Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Safway Services LlcfiledCriticalSafway Services Llc
Priority to MX2019011255ApriorityCriticalpatent/MX2019011255A/en
Publication of MX2019011255ApublicationCriticalpatent/MX2019011255A/en
The present invention relates to an assembly for integrating access structures (300) and an integrated system using the assembly (300). It includes a corrugated structure (50) and housing on the joist (60) fitting with the sliding allowed therein. Said structure fixes the base structure (100), such as a suspended work platform system. Also, the housing fixes into a second structure (200), such as a supported work platform system. Further, the integrated system includes a base structure (100), a second structure (200) and two integration mounts (300) involving the same arrangement.
MX2019011255A2016-02-082016-02-08Assembly for integrating access structures and integrated access systems and methods for use thereof.
MX2019011255A
(en)
subsea pump arrangement, modular subsea production system, fluid conditioning module, foot configured to receive a pump module, pump module, modular production system, and frame portion system to support a pump