US6612382B2
(en)
*
|
1996-03-25 |
2003-09-02 |
Halliburton Energy Services, Inc. |
Iterative drilling simulation process for enhanced economic decision making
|
US7032689B2
(en)
*
|
1996-03-25 |
2006-04-25 |
Halliburton Energy Services, Inc. |
Method and system for predicting performance of a drilling system of a given formation
|
US5794720A
(en)
*
|
1996-03-25 |
1998-08-18 |
Dresser Industries, Inc. |
Method of assaying downhole occurrences and conditions
|
US9482055B2
(en)
*
|
2000-10-11 |
2016-11-01 |
Smith International, Inc. |
Methods for modeling, designing, and optimizing the performance of drilling tool assemblies
|
US20050273304A1
(en)
*
|
2000-03-13 |
2005-12-08 |
Smith International, Inc. |
Methods for evaluating and improving drilling operations
|
US6785641B1
(en)
*
|
2000-10-11 |
2004-08-31 |
Smith International, Inc. |
Simulating the dynamic response of a drilling tool assembly and its application to drilling tool assembly design optimization and drilling performance optimization
|
US9765571B2
(en)
*
|
2000-10-11 |
2017-09-19 |
Smith International, Inc. |
Methods for selecting bits and drilling tool assemblies
|
US20030110183A1
(en)
*
|
2001-12-10 |
2003-06-12 |
Gleitman Daniel D. |
Methods and systems for managing and updating a database of geophysical data
|
US6968909B2
(en)
|
2002-03-06 |
2005-11-29 |
Schlumberger Technology Corporation |
Realtime control of a drilling system using the output from combination of an earth model and a drilling process model
|
US7162695B2
(en)
*
|
2002-06-17 |
2007-01-09 |
The United States Of America As Represented By The Secretary Of The Navy |
Safety analysis training device
|
US6741951B2
(en)
*
|
2002-08-02 |
2004-05-25 |
General Electric Company |
Method for performing a hazard review and safety analysis of a product or system
|
US6807486B2
(en)
*
|
2002-09-27 |
2004-10-19 |
Weatherford/Lamb |
Method of using underbalanced well data for seismic attribute analysis
|
US6868920B2
(en)
*
|
2002-12-31 |
2005-03-22 |
Schlumberger Technology Corporation |
Methods and systems for averting or mitigating undesirable drilling events
|
US20050063251A1
(en)
*
|
2003-09-04 |
2005-03-24 |
Schlumberger Technology Corporation |
Dynamic generation of vector graphics and animation of bottom hole assembly
|
US7698148B2
(en)
*
|
2003-09-12 |
2010-04-13 |
Raytheon Company |
Web-based risk management tool and method
|
US7422076B2
(en)
*
|
2003-12-23 |
2008-09-09 |
Varco I/P, Inc. |
Autoreaming systems and methods
|
US7653563B2
(en)
*
|
2004-03-17 |
2010-01-26 |
Schlumberger Technology Corporation |
Method and apparatus and program storage device adapted for automatic qualitative and quantitative risk assessment based on technical wellbore design and earth properties
|
US7630914B2
(en)
*
|
2004-03-17 |
2009-12-08 |
Schlumberger Technology Corporation |
Method and apparatus and program storage device adapted for visualization of qualitative and quantitative risk assessment based on technical wellbore design and earth properties
|
GB2413403B
(en)
*
|
2004-04-19 |
2008-01-09 |
Halliburton Energy Serv Inc |
Field synthesis system and method for optimizing drilling operations
|
US7337660B2
(en)
*
|
2004-05-12 |
2008-03-04 |
Halliburton Energy Services, Inc. |
Method and system for reservoir characterization in connection with drilling operations
|
RU2321064C2
(ru)
*
|
2004-06-03 |
2008-03-27 |
Мурманский государственный технический университет |
Способ построения обратимой трехмерной гидродинамической модели земли, калибруемой в реальном времени в процессе бурения
|
MX2007000363A
(es)
*
|
2004-07-07 |
2008-03-05 |
Exxonmobil Upstream Res Co |
Prediccion de la composicion de arena-grano y textura de la arena.
