Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Univ Teknologi PetronasfiledCriticalUniv Teknologi Petronas
Priority to MYPI2012005415ApriorityCriticalpatent/MY168914A/en
Publication of MY168914ApublicationCriticalpatent/MY168914A/en
INTERCONNECTING CONCRETE UNIT (ICU-V) PROVIDES A UNIQUE ARMOR UNIT FOR EROSION PROTECTION MEASURE FOR PROTECTING A SLOPING SURFACE FOR COASTAL PROTECTION STRUCTURE. THE PROTECTION STRUCTURE USE TO PROTECT COASTAL AREA, RIVER, LAKE, RESERVOIR BANKS, SHORELINE FROM DAMAGING HYDRODYNAMIC FORCES OF WAVES AND WATER CURRENTS. ICU-V IS DESIGNED TO HAVE INTERLOCKING CAPABILITY AND FRICTION BETWEEN NEIGHBORING UNITS TO GAIN ITS? STABILITY. ICU-V CONSISTS OF THREE ELONGATE MEMBERS WITH TOP SECTION PARALLEL TO THE LONGITUDINAL AXIS. MOST ILLUSTRATIVE DIAGRAM: FIGURE 1
MYPI2012005415A2012-12-142012-12-14Interlocking concrete unit v (icu-v)
MY168914A
(en)
Express flood mitigation works using elevated and or at ground level with tunnel integrated large scale aqueduct with numerous functions, with main function to divert flood water or river water away from cities in order to fight or mitigate flood events and effect of global warming, with discharge invert levels to the sea higher than high tide levels
Limpet dam designed to access piers on any bridge. Dam is constructed from steel plates. The contact point between the pier/s and the dam are sealed. Water is drained from the dam and access to the pier/s is accessible. The structure has structural supports in the form of legs, which will allow the dam to be raised or lowered to any height in the river or ocean.
Method for protection of off-shore area against the effects of ocean tides and winds and the system intended for protection of the off-shore area against the effects of ocean tides