MX351042B - Sistema y método para realizar operaciones de estimulación en el fondo del pozo. - Google Patents
Sistema y método para realizar operaciones de estimulación en el fondo del pozo.Info
- Publication number
- MX351042B MX351042B MX2014014753A MX2014014753A MX351042B MX 351042 B MX351042 B MX 351042B MX 2014014753 A MX2014014753 A MX 2014014753A MX 2014014753 A MX2014014753 A MX 2014014753A MX 351042 B MX351042 B MX 351042B
- Authority
- MX
- Mexico
- Prior art keywords
- quality indicator
- stress
- composite quality
- combined
- blocks
- Prior art date
Links
- 230000000638 stimulation Effects 0.000 title abstract 2
- 239000002131 composite material Substances 0.000 abstract 5
- 230000015572 biosynthetic process Effects 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/17—Interconnecting two or more wells by fracturing or otherwise attacking the formation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06G—ANALOGUE COMPUTERS
- G06G7/00—Devices in which the computing operation is performed by varying electric or magnetic quantities
- G06G7/48—Analogue computers for specific processes, systems or devices, e.g. simulators
- G06G7/50—Analogue computers for specific processes, systems or devices, e.g. simulators for distribution networks, e.g. for fluids
Abstract
Se proporciona un sistema y un método para realizar operaciones de estimulación en un sitio de pozo que tiene una formación subterránea con un yacimiento allí. El método implica generar una variedad de indicadores de calidad a partir de múltiples registros y combinar la variedad de indicadores de calidad para formar un indicador de calidad compuesto. Luego, pueden fusionarse los múltiples bloques de tensión usando un criterio de desvío. El indicador de calidad compuesto se puede combinar con los bloques de tensión para formar una tensión e indicador de calidad compuesto combinados, la tensión e indicador de calidad compuesto combinados comprende una variedad de bloques con límites entre ellos. El método puede comprender adicionalmente definir las plataformas a lo largo de la tensión e indicador de calidad compuesto combinados en función de las clasificaciones de plataformas asistidas con desviadores; y ubicar selectivamente perforaciones en plataformas seleccionadas en las clasificaciones de plataformas asistidas con desviadores allí.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US14/101,028 US9135475B2 (en) | 2007-01-29 | 2013-12-09 | System and method for performing downhole stimulation operations |
Publications (2)
Publication Number | Publication Date |
---|---|
MX2014014753A MX2014014753A (es) | 2015-07-01 |
MX351042B true MX351042B (es) | 2017-09-29 |
Family
ID=51903801
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
MX2014014753A MX351042B (es) | 2013-12-09 | 2014-12-03 | Sistema y método para realizar operaciones de estimulación en el fondo del pozo. |
Country Status (8)
Country | Link |
---|---|
US (2) | US9135475B2 (es) |
EP (1) | EP2884043A3 (es) |
CN (1) | CN104695916B (es) |
AR (1) | AR098677A1 (es) |
AU (1) | AU2014256418B2 (es) |
CA (1) | CA2873520C (es) |
MX (1) | MX351042B (es) |
RU (1) | RU2663011C2 (es) |
Families Citing this family (59)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8412500B2 (en) | 2007-01-29 | 2013-04-02 | Schlumberger Technology Corporation | Simulations for hydraulic fracturing treatments and methods of fracturing naturally fractured formation |
MX2013007039A (es) * | 2010-12-20 | 2013-12-06 | Schlumberger Technology Bv | Método de utilización de datos de formaciones subterráneas para mejorar las operaciones de tratamiento. |
CA2823116A1 (en) | 2010-12-30 | 2012-07-05 | Schlumberger Canada Limited | System and method for performing downhole stimulation operations |