|
MX2007000170A
(es)
*
|
2004-07-07 |
2007-03-30 |
Exxonmobil Upstream Res Co |
Aplicaciones de red bayesiana para geologia y geografia.
|
US7451213B2
(en)
*
|
2005-09-30 |
2008-11-11 |
Iq Company |
Online forecasting system and method
|
US8812334B2
(en)
*
|
2006-02-27 |
2014-08-19 |
Schlumberger Technology Corporation |
Well planning system and method
|
US20070227774A1
(en)
*
|
2006-03-28 |
2007-10-04 |
Reitsma Donald G |
Method for Controlling Fluid Pressure in a Borehole Using a Dynamic Annular Pressure Control System
|
US7480536B2
(en)
*
|
2006-09-21 |
2009-01-20 |
General Electric Company |
Method for assessing reliability requirements of a safety instrumented control function
|
US7860593B2
(en)
*
|
2007-05-10 |
2010-12-28 |
Canrig Drilling Technology Ltd. |
Well prog execution facilitation system and method
|
US7606666B2
(en)
*
|
2007-01-29 |
2009-10-20 |
Schlumberger Technology Corporation |
System and method for performing oilfield drilling operations using visualization techniques
|
WO2008112929A1
(en)
*
|
2007-03-13 |
2008-09-18 |
Schlumberger Canada Limited |
Method and system for managing information
|
US8014987B2
(en)
*
|
2007-04-13 |
2011-09-06 |
Schlumberger Technology Corp. |
Modeling the transient behavior of BHA/drill string while drilling
|
US8688487B2
(en)
*
|
2007-04-18 |
2014-04-01 |
Schlumberger Technology Corporation |
Method and system for measuring technology maturity
|
US7814989B2
(en)
*
|
2007-05-21 |
2010-10-19 |
Schlumberger Technology Corporation |
System and method for performing a drilling operation in an oilfield
|
US8332194B2
(en)
*
|
2007-07-30 |
2012-12-11 |
Schlumberger Technology Corporation |
Method and system to obtain a compositional model of produced fluids using separator discharge data analysis
|
US8073800B2
(en)
*
|
2007-07-31 |
2011-12-06 |
Schlumberger Technology Corporation |
Valuing future information under uncertainty
|
US20090045973A1
(en)
*
|
2007-08-16 |
2009-02-19 |
Rodney Paul F |
Communications of downhole tools from different service providers
|
US20100191516A1
(en)
*
|
2007-09-07 |
2010-07-29 |
Benish Timothy G |
Well Performance Modeling In A Collaborative Well Planning Environment
|
US20110161133A1
(en)
*
|
2007-09-29 |
2011-06-30 |
Schlumberger Technology Corporation |
Planning and Performing Drilling Operations
|
US7660673B2
(en)
*
|
2007-10-12 |
2010-02-09 |
Schlumberger Technology Corporation |
Coarse wellsite analysis for field development planning
|
DE602007011467D1
(de)
*
|
2007-11-22 |
2011-02-03 |
Prad Res & Dev Nv |
Autonome Bohrlochnavigationsvorrichtung
|
GB2468251B
(en)
*
|
2007-11-30 |
2012-08-15 |
Halliburton Energy Serv Inc |
Method and system for predicting performance of a drilling system having multiple cutting structures
|
DE112008003302B4
(de)
|
2007-12-07 |
2023-05-25 |
ExxonMobil Technology and Engineering Company |
Verfahren und Systeme zur Abschätzung von Bohrlochereignissen
|
WO2009075946A1
(en)
|
2007-12-13 |
2009-06-18 |
Exxonmobil Upstream Research Company |
Iterative reservior surveillance
|
US9638830B2
(en)
*
|
2007-12-14 |
2017-05-02 |
Westerngeco L.L.C. |
