KR950005540Y1 - Arrangements for cleaning sewer pipes - Google Patents
Arrangements for cleaning sewer pipes Download PDFInfo
- Publication number
- KR950005540Y1 KR950005540Y1 KR92021144U KR920021144U KR950005540Y1 KR 950005540 Y1 KR950005540 Y1 KR 950005540Y1 KR 92021144 U KR92021144 U KR 92021144U KR 920021144 U KR920021144 U KR 920021144U KR 950005540 Y1 KR950005540 Y1 KR 950005540Y1
- Authority
- KR
- South Korea
- Prior art keywords
- pulley
- support
- drums
- platform
- spiral
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F7/00—Other installations or implements for operating sewer systems, e.g. for preventing or indicating stoppage; Emptying cesspools
Landscapes
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
내용 없음.No content.
Description
제 1 도는 본 고안의 사용 상태 설명도.1 is an explanatory diagram of a use state of the present invention.
제 2 도는 제 1 도의 A-A선에 따른 설치 상태의 단면도.2 is a cross-sectional view of the installation state along the line A-A in FIG.
제 3 도는 제 2 도의 지지프레임의 종 단면도.3 is a longitudinal sectional view of the support frame of FIG.
제 4 도는 제 3 도의 B-B선 단면도.4 is a cross-sectional view taken along the line B-B in FIG.
제 5 도는 본 고안의 활차의 사시도.5 is a perspective view of a pulley of the present invention.
제 6 도는 본 고안의 활차를 정면에서 본 일부절개도이다.Figure 6 is a partial cutaway view of the pulley of the present invention from the front.
* 도면의 주요부분에 대한 부호의 설명* Explanation of symbols for main parts of the drawings
1, 1' : 윈치 2, 2' : 수직관로1, 1 ': winch 2, 2': vertical pipe
3, 3' : 차집관로 4 : 하수로3, 3 ': Tea House 4: Sewer
5 : 활차 5' : 결착고리5: pulley 5 ': binding hook
5a, 5b : 횡간 6, 6' : 회전기5a, 5b: Transverse 6, 6 ': Rotator
6", 6"' : 벨트 6a, 6b, 6a', 6b', 10, 10' : 드럼6 ", 6" ': belt 6a, 6b, 6a', 6b ', 10, 10': drum
7, 7' : 로프 8, 9 : 지지프레임7, 7 ': rope 8, 9: support frame
11 : 브라켓 11', 18 : 나선공11: bracket 11 ', 18: spiral
12, 20, 20' : 나선봉 13, 13' : 승강대12, 20, 20 ': Spiral bar 13, 13': Platform
14, 14' : 지지체 15, 15' : 구동 로울러14, 14 ': support 15, 15': drive roller
16, 16' : 삽 17, 17' : 로울러16, 16 ': Shovel 17, 17': Roller
19, 19' : 지지대 19a, 19b : 레버19, 19 ': support 19a, 19b: lever
본 고안은 하수로내의 침전한 각종 오물 및 토사를 제거하기 위한 차집관로 준설장치에 관한 것이다.The present invention relates to a dredging channel to a collecting pipe for removing various sediment and sediment deposited in the sewer.
종래에는 긴 체인에 삽을 다수 부설하여 이를 하수로 내에 설치하여 체인 구동에 의해 쌓여진 각종 오물 및 토사를 제거토록 한 것이 있었으나 이것은 체인이 만곡되게 설치, 이동하므로 평평한 하수로 바닥의 구석구석까지 긁어내지 못하여 준설작업이 완전하게 이루어지지 못한 폐단이 있었다.Conventionally, a large number of shovels were installed on a long chain and installed in a sewer to remove various soils and soils accumulated by the chain drive. However, since the chain is installed and moved in a curved manner, the flat sewer does not scrape every corner of the floor. There was a defect that dredging was not completed completely.