EP2699947A2 (en) * | 2011-01-28 | 2014-02-26 | Services Pétroliers Schlumberger | Method for estimating a logging tool response in a layered formation |
BR112014011103A2 (pt) * | 2011-12-08 | 2017-05-16 | Halliburton Energy Services Inc | método para prever a permeabilidade total de um sistema de uma formação geológica e sistema para prever a permeabilidade total de um sistema de uma formação geológica |
US10267131B2 (en) * | 2012-08-13 | 2019-04-23 | Schlumberger Technology Corporation | Competition between transverse and axial hydraulic fractures in horizontal well |
US9784085B2 (en) * | 2012-09-10 | 2017-10-10 | Schlumberger Technology Corporation | Method for transverse fracturing of a subterranean formation |
CA2886327C (en) * | 2012-09-28 | 2018-07-10 | Landmark Graphics Corporation | Self-guided geosteering assembly and method for optimizing well placement and quality |
BR112015016401B8 (pt) * | 2013-02-21 | 2021-07-13 | Halliburton Energy Services Inc | sistemas e métodos para criação otimizada de poço em uma formação de folhelho |
US10001000B2 (en) * | 2013-07-22 | 2018-06-19 | Halliburton Energy Services, Inc. | Simulating well system fluid flow based on a pressure drop boundary condition |
WO2015089458A1 (en) | 2013-12-13 | 2015-06-18 | Schlumberger Canada Limited | Creating radial slots in a wellbore |
US10221667B2 (en) | 2013-12-13 | 2019-03-05 | Schlumberger Technology Corporation | Laser cutting with convex deflector |
US10613250B2 (en) | 2014-08-04 | 2020-04-07 | Schlumberger Technology Corporation | In situ stress properties |
WO2016069977A1 (en) | 2014-10-30 | 2016-05-06 | Schlumberger Canada Limited | Creating radial slots in a subterranean formation |
US10012069B2 (en) | 2014-10-31 | 2018-07-03 | Schlumberger Technology Corporation | Method of treatment design and optimization of sequenced fracturing technique |
US20160161933A1 (en) * | 2014-12-04 | 2016-06-09 | Weatherford Technology Holdings, Llc | System and method for performing automated fracture stage design |
WO2016198894A2 (en) * | 2015-06-10 | 2016-12-15 | Ikon Science Innovation Limited | Method and apparatus for reservoir analysis and fracture design in a rock layer |
CN104989357B (zh) * | 2015-06-12 | 2017-09-15 | 中国石油天然气股份有限公司 | 一种选择致密油气藏重复压裂目标井的方法 |
WO2017027068A1 (en) * | 2015-08-07 | 2017-02-16 | Schlumberger Technology Corporation | Well management on cloud computing system |
US10920538B2 (en) | 2015-08-07 | 2021-02-16 | Schlumberger Technology Corporation | Method integrating fracture and reservoir operations into geomechanical operations of a wellsite |
US10393921B2 (en) * | 2015-09-16 | 2019-08-27 | Schlumberger Technology Corporation | Method and system for calibrating a distributed vibration sensing system |
US20170114616A1 (en) * | 2015-10-23 | 2017-04-27 | Schlumberger Technology Corporation | Use of drilling data for engineered completions |
RU2705012C1 (ru) * | 2015-11-03 | 2019-11-01 | ВЕЗЕРФОРД ТЕКНОЛОДЖИ ХОЛДИНГЗ, ЭлЭлСи | Системы и способы оценивания и оптимизации эффективности стимуляции с использованием отводных устройств |
US20180100390A1 (en) * | 2015-11-17 | 2018-04-12 | Baker Hughes, A Ge Company, Llc | Geological asset uncertainty reduction |
US10883346B2 (en) | 2015-12-18 | 2021-01-05 | Schlumberger Technology Corporation | Method of performing a perforation using selective stress logging |
US10364672B2 (en) | 2016-03-28 | 2019-07-30 | Baker Hughes, A Ge Company, Llc | Completion optimization process based on acoustic logging data in the lateral section in a horizontal well |
US11454102B2 (en) * | 2016-05-11 | 2022-09-27 | Baker Hughes, LLC | Methods and systems for optimizing a drilling operation based on multiple formation measurements |
US10301903B2 (en) | 2016-05-16 | 2019-05-28 | Schlumberger Technology Corporation | Well treatment |
