NL2017496B1 - Method of handling transportation of modular cargo elements - Google Patents

Method of handling transportation of modular cargo elements Download PDF

Info

Publication number
NL2017496B1
NL2017496B1 NL2017496A NL2017496A NL2017496B1 NL 2017496 B1 NL2017496 B1 NL 2017496B1 NL 2017496 A NL2017496 A NL 2017496A NL 2017496 A NL2017496 A NL 2017496A NL 2017496 B1 NL2017496 B1 NL 2017496B1
Authority
NL
Netherlands
Prior art keywords
transport
line
area
trolley
loading
Prior art date
Application number
NL2017496A
Other languages
Dutch (nl)
Inventor
Biek Hendrik
Original Assignee
Ect Delta Terminal B V
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ect Delta Terminal B V filed Critical Ect Delta Terminal B V
Priority to NL2017496A priority Critical patent/NL2017496B1/en
Priority to PCT/NL2017/050615 priority patent/WO2018052301A2/en
Application granted granted Critical
Publication of NL2017496B1 publication Critical patent/NL2017496B1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G63/00Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations
    • B65G63/002Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations for articles
    • B65G63/004Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations for articles for containers

Abstract

The various aspect and embodiments relate to discharge of a container from a ship on a first transport line and subsequently loading a container from an adjacent second transport line. Hence, the trolley of a quay crane moves with a container from ship to shore, drops the container on the first line, picks up a container from the second line and returns to the ship. The transport lines may comprise vehicles for transporting containers. While the container is being moved to the ship, a vehicle may move from the first transport line to the second transport line. Alternatively or additionally, loading and discharging may be executed intermittently from the first line and the second line, respectively.

