MXPA03006977A - Optimizacion de sistemas de red de reservorio, pozo y superficie. - Google Patents
Optimizacion de sistemas de red de reservorio, pozo y superficie.Info
- Publication number
- MXPA03006977A MXPA03006977A MXPA03006977A MXPA03006977A MXPA03006977A MX PA03006977 A MXPA03006977 A MX PA03006977A MX PA03006977 A MXPA03006977 A MX PA03006977A MX PA03006977 A MXPA03006977 A MX PA03006977A MX PA03006977 A MXPA03006977 A MX PA03006977A
- Authority
- MX
- Mexico
- Prior art keywords
- data
- target data
- actual
- reservoir
- predetermined signature
- Prior art date
Links
- 238000005457 optimization Methods 0.000 title 1
- 238000012544 monitoring process Methods 0.000 abstract 3
- 238000000034 method Methods 0.000 abstract 2
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B2200/00—Special features related to earth drilling for obtaining oil, gas or water
- E21B2200/22—Fuzzy logic, artificial intelligence, neural networks or the like
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Geochemistry & Mineralogy (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- Flow Control (AREA)
- Control Of Fluid Pressure (AREA)
- Pipeline Systems (AREA)
- Geophysics And Detection Of Objects (AREA)
- Control Of Heat Treatment Processes (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Un metodo y aparato asociado optimizan continuamente los sistemas de red de reservorio, pozo y superficie utilizando dispositivos de datos de monitoreo y control en el fondo del pozo para cambiar en forma continua la posicion de una valvula de control inteligente (VCI) (12) hasta que un conjunto de caracteristicas asociadas con los datos monitoreados "actuales" es aproximadamente igual o no es significativamente diferente a un conjunto de caracteristicas asociadas con datos "objetivo" que se suministran mediante un simulador de reservorio (32). Un pulso de control (18) que posee un afirma predeterminada se transmite en el fondo del pozo y de ese modo cambia una posicion de la VCI. En respuesta, un sensor (14) genera senales que representan de datos de monitoreo "actuales". Un simulador (32) que modela una capa de reservorio provee datos "objetivo". Un aparato de computacion (30) recibe los datos "actuales" y los datos "objetivo" y, cuando los datos "reales" no son aproximadamente iguales a los datos "objetivo", el aparato de computacion (39) ejecuta un codigo de programa de "proceso de monitoreo y control" que cambia la firma predeterminada del pulso de control a una segunda firma predeterminada diferente. Un nuevo pulso que posee una segunda firma predeterminada se transmite al fondo del pozo y el proceso anterior se repite hasta que los datos "actuales" recibidos por el aparato de computacion (30) es aproximadamente igual a los datos "objetivo".
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US26646401P | 2001-02-05 | 2001-02-05 | |
PCT/US2002/003224 WO2002063130A1 (en) | 2001-02-05 | 2002-02-04 | Optimization of reservoir, well and surface network systems |
Publications (1)
Publication Number | Publication Date |
---|---|
MXPA03006977A true MXPA03006977A (es) | 2004-04-02 |
Family
ID=23014691
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
MXPA03006977A MXPA03006977A (es) | 2001-02-05 | 2002-02-04 | Optimizacion de sistemas de red de reservorio, pozo y superficie. |
Country Status (9)
Country | Link |
---|---|
US (1) | US7434619B2 (es) |
EP (1) | EP1358394B1 (es) |
AU (1) | AU2002235526B2 (es) |
BR (1) | BR0203994B1 (es) |
CA (1) | CA2437335C (es) |
EA (1) | EA005604B1 (es) |
MX (1) | MXPA03006977A (es) |
NO (1) | NO329034B1 (es) |
WO (1) | WO2002063130A1 (es) |
Families Citing this family (62)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8682589B2 (en) * | 1998-12-21 | 2014-03-25 | Baker Hughes Incorporated | Apparatus and method for managing supply of additive at wellsites |
