CN101371164A - 动态生产系统管理 - Google Patents

动态生产系统管理 Download PDF

Info

Publication number
CN101371164A
CN101371164A CNA2007800025651A CN200780002565A CN101371164A CN 101371164 A CN101371164 A CN 101371164A CN A2007800025651 A CNA2007800025651 A CN A2007800025651A CN 200780002565 A CN200780002565 A CN 200780002565A CN 101371164 A CN101371164 A CN 101371164A
Authority
CN
China
Prior art keywords
data
oil well
model
transmission system
automatically
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2007800025651A
Other languages
English (en)
Inventor
R·埃拉
A·拉塞尔
L·里德
W·D·约翰逊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Landmark Graphics Corp
Original Assignee
Landmark Graphics Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Landmark Graphics Corp filed Critical Landmark Graphics Corp
Publication of CN101371164A publication Critical patent/CN101371164A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning

Abstract

接收关于从地下油藏(202)提取产物的油井(204)操作、以及地下油藏(202)的特性或销售点上游的处理和传输系统的操作中的至少一个的数据。可响应于接收到的数据与指定的操作目标之间的差异自动地对油井(204)或处理和传输系统(206)中的至少一个发起校正动作。可响应于接收到的数据自动对油藏、油井、以及处理和传输系统的模型(228)发起调整。