Description

Title: Method of handling transportation of modular cargo elements
TECHNICAL FIELD
The various aspects and embodiments thereof relate to unloading and loading of modular cargo elements from and to a ship.
BACKGROUND
Container vessels are discharged and loaded using container cranes. Such cranes comprise a structure provided on a quay and a horizontal boom that overhangs the ship. On the boom, a trolley is provided. From the trolley, a spreader is suspended for transporting containers between the quay and the ship.
On the quay, transport vehicles are provided for transportation of containers on the quay. These vehicles wait in a line on the quay. A container is picked up from a vehicle and loaded in the ship. A container is discharged from the ship and loaded on the empty vehicle. Next, the loaded vehicle is driven off and the next vehicle in line, with a container to be loaded, is driven under the gantry crane.
With the advent of larger and larger container vessels, currently nearing a capacity of 20.000 containers, efficient discharging procedures and loading procedures are becoming more and more important.
SUMMARY
Waiting for the loaded vehicle to be driven off and for the next vehicle to arrive introduces waiting time between dropping off a container on the quay and picking up a container from the quay. It is preferred to reduce this waiting time. A first aspect provides a method of handling transportation of modular cargo elements between a storage area and a transport area by means of a first gantry crane comprising a first trolley comprising a first gripper for griping the cargo elements, the first trolley being arranged for moving between the storage area and the transport area over a substantially linear first trolley trajectory, the transport area comprising under the first trolley trajectory a first transportation line and a second transportation line for transporting the cargo elements from and to the transport area, the first transportation line being in the transport area substantially parallel to the second transportation line and substantially perpendicular to the trolley direction. The method comprises: transporting, by means of the first gantry crane, a first cargo element from the storage area to the transport area, providing a second cargo element to the transport area via the second transportation line and deploying, by means of the first gantry crane, the first cargo element on the first transportation line. The second cargo element is picked up from the second transportation line by means of the first gantry crane and, by means of the first gantry crane, transported from the transport area to the storage area.
By unloading a cargo element to a first lane and loading a cargo element from a second lane, the crane does not have to wait for transportation of a transportation line to transport the discharged cargo element away and to provide the cargo element to be loaded to the vessel -or other storage facility or storage area.
An embodiment of the first aspect comprises moving the first trolley from the storage area to the transport area for transporting the first cargo element from the storage area to the transport area, after deployment of the first cargo element on the first transportation line, moving the first trolley from the first transportation line to the second transportation line and moving the first trolley from the transport area to the storage area for transporting the second cargo element from the transport area to the storage area.
In this embodiment, the trolley first completes all local movements before making large movements. This reduces local waiting time and travel time of the trolley.
In another embodiment, the first transportation line and the second transportation line comprise vehicles. In this embodiment, providing a second cargo element to the transport area via the second transportation line comprises providing a second vehicle carrying the second cargo element via the second transportation line; and deploying the first cargo element on the first transportation line comprises deploying the first cargo element on a first vehicle provided on the first transportation line.
Vehicles provide flexible transportation systems, as compared to for example conveyor belts. A further embodiment comprises moving the first vehicle with the first cargo element away from the transport area, and moving the second vehicle from the second transportation lane to the first transportation lane.
This allows the gantry crane to pick up cargo elements always from the same position and to deploy discharged cargo elements at the same location.
In again another embodiment, a first transportation direction of the first transportation line is opposite to a second transportation direction of the second transportation line.
This embodiment allows for flexibility and implementation of alternative transportation schemes.
In again a further embodiment, a second gantry crane is provided for transportation of modular cargo elements between the storage area and the transport area, the second gantry crane comprising a second trolley comprising a second gripper for griping the cargo elements, the second trolley being arranged for moving between the storage area and the transport area over a substantially linear second trolley trajectory. Furthermore, the transport area comprises under the second trolley trajectory a third transportation line and a fourth transportation line for transporting the cargo elements, the third transportation line being substantially in extension of a first of the first or second transportation line and the fourth transportation line being substantially in extension of a second of the first or second transportation line. This again further embodiment comprises transporting, by means of the second gantry crane, a third cargo element from the storage area to the transport area, providing a fourth cargo element to the transport area via the fourth transportation line and deploying, by means of the second gantry crane, the third cargo element on the third transportation line. The fourth cargo element is picked up, by means of the second gantry crane, from the fourth transportation line; and transported, by means of the second gantry crane, from the transport area to the storage area.
In this way, two transport lanes are shared by two gantry cranes. This allows operation of two gantry cranes with two lanes in an efficient way.