US20080262737A1 (en) * | 2007-04-19 | 2008-10-23 | Baker Hughes Incorporated | System and Method for Monitoring and Controlling Production from Wells |
US6853921B2 (en) | 1999-07-20 | 2005-02-08 | Halliburton Energy Services, Inc. | System and method for real time reservoir management |
US7379853B2 (en) | 2001-04-24 | 2008-05-27 | Exxonmobil Upstream Research Company | Method for enhancing production allocation in an integrated reservoir and surface flow system |
WO2004049216A1 (en) * | 2002-11-23 | 2004-06-10 | Schlumberger Technology Corporation | Method and system for integrated reservoir and surface facility networks simulations |
US7584165B2 (en) * | 2003-01-30 | 2009-09-01 | Landmark Graphics Corporation | Support apparatus, method and system for real time operations and maintenance |
US20050088316A1 (en) * | 2003-10-24 | 2005-04-28 | Honeywell International Inc. | Well control and monitoring system using high temperature electronics |
US20050087336A1 (en) * | 2003-10-24 | 2005-04-28 | Surjaatmadja Jim B. | Orbital downhole separator |
US7946356B2 (en) | 2004-04-15 | 2011-05-24 | National Oilwell Varco L.P. | Systems and methods for monitored drilling |
US7370701B2 (en) * | 2004-06-30 | 2008-05-13 | Halliburton Energy Services, Inc. | Wellbore completion design to naturally separate water and solids from oil and gas |
US7429332B2 (en) * | 2004-06-30 | 2008-09-30 | Halliburton Energy Services, Inc. | Separating constituents of a fluid mixture |
US7462274B2 (en) * | 2004-07-01 | 2008-12-09 | Halliburton Energy Services, Inc. | Fluid separator with smart surface |
US7823635B2 (en) * | 2004-08-23 | 2010-11-02 | Halliburton Energy Services, Inc. | Downhole oil and water separator and method |
AU2006344398B2 (en) | 2005-10-06 | 2011-05-19 | Logined B.V. | Method, system and apparatus for numerical black oil delumping |
CN101371164A (zh) | 2006-01-20 | 2009-02-18 | 界标制图有限公司 | 动态生产系统管理 |
US8504341B2 (en) * | 2006-01-31 | 2013-08-06 | Landmark Graphics Corporation | Methods, systems, and computer readable media for fast updating of oil and gas field production models with physical and proxy simulators |
US20070179766A1 (en) * | 2006-01-31 | 2007-08-02 | Landmark Graphics Corporation | Methods, systems, and computer-readable media for real-time oil and gas field production optimization using a proxy simulator |
US7464753B2 (en) * | 2006-04-03 | 2008-12-16 | Time Products, Inc. | Methods and apparatus for enhanced production of plunger lift wells |
BRPI0720128A2 (pt) * | 2006-12-07 | 2014-12-09 | Logined Bv | Método para realizar operações em um campo de petróleo, programa de computador adaptado para ser executado por um processador, dispositivo armazenador de programas legíveis por uma máquina, e sistema adaptado para alocação ideal de recurso |
US7953584B2 (en) * | 2006-12-07 | 2011-05-31 | Schlumberger Technology Corp | Method for optimal lift gas allocation |
US8078444B2 (en) * | 2006-12-07 | 2011-12-13 | Schlumberger Technology Corporation | Method for performing oilfield production operations |
US7828058B2 (en) * | 2007-03-27 | 2010-11-09 | Schlumberger Technology Corporation | Monitoring and automatic control of operating parameters for a downhole oil/water separation system |
US20080257544A1 (en) * | 2007-04-19 | 2008-10-23 | Baker Hughes Incorporated | System and Method for Crossflow Detection and Intervention in Production Wellbores |
US7711486B2 (en) | 2007-04-19 | 2010-05-04 | Baker Hughes Incorporated | System and method for monitoring physical condition of production well equipment and controlling well production |
US7805248B2 (en) | 2007-04-19 | 2010-09-28 | Baker Hughes Incorporated | System and method for water breakthrough detection and intervention in a production well |