본 고안은 이에 착안하여 하수로 내에 다수의 삽이 형성된 활차를 설치하고 그 양측에 로프를 결착, 지상의 윈치와 연결, 구동시켜 활차를 좌, 우로 이동시켜 쌓인 각종 오물 및 토사를 차집관로 내에 낙하시키고 차집관로 내에서 지상까지 입설된 배출관을 통해 흡입펌프를 이용하여 퍼 올려 제거토록 한 것으로 하수로 내의 오물 및 토사를 완전제거토록 함에 고안의 목적이 있는 바, 이를 첨부도면에 의거 상세히 설명하면 다음과 같다.The present invention is based on this, installs a pulley with a plurality of shovels in the sewer, connects and drives the rope to both sides of the ground winch to move the pulley to the left and right to drop various dirt and soil accumulated in the collecting pipe passage The purpose of the present invention is to completely remove the dirt and soil in the sewage, using the suction pump through the discharge pipe installed in the collecting pipe passage to the ground. Same as
본 고안은 지상에 2개의 윈치(1)(1')를 설치하고 수직관로(2)(2')와 연통되게 형성된 차집관로(3)(3')의 상부에 횡으로 형성된 활차(5)를 설치하되, 상기 윈치(1)(1')를 구성하는 회전기(6)(6')와 벨트(6")(6"')로 연결된 드럼(6a)(6b)(6a')(6b')에 로프(7)(7')를 권취하고, 상기 수직관로(2)(2')의 양 둘레에 설치된 지지프레임(8)(9)의 하부에 드럼(10)(10')을 형성하여 상기 로프(7)(7')가 수직 하향하여 상기 드럼(10)(10') 경유하여 횡으로 활차(5)의 양단에 결착하되, 상기 드럼(10)(10')은 지지프레임(8)(9)내에 관삽된 브라켓(11)의 일측에 지지고정되고, 이 브라켓(11)에는 나선공(11')을 형성하여 나선봉(12)과 나합하여 지지프레임(7)(8)을 타고 상, 하 이동되게 하며, 상기 활차(5)는 승강대(13)(13')와 지지체(14)(14') 및 이를 지지하는 횡간(5a)(5b)과 2개의 구동 로울러(15)(15')로 구성하되, 상기 승강대(13)(13')의 하부 양측에는 다수의 삽(16)(16')을 형성하고, 그 중앙에 상기 로프(7)(7')와 결착되는 결착고리(5')를 형성하며, 양단에 각각 로울러(17)(17')를 형성하여 상기 지지체(14)(14')에 접치시키고, 승강대(13)(13')의 중앙에는 나조공(18)을 형성하여 상부의 지지대(19)(19')에 고착된 선단에 레버(19a)(19b')가 형성된 나선봉(20)(20')과 나합하여 상, 하 이동되도록 하여서 된 구조로서 부호 21은 토사, 22는 나선봉(12)의 선단에 결착하여 돌리는 렌치, 23은 배출관, 24는 흡입펌프, 25는 활차(5)의 구동로울러(15)(15')에 결합된 축핀이다.The present invention installs two winches (1) (1 ') on the ground and pulley (5) formed laterally on the upper part of the collecting pipe passage (3) (3') formed in communication with the vertical pipe (2) (2 '). A drum (6a) (6b) (6a ') (connected by a rotator (6) (6') and a belt (6 ") (6" ') constituting the winch (1) (1') ( 6b '), the ropes 7 and 7' are wound, and the drums 10 and 10 'are disposed at the lower portions of the support frames 8 and 9 provided at both circumferences of the vertical lines 2 and 2'. The rope (7) (7 ') is vertically downward and bound to both ends of the pulley (5) laterally via the drum (10) (10'), the drum (10) (10 ') The support is fixed to one side of the bracket 11 inserted into the support frame 8, 9, and the bracket 11 is formed with a spiral hole 11 'to be screwed with the spiral rod 12 to support the frame 7 (8) to move up and down, the pulley (5) is a platform 13 (13 ') and the support (14) (14') and the transverse (5a) (5b) and two drives supporting it Roller 15, 15 ', A plurality of shovels 16, 16 'are formed on both sides of the lower side of the platform 13, 13', and a binding ring 5 'is formed at the center thereof to be bound with the ropes 7, 7'. Rollers 17 and 17 'are formed at both ends thereof to be in contact with the supports 14 and 14', and a screw hole 18 is formed at the center of the lifting platforms 13 and 13 'to support the upper support. (19) (19 ') is a structure designed to be moved up and down by joining with the spiral rods (20, 20') formed with the lever (19a) (19b ') at the tip fixed to, the reference numeral 21 is earth and sand, 22 is A wrench that is attached to the tip of the spiral rod 12 and turned, 23 is a discharge pipe, 24 is a suction pump, 25 is an axial pin coupled to the drive rollers 15 and 15 'of the pulley 5.
