NL1002873C2 - Method for mounting a scaffolding construction as well as scaffolding construction. - Google Patents

Method for mounting a scaffolding construction as well as scaffolding construction. Download PDF

Info

Publication number
NL1002873C2
NL1002873C2 NL1002873A NL1002873A NL1002873C2 NL 1002873 C2 NL1002873 C2 NL 1002873C2 NL 1002873 A NL1002873 A NL 1002873A NL 1002873 A NL1002873 A NL 1002873A NL 1002873 C2 NL1002873 C2 NL 1002873C2
Authority
NL
Netherlands
Prior art keywords
uprights
guides
frame
guide elements
scaffolding construction
Prior art date
Application number
NL1002873A
Other languages
Dutch (nl)
Inventor
Petrus Christianus Johann Oers
Johannes Martinus Slegers
Alphonsus Antonius Garritsen
Original Assignee
Sgb Holdings
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sgb Holdings filed Critical Sgb Holdings
Priority to NL1002873A priority Critical patent/NL1002873C2/en
Priority to FR9704796A priority patent/FR2748290B1/en
Application granted granted Critical
Publication of NL1002873C2 publication Critical patent/NL1002873C2/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/14Comprising essentially pre-assembled two-dimensional frame-like elements, e.g. of rods in L- or H-shape, with or without bracing
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • E04G5/147Railings specially adapted for mounting prior to the mounting of the platform
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/30Scaffolding bars or members with non-detachably fixed coupling elements
    • E04G7/302Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members
    • E04G7/303Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members the added coupling elements are only fixed at one of the bars or members to connect
    • E04G7/305Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members the added coupling elements are only fixed at one of the bars or members to connect without tying means for connecting the bars or members

Description

Werkwijze voor het monteren van een steigerconstructie alsmede steigerconstructie.Method for mounting a scaffolding construction as well as scaffolding construction.

De uitvinding heeft betrekking op een werkwijze voor het monteren van een 5 steigerconstructie waarbij een frame tussen twee staanders wordt aangebracht en met de staanders wordt gekoppeld. Dit geschiedt zo bij montage van nagenoeg alle bekende steigerconstructies en kan op verschillende wijzen uitgevoerd worden. Bij veel bekende steigerconstructies wordt het frame in ogen aanwezig op de staanders gehaakt. Ook is het bekend om het frame met hulpdelen, bijvoorbeeld spieën, in een in de staander aanwezige 10 gleuf te klemmen. Bij de meeste van de toegepaste bekende montage methoden echter dient het frame eerst in de juiste positie getild te worden en wordt het frame daarna met de staanders gekoppeld. Het optillen van het frame en het in opgetilde stand koppelen van het frame met de staanders is een inspannende handeling en kan tot lichamelijke klachten van de monteurs leiden.The invention relates to a method for mounting a scaffolding construction in which a frame is placed between two uprights and coupled to the uprights. This is done when mounting almost all known scaffolding constructions and can be carried out in various ways. In many known scaffolding constructions, the frame is hooked onto the uprights in the eyes. It is also known to clamp the frame with auxiliary parts, for instance wedges, in a slot present in the upright. In most of the known mounting methods used, however, the frame must first be lifted into the correct position and the frame is then coupled to the uprights. Lifting the frame and coupling the frame to the uprights in a raised position is a strenuous operation and can lead to physical complaints from the fitters.

