KR930007870B1 - Prefabricated forms for a sewer - Google Patents
Prefabricated forms for a sewer Download PDFInfo
- Publication number
- KR930007870B1 KR930007870B1 KR1019900018128A KR900018128A KR930007870B1 KR 930007870 B1 KR930007870 B1 KR 930007870B1 KR 1019900018128 A KR1019900018128 A KR 1019900018128A KR 900018128 A KR900018128 A KR 900018128A KR 930007870 B1 KR930007870 B1 KR 930007870B1
- Authority
- KR
- South Korea
- Prior art keywords
- formwork
- haunch
- prefabricated
- slab
- pedestal
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/02—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for rooms as a whole by which walls and floors are cast simultaneously, whole storeys, or whole buildings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- Sewage (AREA)
Abstract
Description
제1도는 본 발명 조립식 거푸집 시스템의 전체적인 측면도.1 is an overall side view of the prefabricated formwork system of the present invention.
제2도는 상부헌치 거푸집의 사시도.2 is a perspective view of the upper haunch formwork.
제3도는 하부헌치 거푸집의 사시도.3 is a perspective view of the lower haunch formwork.
제4도는 하부헌치거푸집의 설치상태 단면도.4 is a cross-sectional view of the installation state of the lower haunch formwork.
제5도는 상부빔의 사시도.5 is a perspective view of the upper beam.
제6도는 본 발명 조립식 거푸집의 분해사시도.6 is an exploded perspective view of the prefabricated formwork of the present invention.
* 도면의 주요부분에 대한 부호의 설명* Explanation of symbols for main parts of the drawings
1 : 상부헌치 거푸집 2 : 받침대1: upper haunch die 2: pedestal
10 : 하부헌치거푸집 20 : 슬라브판넬10: lower haunch die 20: slab panel
25 : 원판넬 30 : 상부빔25: original panel 30: upper beam
본 발명은 구형(Box culvert) 콘크리트 구조물용 조립식형틀에 관한 것으로서 구조물의 하측의 바닥면에 고정설치된 앙카볼트에 고정설치되는 두개의 하부헌치(Hunch) 거푸집과 상측의 측면 모서리를 형성하는 두개의 상부헌치 거푸집 그리고 상부헌치 거푸집 그리고 상부헌치 거푸집 사이를 연결하여주는 상부빔, 상부빔위에 조립되는 슬라브판넬, 또한 상부헌치 거푸집과 하부헌치 거푸집 사이에 조립설치되는 월판넬(Wall panel)등으로서 이루어지는 조립식형트 시스템에 관한 것이다.The present invention relates to a prefabricated frame for a box culvert concrete structure, two upper hunch (Hunch formwork) and two upper side edges that are fixed to the anchor bolt is fixed to the bottom of the structure fixed to the bottom of the structure Prefabricated form consisting of an upper beam connecting the haunch formwork and the upper haunch formwork and the upper haunch formwork, a slab panel assembled on the upper beam, and a wall panel assembled between the upper haunch formwork and the lower haunch formwork. It's about the system.
주지된 바와같이 구형 콘크리트 구조물은 주로 지하에 매설되는 대형 하수관이나 전기, 전화 선등을 매설하기 위한 지하 구조물인데 현재 이와같은 구조물을 시공하기 위하여는 먼저 바닥과 측벽을 먼저 시공하고 그 다음 상판을 시공하는 방법을 사용하였으며 이때 사용되는 거푸집을 대부분 목재 거푸집을 사용하였다.As is well known, the spherical concrete structure is an underground structure mainly for laying large sewer pipes, electricity, telephone lines, etc., which are buried underground. In this case, most of the formwork used was wooden formwork.
