Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Golden Scaffolding Sdn BhdfiledCriticalGolden Scaffolding Sdn Bhd
Priority to MYPI9601089priorityCriticalpatent/MY118805A/en
Publication of MY118805ApublicationCriticalpatent/MY118805A/en
THERE IS DISCLOSED A METHOD OF ASSEMBLING SCAFFOLDING BY RAISING UPRIGHT FIRST FRAME MEMBERS (20A), FIXING CROSS BRACES (30) TO THE FRAME MEMBERS (20A) AND THEN RAISING SUFFICIENTLY FOR FURTHER FRAME MEMBERS (20B) TO BE FASTENED TO THE BOTTOM END OF FIRST FRAME MEMBERS (20A). THE STEPS ARE REPEATED UNTIL REACHING A PREDETERMINED HEIGHT WHEREBY THE UPPER ENDS OF THE FIRST FRAME MEMBERS (20A) ARE FASTENED TO SUPPORT MEANS (12) AND THE SCAFFOLD IS THEN SECURED ONTO THE ADJACENT BUILDING STRUCTURE FOR ADDITIONAL SUPPORT. EACH FRAME MEMBER COMPRISES UPPER ENDS INCLUDING FASTENING MEANS (24) AND BOTTOM ENDS, SUCH THAT ON JOINING UPPER AND LOWER FRAME MEMBERS TOGETHER, UPPER END OF LOWER FRAME MEMBER IS FASTENED ONTO THE BOTTOM END OF UPPER FRAME MEMBER. (FIGURE 5)