Claims (3)
분산 제어 시스템인 전전자 교환기에 적용되는 연속성 시험 제어 방법에 있어서, UPC(ISDN User Part Control)메인 프로세스에서 운용자에 의한 출ㆍ입증계선에 대하여 연속성 시험을 요청받은 경우 해당중계선을 판단하는 제1단계; 상기 제1단계 수행 후, 해당 중계선이 출중계선이면 출중계선 연속성 재시험 처리 프로세스를 생성시키는 제2단계; 및 상기 제1단계 수행 후, 해당 중계선이 입중계선이면 입중계선 연속성 재시험 처리 프로세스를 생성시킨 후 UPI(ISDN User Part Interface) 블럭에게 입중계선 연속성 재시험 처리 프로세스의 생성을 통보하는 제3단계를 포함하여 이루어지는 것을 특징으로 하는 운용자에 의한 넘버(No.7) 신호 방식의 연속성 시험 제어 방법.In the continuity test control method applied to an electronic switching system, which is a distributed control system, a first step of determining a corresponding relay line when a continuity test is requested for an entry / exit relay line by an operator in an UPC (ISDN User Part Control) main process ; A second step of generating an outgoing line continuity retest processing process if the corresponding relay line is the outgoing line after performing the first step; And a third step of generating a incoming line continuity retest processing process if the corresponding relay line is an incoming line after performing the first step, and then notifying the ISDN User Part Interface (UPI) block to generate the incoming line continuity retest processing process. A method for controlling the continuity test of the number (No. 7) signaling method by an operator.
제1항에 있어서, 상기 제2단계는, 생성된 출중계선 연속성 재시험 처리 프로세스는 연속성 재검사 요청 타이머를 구동한 후 호의 상태를 연속성 재시험 처리 상태로 천이하는 제1과정(6,7); 상기 제1과정 수행 후, 연속성 재시험 처리 상태에서 타이머가 만료되면 연속성 시험을 요청하고 연속성 재시험 처리 상태로 천이하는 제2과정(8 내지 13); 상기 제1과정 수행 후, 연속성 재시험 처리 상태에서 대국으로 부터 연속성 시험 결과를 통보받으면 구동중이던 타이머를 종료시키고 연속성 재시험이 성공한 경우 상태를 연속성 재시험 처리 상태로 천이하고, 연속성 재시험이 실패한 경우 연속성 반복 시험을 위한 안내 타이머를 구동하고 호의 상태를 연속성 재시험 처리 상태로 천이하는 제3과정(14 내지 19,21 내지 24); 상기 제1과정 수행 후, 연속성 시험 결과 대기 타이머가 종료된 경우 연속성 반복 시험을 위한 안내 타이머를 구동하고 호의 상태를 연속성 재시험 처리 상태로 천이하는 제4과정(20 내지 24); 상기 제1과정 수행 후, 대국으로부터 호 절단 완료 메시지(RLC)를 수신한 경우 연속성 재시험의 성공을 통보하고 연속성 재시험용 출중계 프로세스를 종료시키는 제6과정(31 내지 33); 및 상기 제1과정 수행 후, 운용자에 의하여 연속된 재시험의 종료를 요청받은 경우 구동중이던 타이머를 종료하고 대국으로 회선의 해체를 통보하고 호의 상태를 연속성 재시험 처리 상태로 천이하는 제7과정(34 내지 38)을 구비하고 있는 것을 특징으로 하는 운용자에 의한 넘버(No.7) 신호 방식의 연속성 시험 제어 방법.The method of claim 1, wherein the second step comprises: a first outgoing line continuity retest processing process comprising: a first process (6, 7) of transitioning a call state to a continuity retest processing state after driving a continuity retest request timer; A second step (8 to 13) of requesting the continuity test and transitioning to the continuity retest processing state when the timer expires in the continuity retest processing state after performing the first process; After performing the first step, if the continuity test result is notified from the power station in the continuity retest processing state, the running timer is terminated, and if the continuity retest is successful, the state transitions to the continuity retest processing state, and if the continuity retest fails, the continuity repetition test A third process (14 to 19, 21 to 24) for driving a guidance timer for the transition and transitioning the state of the call to the continuity retest processing state; A fourth step (20 to 24) of driving a guide timer for the continuity repetition test and transitioning the call state to the continuity retest processing state when the continuity test result wait timer is terminated after performing the first step; A sixth step (31 to 33) of notifying the success of the continuity retest and terminating the outgoing transmission process for the continuity retest when receiving a call disconnection completion message (RLC) from the power after performing the first step; And a seventh process (34 to 34) which terminates the timer in operation, notifies the dismantling of the line to the power station, and transitions the call state to the continuity retest processing state when the operator is requested to end the continuous retest after performing the first process. 38. A method for controlling continuity testing of a number (No. 7) signaling system by an operator.
제1항에 있어서, 상기 제2단계는, 연속성 재검사 요청 타이머를 구동한 후 호의 상태를 연속성 재시험 처리 상태로 천이하는 제1과정(39,40); 상기 제1과정 수행 후, 대국으로 부터 연속성 재시험 요청 메시지(CCR)를 수신한 경우 LSP로 연속성 시험을 요구한 후 호의 상태를 연속성 재시험 처리 상태로 천이하는 제2과정(41 내지 46); 상기 제1과정 수행 후, 대국으로 부터 해제 메시지(REL)를 수신한 경우 대국으로 호 해제 완료 메세지(RLC)를 전송하고 연속성 재시험용 입중계 프로세스를 종료시키는 제2과정(47 내지 51); 및 상기 제1과정 수행 후, 대국으로 부터 연속성 재시험 실패를 알리는 연속성 시험 결과 메시지(COT)를 수신한 경우 구동중이던 타이머를 종료하고 연속성 반복 시험을 위한 타이머를 구동하고 호의 상태를 연속성 재시험 처리 상태로 천이하는 제3과정(52 내지 56)을 포함하고 있는 것을 특징으로 하는 운용자에 의한 넘버(No.7) 신호 방식의 연속성 시험 제어 방법.2. The method of claim 1, wherein the second step comprises: a first process (39, 40) of transitioning a call state to a continuity retest processing state after driving a continuity retest request timer; A second process (41 to 46) of transitioning a call state to a continuity retest processing state after requesting a continuity test to the LSP after receiving the continuity retest request message (CCR) from the power after performing the first process; A second step (47 to 51) of transmitting a call release completion message (RLC) to the power station and terminating the continuity re-input process after receiving the release message REL from the power after performing the first process; And when the continuity test result message (COT) is received from the power station indicating the failure of the continuity retest from the power station, the timer that was running is terminated, the timer for the continuity repetition test is driven, and the call state is changed to the continuity retest processing state. A method for controlling the continuity test of the number (No. 7) signaling method by an operator, characterized in that it comprises a third process (52 to 56) to transition.
※ 참고사항 : 최초출원 내용에 의하여 공개하는 것임.※ Note: The disclosure is based on the initial application.