Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Che Bahanuddin Bin Che YobfiledCriticalChe Bahanuddin Bin Che Yob
Priority to MYUI9601107priorityCriticalpatent/MY134998A/en
Publication of MY134998ApublicationCriticalpatent/MY134998A/en
Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes
(AREA)
Retaining Walls
(AREA)
Abstract
THERE IS DISCLOSE A NEW AND INNOVATIVE EMBANKMENT FOR HILLSLOPE AND ITS METHOD OF CONSTRUCTION. ACCORDING TO THE PRESENT INNOVATION, THE EMBANKMENT FOR HILLSLOPE COMPRISING A RETAINING WALL (4), A FILLER MATERIAL, AND AT LEAST ONE ANCHORING MEANS (5) TO FIRMLY HOLD THE RETAINING WALL TO EARTH ON THE HILLSLOPE. WHAT IS NEW AND INNOVATIVE IS INSTEAD OF SAND OR EARTH, EXPANDABLE POLYSTYRENE BLOCKS (6) IS USED AS THE FILLER MATERIAL. EXPANDABLE POLYSTYRENE BLOCKS IS LIGHTER, EASIER TO HANDLE AND IS NOT SUBJECT TO THE MOST COMMON PROBLEM OF A CONVENTIONAL MATERIAL, THAT IS SETTLEMENT. (FIG. 2)
MYUI96011071996-03-231996-03-23Embankment for hillslope and method of constructing the same
MY134998A
(en)