Description

动态生产系统管理
相关申请的引用
本申请要求提交于2006年1月20日题为“Dynamic Exploration andProduction Asset Management”(动态勘探及生产资产管理)的美国专利申请S/N.60/760,708的优先权。
背景
本说明涉及地下油藏的生产管理。
传统上,地下油藏和用于回收、处理并将从油藏回收的资源传输至销售点的系统还未充分实现,这是由于源自关于油藏和系统的当前及历史数据、专家解释、决策以及执行动作在时间和通信上的断裂所引起的管理的低效率。时间和通信上的断裂不仅导致了损失,还导致无法实现改进机会。此外,尽管可以定期地监视一些生产子系统以寻求减轻损失或改进操作的机会,但经常遭受到的断裂阻碍了解决所发现和遭受到的损失的影响、或阻碍了用以减轻损失或实现整个生产系统的改进的动作的发起。优化研究一向说明生产和工作效率的实质和后续优化是可实现的,并且指示这些系统固有地无法维持上游生产系统的有效操作。
概要
本公开一般性地描述了用于管理地下油藏的生产的说明性系统和方法,包括上游生产系统。
一个方面包括一种方法,其中接收关于从地下油藏提取产物的油井操作、以及地下油藏的特性或销售点上游的处理和传输系统的操作中的至少一个的数据。响应于接收到的数据与指定操作目标之间的差异对油井或处理和传输系统中的至少一个发起校正动作。在特定情形下,一种包括机器可读介质的制品存储可用以使一个或多个机器执行包括该方法的操作的指令。在特定情形下,具有至少一个处理器和耦合至所述至少一个处理器的至少一个存储器的一种系统存储可用以使该至少一个处理器执行包括该方法的操作的指令。
另一方面包括一种方法,其中接收关于从地下油藏提取产物的油井操作以及地下油藏的特性、或炼油厂之前销售点上游的处理和传输系统的操作中的至少一个的数据。使用所述数据和所述油井、所述地下油藏以及所述处理和传输系统的模型,自动确定相关于指定操作目标对所述油井或所述处理和传输系统中的至少一个的校正动作。对油井、处理和传输系统的采集系统或处理和传输系统的生产设施中的至少一个的校正动作。在特定情形下,一种包括机器可读介质的制品存储可用以使一个或多个机器执行包括该方法的操作的指令。在特定情形下,具有至少一个处理器和耦合至所述至少一个处理器的至少一个存储器的一种系统存储可用以使该至少一个处理器执行包括该方法的操作的指令。
另一方面包括一种方法,其中接收关于从地下油藏提取产物的油井操作、以及地下油藏的特性或销售点上游的处理和传输系统的操作中的至少一个的数据。响应于接收到的数据自动对油藏、油井、以及处理和传输系统的模型发起调整。在特定情形下,一种包括机器可读介质的制品存储可用以使一个或多个机器执行包括该方法的操作的指令。在特定情形下,具有至少一个处理器和耦合至所述至少一个处理器的至少一个存储器的一种系统存储可用以使该至少一个处理器执行包括该方法的操作的指令。
特定方面包括以下这些特征中的一个或多个。操作目标包括产物销售率或产物生产率中的至少一个。处理和传输系统包括用于在炼油厂上游处理产物的生产设施和用于将产物从油井运输到销售点的采集系统。自动对生产设施发起校正动作包括对以下至少之一发起调整:提供给分离器的流的量、提供给分离器的流的压力、提供给分离器的流的流量、提供给脱水器的流的量、提供给脱水器的流的压力、提供给脱水器的流的流量、阀门、阻气门、流控制设备、压缩机、泵、加热器、冷却器、或液位。自动对采集系统发起校正动作包括对以下至少之一发起调整:通过管道的流的量、通过管道提供的流的压力、通过管道提供的流的流量、阀门、阻气门、流控制设备、压缩机、泵、加热器、和冷却器。自动发起对油井的校正动作包括对油井的产出率或油井的注入率中的至少一个发起调整。自动确定校正动作是使用地下油藏、油井以及处理和传输系统的模型来执行的。该模型包括第一主模型、代理模型、或导出模型中的至少一种。对模型的调整是响应于接收到的数据自动发起的。关于地下油藏的特性的数据包括地震数据、地质数据或测井数据中的至少一种。关于油井的操作的数据包括流量、压力、温度、流体成分、流体密度、粘度或致动器状态中的至少一种。关于处理和传输系统的操作的数据包括流量、压力、温度、流体成分、流体密度、粘度或致动器状态中的至少一种。接收数据包括实时地接收数据。自动发起校正动作包括实时地自动发起校正动作。操作可包括自动对油井或处理和传输系统中的至少一个发起校正动作,校正动作是使用经调整的模型来确定的。调整模型包括实时地调整模型。
一个或多个实现的详情在附图及以下说明中阐述。其它特征、目的、以及优点将可从此说明和附图、以及所附权利要求书显而易见。
附图描述
图1是将通常在从地下油藏可得的潜产量与从该油藏得到的实际产量之间所体验到的产量延缓的分层结构图形地表示为潜能和延缓间隙的条形图。
图2A是对上游生产系统操作的说明性生产管理系统的框图。
图2B是由图2A的说明性管理系统操作的说明性上游生产系统的示意图。
图3A是描绘图2A中说明性生产管理系统的某些子元素的框图。
图3B是描绘图2A中说明性生产管理系统的替换子元素的框图。
图4是图2A中说明性生产管理系统的说明性自动化生产工作流的框图。
图5是描绘图2A中说明性生产管理系统确定上游生产系统潜能和延缓间隙的操作的框图。
图6是图2A中说明性生产管理系统的说明性自动化模型更新的框图。
图7是描绘图2A中说明性生产管理系统的说明性经编配的生产操作工作流的操作的流程图。
图8是描绘图2A中说明性生产管理系统的说明性经编配的生产损失报告工作流的操作的流程图。
图9是描绘图2A中说明性生产管理系统的说明性经编配的维护工作流的操作的流程图。
图10是描绘图2A中生产管理系统的说明性经编配的生产管理工作流的操作的流程图。
各附图中的相似的参考标号指示相类似的元素。
具体描述
本公开描述了管理上游生产系统,包括系统及其方法的一些说明性示例。如在此使用的,上游生产系统包括:其中具有一个或多个产烃类地层的一个或多个地下油藏、用于从油藏提取烃类和其它流体(“产物”)和副产物的油井、以及用于处理来自油藏的产物并将其移至销售点的处理和传输系统。在考虑销售点时无需用常规销售来表征,而是可包括其它转移,这其中包括公司内的控制转移。上游生产系统可包括横跨多个油井区、开采权或其它法律、政府或物理边界的油藏,并且可包括由一个或一个以上的公司或法人实体所有、控制或运营的油藏、油井、以及处理和传输系统。用于提取产物的油井和用于处理及转移产物的处理和传输系统可包括一个或多个海上或陆上设施。在特定情形下,产物包括原油、天然气、和/或液化天然气。
首先参照图1,上游生产系统的地下油藏包含有限量的产物。然而出于各种原因,并非所有产物都能或都将从地下油藏中产出。换言之,产物的一部分潜产量被延缓。图1中的条形图将产量延缓的分层结构图形地表示为潜能和延缓间隙。地下油藏内所包含的有限量的可得产物限定了油藏潜能102(即,上游生产系统潜产量和可实现回收的最终水平)。以下讨论一些示例分类的产量延缓。
一种产量延缓——油田开发间隙104,源于地下油藏的油井设施和其它基础设施可能不能产出地下油藏中有限量的可得产物的全部。例如,在设计油井设施及基础设施的安装时,可能会权衡成本与预期将从地下油藏获得的产物的价值。在许多情况下,安装提取所有可得产物所必需的油井和基础设施在财政上是不可行的。此外,诸如经济因素、政治因素、装备和材料的可用性、人力可用性及其它因素等各种附加因素可导致不能够提取所有可得产物这一实现。另外,指定设计在一些操作部分中可能没有完全实现。例如,同时完成将在从油藏提取产物时使用的全部油井和基础设施可能是不可行的。设计还可能规定油井和基础设施的分阶段安装以及开采油藏地层的分阶段计划。因此,当油藏未被完全开发和/或配置以从少于全部的地层开采时,可提取甚至更少的可得产物。油井和基础设施提取可得产物的能力产生已安装潜能106。因此,油田开发间隙104根据上游生产系统潜能102与已安装潜能106之间的差异而逐渐形成。
另一产量延缓——性能间隙108,源于一个或多个地下油藏、油井、以及处理和传输系统的操作性能的退化。例如,可提取产物的量和提取速率在油藏的寿命期间改变,并且通常随着油藏条件使得产物提取更加困难而下降。此外,产物构成可在油藏的寿命期间变化。油藏中可得和/或可行产物的量下降、以及容易得到、可行的产物耗尽迫使生产转向更难以到达的产物。同样地,在油井的寿命期间,其提取产物的效率随着井身上条件的改变以及油井的装备及其它硬件丧失性能(例如,由于磨损、堵塞、故障或其它)而下降。这些油藏和油井特性是上游生产操作中在特定情形下希望减轻或响应的固有不确定性的原因。在处理和传输系统的寿命期间,处理和转移产物的效率随着该系统的装备和其它硬件丧失性能(例如,由于磨损、堵塞、故障及其它)而下降。上游生产系统操作性能的降低或退化导致可用潜能110。因此,性能间隙108根据已安装潜能106与可用潜能110之间的差异而逐渐形成。
另一产量延缓——可用性间隙112,源于用以实现和维持可用潜能110所必需的装备、材料、及人力的可用性的缺乏。例如,随着装备和/或油井以及基础设施的性能的退化,可能降低油井和基础设施或工具的工作效率。为了取回效率损失,装备可能需要调整、维护或更替,或者油井可能需要检查或退役并在另一位置重新钻井。如果调整、维护或更替所必需的装备、材料或人力不可用,则该降低的效率将一直继续到这些装备、材料或人力可用。同样地,在分阶段的开发计划中,进一步开发油藏的速率可能受到装备、材料、和人力的可用性的限制。在任何时候,都可能有装备、材料或人力的限制或不可用性阻碍获得可用潜能110的多种实例。装备、材料和人力的可用性产生操作潜能114。因此,可用性间隙112根据可用潜能110与操作潜能114之间的差异而逐渐形成。
另一产量延缓——容量间隙116,源于上游生产系统——包括其被最优地设置或调整以实现操作潜能114的油井、处理和传输系统以及其组件和装备的故障。例如,当工作条件改变时,油井、处理和传输系统和/或其组件和装备可能需要调整以最优或接近最优地补偿条件的改变。另外,油井、处理和传输系统、和/或其组件和装备的实际操作可能与预期操作不同,这可能是诸如因为效率损失(例如,由于磨损、堵塞、故障或其它)或者由于油藏、油井、和/或处理及运输系统的预期操作没有准确表示实际操作(例如,由于最初没有准确建模或没有精确维护,或者纳入该模型或从该模型导出的假设过期或不正确)。为了实现预期的操作,油井及基础设施、工具、和/或其装备可能需要调整。可归因于上游生产系统的组件和子组件未被最优地设置或调整的延缓和产量得到实际产量120。因此,容量间隙116根据操作潜能114与实际潜能120之间的差异而逐渐形成。
油田开发间隙104、性能间隙108、可用性间隙112、以及容量间隙116的总和等于总延缓,或者在特定情形下等于实际产量120与上游生产系统潜能102之间损失的产量118。在此所述的说明性系统和方法操作(在一些情况下自动操作)以减小性能间隙108、可用性间隙112和容量间隙116,并且增大(在一些情况下优化)可用潜能110、操作潜能114、以及实际产量122并减少总延缓的产量118。
现在转到图2A,以框图格式描绘一说明性生产管理系统200。该说明性系统200对诸如在图2B中示意性描绘的说明性上游生产系统250等上游生产系统操作以控制该上游生产系统实现一个或多个操作目标。该说明性生产管理系统200在特定情形下通过实现一个或多个校正动作来逐步实现或实现一个或多个操作目标。说明性生产管理系统200的操作以及得到的对上游生产系统250的控制可全部自动化或可部分自动化。如从以下讨论将变得显而易见的是,在特定情形下,说明性生产管理系统200可用以对上游生产系统250分析并发起和/或执行校正动作,并且其操作为连续或基本连续、在规则和/或不规则间隔上定期、或者有时连续而有时定期。该说明性生产管理系统200的不同方面可以不同速率工作。在特定情形下,可以与上游生产系统250的相关操作上的显著改变没有显著延迟地发起和/或执行部分或全部校正动作。在特定情形下,可以实时地、与上游生产系统250的相关操作上的显著改变在时间上相近地发起和/或执行部分或全部校正动作。
在特定情形下,操作目标可包括以下一个或多个:指定的上游生产系统价值目标、指定的生产量、指定的生产特性、指定的系统利用率、指定的操作可用时间/可用性、指定的维护效率、指定的环境辐射、合法性目标或其它目标。指定的上游生产系统价值目标可包括以下一个或多个:指定的净现值、指定的现金流、指定的生产成本延缓、指定的采油成本、指定的最终回收因素、指定的最终回收的产物或其它目标。产物特性可包括热值、比重、含硫量、含水量或其它特性的一个或多个。合法性目标可包括以下一个或多个:指定的安全性目标、指定的辐射、指定的废物处理目标、指定的副产物回收、指定的发电、指定的产物分配或会计、或其它目标。在特定情形下,可专门将这些目标中的一个或多个最优化或接近最优化、和/或最大化或接近最大化。例如,在特定情形下,操作目标可包括将来自上游生产系统的生产量最大化或接近最大化。在特定情形下,各操作目标可按重要性的分层结构来排序,并且重要的操作目标在确定校正动作时可加权较大,而不太重要的操作目标可加权较小。
图2B的说明性上游生产系统250包括一个或多个油藏202(示出一个)、用于从油藏202提取产物或副产物的一个或多个油井及其它基础设施204a-204x(统称为油井204)、以及用于处理这些产物(及其它流体)并在油藏202与一个或多个销售点208(示出一个)之间进行传输的处理和传输系统206。
油井204包括用以控制生产和/或来自及去往油井的灌注的组件和装备252a-252x(统称为组件252)。在特定情形下,组件252包括一个或多个阻气门、阀门、其它流体控制设备、传感器、测试设备、地面和/或井下蒸汽发生器、甲醇灌注系统、压缩机、泵及其它装备。在特定情形下,油井204可以是已完成的,或者可以是在钻井的过程中,并且可包括在钻井的同时正在产油的油井。
处理和传输系统206包括用以在油藏202、一个或多个生产设施260以及销售点208之间传送产物和其它流体的采集和传输网络254,其具有输油管网络256和其它装备及组件258a-258x(通称为装备258)。在特定情形下,采集和传输网络254可用以执行以下一种或多种动作:将产物或副产物传输回油井204和/或油藏202以便重新灌注,提供气体以用于从油藏202气举出产物,压缩产物和/或副产物,泵抽产物和/或副产物,存储产物和/或副产物,执行对产物和/或副产物的一些处理,或其它功能。在特定情形下,采集和传输网络258可包括以下一个或多个:阀门,阻气门,其它流控制设备,传感器,测试设备,压缩机,泵,马达,包括加热器和/或冷却器的热交换器,分离器,储油罐及其它装备。生产设施260用以分离和处理从油井204回收到的一种或多种产物和副产物。在特定情形下,生产设施260可用以执行以下一种或多种动作:从副产物中分离产物(例如,从水和沉积物中分离烃类),分离产物(例如,液体和气体相分离)、处理产物和/或副产物(例如,对产物进行脱硫、脱水、添加水合抑制剂、和/或移除重金属),压缩产物和/或副产物,泵抽产物和/或副产物,存储产物和/或副产物,发电,为产物和/或副产物提供测试和测量,或其它功能。在特定情形下,生产设施260包括一个或多个阀门,阻气门,其它流控制设备,传感器、测试设备,压缩机,泵,涡轮,马达,包括加热器和/或冷却器的热交换器,分离器,脱水器,乳化器,甲醇灌注系统,储油罐及其它装备。
关于生产管理系统200,该系统的一个或多个方面可用数字电子电路、集成电路、或用计算机硬件、固件、软件、或用它们的组合来实现。生产管理系统200的一个或多个方面可用切实包含在机器可读存储设备中供可编程处理器执行的软件产品(例如,计算机程序产品)来实现,并且处理操作可由执行指令程序的可编程处理器来执行通过对输入数据运算并产生输出来执行所描述的功能。这些方面的一个或多个可用在可编程系统上执行的一个或多个软件程序来实现,该可编程系统包括耦合用以从/向数据存储系统接收数据和指令并传送数据和指令的至少一个可编程处理器、至少一个输入设备、以及至少一个输出设备。每个软件程序可根据需要以高级过程或面向对象编程语言、或以汇编或机器语言来实现;并且在任意情形下,该语言可以是经编译或解释的语言。
说明性生产管理系统200的一个或多个方面可驻留在上游生产系统250上或远离上游生产系统250。在一个示例中,操作设施262容纳用以操作生产管理系统200的一个或多个方面的一个或多个处理器264和一个或多个机器可读存储设备266。在特定情形下,操作设施262远离上游生产系统200驻留并经由包括一个或多个公众可接入通信网络(例如,因特网、电话网或其它)和/或一个或多个专用通信网络的有线和/或无线通信网络268与油藏202、油井204和/或处理和传输系统206的致动器、传感器和/或测试(以下描述)通信。在特定情形下,操作设施262可驻留在距离上游生产设施250数英里之外,并且可与上游生产设施250驻留在不同城市、国家或全球性区域。
再次参照图2A,生产管理系统200在特定情形下可包括用以感测油藏202的特性的一个或多个地面或井下传感器210。系统200还可包括对油藏202基于地面以及井下的测试212。在特定情形下,这一个或多个传感器210可包括配置成收集地震数据(包括1D、2D、3D、和/或4D地震数据)的地震传感器(例如,水中听音器和地震检波器)和/或其它传感器。在特定情形下,测试212包括用以确定地质数据的测试,其中地质数据包括测井数据(声学、伽玛、中子、电子、或其它类型的测井)、岩心数据、谱密度测井数据中的一种或多种。传感器210中的一个或多个用以连续或基本连续、以规则和/或不规则的间隔定期、或者有时连续而有时定期地进行感测。传感器210采样的速率可取决于该传感器正在感测的特性的性质,包括该特定变化得有多快或者该特性的变化对生产有什么影响。在特定情形下,一个或多个传感器采样通常足以捕获到正在测量的参数在操作上的显著变化。此外,不同的传感器210可以不同的采样率工作。在特定情形下,传感器210中的一个或多个可用以实时地发送数据并提供实时数据。如在此使用的实时数据是在时间上接近正在收集的数据的操作上的显著变化(例如,正在测量一参数,连续地或以规则和/或不规则的间隔定期地对其测量)。在特定情形下,实时数据可用关于收集的时间和源的信息来标记或与其相关联,例如以便在并非实时使用时方便对这种数据的使用。实时数据并不一定是连续数据,但在特定情形下,连续数据可提供实时数据。并且,测试212可以连续或基本连续地、以规则和/或不规则间隔定期地、或有时连续而有时定期地来执行,并且可取决于测试的类型。在特定情形下,测试212通常可足够经常地执行以捕获正在测试的参数的操作上的显著变化。在特定情形下,部分或全部测试212可被执行用以提供实时数据。
系统200包括可用以感测油井204的特性的一个或多个地面或井下传感器214、以及可用以控制油井204及其组件252的操作的一个或多个地面或井下致动器和/或其它管理控件(统称为致动器216)。系统200还包括油井204的基于地面的和井下测试212。在特定情形下,传感器214感测关于产油和/或灌注的信息,例如,压力、温度、粘度、流量、成分概况、油井204的组件的操作状态、及其它特性。在特定情形下,测试218包括用以确定油井204的状况和操作的测试。在特定情形下,传感器214和/或测试218确定以下一项或多项:生产流量、灌注流量、灌注压力、生产压力、环空压力、地层压力、井底压力、井口压力、温度、温度勘察测井数据、油井温度瞬时概况数据、流体流量、流体密度、流体速度、产水量、产油量、产气量、背压、成分、色谱成分分析数据、井下组件(阀门等)状态、气液比、气油比、及其它数据。如上所述,一个或多个传感器214可用以连续或基本连续地、以规则和/或不规则间隔定期地、或有时连续而有时定期地进行感测。传感器214采样的速率可取决于该传感器正在感测的特性的性质,包括该特定变化得有多快或者该特性的变化对生产有什么影响。在特定情形下,一个或多个传感器214通常足够经常地采样以捕捉正在测量的参数操作上的显著变化。此外,不同的传感器214可以不同的采样率工作。在特定情形下,传感器214中的一个或多个可用以提供实时数据。同样,测试218可以连续或基本连续地、以规则和/或不规则间隔定期地、或有时连续而有时定期地来执行,并且可取决于测试的类型。在特定情形下,部分或全部测试218可被执行用以提供实时数据。
致动器216可被配置成接收信号(例如,电子、光学、液压、机械、或其它)并基本上即时或以一定程度的指定或非指定延迟自动地驱动油井204的相应组件。该信号可提供关于例如对组件252的操作作出调整的校正动作的指令,包括调整组件252至其工作范围的极限(例如,开/关、打开/关闭、或其它)、调整组件252一指定量、或其它指令。在特定情形下,致动器216可响应于相应的控制信号在没有显著延迟的情况下致动。在特定情形下,信号可由人接收(例如,通过电话、电子邮件或文本消息、控制面板显示器或其它用户界面上的信号、口头地、或其它),后者被指示驱动或随后根据该信号驱动油井204的组件。在特定情形下,致动器216响应以对油井204及其组件252提供实时控制。
系统200包括可用以在控制处理和传输系统206及其装备258和260的一个或多个致动器和/或其它管理控制(统称为致动器222)中感测处理和传输系统206的特性的一个或多个传感器220。系统200还包括处理和传输系统206的测试224。在特定情形下,传感器220感测压力、温度、粘度、密度、流量、流速、成分概况、处理和传输系统206的组件的工作状态、及其它特性。在特定情形下,致动器222与采集网络258以及涉及产物的处理及向销售点208的传输的其它组件的部分或全部相关联、并对其进行控制。在特定情形下,测试224包括用以确定处理和传输系统206的状况和操作的测试。在特定情形下,传感器220和/或测试224确定以下一项或多项:处理流量、灌注流量、处理压力、灌注压力、温度、流体流量、流体密度、流体速度、产水量、产油量、产气量、背压、成分、组件(阀门等)状态、气液比、气油比、组件功率使用、总生产设施功率使用、组件效用使用、总生产设施效用使用、及其它数据。
如上所述,这一个或多个传感器220可用以连续或基本连续地、以规则和/或不规则间隔定期地、或有时连续而有时定期地进行感测。传感器220采样的速率可取决于该传感器正在感测的特性的性质,包括该特定变化得有多快或者该特性的变化对生产的处理和传输有什么影响。在特定情形下,一个或多个传感器通常足够经常地采样以捕捉正在测量的参数操作上的显著变化。此外,不同的传感器220可以不同的采样率工作。在特定情形下,传感器220中的一个或多个可用以提供实时数据。同样,测试224可以连续或基本连续地、以规则和/或不规则间隔定期地、或有时连续而有时定期地来执行,并且可取决于测试的类型。在特定情形下,部分或全部测试224可被执行用以提供实时数据。
致动器222可被配置成接收信号(例如,电子、光学、液压、机械、或其它)并基本上即时或以一定程度的指定或非指定延迟自动地驱动处理和传输系统206的相应装备254。该信号可提供关于例如对装备258的操作作出调整的校正动作的指令,包括调整装备258至其工作范围的极限(例如,开/关、打开/关闭、或其它)、调整装备258一指定量、或其它指令。在特定情形下,致动器222可响应于相应的控制信号在没有显著延迟的情况下驱动。在特定情形下,信号可由人接收(例如,通过电话、电子邮件或文本消息、控制面板显示器或其它用户界面上的信号、口头地、或其它),后者被指示驱动或随后根据该信号驱动处理和传输系统206的装备258。在特定情形下,致动器222响应以对处理和传输系统206及其装备258提供实时控制。
系统200包括用以从油藏202、油井204以及处理和传输系统206接收信息、并向油井204以及处理和传输系统206传送信息的数据中心226。更具体而言,数据中心226从/向油藏传感器210和测试212,油井传感器214、致动器216和测试218、以及处理和传输传感器220、致动器222和测试224中的一个或多个接收数据并传达信息和信号。数据中心226用作通信的网关,并且包含有用作传感器感测到的数据、根据测试确定的信息、及系统组件的操作状态的储存库的存储器和数据存储。另外,数据中心226用作向传感器、测试和致动器传达信息和信号并记录这些信息和信号的网关。
数据中心226还与系统200的其它操作组件和模型通信。在特定情形下,数据中心226与生产系统模型228、专家分析和智能组件230、协作决策组件232以及执行动作组件234(统称为“组件和模型”)中的一个或多个通信。数据中心226接收从系统200的组件和模型接收数据并向它们传达信息和信号。数据中心226记录在系统200的组件和模型之间传达的信息和信号、以及在系统200的组件和模型与油藏202、油井204及处理和传输系统206的传感器、致动器及测试之间传达的信息和信号。这样,数据中心用作关于系统200所传达的信息及信号的储存库。注意,数据中心226无需从向其传达信息和信号的每个组件接收数据,反之亦然。并且,尽管在此被描述为直接链接系统200的操作组件和模型与油藏202、油井204及处理和传输系统206之间的通信,数据中心226也可同系统200的操作组件和模型与油藏202、油井204及处理和传输系统206之间的通信并行地放置。换言之,系统200的组件和模型可直接与油藏202、油井204及处理和传输系统206的传感器和测试通信,并且数据中心226可以仅用于收集和记录所传达的信息。此外,数据中心226可连续或基本连续、以规则和/或不规则间隔定期地、或者有时连续而有时定期地传达部分或全部数据。传达数据的速率可取决于数据的性质,包括该数据更新得有多快以及数据的变化对生产有何影响。在特定情形下,部分或全部数据被足够快地传达以捕捉数据操作上的显著变化。此外,不同数据可以不同速率来传达。在特定情形下,部分或全部数据可以实时传达以提供实时数据。