위와 같이 구성된 본 고안은 저수지 등이 범람하여 하수로(4)에 유입되어 쌓인 오물 및 토사(21)를 활차(5)를 이동시켜 하수로(4)의 양측에 함몰되게 형성된 차집관로(3)(3')에 낙하시킨 다음 이를 입설된 배출관(23)을 통해 흡입펌프(24)로 퍼올려 제거하도록 한 것으로 이를 구체적으로 설명하면 다음과 같다.The present invention configured as described above is a reservoir pipe (3) formed to be recessed on both sides of the sewer (4) by moving the pulley (5) and the sewage and soil (21) accumulated in the sewer (4) to overflow the reservoir. After dropping to (3 ') it is to be removed by pumping it up to the suction pump 24 through the discharge pipe 23 installed in the following will be described in detail.
본 고안은 지상의 수직관로(2)(2')의 입구부에 윈치(1)(1')가 설치되어 있는데, 회전기(6)(6')를 구동시키면 벨트(6")(6"')를 경유하여 드럼(6a)(6b)이 회전하고 이 드럼(6a)(6b)에는 로프(7)(7')가 권취되어 있어 만일 첨부도면 제 1 도에서 보는 바와 같이 활차(5)를 좌측으로 이동시키고자 할 경우에는 회전기(6a)(6b)를 시계방향으로 구동시키면 로프(7)(7')가 각 드럼을 경유하면서 수직관로(2)(2')를 지날때에는 수직방향으로 연결되고 하수로(4)를 지날 때에는 수평 방향으로 활차(5)에 연결되어 있어 상기 로프(7)은 상향 이동되고 로프(7')는 하향 이동되며 이때 각 로프와 결착고리(5')로 결착된 활차(5)는 횡간(5a)(5b)에 축핀(25)으로 결합된 구동 로울러(15)(15')가 축핀(25)을 중심으로 회전하면서 좌측으로 이동되고 이에 따라 승강대(13)(13')의 하부에 고착된 다수의 삽(16)(16')이 쌓인 각종 오물 및 토사(21)를 쓸고 가 좌측에 형성된 차집관로(3)내로 투입시킨다. 또한 활차(5)를 우측으로 이동시키고자 할 경우에는 상기 회전기(6a)(6b)를 반시계 방향으로 구동시키면 로프(7)은 하향 이동되고 로프(7')는 상향 이동되어 활차(5)는 우측으로 이동하면서 삽(16)(16')이 동시에 이동하면서 토사(21)를 쓸고가 우측에 형성된 차집관로(3')내로 투입시킨다.In the present invention, the winch (1) (1 ') is installed at the inlet of the vertical pipeline (2) (2') on the ground. When the rotor (6) (6 ') is driven, the belt (6 ") (6) The drum 6a, 6b is rotated via " 'and the rope 6, 7' is wound around the drum 6a, 6b, as shown in FIG. ) To the left to drive the rotor (6a) (6b) clockwise, when the rope (7) (7 ') passes through each drum while passing through the vertical line (2) (2') When connected in the vertical direction and passing through the sewer (4) is connected to the pulley (5) in the horizontal direction so that the rope (7) is moved upwards and the rope (7 ') is moved downwards, where each rope and binding ring (5) The pulley 5 fixed with ') is moved to the left while the driving rollers 15 and 15' coupled to the transverses 5a and 5b by the shaft pins 25 rotate about the shaft pins 25. Multiple shovels 16 and 16 'secured to the lower part of the platform 13 and 13' The accumulated various soils and soils 21 are swept and put into the collecting pipe path 3 formed on the left side. In addition, when the pulley 5 is to be moved to the right, when the rotors 6a and 6b are driven counterclockwise, the rope 7 moves downward and the rope 7 'moves upward so that the pulley 5 is moved. While moving to the right, the shovels 16 and 16 'move simultaneously while sweeping the soil sand 21 and inserting them into the collecting pipe path 3' formed on the right side.