Yet another embodiment comprises transporting the first cargo element away from the transport area over the first transport line, transporting a fifth cargo element from the storage area to the transport area and providing a sixth cargo element to the transport area via the first transportation line. The fifth cargo element is deployed on the second transport line, the sixth cargo element is picked up from the first transportation line and transported from the transport area to the storage area. A second aspect provides a computer programme product readable by an electronic computing device, comprising instructions arranged to programming the electronic computing device to provide a set of instructions for managing transportation of cargo elements between a storage area and a transport area by means of a first gantry crane comprising a first trolley comprising a first gripper for griping the cargo elements, the first trolley being arranged for moving between the storage area and the transport area over a substantially linear first trolley trajectory, the transport area comprising under the first trolley trajectory a first transportation line and a second transportation line for transporting the cargo elements from and to the transport area, the first transportation line being in the transport area substantially parallel to the second transportation line and substantially perpendicular to the trolley direction. The set of instructions comprises instructions to transport, by means of the first gantry crane, a first cargo element from the storage area to the transport area, provide a second cargo element to the transport area via the second transportation line, deploy, by means of the first gantry crane, the first cargo element on the first transportation line; pick up, by means of the first gantry crane, the second cargo element from the second transportation line; and transport, by means of the first gantry crane, the second cargo element from the transport area to the storage area. A third aspect provides an computing device programmed by means of the computer programme product according to the second aspect.
BRIEF DESCRIPTION OF THE DRAWINGS
The various aspects and embodiments thereof will now be discussed in further detail in conjunction with drawings. In the drawings,
Figure 1 A: shows a vessel to be unloaded and loaded;
Figure 1 B: shows a top view of a vessel to be unloaded and loaded;
Figure 2: shows a flowchart;
Figure 3 A: shows a step in handling of containers;
Figure 3 B: shows a step in handling of containers;
Figure 3 C: shows a step in handling of containers;
Figure 3 D: shows a step in handling of containers;
Figure 3 E: shows a step in handling of containers;
Figure 4: shows a first top view of a vessel and transport lanes;
Figure 5: shows a second flowchart;
Figure 6 A: shows a step in handling of containers;
Figure 6 B: shows a step in handling of containers;
Figure 6 C: shows a step in handling of containers;
Figure 6 D: shows a step in handling of containers;
Figure 6 E: shows a step in handling of containers;
Figure 7: shows a second top view of a vessel and transport lanes; and
Figure 8: shows a third top view of a vessel and transport lanes.
DETAILED DESCRIPTION
Figure 1 A shows a container ship 100 as a cargo vessel moored to a quay 170 on which a gantry crane 150 is provided as a quay crane. The container ship 100 comprises a lower cargo level 110 below a first deck module 102 and further deck modules and an upper cargo level 120 above the a first deck module 102 and further deck modules. Optionally, the container ship 100 comprises an upper cargo level 130 on top of various upper cargo module at the upper cargo level. The container ship 100 carries containers and preferably steel containers having sizes in accordance with ISO standards as modular cargo elements.
The gantry crane 150 comprises a base structure 152, on top of which a boom 154 is provided. The boom 154 extends from the gantry crane 150 over the container ship 100. The boom 154 may comprise a pivoting element for swiveling a part of the boom 154 that overhangs over the container ship 100 upward. For providing balancing of the gantry crane 150, a counterweight 156 is provided at the mainland side of the gantry crane 150.
On the boom 154, a trolley 162 is provided. The trolley 162 is arranged for executing a reciprocating linear movement over substantially the full length of the boom 154, from a distal point of the boom 154 at the counterweight 156 to a proximal point of the boom 154 opposite to the distal point - or at least over a substantial part thereof. To the trolley 162, a cabin 164 is provided for accommodating a crane driver. To the trolley, also a hoisting module is provided for hoisting a line holding a spreader 166 as a gripper. The hoisting module allows moving the container spreader 166 up and down.
The spreader 166 is arranged for gripping and holding one or more containers. This allows the gantry crane 150 for transporting containers between the container ship 100 and a first vehicle 412 and a second vehicle 422 provided in a target area 172. The vehicles are arranged for transporting containers to and from the target area. In this way, containers to be loaded on the container ship 100 are transported towards the target area 172 and containers discharged from the container ship 100 may be transported away from the target area 172.
Within the cabin 164, the crane driver is provided with controls for, among others, moving the trolley 162, hoisting and lowering the spreader 166 and for gripping or releasing containers. The crane driver receives instructions which container to pick up and where to deploy it via a computing device 180. The processing device 180 may be embodied as a computer. The computing device 180 is programmed by means of a computer programme product 182 which may be provided on a non-transitory or transitory medium. Alternatively, driving of the gantry crane 150 is automated and operation thereof is fully controlled by the computing device 180.
Figure 1 B shows a schematic view of the top of the situation depicted by Figure 1 A. Figure 1 B shows the gantry crane 150. In the target area 172, Figure 1 B shows a first lane 410 for the first vehicle 412 and a second lane 420 for the second vehicle 422. On the first lane 410, the first vehicle 412 is provided empty and on the second lane 420, the second vehicle 422 is provided with a container. The first vehicle 412 is ready to receive a discharged container from the ship 100 and the container on the second vehicle 422 is ready to be loaded onto the ship 100. The method of managing transportation of the containers between the ship 100 and vehicles as part of the transportation line in the target area 172 will be discussed in further detail in conjunction with a first flowchart 200 in Figure 2 and drawings provided by Figure 3 and Figure 4. The parts of the first flowchart are summarised below: 202 start 204 pick up container from ship 206 transport container to first lane 208 deploy discharged container on first lane 210 move trolley from first lane to second lane 212 pick up container from second lane 214 transport container to ship 216 deploy container in ship 218 move away discharged container on first lane 220 move vehicle from second to first lane 222 end
