US6247542B1
(en)
*
|
1998-03-06 |
2001-06-19 |
Baker Hughes Incorporated |
Non-rotating sensor assembly for measurement-while-drilling applications
|
FR2817623B1
(fr)
*
|
2000-12-04 |
2003-02-07 |
Innov Pro |
Dispositif permettant d'orienter des carottes de forage
|
GB0101919D0
(en)
*
|
2001-01-25 |
2001-03-07 |
Geolink Uk Ltd |
Induction logging antenna
|
FR2830272B1
(fr)
*
|
2001-10-01 |
2004-04-02 |
Schlumberger Services Petrol |
Dispositif de surveillance ou d'etude d'un reservoir traverse par un puits
|
GB2402148A
(en)
*
|
2002-01-18 |
2004-12-01 |
Schlumberger Holdings |
A sensor system in a wall of a drill collar
|
US6856255B2
(en)
|
2002-01-18 |
2005-02-15 |
Schlumberger Technology Corporation |
Electromagnetic power and communication link particularly adapted for drill collar mounted sensor systems
|
US7350590B2
(en)
|
2002-11-05 |
2008-04-01 |
Weatherford/Lamb, Inc. |
Instrumentation for a downhole deployment valve
|
US7451809B2
(en)
*
|
2002-10-11 |
2008-11-18 |
Weatherford/Lamb, Inc. |
Apparatus and methods for utilizing a downhole deployment valve
|
US7178600B2
(en)
|
2002-11-05 |
2007-02-20 |
Weatherford/Lamb, Inc. |
Apparatus and methods for utilizing a downhole deployment valve
|
US7219729B2
(en)
|
2002-11-05 |
2007-05-22 |
Weatherford/Lamb, Inc. |
Permanent downhole deployment of optical sensors
|
US7413018B2
(en)
|
2002-11-05 |
2008-08-19 |
Weatherford/Lamb, Inc. |
Apparatus for wellbore communication
|
CA2473511C
(en)
*
|
2003-07-09 |
2008-05-13 |
Weatherford/Lamb, Inc. |
Apparatus for wellbore communication
|
US7170423B2
(en)
*
|
2003-08-27 |
2007-01-30 |
Weatherford Canada Partnership |
Electromagnetic MWD telemetry system incorporating a current sensing transformer
|
US7063134B2
(en)
*
|
2004-06-24 |
2006-06-20 |
Tenneco Automotive Operating Company Inc. |
Combined muffler/heat exchanger
|
US7493962B2
(en)
*
|
2004-12-14 |
2009-02-24 |
Schlumberger Technology Corporation |
Control line telemetry
|
GB2424962B
(en)
*
|
2005-04-05 |
2007-10-17 |
Sensor Highway Ltd |
Aparatus and method for preventing unwanted exposure of a device to an undesirable substance
|
US7535377B2
(en)
*
|
2005-05-21 |
2009-05-19 |
Hall David R |
Wired tool string component
|
US7277026B2
(en)
*
|
2005-05-21 |
2007-10-02 |
Hall David R |
Downhole component with multiple transmission elements
|
US20080012569A1
(en)
*
|
2005-05-21 |
2008-01-17 |
Hall David R |
Downhole Coils
|
US7504963B2
(en)
*
|
2005-05-21 |
2009-03-17 |
Hall David R |
System and method for providing electrical power downhole
|
US20090151926A1
(en)
*
|
2005-05-21 |
2009-06-18 |
Hall David R |
Inductive Power Coupler
|
US8264369B2
(en)
*
|
2005-05-21 |
2012-09-11 |
Schlumberger Technology Corporation |
Intelligent electrical power distribution system
|
US7495446B2
(en)
*
|
2005-08-23 |
2009-02-24 |
Schlumberger Technology Corporation |
Formation evaluation system and method
|
US7477162B2
(en)
*
|
2005-10-11 |
2009-01-13 |
Schlumberger Technology Corporation |
Wireless electromagnetic telemetry system and method for bottomhole assembly
|
US8022838B2
(en)
*
|
2005-10-28 |
2011-09-20 |
Thrubit B.V. |
Logging system, method of logging an earth formation and method of producing a hydrocarbon fluid
|
US7793718B2
(en)
*
|
2006-03-30 |
2010-09-14 |
Schlumberger Technology Corporation |
Communicating electrical energy with an electrical device in a well
|
US7712524B2
(en)
|
2006-03-30 |
2010-05-11 |
Schlumberger Technology Corporation |