상기 삽(16)(16')은 활차(5)의 폭 방향으로 다수 형성되어 있는데 하수로(4)의 폭 길이 만큼 형성되어 쌓인 토사를 말끔히 쓸고 가는 것이며 이러한 제거 작업시 쌓인 토사의 높이가 감소하는데, 본 고안의 활차(5)의 양단에 결착된 로프(7)(7')는 수직관로(2)(2')의 양측벽에 설치된 지지프레임(8)(9)의 하부의 드럼(10)(10')을 경유하는바, 이 드럼(10)(10')은 지지프레임(8)(9)에 관삽된 브라켓(11)의 일측에 지지고정되어 있어 이 브라켓(11)은 나선공(11')이 형성되어 지지프레임(8)(9)의 수직 길이 방향으로 길게 형성된 나선봉(12)과 나합되어 있어 지상에서 작업자가 렌치(22) 등을 사용하여 돌리면 나선봉(12)의 나선을 따라 브라켓(11)이 상, 하향 이동되고 동시에 드럼(10)(10')도 이동하므로 이에 로프(7)(7')로 결착된 활차(5)가 비례하여 이동되러 쌓인 토사의 높이가 변화하더라도 이에 대응하여 적절하게 활차(5)를 이동시킬 수 있으므로 토사를 완전히 제거할 수 있는 것이다.The shovels 16 and 16 'are formed in the width direction of the pulley 5, and are formed by the width of the sewer 4 so as to sweep the piled up soil. The height of the piled up soil is reduced. Rope (7) (7 ') attached to both ends of the pulley (5) of the present invention is the drum of the lower portion of the support frame (8) (9) installed on both side walls of the vertical pipe (2) (2') Via (10) and (10 '), the drum (10) and (10') are supported and fixed on one side of the bracket (11) inserted into the support frames (8) and (9). A spiral hole 11 'is formed and is screwed together with a spiral rod 12 formed long in the vertical length direction of the support frames 8 and 9 so that when the worker turns the ground using a wrench 22 or the like, the spiral rod 12 As the bracket 11 is moved up and down along the spiral of) and the drum 10, 10 'is also moved at the same time, the pulleys 5 bound by the ropes 7 and 7' are piled up to move proportionally. The height of the Even so it can be associated to appropriately move the pulley 5 this is to completely remove the earth and sand.
또한, 본 고안은 토사의 제거시 활차(5)에 설치된 삽(16)(16')을 상, 하향 이동시켜 토사의 양에 따라 적절하게 이동시켜 작업을 수행할 수 있는 바, 이는 나선봉(20)(20')이 승강대(13)(13')의 나선공(18)에 나합되어 있어 나선봉(20)(20')의 선단에 형성된 레버(19)(19')를 돌리면 나선봉(20)(20')의 나선을 따라 승강대(13)(13')가 상향 또는 하향 이동하여 그 하단에 고정 설치된 다수의 삽(16)(16')이 상, 하향 이동되는 것이며, 승강대(13)(13')의 양단에는 지지체(14)(14')에 접치된 로울러(17)(17')가 형성되어 있어 승강대(13)(13')의 이동을 원활하게 해주는 것이다. 이러므로써 토사의 쌓인 높이가 변화하더라도 이에 적절하게 활차(5)의 삽(16)(16')을 이동시켜 토사를 완전히 제거할 수 있는 것이다.In addition, the present invention can be carried out by moving the shovel 16 (16 ') installed on the pulley (5) up and down when appropriate to move according to the amount of earth and sand, the spiral bar ( 20 (20 ') is screwed into the spiral hole 18 of the platform 13 (13') and turns the spiral 19 (19 ') formed at the tip of the spiral bar (20) (20'). (20, 20 ') along the helix platform 13, 13' is moved up or down and a plurality of shovels (16, 16 ') fixed to the lower end is moved up, down, Both ends of the 13 and 13 ′ are formed with rollers 17 and 17 ′ in contact with the supports 14 and 14 ′ to facilitate the movement of the platform 13 and 13 ′. Thus, even if the pile height of the soil changes, the soil can be completely removed by moving the shovels 16 and 16 'of the pulley 5 accordingly.