US9175547B2 (en) * | 2007-06-05 | 2015-11-03 | Schlumberger Technology Corporation | System and method for performing oilfield production operations |
JP2010537282A (ja) * | 2007-08-14 | 2010-12-02 | シエル・インターナシヨナル・リサーチ・マートスハツペイ・ベー・ヴエー | 化学プラントや精製所の連続オンラインモニタリング用のシステムおよび方法 |
US8892221B2 (en) * | 2007-09-18 | 2014-11-18 | Groundswell Technologies, Inc. | Integrated resource monitoring system with interactive logic control for well water extraction |
US20090076632A1 (en) * | 2007-09-18 | 2009-03-19 | Groundswell Technologies, Inc. | Integrated resource monitoring system with interactive logic control |
US8121790B2 (en) * | 2007-11-27 | 2012-02-21 | Schlumberger Technology Corporation | Combining reservoir modeling with downhole sensors and inductive coupling |
CN101903805B (zh) * | 2007-12-21 | 2013-09-25 | 埃克森美孚上游研究公司 | 沉积盆地中的建模 |
US8751164B2 (en) * | 2007-12-21 | 2014-06-10 | Schlumberger Technology Corporation | Production by actual loss allocation |
EP2279329A2 (en) * | 2008-03-20 | 2011-02-02 | BP Corporation North America Inc. | Management of measurement data being applied to reservoir models |
US8670966B2 (en) * | 2008-08-04 | 2014-03-11 | Schlumberger Technology Corporation | Methods and systems for performing oilfield production operations |
US20100243243A1 (en) * | 2009-03-31 | 2010-09-30 | Schlumberger Technology Corporation | Active In-Situ Controlled Permanent Downhole Device |
US8600717B2 (en) | 2009-05-14 | 2013-12-03 | Schlumberger Technology Corporation | Production optimization for oilfields using a mixed-integer nonlinear programming model |
US20100300696A1 (en) * | 2009-05-27 | 2010-12-02 | Schlumberger Technology Corporation | System and Method for Monitoring Subsea Valves |
US8025445B2 (en) | 2009-05-29 | 2011-09-27 | Baker Hughes Incorporated | Method of deployment for real time casing imaging |
US20110067882A1 (en) * | 2009-09-22 | 2011-03-24 | Baker Hughes Incorporated | System and Method for Monitoring and Controlling Wellbore Parameters |
US9482077B2 (en) | 2009-09-22 | 2016-11-01 | Baker Hughes Incorporated | Method for controlling fluid production from a wellbore by using a script |
US20110099423A1 (en) * | 2009-10-27 | 2011-04-28 | Chih-Ang Chen | Unified Boot Code with Signature |
CA2693640C (en) | 2010-02-17 | 2013-10-01 | Exxonmobil Upstream Research Company | Solvent separation in a solvent-dominated recovery process |
CA2696638C (en) | 2010-03-16 | 2012-08-07 | Exxonmobil Upstream Research Company | Use of a solvent-external emulsion for in situ oil recovery |
CA2705643C (en) | 2010-05-26 | 2016-11-01 | Imperial Oil Resources Limited | Optimization of solvent-dominated recovery |
US9031674B2 (en) | 2010-10-13 | 2015-05-12 | Schlumberger Technology Corporation | Lift-gas optimization with choke control |
US8805660B2 (en) | 2010-12-13 | 2014-08-12 | Chevron U.S.A. Inc. | Method and system for coupling reservoir and surface facility simulations |
US8781807B2 (en) | 2011-01-28 | 2014-07-15 | Raymond E. Floyd | Downhole sensor MODBUS data emulator |
US9816353B2 (en) * | 2013-03-14 | 2017-11-14 | Schlumberger Technology Corporation | Method of optimization of flow control valves and inflow control devices in a single well or a group of wells |
CA2930653C (en) * | 2013-11-14 | 2020-09-29 | Statoil Petroleum As | Well control system |
US10443358B2 (en) | 2014-08-22 | 2019-10-15 | Schlumberger Technology Corporation | Oilfield-wide production optimization |
US9951601B2 (en) | 2014-08-22 | 2018-04-24 | Schlumberger Technology Corporation | Distributed real-time processing for gas lift optimization |
US10704388B2 (en) * | 2016-03-31 | 2020-07-07 | Schlumberger Technology Corporation | Systems and methods for pump control based on non-linear model predictive controls |
CA2972203C (en) | 2017-06-29 | 2018-07-17 | Exxonmobil Upstream Research Company | Chasing solvent for enhanced recovery processes |