WO2018022044A1 (en) | 2016-07-27 | 2018-02-01 | Halliburton Energy Services, Inc. | Real-time monitoring and control of diverter placement for multistage stimulation treatments |
WO2018022045A1 (en) * | 2016-07-27 | 2018-02-01 | Halliburton Energy Services, Inc. | Real-time monitoring and control of diverter placement for multistage stimulation treatments |
WO2018034652A1 (en) * | 2016-08-16 | 2018-02-22 | Halliburton Energy Services, Inc. | Methods and systems of modeling fluid diversion treatment operations |
CA3031626C (en) | 2016-09-09 | 2021-03-09 | Halliburton Energy Services, Inc. | Real-time diversion control for stimulation treatments using tortuosity and step-down analysis |
US11268914B2 (en) * | 2017-01-13 | 2022-03-08 | Baker Hughes, A Ge Company, Llc | Super-stages and methods of configuring super-stages for fracturing downhole earth formations |
US10914139B2 (en) * | 2017-02-22 | 2021-02-09 | Weatherford Technology Holdings, Llc | Systems and methods for optimization of the number of diverter injections and the timing of the diverter injections relative to stimulant injection |
US11236596B2 (en) | 2017-02-28 | 2022-02-01 | Halliburton Energy Services, Inc. | Real-time diversion control for stimulation treatments using fiber optics with fully-coupled diversion models |
CN107939365B (zh) * | 2017-11-16 | 2020-01-31 | 能新科能源技术股份有限公司 | 前置液增能压裂方案生成方法及装置 |
US20200063015A1 (en) | 2018-08-22 | 2020-02-27 | Carbo Ceramics Inc. | Composite diversion particle agglomeration |
CN110965969B (zh) * | 2018-09-28 | 2021-02-02 | 北京国双科技有限公司 | 注水井化学措施确定方法及装置 |
CN109359376B (zh) * | 2018-10-10 | 2020-12-22 | 北京科技大学 | 水力压裂裂缝在页岩储层天然裂缝界面扩展判识方法 |
US11530581B2 (en) * | 2018-12-17 | 2022-12-20 | Exxonmobil Upstream Research Company | Weighted material point method for managing fluid flow in pipes |
US11713669B2 (en) | 2018-12-31 | 2023-08-01 | Halliburton Energy Services, Inc. | Real-time diverter diagnostics and distribution |
US11268351B2 (en) | 2018-12-31 | 2022-03-08 | Halliburton Energy Services, Inc. | Fracturing treatments that systematically add complexity in the formation |
GB2593627B (en) * | 2019-02-13 | 2022-11-09 | Landmark Graphics Corp | Planning a well configuration using geomechanical parameters |
CN112392472B (zh) | 2019-08-19 | 2022-08-02 | 中国石油天然气股份有限公司 | 确定页岩与邻近油层一体化开发方式的方法及装置 |
US11556612B2 (en) * | 2019-09-09 | 2023-01-17 | Halliburton Energy Services, Inc. | Predicting material distribution in a hydraulic fracturing treatment stage |
US11449645B2 (en) * | 2019-09-09 | 2022-09-20 | Halliburton Energy Services, Inc. | Calibrating a diversion model for a hydraulic fracturing well system |
US11514383B2 (en) * | 2019-09-13 | 2022-11-29 | Schlumberger Technology Corporation | Method and system for integrated well construction |
CN110685656A (zh) * | 2019-10-11 | 2020-01-14 | 长江大学 | 一种低渗透油藏压裂三采一体化施工方法 |
US11319790B2 (en) * | 2019-10-30 | 2022-05-03 | Halliburton Energy Services, Inc. | Proppant ramp up decision making |
RU2737630C1 (ru) * | 2019-12-10 | 2020-12-01 | Публичное акционерное общество "Славнефть-Мегионнефтегаз" | Способ проведения повторного многостадийного гидравлического разрыва пласта в горизонтальной скважине |
US11448054B2 (en) * | 2020-05-19 | 2022-09-20 | Saudi Arabian Oil Company | Integrated methods for reducing formation breakdown pressures to enhance petroleum recovery |
RU2740597C1 (ru) * | 2020-07-20 | 2021-01-15 | федеральное государственное бюджетное образовательное учреждение высшего образования "Пермский национальный исследовательский политехнический университет" | Способ прогнозирования изменения дебита добывающих скважин при распространении упругих колебаний в призабойной зоне пласта |
CN111827993B (zh) * | 2020-07-30 | 2023-07-25 | 中国石油天然气股份有限公司 | 一种合采气井无阻流量预测方法 |
