Conveying And Assembling Of Building Elements In Situ
(AREA)
Abstract
Sistema de construcción para techos y entrepisos que permite eliminar la obra falsa, por ser un sistema autoportante a base de viguetas precoladas en obra, mediante una serie de bloques prefabricados que sirven de molde, y armadas con varillas de acuerdo a los claros y cargas de cada caso particular.Construction system for ceilings and mezzanines that allows eliminating false work, as it is a self-supporting system based on precast joists on site, by means of a series of prefabricated blocks that serve as molds, and armed with rods according to gaps and loads of each particular case.
MX9206396A1992-11-061992-11-06
CONSTRUCTION SYSTEM OF ROOF SLABS AND THE LIKE, AND ELEMENTS USED IN IT.
MX9206396A
(en)
PRE-MOLDED CONCRETE PANELS FOR THE BUILDING CONSTRUCTION INDUSTRY, STRUCTURE CONSTRUCTION SYSTEM THAT INCORPORATES PRE-MOLDED CONCRETE PANELS AND STRUCTURE CONSTRUCTION METHOD.
SEMI-PREFABRICATED STRUCTURE OF REINFORCED OR PRE-STRESSED CONCRETE FOR BUILDING, WHICH USES THE PILLAR AND / OR ITS FORMWORK TO CREATE A WORK PLATFORM AROUND THE PILLAR THAT SUPPORTS FORMWORK AND SUPPORTING SEMI-PREFABRICATED BEAMS.
Installations for the production of large hollow monolithic building structures of reinforced concrete, preferably prefabricated reinforced concrete garages.
SYSTEM FOR CREATING STRUCTURES, EVEN PREFABRICATED, HOWEVER COMPLEX, OF EXTREMELY LOW OVERALL WEIGHT, IN CONCRETE, OF SMALL THICKNESS, REINFORCED WITH MESH.