参照图3A和3B,在特定情形下,数据中心226包括油藏数据库302、监督控制及数据采集系统(SCADA)304、工程/生产数据库306、企业信息系统308、数据历史归档器(Data Historian)310、计算机化维护及管理系统(CMMS)312、及其它数据组件。数据中心226可被实现为硬件和/或软件。包括油藏数据库302、SCADA 304、工程/生产数据库306、企业信息系统308、数据历史归档器310、计算机化维护及管理系统(CMMS)312、及其它数据组件的各组件可被配置成交互和互通信息。油藏数据库302从传感器和油藏302处执行的测试收集信息。SCADA 304监视来自传感器、致动器及在油藏202、油井204及处理和传输系统206处执行的测试的信息,处理该信息并以易了解的格式向操作人员显示(例如,在控制面板或其它用户界面的显示器上),在特性变得不合需要时发出警报和警告,并且包括控制各传感器、致动器和测试的分布式控制系统。工程/生产数据库306从传感器、致动器和在油井204处与处理和传输系统206处执行的测试收集信息——包括关于生产和灌注的信息。企业信息系统308使得能够对数据中心226的各种数据存储(例如,油藏数据库302、工程/生产数据库306、数据历史归档器310、及其它数据存储)、数据中心226的系统(SCADA 304和CMMS 312)、以及系统200的组件和模型进行企业层的访问。CMMS 312维护所收集的关于在油井204及处理和传输系统206处执行的维护操作的信息,包括维护例程、维护调度、已完成维护、作业次序、关于系统200内的装备和设备的信息、及其它信息。
再参照图2A,生产系统模型228可被实现为软件和/或硬件并且可用以对上游生产系统——包括油藏202、油井204、或处理和传输系统206,上游生产系统的经济方面、上游生产系统的维护及可靠性方面、或上游生产系统的其它方面进行建模。
参照图3A,在特定情形下,生产系统模型可包括数个第一主子模型,它们在特定情形下协同动作并共享信息以对上游生产系统建模并解决各子模型(在此被称为生产系统模型228a)当中影响另一子模型的一个子模型的变化。例如,生产系统模型228a可包括地球模型320、油藏模型318、油井模型316、处理和传输模型314、经济模型338、维护及可靠性模型340或其它模型中的一个或多个。关于油藏202,地球模型320对油藏202的地质、地球物理或其它特性中的一个或多个建模。可用于此处的地球模型的一个示例是PETREL——斯伦贝谢(Schlumberger)科技公司的注册商标。油藏模型318对油藏202的渗透性、多孔性、油藏压力、水油饱和度、地层学、烃类量、油藏驱动机构或其它特性中的一个或多个建模。可在此使用的油藏模型的一个示例是NEXUS——界标制图公司(Landmark Graphics Corporation)的注册商标。油井模型316特别对上游生产系统的油井204的生产和流特性进行建模——包括在各个油井处或油井的全部或子集上的流量。可在此使用的油井模型的一个示例是PROSPER——石油专家有限公司(Petroleum Experts.Ltd)的商标。处理和传输模型314可对处理和传输系统206的各种装备的操作的压力、流量、成分、及其它特性进行建模。可在此使用的处理和传输系统模型的一些示例包括:PIPESIM——斯伦贝谢(Schlumberger)科技公司的注册商标,用于对采集和传输系统方面进行建模;以及HYSIS——海普泰克有限公司(HyprotechLtd)的注册商标,用于对生产设施的各方面进行建模。经济模型338对经济回报、净现值、支出、利润投资比或上游生产系统上将当前产品价格、当前固定成本、和/或当前可变成本纳入考虑的其它经济因素进行建模。可在此使用的经济模型的一个示例是ARIES——界标制图公司(Landmark GraphicsCorporation)的注册商标。维护及可靠性模型340对故障间平均工作时间、或上游生产系统的组件及子组件平均修复时间的一个或多个和/或上游生产系统的其它操作方面进行建模。可在此使用的维护及可靠性模型的一个示例是MAROS——甲丁科技有限公司(Jardine Technology Ltd)的商标。在特定情形下,界面系统可在生产系统模型228a内操作以便于和/或使得能够与第一主子模型协同地相互通信和操作。
如在图3B中所见,在特定情形下,生产系统模型可以是对油藏202、油井204、处理和传输系统206和/或上游生产系统的其它方面进行建模的单个综合模型(下文中称为生产系统模型228b)。这种生产系统模型228b可包括对上游生产系统的物理特性建模的集成系统模型342,对在与上游生产系统和子系统、元件和组件以及影响上游生产系统的约束——可能是物理的、经济的、法律的、操作的、组织的或其它方面——相关时被确定为目标函数的系统目标的分层结构建模的目标函数模型344。生产系统模型228b可以是具有与上述第一主模型相当的特征和建模的完整模型,或者可以是完整模型的近似或代理。例如,题为“用代理模拟器进行实时油田和气田生产最优化的方法、系统和计算机可读介质”(Methods,Systems and Computer-Readable Media for Real-TimeOil and Gas Field Production Optimization with Proxy Simulator)的美国临时专利申请No.60/763,971,以及题为“用物理和代理模拟器对油田和气田生产模型进行快速更新的方法、系统和计算机可读介质”(Methods,Systems andComputer-Readable Media for Fast Updating of Oil and Gas Field ProductionModels with Physical and Proxy Simulators)的美国临时专利申请No.60/763,973,以及它们的后续内容描述了可用在生产系统模型228b中的代理建模技术的一些示例。在特定情形下,生产系统模型228b可从第一主模型314、316、318、320、和/或包括经济模型338、维护及可靠性模型340、和/或附加模型的其它模型导出。在特定情形下,生产系统模型228b可以是导出的模型,例如从上游生产系统数据和历史数据导出。在特定情形下,生产系统模型228b可从第一主模型组件及导出的模型组件的组合导出。
在任一情形下,由于生产系统模型228横跨该上游生产系统,因此它可以在该模型的对油藏202、油井204、及处理和传输系统206建模的各部分之间传达信息以应对上游生产系统的一个部分中影响其它部分的变化。例如,油藏202的变化可能对油井204有相应的影响,而油井204的变化可能对处理和传输系统206具有相应的影响。
在特定情形下,求解器模块326可被设置成用以使用生产系统模型228(或生产系统模型228的部分或全部的模块或子模型)来测试上游生产系统的操作情景并确定一操作情景、以及针对组件和装备的逐步实现或实现一个或多个操作目标的相应校正动作。如果未被纳入模型本身,则求解器模块326可说明上游生产系统及子系统、元件和组件以及影响上游生产系统的约束——可能是物理的、经济的、法律的、操作的、组织的或其它方面——的系统目标的分层结构。求解器模块326可以是如图3A中所示的专家分析和智能模型230的子集,如图3B中所示的生产系统模型228的子集,或这两者。在特定情形下,情景测试可表示上游生产系统的操作中的多个决策点,并且可说明物理设置选项的范围可能对上游生产系统以及目标函数和对该操作所应用的约束所造成的多种影响。在特定情形下,执行所选决策所涉及的时间约束对于情景测试可能较长,而在其它情形下,可能需要没有显著延迟的响应。求解器模型326可用以在某些情形下经由诸如图4和6中的自动化工作流、而在某些情形下经由图7-10中的经编配的工作流来提供自动或部分自动的校正动作。在特定情形下,求解器模块326可与生产系统模型228一起操作以连续或基本连续地、以规则和/或不规则间隔定期地、或有时连续而有时定期地确定校正动作。对上游生产系统的不同方面的校正动作可以不同速率来确定。在特定情形下,校正动作可与上游生产系统的相应操作上的显著变化没有显著延迟地来确定。在特定情形下,校正动作可以实时地来确定。校正动作可以与执行动作模块234接口连接,以经由通过与SCADA接口组件330接口连接来驱动致动器216和致动器222的高级过程管理而自动地、经由由动态过程工作流模块332协调的经编配的工作流而至少部分自动地、和/或通过与工作管理系统模块334接口连接以将工作活动输入到生产系统工作调度而至少部分自动地发起和/或执行所确定的校正动作。
专家分析和智能模块230可被实现为硬件和/或软件,并且用以应用专家知识和分析以分析油藏202、油井204、或处理和传输系统206的一个或多个的操作。相应地,专家分析和智能组件230可执行以下一项或多项:标识改进机会(缺陷和改善机会)、自动验证或便于决策者验证所标识出的改进机会、或自动确定校正动作和/或便于决策者确定实现该改进机会的校正动作。专家分析和智能模块230可以与执行动作模块234接口连接,以经由与SCADA接口组件330接口连接来驱动致动器216和致动器222的高级过程管理而自动地、经由由动态过程工作流模块332协调的经编配的工作流而至少部分自动地、和/或通过与工作管理系统模块334接口连接以将工作活动输入到生产系统工作调度而至少部分自动地发起和/或执行所确定的校正动作。在一个示例中,专家分析和智能模块230可从数据中心226接收关于系统200的操作的信息,自动地(即,无需人为输入)将该信息与一个或多个操作目标相比较并标识出校正动作。该比较可在系统操作期间连续或基本连续地、以规则和/或不规则间隔定期地、或有时连续而有时定期地执行。执行比较的速率可以取决于所比较的数据的性质,包括潜在的特性改变得有多快或者潜在特性的变化如何影响系统。不同数据可以不同速率进行比较。在特定情形下,这些比较中的一个或多个可以实时地执行。同样,校正动作可在系统操作期间连续或基本连续地、以规则和/或不规则间隔定期地、或有时连续而有时定期地确定。执行确定的速率可取决于校正动作的性质、确定是如何作出的、以及所使用的数据,包括潜在特性变化得有多快或者潜在特性的变化如何影响系统。不同确定可以不同速率执行。在特定情形下,校正动作的确定中的一个或多个可以实时地来执行。
在特定情形下,如图3中所描绘的,专家分析和智能模块230可包括实现为软件和/或硬件的咨询子模块322,用以从系统200的其它模块接收输入——包括关于改进机会的信息,并指示已标识出改进机会。关于改进机会的信息可以从来自数据中心226的实际数据,和经由求解器326或经由算法模块324中指定的算法来自生产系统模型228的经建模的或预期数据(例如,标准或目标,其中包括性能标准),以及油藏202、油井204、及处理和传输系统206的预期操作或指定标准/目标与实际操作之间所标识出的偏差来导出。合起来或者单独地,算法子模块324、求解器模块326以及知识捕捉模块328起到专家系统的作用。知识捕捉模块328用作关于上游生产系统的专家知识的储存库,并且与咨询模块322接口连接以呈现关于在上游生产系统上检测出的状况的信息。算法子模块324对接收自生产系统模型228及系统200的其它模块的数据应用算法以帮助解释该数据。如上所提及的求解器模块326对照系统200上的生产系统模型228以及系统200的其它模块来测试情景以便帮助解释数据并确定与上游生产系统的操作目标相一致的将来数据。
在便于决策者验证并确定校正动作时,专家分析和智能模块230可经由合作决策模块232向决策者提供关于系统子集的分析和信息(例如,规范,所设计的特性,工艺和工具图表,数字建模,历史故障和修复信息,对关于系统子集的专家系统的访问、缺陷或改进机会的可能缘由的分析、及其它分析和信息)。专家分析和智能模块230可自动提供信息和分析,或者决策者可向专家分析和智能模块230询问信息和分析。分析和智能可包括一个或多个推荐的动作。决策者可与专家分析和智能模块230交互,或者通过经由合作决策模块232对照生产系统模型228测试情景来确定各种可能动作的效力并使用该信息来选择将采取的动作。
校正动作可包括对油井204、处理和传输系统206和/或生产管理系统200自身的校正动作。在特定情形下,对油井204的校正动作可包括使用地面和/或井下阀门、阻气门、泵、人工升举设备、或其它流控制设备来调整一个或多个油井的产出率或灌注率中的至少一个。调整产出/灌注率可包括对一个或多个油井发起和/或执行一个或多个油井干预动作。例如,油井干预动作可包括油井模拟、油井压裂、井下设备维护或其它动作中的一个或多个。调整产出/灌注率可包括隔离一个或多个油藏或地下带。调整产出/灌注率可包括实现设计改变。在特定情形下,校正动作可包括发起对生产计划和/或油井计划的调整和/或调整生产计划和/或油井计划(包括指定新油井和/或重新操作或重钻现有油井)。
在特定情形下,对处理和传输系统206的采集和传输网络254的校正动作可包括调整以下一项或多项:通过管道的流的量、通过管道提供的流的压力、通过管道提供的流的流量、阀门、阻气门、流控制设备、压缩机、泵、加热器、和冷却器。在特定情形下,对处理和传输系统206的生产设施260的校正动作可包括调整以下一项或多项:提供给分离器的流的量、提供给分离器的流的压力、提供给分离器的流的流量、提供给脱水器的流的量、提供给脱水器的流的压力、提供给脱水器的流的流量、阀门、阻气门、流控制设备、压缩机、泵、加热器、冷却器、或液位。调整处理和传输系统206可包括使流转向以控制不同流路径和/或生产流程之间的液压平衡、以便于油井测试或干预、以便于装备或组件测试或修复/维护、以隔离油井、装备或组件、或其它动机。调整处理和传输系统206可包括调整处理量——例如甲醛或腐蚀灌注量。调整处理和传输系统206可包括控制诸如电子、气、致冷、蒸汽和/或压缩空气使用等效用使用。调整处理和传输系统206可包括控制诸如紧急关闭阀门、集水和火炬系统和/或其它系统等安全系统。调整处理和传输系统206可包括实现预防性或校正性维护和/或设计改变。
一旦已经确定校正动作——或者通过决策者或者自动地,该校正动作就可在生产系统子集上实现(例如,调整操作、修复、替换装备或其它)或可对生产系统模型228或专家分析和智能模块230作出改变(例如,更新模型、调整分析、或其它)。可连续或基本连续地、以规则和/或不规则间隔定期地、或有时连续而有时定期地对系统作出调整。不同调整可以不同速率作出。在特定情形下,这些调整中的一个或多个可以实时地执行。以下参照图4-10描述了系统200的特定实现的更具体示例。
再次参照图2A,执行动作模块234用以驱动并跟踪在系统200内操作以管理油藏202、油井204、以及处理和传输系统206的多个工作流的进度。执行动作模块234根据来自数据中心226、生产系统模型228、专家分析和智能模块230、以及合作决策模块232的提示来驱动上游生产系统的操作。执行动作模块234还可在一种情形下根据预定频率或时帧、和/或在另一情形下基于向适当模块提供信息以便该模块在系统200管理中起到其作用的特定事件的发生而使用发起信息通信的调度器模块336协调数据中心226、生产系统模型228、专家分析和智能模块230、以及合作决策模块232之间的信息通信。执行动作模块234可被实现为软件和/或硬件。
在特定情形下,如图3中所示,执行动作模块包括SCADA接口330、动态过程工作流332、工作管理系统334、以及实现为软件和/或硬件的调度器336。SCADA接口330接收对油井204以及处理和传输系统206的各种组件的一个或多个设定点(即,校正动作),并将这些设定点传达给自动控制油井204以及处理和传输系统206的操作的SCADA 304(例如,经由去往致动器216和222的信号)以设置和/或维护这些设定点。在维护这些设定点时,SCADA 304可操作反馈环路,从数据中心226接收关于实际操作的数据,将该实际操作与设定点相比较,并且在存在偏差的情况下确定并实现调整以达到这些设定点。可连续或基本连续地、以规则和/或不规则间隔定期地、或有时连续而有时定期地操作该反馈环路。在特定情形下,可实时地执行该反馈环路。设定点可从决策者经由合作决策模块232指定的动作、从专家分析和智能模块230自动地、从执行动作模块234的工作流自动或半自动地、从生产系统模型228或其它自动地导出。SCADA 304可被实现成对上游生产系统的装备或组件级以及更大的子集(例如,油井204、处理和传输系统206、或其其它子集)进行控制。
工作管理系统334协调整个系统200的工作(例如,校正动作)的执行,诸如组件和装备的调整、维护、修复或替换。例如,在特定实现中,工作管理系统协调人力和工序的调度和指派以便对油藏202、油井204、以及处理和传输系统206、及系统200的其它组件执行工作。工作管理系统334在特定实现中还可跟踪工序的状态和/或完成。
动态过程工作流332包括用以驱动系统200管理上游生产系统的的执行的一个或多个工作流。工作流332协调系统操作中的任务是如何结构化的、谁/什么来执行它们、它们的相对次序是什么、它们是如何同步的、信息流如何支持这些任务以及是如何跟踪任务的。动态过程工作流332驱动上游生产系统及生产管理系统200的管理和操作中的生产操作、模型更新、产量损失报告、维护、及其它活动。例如,在一些实现中,动态工作流332用以驱动专家分析和智能模块230标识改进机会,并驱动合作决策模块232提示决策者输入以验证改进机会和/或实施用以实现所标识出的改进机会的动作。动态工作流332还可用以驱动并协调被选择用以实现所标识出的改进机会的动作的实现。例如,动态工作流332可提示对油井204、处理和传输系统206、和/或其致动器216、222进行维护或调整。在一些情形下,动态工作流332与工作管理系统334及SCADA接口330协调以实现调整。在特定情形下,工作流332是动态的,因为由于并且当改进机会被标识出时工作流编配人工和/或系统交互以使得这些机会能够更好地在与该机会相一致的时帧中实现。在特定情形下,工作流332是全自动的。在特定情形下,工作流332用以对上游生产系统提供实时控制。以下参照图4-10更加具体地对一些示例动态过程工作流332进行描述。
合作决策模块232充当负责上游生产系统的管理和操作的组织(包括例如,决策者、操作、维护、工程支持人员和特定的供应商和卖方)与系统200的其它方面之间的接口。通信可经由诸如基于网络或因特网的门户等从系统200的各组件收集或接收信息、并以容易理解的格式将其显示给用户的计算机访问的企业信息门户来进行。该门户可经由多种类型的计算机设备来访问,包括个人计算机、手持式个人助理、固定或移动电话、专用设备、远程终端、及其它设备。该门户可允许用户定制。门户中的信息可以分层的方式来布置,从而呈现用户可向其深入挖掘更为具体或相关信息的高层信息。类似或其它通信可经由发往或接收自实践、电子或其它团体中的一个或多个成员的消息——包括SMS、电子邮件、文本消息、音频消息和/或其它类型的消息——来进行。在任一情形下,易理解的格式可包括文本信息、信息的图形表示、可听信息和/或其它形式的信息。例如,信息可布置成示出工作流,三维设施和油井地下步行道,压力、温度、流、和其它特性的图形表示,油藏202、油井204及处理和传输系统206的操作的三维模型的图形、图表、流程图,及其它形式的信息。提供给合作决策模块232的信息(以及由此的门户或其它通信模式)可连续或基本连续地、以规则和/或不规则间隔定期地、或有时连续而有时定期地更新。不同信息可以不同速率更新。在特定情形下,该信息可以是实时信息。题为“用于实时操作和维护的支持装置、方法和系统”(Support Apparatus,Method andSystem for Real Time Operations and Maintenance)的美国公开专利申请No.2004/0153437描述了可用以实现本文中合作决策模块的系统的一个示例。
由于系统200跨上游生产系统操作,因此从上游生产系统的不同方面收集的信息可以一起呈现。例如,来自油藏202、油井204、以及处理和传输系统206的一个或多个方面的信息可以一起被分析以提供上游生产系统的状况和操作的更大形象。在一些情形下,数据可以在油藏202、油井204、以及处理和传输系统206作为单独实体分析的情况下无法实现的方式来表达上游生产系统的一个方面的数据与上游生产系统的另一方面的数据之间的相互关系。例如,用以实现油井204中的改进机会的一个或多个动作可要求完全实现处理和传输系统206中的某一改变,或者可对处理和传输系统206或油藏202的操作有负面或正面的影响。同样,用以实现处理和传输系统206中的改进机会的一个或多个动作可要求完全实现油井204中的某一改变,或者可对油井204的操作或油藏202有负面或正面的影响。因此,通过基于其对系统的更大影响来选择动作,可关于动作作出更佳的决策。
现在转到图4-10,描述了系统200的说明性工作流。图4描绘了用以操作来自上游生产系统的实际产量120的说明性自动化生产操作工作流600。在特定情形下,自动化生产操作工作流600被实现为软件和/或硬件,并且可相关于操作目标操作来自上游生产系统的产物。例如,工作流600可使上游生产系统逐步实现或实现一个或多个操作目标。
在操作中,生产系统模型228自动从数据中心226和生产监督模块604接收数据。可连续或基本连续地、以规则和/或不规则间隔定期地、或有时连续而有时定期地接收数据。不同数据可以不同速率接收。在特定情形下,数据可以无显著延迟地接收,而在一些情形下数据可以实时地接收。使用该数据,生产系统模型228自动确定诸如致动器216和222等致动器的控制设置以控制上游生产系统。在特定情形下,生产系统模型228还可确定不受致动器控制而必须手动控制的组件和装备的控制设置。控制设置可被选择成逐步实现或实现这一个或多个操作目标,并且可以例如由求解器326与集成系统模型342和目标函数模型344(或模型314-320)操作数个情景来确定。在一个示例中,控制设置可产生实现对生产和关闭油井以及来自生产井的产物流量和压力的设置以最大化可用采集和传输网络254和/或生产设施256容量的使用的校正动作。在采集和传输网络254包括一个以上用以传送产物的流送线路和/或生产设施256可对产物执行并行处理的另一示例中,控制设置可实现阀门、阻气门和其它控制设置以最优或接近最优地平衡各可用流送线路之间的流送。
在操作610,对油藏202、油井204和/或处理和传输系统206发起和执行用以实现校正动作的动作,并且记录关于校正动作的信息。至少对实现控制设置的发起是自动地实现的,并且执行也可自动地实现。动作的执行和记录可经由SCADA接口330和/或工作管理系统334来执行。如上所讨论的工作管理系统334用以协调调度、人员指派、实现动作的工序和其它方面。在特定情形下,经由诸如致动器216和222等致动器的调整可经由SCADA接口330来执行。在特定情形下,对手动控制的组件或装备的调整或本质上不能由SCADA接口执行的调整可经由工作管理系统334来执行。在一些情形下,例如可经由去往油井204的致动器216和/或处理和传输系统206的致动器222的信号基本即时地、或无显著延迟地发起和/或实现动作。动作还可自动地或者全部或部分通过人为干预地实现。例如,校正动作的性质和幅度(例如,对一指定阀门调整一指定量)可经由工作管理系统334被传达给人。
在操作612,如下所述,监视油藏202、油井204和/或处理和传输系统的操作以标识操作的变化,并将这些变化归因于导致这些变化的相应动作。这样,系统200允许分析这些动作以查看它们在实现改进机会上是否成功。在操作680,如下所述,生产系统模型228被更新。
确定控制设置、发起和执行控制设置、或者监视变化并将其归因于操作中的一个或多个可与数据(即,测得或经测试的参数)发生显著操作变化无显著延迟地执行,而在一些情形下可实时地执行。如果数据是连续或基本连续地、在足够快的时间间隔(取决于数据类型)收集的、或者是实时数据,则生产操作工作流600可用以与实际产量120发生变化基本并发地采取校正动作,而在一些情形下实时地采取校正动作。