또한 가지 방법으로는 먼저 바닥면을 타설한 후에 그위에 구형으로 거푸집을 설치한 후 콘크리트 타설작업을 한다음, 시멘트 콘크리트가 완전히 경화하면 거푸집을 모두 뜯어서 다음장소로 이동설치하여 다시 콘크리트 타설 작업을 하는 등 이와같은 작업을 반복하여 시공하였다. 그러나 이와같은 방법으로 구형콘크리트 구조물을 시공할때는 벽면이나 바닥면만을 시공할때와는 다르게 거푸집을 설치라고 해체하는데 많은 어려움이 있다.In addition, there are ways to pour the floor first, then install the formwork in the form of a sphere on top of it, and then do concrete pouring work.When the cement concrete is completely cured, remove all the formwork and move it to the next place. Such construction was repeated. However, when constructing the spherical concrete structure in this way, there is a lot of difficulty in dismantling the formwork, unlike when installing only the wall or floor.
즉, 거푸집을 구형으로 설치하기 위하여는 내부에서 많은 받침목을 설치하여야하므로 설치시간이 많이 소요되며 해체할때도 시간이 많이 허비됨을 물론 거푸집 자체도 파손이 심하여 수명이 길지 못한 문제점도 있었다.In other words, in order to install the formwork in a spherical form, many support necks must be installed inside, so it takes a lot of installation time and wastes a lot of time when dismantling.
또한 더욱 큰 문제점으로는 구형으로 거푸집을 설치하기 위해서는 경험이 많고 능숙한 목수기능공이 꼭 필요하다는 문제점이 있다. 따라서 목수기능공의 확보에 어려움이 있어 공사기 지연됨은 물론 인건비의 상승요인도 되었다.In addition, there is a problem that requires an experienced and skilled carpenter skilled worker to install the formwork in the spherical form. As a result, it was difficult to secure carpenter technicians, which delayed the construction period and increased labor costs.
본 발명은 이와같은 제반 문제점을 감안하여 안출한 구형 콘크리트 구조물용 조립식형틀에 관한 것인데, 본 발명의 조립식 형틀은 철재로서 이루어지며 완전 조립식 형태를 이루기 위하여, 하측의 모서리를 구성하는 두개의 하부헌치거푸집과 상측의 모서리를 형성하기 위한 두개의 상부헌치 거푸집, 그리고 상측의 상부한치 거푸집에 설치되어 슬라브판넬을 받쳐주는 상부빔과, 측벽을 형서하는 월판넬 등으로 구성 되어진다.The present invention relates to a prefabricated mold for spherical concrete structures in view of the above problems, the prefabricated mold of the present invention is made of steel and to form a fully prefabricated form, two lower haunch formwork forming the lower corners It consists of two upper haunch formwork to form the upper and upper edges, and an upper beam installed on the upper upper limit formwork to support the slab panel, and a wall panel to form the side wall.
이와같은 본 발명에 의한 조립식 형틀은 다음과 같은 특징으로 얻을 수 있다.Such a prefabricated mold according to the present invention can be obtained with the following features.
즉, 소형이나 대형등에 제한없이 자유로히 완전 조립식으로 형틀을 설치할 수 있으며, 형틀의 설치작업을 일반공으로 대체할 수 있어 인건비를 절감할 수 있다. 전체가 금속재이므로 반영구적으로 사용할 수 있다. 평활성이 높아 미려하고 정교한 품질의 콘크리트 구조체를 얻을 수 있다. 조립설치후에도 내부공간이 목재거푸집에 비하여 매우 넓어 콘크리트 타설중 변형등에 대한 응급조치가 용이하여 간단한 공구로서 신속하고 편리하게 해체할 수 있다. 이하 본 발명을 철부 도면에 의하여 상세히 설명하면 다음과 같다.In other words, the mold can be installed freely without any limitation, such as small or large, and the installation work of the mold can be replaced by a general worker, thereby reducing labor costs. Since the whole is made of metal, it can be used semi-permanently. High smoothness makes it possible to obtain beautiful and sophisticated concrete structures. Even after assembling and installation, the inner space is much larger than the wooden formwork, so it is easy to make emergency measures for deformation during concrete placing and can be disassembled quickly and conveniently as a simple tool. Hereinafter, the present invention will be described in detail with reference to the iron drawings.
