MY182928A - Subsea universal xmas tree hang-off adapter - Google Patents
Subsea universal xmas tree hang-off adapterInfo
- Publication number
- MY182928A MY182928A MYPI2016703443A MYPI2016703443A MY182928A MY 182928 A MY182928 A MY 182928A MY PI2016703443 A MYPI2016703443 A MY PI2016703443A MY PI2016703443 A MYPI2016703443 A MY PI2016703443A MY 182928 A MY182928 A MY 182928A
- Authority
- MY
- Malaysia
- Prior art keywords
- adapter
- subsea
- universal
- xmas tree
- interface
- Prior art date
Links
- 241000191291 Abies alba Species 0.000 abstract 3
- 230000004888 barrier function Effects 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
- E21B33/035—Well heads; Setting-up thereof specially adapted for underwater installations
- E21B33/038—Connectors used on well heads, e.g. for connecting blow-out preventer and riser
- E21B33/0385—Connectors used on well heads, e.g. for connecting blow-out preventer and riser electrical connectors
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
- E21B33/04—Casing heads; Suspending casings or tubings in well heads
- E21B33/043—Casing heads; Suspending casings or tubings in well heads specially adapted for underwater well heads
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
- E21B33/035—Well heads; Setting-up thereof specially adapted for underwater installations
- E21B33/0353—Horizontal or spool trees, i.e. without production valves in the vertical main bore
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
- E21B33/04—Casing heads; Suspending casings or tubings in well heads
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
- E21B43/121—Lifting well fluids
- E21B43/128—Adaptation of pump systems with down-hole electric drives
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
- Mechanical Coupling Of Light Guides (AREA)
- Connector Housings Or Holding Contact Members (AREA)
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| NO20140609 | 2014-05-14 | ||
| NO20141108 | 2014-09-15 | ||
| PCT/EP2015/060629 WO2015173319A1 (en) | 2014-05-14 | 2015-05-13 | Subsea universal xmas tree hang-off adapter |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| MY182928A true MY182928A (en) | 2021-02-05 |
Family
ID=53180738
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| MYPI2016703443A MY182928A (en) | 2014-05-14 | 2015-05-13 | Subsea universal xmas tree hang-off adapter |
Country Status (8)
| Country | Link |
|---|---|
| US (1) | US9896897B2 (enExample) |
| AU (1) | AU2015261530B2 (enExample) |
| BR (1) | BR112016026567B1 (enExample) |
| CA (1) | CA2946951A1 (enExample) |
| GB (1) | GB2544186B (enExample) |
| MY (1) | MY182928A (enExample) |
| NO (1) | NO347684B1 (enExample) |
| WO (1) | WO2015173319A1 (enExample) |
Families Citing this family (19)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US10100596B2 (en) * | 2014-09-17 | 2018-10-16 | Saudi Arabian Oil Company | Hanger for an umbilically deployed electrical submersible pumping system |
| CN109415927A (zh) * | 2016-06-14 | 2019-03-01 | 齐立富控股有限公司 | 用于电缆和其他类型导管的井口穿通装置 |
| WO2018013095A1 (en) * | 2016-07-13 | 2018-01-18 | Fmc Technologies, Inc. | System for installing an electrically submersible pump on a well |
| US10808483B2 (en) | 2017-03-28 | 2020-10-20 | Ge Oil & Gas Uk Limited | System for hydrocarbon recovery |
| US11220877B2 (en) * | 2018-04-27 | 2022-01-11 | Sean P. Thomas | Protective cap assembly for subsea equipment |
| US10253606B1 (en) | 2018-07-27 | 2019-04-09 | Upwing Energy, LLC | Artificial lift |
| US10787873B2 (en) | 2018-07-27 | 2020-09-29 | Upwing Energy, LLC | Recirculation isolator for artificial lift and method of use |
| US10370947B1 (en) | 2018-07-27 | 2019-08-06 | Upwing Energy, LLC | Artificial lift |
| US10280721B1 (en) * | 2018-07-27 | 2019-05-07 | Upwing Energy, LLC | Artificial lift |