现在参照图5,在标识生产系统潜能并归因于损失——操作612时,系统200可确定安装能力潜能(installed potential)106、性能间隙108、可用潜能110、可用性112、操作潜能114和容量116。在操作402,已安置潜能106可通过用所设计的参数模拟上游生产系统的操作来确定。即,安装能力潜能106是在假定油藏202、油井204以及处理和传输系统206如预期或预想地操作、并且假定用以实现和维持油藏202、油井204以及处理和传输系统206在预期或预想水平上的操作所必需的装备、材料、和人员可用的情况下确定的。在操作404,可用潜能110可通过用所设计的可用性但使用数据中心226所收集的实际性能数据406模拟上游生产系统的操作来确定。如上所述,数据中心226从油藏202的传感器210和测试212、油井204的传感器214和测试218、以及处理和传输系统206的传感器220和测试224收集实际性能数据。性能间隙108可根据已安置潜能106与可用潜能110之间的差异而确定。在操作408,操作潜能114可通过用数据中心226收集的实际性能数据和实际可用性数据模拟上游生产系统的操作来确定。可用性间隙112可根据可用潜能110与操作潜能114之间的差异而确定。此外,容量间隙116可根据操作潜能114与生产数据412之间的差异而确定。
在每种情形下,如果数据是连续或基本连续地、实时地、或以足够快的时间周期来收集,则生产系统模型228可被用以在时间上与上游生产系统的操作变化相近地确定性能间隙108、可用潜能110、可用性间隙112、操作潜能114和容量间隙116。注意,生产数据412、可用性数据410、以及性能数据406的变化可不以同样速率发生。例如,性能数据406可能大约数个星期、数个月或数年没有显著改变。这是由于油藏202、油井204、以及处理和传输系统206(其生产数据412表示)的操作性能的退化在较长的时段上发生。在油藏202的一特定示例中,使得产物提取更加困难和/或容易到达的产物耗尽的状况变化在若干年后发生。在油井204或处理和传输系统206的特定示例中,磨损、堵塞、以及装备和硬件等的故障发生在诸如若干星期、若干月、或若干年的较长时段上。相反,生产数据412可能在若干秒、若干分钟或小时内产生显著变化。这是因为上游生产系统的组件和子组件不能最优地设置或调整以实现操作潜能的结果发生迅速。例如,如果油井204或处理和传输系统206的阀门失调,则将对可测量和可校正的流产生基本即时的影响。可用性数据410可在若干小时、若干天或星期内产生显著改变。
现在参照图6,示意性地描绘了用以自动更新上游生产系统模型228的说明性自动模型更新680。自动化模型更新680可被实现为软件和/或硬件,并且可与例如自动化生成操作工作流600或经编配的生产操作工作流650(如下所述)等其它工作流并行操作,或者在自动模型更新680的操作期间可停止一个或多个其它工作流的操作。自动化模型更新680可从一个或多个其它工作流接收信息。自动化模型更新680可更新如图3A所示的具有诸如模型314-320、338和340等第一实例模型的生产系统模型228,或者如图3B中所示的具有集成系统模型342、目标函数模型334和求解器326的生产系统模型228。通过更新生产系统模型228,生产系统模型228可维持对上游生产系统的准确建模。
在操作中,生产系统模型228自动从数据中心226和生产监督模块604接收数据。数据可包括例如从SCADA 304获得的当前或基本当前数据(包括实时数据)、以及例如从数据历史归档器310获得的历史数据。在操作682,生产系统模型228是对照数据自动验证的。在验证生产系统模型228时,来自生产系统模型228的模拟对比接收自数据中心226的实际数据进行比较。生产系统模型228被用以确定是否有任意差异源自上游生产系统的变化、生产系统模型228的固有错误(例如,错误假设或建模)、或是由于故障数据。如果生产系统228错误(即,差异不是源于故障数据),则确定生产系统模型228需要更新。验证操作可在生产管理系统200的操作期间连续或基本连续地、以规则和/或不规则间隔定期地、或有时连续而有时定期地执行。生产系统模型228的不同方面(包括第一主模型314-320、338、和340的不同方面)可以不同速率验证。
在操作684,生产系统模型228可通过例如调整该模型所基于的假设、用以导出模拟的算法、根据其求解模拟的约束、和/或用以改善模拟结果与实际数据之间的匹配的其它方面来更新。生产系统模型228偶尔需要更新或调整,例如由于该模型所基于的参数可能是在上游生产系统的生命周期的早期确定的。随着上游生产系统的操作,积聚了更多可从其更佳地估计参数的数据。此外,一些参数在系统的生命周期上变化。在一个示例中,生产系统模型228的油藏建模方面的初始参数是基于地址和/或测井数据。随着生产系统的生产,参数可使用生产数据和历史匹配来更佳地估计。可使用生产数据在生产系统模型228的油藏建模方面更新渗透性、粘度、水油接触、故障传递率、含水层粘度、岩石孔隙量或其它参数的一个或多个。在另一示例中,在操作期间,上游生产系统的组件和装备沾污和/或性能退化。上游生产系统模型可例如通过确定并应用表皮因子、热交换器沾污因子、泵效率、压缩机效率、涡轮效率、管道摩擦因子、阀门摩擦因子及其它因素等的一个或多个来更新以解决沾污和/或性能退化。在又一示例中,产生的流体随时间变化。通过传感器和测试确定的流体属性可用于更新生产系统模型228以解决流体随时间的变化。还可更新生产系统模型228的其它方面和参数。
在特定情形下,可定义调整的指定限度,以使得在需要超过该指定限度的调整来更新生产系统模型228时可向人员或具有监督权限的人员(例如,经由合作决策模块232)传达警报。监督权限随后可查看该情况以验证或拒绝超过该指定限度的调整。
一旦确定了对模型的更新,就在操作684发起和执行调整并将其输入回生产系统模型228。至少发起操作是自动地实现的,并且执行也可自动地实现。更新模型可在生产管理系统200的操作期间连续或基本连续地、以规则和/或不规则间隔定期地、或有时连续而有时定期地执行。生产系统模型228的不同方面(包括第一主模型314-320、338、和340的不同方面)可以不同速率更新。验证模型、发起并执行模型更新的一个或多个方面可与模型和实际上游生产模型发生显著操作偏离无显著延迟地执行,而在一些情形下可以实时地执行。
现在转到图7,示意性地描绘了用以操作实际产量120的说明性经编配的生产操作工作流650。说明性生产操作工作流650可通过软件和/或硬件来实现并且可关于一个或多个操作目标操作来自上游生产系统的产物。例如,工作流650可操作上游生产系统逐步实现或实现以上提及的一个或多个操作目标。通过增大或最大化实际产量120,容量间隙116被缩小或最小化。
在操作602,自动标识生产改进机会。生产改进机会可以多种方式来标识。例如,油藏202、油井204、和/或处理和传输系统206的操作可经由生产数据412来监视,并对照由生产系统模型228确定的预期操作或指定的生产目标来比较以确定该操作是否满足预期或指定操作。预期操作或指定生产目标可根据操作潜能114导出。在另一情形下,油藏202、油井204、和/或处理和传输系统206的组件和装备的操作可经由生产数据412来监视,并对照发送给这些组件和装备的指令(由或者使用生产系统模型228根据一个或多个操作目标确定)来比较以确定这些组件和装备是否根据操作目标来操作。用以确定生产改进机会的这种比较和其它比较是由生产监督模块604来监视的。在特定情形下,生产改进机会可通过咨询模块322经由咨询来标识。咨询不仅可以包括对生产改进机会的指示,还可包括其幅度以及结果容量间隙的可能原因。
在操作606,在操作602标识出的机会对照生产系统模型228进行验证。在特定情形下,这些机会可自动验证和/或例如经由合作决策模块232由或通过人为干预来验证。一旦确定一机会是否有效,在操作608就可授权或不授权用以处理该机会的动作。例如,如果该机会要由具有监督权限的一人或多人授权,则该人就被提示查看该机会,并且根据需要验证或进一步验证该机会,并经由合作决策模块232来批准或反驳该机会。如果动作未被授权,则操作行进到如下所述的生产损失报告工作流700。在操作610,对油藏202、油井204和/或处理和传输系统206执行已授权的动作,并记录关于该动作的信息。在特定情形下,经编配的生产操作工作流650可被配置成在所标识的校正动作在指定限度内的情况下绕过操作602-608。指定限度可指示以下一种或多种:调整的幅度、调整的性质、指定被调整的特定组件或装备、或其它限度。不论操作602-608是否被绕过,可能的动作都包括更新一个或多个操作目标、调整油井204和/或处理和传输系统206的一个或多个组件和装备的操作(例如,经由致动器216、222)、或其它动作。动作的执行和记录是经由SCADA接口330和/或工作管理系统334来执行的。如上所讨论的工作管理系统334用以协调调度、人员指派、实现动作的工序和其它方面。在特定情形下,对手动控制的组件或装备的调整或本质上不能由SCADA接口执行的调整可经由工作管理系统334来执行。在一些情形下,例如可经由去往油井204的致动器216和/或处理和传输系统206的致动器222的信号基本即时地、或延迟极小地发起和/或实现动作。动作还可自动地或者全部或部分通过人为干预地来实现。例如,校正动作的性质和幅度可经由工作管理系统334被传达给人。
在操作612,如下所述,监视油藏202、油井204和/或设施的操作以标识操作的变化,并用将这些变化归因于导致这些变化的相应动作。这样,系统200允许分析这些动作以查看它们在实现改进机会上是否成功。
操作602-612中的部分或全部可自动地执行,以使得能够脱离决策者进行管理。可连续或基本连续地、以规则和/或不规则间隔定期地、或有时连续而有时定期地执行这些操作。不同操作可以不同速率执行。在特定情形下,这些操作中的一个或多个或者全部可以实时地执行。如果数据是连续或基本连续地、在足够快的时间间隔(取决于数据类型)收集的、或者是实时数据,生产操作工作流650可用以标识生产改进机会,并与实际产量120发生变化基本并发地采取校正动作,而在一些情形下实时地采取校正动作。
图8描绘了用以跟踪随时间的生产损失并减轻该损失由此增大且在一些情形下最大化实际产量120的说明性经编配的生产损失报告工作流700。该说明性生产损失报告工作流700可被实现为在与用以驱动工作流700的操作的系统200的其它组件接口连接的执行动作模块232中操作的软件和/或硬件。生产损失报告工作流700关于控制油井和基础设施204以及处理和传输系统206中一个或多个的操作的现有操作目标来操作监督能力。
在操作702,设置生产目标。生产目标表示所希望的来自油藏202、油井204以及处理和传输系统206的产量,并且在特定情形下是从操作潜能114导出的。在特定实现中,生产目标可从针对油藏202、油井204以及处理和传输系统206的预期效率而调整的操作潜能114导出。生产目标是用接收自生产系统模型228的信息来设置的。在这些实施例中,生产系统模型228根据接收自SCADA 304的当前生产数据412和接收自数据历史归档器310的历史生产数据412确定操作潜能114。生产目标可自动地设置,或者可用决策者经由合作决策模块232的输入来设置。生产损失报告工作流700通过自动提示系统200的组件(包括生产系统模型228)以及决策者在操作702中设置生产目标时执行其相应部分来导出生产目标的设置。
在操作704,标识生产损失。生产损失可以多种方式来标识。例如,油藏202、油井204、和/或处理和传输系统206的操作可经由生产数据412来监视并且可对照生产目标来比较以确定该操作是否满足生产目标。这种比较和用以确定生产损失的其它比较由生产监督模块604来监视、并通过咨询模块322经由咨询来标识。生产监督模块604经由SCADA 304接收当前生产数据412并经由数据历史归档器310来接收历史生产数据412。咨询不仅可以包括对生产损失的指示,还可包括其幅度以及结果容量间隙116的可能原因。
在操作706,根据生产损失的原因将生产损失分类。例如,生产损失可被分类为源于性能退化(即,性能间隙108)、缺乏可用性(即,可用性间隙112)、要最优调整的组件和子组件的故障(即,容量间隙116)或其它。损失的类别被传达给生产监督模块604并在进一步的操作中用以标识生产损失。
在操作708,分析生产损失以确定该生产损失是否异常、不可能再次发生、或者该生产损失是否是一正在发展的损失、以及在一些情形下该生产损失是否是一增加的损失。在分析生产损失时,分析可注意历史数据趋势以注意该生产损失是否再次发生、和正在增大或减小。如果确定该生产损失是再次发生的,则操作708处的分析可自动地确定或便于确定(用决策者的输入)一个或多个可能动作以补救该生产损失并行进到操作710。
在操作710,授权用以补救生产损失的动作。该动作可以是在操作708推荐的动作中的一个或多个,或者可以是另一动作。该动作可自动地授权,或者可由决策者或用决策者经由合作决策模块232的输入来授权。在一些情形下,授权的动作可涉及维护工作流500的操作,例如更新性能标准(操作502)、更新维护策略(操作506)、更新维护例程(操作508)、更新维护调度(操作510)、或其它。在一些情形下,授权的动作可涉及生产操作工作流600/650的操作,例如执行操作606-612。在一些情形下,该动作可涉及生产管理工作流900在操作702更新生产目标的操作。在一些情形下,这些动作可涉及经由工作管理系统334发起工作、或经由维护工作流500发起维护活动。
操作702-710中的部分或全部可自动地执行,以使得能够脱离决策者进行管理。可连续或基本连续地、以规则和/或不规则间隔定期地、或有时连续或有时定期地执行这些操作。不同操作可以不同速率执行。在特定情形下,操作是实时地执行的。如以上所讨论的,如果数据是连续或基本连续地、在足够快的时间间隔(取决于数据类型)收集的、或者是实时数据,生产损失报告工作流700可用以标识生产改进机会,并可与实际产量120发生变化基本并发地采取校正动作。
现在转到图9,示意性地描绘了操作用以增大且在一些情形下用以最大化可用潜能110和操作潜能114的说明性维护工作流500。通过增大或最大化可用潜能110和操作潜能114,性能间隙108和可用性间隙112被缩小或最小化。该说明性维护工作流500可被实现为在与用以驱动工作流500的操作的系统200的其它组件接口连接的执行动作模块232中操作的软件和/或硬件。在该说明性维护工作流500中,在操作502设置性能标准。性能目标表示油藏202、油井204以及处理和传输系统206的所希望的性能,并且在特定情形下表示安装能力潜能106。性能标准是用接收自生产系统模型228的维护和可靠性建模方面的信息来设置的。在特定实施例中,生产系统模型228可被用来标识安装能力潜能106,并确定上游生产系统的组件和子组件的故障间平均工作时间和平均修复或预防性干预时间,以及在设置性能标准时修改安装能力潜能106。性能标准可由生产系统模型228自动设置,或者可由决策者或通过决策者用来自生产系统模型228的信息进行输入来设置。在决策者参与设置性能标准的情形下,来自生产系统模型228的信息经由合作决策模块232被传达给决策者。同样,经由合作决策模块232从决策者处传达性能标准。另外,决策者可在设置性能标准时经由合作决策模块232访问诸如数据中心226等系统200的其它组件以作参考。维护工作流500通过自动提示系统200的组件(包括生产系统模型228)以及决策者在操作502中设置性能标准时执行其相应部分来导出性能标准的设置。
在操作506-510,设置用于维护上游生产系统的维护计划。具体而言,在操作506,设置维护策略。在操作508,设置维护例程。维护例程被自动传达给计算机化维护及管理系统(CMMS)312。在操作510,设置维护调度。维护调度被自动传达给企业信息系统308。维护策略、维护例程以及维护调度涉及油藏202、油井204、及处理和传输系统206中的一个或多个。如上所述,维护策略、维护例程、以及维护调度可自动设置,或者可用经由合作决策模块232传达的信息由决策者或用决策者的输入来设置。该说明性维护工作流500通过自动提示系统200的各组件以及决策者执行他们在操作中的相应部分来驱动操作506-510。
在操作512,对油藏202、油井204以及处理和传输系统206自动执行维护并记录关于该维护的信息。维护的执行和记录是经由工作管理工作流800和工作管理系统334来执行的。工作管理工作流800。工作管理系统334由工作管理工作流800驱动来实现维护。如上所讨论的工作管理系统334用以协调调度、人员指派、实现维护的工序和其它方面。工作管理系统还自动关于调度、人员、工序、状态完成、及在实现维护时所采取的动作向CMMS 312报告。
在操作518,工作流500通过提示工作管理系统334和维护分析模块516关于效率的信息来驱动对维护操作的效率分析。效率分析一般确定维护计划(即,维护策略、维护例程和维护调度)正执行到什么程度。维护分析模块516从CMMS 312采集信息并确定关于维护效率的信息,例如,包括百分比效率、利用率、采取了多少计划动作、采取了多少非计划动作、及其它信息。
在操作520,工作流500通过提示装备监视及分析模块524关于维护操作的效用的信息来驱动对维护操作的效用分析。效用分析一般确定正在执行的维护在维护安装能力潜能106上有效到什么程度。例如,效用分析可指出虽然正对一组件执行调度维护,但该组件仍然遭遇到频繁故障。装备监视及分析模块524监视接收自SCADA 304的关于系统200的装备和组件的当前性能和状况信息、以及接收自数据历史归档器310的关于系统200的装备和组件的历史性能和状况信息。装备监视及分析模块524输出包括故障间平均工作时间数据、平均修复时间、及其它性能数据406和可用性数据410的信息。
在操作528,将操作518的效率分析和操作520的效用分析的输出与在操作502设置的性能标准相比较。在操作530,鉴于维护的效率和效用与性能标准之间的比较来确定动作。如果维护的效率和效用与性能标准之间没有显著差异,则所采取的动作可以在设置的维护策略、维护例程、及维护调度下继续操作。相应地,操作返回操作512并如上所述地重复。如果维护的效率和效用与性能标准之间有显著差异,则所采取的动作可更新性能标准、更新维护策略、更新维护例程、和/或更新维护调度。在操作530决定动作时,可以参考根本原因分析模块526,它接收来自装备监视及分析模块524和维护分析模块516的输入以便于或执行对维护操作的效率和效用与性能标准之间的差异的根本原因分析。在一些情形下,可自动地确定动作。或者,决策者经由合作决策模块232可确定或可参与确定该动作。如果决策者涉及动作确定,则关于维护操作的效率和效用与性能标准之间的差异的信息、关于自动确定的可能动作的信息、以及来自根本原因分析模块526的信息中的一个或多个可经由合作决策模块232被传达给决策者。工作流500将提示决策者确定动作,由此驱动决策者在系统200的操作中的相应部分。另外,通过合作决策模块232,决策者可以访问关于油藏202、油井204、以及处理和传输系统206的操作的当前和历史等其它信息。动作是自动确定还是用来自决策者的输入来确定可取决于维护动作的效率和效用与性能标准之间的差异的幅度、根本原因分析模块526所确定的可能的根本原因、和/或其它因素。同时,如果该动作是自动确定的,则决策者可查看该动作、并确定保持该自动作出的动作和/或经由合作决策模块232作出进一步或不同的动作。根据自动或由决策者决定的动作,操作可返回到更新性能标准的操作502、更新维护策略的操作506、更新维护例程的操作508、和/或更新维护调度的操作510中的一个或多个。一旦已实现了动作,系统200就可用以跟踪油藏202、油井204、处理和传输系统206、以及系统200的操作的变化以将这些变化与导致变化的相应动作相关联。这样,系统200允许分析这些动作以查看它们在实现改进机会上是否成功。
注意,操作512-530中的部分或全部可自动地执行,以使得能够脱离决策者进行管理。可连续或基本连续地、以规则和/或不规则间隔定期地、或有时连续而有时定期地执行这些操作。在特定情形下,这些操作中的一个或多个可以实时地执行。如上所讨论的,如果数据是连续或基本连续地、在足够快的时间间隔(取决于数据类型)收集的、或者是实时数据,则维护工作流500可用以确定维护操作的效率和效用与性能标准之间的差异,并可与维护操作对可用潜能110和操作潜能114的影响基本并发地采取校正动作。例如,如果确定一计划动作未被实现,则可采取基本即时的动作以在操作510重新调度该动作。在另一示例中,可确定组件或装备的操作指示一即将发生或正在发生的故障,并可采取一基本即时的动作以在操作510发起校正动作。
现在参照图10,示意性地描绘了用以管理上游生产系统的生产操作的说明性生产管理工作流900。在利用上游生产系统时,开发了一高层生产系统(或资产)参考计划/基本原理902,其在一较高层面上勾勒了上游生产系统将依据其以进行操作的目标和一般性基本原理。例如,计划/基本原理902可勾勒上游生产系统将被用以挖掘特定油藏或地带内的可用或假定可得的储量,在若干年内产出指定的生产量,将以特定容量、发展的或假定的产物特性、与投资决策一致的关键经济因素和假定、人员水平和操作支出来设计和/或操作。这些假定和参数在上游生产系统的使用期中经常改变,并且可影响生产模型或生产系统目标和约束。
在操作904,根据生产系统参考计划/基本原理902使用生产系统模型228确定关于计划上游生产系统使用寿命的子集——例如一年的更具指导性的生产计划。在特定情形下,生产计划可设置操作目标、假定的经济因素、可用操作支出、资本投资计划中的一个或多个。这些假定和参数在生产计划的时段上经常改变,并且可影响生产模型或生产系统目标和约束。在操作906,使用确定的生产计划,设置将在上游生产系统的寿命期间执行的工作动作。这些工作动作旨在维护上游生产系统、操作并维护组件和装备。初始工作动作被传达给如上所述地协调实现这些初始工作动作的工作管理系统334。还设置上游生产系统的生产目标例如以用于生产损失报告(例如,在工作流700中)。使用生产系统模型228,为上游生产系统的操作确定初始控制设定点并实现这些设定点。
在操作908,上游生产系统最初基于在操作906确定的控制设定点和工作动作来操作。关于上游生产系统的操作的数据被传达给生产监督模块604。此后,在操作910,对照上游生产系统模型228运行操作情景以确定根据控制设置和根据生产管理工作流600/500实现的控制设置。在操作912,例如如在模型更新680所描述地那样对生产系统模型228进行维护。
参照图4-10描述的说明性工作流被提供用于示例目的,并且这些工作流中的一个或多个可以改变或省略。这些说明性工作流中的一个或多个或全部可以至少部分地并发或在不同时刻、以任意次序或无序地执行。此外,这些说明性工作流的步骤的一个或多个还可改变或省略。一给定说明性工作流内步骤中的一个或多个或全部可以至少部分地并发或在不同时刻、以任意次序或无序地执行。在特定情形下,销售点在炼油厂之前,产物在炼油厂处从原始或初步产物被进一步处理成最终或接近最终的产物,诸如燃气、柴油、燃料油、和/或液化石油天然气(LPG)等。
上述说明性系统和方法的部分允许进行持续的上游生产系统广泛改进,并且在一些情形下允许优化操作以提取、处理来自一个或多个油藏的产物并将其传输到一个或多个销售点。在这些说明性系统和方法中,闭环系统重复操作以管理(并且在一些情形下最大化)油藏、油井及基础设施、和设施中一个或多个的性能,装备、材料及人员的可用性,和/或油藏、油井、以及处理和传输系统的操作。
上述说明性系统和方法中的一部分跨油藏、油井及基础设施、以及处理和传输系统地集成数据和分析。这些集成的数据和分析允许访问通常不能一起访问的信息,以及说明动作对油藏、油井及基础设施以及处理和传输系统中的一个或全部的影响。对来自整个上游生产系统的数据的唯一访问使得决策者能够标识油藏、油井及基础设施、以及处理和传输系统的操作之间的协作。说明动作对上游生产系统的各方面中的一个或全部的影响的能力允许对用以实现改进机会的动作作出更具见识的决策。
在上述说明性系统和方法的一部分中,生产数据、可用性数据及性能数据是被监视的,而改进机会是自动标识的。这种监视使决策者能根据异常来进行管理,即仅在需要其输入时作出响应。此外,在一些情形下,可自动地确定动作,以进一步增强决策者根据异常来管理上游生产系统的能力。
在上述说明性系统和方法的一部分中,采取用以实现改进机会的动作被从改进机会的标识一直到由于动作的实现而引起的改变进行跟踪。通过跟踪改进机会、动作及得到的改变,可将改变归因于所采取的动作,并且可确定该动作在实现改进机会上是否成功(和/或有多成功)。
在上述说明性系统和方法的一部分中,动态工作流被实现以驱动上游生产系统的管理。通过驱动上游生产系统的管理,管理上游生产系统时操作之间的滞后时间被缩短,源于确定下一步骤的困惑被消除,以及决策者被从耗时的低级管理活动——诸如定期地监视对应改进机会的数据和这些动作的日常实现——中解脱出来。
在上述说明性系统和方法的一部分中,数据是实时地感测和/或处理的,从而允许决策者和工作流基本上在改进机会发生时标识和实现改进机会。
已描述了数个实现。但是,应理解的是可作出各种修改。相应地,其它实施例也落在所附权利要求的范围之内。

