Application filed by Say Kiat OngfiledCriticalSay Kiat Ong
Priority to MYPI90002280ApriorityCriticalpatent/MY107352A/en
Publication of MY107352ApublicationCriticalpatent/MY107352A/en
METHOD OF CONCTRUCTION AN ELEVATED ROADWAY OR EMBANKMENT 2 COMPRISING THE STEPS OF :(i)PLACING PILES 8 IN THE GROUND;(ii)SUPPORTING PREFORMED STRUCTURAL ELEMENTS 5, 15 ON THE PILES 8: AND (iii)SUPPORTING PREFORMED SLABS 4 ON THE PREFORMED STRUCTURAL ELEMENTS 5, 15.THE PREFORMED STRUCTURAL ELEMENTS 5, 15 MAY BE SHAPED SO AS TO PROVIDE AN OPEN WORK STRUCTURE. PREFERABLY THE PREFORMED STRUCTURAL ELEMENTS 5, 15 COMPRISE SUBSTANTIALLY V-SHAPED CHANNELS WHICH ARE LAID WITH THEIR LONGITUDINAL AXES AT RIGHT ANGLES TO THE LONGITUDINAL CENTRELINES OF THE ROADWAY 2, AND WITH THEIR FLANGES14 DIRECTED DOWNWARDS. A PLURALITY OF ROWS OF PREFORMED STRUCTURAL ELEMENTS 5, 15 MAY BE STACKED ONE ABOVE THE OTHER TO ACHIEVE THE DESIRED ELEVATION OF THE ROADWAY 2. IN ADDITION, THE SIZE OF SUCCESSIVE PREFORMED STRUCTURAL ELEMENTS 5A, 5B, 15, 15 MAY BE GRADUALLY VARIED TO PROVIDE THE FINISHED ROADWAY 2 WITH THE DESIRED GRADIENT. (FIG.)
MYPI90002280A1990-12-271990-12-27Method of constructing an elevated roadway
MY107352A