topschijvensamenstel (40).An offshore drilling vessel as claimed in any one of claims 1 to 4, wherein each working deck suspension cable (75) has an end portion connected to the working deck which is suspended from a departure sheave (76) mounted at a fixed height on the turret, preferably lower than the top disc assembly (40). 6. Offshore boorinstallatie ingericht voor plaatsing op een boorvaartuig met een drijvende romp (2) omvattende een moonpool (3), waarbij de installatie omvat: -een boortoren (10) ingericht voor plaatsing op de romp bij of nabij de moonpool; - een hoofdhijsinrichting (30) omvattende: - een verplaatsende topdrive-drager (35) ingericht om een topdrive en een boorbuizenstreng (100) die zich langs een vuurlijn {4) door de moonpool uitstrekt te dragen; - een topschijvensamenstel (4) dat verticaal is geleid ten opzichte van een hoger gelegen deel van de toren en een of meer dragerophangkabelschijven (41) omvat, - een of meer verticaal georiënteerde hydraulische zuiger-en-cilinder type hefinrichtingen (50), die elk een cilinderlichaam (51) en een zuigerstang (52) hebben, welke hefinrichtingen elk één van de cilinder en de zuigerstang daarvan vastgezet hebben tenAn offshore drilling rig adapted for placement on a drilling vessel with a floating hull (2) comprising a moonpool (3), the rig comprising: - a derrick (10) adapted for placement on the hull at or near the moonpool; - a main hoist (30) comprising: - a moving top drive carrier (35) arranged to carry a top drive and a string of casings (100) extending along a line of fire {4) through the moon pool; - a top sheaves assembly (4) guided vertically with respect to an upper part of the tower and comprising one or more carrier suspension cable sheaves (41), - one or more vertically oriented hydraulic piston and cylinder type lifting devices (50), each have a cylinder body (51) and a piston rod (52), which lifting devices each have fixed one of the cylinder and the piston rod thereof to -16 - opzichte van de romp en de andere van de cilinder en de zuigerstang het topschijvensamenstel (40) daarop draagt om zo verticaal beweegbaar te zijn ten opzichte van de toren, - een of meer dragerophangkabels (55), waarbij elke dragerophangkabel een einde-16 - relative to the hull and the other from the cylinder and the piston rod, the top sheave assembly (40) carries thereon so as to be vertically movable relative to the turret, - one or more carrier suspension cables (55), each carrier suspension cable having one end (56) heeft dat bevestigd is aan de verplaatsende topdrive-drager (35} en zich uitstrekt over een bijbehorende schijf (41) van het topschijvensamenstel naar een ander einde (57) van de dragerophangkabel, waarbij het andere einde verbonden is met een van een anker (60;90;95) dat vast is ten opzichte van de romp of met een lier (200) die vast is ten opzichte van de romp,(56) attached to the moving top drive carrier (35} and extending across an associated sheave (41) of the top sheave assembly to another end (57) of the carrier suspension cable, the other end being connected to one of a anchor (60;90;95) fixed to the hull or with a winch (200) fixed to the hull, - een hydraulisch circuit (80) verbonden met de een of meer hefinrichtingen (50) en omvattende een hydraulische pomp, waarbij het hydraulische circuit ingericht is om de verplaatsende topdrive-drager (35) te heffen en te laten zakken door het uitschuiven en intrekken van de een of meer hefinrichtingen (50),- a hydraulic circuit (80) connected to the one or more lifting devices (50) and comprising a hydraulic pump, the hydraulic circuit being arranged to raise and lower the moving top drive carrier (35) by extending and retracting the one or more lifting devices (50), - een deiningscompensatiesysteem (90,91,92:200) dat op de een of meer dragerophangkabels werkt en is ingericht om een deiningscompensatiebeweging te verschaffen van de verplaatsende topdrive-drager, met het kenmerk, dat een verticaal beweegbaar werkdek (70) is voorzien, dat langs de vuurlijn verticaal beweegbaar is ten opzichte van de toren (10) en de romp (2) binnen een bewegingsbereik dat een deiningscompensatiebewegingsbereik omvat, waarbij het werkdek (70) is voorzien van een slipinrichting (20) die is ingericht om een buizenstreng (100) in de vuurlijn op te hangen, waarbij het verticaal beweegbare werkdek (7) is afgehangen van ten