Claims (73)

1.一种方法,包括:
接收关于从地下油藏提取产物的油井操作、以及所述地下油藏的特性或炼油厂之前的销售点上游的处理和传输系统的操作中的至少一个的数据;
使用所述数据和所述油井、所述地下油藏以及所述处理和传输系统的模型关于指定的操作目标自动确定对所述油井或所述处理和传输系统中的至少一个的校正动作;以及
对所述油井、所述处理和传输系统的采集系统或所述处理和传输系统的生产设施中的至少一个自动发起所述校正动作。
2.如权利要求1所述的方法,其特征在于,所述校正动作包括对所述油井、所述处理和传输系统的采集系统或所述处理和传输系统的生产设施中的至少一个的操作的调整。
3.如权利要求1所述的方法,其特征在于,所述自动确定包括实时自动确定。
4.如权利要求1所述的方法,其特征在于,还包括响应于接收到的数据自动发起对所述模型的调整。
5.一种方法,包括:
接收关于从地下油藏提取产物的油井操作以及所述地下油藏的特性或销售点上游的处理和传输系统的操作中的至少一个的数据;以及
响应于接收到的数据与指定的操作目标之间的差异自动地对所述油井或所述处理和传输系统中的至少一个发起校正动作。
6.如权利要求5所述的方法,其特征在于,所述操作目标包括产物销售率或产物生产率中的至少一个。
7.如权利要求5所述的方法,其特征在于,所述处理和传输系统包括用于在炼油厂上游处理产物的生产设施和用于将所述产物从所述油井运输到所述销售点的采集系统。
8.如权利要求7所述的方法,其特征在于,自动对所述生产设施发起校正动作包括对以下至少之一发起调整:提供给分离器的流的量、提供给所述分离器的流的压力、提供给所述分离器的流的流量、提供给脱水器的流的量、提供给所述脱水器的流的压力、提供给脱水器的流的流量、阀门、阻气门、流控制设备、压缩机、泵、加热器、冷却器、或液位。
9.如权利要求7所述的方法,其特征在于,自动对所述采集系统发起校正动作包括对以下至少之一发起调整:通过管道的流的量、通过管道提供的流的压力、通过管道提供的流的流量、阀门、阻气门、流控制设备、压缩机、泵、加热器、和冷却器。
10.如权利要求5所述的方法,其特征在于,自动发起对所述油井的校正动作包括对所述油井的产出率或所述油井的灌注率中的至少一个发起调整。
11.如权利要求5所述的方法,其特征在于,还包括使用所述地下油藏、所述油井以及所述处理和传输系统的模型来自动地确定所述校正动作。
12.如权利要求11所述的方法,其特征在于,所述模型还包括第一主模型、代理模型、或导出模型中的至少一种。
13.如权利要求11所述的方法,其特征在于,还包括响应于接收到的数据自动发起对所述模型的调整。
14.如权利要求5所述的方法,其特征在于,所述关于地下油藏的特性的数据包括地震数据、地质数据或测井数据中的至少一种。
15.如权利要求5所述的方法,其特征在于,所述关于油井的操作的数据包括流量、压力、温度、流体成分、流体密度、粘度或致动器状态中的至少一种。
16.如权利要求5所述的方法,其特征在于,所述关于处理和传输系统的操作的数据包括流量、压力、温度、流体成分、流体密度、粘度或致动器状态中的至少一种。
17.如权利要求5所述的方法,其特征在于,接收数据包括实时地接收所述数据。
18.如权利要求5所述的方法,其特征在于,自动地发起校正动作包括实时地自动发起校正动作。
19.一种包括用于存储用以使一个或多个机器执行操作的指令的机器可读介质的制品,包括:
接收关于从地下油藏提取产物的油井操作以及所述地下油藏的特性或销售点上游的处理和传输系统的操作中的至少一个的数据;以及
响应于接收到的数据与指定的操作目标之间的差异自动地对所述油井或所述处理和传输系统中的至少一个发起校正动作。
20.如权利要求19所述的制品,其特征在于,所述操作目标包括产物销售率或产物生产率中的至少一个。
21.如权利要求19所述的制品,其特征在于,所述处理和传输系统包括用于在炼油厂上游处理产物的生产设施和用于将所述产物从所述油井运输到所述销售点的采集系统。
22.如权利要求21所述的制品,其特征在于,自动对所述生产设施发起校正动作包括对以下至少之一发起调整:提供给分离器的流的量、提供给所述分离器的流的压力、提供给分离器的流的流量、提供给脱水器的流的量、提供给所述脱水器的流的压力、提供给脱水器的流的流量、阀门、阻气门、流控制设备、压缩机、泵、加热器、冷却器、或液位。
23.如权利要求21所述的制品,其特征在于,自动对所述采集系统发起校正动作包括对以下至少之一发起调整:通过管道的流的量、通过管道提供的流的压力、通过管道提供的流的流量、阀门、阻气门、流控制设备、压缩机、泵、加热器、和冷却器。
24.如权利要求19所述的制品,其特征在于,自动发起对所述油井的校正动作包括对所述油井的产出率或所述油井的灌注率中的至少一个发起调整。
25.如权利要求19所述的制品,其特征在于,还包括使用所述地下油藏、所述油井以及所述处理和传输系统的模型来自动地确定所述校正动作。
26.如权利要求25所述的制品,其特征在于,所述模型还包括第一主模型、代理模型、或导出模型中的至少一种。
27.如权利要求25所述的制品,其特征在于,所述操作还包括响应于接收到的数据自动发起对所述模型的调整。
28.如权利要求19所述的制品,其特征在于,所述关于地下油藏的特性的数据包括地震数据、地质数据或测井数据中的至少一种。
29.如权利要求19所述的方法,其特征在于,所述关于油井的操作的数据包括流量、压力、温度、流体成分、流体密度、粘度或致动器状态中的至少一种。
30.如权利要求19所述的制品,其特征在于,所述关于处理和传输系统的操作的数据包括流量、压力、温度、流体成分、流体密度、粘度或致动器状态中的至少一种。
31.如权利要求19所述的制品,其特征在于,接收数据包括实时地接收所述数据。
32.如权利要求19所述的制品,其特征在于,自动地发起校正动作包括实时地自动发起校正动作。
33.一种系统,包括:
至少一个处理器;以及
至少一个处理器,其耦合至所述至少一个处理器并存储用以使所述至少一个处理器执行包括以下动作的操作的指令:
接收关于从地下油藏提取产物的油井操作以及所述地下油藏的特性或销售点上游的处理和传输系统的操作中的至少一个的数据;以及
响应于接收到的数据与指定的操作目标之间的差异自动地对所述油井或所述处理和传输系统中的至少一个发起校正动作。
34.如权利要求33所述的系统,其特征在于,所述操作目标包括产物销售率或产物生产率中的至少一个。
35.如权利要求33所述的系统,其特征在于,所述处理和传输系统包括用于在炼油厂上游处理产物的生产设施和用于将所述产物从所述油井运输到所述销售点的采集系统。
36.如权利要求33所述的系统,其特征在于,自动对所述生产设施发起校正动作包括对以下至少之一发起调整:提供给分离器的流的量、提供给所述分离器的流的压力、提供给分离器的流的流量、提供给脱水器的流的量、提供给所述脱水器的流的压力、提供给脱水器的流的流量、阀门、阻气门、流控制设备、压缩机、泵、加热器、冷却器、或液位。
37.如权利要求33所述的系统,其特征在于,自动对所述采集系统发起校正动作包括对以下至少之一发起调整:通过管道的流的量、通过管道提供的流的压力、通过管道提供的流的流量、阀门、阻气门、流控制设备、压缩机、泵、加热器、和冷却器。
38.如权利要求33所述的系统,其特征在于,自动发起对所述油井的校正动作包括对所述油井的产出率或所述油井的灌注率中的至少一个发起调整。
39.如权利要求33所述的系统,其特征在于,还包括使用所述地下油藏、所述油井以及所述处理和传输系统的模型来自动地确定所述校正动作。
40.如权利要求39所述的系统,其特征在于,所述模型还包括第一主模型、代理模型、或导出模型中的至少一种。
41.如权利要求39所述的系统,其特征在于,所述操作还包括响应于接收到的数据自动发起对所述模型的调整。
42.如权利要求33所述的系统,其特征在于,所述关于地下油藏的特性的数据包括地震数据、地质数据或测井数据中的至少一种。
43.如权利要求33所述的系统,其特征在于,所述关于油井的操作的数据包括流量、压力、温度、流体成分、流体密度、粘度或致动器状态中的至少一种。
44.如权利要求33所述的系统,其特征在于,所述关于处理和传输系统的操作的数据包括流量、压力、温度、流体成分、流体密度、粘度或致动器状态中的至少一种。
45.如权利要求33所述的系统,其特征在于,接收数据包括实时地接收所述数据。
46.如权利要求33所述的系统,其特征在于,自动地发起校正动作包括实时地自动发起校正动作。
47.一种方法,包括:
接收关于从地下油藏提取产物的油井操作以及所述地下油藏的特性或销售点上游的处理和传输系统的操作中的至少一个的数据;以及
响应于接收到的数据自动对所述油藏、所述油井、以及所述处理和传输系统的模型发起调整。
48.如权利要求47所述的方法,其特征在于,所述处理和传输系统包括用于在炼油厂上游处理产物的生产设施和用于将所述产物从所述油井运输到所述销售点的采集系统。
49.如权利要求47所述的方法,其特征在于,所述关于地下油藏的特性的数据包括地震数据、地质数据或测井数据中的至少一种。
50.如权利要求47所述的方法,其特征在于,所述关于油井的操作的数据包括流量、压力、温度、或流体成分中的至少一种。
51.如权利要求47所述的方法,其特征在于,所述关于处理和传输系统的操作的数据包括流量、压力、温度、或流体成分中的至少一种。
52.如权利要求47所述的方法,其特征在于,接收数据包括实时地接收所述数据。
53.如权利要求47所述的方法,其特征在于,调整模型包括实时地调整所述模型。
54.如权利要求47所述的方法,其特征在于,所述模型还包括第一主模型、代理模型、或导出模型中的至少一种。
55.如权利要求47所述的方法,其特征在于,还包括自动对所述油井或所述处理和传输系统中的至少一个发起校正动作,所述校正动作是使用所述经调整的模型来确定的。
56.一种包括用于存储用以使一个或多个机器执行操作的指令的机器可读介质的制品,包括:
接收关于从地下油藏提取产物的油井操作以及所述地下油藏的特性或销售点上游的处理和传输系统的操作中的至少一个的数据;以及
响应于接收到的数据自动对所述油藏、所述油井、以及所述处理和传输系统的模型发起调整。
57.如权利要求56所述的制品,其特征在于,所述处理和传输系统包括用于在炼油厂上游处理产物的生产设施和用于将所述产物从所述油井运输到所述销售点的采集系统。
58.如权利要求56所述的制品,其特征在于,所述关于地下油藏的特性的数据包括地震数据、地质数据或测井数据中的至少一种。
59.如权利要求56所述的制品,其特征在于,所述关于油井的操作的数据包括流量、压力、温度、或流体成分中的至少一种。
60.如权利要求56所述的制品,其特征在于,所述关于处理和传输系统的操作的数据包括流量、压力、温度、或流体成分中的至少一种。
61.如权利要求56所述的制品,其特征在于,接收数据包括实时地接收所述数据。
62.如权利要求56所述的制品,其特征在于,调整模型包括实时地调整所述模型。
63.如权利要求56所述的制品,其特征在于,所述模型还包括第一主模型、代理模型、或导出模型中的至少一种。
64.如权利要求56所述的制品,其特征在于,还包括自动对所述油井或所述处理和传输系统中的至少一个发起校正动作,所述校正动作是使用所述经调整的模型来确定的。
65.一种系统,包括:
至少一个处理器;以及
至少一个处理器,其耦合至所述至少一个处理器并存储用以使所述至少一个处理器执行包括以下动作的操作的指令:
接收关于从地下油藏提取产物的油井操作以及所述地下油藏的特性或销售点上游的处理和传输系统的操作中的至少一个的数据;以及
响应于接收到的数据自动对所述油藏、所述油井、以及所述处理和传输系统的模型发起调整。
66.如权利要求65所述的系统,其特征在于,所述处理和传输系统包括用于在炼油厂上游处理产物的生产设施和用于将所述产物从所述油井运输到所述销售点的采集系统。
67.如权利要求65所述的系统,其特征在于,所述关于地下油藏的特性的数据包括地震数据、地质数据或测井数据中的至少一种。
68.如权利要求65所述的系统,其特征在于,所述关于油井的操作的数据包括流量、压力、温度、或流体成分中的至少一种。
69.如权利要求65所述的系统,其特征在于,所述关于处理和传输系统的操作的数据包括流量、压力、温度、或流体成分中的至少一种。
70.如权利要求65所述的系统,其特征在于,接收数据包括实时地接收所述数据。
71.如权利要求65所述的系统,其特征在于,调整模型包括实时地调整所述模型。
72.如权利要求65所述的系统,其特征在于,所述模型还包括第一主模型、代理模型、或导出模型中的至少一种。
73.如权利要求65所述的系统,其特征在于,还包括自动对所述油井或所述处理和传输系统中的至少一个发起校正动作,所述校正动作是使用所述经调整的模型来确定的。
CNA2007800025651A 2006-01-20 2007-01-19 动态生产系统管理 Pending CN101371164A (zh)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US76070806P 2006-01-20 2006-01-20
US60/760,708 2006-01-20