CA2974712C (en) | 2017-07-27 | 2018-09-25 | Imperial Oil Resources Limited | Enhanced methods for recovering viscous hydrocarbons from a subterranean formation as a follow-up to thermal recovery processes |
CA2978157C (en) | 2017-08-31 | 2018-10-16 | Exxonmobil Upstream Research Company | Thermal recovery methods for recovering viscous hydrocarbons from a subterranean formation |
CA2983541C (en) | 2017-10-24 | 2019-01-22 | Exxonmobil Upstream Research Company | Systems and methods for dynamic liquid level monitoring and control |
CN108397173A (zh) * | 2018-02-07 | 2018-08-14 | 中国石油天然气股份有限公司 | 分层注水系统及分层注水方法 |
BR112020020537B1 (pt) | 2018-05-23 | 2023-10-24 | Halliburton Energy Services, Inc. | Aparelho e método |
BR112020020538B1 (pt) | 2018-05-23 | 2024-04-30 | Halliburton Energy Services, Inc | Aparelho e método para controlar uma ou mais válvulas de controle |
CN112012700B (zh) * | 2019-05-13 | 2023-03-31 | 中国石油化工股份有限公司 | 一种用于稠油雾化掺稀降粘的模拟系统及模拟方法 |
CN111734407A (zh) * | 2020-06-30 | 2020-10-02 | 中海石油(中国)有限公司天津分公司 | 一种考虑不同完井方式的油气井产能评价实验装置 |
US20240068324A1 (en) * | 2022-08-30 | 2024-02-29 | Saudi Arabian Oil Company | Controlling production efficiency of intelligent oil fields |
Family Cites Families (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US581811A (en) * | 1897-05-04 | James coyle | ||
US1796699A (en) * | 1926-09-07 | 1931-03-17 | John W Wyland | Egg tester |
US4633954A (en) | 1983-12-05 | 1987-01-06 | Otis Engineering Corporation | Well production controller system |
US4796699A (en) | 1988-05-26 | 1989-01-10 | Schlumberger Technology Corporation | Well tool control system and method |
US4896722A (en) | 1988-05-26 | 1990-01-30 | Schlumberger Technology Corporation | Multiple well tool control systems in a multi-valve well testing system having automatic control modes |
US4856595A (en) * | 1988-05-26 | 1989-08-15 | Schlumberger Technology Corporation | Well tool control system and method |
US5732776A (en) * | 1995-02-09 | 1998-03-31 | Baker Hughes Incorporated | Downhole production well control system and method |
US5706896A (en) | 1995-02-09 | 1998-01-13 | Baker Hughes Incorporated | Method and apparatus for the remote control and monitoring of production wells |
US5597042A (en) | 1995-02-09 | 1997-01-28 | Baker Hughes Incorporated | Method for controlling production wells having permanent downhole formation evaluation sensors |
FR2742794B1 (fr) | 1995-12-22 | 1998-01-30 | Inst Francais Du Petrole | Methode pour modeliser les effets des interactions entre puits sur la fraction aqueuse produite par un gisement souterrain d'hydrocarbures |
US6046685A (en) * | 1996-09-23 | 2000-04-04 | Baker Hughes Incorporated | Redundant downhole production well control system and method |
US6434435B1 (en) * | 1997-02-21 | 2002-08-13 | Baker Hughes Incorporated | Application of adaptive object-oriented optimization software to an automatic optimization oilfield hydrocarbon production management system |
US5992519A (en) | 1997-09-29 | 1999-11-30 | Schlumberger Technology Corporation | Real time monitoring and control of downhole reservoirs |
US6236894B1 (en) | 1997-12-19 | 2001-05-22 | Atlantic Richfield Company | Petroleum production optimization utilizing adaptive network and genetic algorithm techniques |
US6101447A (en) | 1998-02-12 | 2000-08-08 | Schlumberger Technology Corporation | Oil and gas reservoir production analysis apparatus and method |
US6266619B1 (en) | 1999-07-20 | 2001-07-24 | Halliburton Energy Services, Inc. | System and method for real time reservoir management |
US20020049575A1 (en) * | 2000-09-28 | 2002-04-25 | Younes Jalali | Well planning and design |
US20020177955A1 (en) | 2000-09-28 | 2002-11-28 | Younes Jalali | Completions architecture |
US7294317B2 (en) | 2001-02-08 | 2007-11-13 | Sd Lizenzverwertungsgesellschaft Mbh & Co. | Exothermic reaction system |