minste een werkdekophangkabel (75),- a swell compensation system (90,91,92:200) acting on the one or more carrier suspension cables and arranged to provide swell compensation movement of the moving top drive carrier, characterized in that a vertically movable working deck (70) is provided, which is movable vertically along the line of fire with respect to the turret (10) and the hull (2) within a range of motion including a swell compensating range of motion, the working deck (70) including a slip device (20) arranged to hold a string of tubing ( 100) in the firing line, wherein the vertically movable working deck (7) is suspended from at least one working deck suspension cable (75), waarbij de ten minste ene werkdekophangkabel (75) onafhankelijk van de een of meer hefinrichtingen (50) is geleid, zodat verticale positie en verticale beweging van het werkdek onafhankelijk is van de werking van de een of meer hefinrichtingen (50), en dat een geïntegreerd deiningscompensatiesysteem {90,91,92;200) is voorzien dat is ingericht om, in bedrijf daarvan, een deiningscompensatiebeweging te bewerkstelligen van het verticaal beweegbare werkdek (70) ten opzichte van de toren en van de romp binnen genoemd deiningscompensatiebewegingsbereik en een synchrone deiningscompensatiebeweging van de verplaatsende topdrive-drager (35) om synchronewherein the at least one working deck suspension cable (75) is routed independently of the one or more lifting devices (50) such that vertical position and vertical movement of the working deck is independent of the operation of the one or more lifting devices (50), and that an integrated swell compensation system {90,91,92;200) is provided which is arranged, in operation, to effect a swell compensation movement of the vertically movable working deck (70) relative to the turret and of the hull within said swell compensation movement range and a synchronous swell compensation movement of the moving top drive carrier (35) to ensure synchronous -17 - deiningscompensatiebewegingen van het verticaal beweegbare werkdek en de verplaatsende topdrive-drager te verkrijgen, waarbij een geintegreerd deiningscompensatiesysteem en gemeenschappelijke deiningscompensatie-inrichting (90,91,92;200) omvat die zowel op de een of meer dragerophangkabels (55) als op de een of meer werkdekophangkabels (75) werkt, zodat wanneer een last gevormd door een buizenstreng (100) die initieel was afgehangen van de verplaatsende topdrive-drager (35) wordt overgebracht naar de slipinrichting (20) of omgekeerd, de last op de gemeenschappelijke deiningscompensatie-inrichting (90,91,92;200) in hoofdzaak dezelfde blijft.-17 - obtain swell compensation movements of the vertically movable working deck and the moving top drive carrier, comprising an integrated swell compensation system and common swell compensation device (90,91,92;200) operating on both the one or more carrier suspension cables (55) and on the one or more workdeck suspension cables (75) operate so that when a load formed by a tubing string (100) that was initially suspended from the moving top drive carrier (35) is transferred to the slip device (20) or vice versa, the load on the common swell compensation device (90,91,92;200) remains essentially the same. 7. Werkwijze voor het uitvoeren van een bij een onderzees boorgat behorende activiteit, waarbij gebruik wordt gemaakt van een vaartuig of installatie volgens een van de conclusie 1 - 6.A method of conducting a subsea borehole activity using a vessel or installation according to any one of claims 1 to 6. 8. Werkwijze volgens conclusie 7, waarbij een activiteit tripping in of tripping out van een buizenstreng is.The method of claim 7, wherein an activity is tripping in or tripping out of a tubing string.
NL2024928A 2020-02-17 2020-02-17 Offshore drilling vessel and installation for performing subsea wellbore related activities. NL2024928B1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
NL2024928A NL2024928B1 (en) 2020-02-17 2020-02-17 Offshore drilling vessel and installation for performing subsea wellbore related activities.
PCT/EP2021/053353 WO2021165143A1 (en) 2020-02-17 2021-02-11 Offshore drilling vessel and installation for performing subsea wellbore related activities.
EP21703735.7A EP4107359A1 (en) 2020-02-17 2021-02-11 Offshore drilling vessel and installation for performing subsea wellbore related activities