Publications (1)

Publication Number Publication Date
CN101371164A true CN101371164A (zh) 2009-02-18

Family

ID=38288230

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2007800025651A Pending CN101371164A (zh) 2006-01-20 2007-01-19 动态生产系统管理

Country Status (9)

Country Link
US (3) US8195401B2 (zh)
EP (1) EP1999492A4 (zh)
CN (1) CN101371164A (zh)
AU (1) AU2007207497B8 (zh)
BR (1) BRPI0706580A2 (zh)
CA (1) CA2636428C (zh)
MX (1) MX2008009308A (zh)
NO (2) NO344041B1 (zh)
WO (1) WO2007084611A2 (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104981810A (zh) * 2013-01-10 2015-10-14 西方奇科抗震控股有限公司 用于地球科学和石油技术协作的方法和计算系统
CN107111304A (zh) * 2014-11-24 2017-08-29 拜耳股份公司 用于配置被设计用于进行至少一个化学反应的生产设备的方法
CN107944123A (zh) * 2017-11-20 2018-04-20 北京宇航系统工程研究所 一种基于主模型的多专业协同设计系统及协同设计方法
CN109296343A (zh) * 2018-08-31 2019-02-01 中国海洋石油集团有限公司 一种气井排采工艺评价系统集成及方法
CN114227145A (zh) * 2020-09-09 2022-03-25 南阳二机石油装备集团股份有限公司 一种密封环的智能化自适应加工方法
US11295399B2 (en) * 2017-02-22 2022-04-05 Landmark Graphics Corporation Well exploration, service and production appliance architecture

Families Citing this family (148)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6853921B2 (en) 1999-07-20 2005-02-08 Halliburton Energy Services, Inc. System and method for real time reservoir management
US7707485B2 (en) * 2005-09-28 2010-04-27 Vixs Systems, Inc. System and method for dynamic transrating based on content
WO2007084611A2 (en) * 2006-01-20 2007-07-26 Landmark Graphics Corporation Dynamic production system management
AU2007225358B2 (en) * 2006-03-02 2012-11-15 Exxonmobil Upstream Research Company Method for quantifying reservoir connectivity using fluid travel times
US7752013B1 (en) * 2006-04-25 2010-07-06 Sprint Communications Company L.P. Determining aberrant server variance
US8352227B2 (en) * 2006-10-30 2013-01-08 Schlumberger Technology Corporation System and method for performing oilfield simulation operations
US7860593B2 (en) * 2007-05-10 2010-12-28 Canrig Drilling Technology Ltd. Well prog execution facilitation system and method
WO2008112929A1 (en) * 2007-03-13 2008-09-18 Schlumberger Canada Limited Method and system for managing information
US8117016B2 (en) 2007-04-19 2012-02-14 Schlumberger Technology Corporation System and method for oilfield production operations
US8775141B2 (en) * 2007-07-02 2014-07-08 Schlumberger Technology Corporation System and method for performing oilfield simulation operations
US20110161133A1 (en) * 2007-09-29 2011-06-30 Schlumberger Technology Corporation Planning and Performing Drilling Operations
WO2009061903A2 (en) * 2007-11-10 2009-05-14 Landmark Graphics Corporation Systems and methods for workflow automation, adaptation and integration
AU2008335691B2 (en) * 2007-12-13 2013-12-05 Exxonmobil Upstream Research Company Iterative reservior surveillance
US8417497B2 (en) * 2008-01-18 2013-04-09 Westerngeco L.L.C. Updating a model of a subterranean structure using decomposition
US10552391B2 (en) 2008-04-04 2020-02-04 Landmark Graphics Corporation Systems and methods for real time data management in a collaborative environment
US8670966B2 (en) * 2008-08-04 2014-03-11 Schlumberger Technology Corporation Methods and systems for performing oilfield production operations
US8020616B2 (en) * 2008-08-15 2011-09-20 Schlumberger Technology Corporation Determining a status in a wellbore based on acoustic events detected by an optical fiber mechanism
US9228415B2 (en) 2008-10-06 2016-01-05 Schlumberger Technology Corporation Multidimensional data repository for modeling oilfield operations
US8706541B2 (en) 2008-10-06 2014-04-22 Schlumberger Technology Corporation Reservoir management linking
US8146374B1 (en) * 2009-02-13 2012-04-03 Source IT Energy, LLC System and method for efficient utilization of energy generated by a utility plant
US8490693B2 (en) * 2009-02-17 2013-07-23 Schlumberger Technology Corporation Determining fracture orientation using wellbore acoustic radial profiles
AU2013200561B2 (en) * 2009-03-13 2015-11-19 Landmark Graphics Corporation Systems and methods for real time data management in a collaborative environment
US9328285B2 (en) * 2009-04-02 2016-05-03 Weatherford Technology Holdings, Llc Methods using low concentrations of gas bubbles to hinder proppant settling
AU2010258106B2 (en) * 2009-06-12 2015-10-08 Technological Resources Pty Limited A mine operation monitoring system
US9323582B2 (en) * 2009-08-12 2016-04-26 Schlumberger Technology Corporation Node to node collaboration
US9323639B2 (en) * 2009-09-10 2016-04-26 International Business Machines Corporation Dynamic recommendation framework for information technology management
US20110098996A1 (en) * 2009-10-26 2011-04-28 David Nichols Sifting Models of a Subsurface Structure
WO2011060005A2 (en) * 2009-11-13 2011-05-19 Chevron U.S.A. Inc. System and method for well control
BR112012012817A2 (pt) 2009-11-30 2020-08-11 Exxonmobil Upstream Research Company método de newton adaptativo para simulação de reservatório
US9594186B2 (en) 2010-02-12 2017-03-14 Exxonmobil Upstream Research Company Method and system for partitioning parallel simulation models
US8422859B2 (en) * 2010-03-23 2013-04-16 Vixs Systems Inc. Audio-based chapter detection in multimedia stream
CN102870087B (zh) 2010-04-30 2016-11-09 埃克森美孚上游研究公司 流体有限体积仿真的方法和系统
EP2588952A4 (en) 2010-06-29 2017-10-04 Exxonmobil Upstream Research Company Method and system for parallel simulation models
US8700371B2 (en) * 2010-07-16 2014-04-15 Schlumberger Technology Corporation System and method for controlling an advancing fluid front of a reservoir
US20120022907A1 (en) * 2010-07-22 2012-01-26 Rockwell Automation Technologies, Inc. Social networking in an asset performance management system
CA2803066A1 (en) 2010-07-29 2012-02-02 Exxonmobil Upstream Research Company Methods and systems for machine-learning based simulation of flow
AU2011283193B2 (en) 2010-07-29 2014-07-17 Exxonmobil Upstream Research Company Methods and systems for machine-learning based simulation of flow
US9058445B2 (en) 2010-07-29 2015-06-16 Exxonmobil Upstream Research Company Method and system for reservoir modeling
CA2808078C (en) 2010-08-24 2018-10-23 Exxonmobil Upstream Research Company System and method for planning a well path
WO2012039811A1 (en) 2010-09-20 2012-03-29 Exxonmobil Upstream Research Company Flexible and adaptive formulations for complex reservoir simulations
US20120084110A1 (en) * 2010-10-05 2012-04-05 M3 Technology, Inc. System and method for smart oil, gas and chemical process scheduling
US10318663B2 (en) 2011-01-26 2019-06-11 Exxonmobil Upstream Research Company Method of reservoir compartment analysis using topological structure in 3D earth model
AU2011360212B2 (en) 2011-02-21 2017-02-02 Exxonmobil Upstream Research Company Reservoir connectivity analysis in a 3D earth model
WO2013006226A1 (en) 2011-07-01 2013-01-10 Exxonmobil Upstream Research Company Plug-in installer framework
CA2843469A1 (en) * 2011-07-28 2013-01-31 Schlumberger Canada Limited System and method for performing wellbore fracture operations
EP2756382A4 (en) 2011-09-15 2015-07-29 Exxonmobil Upstream Res Co MATRIX AND VECTOR OPERATIONS OPTIMIZED IN LIMITED INSTRUCTION ALGORITHMS THAT COMPLETE EOS CALCULATIONS
US20130110474A1 (en) 2011-10-26 2013-05-02 Nansen G. Saleri Determining and considering a premium related to petroleum reserves and production characteristics when valuing petroleum production capital projects
US10508520B2 (en) 2011-10-26 2019-12-17 QRI Group, LLC Systems and methods for increasing recovery efficiency of petroleum reservoirs
US9946986B1 (en) 2011-10-26 2018-04-17 QRI Group, LLC Petroleum reservoir operation using geotechnical analysis
US9767421B2 (en) * 2011-10-26 2017-09-19 QRI Group, LLC Determining and considering petroleum reservoir reserves and production characteristics when valuing petroleum production capital projects
EP2748739B1 (en) * 2011-10-28 2019-05-15 Landmark Graphics Corporation Methods and systems for well planning based on a complex fracture model
CN102436237B (zh) * 2011-11-02 2014-12-10 北京必创科技有限公司 掺水伴热控制方法
CA2856132C (en) * 2011-11-22 2016-06-07 Saudi Arabian Oil Comapny Coupled pipe network - reservoir modeling for multi-branch oil wells
US9816370B2 (en) * 2012-09-19 2017-11-14 Honeywell International Inc. System and method for optimizing an operation of a sensor used with wellbore equipment
CA2883169C (en) 2012-09-28 2021-06-15 Exxonmobil Upstream Research Company Fault removal in geological models
US11476781B2 (en) 2012-11-16 2022-10-18 U.S. Well Services, LLC Wireline power supply during electric powered fracturing operations
US10526882B2 (en) 2012-11-16 2020-01-07 U.S. Well Services, LLC Modular remote power generation and transmission for hydraulic fracturing system
US10036238B2 (en) 2012-11-16 2018-07-31 U.S. Well Services, LLC Cable management of electric powered hydraulic fracturing pump unit
US10254732B2 (en) 2012-11-16 2019-04-09 U.S. Well Services, Inc. Monitoring and control of proppant storage from a datavan
US9410410B2 (en) 2012-11-16 2016-08-09 Us Well Services Llc System for pumping hydraulic fracturing fluid using electric pumps
US10020711B2 (en) 2012-11-16 2018-07-10 U.S. Well Services, LLC System for fueling electric powered hydraulic fracturing equipment with multiple fuel sources
US9650879B2 (en) 2012-11-16 2017-05-16 Us Well Services Llc Torsional coupling for electric hydraulic fracturing fluid pumps
US9995218B2 (en) 2012-11-16 2018-06-12 U.S. Well Services, LLC Turbine chilling for oil field power generation
US10232332B2 (en) 2012-11-16 2019-03-19 U.S. Well Services, Inc. Independent control of auger and hopper assembly in electric blender system
US10119381B2 (en) 2012-11-16 2018-11-06 U.S. Well Services, LLC System for reducing vibrations in a pressure pumping fleet
US9893500B2 (en) 2012-11-16 2018-02-13 U.S. Well Services, LLC Switchgear load sharing for oil field equipment
US10407990B2 (en) 2012-11-16 2019-09-10 U.S. Well Services, LLC Slide out pump stand for hydraulic fracturing equipment
US9970278B2 (en) 2012-11-16 2018-05-15 U.S. Well Services, LLC System for centralized monitoring and control of electric powered hydraulic fracturing fleet
US11449018B2 (en) 2012-11-16 2022-09-20 U.S. Well Services, LLC System and method for parallel power and blackout protection for electric powered hydraulic fracturing
US9745840B2 (en) 2012-11-16 2017-08-29 Us Well Services Llc Electric powered pump down
US9840901B2 (en) 2012-11-16 2017-12-12 U.S. Well Services, LLC Remote monitoring for hydraulic fracturing equipment
US10026133B2 (en) 2012-12-11 2018-07-17 Landmark Graphics Corporation Method and system of analyzing wells of a mature field
US20140166272A1 (en) * 2012-12-14 2014-06-19 World Energy Systems Incorporated Measurement and control system for a downhole tool
US20140214476A1 (en) * 2013-01-31 2014-07-31 Halliburton Energy Services, Inc. Data initialization for a subterranean operation
US9373960B2 (en) * 2013-03-13 2016-06-21 Oracle International Corporation Computerized system and method for distributed energy resource scheduling
US9727928B2 (en) * 2013-03-14 2017-08-08 National Technology & Engineering Solutions Of Sandia, Llc Financial methods for waterflooding injectate design
US9816353B2 (en) * 2013-03-14 2017-11-14 Schlumberger Technology Corporation Method of optimization of flow control valves and inflow control devices in a single well or a group of wells
US10584570B2 (en) 2013-06-10 2020-03-10 Exxonmobil Upstream Research Company Interactively planning a well site
US9324027B2 (en) * 2013-07-30 2016-04-26 International Business Machines Corporation Collective evaluation of alternatives in a collaborative decision making environment
US10689965B2 (en) * 2013-08-26 2020-06-23 Repsol, S.A. Field development plan selection system, method and program product
US9864098B2 (en) 2013-09-30 2018-01-09 Exxonmobil Upstream Research Company Method and system of interactive drill center and well planning evaluation and optimization
WO2015057242A1 (en) * 2013-10-18 2015-04-23 Halliburton Energy Services, Inc. Managing a wellsite operation with a proxy model
US9593566B2 (en) * 2013-10-23 2017-03-14 Baker Hughes Incorporated Semi-autonomous drilling control
US10316653B2 (en) 2013-11-13 2019-06-11 Schlumberger Technology Corporation Method for calculating and displaying optimized drilling operating parameters and for characterizing drilling performance with respect to performance benchmarks
AU2013405166B2 (en) * 2013-11-15 2017-06-29 Landmark Graphics Corporation Optimizing flow control device properties for a liquid injection well using a coupled wellbore-reservoir model
US10049135B2 (en) * 2013-11-22 2018-08-14 Ronald Gordon WHITLEY, JR. Method and apparatus for context based data analytics
US20150170037A1 (en) * 2013-12-16 2015-06-18 Alcatel-Lucent Usa Inc. System and method for identifying historic event root cause and impact in a data center
US9283674B2 (en) 2014-01-07 2016-03-15 Irobot Corporation Remotely operating a mobile robot
MX2016011021A (es) 2014-02-24 2016-10-26 Landmark Graphics Corp Modelado total de recursos con modelos de recursos integrados y modelos de recursos persistentes.
US10670753B2 (en) 2014-03-03 2020-06-02 Saudi Arabian Oil Company History matching of time-lapse crosswell data using ensemble kalman filtering
US9945703B2 (en) 2014-05-30 2018-04-17 QRI Group, LLC Multi-tank material balance model
NO20140740A1 (no) * 2014-06-13 2015-06-08 Mhwirth As Fremgangsmåte for forbedret redundans og oppetid i SCADA nettverk
US10319143B2 (en) 2014-07-30 2019-06-11 Exxonmobil Upstream Research Company Volumetric grid generation in a domain with heterogeneous material properties
US9951601B2 (en) 2014-08-22 2018-04-24 Schlumberger Technology Corporation Distributed real-time processing for gas lift optimization
US10443358B2 (en) 2014-08-22 2019-10-15 Schlumberger Technology Corporation Oilfield-wide production optimization
US10508532B1 (en) 2014-08-27 2019-12-17 QRI Group, LLC Efficient recovery of petroleum from reservoir and optimized well design and operation through well-based production and automated decline curve analysis
CA2963092C (en) 2014-10-31 2021-07-06 Exxonmobil Upstream Research Company Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares
CA2963416A1 (en) 2014-10-31 2016-05-06 Exxonmobil Upstream Research Company Handling domain discontinuity in a subsurface grid model with the help of grid optimization techniques
US9880549B2 (en) 2014-11-14 2018-01-30 International Business Machines Corporation Dynamic batch size and internal transportation
JP6575099B2 (ja) * 2015-03-24 2019-09-18 富士通株式会社 運用操作管理プログラム、運用操作管理装置および運用操作管理方法
US10280722B2 (en) 2015-06-02 2019-05-07 Baker Hughes, A Ge Company, Llc System and method for real-time monitoring and estimation of intelligent well system production performance
US11487915B2 (en) * 2015-06-29 2022-11-01 Onesubsea Ip Uk Limited Integrated modeling using multiple subsurface models
US9843941B2 (en) * 2015-12-31 2017-12-12 Kodacloud Inc. Delaying execution of a corrective action in a wireless environment
RU2625051C1 (ru) * 2016-02-18 2017-07-11 Акционерное общество "Лаборатория Касперского" Система и способ обнаружений аномалий в технологической системе
CN105756661A (zh) * 2016-02-26 2016-07-13 山东天工石油装备有限公司 一种油水井管理量化方法
US10816965B2 (en) * 2016-03-11 2020-10-27 Hitachi, Ltd. Manufacturing facility management optimization device
US10458207B1 (en) 2016-06-09 2019-10-29 QRI Group, LLC Reduced-physics, data-driven secondary recovery optimization
US10590752B2 (en) * 2016-06-13 2020-03-17 Saudi Arabian Oil Company Automated preventive and predictive maintenance of downhole valves
CA2987665C (en) 2016-12-02 2021-10-19 U.S. Well Services, LLC Constant voltage power distribution system for use with an electric hydraulic fracturing system
US10364655B2 (en) 2017-01-20 2019-07-30 Saudi Arabian Oil Company Automatic control of production and injection wells in a hydrocarbon field
US10280724B2 (en) 2017-07-07 2019-05-07 U.S. Well Services, Inc. Hydraulic fracturing equipment with non-hydraulic power
US10588012B2 (en) * 2017-07-28 2020-03-10 Cisco Technology, Inc. In-situ operations, administration and management proxy
US11755795B2 (en) * 2017-09-22 2023-09-12 ExxonMobil Technology and Engineering Company Detecting and mitigating flow instabilities in hydrocarbon production wells
US11067481B2 (en) 2017-10-05 2021-07-20 U.S. Well Services, LLC Instrumented fracturing slurry flow system and method
CA3078879A1 (en) 2017-10-13 2019-04-18 U.S. Well Services, LLC Automated fracturing system and method
US10655435B2 (en) 2017-10-25 2020-05-19 U.S. Well Services, LLC Smart fracturing system and method
AR113611A1 (es) 2017-12-05 2020-05-20 U S Well Services Inc Bombas de émbolos múltiples y sistemas de accionamiento asociados
US10648311B2 (en) 2017-12-05 2020-05-12 U.S. Well Services, LLC High horsepower pumping configuration for an electric hydraulic fracturing system
US11114857B2 (en) 2018-02-05 2021-09-07 U.S. Well Services, LLC Microgrid electrical load management
US20190266575A1 (en) * 2018-02-27 2019-08-29 Honeywell International, Inc. Modifying field workflows
US10584577B2 (en) 2018-03-13 2020-03-10 Saudi Arabian Oil Company In-situ reservoir depletion management based on surface characteristics of production
US11466554B2 (en) 2018-03-20 2022-10-11 QRI Group, LLC Data-driven methods and systems for improving oil and gas drilling and completion processes
WO2019204242A1 (en) 2018-04-16 2019-10-24 U.S. Well Services, Inc. Hybrid hydraulic fracturing fleet
CN112384937A (zh) 2018-05-12 2021-02-19 地质探索系统公司 地震数据解释系统
US20200175443A1 (en) * 2018-12-04 2020-06-04 Schlumberger Technology Corporation Multi-domain planning and execution
WO2019241783A1 (en) 2018-06-15 2019-12-19 U.S. Well Services, Inc. Integrated mobile power unit for hydraulic fracturing
US11506052B1 (en) 2018-06-26 2022-11-22 QRI Group, LLC Framework and interface for assessing reservoir management competency
EP3850187A4 (en) * 2018-09-11 2022-04-13 Services Pétroliers Schlumberger METHOD AND SYSTEM FOR REACTIVELY DEFINING VALVE POSITIONS
US10648270B2 (en) 2018-09-14 2020-05-12 U.S. Well Services, LLC Riser assist for wellsites
US11208878B2 (en) 2018-10-09 2021-12-28 U.S. Well Services, LLC Modular switchgear system and power distribution for electric oilfield equipment
CN113227640A (zh) * 2018-11-21 2021-08-06 克洛克斯运行控制管理有限公司 管道和中游设施系统自主运行的系统和方法
CN109577956B (zh) 2019-01-08 2023-09-26 中国石油大学(北京) 地层呼吸效应模拟装置及方法
WO2020150540A1 (en) * 2019-01-17 2020-07-23 Schlumberger Technology Corporation Reservoir performance system
US11578577B2 (en) 2019-03-20 2023-02-14 U.S. Well Services, LLC Oversized switchgear trailer for electric hydraulic fracturing
US11728709B2 (en) 2019-05-13 2023-08-15 U.S. Well Services, LLC Encoderless vector control for VFD in hydraulic fracturing applications
WO2021022048A1 (en) 2019-08-01 2021-02-04 U.S. Well Services, LLC High capacity power storage system for electric hydraulic fracturing
US11934440B2 (en) 2019-08-07 2024-03-19 Saudi Arabian Oil Company Aggregation functions for nodes in ontological frameworks in representation learning for massive petroleum network systems
US11551106B2 (en) 2019-08-07 2023-01-10 Saudi Arabian Oil Company Representation learning in massive petroleum network systems
US11009162B1 (en) 2019-12-27 2021-05-18 U.S. Well Services, LLC System and method for integrated flow supply line
US11668165B2 (en) 2020-03-04 2023-06-06 Saudi Arabian Oil Company Method and system for simulating well performance using wellhead measurements
US11409015B2 (en) 2020-06-12 2022-08-09 Saudi Arabian Oil Company Methods and systems for generating graph neural networks for reservoir grid models
US11341830B2 (en) 2020-08-06 2022-05-24 Saudi Arabian Oil Company Infrastructure construction digital integrated twin (ICDIT)
US11687053B2 (en) 2021-03-08 2023-06-27 Saudi Arabian Oil Company Intelligent safety motor control center (ISMCC)
US20220026887A1 (en) * 2021-07-07 2022-01-27 Engel Austria Gmbh Method for optimizing and/or operating a production process, a feedback method for a production process, and a production plant and computer program for performing the method
CN115022379B (zh) * 2022-08-04 2022-10-11 晋江新建兴机械设备有限公司 一种基于5g云平台的陶瓷生产管理系统
US20240062134A1 (en) * 2022-08-18 2024-02-22 Saudi Arabian Oil Company Intelligent self-learning systems for efficient and effective value creation in drilling and workover operations
WO2024039379A1 (en) * 2022-08-19 2024-02-22 Typhon Technology Solutions, Llc Predicting frac pump component life interval
WO2024039378A1 (en) * 2022-08-19 2024-02-22 Typhon Technology Solutions, Llc Predictive block maintenance