Optimizing drilling operations using petrotechnical data
|
US7878268B2
(en)
*
|
2007-12-17 |
2011-02-01 |
Schlumberger Technology Corporation |
Oilfield well planning and operation
|
US8135862B2
(en)
*
|
2008-01-14 |
2012-03-13 |
Schlumberger Technology Corporation |
Real-time, bi-directional data management
|
US9223041B2
(en)
|
2008-01-23 |
2015-12-29 |
Schlubmerger Technology Corporation |
Three-dimensional mechanical earth modeling
|
US8577660B2
(en)
*
|
2008-01-23 |
2013-11-05 |
Schlumberger Technology Corporation |
Three-dimensional mechanical earth modeling
|
US8285532B2
(en)
*
|
2008-03-14 |
2012-10-09 |
Schlumberger Technology Corporation |
Providing a simplified subterranean model
|
CA2717353C
(en)
*
|
2008-04-22 |
2016-06-21 |
Exxonmobil Upstream Research Company |
Functional-based knowledge analysis in a 2d and 3d visual environment
|
US20090287525A1
(en)
*
|
2008-05-15 |
2009-11-19 |
Rpt Safety & Health Services, Inc. |
System and Method For Safety Management
|
US9488044B2
(en)
|
2008-06-23 |
2016-11-08 |
Schlumberger Technology Corporation |
Valuing future well test under uncertainty
|
US7967069B2
(en)
*
|
2008-10-22 |
2011-06-28 |
Westerngeco L.L.C. |
Active seismic monitoring of fracturing operations
|
US8938363B2
(en)
|
2008-08-18 |
2015-01-20 |
Westerngeco L.L.C. |
Active seismic monitoring of fracturing operations and determining characteristics of a subterranean body using pressure data and seismic data
|
US9086507B2
(en)
*
|
2008-08-18 |
2015-07-21 |
Westerngeco L.L.C. |
Determining characteristics of a subterranean body using pressure data and seismic data
|
WO2010039317A1
(en)
*
|
2008-10-01 |
2010-04-08 |
Exxonmobil Upstream Research Company |
Robust well trajectory planning
|
EP2331904B1
(en)
*
|
2008-10-03 |
2018-04-18 |
Halliburton Energy Services, Inc. |
Method and system for predicting performance of a drilling system
|
BRPI0914510B1
(pt)
|
2008-10-14 |
2019-07-16 |
Prad Research And Development Limited |
Métodos para automatizar ou parcialmente automatizar a otimização de uma operação de perfuração automatizada ou parcialmente automatizada, sistema para automatizar ouparcialmente automatizar um processo, método para operar um equipamento de perfuração automatizado, método para controlar um processo automatizado para perfurar um furo de poço, e sistema de controle de perfuração
|
US9127543B2
(en)
|
2008-10-22 |
2015-09-08 |
Westerngeco L.L.C. |
Active seismic monitoring of fracturing operations
|
US8849640B2
(en)
*
|
2008-11-06 |
2014-09-30 |
Exxonmobil Upstream Research Company |
System and method for planning a drilling operation
|
US20100185395A1
(en)
*
|
2009-01-22 |
2010-07-22 |
Pirovolou Dimitiros K |
Selecting optimal wellbore trajectory while drilling
|
NO338750B1
(no)
|
2009-03-02 |
2016-10-17 |
Drilltronics Rig Systems As |
Fremgangsmåte og system for automatisert styring av boreprosess
|
US8170800B2
(en)
|
2009-03-16 |
2012-05-01 |
Verdande Technology As |
Method and system for monitoring a drilling operation
|
US9127530B2
(en)
*
|
2009-08-07 |
2015-09-08 |
Schlumberger Technology Corporation |