The procedure starts in a terminator 202 and proceeds by picking up a container from the ship 100 in step 204 by means of the spreader 166. The container picked up is transported to the first lane 410 by moving the trolley 162 from above the ship 100 to above the first lane 410. Once above the first lane 410 and the first vehicle 412 in particular, the container is deployed on the first vehicle 412 by lowering the spreader 166 in step 208. This is depicted in Figure 3 A.
Next, the trolley 162 is moved from above the first lane 410 to above the second lane 420. This is depicted by Figure 3 B. Once above the second lane 420, the spreader 166 is lowered and another container, available on the second vehicle 422, is picked up in step 212. This is depicted by Figure 3 C. Subsequently, the procedure splits in two branches executed in parallel. In step 214, the container picked up from the second vehicle 422 is transported to the ship 100 and deployed in the ship 100 in step 216.
In the right branch, the procedure proceeds in step 218 by moving away the discharged container by moving away the first vehicle 412. This is depicted in Figure 3 D. The first vehicle 412 is moved away to a further area where containers are stored or to another transportation area for loading the container in another vessel or vehicle like a lorry or a train. The arrow in Figure 3 D indicates step 220, in which the second vehicle 422 is moved from the second lane 420 to the first lane 410. The process ends in terminator 222.
Subsequently, the procedure may be repeated as long as required. This means that the subsequent container discharged from the ship 100 is received by the second vehicle 422, from that moment designated as the new first vehicle 412. Switching of lanes by the vehicles is depicted in Figure 4 in further detail.
Figure 4 shows a top view of the ship 100 and the target area 172. In the target area 172 and over the ship 100, a first gantry crane 150', a second gantry crane 150", a third gantry crane 150"', a fourth gantry crane 150"", a fifth gantry crane 150'"" and a sixth gantry crane 150""" are provided. Below the gantry cranes, the first transport lane 460, the second transport lane 450, a third transport lane 440, a fourth transport lane 430, a fifth transport lane 420 and a sixth transport lane 410 are provided. In the situation depicted by Figure 4, only the first transport lane 460 and the second transport lane 450 are dedicated to specific gantry cranes: the first transport lane 460 is dedicated to the first gantry crane 150' and the second transport lane 450 is dedicated to the sixth gantry crane 150""". Hence, in the situation as depicted by Figure 4, the method as depicted by the first flowchart does not apply to operation of the first gantry crane 150' and the sixth gantry crane 150""".
For the second gantry crane 150", a first transportation line 434 for providing containers to be loaded in the ship 100 and for further transportation of discharged containers is provided by a part of the third transport lane 440 and a part of the fourth transport lane 430. Once a container supplied via the relevant part of the third transport lane 440, the third vehicle 442 moves in the first transportation line 434 from the third transport lane 440 to the fourth transport lane 430. The trajectory from the third transport lane 440 to the fourth transport lane 430 is diagonal relative to the transport lanes.
Vehicles used for the transportation of container on the shore are provided with steering capacity on all wheels, preferably four wheels. This allows the third vehicle 442 to follow a crab like movement. The body of the vehicle remains substantially parallel to the third transport lane 440 and the fourth transport lane 430, the wheels are swiveled over substantially the same angle over a substantially vertical angle towards the fourth transport lane 430. In the embodiment shown by Figure 4, the wheels are swivelled over an angle of approximately 30 degrees. In other embodiments, the wheels may be swivelled up to ninety degrees or even more.
Next, the wheels are driven such that the third vehicle 442 moves from the third transport lane 440 to the fourth transport lane 430, as part of the first transportation line 434. Likewise, a second transportation line 444, a third transportation line 454 and a fourth transportation line 464 are provided. The first transport lane 460 and the second transport lane 450 may also be considered providing transportation lines. It is noted that embodiments without the all-wheel steering capacity may be envisaged as well. In such embodiment, mostly more room is required on the quay.
Therefore, vehicles with all-wheel steering capacity and crab capability are preferred.
This set up allows the gantry cranes to deploy a container in one lane and pick up a container in another, preferably adjacent, lane. This reduces discharging and loading time as the loading and discharging time is far less dependent on time required for moving of vehicles for carrying away discharged containers and for providing containers to be loaded. Rather, the loading times are determined by the travel speed of the trolleys 162 (Figure 1) over the boom 154.
However, in the situation as depicted above, the dual lane transportation of containers is not implemented for the first gantry crane 150' and the sixth gantry crane 150""". A reason for this is that in particular situations, the target area 172 is not wide enough to provide for a dual lane transportation line for the outer gantry cranes. Implementing such dual lane transportation line for the outer gantry cranes would result in a target area 172 that is significantly wider than the ship 100, which would go at the cost of port capacity.
Another solution would be implementing two lanes per crane for the outer gantry cranes. This would require, however, much wider gantry cranes, which comes at a significant cost. However, it is possible to provide a seventh lane under existing gantry cranes, this additional lane is preferably provided between the first transport lane 460 and the second transport lane 450. This, in turn, allows for lane sharing for the first gantry crane 150’ and the sixth gantry crane 150""". The lane sharing is depicted by a second flowchart 500 provided by Figure 5. The second flowchart 500 will be discussed in conjunction with Figure 6 and Figure 7. Figure 7 shows a situation similar to that as shown by Figure 4, with the addition of the seventh transport lane 470. The various parts of the second flowchart are summarised below: 502 start 504 pick up container from ship 506 transport container to first lane 508 deploy discharged container on first lane 510 move trolley from first lane to seventh lane 512 pick up container from seventh lane 514 transport container to ship 516 deploy container in ship 518 pick up container from ship 520 move away discharged container on first lane 522 provide new container in first lane 524 deploy discharged container in seventh lane 526 move trolley from seventh lane to first lane 528 pick up container from first lane 530 transport container to ship 532 deploy container in ship 534 move away discharged container in seventh lane 536 end