15 Een doel van de uitvinding is een werkwijze van de in de aanhef genoemde soort te verschaffen welke eenvoudiger is en minder inspanning vergt dan bij de bekende werkwijzen. Hiertoe is de werkwijze volgens de uitvinding gekenmerkt, doordat het aanbrengen en koppelen geschiedt door eerst geleidingselementen van het frame te koppelen met geleidingen van de staanders en daarna het frame omhoog te duwen waarbij 20 de geleidingselementen zich in de geleidingen verplaatsen. Hierbij kan het frame eenvoudig in de geleidingen omhoog geduwd worden en hoeft het frame niet in opgetilde stand ingehaakt te worden. Deze werkwijze is ergonomisch beter dan de bekende werkwijzen en vergt minder inspanningen van de monteur waardoor het ziekte verzuim op de bouw wordt teruggedrongen en het werk beter voldoet aan de steeds strenger wordende eisen in de 25 bouwwereld.An object of the invention is to provide a method of the type mentioned in the opening paragraph which is simpler and requires less effort than with the known methods. To this end, the method according to the invention is characterized in that the mounting and coupling takes place by first coupling guide elements of the frame with guides of the uprights and then pushing the frame upwards, wherein the guide elements move in the guides. The frame can easily be pushed upwards in the guides and the frame does not have to be hooked in the raised position. This method is ergonomically better than the known methods and requires less effort from the engineer, so that sick leave is reduced on the construction site and the work better meets the increasingly stringent requirements in the construction world.

Een uitvoeringsvorm van de werkwijze volgens de uitvinding is gekenmerkt, doordat het frame tot tegen een aanslag omhoog wordt geduwd. Hierdoor komt het frame eenvoudig op de juiste hoogte om verdere koppeling van het frame met de staanders mogelijk te maken. Dit zal hierna aan de hand van verdere uitvoeringsvormen worden 30 verduidelijkt.An embodiment of the method according to the invention is characterized in that the frame is pushed upwards against a stop. This simply brings the frame to the correct height to allow further coupling of the frame to the uprights. This will be explained below with reference to further embodiments.

Deze verdere koppeling van het frame met de staanders geschiedt bij 1002873 2 voorkeur doordat nadat het frame naar boven is geduwd het frame wordt gedraaid tot in een verticale stand waarna het frame althans nabij de onderzijde met de staanders wordt gekoppeld. Hierbij dient het ondereinde van het frame op de juiste hoogte ten opzichte van de staanders aanwezig te zijn, hetgeen bereikt wordt door het frame zoals hiervoor 5 aangegeven tot tegen een aanslag omhoog te duwen.This further coupling of the frame with the uprights is preferably done in that, after the frame has been pushed upwards, the frame is rotated into a vertical position, after which the frame is coupled at least near the bottom to the uprights. The lower end of the frame must be present at the correct height relative to the uprights, which is achieved by pushing the frame upwards as against a stop as indicated above.

Bij voorkeur geschiedt het koppelen door verdere geleidingselementen van het frame in de geleidingen van de staanders of in verdere geleidingen van de staanders of van in de staanders aanwezige koppelstukken te brengen.Coupling preferably takes place by inserting further guide elements of the frame into the guides of the uprights or in further guides of the uprights or of coupling pieces present in the uprights.

Om de stabiliteit van de zo verkregen steigerconstructie te vergroten wordt 10 in een verdere uitvoeringsvorm, na het koppelen, het frame tot tegen een verdere aanslag naar beneden verplaatst en daarna in verticale richting geblokkeerd of opgesloten. Dit laatste kan bijvoorbeeld worden gerealiseerd door middel van een spie. Bij voorkeur echter wordt het frame in verticale richting opgesloten door een reeds aanwezig koppelstuk welke de buizen van de staander aan elkaar koppelt.In order to increase the stability of the scaffolding construction thus obtained, in a further embodiment, after coupling, the frame is moved downwards against a further stop and then blocked or locked in vertical direction. The latter can for instance be realized by means of a wedge. Preferably, however, the frame is enclosed in a vertical direction by an already present coupling piece which connects the tubes of the upright to each other.