Collision avoidance system with offset wellbore vibration analysis
|
GB2482800B
(en)
*
|
2009-12-07 |
2015-07-22 |
Halliburton Energy Services Inc |
System and method for remote well monitoring
|
US8386221B2
(en)
*
|
2009-12-07 |
2013-02-26 |
Nuovo Pignone S.P.A. |
Method for subsea equipment subject to hydrogen induced stress cracking
|
GB2476053B
(en)
*
|
2009-12-08 |
2011-11-02 |
Schlumberger Holdings |
Processing of geological data
|
US9607007B2
(en)
|
2009-12-23 |
2017-03-28 |
Schlumberger Technology Corporation |
Processing of geological data
|
US8453764B2
(en)
|
2010-02-01 |
2013-06-04 |
Aps Technology, Inc. |
System and method for monitoring and controlling underground drilling
|
US8731872B2
(en)
|
2010-03-08 |
2014-05-20 |
Exxonmobil Upstream Research Company |
System and method for providing data corresponding to physical objects
|
US8731887B2
(en)
|
2010-04-12 |
2014-05-20 |
Exxonmobile Upstream Research Company |
System and method for obtaining a model of data describing a physical structure
|
US8727017B2
(en)
|
2010-04-22 |
2014-05-20 |
Exxonmobil Upstream Research Company |
System and method for obtaining data on an unstructured grid
|
US8731873B2
(en)
|
2010-04-26 |
2014-05-20 |
Exxonmobil Upstream Research Company |
System and method for providing data corresponding to physical objects
|
US8731875B2
(en)
|
2010-08-13 |
2014-05-20 |
Exxonmobil Upstream Research Company |
System and method for providing data corresponding to physical objects
|
CA2808078C
(en)
|
2010-08-24 |
2018-10-23 |
Exxonmobil Upstream Research Company |
System and method for planning a well path
|
GB2486877B
(en)
*
|
2010-12-21 |
2018-02-07 |
Statoil Petroleum As |
Quality control of sub-surface and wellbore position data
|
US9103936B2
(en)
*
|
2011-01-20 |
2015-08-11 |
Halliburton Energy Services, Inc. |
Method and apparatus for determining and displaying geosteering information
|
WO2012102784A1
(en)
|
2011-01-26 |
2012-08-02 |
Exxonmobil Upstream Research Company |
Method of reservoir compartment analysis using topological structure in 3d earth model
|
US9719332B2
(en)
|
2011-01-31 |
2017-08-01 |
M-I L.L.C. |
Method of minimizing wellbore instability
|
US9874648B2
(en)
|
2011-02-21 |
2018-01-23 |
Exxonmobil Upstream Research Company |
Reservoir connectivity analysis in a 3D earth model
|
BR112013023134A2
(pt)
|
2011-03-10 |
2017-04-25 |
Landmark Graphics Corp |
método para monitorar dados de operações para múltiplos poços em tempo real, dispositivo não transitório portador de programa carregando tangivelmente instruções executáveis por computador e dispositivo não transitório portador de programa carregando uma estrutura de dados
|
US9223594B2
(en)
|
2011-07-01 |
2015-12-29 |
Exxonmobil Upstream Research Company |
Plug-in installer framework
|
US20130191081A1
(en)
*
|
2011-07-14 |
2013-07-25 |
Vivek Jain |
Creating a well path
|
US9045967B2
(en)
*
|
2011-07-26 |
2015-06-02 |
Schlumberger Technology Corporation |
System and method for controlling and monitoring a drilling operation using refined solutions from a panistic inversion
|
US9394783B2
(en)
|
2011-08-26 |
2016-07-19 |