CN111810144B (zh) * | 2020-08-28 | 2023-04-21 | 四川长宁天然气开发有限责任公司 | 一种页岩气井工程智能调度方法及系统 |
US11599955B2 (en) * | 2021-01-04 | 2023-03-07 | Saudi Arabian Oil Company | Systems and methods for evaluating and selecting completion equipment using a neural network |
US20230012733A1 (en) * | 2021-07-07 | 2023-01-19 | Saudi Arabian Oil Company | Machine learning workflow for predicting hydraulic fracture initiation |
US11719083B2 (en) | 2021-08-17 | 2023-08-08 | Saudi Arabian Oil Company | Maintaining integrity of lower completion for multi-stage fracturing |
US11859469B2 (en) | 2021-10-20 | 2024-01-02 | Saudi Arabian Oil Company | Utilizing natural gas flaring byproducts for liquid unloading in gas wells |
US11880639B1 (en) * | 2022-09-23 | 2024-01-23 | David Cook | Apparatus and method for multi-stage fracking |
Family Cites Families (66)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3721960A (en) | 1969-07-14 | 1973-03-20 | Schlumberger Technology Corp | Methods and apparatus for processing well logging data |
US4502121A (en) * | 1971-02-02 | 1985-02-26 | Schlumberger Technology Corporation | Machine method for determining the presence and location of hydrocarbon deposits within a subsurface earth formation |
US4584874A (en) | 1984-10-15 | 1986-04-29 | Halliburton Company | Method for determining porosity, clay content and mode of distribution in gas and oil bearing shaly sand reservoirs |
US5170378A (en) | 1989-04-04 | 1992-12-08 | The British Petroleum Company P.L.C. | Hydraulic impedance test method |
US5070457A (en) | 1990-06-08 | 1991-12-03 | Halliburton Company | Methods for design and analysis of subterranean fractures using net pressures |
US5279366A (en) | 1992-09-01 | 1994-01-18 | Scholes Patrick L | Method for wireline operation depth control in cased wells |
US5551516A (en) | 1995-02-17 | 1996-09-03 | Dowell, A Division Of Schlumberger Technology Corporation | Hydraulic fracturing process and compositions |
US6435277B1 (en) | 1996-10-09 | 2002-08-20 | Schlumberger Technology Corporation | Compositions containing aqueous viscosifying surfactants and methods for applying such compositions in subterranean formations |
US6258859B1 (en) | 1997-06-10 | 2001-07-10 | Rhodia, Inc. | Viscoelastic surfactant fluids and related methods of use |
US7283061B1 (en) | 1998-08-28 | 2007-10-16 | Marathon Oil Company | Method and system for performing operations and for improving production in wells |
US6876959B1 (en) | 1999-04-29 | 2005-04-05 | Schlumberger Technology Corporation | Method and apparatus for hydraulic fractioning analysis and design |
US6853921B2 (en) * | 1999-07-20 | 2005-02-08 | Halliburton Energy Services, Inc. | System and method for real time reservoir management |
US6508307B1 (en) | 1999-07-22 | 2003-01-21 | Schlumberger Technology Corporation | Techniques for hydraulic fracturing combining oriented perforating and low viscosity fluids |
US6980940B1 (en) * | 2000-02-22 | 2005-12-27 | Schlumberger Technology Corp. | Intergrated reservoir optimization |
US20020013687A1 (en) * | 2000-03-27 | 2002-01-31 | Ortoleva Peter J. | Methods and systems for simulation-enhanced fracture detections in sedimentary basins |
AU2002239619A1 (en) | 2000-12-08 | 2002-06-18 | Peter J. Ortoleva | Methods for modeling multi-dimensional domains using information theory to resolve gaps in data and in theories |
EP1487417A4 (en) | 2001-09-17 | 2010-03-17 | Glaxo Group Ltd | DRY POWDER DRUG FORMULATIONS |
RU2208153C2 (ru) * | 2001-10-02 | 2003-07-10 | Закрытое акционерное общество Научно-производственная фирма "Самарские Горизонты" | Система управления процессом бурения |
US6834233B2 (en) | 2002-02-08 | 2004-12-21 | University Of Houston | System and method for stress and stability related measurements in boreholes |