15 De uitvinding heeft tevens betrekking op een steigerconstructie omvattende twee staanders voorzien van zich in lengterichting van de staanders uitstrekkende geleidingen en een tussen de staanders aanwezig en met de staanders gekoppeld frame voorzien van geleidingselementen welke zich in de geleidingen bevinden. Om het monteren van dergelijke steigerconstructies eenvoudiger (bij voorkeur volgens de hierboven 20 omschreven werkwijze volgens de uitvinding) en lichter te maken is de steigerconstructie volgens de uitvinding gekenmerkt, doordat de staanders althans nabij de onderste einden van de geleidingen voorzien zijn van toegangen tot de geleidingen voor het inbrengen van de geleidingselementen in de geleidingen. Voor het monteren volgens de hierboven beschreven werkwijze is het namelijk voordelig dat de geleidingselementen althans nabij 25 de ondereinde van de geleidingen in de geleidingen gebracht kunnen worden.The invention also relates to a scaffolding construction comprising two uprights provided with guides extending in the longitudinal direction of the uprights and a frame provided between the uprights and coupled to the uprights provided with guide elements which are located in the guides. In order to make the mounting of such scaffolding constructions simpler (preferably according to the method according to the invention described above) and lighter, the scaffolding construction according to the invention is characterized in that the uprights are provided with accesses to the guides at least near the lower ends of the guides for inserting the guide elements into the guides. Namely, for mounting according to the above-described method it is advantageous that the guide elements can be introduced into the guides at least near the lower end of the guides.

Overigens betekent dit niet dat de hierboven beschreven werkwijze volgens de uitvinding enkel bij een dergelijke steigerconstructie uitvoerbaar is. Ook indien de geleidingen niet voorzien zijn van aparte toegangen kan de werkwijze toegepast worden, bijvoorbeeld indien de geleidingselementen verdraaibaar zijn ten opzichte van het frame 30 en in een eerste stand in de sleuven van de geleidingen gebracht kunnen worden waarna door de geleidingselementen een kwart slag te draaien de geleidingselementen deels achter 1002873 3 de zijwanden van de sleuven komen en zo niet meer uit de sleuven kunnen geraken.Incidentally, this does not mean that the above-described method according to the invention is only feasible with such a scaffolding construction. The method can also be applied if the guides are not provided with separate accesses, for instance if the guide elements are rotatable relative to the frame 30 and can be introduced into the slots of the guides in a first position, after which the guide elements can be turned a quarter turn. turn the guide elements partly behind 1002873 3 the side walls of the slots so that they can no longer get out of the slots.

Een uitvoeringsvorm van de steigerconstructie volgens de uitvinding is gekenmerkt, doordat de staanders elk voorzien zijn van een verdere geleiding en het frame verdere geleidingselementen omvat waarbij de bovenste geleidingselementen samenwerken 5 met de bovenste geleidingen en de onderste verdere geleidingselementen samenwerken met de onderste verdere geleidingen. Hierdoor kan het frame op eenvoudige wijze op vier plaatsen met de staanders worden gekoppeld voor het verkrijgen van een stabiele constructie.An embodiment of the scaffolding construction according to the invention is characterized in that the uprights are each provided with a further guide and the frame comprises further guide elements, the upper guide elements cooperating with the upper guides and the lower further guide elements cooperating with the lower further guides. This allows the frame to be easily coupled to the uprights in four places to obtain a stable construction.

Indien de staanders van de steigerconstructie koppelstukken omvatten welke 10 koppelstukken twee buizen van de staanders met elkaar koppelen, is het voordelig dat de onderste geleidingen zich in koppelstukken van de staanders bevinden.If the uprights of the scaffolding construction comprise coupling pieces, which coupling pieces couple two tubes of the uprights together, it is advantageous that the lower guides are located in coupling pieces of the uprights.

Om de stabiliteit van de steigerconstructie te vergroten is het hierbij voordelig indien de koppelstukken het frame in verticale richting blokkeren.In order to increase the stability of the scaffolding construction, it is advantageous here if the coupling pieces block the frame in vertical direction.

Voor het vereenvoudigen van het in de geleidingen brengen van de 15 geleidingselementen is een verdere uitvoeringsvorm van de steigerconstructie gekenmerkt, doordat de staanders en/of koppelstukken zijn voorzien van hulpgeleidingen.To simplify the introduction of the guide elements into the guides, a further embodiment of the scaffolding construction is characterized in that the uprights and / or coupling pieces are provided with auxiliary guides.