Measuring a characteristic of a well proximate a region to be gravel packed
|
US8056619B2
(en)
*
|
2006-03-30 |
2011-11-15 |
Schlumberger Technology Corporation |
Aligning inductive couplers in a well
|
CA2544457C
(en)
|
2006-04-21 |
2009-07-07 |
Mostar Directional Technologies Inc. |
System and method for downhole telemetry
|
US7782060B2
(en)
*
|
2006-12-28 |
2010-08-24 |
Schlumberger Technology Corporation |
Integrated electrode resistivity and EM telemetry tool
|
US8469084B2
(en)
*
|
2009-07-15 |
2013-06-25 |
Schlumberger Technology Corporation |
Wireless transfer of power and data between a mother wellbore and a lateral wellbore
|
US8839850B2
(en)
|
2009-10-07 |
2014-09-23 |
Schlumberger Technology Corporation |
Active integrated completion installation system and method
|
US9249559B2
(en)
|
2011-10-04 |
2016-02-02 |
Schlumberger Technology Corporation |
Providing equipment in lateral branches of a well
|
CN103195414B
(zh)
*
|
2012-01-05 |
2019-03-26 |
默林科技股份有限公司 |
钻柱通信系统、部件和方法
|
US9644476B2
(en)
|
2012-01-23 |
2017-05-09 |
Schlumberger Technology Corporation |
Structures having cavities containing coupler portions
|
US9175560B2
(en)
|
2012-01-26 |
2015-11-03 |
Schlumberger Technology Corporation |
Providing coupler portions along a structure
|
US9938823B2
(en)
|
2012-02-15 |
2018-04-10 |
Schlumberger Technology Corporation |
Communicating power and data to a component in a well
|
US9274038B2
(en)
|
2012-02-23 |
2016-03-01 |
Halliburton Energy Services, Inc. |
Apparatus and method for constant shear rate and oscillatory rheology measurements
|
US10175385B2
(en)
|
2012-05-23 |
2019-01-08 |
Halliburton Energy Services, Inc. |
Optimization visualization using normalized achievement variables
|
US10036234B2
(en)
|
2012-06-08 |
2018-07-31 |
Schlumberger Technology Corporation |
Lateral wellbore completion apparatus and method
|
CA2886377A1
(en)
*
|
2012-09-26 |
2014-04-03 |
Nabors International, Inc. |
Electromagnetic data telemetry for downhole well drilling
|
EA031415B1
(ru)
|
2012-11-16 |
2018-12-28 |
Эволюшн Инжиниринг Инк. |
Узел электрического разделителя с изолирующей муфтой для электромагнитной телеметрии
|
WO2014100262A1
(en)
*
|
2012-12-19 |
2014-06-26 |
Exxonmobil Upstream Research Company |
Telemetry for wireless electro-acoustical transmission of data along a wellbore
|
US10480308B2
(en)
*
|
2012-12-19 |
2019-11-19 |
Exxonmobil Upstream Research Company |
Apparatus and method for monitoring fluid flow in a wellbore using acoustic signals
|
US9810806B2
(en)
*
|
2012-12-21 |
2017-11-07 |
Baker Hughes Incorporated |
Electronic frame for use with coupled conduit segments
|
CN103089249B
(zh)
*
|
2013-01-09 |
2015-07-15 |
电子科技大学 |
随钻信号无线电磁传输系统
|
WO2014131133A1
(en)
|
2013-03-01 |
2014-09-04 |
Evolution Engineering Inc. |
Pinned electromagnetic telemetry gap sub assembly
|
US9598951B2
(en)
|
2013-05-08 |
2017-03-21 |
Baker Hughes Incorporated |
Coupled electronic and power supply frames for use with borehole conduit connections
|
CN103266884A
(zh)
*
|
2013-05-09 |
2013-08-28 |
电子科技大学 |
Em-mwd接力传输系统
|
US9725967B2
(en)
|
2013-07-24 |
2017-08-08 |
Bp Corporation North America Inc. |
Centralizers for centralizing well casings
|
US9644433B2
(en)
|
2013-08-28 |
2017-05-09 |
Baker Hughes Incorporated |
Electronic frame having conductive and bypass paths for electrical inputs for use with coupled conduit segments
|
CN106232935B
(zh)
|
2014-05-01 |
2020-03-27 |
哈里伯顿能源服务公司 |
具有至少一个传输交叉布置的套管段
|