제1도는 본 발명 구형 콘크리트 구조물용 조립식 형틀을 조립 설치하고 콘크리트를 타설한 형태의 측면도로서 (10)은 하부헌치 거푸집이고, (24)는 월판넬이며, (1)은 상부헌치 거푸집이다.FIG. 1 is a side view of the present invention, in which a prefabricated mold for spherical concrete structures is assembled and placed in concrete, in which 10 is a lower haul formwork, 24 is a wall panel, and 1 is an upper haul form.
또한, 상부헌 치거푸집(1)에 결합된 도면부호(2)는 상부빔(30)을 지지하기 위한 받침대이며 상부빔(30)위에는 슬라브판넬(20)이 설치되어 있다.In addition, the reference numeral 2 coupled to the upper demolition die (1) is a pedestal for supporting the upper beam 30 and the slab panel 20 is installed on the upper beam (30).
제2도는 상부헌치 거푸집(1)의 상세도로서 일정길이의 상부헌치 거푸집(1) 양 끝단에는 상부빔(30)을 지지하여 주는 받침대(2)가 부착되어 있으며 받침대(2)에는 상부빔을 움직이지 않게 협지하여주는 고정구(3)가 용접으로 고정설치되어 있다. 그리고 거푸집(1)의 내측에는 거푸집자체의 휨강도를 증대시켜 주기위한 보강재(4)가 용착되어 있다.2 is a detailed view of the upper haunch formwork (1) is a pedestal (2) for supporting the upper beam 30 is attached to both ends of the upper haunch formwork (1) of a certain length and the upper beam is attached to the pedestal (2) The fixture 3 which clamps so that it does not move is fixed by welding. A reinforcing member 4 is welded to the inside of the formwork 1 to increase the bending strength of the formwork itself.
제3도는 하부헌치 거푸집(10)의 상세도면으로서 하부헌치 거푸집에도 역시 휨강도를 증대시키기 위한 보강재(11)가 있으며, 앙카 볼트공(12)이 천공되어 있어 제4도와 같이 바닥슬라브(14)에 배설된 앙카볼트(13)에 끼워서 설치된다.FIG. 3 is a detailed view of the lower haunch formwork 10. The lower haunch form also includes a reinforcing member 11 for increasing the bending strength, and an anchor bolt hole 12 is drilled to the bottom slab 14 as shown in FIG. It is installed by being inserted into the excavated anchor bolt 13.
제5도는 상부헌치 거푸집(1)의 받침대(2)에 설치되는 상부빔(30)의 상세도면으로 상부빔은 고정부재(31)와 이동부재(32)로 이루어지고 각각의 부재에는 고정구멍(33)(34)이 천공되어 있으며 이동부재(32)는 고정부재(31)내부에 슬라이브 되면서 들어가거나 나올수 있게 되어 있어 상부빔은 전체의 길이를 자유롭게 조절 할 수 있다.5 is a detailed view of the upper beam 30 installed on the pedestal 2 of the upper haunch formwork 1, and the upper beam is composed of the fixing member 31 and the moving member 32, and each of the fixing holes ( 33) 34 is perforated and the movable member 32 is allowed to enter or exit while being slid into the fixing member 31 so that the upper beam can freely adjust the entire length.
또한 제6도는 본 발명 조립식 형틀의 분해 도면이다.6 is an exploded view of the prefabricated mold of the present invention.
이와같이 구성되어지는 본 발명 조립식 형틀을 조립설치 할때는 먼저 바닥 슬라브(14)를 시공하고 그위에 형틀을 조립 설치하는데 바닥 슬라브(14)를 시공할때는 제4도와 같이 하부헌치 거푸집(10)이 설치되는 위치, 더욱 상세하게는 앙카 볼트공이 맞닿는 위치에 앙카볼트(13)를 설치하고 시공한다. 이 상태에서 앙카볼트(13)에 하부헌치 거푸집(10)의 앙카볼트공(12)를 끼워서 너트로 고정하면 하부헌치 거푸집(10)은 견고하게 바닥 슬라브(14)에 고정된다.When assembling and installing the present invention prefabricated mold configured as described above, first install the bottom slab 14, and then install the mold assembled thereon. When the bottom slab 14 is constructed, the position where the lower haunch formwork 10 is installed as shown in FIG. More specifically, the anchor bolt 13 is installed and constructed at the position where the anchor bolt hole abuts. In this state, when the anchor bolt hole 12 of the lower haul die 10 is inserted into the anchor bolt 13 and fixed with a nut, the lower haul die 10 is firmly fixed to the bottom slab 14.