US6926081B2 (en) | 2002-02-25 | 2005-08-09 | Halliburton Energy Services, Inc. | Methods of discovering and correcting subterranean formation integrity problems during drilling |
US20050058606A1 (en) | 2002-12-16 | 2005-03-17 | Boehringer Ingelheim Pharma Gmbh & Co. Kg | Tiotropium containing HFC solution formulations |
US7114567B2 (en) | 2003-01-28 | 2006-10-03 | Schlumberger Technology Corporation | Propped fracture with high effective surface area |
US20040209780A1 (en) | 2003-04-18 | 2004-10-21 | Harris Phillip C. | Methods of treating subterranean formations using hydrophobically modified polymers and compositions of the same |
US7054751B2 (en) | 2004-03-29 | 2006-05-30 | Halliburton Energy Services, Inc. | Methods and apparatus for estimating physical parameters of reservoirs using pressure transient fracture injection/falloff test analysis |
US20050284637A1 (en) | 2004-06-04 | 2005-12-29 | Halliburton Energy Services | Methods of treating subterranean formations using low-molecular-weight fluids |
CA2570058C (en) | 2004-06-25 | 2013-07-30 | Shell Canada Limited | Closed loop control system for controlling production of hydrocarbon fluid from an underground formation |
US20060015310A1 (en) | 2004-07-19 | 2006-01-19 | Schlumberger Technology Corporation | Method for simulation modeling of well fracturing |
DK1797281T3 (da) | 2004-10-04 | 2014-02-10 | Momentive Specialty Chemicals Res Belgium | Fremgangsmåde til at estimere et bruds geometri, såvel som sammensætninger og artikler anvendt dertil |
US7386431B2 (en) | 2005-03-31 | 2008-06-10 | Schlumberger Technology Corporation | Method system and program storage device for simulating interfacial slip in a hydraulic fracturing simulator software |
US7369979B1 (en) | 2005-09-12 | 2008-05-06 | John Paul Spivey | Method for characterizing and forecasting performance of wells in multilayer reservoirs having commingled production |
US20070179767A1 (en) | 2006-01-31 | 2007-08-02 | Alvin Stanley Cullick | Methods, systems, and computer-readable media for fast updating of oil and gas field production models with physical and proxy simulators |
US20070272407A1 (en) | 2006-05-25 | 2007-11-29 | Halliburton Energy Services, Inc. | Method and system for development of naturally fractured formations |
US7953587B2 (en) | 2006-06-15 | 2011-05-31 | Schlumberger Technology Corp | Method for designing and optimizing drilling and completion operations in hydrocarbon reservoirs |
US7450053B2 (en) | 2006-09-13 | 2008-11-11 | Hexion Specialty Chemicals, Inc. | Logging device with down-hole transceiver for operation in extreme temperatures |
US7398829B2 (en) | 2006-09-18 | 2008-07-15 | Schlumberger Technology Corporation | Methods of limiting leak off and damage in hydraulic fractures |
US7998909B2 (en) | 2006-09-28 | 2011-08-16 | Schlumberger Technology Corporation | Foaming agent for subterranean formations treatment, and methods of use thereof |
CN101558216B (zh) | 2006-10-13 | 2013-08-07 | 埃克森美孚上游研究公司 | 使用水力压裂生产井、通过原位加热增强页岩油生产 |
US7925482B2 (en) | 2006-10-13 | 2011-04-12 | Object Reservoir, Inc. | Method and system for modeling and predicting hydraulic fracture performance in hydrocarbon reservoirs |
US7565929B2 (en) | 2006-10-24 | 2009-07-28 | Schlumberger Technology Corporation | Degradable material assisted diversion |
US7565278B2 (en) | 2006-12-04 | 2009-07-21 | Chevron U.S.A. Inc. | Method, system and apparatus for simulating fluid flow in a fractured reservoir utilizing a combination of discrete fracture networks and homogenization of small fractures |
US7928040B2 (en) | 2007-01-23 | 2011-04-19 | Halliburton Energy Services, Inc. | Compositions and methods for breaking a viscosity increasing polymer at very low temperature used in downhole well applications |