Hieronder zal de uitvinding nader worden toegelicht aan de hand van in de tekeningen weergegeven uitvoeringsvoorbeelden van de steigerconstructie volgens de uitvinding. Hierbij toont: 20 Figuur 1 een deel van een eerste uitvoeringsvorm van de steigerconstructie volgens de uitvinding;The invention will be explained in more detail below with reference to illustrative embodiments of the scaffolding construction according to the invention shown in the drawings. Herein: Figure 1 shows part of a first embodiment of the scaffolding construction according to the invention;

Figuur 2 een detail van de koppeling tussen frames en staander;Figure 2 shows a detail of the coupling between frames and upright;

Figuur 3 een doorsnede van een buis van een staander;Figure 3 is a cross-section of a tube of an upright;

Figuur 4 een eerste fase van het montageproces van de steigerconstructie; 25 Figuur 5 een tweede fase van het montageproces enFigure 4 shows a first phase of the assembly process of the scaffolding construction; Figure 5 a second phase of the assembly process and

Figuur 6 een derde fase van het montageproces.Figure 6 a third phase of the assembly process.

Figuur 1 toont een deel van een eerste uitvoeringsvorm van de steigerconstructie volgens de uitvinding. De steigerconstructie 1 omvat twee staanders 3 en 5 welke elk zijn opgebouwd uit een aantal buizen 7, 9. De buizen zijn onderling 30 gekoppeld via koppelstukken 11 en 13, bijvoorbeeld door middel van een bajonetsluiting om te voorkomen dat tijdens het optillen van de steigerconstructie -bijvoorbeeld met 1002873 4 behulp van een kraan- de staanders uit elkaar kunnen vallen. De buizen 7,9 zijn voorzien van geleidingen 15,19 en de koppelstukken 11,13 zijn voorzien van verdere geleidingen 17, 21. De in de buizen 7, 9 aanwezige geleidingen 15,19 werken samen met bovenste geleidingselementen 23 van tussen de staanders aanwezige frames 27, 29 en de in de 5 koppelstukken 11 en 13 aanwezige verdere geleidingen 17,21 werken samen met verdere geleidingselementen 25 onderaan de frames 27,29.Figure 1 shows part of a first embodiment of the scaffolding construction according to the invention. Scaffolding construction 1 comprises two uprights 3 and 5, each of which is built up from a number of pipes 7, 9. The pipes are mutually coupled via coupling pieces 11 and 13, for instance by means of a bayonet fitting, in order to prevent during lifting of the scaffolding construction - for example, with 1002873 4, the uprights could fall apart. The tubes 7,9 are provided with guides 15,19 and the coupling pieces 11,13 are provided with further guides 17, 21. The guides 15,19 present in tubes 7, 9 cooperate with upper guide elements 23 of between the uprights frames 27, 29 and the further guides 17, 21 present in the coupling pieces 11 and 13 cooperate with further guide elements 25 at the bottom of the frames 27, 29.