위와 같이 본 고안은 하수로에 쌓이는 각종 오물 토사를 신속하고 말끔히 제거할 수 있어 작업시 활차의 높이 조절이 가능하여 토사의 양의 변화에 능동적으로 대응하여 작업을 수행할 수 있는 매우 유용한 고안인 것이다.As described above, the present invention is a very useful design that can quickly and neatly remove various soil sediment accumulated in the sewer, so that the height of the pulley can be adjusted during the work to actively respond to changes in the amount of soil.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR92021144U KR950005540Y1 (en) | 1992-10-30 | 1992-10-30 | Arrangements for cleaning sewer pipes |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR92021144U KR950005540Y1 (en) | 1992-10-30 | 1992-10-30 | Arrangements for cleaning sewer pipes |
Publications (2)
Publication Number | Publication Date |
---|---|
KR940010193U KR940010193U (en) | 1994-05-23 |
KR950005540Y1 true KR950005540Y1 (en) | 1995-07-13 |
Family
ID=19342914
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR92021144U KR950005540Y1 (en) | 1992-10-30 | 1992-10-30 | Arrangements for cleaning sewer pipes |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR950005540Y1 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100740675B1 (en) * | 2006-01-20 | 2007-07-18 | 호용종합건설주식회사 | Tensioning steel wire fixing installation to prevent sag of steam hose for undergrand pipes repair |
KR101223293B1 (en) * | 2012-10-29 | 2013-01-16 | 박용규 | Sewer pipe sediment dredging and dredge the device sat |
-
1992
- 1992-10-30 KR KR92021144U patent/KR950005540Y1/en not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
KR940010193U (en) | 1994-05-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101599504B1 (en) | Rotary type dust removing machine | |
KR950005540Y1 (en) | Arrangements for cleaning sewer pipes | |
KR101599999B1 (en) | Rotary type dust removing machine | |
KR20100135470A (en) | Dust removing machine | |
JPS581606B2 (en) | Chinsakakiyoseki | |
US867536A (en) | Well-making machine. | |
CN115305937B (en) | Accumulated water discharging equipment for building foundation pit for engineering construction | |
JPS5835288Y2 (en) | Sand raking machine equipped with a bendable raking guide frame | |
CN115059391B (en) | Drilling device for weak interlayer geological exploration | |
JP3849087B2 (en) | Dust remover | |
JPS6119764Y2 (en) | ||
CN209338024U (en) | A kind of bridge construction hanging apparatus | |
JPS5928646Y2 (en) | Sand raking machine | |
JPS6216167Y2 (en) | ||
KR100689300B1 (en) | Rotary-type screener machine | |
JPS6313772Y2 (en) | ||
JPS591685Y2 (en) | Sand raking machine | |
KR930001325Y1 (en) | Wheeled apparatus for emptying sewers | |
JPS6036323Y2 (en) | Sand raking machine | |
KR910001748Y1 (en) | Dredger in the sewer system | |
JPS6051367B2 (en) | Sand raking machine | |
JPH0213049Y2 (en) | ||
JPS5931287Y2 (en) | Sand raking machine | |
KR910005067Y1 (en) | Dredger adapted to be used with sewer | |
JPS591687Y2 (en) | Support device for submersible sprocket wheel of sand scraper |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
REGI | Registration of establishment | ||
FPAY | Annual fee payment |
Payment date: 20070702 Year of fee payment: 13 |
|
EXPY | Expiration of term |