그리고 구조물의 높이에 맞게 하부헌치 거푸집(10)위에 월판넬(25)을 설치하는데 이때는 도시되지 않은 보강재를 사용하게 되며 판넬과 판넬은 서로 별도의 연결구로서 결합되어진다. 또한 월판넬(25)의 조립이 완료되면 그 상측에 상부헌치 거푸집(1)을 설치하는데 이때도 도시생략한 버팀재를 사용하게 된다.And to install the wall panel 25 on the lower haunch formwork 10 according to the height of the structure, this time using a reinforcement not shown and the panel and the panel is combined as a separate connector. In addition, when the assembly of the wall panel 25 is completed, the upper haunch formwork (1) is installed on the upper side.
상부헌치 거푸집(1)의 받침대에는 신축자재한 상부빔(30)을 설치하는데 상부 빔(30)은 이동부재(32)를 고정부재(31)내부로 밀어넣거나 잡아당겨서 상부헌치 거푸집(1)의 받침대(2)에 고정설치한 후 고정구멍(33)(34)에 별도의 핀을 끼워서 길이가 고정되게 한다. 이와같이 설치된 상부빔(30)은 받침대(2)의 고정구(3)에 끼워지는 형태가 되므로 전후좌우로 유동이 될 수 없다.The upper beam 30 is installed on the pedestal of the upper haunch formwork 1 and the upper beam 30 is pushed or pulled by the moving member 32 into the fixing member 31. After fixing to the pedestal (2) by inserting a separate pin in the fixing holes 33, 34 so that the length is fixed. The upper beam 30 installed as described above is fitted to the fixture 3 of the pedestal 2 so that it cannot flow back and forth, left and right.
이 상태에서 상부빔(30)위에 슬라브 판넬(20)을 설치하면 모든 조립과정이 완료된다. 한편 해체시에는 조립할때의 역순으로 해체하면서 손쉽게 해체를 할 수 있게 된다. 이상과 같은 본 발명은 다음과 같은 장점을 얻을 수 있다.In this state, if the slab panel 20 is installed on the upper beam 30, all assembly processes are completed. On the other hand, when disassembling it can be easily dismantled in the reverse order of assembly. The present invention as described above can obtain the following advantages.
ㄱ. 구형콘크리트 구조체는 일련에서 다련까지 또한 소형단면에 대현단면까지 자유로히 완전 조립식으로 설치할 수 있다.A. The spherical concrete structure can be freely installed in a series from multiple to multi-sided and large cross-section side freely.
ㄴ. 거의 모든 부재가 취급 간편한 조립식이므로 설치작업속도가 대단히 빠르고 일정한 부재 사용에 의한 조립과 간단한 방법에 의해 설치가 자연적으로 정확하게 되므로 목수 기능공을 절대적으로 필요로하는 형틀작업을 일반공으로 대체 시공케하며 소요투입 인건비를 종래의 것보다 30~40% 절감할 수 있다.N. Since almost all members are easy to handle, the installation speed is very fast and the installation is natural and accurate by the simple method of assembly and the use of certain members. Therefore, the mold work that requires the carpenter's skill is absolutely required. Labor costs can be reduced by 30-40% compared to the conventional one.
ㄷ. 중장비와 특별한 기계 설비를 요구치 않고도 소요의 거푸집 치수와 형상을 정확하게 조립하고 자유로히 변경 적용할 수 있는 범용성(汎用性)을 가지고 있다.C. It has the versatility to precisely assemble and freely modify the required formwork dimensions and shapes without requiring heavy equipment and special mechanical equipment.