In figuur 2 is de koppeling tussen de frames en een van de staanders in detail weergegeven. De geleidingen 15 zijn aan de ondereinden voorzien van toegangen 30 voor het inbrengen van de geleidingselementen 23 in de geleidingen 15. Het koppelstuk 11 heeft 10 een onderste deel 31 waarin zich aan de onderzijde 33 een centrale opening bevindt waarmee het koppelstuk over de onderste buis 7 is geschoven. De onderzijde 33 van het koppelstuk 11 sluit het frame 29 in verticale richting op. Aan de boveneinden van de geleidingen 15 bevinden zich aanslagen 34, gevormd door de begrenzingswanden van de geleidingen, waartegen het frame 29 tijdens montage wordt geduwd. Hierdoor komen de 15 onderste, verdere geleidingselementen 25 -na verdraaiing van het frame 29 naar de verticale stand- op de juiste hoogte boven de verdere geleidingen 17, hetgeen het inbrengen van de verdere geleidingselementen 25 in de verdere geleidingen 17 vergemakkelijkt. Aan de ondereinden van de verdere geleidingen 17 bevinden zich begrenzingswanden welke verdere aanslagen 35 vormen waarop het bovenste frame 27 met het onderste 20 geleidingselement 25 rust. Het bovenste deel 37 van het koppelstuk is aan de bovenste buis 7 bevestigd. Om de geleidingselementen 23 en 25 eenvoudiger in de geleidingen 15 en 17 te kunnen brengen is de staander voorzien van hulpgeleidingen 38 welke in twee standen gekanteld kunnen worden voor geleiding van de geleidingselementen in de bovenste respectievelijk onderste geleidingen 15,17.Figure 2 shows the coupling between the frames and one of the uprights in detail. The guides 15 are provided at the bottom ends with entrances 30 for inserting the guide elements 23 into the guides 15. The coupling piece 11 has a bottom part 31 in which at the bottom 33 there is a central opening with which the coupling piece over the bottom tube 7 has been pushed. The bottom 33 of the coupling piece 11 encloses the frame 29 in a vertical direction. At the upper ends of the guides 15 there are stops 34, formed by the boundary walls of the guides, against which the frame 29 is pushed during mounting. As a result, the bottom, further guide elements 25, after rotation of the frame 29 to the vertical position, come to the correct height above the further guides 17, which facilitates the insertion of the further guide elements 25 into the further guides 17. At the lower ends of the further guides 17 there are boundary walls which form further stops 35 on which the top frame 27 rests with the bottom 20 guide element 25. The top part 37 of the coupling piece is attached to the top tube 7. In order to make it easier to guide the guide elements 23 and 25 into the guides 15 and 17, the upright is provided with auxiliary guides 38 which can be tilted in two positions for guiding the guide elements in the top and bottom guides 15, 17 respectively.

25 Figuur 3 toont een dwarsdoorsnede van een buis 7 van een staander. In de wand 39 van de buis bevinden zich sleuven welke de geleidingen vormen. In dwarsdoorsnede zijn deze sleuven C-vormige inhammen 41 in de omtrek van de buis welke worden begrensd door een begrenzingswand 43 met C-vormige dwarsdoorsnede. Deze begrenzingswand 43 vormt samen met de omtrekswand 39 één geheel.Figure 3 shows a cross-section of a tube 7 of an upright. In the wall 39 of the tube there are slots which form the guides. In cross section, these slots are C-shaped inlets 41 in the periphery of the tube which are bounded by a boundary wall 43 of C-shaped cross section. Together with the circumferential wall 39, this boundary wall 43 forms one whole.

30 In de figuren 4,5 en 6 worden verschillende stappen van het montage proces getoond. Ter verduidelijking van het montage proces is dit getoond aan de hand van een 1002873 5 tweede, vereenvoudigde uitvoeringsvorm, daar aan de hand van deze tweede uitvoeringsvorm de samenwerking van de geleidingselementen met de geleidingen beter zichtbaar kan worden gemaakt.Different steps of the assembly process are shown in Figures 4,5 and 6. To clarify the mounting process, this has been shown on the basis of a second, simplified embodiment, since on the basis of this second embodiment the cooperation of the guide elements with the guides can be made more visible.

Figuur 4 toont een eerste fase van het montage proces. Ook deze 5 steigerconstructie 51 wordt samengesteld uit staanders 53 en frames 55, 57. Echter de buizen 59,61 van de staanders zijn nu rechtstreeks met elkaar gekoppeld en de geleidingen 63, 65 bevinden zich aan de buitenzijde van de buizen 59, 61. In het verlengde van een zijwand 67,69 van de geleidingen 63 en 65 bevinden zich, zowel aan de onderzijden als aan de bovenzijden van de geleidingen, hulpgeleidingen 71,73.Figure 4 shows a first phase of the assembly process. This scaffolding construction 51 is also composed of uprights 53 and frames 55, 57. However, the tubes 59, 61 of the uprights are now directly coupled to each other and the guides 63, 65 are located on the outside of the tubes 59, 61. the extension of a side wall 67,69 of the guides 63 and 65, auxiliary guides 71,73 are located on both the bottom and top sides of the guides.