Schlumberger Technology Corporation |
Methods for evaluating inflow and outflow in a subterranean wellbore
|
US9404327B2
(en)
|
2011-08-26 |
2016-08-02 |
Schlumberger Technology Corporation |
Methods for evaluating borehole volume changes while drilling
|
US9228430B2
(en)
*
|
2011-08-26 |
2016-01-05 |
Schlumberger Technology Corporation |
Methods for evaluating cuttings density while drilling
|
US10030499B2
(en)
*
|
2011-12-06 |
2018-07-24 |
Bp Corporation North America Inc. |
Geological monitoring console
|
US9291018B2
(en)
|
2011-12-20 |
2016-03-22 |
Exxonmobil Upstream Research Company |
Systems and methods to inhibit packoff events during downhole assembly motion within a wellbore
|
US9297205B2
(en)
|
2011-12-22 |
2016-03-29 |
Hunt Advanced Drilling Technologies, LLC |
System and method for controlling a drilling path based on drift estimates
|
US11085283B2
(en)
*
|
2011-12-22 |
2021-08-10 |
Motive Drilling Technologies, Inc. |
System and method for surface steerable drilling using tactical tracking
|
US8596385B2
(en)
|
2011-12-22 |
2013-12-03 |
Hunt Advanced Drilling Technologies, L.L.C. |
System and method for determining incremental progression between survey points while drilling
|
US9404356B2
(en)
|
2011-12-22 |
2016-08-02 |
Motive Drilling Technologies, Inc. |
System and method for remotely controlled surface steerable drilling
|
US8210283B1
(en)
|
2011-12-22 |
2012-07-03 |
Hunt Energy Enterprises, L.L.C. |
System and method for surface steerable drilling
|
US9157309B1
(en)
|
2011-12-22 |
2015-10-13 |
Hunt Advanced Drilling Technologies, LLC |
System and method for remotely controlled surface steerable drilling
|
GB201204815D0
(en)
*
|
2012-03-19 |
2012-05-02 |
Halliburton Energy Serv Inc |
Drilling system failure risk analysis method
|
WO2013169429A1
(en)
|
2012-05-08 |
2013-11-14 |
Exxonmobile Upstream Research Company |
Canvas control for 3d data volume processing
|
US9057258B2
(en)
|
2012-05-09 |
2015-06-16 |
Hunt Advanced Drilling Technologies, LLC |
System and method for using controlled vibrations for borehole communications
|
US9982532B2
(en)
|
2012-05-09 |
2018-05-29 |
Hunt Energy Enterprises, L.L.C. |
System and method for controlling linear movement using a tapered MR valve
|
US8517093B1
(en)
|
2012-05-09 |
2013-08-27 |
Hunt Advanced Drilling Technologies, L.L.C. |
System and method for drilling hammer communication, formation evaluation and drilling optimization
|
WO2013184280A1
(en)
*
|
2012-06-08 |
2013-12-12 |
Exxonmobil Upstream Research Company |
Systems and methods for vertical depth control during extended-reach drilling operations
|
US20130341093A1
(en)
*
|
2012-06-21 |
2013-12-26 |
Stuart Inglis Jardine |
Drilling risk avoidance
|
US20140005996A1
(en)
*
|
2012-06-28 |
2014-01-02 |
Schlumberger Technology Corporation |
Interactive and three-dimensional well path design
|
US9309747B2
(en)
*
|
2012-09-14 |
2016-04-12 |
Baker Hughes Incorporated |
System and method for generating profile-based alerts/alarms
|
SA113340567B1
(ar)
|
2012-10-26 |
2015-07-07 |
بيكر هوغيس انكوربوريتد |
نظام وطريقة لمعالجة بيانات بئر باستخدام تحليل بيانات توبولوجية.
