KR900005839Y1 - Welding jig - Google Patents
Welding jig Download PDFInfo
- Publication number
- KR900005839Y1 KR900005839Y1 KR2019870023544U KR870023544U KR900005839Y1 KR 900005839 Y1 KR900005839 Y1 KR 900005839Y1 KR 2019870023544 U KR2019870023544 U KR 2019870023544U KR 870023544 U KR870023544 U KR 870023544U KR 900005839 Y1 KR900005839 Y1 KR 900005839Y1
- Authority
- KR
- South Korea
- Prior art keywords
- plate
- supporting
- welding jig
- support
- jig
- Prior art date
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
내용 없음.No content.
Description
제1도는 본 고안의 실시 및 구조 사시도.1 is a perspective view of the implementation and structure of the present invention.
제2-3도는 본 고안의 실시 설명도.2-3 is an explanatory view of the implementation of the present invention.
본 고안은 특히 선박건조시 더블시킨 버텀블록(BOBLE SKIN BOTTOM BLOCK) 제작시 플로워에 세로판(SONGI TUDINAL)을 용접할때 보강판위에서 세로판을 안전하게 받쳐주는 받침지그에 관한 것이다.The present invention particularly relates to a supporting jig that securely supports a vertical plate on a reinforcement plate when welding a vertical plate (SONGI TUDINAL) to a floor when manufacturing a double bottom block (BOBLE SKIN BOTTOM BLOCK).
종래 이러한 대형 철구조물에 제작시에는 크레인으로 세로판을 들어 올려서 플러워에 대고 보강판 옆에서 쇄기를 햄머로 때려 끼워서 받침을 형성한후 가용접을 하고 다시 햄머로 때려 빼내는 방법이어서 세로판의 정확한 위치 고정이 어렵고 고소작업임으로 안전사고의 위험이 뒤따를 뿐아니라 크레인으로 잡고 있는 시간이 길어지는 원시적인 공정이다.Conventionally, when manufacturing such a large steel structure, the vertical plate is lifted by a crane, and the hammer is placed on the side of the reinforcement plate, and a hammer is inserted into the base plate to form a support, and then the welding process is performed. It is a primitive process that is difficult to fix and is a high-rise operation, which not only entails the risk of safety accidents but also lengthens the time it takes to hold the crane.
본 고안은 이와 같은 특수 구조물의 제작을 용이하게한 것으로서 그 요지를 첨부도면에 의하여 상세히 설명하면 다음과 같다.The present invention is to facilitate the production of such a special structure as described in detail by the accompanying drawings as follows.
지지판(1)(1')위에 받침턱(2)과 받침편(3)(3')을 일체로 형성하고 지지판(1)(1')의 위에 소공을 뚫고 걸림봉(4)를 끼우며 지지판 중앙에 보울트(5)(5')를 나사 결합한 구조이다.On the supporting plate (1) (1 '), the supporting jaw (2) and the supporting piece (3) (3') are integrally formed, and through the small holes on the supporting plate (1) (1 '), the locking rod (4) is fitted. The bolts 5 and 5 'are screwed into the center of the support plate.
미설명 부호 6은 플로워 7는 보강판 8은 세로판이다.Reference numeral 6 denotes a floor 7 a reinforcement plate 8 a vertical plate.
이와 같이된 본 고안은 베이스에 용접한 플러워(6)과 보강판(7) 한개 한개마다 받침지그를 설치하는 것인데 먼저 걸럼봉(4)을 빼고 지지판(1)(1')과 받침편(3)(3')이 플로워(6)에 맞닫고 받침턱(2)과 받침편(3)(3')이 보강판(7)의 선단에 일치되게 지지판(1)(1')을 보강판(7)에 끼운후 걸림봉(4)을 지지판에 뚫린 소공에 끼워 위치설정한후 보울트(5)(5')를 조여 보강판에 고정시킨 다음 크레인으로 세포판(8)을 들어 올려 놓으면 정확한 위치에 받침지그 위에서 안치되는 것이여서 그 옆면과 플로워를 용접할 수 있는 것이다.The present invention as described above is to install the supporting jig for each one of the floor welder (6) and the reinforcing plate (7) welded to the base, and first remove the catch rod (4) and the support plate (1) (1 ') and the support piece ( 3) (3 ') reinforces the support plate (1) (1') so that the base (2) and the support piece (3) (3 ') are aligned with the tip of the reinforcing plate (7) close to the floor (6). After inserting into the plate (7) and positioning the locking rod (4) in the hole drilled in the support plate, tighten the bolts (5) (5 ') to secure the reinforcement plate and then lift the cell plate (8) by the crane It is placed on the supporting jig in the correct position so that the side and the floor can be welded.