10 Bij het aanbrengen van het frame 55, wordt het frame eerst met de bovenste geleidingselementen 75 tegen de hulpgeleiding 71 gebracht. Vervolgens wordt het frame 55 omhoog geduwd tot tegen een aanslag 64, waarbij het bovenste geleidingselement 75 via de hulpgeleiding 71 in de geleiding 63 glijdt.When the frame 55 is fitted, the frame is first brought with the upper guide elements 75 against the auxiliary guide 71. The frame 55 is then pushed upwards against a stop 64, the upper guide element 75 sliding into the guide 63 via the auxiliary guide 71.

In figuur 5 is de situatie weergegeven waarbij het frame 55 helemaal naar 15 boven is geduwd tot tegen de aanslag 64. Hierna wordt het frame in verticale stand gedraaid volgens pijl 77 totdat de onderste geleidingselementen 79 tegen de hulpgeleiding 73 komen. Hierdoor zijn de onderste geleidingselementen 79 gepositioneerd ten opzichte van de geleiding 65.Figure 5 shows the situation in which the frame 55 has been pushed all the way up to the stop 64. After this, the frame is rotated in vertical position according to arrow 77 until the lower guide elements 79 touch the auxiliary guide 73. As a result, the lower guide elements 79 are positioned relative to the guide 65.

Vervolgens laat men het frame 55 naar beneden zakken tot tegen de 20 bovenzijde van de aanslag 64, zie figuur 6. Tenslotte dient het frame 55 in verticale richting opgesloten te worden. Dit kan bijvoorbeeld met behulp van een spie geschieden.Then the frame 55 is lowered down to the top of the stop 64, see figure 6. Finally, the frame 55 must be enclosed in vertical direction. This can be done, for example, with the aid of a wedge.

Hoewel in het voorgaande de uitvinding is toegelicht aan de hand van de tekeningen, dient te worden vastgesteld dat de uitvinding geenszins tot de in de tekeningen getoonde uitvoeringsvormen is beperkt. Zo kan het frame ook slechts twee 25 geleidingselementen omvatten, aanwezig aan de bovenzijde van het frame, waarbij het frame aan de onderzijde enkel één of meer voetstukken omvat, die op een eronder aanwezig verder frame geplaatst worden of op draagstukken aanwezig aan de staanders geplaatst worden.Although the invention has been elucidated in the foregoing with reference to the drawings, it should be noted that the invention is by no means limited to the embodiments shown in the drawings. For example, the frame can also comprise only two guide elements, present at the top of the frame, the frame at the bottom comprising only one or more bases, which are placed on a further frame present underneath or on supporting pieces present on the uprights. .

10028731002873

Claims (11)