Family Cites Families (131)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3045750A (en) 1957-01-22 1962-07-24 Us Industries Inc Control systems
US3760362A (en) * 1969-11-14 1973-09-18 Halliburton Co Oil field production automation method and apparatus
US3971926A (en) 1975-05-28 1976-07-27 Halliburton Company Simulator for an oil well circulation system
US4461172A (en) 1982-05-24 1984-07-24 Inc. In-Situ Well monitoring, controlling and data reducing system
US4559610A (en) 1983-05-04 1985-12-17 Southwest Research Corporation Gas pumping system analog
US4685522A (en) * 1983-12-05 1987-08-11 Otis Engineering Corporation Well production controller system
US4633954A (en) * 1983-12-05 1987-01-06 Otis Engineering Corporation Well production controller system
US4676313A (en) * 1985-10-30 1987-06-30 Rinaldi Roger E Controlled reservoir production
US5208748A (en) * 1985-11-18 1993-05-04 Action Technologies, Inc. Method and apparatus for structuring and managing human communications by explicitly defining the types of communications permitted between participants
US4721158A (en) 1986-08-15 1988-01-26 Amoco Corporation Fluid injection control system
US4738313A (en) * 1987-02-20 1988-04-19 Delta-X Corporation Gas lift optimization
US5455780A (en) 1991-10-03 1995-10-03 Halliburton Company Method of tracking material in a well
US5442730A (en) 1993-10-08 1995-08-15 International Business Machines Corporation Adaptive job scheduling using neural network priority functions
US5566092A (en) 1993-12-30 1996-10-15 Caterpillar Inc. Machine fault diagnostics system and method
FR2722191B1 (fr) 1994-07-08 1996-08-23 Rhone Poulenc Rorer Sa Procede de preparation du trihydrate du (2r,3s)-3-tertbutoxycarbonylamino-2-hydroxy-3-phenylpropionate de 4-acetoxy2alpha-benzoyloxy-5beta,20epoxy-1,7beta,10beta trihydroxy-9-oxo-tax-11-en-13alpha-yle
US5547029A (en) * 1994-09-27 1996-08-20 Rubbo; Richard P. Surface controlled reservoir analysis and management system
US6397946B1 (en) 1994-10-14 2002-06-04 Smart Drilling And Completion, Inc. Closed-loop system to compete oil and gas wells closed-loop system to complete oil and gas wells c
US5636693A (en) 1994-12-20 1997-06-10 Conoco Inc. Gas well tubing flow rate control
US5842149A (en) 1996-10-22 1998-11-24 Baker Hughes Incorporated Closed loop drilling system
NO325157B1 (no) 1995-02-09 2008-02-11 Baker Hughes Inc Anordning for nedihulls styring av bronnverktoy i en produksjonsbronn
US5959547A (en) 1995-02-09 1999-09-28 Baker Hughes Incorporated Well control systems employing downhole network
US5730219A (en) 1995-02-09 1998-03-24 Baker Hughes Incorporated Production wells having permanent downhole formation evaluation sensors
US5732776A (en) 1995-02-09 1998-03-31 Baker Hughes Incorporated Downhole production well control system and method
US5597042A (en) 1995-02-09 1997-01-28 Baker Hughes Incorporated Method for controlling production wells having permanent downhole formation evaluation sensors
US5706896A (en) 1995-02-09 1998-01-13 Baker Hughes Incorporated Method and apparatus for the remote control and monitoring of production wells
NO317626B1 (no) 1995-02-09 2004-11-29 Baker Hughes Inc Anordning for blokkering av verktoytransport i en produksjonsbronn
US5829520A (en) 1995-02-14 1998-11-03 Baker Hughes Incorporated Method and apparatus for testing, completion and/or maintaining wellbores using a sensor device
US5565862A (en) 1995-03-28 1996-10-15 The Titan Corporation Collection and management of pipeline-flow data
US5531270A (en) * 1995-05-04 1996-07-02 Atlantic Richfield Company Downhole flow control in multiple wells
FR2734069B1 (fr) 1995-05-12 1997-07-04 Inst Francais Du Petrole Methode pour predire, par une technique d'inversion, l'evolution de la production d'un gisement souterrain
US5710726A (en) 1995-10-10 1998-01-20 Atlantic Richfield Company Semi-compositional simulation of hydrocarbon reservoirs
US6021377A (en) * 1995-10-23 2000-02-01 Baker Hughes Incorporated Drilling system utilizing downhole dysfunctions for determining corrective actions and simulating drilling conditions
FR2742794B1 (fr) * 1995-12-22 1998-01-30 Inst Francais Du Petrole Methode pour modeliser les effets des interactions entre puits sur la fraction aqueuse produite par un gisement souterrain d'hydrocarbures
US7032689B2 (en) * 1996-03-25 2006-04-25 Halliburton Energy Services, Inc. Method and system for predicting performance of a drilling system of a given formation
GB2320731B (en) 1996-04-01 2000-10-25 Baker Hughes Inc Downhole flow control devices
US5767680A (en) * 1996-06-11 1998-06-16 Schlumberger Technology Corporation Method for sensing and estimating the shape and location of oil-water interfaces in a well
US5871047A (en) * 1996-08-14 1999-02-16 Schlumberger Technology Corporation Method for determining well productivity using automatic downtime data
FR2757947B1 (fr) 1996-12-30 1999-01-29 Inst Francais Du Petrole Methode pour determiner la permeabilite equivalente d'un reseau de fracture dans un milieu souterrain multi-couches
US5841678A (en) 1997-01-17 1998-11-24 Phillips Petroleum Company Modeling and simulation of a reaction for hydrotreating hydrocarbon oil
US6112126A (en) 1997-02-21 2000-08-29 Baker Hughes Incorporated Adaptive object-oriented optimization software system
US6434435B1 (en) * 1997-02-21 2002-08-13 Baker Hughes Incorporated Application of adaptive object-oriented optimization software to an automatic optimization oilfield hydrocarbon production management system
US5873049A (en) * 1997-02-21 1999-02-16 Atlantic Richfield Company Abstraction of multiple-format geological and geophysical data for oil and gas exploration and production analysis
US5859437A (en) * 1997-03-17 1999-01-12 Taiwan Semiconductor Manufacturing Corporation Intelligent supervision system with expert system for ion implantation process
EG21490A (en) 1997-04-09 2001-11-28 Shell Inernationale Res Mij B Downhole monitoring method and device
US6281489B1 (en) 1997-05-02 2001-08-28 Baker Hughes Incorporated Monitoring of downhole parameters and tools utilizing fiber optics
CA2236944C (en) * 1997-05-06 2005-12-13 Baker Hughes Incorporated Flow control apparatus and methods
US6002985A (en) 1997-05-06 1999-12-14 Halliburton Energy Services, Inc. Method of controlling development of an oil or gas reservoir
WO1999000575A2 (en) * 1997-06-27 1999-01-07 Baker Hughes Incorporated Drilling system with sensors for determining properties of drilling fluid downhole
US5979558A (en) 1997-07-21 1999-11-09 Bouldin; Brett Wayne Variable choke for use in a subterranean well
US5992519A (en) 1997-09-29 1999-11-30 Schlumberger Technology Corporation Real time monitoring and control of downhole reservoirs
US6959220B1 (en) * 1997-11-07 2005-10-25 Microsoft Corporation Digital audio signal filtering mechanism and method
FR2772483B1 (fr) * 1997-12-15 2000-01-14 Inst Francais Du Petrole Methode pour modeliser des deplacements de fluides dans un milieu poreux
US6236894B1 (en) 1997-12-19 2001-05-22 Atlantic Richfield Company Petroleum production optimization utilizing adaptive network and genetic algorithm techniques
US6101447A (en) 1998-02-12 2000-08-08 Schlumberger Technology Corporation Oil and gas reservoir production analysis apparatus and method
AT407206B (de) * 1998-05-14 2001-01-25 Va Tech Elin Transformatoren G Verfahren und anordnung zur ermittlung von zustandsgrössen
NO982823D0 (no) 1998-06-18 1998-06-18 Kongsberg Offshore As Styring av fluidstr°m i olje- eller gass-br°nner
US6082455A (en) 1998-07-08 2000-07-04 Camco International Inc. Combination side pocket mandrel flow measurement and control assembly
US6076046A (en) 1998-07-24 2000-06-13 Schlumberger Technology Corporation Post-closure analysis in hydraulic fracturing
US20040236553A1 (en) 1998-08-31 2004-11-25 Shilin Chen Three-dimensional tooth orientation for roller cone bits
US20040230413A1 (en) 1998-08-31 2004-11-18 Shilin Chen Roller cone bit design using multi-objective optimization
US6095262A (en) * 1998-08-31 2000-08-01 Halliburton Energy Services, Inc. Roller-cone bits, systems, drilling methods, and design methods with optimization of tooth orientation
US6088656A (en) 1998-11-10 2000-07-11 Schlumberger Technology Corporation Method for interpreting carbonate reservoirs
US6282452B1 (en) 1998-11-19 2001-08-28 Intelligent Inspection Corporation Apparatus and method for well management
US6182756B1 (en) 1999-02-10 2001-02-06 Intevep, S.A. Method and apparatus for optimizing production from a gas lift well
US6442445B1 (en) 1999-03-19 2002-08-27 International Business Machines Corporation, User configurable multivariate time series reduction tool control method
US6985750B1 (en) 1999-04-27 2006-01-10 Bj Services Company Wireless network system
US6266619B1 (en) 1999-07-20 2001-07-24 Halliburton Energy Services, Inc. System and method for real time reservoir management
US6853921B2 (en) * 1999-07-20 2005-02-08 Halliburton Energy Services, Inc. System and method for real time reservoir management
US6549879B1 (en) 1999-09-21 2003-04-15 Mobil Oil Corporation Determining optimal well locations from a 3D reservoir model
US6826483B1 (en) 1999-10-13 2004-11-30 The Trustees Of Columbia University In The City Of New York Petroleum reservoir simulation and characterization system and method
US6980940B1 (en) 2000-02-22 2005-12-27 Schlumberger Technology Corp. Intergrated reservoir optimization
US8082134B2 (en) 2000-03-13 2011-12-20 Smith International, Inc. Techniques for modeling/simulating, designing optimizing, and displaying hybrid drill bits
US6516293B1 (en) * 2000-03-13 2003-02-04 Smith International, Inc. Method for simulating drilling of roller cone bits and its application to roller cone bit design and performance
US6701514B1 (en) * 2000-03-27 2004-03-02 Accenture Llp System, method, and article of manufacture for test maintenance in an automated scripting framework
AU5902801A (en) 2000-04-14 2001-10-30 Lockheed Corp Method of determining boundary interface changes in a natural resource deposit
US6424919B1 (en) * 2000-06-26 2002-07-23 Smith International, Inc. Method for determining preferred drill bit design parameters and drilling parameters using a trained artificial neural network, and methods for training the artificial neural network
FR2811760B1 (fr) 2000-07-17 2002-09-13 Inst Francais Du Petrole Methode pour modeliser des deplacements de fluides dans un milieu poreux tenant compte d'effets d'hysteresis
US20020049625A1 (en) * 2000-09-11 2002-04-25 Srinivas Kilambi Artificial intelligence manufacturing and design
DZ3287A1 (fr) * 2000-10-04 2002-04-11 Sofitech Nv Methodologie d'optimisation de la production pour reservoirs de melange multicouches au moyen de donnees de performances pour reservoirs de melange et d'informations diagraphiques de production
US7096092B1 (en) 2000-11-03 2006-08-22 Schlumberger Technology Corporation Methods and apparatus for remote real time oil field management
FR2818742B1 (fr) 2000-12-22 2003-02-14 Inst Francais Du Petrole Methode pour former un module a reseaux neuronaux optimise, destine a simuler le mode d'ecoulement d'une veine de fluides polyphasiques
US7277836B2 (en) 2000-12-29 2007-10-02 Exxonmobil Upstream Research Company Computer system and method having a facility network architecture
US7761270B2 (en) 2000-12-29 2010-07-20 Exxonmobil Upstream Research Co. Computer system and method having a facility management logic architecture
US7049975B2 (en) 2001-02-02 2006-05-23 Fisher Controls International Llc Reporting regulator for managing a gas transportation system
US7434619B2 (en) 2001-02-05 2008-10-14 Schlumberger Technology Corporation Optimization of reservoir, well and surface network systems
FR2821675B1 (fr) * 2001-03-01 2003-06-20 Inst Francais Du Petrole Methode pour detecter et controler la formation d'hydrates en tout point d'une conduite ou circulent des fluides petroliers polyphasiques
FR2823877B1 (fr) 2001-04-19 2004-12-24 Inst Francais Du Petrole Methode pour contraindre par des donnees dynamiques de production un modele fin representatif de la repartition dans le gisement d'une grandeur physique caracteristique de la structure du sous-sol
ATE310890T1 (de) 2001-04-24 2005-12-15 Exxonmobil Upstream Res Co Verfahren zur verbesserung von produktionszuweisung in einem integrierten reservoir und oberflächenströmungssystem
US6907416B2 (en) 2001-06-04 2005-06-14 Honeywell International Inc. Adaptive knowledge management system for vehicle trend monitoring, health management and preventive maintenance
US6890940B2 (en) * 2001-06-29 2005-05-10 Kowa Co., Ltd. Bis(2-aryl-5-pyridyl) derivatives
US6954737B2 (en) 2001-11-05 2005-10-11 Johnsondiversey, Inc. Method and apparatus for work management for facility maintenance
US7027968B2 (en) * 2002-01-18 2006-04-11 Conocophillips Company Method for simulating subsea mudlift drilling and well control operations
FR2836719B1 (fr) * 2002-03-01 2004-10-22 Inst Francais Du Petrole Methode pour modeliser les conditions de floculation d'asphaltenes dans des fluides hydrocarbones apparentes a un fluide de reference
US7303010B2 (en) 2002-10-11 2007-12-04 Intelligent Robotic Corporation Apparatus and method for an autonomous robotic system for performing activities in a well
FR2846767B1 (fr) 2002-10-30 2004-12-24 Inst Francais Du Petrole Methode pour former plus rapidement un modele stochastique representatif d'un reservoir heterogene souterrain, contraint par des donnees dynamiques
US20070271077A1 (en) 2002-11-15 2007-11-22 Kosmala Alexandre G Optimizing Well System Models
MXPA05005466A (es) 2002-11-23 2006-02-22 Schlumberger Technology Corp Metodo y sistema para simulaciones integradas de redes de instalaciones en depositos y en superficie.
US7899657B2 (en) 2003-01-24 2011-03-01 Rockwell Automoation Technologies, Inc. Modeling in-situ reservoirs with derivative constraints
US7584165B2 (en) * 2003-01-30 2009-09-01 Landmark Graphics Corporation Support apparatus, method and system for real time operations and maintenance
FR2851670B1 (fr) * 2003-02-21 2005-07-01 Inst Francais Du Petrole Methode pour elaborer plus rapidement un modele stochastique representatif d'un reservoir heterogene souterrain, contraint par des donnees statiques et dynamiques incertaines
EP1611508A4 (en) 2003-03-26 2006-07-26 Exxonmobil Upstream Res Co PERFORMANCE FORECAST OF HYDROCARBON RECOVERY PROCESS
US7835893B2 (en) 2003-04-30 2010-11-16 Landmark Graphics Corporation Method and system for scenario and case decision management
JP2004348265A (ja) * 2003-05-20 2004-12-09 Univ Of Tokyo 油の変動のシミュレーションを行う方法、プログラム及び装置
FR2855631A1 (fr) 2003-06-02 2004-12-03 Inst Francais Du Petrole Methode pour optimiser la production d'un gisement petrolier en presence d'incertitudes
FR2855633B1 (fr) 2003-06-02 2008-02-08 Inst Francais Du Petrole Methode d'aide a la prise de decision pour la gestion d'un gisement petrolier en presence de parametres techniques et economiques incertains
US7783462B2 (en) 2004-01-30 2010-08-24 Exxonmobil Upstream Research Co. Reservoir evaluation methods
US7172020B2 (en) * 2004-03-05 2007-02-06 Tseytlin Software Consulting Inc. Oil production optimization and enhanced recovery method and apparatus for oil fields with high gas-to-oil ratio
US7266456B2 (en) 2004-04-19 2007-09-04 Intelligent Agent Corporation Method for management of multiple wells in a reservoir
FR2870621B1 (fr) 2004-05-21 2006-10-27 Inst Francais Du Petrole Methode pour generer un maillage hybride conforme en trois dimensions d'une formation heterogene traversee par une ou plusieurs discontinuites geometriques dans le but de realiser des simulations
US7627461B2 (en) 2004-05-25 2009-12-01 Chevron U.S.A. Inc. Method for field scale production optimization by enhancing the allocation of well flow rates
US20050267771A1 (en) 2004-05-27 2005-12-01 Biondi Mitchell J Apparatus, system and method for integrated lifecycle management of a facility
US7809537B2 (en) 2004-10-15 2010-10-05 Saudi Arabian Oil Company Generalized well management in parallel reservoir simulation
EA010667B1 (ru) 2004-11-01 2008-10-30 Шелл Интернэшнл Рисерч Маатсхаппий Б.В. Способ и система для определения многофазных потоков флюидов из скважин
US7373976B2 (en) * 2004-11-18 2008-05-20 Casey Danny M Well production optimizing system
US7373285B2 (en) * 2004-12-01 2008-05-13 Bp Corporation North America Inc. Application of phase behavior models in production allocation systems
AU2006249641B2 (en) 2005-05-26 2010-12-23 Exxonmobil Upstream Research Company A rapid method for reservoir connectivity analysis using a fast marching method
AU2006279437A1 (en) 2005-08-15 2007-02-22 University Of Southern California Method and system for integrated asset management utilizing multi-level modeling of oil field assets
US20070078637A1 (en) * 2005-09-30 2007-04-05 Berwanger, Inc. Method of analyzing oil and gas production project
US7389185B2 (en) 2005-10-07 2008-06-17 Halliburton Energy Services, Inc. Methods and systems for determining reservoir properties of subterranean formations with pre-existing fractures
WO2007084611A2 (en) 2006-01-20 2007-07-26 Landmark Graphics Corporation Dynamic production system management
US8504341B2 (en) * 2006-01-31 2013-08-06 Landmark Graphics Corporation Methods, systems, and computer readable media for fast updating of oil and gas field production models with physical and proxy simulators
DE602007013530D1 (de) 2006-01-31 2011-05-12 Landmark Graphics Corp Verfahren, systeme und computerlesbare medien zur öl- und gasfeldproduktionsoptimierung in echtzeit mit einem proxy-simulator
US20070179767A1 (en) 2006-01-31 2007-08-02 Alvin Stanley Cullick Methods, systems, and computer-readable media for fast updating of oil and gas field production models with physical and proxy simulators
US7620534B2 (en) * 2006-04-28 2009-11-17 Saudi Aramco Sound enabling computerized system for real time reservoir model calibration using field surveillance data
US7716029B2 (en) 2006-05-15 2010-05-11 Schlumberger Technology Corporation Method for optimal gridding in reservoir simulation
US8335677B2 (en) 2006-09-01 2012-12-18 Chevron U.S.A. Inc. Method for history matching and uncertainty quantification assisted by global optimization techniques utilizing proxies
US7657494B2 (en) 2006-09-20 2010-02-02 Chevron U.S.A. Inc. Method for forecasting the production of a petroleum reservoir utilizing genetic programming
US7925482B2 (en) 2006-10-13 2011-04-12 Object Reservoir, Inc. Method and system for modeling and predicting hydraulic fracture performance in hydrocarbon reservoirs
US20080270328A1 (en) 2006-10-18 2008-10-30 Chad Lafferty Building and Using Intelligent Software Agents For Optimizing Oil And Gas Wells
US8352227B2 (en) 2006-10-30 2013-01-08 Schlumberger Technology Corporation System and method for performing oilfield simulation operations
EP2118738A4 (en) * 2006-12-28 2014-07-02 Chevron Usa Inc METHOD, SYSTEM AND DEVICE FOR STORING HISTORIC COMPARISON PROGRAMS AND PREDICTION RELATING TO HYDROCARBON PITCHING RESERVOIR ROCKS USING APPROXIMATIONS FOR RESEMBLY FUNCTIONS