US10145233B2
(en)
|
2014-05-01 |
2018-12-04 |
Halliburton Energy Services, Inc. |
Guided drilling methods and systems employing a casing segment with at least one transmission crossover arrangement
|
WO2015167933A1
(en)
*
|
2014-05-01 |
2015-11-05 |
Halliburton Energy Services, Inc. |
Interwell tomography methods and systems employing a casing segment with at least one transmission crossover arrangement
|
GB2542041B
(en)
|
2014-05-01 |
2020-10-14 |
Halliburton Energy Services Inc |
Multilateral production control methods and systems employing a casing segment with at least one transmission crossover arrangement
|
CA2955381C
(en)
|
2014-09-12 |
2022-03-22 |
Exxonmobil Upstream Research Company |
Discrete wellbore devices, hydrocarbon wells including a downhole communication network and the discrete wellbore devices and systems and methods including the same
|
US10400536B2
(en)
|
2014-09-18 |
2019-09-03 |
Halliburton Energy Services, Inc. |
Model-based pump-down of wireline tools
|
CA2964218C
(en)
|
2014-10-28 |
2019-09-17 |
Halliburton Energy Services, Inc. |
Downhole state-machine-based monitoring of vibration
|
US10422217B2
(en)
*
|
2014-12-29 |
2019-09-24 |
Halliburton Energy Services, Inc. |
Electromagnetically coupled band-gap transceivers
|
US10408047B2
(en)
|
2015-01-26 |
2019-09-10 |
Exxonmobil Upstream Research Company |
Real-time well surveillance using a wireless network and an in-wellbore tool
|
US9835025B2
(en)
|
2015-02-16 |
2017-12-05 |
Schlumberger Technology Corporation |
Downhole assembly employing wired drill pipe
|
WO2017007453A1
(en)
*
|
2015-07-07 |
2017-01-12 |
Halliburton Energy Services, Inc. |
Telemetry system with terahertz frequency multiplier
|
GB2555733B
(en)
*
|
2015-07-27 |
2021-05-19 |
Halliburton Energy Services Inc |
Electrical isolation to reduce magnetometer interference
|
CA2997054A1
(en)
*
|
2015-10-21 |
2017-04-27 |
Halliburton Energy Services, Inc. |
Hybrid transceiver for downhole telemetry
|
US9803473B2
(en)
*
|
2015-10-23 |
2017-10-31 |
Schlumberger Technology Corporation |
Downhole electromagnetic telemetry receiver
|
WO2017074353A1
(en)
|
2015-10-28 |
2017-05-04 |
Halliburton Energy Services, Inc. |
Transceiver with annular ring of high magnetic permeability material for enhanced short hop communications
|
US10533380B2
(en)
*
|
2016-07-20 |
2020-01-14 |
Halliburton Energy Services, Inc. |
Downhole capacitive coupling systems
|
US10415376B2
(en)
|
2016-08-30 |
2019-09-17 |
Exxonmobil Upstream Research Company |
Dual transducer communications node for downhole acoustic wireless networks and method employing same
|
US10364669B2
(en)
|
2016-08-30 |
2019-07-30 |
Exxonmobil Upstream Research Company |
Methods of acoustically communicating and wells that utilize the methods
|
US10344583B2
(en)
|
2016-08-30 |
2019-07-09 |
Exxonmobil Upstream Research Company |
Acoustic housing for tubulars
|
US11828172B2
(en)
|
2016-08-30 |
2023-11-28 |
ExxonMobil Technology and Engineering Company |
Communication networks, relay nodes for communication networks, and methods of transmitting data among a plurality of relay nodes
|
US10526888B2
(en)
|
2016-08-30 |
2020-01-07 |
Exxonmobil Upstream Research Company |
Downhole multiphase flow sensing methods
|
US10465505B2
(en)
|
2016-08-30 |
2019-11-05 |
Exxonmobil Upstream Research Company |
Reservoir formation characterization using a downhole wireless network
|
US10697287B2
(en)
|
2016-08-30 |
2020-06-30 |
Exxonmobil Upstream Research Company |