1. Werkwijze voor het monteren van een steigerconstructie waarbij een frame tussen twee staanders wordt aangebracht en met de staanders wordt gekoppeld, met het kenmerk, dat het aanbrengen en koppelen geschiedt door eerst geleidingselementen van het 5 frame te koppelen met geleidingen van de staanders en daarna het frame omhoog te duwen waarbij de geleidingselementen zich in de geleidingen verplaatsen.Method for mounting a scaffolding construction in which a frame is arranged between two uprights and coupled to the uprights, characterized in that the fitting and coupling takes place by first coupling guide elements of the frame with guides of the uprights and then pushing the frame upwards with the guide elements moving in the guides. 2. Werkwijze volgens conclusie 1, met het kenmerk, dat het frame tot tegen een aanslag omhoog wordt geduwd.Method according to claim 1, characterized in that the frame is pushed upwards against a stop. 3. Werkwijze volgens conclusie 1 of 2, met het kenmerk, dat nadat het frame 10 naar boven is geduwd het frame wordt gedraaid tot in een verticale stand.Method according to claim 1 or 2, characterized in that after the frame 10 has been pushed upwards, the frame is rotated to a vertical position. 4. Werkwijze volgens conclusie 3, met het kenmerk, dat in de verticale stand het frame althans nabij de onderzijde met de staanders wordt gekoppeld.Method according to claim 3, characterized in that in the vertical position the frame is coupled to the uprights at least near the underside. 5. Werkwijze volgens conclusie 4, met het kenmerk, dat het koppelen geschiedt door verdere geleidingselementen van het frame in de geleidingen van de staanders of in 15 verdere geleidingen van de staanders of van in de staanders aanwezige koppelstukken te brengen.5. Method according to claim 4, characterized in that the coupling takes place by inserting further guide elements of the frame into the guides of the uprights or in further guides of the uprights or of coupling pieces present in the uprights. 6. Werkwijze volgens conclusie 4 of 5, met het kenmerk, dat na het koppelen het frame tot tegen een verdere aanslag naar beneden wordt verplaatst en daarna in verticale richting wordt geblokkeerd of opgesloten.Method according to claim 4 or 5, characterized in that after coupling the frame is moved downwards against a further stop and is then blocked or locked in vertical direction. 7. Steigerconstructie omvattende twee staanders voorzien van zich in lengterichting van de staanders uitstrekkende geleidingen en een tussen de staanders aanwezig en met de staanders gekoppeld frame voorzien van geleidingselementen welke zich in de geleidingen bevinden, met het kenmerk, dat de staanders althans nabij de onderste einden van de geleidingen voorzien zijn van toegangen tot de geleidingen voor het 25 inbrengen van de geleidingselementen in de geleidingen.Scaffolding construction comprising two uprights provided with guides extending in the longitudinal direction of the uprights and a frame present between the uprights and coupled to the uprights provided with guide elements which are located in the guides, characterized in that the uprights are at least near the lower ends of the guides are provided with accesses to the guides for inserting the guide elements into the guides. 8. Steigerconstructie volgens conclusie 7, met het kenmerk, dat de staanders elk voorzien zijn van een verdere geleiding en het frame verdere geleidingselementen omvat waarbij de bovenste geleidingselementen samenwerken met de bovenste geleidingen en de onderste verdere geleidingselementen samenwerken met de onderste verdere 30 geleidingen.Scaffolding construction according to claim 7, characterized in that the uprights each comprise a further guide and the frame comprises further guide elements, the upper guide elements co-operating with the upper guides and the lower further guide elements co-operating with the lower further guides. 9. Steigerconstructie volgens conclusie 8, met het kenmerk, dat de onderste 1. o 2 a 7 3 geleidingen zich in koppelstukken van de staanders bevinden welke koppelstukken twee buizen van de staanders met elkaar koppelen.Scaffolding construction according to claim 8, characterized in that the bottom 1 o 2 a 7 3 guides are located in coupling pieces of the uprights, which coupling pieces couple two tubes of the uprights together. 10. Steigerconstructie volgens conclusie 9, met het kenmerk, dat de koppelstukken het frame in verticale richting blokkeren.Scaffolding construction according to claim 9, characterized in that the coupling pieces block the frame in vertical direction. 11. Steigerconstructie volgens conclusie 7, 8, 9 of 10, met het kenmerk, dat de staanders en/of koppelstukken zijn voorzien van hulpgeleidingen voor het vereenvoudigen van het in de geleidingen brengen van de geleidingselementen. 1002873Scaffolding construction according to claim 7, 8, 9 or 10, characterized in that the uprights and / or coupling pieces are provided with auxiliary guides for simplifying the introduction of the guide elements into the guides. 1002873
NL1002873A 1996-04-16 1996-04-16 Method for mounting a scaffolding construction as well as scaffolding construction. NL1002873C2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
NL1002873A NL1002873C2 (en) 1996-04-16 1996-04-16 Method for mounting a scaffolding construction as well as scaffolding construction.
FR9704796A FR2748290B1 (en) 1996-04-16 1997-04-15 TECHNIQUE OR METHOD FOR ASSEMBLING SCAFFOLDING AND SCAFFOLDING THUS OBTAINED