|
EP2932474A4
(en)
*
|
2012-12-14 |
2016-10-05 |
Services Petroliers Schlumberger |
METHOD FOR VISUALIZING DRILLING DATA
|
AU2014278645B2
(en)
|
2013-06-10 |
2016-07-28 |
Exxonmobil Upstream Research Company |
Interactively planning a well site
|
WO2014201237A1
(en)
|
2013-06-12 |
2014-12-18 |
Schlumberger Canada Limited |
Well trajectory planning using bounding box scan for anti-collision analysis
|
US10871584B2
(en)
*
|
2013-06-17 |
2020-12-22 |
Westerngeco L.L.C. |
Seismic data processing
|
US8818729B1
(en)
|
2013-06-24 |
2014-08-26 |
Hunt Advanced Drilling Technologies, LLC |
System and method for formation detection and evaluation
|
US10920576B2
(en)
|
2013-06-24 |
2021-02-16 |
Motive Drilling Technologies, Inc. |
System and method for determining BHA position during lateral drilling
|
US8996396B2
(en)
*
|
2013-06-26 |
2015-03-31 |
Hunt Advanced Drilling Technologies, LLC |
System and method for defining a drilling path based on cost
|
USD843381S1
(en)
|
2013-07-15 |
2019-03-19 |
Aps Technology, Inc. |
Display screen or portion thereof with a graphical user interface for analyzing and presenting drilling data
|
US10378329B2
(en)
|
2013-08-20 |
2019-08-13 |
Nabors Drilling Technologies Usa, Inc. |
Rig control system and methods
|
CN105474049A
(zh)
*
|
2013-09-03 |
2016-04-06 |
兰德马克绘图国际公司 |
井作业条形图
|
US10472944B2
(en)
|
2013-09-25 |
2019-11-12 |
Aps Technology, Inc. |
Drilling system and associated system and method for monitoring, controlling, and predicting vibration in an underground drilling operation
|
US9864098B2
(en)
|
2013-09-30 |
2018-01-09 |
Exxonmobil Upstream Research Company |
Method and system of interactive drill center and well planning evaluation and optimization
|
MX2016003675A
(es)
*
|
2013-10-25 |
2016-09-16 |
Landmark Graphics Corp |
Prediccion de riesgo en tiempo real durante las operaciones de perforacion.
|
MX2016003840A
(es)
*
|
2013-10-25 |
2017-03-01 |
Landmark Graphics Corp |
Prediccion de riesgo en tiempo real durante las operaciones de perforacion.
|
US9957790B2
(en)
*
|
2013-11-13 |
2018-05-01 |
Schlumberger Technology Corporation |
Wellbore pipe trip guidance and statistical information processing method
|
US10400570B2
(en)
*
|
2013-11-13 |
2019-09-03 |
Schlumberger Technology Corporation |
Automatic wellbore condition indicator and manager
|
US10794168B2
(en)
*
|
2013-12-06 |
2020-10-06 |
Halliburton Energy Services, Inc. |
Controlling wellbore operations
|
MX367540B
(es)
*
|
2013-12-06 |
2019-08-26 |
Halliburton Energy Services Inc |
Gestión de operaciones de agujero de pozo con cálculos de incertidumbre..
|
US9739906B2
(en)
*
|
2013-12-12 |
2017-08-22 |
Baker Hughes Incorporated |
System and method for defining permissible borehole curvature
|
US10062044B2
(en)
*
|
2014-04-12 |
2018-08-28 |
Schlumberger Technology Corporation |
Method and system for prioritizing and allocating well operating tasks
|
US10301923B2
(en)
*
|
2014-05-02 |
2019-05-28 |
Kongsberg Oil And Gas Technologies As |
System and console for monitoring and managing well site drilling operations
|
US10323502B2
(en)
*
|
2014-05-02 |
2019-06-18 |
Kongsberg Oil And Gas Technologies As |
System and console for monitoring and managing tripping operations at a well site
|
US10260332B2
(en)
*
|
2014-05-02 |
2019-04-16 |
Kongsberg Oil And Gas Technologies As |
System and console for monitoring and managing well site operations