ㄹ. 강성이 높은 금속재(주로 철재)로 이루어지므로서 내구성이 일반적으로 3-5회 사용으로 폐기되는 목재에 비하여 본 발명은 30-70회 사용 가능하다.D. The present invention can be used 30-70 times as compared with wood which is made of high rigidity metal (mainly iron), which is generally discarded in 3-5 uses.
ㅁ. 금속면의 평활성과 높은 강성으로 조립되므로 미려하고 정교한 품질의 콘크리트 구조체를 이룩할 수 있다.M. Because of the smoothness and high rigidity of the metal surface, it is possible to achieve a beautiful and sophisticated concrete structure.
ㅂ. 조립후 내부공간이 목재 거푸집에 비하여 넓어 콘크리트 타설중 변형등에 대한 응급조치가 용이하며 해체시에도 간단한 공기구에 의해 신속하고도 편리하게 해체되므로 자재관리에 유리하다.Iii. After assembly, the internal space is wider than wood formwork, so it is easy to take emergency measures for deformation during concrete placing, and it is advantageous for material management because it is dismantled quickly and conveniently by simple air holes during disassembly.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019900018128A KR930007870B1 (en) | 1990-11-09 | 1990-11-09 | Prefabricated forms for a sewer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019900018128A KR930007870B1 (en) | 1990-11-09 | 1990-11-09 | Prefabricated forms for a sewer |
Publications (2)
Publication Number | Publication Date |
---|---|
KR920010100A KR920010100A (en) | 1992-06-26 |
KR930007870B1 true KR930007870B1 (en) | 1993-08-20 |
Family
ID=19305810
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1019900018128A KR930007870B1 (en) | 1990-11-09 | 1990-11-09 | Prefabricated forms for a sewer |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR930007870B1 (en) |
-
1990
- 1990-11-09 KR KR1019900018128A patent/KR930007870B1/en not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
KR920010100A (en) | 1992-06-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7743580B2 (en) | Tilt-up anchor and anchor pocket form | |
KR102243984B1 (en) | Non-supporting formwork system for retaining wall using self-supporting form and construction method thereof | |
KR930007870B1 (en) | Prefabricated forms for a sewer | |
US5676874A (en) | Floor form assembly and apparatus used therewith | |
KR102011988B1 (en) | Deck plate with detachable truss girder | |
KR20010092471A (en) | Wall ascending slab descending concrete casting method | |
JP2002030615A (en) | Construction method of tower structure | |
JP2000234410A (en) | Driven form and slab construction method making use thereof | |
CN111706005A (en) | Integrated reinforcing steel bar formwork-free cast-in-place concrete beam | |
KR200292762Y1 (en) | The fixers of a central supporting bar to construct Al-forms for a wall | |
JPH07109711A (en) | Continuous feeding method of concrete slab | |
CN216109254U (en) | Pre-buried structure of structure floor prestressing force pipeline | |
CN219100069U (en) | Light combined single-sided formwork system | |
KR100379574B1 (en) | Installing and separating system of outer steel form wall | |
KR200306741Y1 (en) | The mold prefabricated concrete | |
KR101046020B1 (en) | Formwork wedge joining structure for easy demoulding and reassembly | |
JP3026929B2 (en) | Pouch unit and construction method | |
KR970005528Y1 (en) | Prefabricated form | |
JPH07119522B2 (en) | Formwork device | |
JP3009298B2 (en) | Method of manufacturing PCa slab | |
JP2001026975A (en) | Construction method for lining plate for side ditch on farm road | |
KR200233527Y1 (en) | Mold for concreting both wall body and hunchy | |
KR960007039Y1 (en) | Brace for formwalls | |
KR100288983B1 (en) | Unit panel for slip form to form lining wall of vertical tunnel | |
JPH11182039A (en) | Column form method and fastening metal fittings therefor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
G160 | Decision to publish patent application | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20090821 Year of fee payment: 17 |
|
LAPS | Lapse due to unpaid annual fee |