The procedure starts in a terminator 502 and proceeds by picking up a container from the ship 100 in step 504 by means of the spreader 166. The container picked up is transported to the first lane 460 by moving the trolley 162 from above the ship to above the first lane 460. Once above the first lane 460 and the first vehicle 462 in particular, the container is deployed on the first vehicle 462 by lowering the spreader 166 in step 508. This is depicted in Figure 6 A.
Next, the trolley 162 is moved from above the first lane 460 to above the seventh lane 470. This is depicted by Figure 6 B. Once above the seventh lane 470, the spreader 166 is lowered and another container, available on the second vehicle 452, is picked up in step 512. This is depicted by Figure 6 C. Subsequently, the procedure splits in two branches executed in parallel. In step 514, the container picked up from the second vehicle 452 is transported to the ship 100 and deployed in the ship 100 in step 516.
After the container has been deployed in the ship, another container is picked up again from the ship 100 in step 518, without moving the trolley 162 back to the target area 172 in between.
In the right branch, the procedure proceeds in step 520 by moving away the discharged container by moving away the first vehicle 462. This is depicted in Figure 6 D. The first vehicle 462 is moved away in the first lane 460 to a further area where containers are stored or to another transportation area for loading the container in another vessel or vehicle like a lorry or a train. Subsequently, a new container is provided by means of a further vehicle 492 in the first lane 460. This is depicted by Figure 6 E.
The container picked up in step 518 is in step 524 provided on the second vehicle 452 available in the seventh lane 470. In step 526, the trolley 162 is moved from above the seventh lane 470 to above the first lane 460 for picking up the new container in step 528. The new container picked up is transported to the ship 100 in step 530 and deployed in the ship 100 in step 532. In parallel, the second vehicle 452 is moved away. The second vehicle 452, available in the seventh lane 470, is firstly moved from the seventh lane 470 to the first lane 460 and subsequently moved away for further processing of the container. This means that the first gantry crane 150' is served by two transportation lines. These two transportation lines are in this embodiment interleaved. A first transportation line provided along the trajectory of the first transport lane 460 and a second transportation line provided mainly along the trajectory of the first transport lane 460 and underneath the first gantry crane 150' provided along the seventh transport lane 470.
The vehicles provided on the transport lanes as part of the transportation lines for transportation of containers are preferably spaced apart sideways to the smallest extent possible to allow for a maximum amount of transport lanes. In one embodiment, this is approximately 4 metres. This pitch allows for safe movement of the vehicles over the lanes in straight lines. However, when taking turns, the vehicles - and hence the transport lanes used - should be spaced apart sideways at about 6 metres to avoid serious risks of collision.
Figure 8 provides an embodiment allowing for transport lanes with a minimum pitch at the quay, underneath the gantry cranes, and with a wider pitch at bends of transport lanes to prevent collision. The first transport lane 460 is continued over the first bend 468, the second transport lane 450 is shifted by half the pitch distance before the second bend 458, the third transport lane 440 is continued via the third bend 438, the fourth transport lane 430 and the fifth transport lane 420 are merged into a merged transport lane 480 before the fourth bend 428 and the sixth transport lane 410 is continued via a fifth bend 418. It is noted that the seventh transport lane 470 is only used at the locations of the first gantry crane 150' and the sixth gantry crane 150""". Therefore, the seventh transport lane 470 does not have to be continued to a further location for further handling of containers.
The situation depicted by Figure 8 only shows the left side of the situation depicted by Figure 7. It is noted at the right side of the situation as depicted by Figure 7, the bends in the transport lanes may be provided as well, preferably as mirrored versions of the trajectories shown by Figure 8.
In summary, The various aspect and embodiments relate to discharge of a container from a ship on a first transport line and subsequently loading a container from an adjacent second transport line. Hence, the trolley of a quay crane moves with a container from ship to shore, drops the container on the first line, picks up a container from the second line and returns to the ship. The transport lines may comprise vehicles for transporting containers. While the container is being moved to the ship, a vehicle may move from the first transport line to the second transport line. Alternatively or additionally, loading and discharging may be executed intermittently from the first line and the second line, respectively.
Expressions such as "comprise", "include", "incorporate", "contain", "is" and "have" are to be construed in a non-exclusive manner when interpreting the description and its associated claims, namely construed to allow for other items or components which are not explicitly defined also to be present. Reference to the singular is also to be construed in be a reference to the plural and vice versa.
In the description above, it will be understood that when an element such as layer, region or substrate is referred to as being “on” or “onto” another element, the element is either directly on the other element, or intervening elements may also be present.
Furthermore, the invention may also be embodied with less components than provided in the embodiments described here, wherein one component carries out multiple functions. Just as well may the invention be embodied using more elements than depicted in the Figures, wherein functions carried out by one component in the embodiment provided are distributed over multiple components. A person skilled in the art will readily appreciate that various parameters disclosed in the description may be modified and that various embodiments disclosed and/or claimed may be combined without departing from the scope of the invention.