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104981810A (zh) * 2013-01-10 2015-10-14 西方奇科抗震控股有限公司 用于地球科学和石油技术协作的方法和计算系统
US11169302B2 (en) 2013-01-10 2021-11-09 Schlumberger Technology Corporation Methods and computing systems for geosciences and petro-technical collaboration
CN107111304A (zh) * 2014-11-24 2017-08-29 拜耳股份公司 用于配置被设计用于进行至少一个化学反应的生产设备的方法
CN107111304B (zh) * 2014-11-24 2020-06-23 拜耳股份公司 用于配置被设计用于进行至少一个化学反应的生产设备的方法
US10998086B2 (en) 2014-11-24 2021-05-04 Bayer Aktiengesellschaft Method for configuring a production plant designed for performing at least one chemical reaction
US11295399B2 (en) * 2017-02-22 2022-04-05 Landmark Graphics Corporation Well exploration, service and production appliance architecture
CN107944123A (zh) * 2017-11-20 2018-04-20 北京宇航系统工程研究所 一种基于主模型的多专业协同设计系统及协同设计方法
CN109296343A (zh) * 2018-08-31 2019-02-01 中国海洋石油集团有限公司 一种气井排采工艺评价系统集成及方法
CN114227145A (zh) * 2020-09-09 2022-03-25 南阳二机石油装备集团股份有限公司 一种密封环的智能化自适应加工方法
CN114227145B (zh) * 2020-09-09 2023-11-14 南阳二机石油装备集团股份有限公司 一种密封环的智能化自适应加工方法

Also Published As

Publication number Publication date
AU2007207497B2 (en) 2013-01-17
NO344041B1 (no) 2019-08-19
AU2007207497A8 (en) 2013-05-16
AU2007207497A1 (en) 2007-07-26
US20080208478A1 (en) 2008-08-28
CA2636428C (en) 2013-12-24
EP1999492A2 (en) 2008-12-10
NO20083592L (no) 2008-10-20
US20070198223A1 (en) 2007-08-23
WO2007084611A3 (en) 2008-09-12
WO2007084611A2 (en) 2007-07-26
CA2636428A1 (en) 2007-07-26
AU2007207497B8 (en) 2013-05-16
US8280635B2 (en) 2012-10-02
BRPI0706580A2 (pt) 2011-03-29
EP1999492A4 (en) 2011-05-18
US8195401B2 (en) 2012-06-05
US20070271039A1 (en) 2007-11-22
NO344987B1 (no) 2020-08-10
NO20181041A1 (no) 2008-10-20
MX2008009308A (es) 2008-10-03

Similar Documents

Publication Publication Date Title
CN101371164A (zh) 动态生产系统管理
US7739089B2 (en) Integrated reservoir optimization
US8190458B2 (en) Method of performing integrated oilfield operations
Mochizuki et al. Real-time optimization: classification and assessment
US20120130696A1 (en) Optimizing Well Management Policy
WO2008055188A2 (en) System and method for performing oilfield simulation operations
Ailin et al. Key technologies and understandings on the construction of smart fields
Tung et al. Digital transformation in oil and gas companies-A case study of Bien Dong POC
US20090164126A1 (en) Production by actual loss allocation
Pham et al. Apply neural network for improving production planning at Samarang petrol mine
Airlie et al. Intelligent asset management: Successful integration of modelling tools and workflow processes
Bøhn Integrating Planning of Maintenance and Continuous Production in an Oil and Gas Production System by the Use of Digital Twins
Jahn et al. Managing the Producing Field
Under Onshore Lower 48 Oil and Gas Supply Submodule Component Design Report
Tubb Competition rises to build Alaskan gas pipeline.
AISSANI Field management and information system using integrated production system modeling to optimize Hassi Messouad field
Barriga Reservoir and production optimization means working together
REAL Application to an extra heavy oil pilot under steam injection.

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20090218