| US11686161B2 (en) | 2018-12-28 | 2023-06-27 | Upwing Energy, Inc. | System and method of transferring power within a wellbore |
| US10669805B1 (en) * | 2019-03-01 | 2020-06-02 | Oil States Industries, Inc. | Adaptor for electronic submersible pump |
| GB2586257B (en) * | 2019-08-15 | 2022-04-13 | Aker Solutions As | Christmas tree and assembly for controlling flow from a completed well |
| EP4061479A1 (en) * | 2019-11-19 | 2022-09-28 | BIOTRONIK SE & Co. KG | In situ welding for feedthrough pad attachment |
| DE102020110826B4 (de) * | 2020-04-21 | 2024-06-20 | Schott Ag | Durchführung für Anwendungen bei hohem Druck |
| BR102020026776A2 (pt) * | 2020-12-28 | 2022-07-12 | Aker Solutions Do Brasil Ltda | Adaptador para conectar árvore de natal concêntrica com base de produção excêntrica |
| US12012824B2 (en) | 2022-03-15 | 2024-06-18 | Baker Hughes Oilfield Operations Llc | Through-tubing electrical submersible pump for live wells and method of deployment |
| US12276170B2 (en) * | 2022-08-31 | 2025-04-15 | Hunting Energy Services, Llc | Subsea wellhead monitoring system |
| US12492605B2 (en) | 2023-04-03 | 2025-12-09 | Baker Hughes Oilfield Operations Llc | Tree adapter and tubing hanger interface tool system and method |
| EP4596828A1 (en) * | 2024-02-02 | 2025-08-06 | Oil Dynamics GmbH | Integrity cap and method of integrity testing |
Family Cites Families (24)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CA2327987C (en) | 1999-12-08 | 2008-02-19 | Robbins & Myers Energy Systems L.P. | Wellhead with improved esp cable pack-off and method |
| GB2361726B (en) * | 2000-04-27 | 2002-05-08 | Fmc Corp | Coiled tubing line deployment system |
| US7063157B2 (en) * | 2002-08-22 | 2006-06-20 | Fmc Technologies, Inc. | Apparatus and method for installation of subsea well completion systems |
| US7201229B2 (en) * | 2003-10-22 | 2007-04-10 | Vetco Gray Inc. | Tree mounted well flow interface device |
| DE602004026905D1 (de) * | 2003-10-23 | 2010-06-10 | Ab Science | 2-aminoaryloxazol-verbindungen als tyrosinkinase-hemmer |
| US7909103B2 (en) * | 2006-04-20 | 2011-03-22 | Vetcogray Inc. | Retrievable tubing hanger installed below tree |
| US7677320B2 (en) * | 2006-06-12 | 2010-03-16 | Baker Hughes Incorporated | Subsea well with electrical submersible pump above downhole safety valve |
| US7798231B2 (en) | 2006-07-06 | 2010-09-21 | Vetco Gray Inc. | Adapter sleeve for wellhead housing |
| US8272448B2 (en) | 2008-10-18 | 2012-09-25 | Baker Hughes Incorporated | Spring loaded anchor system for electro-coil tubing deployed ESP's |
| US8714261B2 (en) * | 2008-11-07 | 2014-05-06 | Schlumberger Technology Corporation | Subsea deployment of submersible pump |
| BRPI1001979B8 (pt) | 2009-02-18 | 2021-02-17 | Baker Hughes Inc | bombas elétricas submersíveis sem sonda em poço |
| US8474520B2 (en) | 2009-07-14 | 2013-07-02 | Baker Hughes Incorporated | Wellbore drilled and equipped for in-well rigless intervention ESP |
| US8534366B2 (en) * | 2010-06-04 | 2013-09-17 | Zeitecs B.V. | Compact cable suspended pumping system for lubricator deployment |
| NO20101382A1 (no) * | 2010-10-06 | 2012-04-09 | Fmc Kongsberg Subsea As | Bronnpumpeinstallasjon |
| US9181785B2 (en) | 2010-11-30 | 2015-11-10 | Baker Hughes Incorporated | Automatic bypass for ESP pump suction deployed in a PBR in tubing |
| US9080436B2 (en) | 2010-12-20 | 2015-07-14 | Baker Hughes Incorporated | Connection assembly for through tubing conveyed submersible pumps |
| US8950476B2 (en) | 2011-03-04 | 2015-02-10 | Accessesp Uk Limited | Coiled tubing deployed ESP |
| NO334816B1 (no) * | 2011-04-28 | 2014-06-02 | Aker Subsea As | Havbunns brønnsammenstilling |