Claims (14)

1. Werkwijze voor beheren van transport van modulaire ladingselementen tussen een opslaggebied en een transportgebied door middel van een eerste portaalkraan omvattende een eerste trolley omvattende een eerste grijper voor grijpen van de ladingselementen, de eerste trolley zijnde ingericht om te bewegen tussen het opslaggebied en het transportgebied over een in hoofdzaak lineair trolley traject, het transportgebied omvattende onder het eerste trolley traject een eerste transportlijn en een tweede transportlijn voor transporteren van ladingselementen van en naar het transportgebied, de eerste transportlijn zijnde in hoofdzaak parallel aan de tweede transportlijn en in hoofdzaak loodrecht op het trolley traject, de werkwijze omvattende: transporteren, door middel van de eerste portaalkraan, een eerste ladingselement van het opslaggebied naar het transportgebied; leveren van een tweede ladingselement naar het transportgebied via de tweede transportlijn; afzetten, door middel van de eerste portaalkraan, van het eerste ladingselement op de eerste transportlijn; oppakken, door middel van de eerste portaalkraan, van het tweede ladingselement van de tweede transportlijn; en transporteren, door middel van de eerste portaalkraan, van het tweede ladingselement van het transportgebied naar het opslaggebied.A method for managing transport of modular loading elements between a storage area and a transport area by means of a first gantry crane comprising a first trolley comprising a first gripper for gripping the loading elements, the first trolley being arranged to move between the storage area and the transport area over a substantially linear trolley trajectory, the transport area comprising under the first trolley trajectory a first transport line and a second transport line for transporting loading elements to and from the transport area, the first transport line being substantially parallel to the second transport line and substantially perpendicular to the trolley trajectory, the method comprising: transporting, by means of the first gantry crane, a first loading element from the storage area to the transport area; supplying a second loading element to the transport area via the second transport line; depositing, by means of the first gantry crane, the first loading element on the first conveyor line; picking up, by means of the first gantry crane, the second loading element of the second conveyor line; and transporting, by means of the first gantry crane, the second loading element from the transport area to the storage area. 2. Werkwijze volgens conclusie 1, verder omvattende: bewegen van de eerste trolley van het opslaggebied naar het transportgebied voor transporteren van het eerste ladingselementen van het opslaggebied naar het transportgebied; na afzetten van het eerste ladingselementen op de eerste transportlijn, bewegen van de eerste trolley van de eerste transportlijn naar de tweede transportlijn; en bewegen van de eerste trolley van het transportgebied naar het opslaggebied voor transporteren van het tweede ladingselementen van het transportgebied naar het opslaggebied.The method of claim 1, further comprising: moving the first trolley from the storage area to the transport area for transporting the first loading elements from the storage area to the transport area; after depositing the first loading elements on the first transport line, moving the first trolley from the first transport line to the second transport line; and moving the first trolley from the transport area to the storage area for transporting the second loading elements from the transport area to the storage area. 3. Werkwijze volgens conclusie 1 of 2, waarbij de eerste transportlijn en de tweede transportlijn voertuigen omvatten, waarbij: Leveren van een tweede ladingselement aan het transportgebied via de tweede transportlijn omvat het leveren, via de tweede transportlijn, van een tweede voertuig welke het tweede ladingselement draagt; en Afzetten van het eerste ladingselement op de eerste transportlijn omvat het afzetten van het eerste ladingselement op een eerste voertuig voorzien op de eerste transportlijn.Method according to claim 1 or 2, wherein the first transport line and the second transport line comprise vehicles, wherein: Delivering a second loading element to the transport area via the second transport line comprises supplying, via the second transport line, a second vehicle which has the second carrying element; and Depositing the first loading element on the first transport line comprises depositing the first loading element on a first vehicle provided on the first transport line. 4. Werkwijze volgens conclusie 3, verder omvattende: Bewegen van het eerste voertuig met het eerste ladingselement weg van het transportgebied; en Bewegen van het tweede voertuig van de tweede transportlaan naar de eerste transportlaan.The method of claim 3, further comprising: Moving the first vehicle with the first loading element away from the transport area; and Moving the second vehicle from the second transport lane to the first transport lane. 5. Werkwijze volgens conclusie 4, waarbij het tweede voertuig vier wielen omvat welke scharnierbaar verbonden zijn aan een basis van het voertuig over een in hoofdzaak verticale as, de werkwijze verder omvattende: Bewegen van het tweede voertuig in de tweede transportlaan verder dan het traject van de trolley; Scharnieren van de vier wielen over in hoofdzaak dezelfde hoek; Aandrijven van ten minste enige van de vier wielen om het tweede voertuig van de tweede transportlaan te bewegen naar de eerste transportlaan.The method of claim 4, wherein the second vehicle comprises four wheels hingedly connected to a base of the vehicle along a substantially vertical axis, the method further comprising: Moving the second vehicle in the second transport lane further than the trajectory of the trolley; Hinges of the four wheels through substantially the same angle; Driving at least some of the four wheels to move the second vehicle from the second transport lane to the first transport lane. 6. Werkwijze volgens conclusie 4 of 5, waarbij een eerste transportrichting van de eerste transportlijn tegengesteld is aan een tweede transportrichting van de tweede transportlijn.Method according to claim 4 or 5, wherein a first conveying direction of the first conveying line is opposite to a second conveying direction of the second conveying line. 7. Werkwijze volgens conclusie 6, waarbij: Een tweede portaalkraan is voorzien voor transporteren van modulaire ladingselementen tussen het opslaggebied en het transportgebied, de tweede portaalkraan omvattende een tweede trolley omvattende een tweede grijper voor grijpen van ladingselementen, de tweede trolley zijnde ingericht om te bewegen tussen het opslaggebied en het transportgebied over een in hoofdzaak lineair tweede trolleytraject; en Het transportgebied onder het tweede trolleytraject een derde transportlijn en een vierde transportlijn omvat voor transporteren van ladingselementen, de derde transportlijn zijn in hoofdzaak in het verlengde van een eerste van de eerste of tweede transportlijn en de vierde transportlijn zijn in hoofdzaak in het verlengde van een tweede van de eerste of de tweede transportlijn; De werkwijze verder omvattende: Transporteren, door middel van de tweede portaalkraan, een derde ladingselement van de opslagruimte naar het transportgebied; Leveren van een vierde ladingselement aan het transportgebied via de vierde transportlijn; Afzetten, door middel van de tweede portaalkraan, van het derde ladingselement op de derde transportlijn; Oppakken, door middel van de tweede portaalkraan, van het vierde ladingselement van de vierde transportlijn; en Transporteren, door middel van de tweede portaalkraan, van het vierde ladingselementen van het transportgebied naar het opslaggebied.7. Method as claimed in claim 6, wherein: A second