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NL1002873A NL1002873C2 (en) 1996-04-16 1996-04-16 Method for mounting a scaffolding construction as well as scaffolding construction.
NL1002873 1996-04-16

Publications (1)

Publication Number Publication Date
NL1002873C2 true NL1002873C2 (en) 1997-10-17

Family

ID=19762684

Family Applications (1)

Application Number Title Priority Date Filing Date
NL1002873A NL1002873C2 (en) 1996-04-16 1996-04-16 Method for mounting a scaffolding construction as well as scaffolding construction.

Country Status (2)

Country Link
FR (1) FR2748290B1 (en)
NL (1) NL1002873C2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ITLI20070013U1 (en) * 2007-09-05 2007-12-05 Giuliano Martelli SLIDING SYSTEM WITH LATCHES, ACTING TO SPEED THE INSTALLATION OF SAFETY TRUNKS FOR METAL SCAFFOLDS BY MEANS OF A GUIDE.
DE102019114913A1 (en) * 2019-06-04 2020-12-10 Manfred Rolle Mounting adapters, safety railings, kit for a scaffolding and scaffolding and methods therefor

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2336532A1 (en) * 1975-12-23 1977-07-22 Somefran BRACING FORMING RAILING OF A WORKING LEVEL OF A SCAFFOLDING
FR2347508A1 (en) * 1976-04-06 1977-11-04 Entrepose Safety screen for scaffolding - consists of frame with adjustable horizontal and vertical parts hooked onto uprights
GB9503432D0 (en) * 1995-02-21 1995-04-12 Sgb Services Plc Improvements in or relating to a scaffolding system

Also Published As

Publication number Publication date
FR2748290B1 (en) 1999-11-12
FR2748290A1 (en) 1997-11-07

Similar Documents

Publication Publication Date Title
CA1308134C (en) Shopping trolley provided with a pivoting basket
US3941271A (en) Collapsible receptacle
RU2044687C1 (en) Method of and device for mounting guides in mine
EP0081985A2 (en) Vehicle for displaying goods
EP0103849B1 (en) Curtain runner
RU2004112561A (en) RACK SYSTEM FOR STORAGE AND ARCHIVING OF ITEMS
NL1002873C2 (en) Method for mounting a scaffolding construction as well as scaffolding construction.
US4315633A (en) Storage cart for music stands
EP0840831B1 (en) Scaffold as well as method for its assembly
ITPO20010004A1 (en) AUTOMATIC STORAGE SYSTEM
EP0931985B1 (en) Tray support for a baking oven
NL8802952A (en) STACKABLE BIN.
US4567985A (en) Nestable and stackable box
KR20050071366A (en) Stackable shopping cart
JP4994801B2 (en) Multistory parking
SU1006754A1 (en) Top shaft mining equipment
EP0310195A2 (en) A nestable roll container
SU564157A1 (en) Mould for producing structural products
EP0553932B1 (en) Plastic container which is stackable and nestable
NO173426B (en) COMPATIBLE SHELF
JPH0547596Y2 (en)
US4004769A (en) Detachable end platform for merchandise display unit
SU1758199A1 (en) Stepladder
EP0537209B1 (en) Support handle for supporting the suspending crossbar in boxes for transporting articles of clothing
JP3009006U (en) Open / close lid device for inspection doors

Legal Events

Date Code Title Description
PD2B A search report has been drawn up
VD1 Lapsed due to non-payment of the annual fee

Effective date: 20001101