| US20130168102A1 (en) | 2011-12-28 | 2013-07-04 | Vetco Gray Inc. | Drilling riser adapter with emergency functionality |
| US9784063B2 (en) * | 2012-08-17 | 2017-10-10 | Onesubsea Ip Uk Limited | Subsea production system with downhole equipment suspension system |
| US9447677B2 (en) | 2012-11-27 | 2016-09-20 | Esp Completion Technologies L.L.C. | Methods and apparatus for sensing in wellbores |
| EP2941524A4 (en) | 2013-01-02 | 2016-08-24 | Schlumberger Holdings | PACKAGING THE CABLE OF AN ELECTRIC DIPPING PUMP IN A REELABLE PIPE TRACK |
| WO2014145837A2 (en) * | 2013-03-15 | 2014-09-18 | Stanley Hosie | Subsea test adaptor for calibration of subsea multi-phase flow meter during initial well clean-up and test and methods of using same |
| US9593561B2 (en) * | 2013-09-06 | 2017-03-14 | Saudi Arabian Oil Company | Hanger and penetrator for through tubing ESP deployment with a vertical production tree |
-
2015
- 2015-05-13 MY MYPI2016703443A patent/MY182928A/en unknown
- 2015-05-13 NO NO20161941A patent/NO347684B1/en unknown
- 2015-05-13 BR BR112016026567-0A patent/BR112016026567B1/pt active IP Right Grant
- 2015-05-13 GB GB1616962.5A patent/GB2544186B/en active Active
- 2015-05-13 WO PCT/EP2015/060629 patent/WO2015173319A1/en not_active Ceased
- 2015-05-13 US US15/304,921 patent/US9896897B2/en active Active
- 2015-05-13 CA CA2946951A patent/CA2946951A1/en not_active Abandoned
- 2015-05-13 AU AU2015261530A patent/AU2015261530B2/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| NO347684B1 (en) | 2024-02-19 |
| US9896897B2 (en) | 2018-02-20 |
| BR112016026567A2 (enExample) | 2017-08-15 |
| CA2946951A1 (en) | 2015-11-19 |
| GB2544186A (en) | 2017-05-10 |
| NO20161941A1 (en) | 2016-12-06 |
| BR112016026567B1 (pt) | 2022-03-15 |
| US20170183935A1 (en) | 2017-06-29 |
| AU2015261530B2 (en) | 2018-11-15 |
| GB201616962D0 (en) | 2016-11-23 |
| WO2015173319A1 (en) | 2015-11-19 |
| GB2544186B (en) | 2021-07-14 |
| AU2015261530A1 (en) | 2016-10-06 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| MY182928A (en) | Subsea universal xmas tree hang-off adapter | |
| NO20181293A1 (en) | Subsea wellhead assembly | |
| BR112017015372A2 (pt) | conjunto de cabeça de poço submarino | |
| EP3227522A4 (en) | Subsea slanted wellhead system and bop system with dual injector head units | |
| GB2538912A (en) | Rod hang-off system | |
| GB201708056D0 (en) | Subsea wellhead assembly | |
| MY171273A (en) | Subsea well assembly and associated method | |
| AU2012205886A8 (en) | Bore protector | |
| MX2017007818A (es) | Sistema de colector submarino. | |
| GB2526010A (en) | A method of pressure testing a plugged well | |
| MX2018006407A (es) | Sistema y metodo para cimentacion de cabezas de pozo. | |
| MY174420A (en) | Segregating fluids, methods of making, and methods of use | |
| EP3526441A4 (en) | UNDERWATER WELLHEAD STABILIZATION MODULE | |
| EP3693539A4 (en) | PROCEDURE FOR CLOSING OIL AND GAS HOLES | |
| SE1451380A1 (en) | Retrievable re-connecting device with internal seal and slips for connecting to the top of an existing tubing in a wellbore | |
| EP3495604A3 (en) | Subsea isolation sleeve system | |
| GB2620068B (en) | Subsea wellhead systems and methods | |
| GB2575002B (en) | Systems and methods for monitoring subsea wellhead systems | |
| GB202017219D0 (en) | Subsea wellhead system and method | |
| GB2543460A (en) | Drilling component retention system and method | |
| GB2572661A (en) | Pressure sensing system | |
| GB201916204D0 (en) | Subsea wellhead systems and methods | |
| GB201916208D0 (en) | Subsea wellhead systems and methods | |
| GB2602742B (en) | Adapter assembly, flowline connector assembly and subsea production system | |
| AU2015237367A8 (en) | Tool arrangement connected to a Christmas tree and methods for installing and removing of a Christmas tree |