US8412500B2 (en) | 2007-01-29 | 2013-04-02 | Schlumberger Technology Corporation | Simulations for hydraulic fracturing treatments and methods of fracturing naturally fractured formation |
US7669655B2 (en) | 2007-02-13 | 2010-03-02 | Bj Services Company | Method of fracturing a subterranean formation at optimized and pre-determined conditions |
US7908230B2 (en) | 2007-02-16 | 2011-03-15 | Schlumberger Technology Corporation | System, method, and apparatus for fracture design optimization |
US9074454B2 (en) | 2008-01-15 | 2015-07-07 | Schlumberger Technology Corporation | Dynamic reservoir engineering |
US8577660B2 (en) | 2008-01-23 | 2013-11-05 | Schlumberger Technology Corporation | Three-dimensional mechanical earth modeling |
US8793111B2 (en) | 2009-01-20 | 2014-07-29 | Schlumberger Technology Corporation | Automated field development planning |
US8200465B2 (en) | 2008-06-18 | 2012-06-12 | Terratek Inc. | Heterogeneous earth models for a reservoir field |
US8670966B2 (en) | 2008-08-04 | 2014-03-11 | Schlumberger Technology Corporation | Methods and systems for performing oilfield production operations |
US8439116B2 (en) | 2009-07-24 | 2013-05-14 | Halliburton Energy Services, Inc. | Method for inducing fracture complexity in hydraulically fractured horizontal well completions |
US8498852B2 (en) | 2009-06-05 | 2013-07-30 | Schlumberger Tehcnology Corporation | Method and apparatus for efficient real-time characterization of hydraulic fractures and fracturing optimization based thereon |
US8886502B2 (en) | 2009-11-25 | 2014-11-11 | Halliburton Energy Services, Inc. | Simulating injection treatments from multiple wells |
US8386226B2 (en) | 2009-11-25 | 2013-02-26 | Halliburton Energy Services, Inc. | Probabilistic simulation of subterranean fracture propagation |
US8898044B2 (en) | 2009-11-25 | 2014-11-25 | Halliburton Energy Services, Inc. | Simulating subterranean fracture propagation |
US8392165B2 (en) | 2009-11-25 | 2013-03-05 | Halliburton Energy Services, Inc. | Probabilistic earth model for subterranean fracture simulation |
US8437962B2 (en) | 2009-11-25 | 2013-05-07 | Halliburton Energy Services, Inc. | Generating probabilistic information on subterranean fractures |
US20130144532A1 (en) | 2009-12-21 | 2013-06-06 | Schlumberger Technology Corporation | Identification of reservoir geometry from microseismic event clouds |
US8731889B2 (en) | 2010-03-05 | 2014-05-20 | Schlumberger Technology Corporation | Modeling hydraulic fracturing induced fracture networks as a dual porosity system |
EP2547864B1 (en) | 2010-04-12 | 2016-04-06 | Services Pétroliers Schlumberger | Automatic stage design of hydraulic fracture treatments using fracture height and in-situ stress |
US20130140031A1 (en) | 2010-12-30 | 2013-06-06 | Schlumberger Technology Corporation | System and method for performing optimized downhole stimulation operations |
CA2823116A1 (en) | 2010-12-30 | 2012-07-05 | Schlumberger Canada Limited | System and method for performing downhole stimulation operations |
US8905133B2 (en) | 2011-05-11 | 2014-12-09 | Schlumberger Technology Corporation | Methods of zonal isolation and treatment diversion |
MX2014000772A (es) | 2011-07-28 | 2014-05-01 | Schlumberger Technology Bv | Sistema y metodo para llevar a cabo operaciones de fractura del hoyo. |
CA2843469A1 (en) | 2011-07-28 | 2013-01-31 | Schlumberger Canada Limited | System and method for performing wellbore fracture operations |
US9027641B2 (en) * | 2011-08-05 | 2015-05-12 | Schlumberger Technology Corporation | Method of fracturing multiple zones within a well using propellant pre-fracturing |
US9262713B2 (en) | 2012-09-05 | 2016-02-16 | Carbo Ceramics Inc. | Wellbore completion and hydraulic fracturing optimization methods and associated systems |