Plunger lift monitoring via a downhole wireless network field
|
US10590759B2
(en)
|
2016-08-30 |
2020-03-17 |
Exxonmobil Upstream Research Company |
Zonal isolation devices including sensing and wireless telemetry and methods of utilizing the same
|
US10697288B2
(en)
|
2017-10-13 |
2020-06-30 |
Exxonmobil Upstream Research Company |
Dual transducer communications node including piezo pre-tensioning for acoustic wireless networks and method employing same
|
AU2018347876B2
(en)
|
2017-10-13 |
2021-10-07 |
Exxonmobil Upstream Research Company |
Method and system for performing hydrocarbon operations with mixed communication networks
|
US10837276B2
(en)
|
2017-10-13 |
2020-11-17 |
Exxonmobil Upstream Research Company |
Method and system for performing wireless ultrasonic communications along a drilling string
|
WO2019074657A1
(en)
|
2017-10-13 |
2019-04-18 |
Exxonmobil Upstream Research Company |
METHOD AND SYSTEM FOR REALIZING OPERATIONS USING COMMUNICATIONS
|
CN111201454B
(zh)
|
2017-10-13 |
2022-09-09 |
埃克森美孚上游研究公司 |
用于利用通信执行操作的方法和系统
|
CA3079020C
(en)
|
2017-10-13 |
2022-10-25 |
Exxonmobil Upstream Research Company |
Method and system for performing communications using aliasing
|
US12000273B2
(en)
|
2017-11-17 |
2024-06-04 |
ExxonMobil Technology and Engineering Company |
Method and system for performing hydrocarbon operations using communications associated with completions
|
WO2019099188A1
(en)
|
2017-11-17 |
2019-05-23 |
Exxonmobil Upstream Research Company |
Method and system for performing wireless ultrasonic communications along tubular members
|
US10690794B2
(en)
|
2017-11-17 |
2020-06-23 |
Exxonmobil Upstream Research Company |
Method and system for performing operations using communications for a hydrocarbon system
|
US10844708B2
(en)
|
2017-12-20 |
2020-11-24 |
Exxonmobil Upstream Research Company |
Energy efficient method of retrieving wireless networked sensor data
|
US11156081B2
(en)
|
2017-12-29 |
2021-10-26 |
Exxonmobil Upstream Research Company |
Methods and systems for operating and maintaining a downhole wireless network
|
AU2018397574A1
(en)
|
2017-12-29 |
2020-06-11 |
Exxonmobil Upstream Research Company (Emhc-N1-4A-607) |
Methods and systems for monitoring and optimizing reservoir stimulation operations
|
WO2019156966A1
(en)
|
2018-02-08 |
2019-08-15 |
Exxonmobil Upstream Research Company |
Methods of network peer identification and self-organization using unique tonal signatures and wells that use the methods
|
US11268378B2
(en)
|
2018-02-09 |
2022-03-08 |
Exxonmobil Upstream Research Company |
Downhole wireless communication node and sensor/tools interface
|
US11293280B2
(en)
|
2018-12-19 |
2022-04-05 |
Exxonmobil Upstream Research Company |
Method and system for monitoring post-stimulation operations through acoustic wireless sensor network
|
US11952886B2
(en)
|
2018-12-19 |
2024-04-09 |
ExxonMobil Technology and Engineering Company |
Method and system for monitoring sand production through acoustic wireless sensor network
|
WO2020176077A1
(en)
*
|
2019-02-26 |
2020-09-03 |
Halliburton Energy Services, Inc. |
Downhole barrier and isolation monitoring system
|
RU2745858C1
(ru)
*
|
2020-06-03 |
2021-04-02 |
Общество с ограниченной ответственностью "Научно-технологический центр Геомеханика" |
Способ мониторинга скважинных забойных параметров и устройство для его осуществления
|
CN113250683B
(zh)
*
|
2021-05-12 |
2023-01-06 |
华中科技大学 |
一种井下极低频通信模组的近场延长器
|