US7379853B2 (en) | 2001-04-24 | 2008-05-27 | Exxonmobil Upstream Research Company | Method for enhancing production allocation in an integrated reservoir and surface flow system |
-
2002
- 2002-02-04 EA EA200300855A patent/EA005604B1/ru not_active IP Right Cessation
- 2002-02-04 EP EP02702144A patent/EP1358394B1/en not_active Expired - Lifetime
- 2002-02-04 CA CA002437335A patent/CA2437335C/en not_active Expired - Lifetime
- 2002-02-04 AU AU2002235526A patent/AU2002235526B2/en not_active Expired
- 2002-02-04 MX MXPA03006977A patent/MXPA03006977A/es active IP Right Grant
- 2002-02-04 US US10/467,275 patent/US7434619B2/en not_active Expired - Lifetime
- 2002-02-04 WO PCT/US2002/003224 patent/WO2002063130A1/en active IP Right Grant
- 2002-02-04 BR BRPI0203994-0A patent/BR0203994B1/pt not_active IP Right Cessation
- 2002-10-01 NO NO20024720A patent/NO329034B1/no not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
CA2437335A1 (en) | 2002-08-15 |
EP1358394A1 (en) | 2003-11-05 |
CA2437335C (en) | 2008-01-08 |
NO20024720L (no) | 2002-12-05 |
EA005604B1 (ru) | 2005-04-28 |
BR0203994A (pt) | 2003-05-06 |
EP1358394B1 (en) | 2007-01-24 |
BR0203994B1 (pt) | 2011-10-04 |
EA200300855A1 (ru) | 2004-08-26 |
AU2002235526B2 (en) | 2007-02-15 |
US20040104027A1 (en) | 2004-06-03 |
NO20024720D0 (no) | 2002-10-01 |
WO2002063130A1 (en) | 2002-08-15 |
US7434619B2 (en) | 2008-10-14 |
EP1358394A4 (en) | 2005-05-18 |
NO329034B1 (no) | 2010-08-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
MXPA03006977A (es) | Optimizacion de sistemas de red de reservorio, pozo y superficie. | |
WO2003036330A8 (en) | Neural network based predication and optimization for groundwater / surface water system | |
WO2002086670A3 (en) | Simplified modeling software interface and method | |
WO2005034180A3 (en) | System and method for on-tool semiconductor simulation | |
WO2007047868A3 (en) | System, method, and computer program for early event detection | |
WO2004064416A3 (en) | Remote control with local, screen-guided setup | |
WO2003025689A3 (en) | Large scale process control by driving factor identification | |
WO2002031608A3 (en) | Plc executive with integrated web server | |
WO2005091899A3 (en) | Surface real-time processing of downhole data | |
WO2008094611A3 (en) | Simulation system implementing real-time machine data | |
AU2003290466A1 (en) | System and method for testing a control system of a marine vessel | |
WO2006124308A3 (en) | Computer assisted lighting control system | |
ATE308779T1 (de) | Verfahren und vorrichtung zur steuerung eines elektronischen systems oder eines informationssystems durch einen flüssigkeitsstrom | |
DE60224034D1 (de) | Alarme auf modellbasis | |
AU2002307547A1 (en) | System and method for configuring and asapting a mass flow controller | |
WO2002086277A3 (en) | Method for enhancing production allocation in an integrated reservoir and surface flow system | |
WO2003057011A3 (en) | Systems and methods for predicting disease behavior | |
WO2002031607A3 (en) | A method and apparatus for generating an application for an automation control system | |
MX2007002574A (es) | Sistema y metodo de control de proceso. | |
WO2004012054A3 (en) | System and method for model based control | |
WO2002067090A3 (en) | System and method for selectively enabling and disabling access to software applications over a network | |
ATE401718T1 (de) | Kommunikationssystem mit einer vorrichtung zum datenempfang von einer vielzahl von mess- oder steuerungsvorrichtungen | |
DE60134302D1 (de) | Verfahren und System zur Steuerung einer Kraftrückkopplungsvorrichtung | |
ATE300379T1 (de) | Werkzeug mit fluidbetätigter achse | |
WO2004003328A3 (en) | Method and system for controlling devices in hydrocarbon production |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FG | Grant or registration |