gantry crane is provided for transporting modular loading elements between the storage area and the transport area, the second gantry crane comprising a second trolley comprising a second gripper for gripping loading elements, the second trolley being arranged to move between the storage area and the transport area over a substantially linear second trolley route; and The conveying area below the second trolley section comprises a third conveying line and a fourth conveying line for conveying loading elements, the third conveying line is substantially in line with a first of the first or second conveying line and the fourth conveying line is substantially in the extension of a second of the first or the second transport line; The method further comprising: Transporting, by means of the second gantry crane, a third loading element from the storage space to the transport area; Delivering a fourth loading element to the transport area via the fourth transport line; Depositing, by means of the second gantry crane, the third loading element on the third transport line; Picking up, by means of the second gantry crane, the fourth loading element of the fourth transport line; and Transporting, by means of the second gantry crane, the fourth loading elements from the transport area to the storage area. 8. Werkwijze volgens een van de conclusies 3 tot en met 7, waarbij de eerste transportlijn op afstand is van de tweede transportlijn met een eerste afstand welke een laanafstandslengte heeft, de werkwijze verder omvattende: Nadat het eerste ladingselement is afgezet op het eerste voertuig, bewegen van het eerste voertuig weg van het eerste trolley traject over de eerste transportlijn; Bewegen van het eerste voertuig van de eerste transportlijn naar een tussenliggende transportlijn welke op een halve laanafstandslengte weg van de eerste transportlijn ligt; en Het voertuig een bocht laten maken.A method according to any of claims 3 to 7, wherein the first transport line is remote from the second transport line with a first distance having an avenue distance length, the method further comprising: After the first loading element has been deposited on the first vehicle, moving the first vehicle away from the first trolley path across the first transport line; Moving the first vehicle from the first transport line to an intermediate transport line which is half a lane distance away from the first transport line; and Have the vehicle make a turn. 9. Werkwijze volgens conclusie 8, waarbij de tussenliggende transportlijn op afstand van de tweede transportlijn ligt met anderhalf maal de laanafstandslengte.The method of claim 8, wherein the intermediate transport line is spaced apart from the second transport line by one and a half times the lane spacing length. 10. werkwijze volgens een van de voorgaande conclusies, verder omvattende: Transporteren van het eerste ladingselement weg van het transportgebied over de eerste transprotlijn; Transporteren van een vijfde ladingselementen van het opslaggebied naar het transportgebied; Leveren van een zesde ladingselement naar het transportgebied via de eerste transportlijn; Afzetten van het vijfde ladingselement op de tweede transportlijn; Oppakken van het zesde ladingselement van de eerste transportlijn; en Transporteren van het zesde ladingselement van het transportgebied naar het opslaggebied.The method of any one of the preceding claims, further comprising: Transporting the first charge element away from the transport area over the first transprot line; Transporting a fifth loading elements from the storage area to the transport area; Delivering a sixth charge element to the transport area via the first transport line; Depositing the fifth loading element on the second transport line; Picking up the sixth loading element from the first transport line; and transporting the sixth charge element from the transport area to the storage area. 11. Werkwijze volgens een van de voorgaande conclusies, waarbij het opslaggebied is omvat door een vrachtschip;The method of any one of the preceding claims, wherein the storage area is comprised of a cargo ship; 12. Werkwijze volgens een van de voorgaande conclusies, waarbij het de modulaire ladingselementen containers zijn volgens de ISO 6346 standaard.A method according to any one of the preceding claims, wherein the modular loading elements are containers according to the ISO 6346 standard. 13. Computerprogrammaproduct leesbaar door een elektronisch rekenapparaat, omvattende instructies ingericht om het elektronisch rekenapparaat een set instructie te leveren voor beheren van transport van modulaire ladingselementen tussen een opslaggebied en een transportgebied door middel van een eerste portaalkraan omvattende een eerste trolley omvattende een eerste grijper voor grijpen van de ladingselementen, de eerste trolley zijnde ingericht om te bewegen tussen het opslaggebied en het transportgebied over een in hoofdzaak lineair trolley traject, het transportgebied omvattende onder het eerste trolley traject een eerste transportlijn en een tweede transportlijn voor transporteren van ladingselementen van en naar het transportgebied, de eerste transportlijn zijnde in hoofdzaak parallel aan de tweede transportlijn en in hoofdzaak loodrecht op het trolley traject, de set van instructies omvattende instructie om: door middel van de eerste portaalkraan, een eerste ladingselement van het opslaggebied naar het transportgebied te transporteren; een tweede ladingselement naar het transportgebied te leveren via de tweede transportlijn; door middel van de eerste portaalkraan, het eerste ladingselement leveren op de eerste transportlijn; door middel van de eerste portaalkraan, het tweede ladingselement op te pakken van de tweede transportlijn; en door middel van de eerste portaalkraan, het tweede ladingselement van het transportgebied naar het opslaggebied te transporteren.A computer program product readable by an electronic computing device, comprising instructions arranged to provide the electronic computing device with a set of instructions for managing transport of modular charge elements between a storage area and a transport area by means of a first gantry crane comprising a first trolley comprising a first gripper for gripping of the loading elements, the first trolley being arranged to move between the storage area and the transport area over a substantially linear trolley trajectory, the transport area comprising under the first trolley trajectory a first transport line and a second transport line for transporting loading elements from and to the transport area , the first transport line being substantially parallel to the second transport line and substantially perpendicular to the trolley path, the set of instructions comprising: by means of the first gantry crane, a first loading element of the t transport the storage area to the transport area; supplying a second loading element to the transport area via the second transport line; by means of the first gantry crane, supplying the first loading element on the first conveyor line; picking up the second loading element from the second transport line by means of the first gantry crane; and by transporting the second loading element from the transport area to the storage area by means of the first gantry crane. 14. Elektronisch rekenapparaat geprogrammeerd door middel van het computerprogrammaproduct volgens conclusie 13.An electronic computing device programmed by means of the computer program product of claim 13.
NL2017496A 2016-09-19 2016-09-19 Method of handling transportation of modular cargo elements NL2017496B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
NL2017496A NL2017496B1 (en) 2016-09-19 2016-09-19 Method of handling transportation of modular cargo elements
PCT/NL2017/050615 WO2018052301A2 (en) 2016-09-19 2017-09-19 Method of handling transportation of modular cargo elements