|
US10267136B2
(en)
*
|
2014-05-21 |
2019-04-23 |
Schlumberger Technology Corporation |
Methods for analyzing and optimizing casing while drilling assemblies
|
CA2948321C
(en)
*
|
2014-06-09 |
2020-08-25 |
Landmark Graphics Corporation |
Employing a target risk attribute predictor while drilling
|
WO2015200259A1
(en)
*
|
2014-06-23 |
2015-12-30 |
Smith International, Inc. |
Methods for analyzing and optimizing drilling tool assemblies
|
US9428961B2
(en)
*
|
2014-06-25 |
2016-08-30 |
Motive Drilling Technologies, Inc. |
Surface steerable drilling system for use with rotary steerable system
|
US11106185B2
(en)
|
2014-06-25 |
2021-08-31 |
Motive Drilling Technologies, Inc. |
System and method for surface steerable drilling to provide formation mechanical analysis
|
WO2015198137A2
(en)
*
|
2014-06-25 |
2015-12-30 |
Cgg Services Sa |
Improving drilling operations using disparate well data types
|
CN105484725A
(zh)
*
|
2014-09-18 |
2016-04-13 |
中国石油化工股份有限公司 |
一种钻井井下异常监测装置
|
CN105484724A
(zh)
*
|
2014-09-18 |
2016-04-13 |
中国石油化工股份有限公司 |
一种钻井井下异常监测方法
|
US9890633B2
(en)
|
2014-10-20 |
2018-02-13 |
Hunt Energy Enterprises, Llc |
System and method for dual telemetry acoustic noise reduction
|
US10443202B2
(en)
*
|
2014-10-21 |
2019-10-15 |
Terracon |
Pile design optimization
|
CN106156934B
(zh)
*
|
2015-04-17 |
2022-06-28 |
普拉德研究及开发股份有限公司 |
分布式井工程和规划
|
US10837244B2
(en)
*
|
2015-04-27 |
2020-11-17 |
Total Sa |
Method for determining a concentration of solid particles
|
BR112017021689A2
(pt)
*
|
2015-05-13 |
2018-07-10 |
Halliburton Energy Services Inc |
método implementado por computador para detecção e visualização de eventos para monitorar operações de perfuração de locais de poços, sistema e meio de armazenamento legível por computador
|
US10851636B1
(en)
|
2015-06-08 |
2020-12-01 |
DataInfoCom USA, Inc. |
Systems and methods for analyzing resource production
|
GB2554304B
(en)
*
|
2015-06-26 |
2021-05-26 |
Landmark Graphics Corp |
Visualization of quantitative drilling operations data related to a stuck pipe event
|
WO2017011510A1
(en)
*
|
2015-07-13 |
2017-01-19 |
Halliburton Energy Services, Inc. |
Mud sag monitoring and control
|
US11151762B2
(en)
*
|
2015-11-03 |
2021-10-19 |
Ubiterra Corporation |
Systems and methods for shared visualization and display of drilling information
|
US11933158B2
(en)
|
2016-09-02 |
2024-03-19 |
Motive Drilling Technologies, Inc. |
System and method for mag ranging drilling control
|
US10872183B2
(en)
*
|
2016-10-21 |
2020-12-22 |
Baker Hughes, A Ge Company, Llc |
Geomechanical risk and hazard assessment and mitigation
|
US20180171774A1
(en)
*
|
2016-12-21 |
2018-06-21 |
Schlumberger Technology Corporation |
Drillstring sticking management framework
|
WO2018183992A1
(en)
|
2017-03-31 |
2018-10-04 |
Schlumberger Technology Corporation |
Smooth surface wrapping of features in an imaged volume
|
US11421523B2
(en)
|
2017-06-27 |
2022-08-23 |
Schlumberger Technology Corporation |
Real-time well construction process inference through probabilistic data fusion
|
TWI626622B
(zh)
*
|
2017-07-04 |
2018-06-11 |
|
System and method for stereoscopic imaging of underground rock formation characteristics
|
US10830033B2
(en)
|
2017-08-10 |
2020-11-10 |
Motive Drilling Technologies, Inc. |
Apparatus and methods for uninterrupted drilling
|
AU2018313280B8
(en)
|
2017-08-10 |
2023-09-21 |