-
2013
- 2013-12-09 US US14/101,028 patent/US9135475B2/en active Active
-
2014
- 2014-10-31 AU AU2014256418A patent/AU2014256418B2/en active Active
- 2014-11-05 EP EP14191955.5A patent/EP2884043A3/en not_active Withdrawn
- 2014-12-01 RU RU2014148318A patent/RU2663011C2/ru active
- 2014-12-03 MX MX2014014753A patent/MX351042B/es active IP Right Grant
- 2014-12-08 CA CA2873520A patent/CA2873520C/en active Active
- 2014-12-08 CN CN201410743801.7A patent/CN104695916B/zh active Active
- 2014-12-09 AR ARP140104573A patent/AR098677A1/es active IP Right Grant
-
2015
- 2015-08-06 US US14/819,659 patent/US10087722B2/en active Active
Also Published As
Publication number | Publication date |
---|---|
RU2014148318A3 (es) | 2018-06-08 |
RU2014148318A (ru) | 2016-06-27 |
US9135475B2 (en) | 2015-09-15 |
EP2884043A2 (en) | 2015-06-17 |
MX2014014753A (es) | 2015-07-01 |
EP2884043A3 (en) | 2015-12-23 |
US20160047207A1 (en) | 2016-02-18 |
AU2014256418A1 (en) | 2015-06-25 |
CA2873520A1 (en) | 2015-06-09 |
CN104695916A (zh) | 2015-06-10 |
CN104695916B (zh) | 2019-01-22 |
AR098677A1 (es) | 2016-06-08 |
CA2873520C (en) | 2022-07-26 |
US10087722B2 (en) | 2018-10-02 |
RU2663011C2 (ru) | 2018-08-01 |
US20140222405A1 (en) | 2014-08-07 |
AU2014256418B2 (en) | 2015-11-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
MX351042B (es) | Sistema y método para realizar operaciones de estimulación en el fondo del pozo. | |
GB2500332A (en) | System and method for performing downhole stimulation operations | |
CO2019006837A2 (es) | Estado de tensión especialmente diseñado con terminaciones de múltiples pozos | |
AR110650A1 (es) | Estado de tensión especialmente diseñado con terminaciones de múltiples pozos | |
SA516371856B1 (ar) | مراقبة العديد من سلاسل الأنابيب باستخدام أداة كهرومغناطيسية للكشف عن التآكل (em) | |
GB2537489A (en) | Real-time risk prediction during drilling operations | |
GB2522145A (en) | Improved hydraulic fracturing process for deviated wellbores | |
CO2018001525A2 (es) | Método para determinar la porosidad asociada a la materia orgánica en un pozo o formación | |
MX2016002657A (es) | Metodo para optimizar la conductividad en una operacion de fracturacion hidraulica. | |
MX2016005898A (es) | Modelado de interaccion de fracturas hidraulicas en redes de fracturas complejas. | |
GB2529774A (en) | Methods and systems for improved document comparison | |
GB2534734A (en) | Systems and methods for optimizing drilling operations using transient cuttings modeling and real-time data | |
GB2534729A (en) | Real-time risk prediction during drilling operations | |
GB2538370A (en) | Designing wellbore completion intervals | |
MX2013012177A (es) | Determinacion de la integridad de pozos. | |
GB2539828A (en) | Integrated 3D method for prediction of mud weight window for complex well sections | |
MX2015014465A (es) | Metodo para la recuperacion mejorada de petroleo por dioxido de carbono y su almacenamiento, y uso de los mismos. | |
WO2014055871A3 (en) | Method and apparatus for matching consumers | |
MX2016011021A (es) | Modelado total de recursos con modelos de recursos integrados y modelos de recursos persistentes. | |
WO2013015879A3 (en) | System and method for perturbing an initial horizon-picking solution to follow local features of a volume | |
RU2015138548A (ru) | Система для обеспечения потока операций бизнес-процесса | |
GB2550092A (en) | Cutting tool | |
MX2016008651A (es) | Administrador de intervalo de profundidad para el analisis de la sarta de perforacion. | |
MX363567B (es) | Métodos para producir suspensiones de cemento resistentes a la migración de fluido. | |
GB2548042A (en) | Real-time performance analyzer for drilling operations |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FG | Grant or registration |