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
NL2024928A NL2024928B1 (en) 2020-02-17 2020-02-17 Offshore drilling vessel and installation for performing subsea wellbore related activities.

Publications (1)

Publication Number Publication Date
NL2024928B1 true NL2024928B1 (en) 2021-09-16

Family

ID=70805157

Family Applications (1)

Application Number Title Priority Date Filing Date
NL2024928A NL2024928B1 (en) 2020-02-17 2020-02-17 Offshore drilling vessel and installation for performing subsea wellbore related activities.

Country Status (3)

Country Link
EP (1) EP4107359A1 (en)
NL (1) NL2024928B1 (en)
WO (1) WO2021165143A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL2033170B1 (en) 2022-09-28 2024-04-05 Itrec Bv Offshore drilling vessel and installation for perforing subsea wellbore related activities

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6094910A (en) 1995-12-22 2000-08-01 Maritime Hydraulics As Apparatus and method for raising and lowering a piston in a piston cylinder arrangement in a derrick
US6095501A (en) 1995-12-27 2000-08-01 Maritime Hydraulics As Stretch compensation in a hoisting system for a derrick
WO2015133895A1 (en) 2014-03-03 2015-09-11 Itrec B.V. An offshore drilling vessel and method
WO2016062812A1 (en) * 2014-10-24 2016-04-28 Itrec B.V. Offshore drilling system, vessel and method
WO2017192046A1 (en) 2016-05-06 2017-11-09 Mhwirth As Hoisting system
WO2019160414A1 (en) * 2018-02-19 2019-08-22 Itrec B.V. Vessel and method for performing subsea wellbore related activities, e.g. workover activities, well maintenance, installing an object on a subsea well bore

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6094910A (en) 1995-12-22 2000-08-01 Maritime Hydraulics As Apparatus and method for raising and lowering a piston in a piston cylinder arrangement in a derrick
US6095501A (en) 1995-12-27 2000-08-01 Maritime Hydraulics As Stretch compensation in a hoisting system for a derrick
WO2015133895A1 (en) 2014-03-03 2015-09-11 Itrec B.V. An offshore drilling vessel and method
WO2016062812A1 (en) * 2014-10-24 2016-04-28 Itrec B.V. Offshore drilling system, vessel and method
WO2017192046A1 (en) 2016-05-06 2017-11-09 Mhwirth As Hoisting system
WO2019160414A1 (en) * 2018-02-19 2019-08-22 Itrec B.V. Vessel and method for performing subsea wellbore related activities, e.g. workover activities, well maintenance, installing an object on a subsea well bore

Also Published As

Publication number Publication date
EP4107359A1 (en) 2022-12-28
WO2021165143A1 (en) 2021-08-26

Similar Documents

Publication Publication Date Title
US11781384B2 (en) Drilling installation: handling system, method for independent operations
EP2847417B1 (en) Offshore vessel and method of operation of such an offshore vessel
CN111491857B (en) Vessel and method for performing subsea wellbore related activities
US20070084606A1 (en) Rig assist compensation system
NL2023277B1 (en) Retrofitting an existing offshore drilling vessel
NL2024928B1 (en) Offshore drilling vessel and installation for performing subsea wellbore related activities.
CN214397139U (en) Vessel for performing subsea wellbore related activities such as workover activities, well maintenance, installing objects on a subsea wellbore
NL2033170B1 (en) Offshore drilling vessel and installation for perforing subsea wellbore related activities
EP3938274B1 (en) Offshore system, vessel and method for performing subsea wellbore related activities
NL2024069B1 (en) Offshore system and method
CN114245784B (en) Offshore drilling system, vessel and method
NL2023412B1 (en) Offshore drilling system, vessel and method
NL2023279B1 (en) Offshore drilling system and method
NL2016059B1 (en) Drilling installation; Handling system, method for independent operations.
NL2014765B1 (en) Drilling installation; Handling system, method for independent operations.
KR20140035067A (en) Apparatus for offshore handling and running of a bop stack with foldable catwalk platform
EP3829967A1 (en) Semi-submersible
KR20190042965A (en) Load test system of trolley for drilling rig
WO2010067098A1 (en) Assembly and method for supporting and deploying an object from a vessel
DK201300303A1 (en) An offshore drilling rig and a method of operating the same.