Motive Drilling Technologies, Inc. |
Apparatus and methods for automated slide drilling
|
EP3740643A4
(en)
|
2018-01-19 |
2021-10-20 |
Motive Drilling Technologies, Inc. |
SYSTEM AND METHOD FOR ANALYSIS AND CONTROL OF DRILLING SLUDGE AND ADDITIVES
|
US11346215B2
(en)
|
2018-01-23 |
2022-05-31 |
Baker Hughes Holdings Llc |
Methods of evaluating drilling performance, methods of improving drilling performance, and related systems for drilling using such methods
|
US20190277131A1
(en)
*
|
2018-03-07 |
2019-09-12 |
Baker Hughes, A Ge Company Llc |
Earth-boring tool monitoring system for showing reliability of an earth-boring tool and related methods
|
CN112105795A
(zh)
|
2018-03-09 |
2020-12-18 |
斯伦贝谢技术有限公司 |
集成井施工系统操作
|
US10808517B2
(en)
|
2018-12-17 |
2020-10-20 |
Baker Hughes Holdings Llc |
Earth-boring systems and methods for controlling earth-boring systems
|
US11162356B2
(en)
|
2019-02-05 |
2021-11-02 |
Motive Drilling Technologies, Inc. |
Downhole display
|
CA3133783A1
(en)
|
2019-03-18 |
2020-09-24 |
Magnetic Variation Services, Llc |
Steering a wellbore using stratigraphic misfit heat maps
|
US11946360B2
(en)
|
2019-05-07 |
2024-04-02 |
Magnetic Variation Services, Llc |
Determining the likelihood and uncertainty of the wellbore being at a particular stratigraphic vertical depth
|
US11466556B2
(en)
|
2019-05-17 |
2022-10-11 |
Helmerich & Payne, Inc. |
Stall detection and recovery for mud motors
|
US11514383B2
(en)
*
|
2019-09-13 |
2022-11-29 |
Schlumberger Technology Corporation |
Method and system for integrated well construction
|
US11989790B2
(en)
|
2019-10-28 |
2024-05-21 |
Schlumberger Technology Corporation |
Drilling activity recommendation system and method
|
US11131184B1
(en)
|
2020-04-29 |
2021-09-28 |
Saudi Arabian Oil Company |
Method and system for determining a drilling hazard condition using well logs
|
US11255189B2
(en)
|
2020-05-20 |
2022-02-22 |
Halliburton Energy Services, Inc. |
Methods to characterize subterranean fluid composition and adjust operating conditions using MEMS technology
|
US11255191B2
(en)
*
|
2020-05-20 |
2022-02-22 |
Halliburton Energy Services, Inc. |
Methods to characterize wellbore fluid composition and provide optimal additive dosing using MEMS technology
|
US20230195952A1
(en)
*
|
2020-05-20 |
2023-06-22 |
Schlumberger Technology Corporation |
Well planning based on hazard predictive models
|
US20210382198A1
(en)
*
|
2020-06-03 |
2021-12-09 |
Chevron U.S.A. Inc. |
Uncertainty-aware modeling and decision making for geomechanics workflow using machine learning approaches
|
EP4162301A1
(en)
*
|
2020-06-04 |
2023-04-12 |
Services Pétroliers Schlumberger |
Predicting formation-top depths and drilling performance or drilling events at a subject location
|
US11697989B2
(en)
|
2020-08-27 |
2023-07-11 |
Landmark Graphics Corporation |
Micro invisible lost time in drilling operations
|
US11885212B2
(en)
|
2021-07-16 |
2024-01-30 |
Helmerich & Payne Technologies, Llc |
Apparatus and methods for controlling drilling
|
US20230175393A1
(en)
*
|
2021-12-08 |
2023-06-08 |
Halliburton Energy Services, Inc. |
Estimating composition of drilling fluid in a wellbore using direct and indirect measurements
|
US11680477B1
(en)
*
|
2021-12-27 |
2023-06-20 |
Halliburton Energy Services, Inc. |
Methods and systems for determining caving volume estimation for use in drilling operations
|