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
NL2017496A NL2017496B1 (en) 2016-09-19 2016-09-19 Method of handling transportation of modular cargo elements

Publications (1)

Publication Number Publication Date
NL2017496B1 true NL2017496B1 (en) 2018-03-27

Family

ID=57394643

Family Applications (1)

Application Number Title Priority Date Filing Date
NL2017496A NL2017496B1 (en) 2016-09-19 2016-09-19 Method of handling transportation of modular cargo elements

Country Status (2)

Country Link
NL (1) NL2017496B1 (en)
WO (1) WO2018052301A2 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040125985A1 (en) * 2001-10-26 2004-07-01 Claes Heidenback Chassis alignment system
US20070071580A1 (en) * 2003-02-28 2007-03-29 Hoogland Hendricus A System and method for the storage and transport of sea containers

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040125985A1 (en) * 2001-10-26 2004-07-01 Claes Heidenback Chassis alignment system
US20070071580A1 (en) * 2003-02-28 2007-03-29 Hoogland Hendricus A System and method for the storage and transport of sea containers

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
ANONYMOUS: "Ports could hasten freight traffic by doubling up on crane trips | UW Today", 5 June 2007 (2007-06-05), XP055375449, Retrieved from the Internet <URL:http://www.washington.edu/news/2007/06/05/ports-could-hasten-freight-traffic-by-doubling-up-on-crane-trips/> [retrieved on 20170523] *
C. F DAGANZO ET AL: "Reducing Ship Turn-Around Time Using Double-Cycling", 1 May 2004 (2004-05-01), XP055375362, Retrieved from the Internet <URL:http://its.berkeley.edu/sites/default/files/publications/UCB/2004/RR/UCB-ITS-RR-2004-4.pdf> [retrieved on 20170523] *
LONGSHOREFREDDY: "Double cycle", 4 February 2012 (2012-02-04), pages 1 - 3, XP054977381, Retrieved from the Internet <URL:https://www.youtube.com/watch?v=T2CtBRKMNrc> [retrieved on 20170523] *

Also Published As

Publication number Publication date
WO2018052301A2 (en) 2018-03-22
WO2018052301A3 (en) 2018-04-26

Similar Documents

Publication Publication Date Title
JP6615315B2 (en) Method and container transshipment facility for container unloading in container yard
US7731041B2 (en) Gantry stacker with two side-by-side spreaders
JP3910509B2 (en) ISO container handling equipment
US9090436B2 (en) Handling system for ISO containers having a gantry crane
KR20170137711A (en) Robot container handling device and method
WO2006002499A3 (en) A method and system for transferring cargo
WO2012105842A3 (en) Unloading and loading crane arrangement, container terminal and method for unloading and loading a ship
EP2346772A1 (en) A container handling system comprising a crane and a plurality of base elements which can be mounted on top of containers for supporting the crane and transporting the containers
JP5194037B2 (en) Cargo handling system and cargo handling method
KR101429092B1 (en) Container Transportation System and Method for Transporting Containers Using the Same
CN109789906A (en) Cargo handler, cargo transfer system and its method of unloading
US5570986A (en) Cargo container transfer system for cranes
US6530492B2 (en) Transporter container-loading bridge
CN110023214A (en) A kind of cargo handler and cargo transfer system
NL2017496B1 (en) Method of handling transportation of modular cargo elements
EP0471411A1 (en) Method and apparatus for loading and/or unloading goods, in particular goods stacked on pallets, generally for use with ships
CN114084701A (en) Ship loading and unloading integrated machine and ship loading and unloading method
EP2743217B1 (en) Loading and unloading system for containers at quayside
CA2184558C (en) Guide chute for cargo container handling cranes
AU2013100395B4 (en) Structure for use with container-handling apparatus
JP2023506266A (en) Storage equipment for standardized storage cargo in high-bay warehouses
US6976599B1 (en) Multi-rail dual hoisting crane
JP2010260718A (en) Container terminal
EP0827934A1 (en) A guide chute for cargo container handling cranes
US9216865B2 (en) Equipment for unloading bulk freighter and bulk carrier

Legal Events

Date Code Title Description
MM Lapsed because of non-payment of the annual fee

Effective date: 20191001