그러므로 본 고안은 까다로운 형태의 대형철 구조물을 전문적으로 연속 제작할수 있는 지그로서 활용되어 크레인의 사용시간이 절약되고 정확한 위치 설정이 유지되어 작업성과 품질이 향상되며 안전사고가 예방되는 효과가 있는 것이다.Therefore, the present invention is utilized as a jig that can professionally produce a large-scale steel structure of the demanding form to save the use time of the crane, maintain the correct positioning to improve the workability and quality and to prevent the safety accident.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2019870023544U KR900005839Y1 (en) | 1987-12-29 | 1987-12-29 | Welding jig |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2019870023544U KR900005839Y1 (en) | 1987-12-29 | 1987-12-29 | Welding jig |
Publications (2)
Publication Number | Publication Date |
---|---|
KR890012810U KR890012810U (en) | 1989-08-07 |
KR900005839Y1 true KR900005839Y1 (en) | 1990-06-30 |
Family
ID=19270941
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR2019870023544U KR900005839Y1 (en) | 1987-12-29 | 1987-12-29 | Welding jig |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR900005839Y1 (en) |
-
1987
- 1987-12-29 KR KR2019870023544U patent/KR900005839Y1/en not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
KR890012810U (en) | 1989-08-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR900005839Y1 (en) | Welding jig | |
CN216840608U (en) | Portable beam mold board reinforced structure | |
CN213837848U (en) | Be suitable for housing construction structure beam bottom reinforcing apparatus of different cross-sections | |
CN210236845U (en) | Adjustable hanger for component steel reinforcement cage | |
CN209936194U (en) | Special point frock of piecing together of body frame right frame structure | |
CN216264637U (en) | Workpiece fixing jig for machining of numerical control lathe | |
JPH06129022A (en) | Joint member metallic material and building method and engineering method using the joint member metallic material | |
CN217619142U (en) | Positioning device of anchor rod fastener processing equipment | |
CN220560336U (en) | Reinforcement cage reinforcing bar positioning tool | |
CN214642093U (en) | Workpiece overturning device suitable for being matched with hoisting machinery to overturn workpieces | |
CN214462430U (en) | Novel worker is high altitude protection hanging flower basket for civil construction | |
CN216892844U (en) | Detachable steel truss bed-jig device | |
CN217205427U (en) | Detachable life upright rod mounting device | |
CN218109825U (en) | Vertical component welding auxiliary device | |
CN214169984U (en) | Novel adjustable self-adaptation interlocking formula crab-bolt locating sleeve frame | |
CN218016750U (en) | Main beam welding forming machine of electric single-beam crane | |
CN219030942U (en) | Smelting tool convenient to get material | |
CN218800587U (en) | Clamping mould for machining steel castings of excavator | |
CN217518189U (en) | Support die carrier of building on face empty concrete beam | |
CN212977469U (en) | Mining chain link is with flat chain link drilling frock that connects | |
CN218708597U (en) | Vertical hoisting auxiliary tool | |
CN218983738U (en) | Reversible clamping device | |
CN212803266U (en) | Supporting rack for steel arch construction | |
CN219704196U (en) | Clamping tool for angle steel machining | |
CN214692779U (en) | Elevator guide rail |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
REGI | Registration of establishment | ||
LAPS | Lapse due to unpaid annual fee |