KR900003062B1 - Mold transfer assembly - Google Patents

Mold transfer assembly Download PDF

Info

Publication number
KR900003062B1
KR900003062B1 KR1019840005698A KR840005698A KR900003062B1 KR 900003062 B1 KR900003062 B1 KR 900003062B1 KR 1019840005698 A KR1019840005698 A KR 1019840005698A KR 840005698 A KR840005698 A KR 840005698A KR 900003062 B1 KR900003062 B1 KR 900003062B1
Authority
KR
South Korea
Prior art keywords
mold
injection
molten metal
legs
filled
Prior art date
Application number
KR1019840005698A
Other languages
Korean (ko)
Other versions
KR860002327A (en
Inventor
더블유.제프리 리만
Original Assignee
암스테드 인더스트리즈 인코포레이티드
고든 알.로만
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 암스테드 인더스트리즈 인코포레이티드, 고든 알.로만 filed Critical 암스테드 인더스트리즈 인코포레이티드
Priority to KR1019840005698A priority Critical patent/KR900003062B1/en
Publication of KR860002327A publication Critical patent/KR860002327A/en
Application granted granted Critical
Publication of KR900003062B1 publication Critical patent/KR900003062B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D45/00Equipment for casting, not otherwise provided for

Abstract

Apparatus for use in pouring molten metal in the manufacture of cast metal articles comprises a mould transfer device having two lifting devices depending from an overhead bridge structure, movable such that a first device moves an empty mould from a pickup position onto a molten metal pouring station, whilst simultaneously a second device lift and moves a filled moluld away to a set down location. Moulds include a molten metal height control and mould stopper closing mechanism. The mould is filled by bottom injection from a pressurised pouring tank.

Description

주형이동장치를 구비한 주입(鑄入)조립체Injection assembly with mold transfer device

제 1 도는 본 발명에 의한 주형취급시스템의 부분단면 정면도.1 is a partial cross-sectional front view of the mold handling system according to the present invention.

제 2 도는 제 1 도의 선 2-2에서 본 측면도.FIG. 2 is a side view as seen from line 2-2 of FIG.

* 도면의 주요부분에 대한 부호의 설명* Explanation of symbols for main parts of the drawings

10 : 주형 12 : 주입탱크10: mold 12: injection tank

14 : 주입관 16 : 상주형14: injection tube 16: permanent column

18 : 하주형 19 : 세트-다운크레인18: lower casting 19: set-down crane

20, 22, 62 : 다리부 24 : 상부프레임조립체20, 22, 62: leg portion 24: upper frame assembly

25 : 픽업크레인 26 : 중간지지거어더25: pickup crane 26: intermediate support girder

28, 30 : 주 지지레일 32, 34 : 주형고정실린더28, 30: main support rail 32, 34: mold fixing cylinder

36 : 주형스톱퍼 38 : 라이저높이제어기구36: mold stopper 38: riser height control mechanism

40 : 빈주형픽업부 42 : 세트-다운부(set-down position)40: empty mold pick-up part 42: set-down position

본 발명은 주조 금속제품의 제조에 관한 것으로 더 구체적으로는, 빈주형이 주입부(鑄入部)위를 움직이는 동안 주입부로부터 용융금속이 채워지는 주형을 고정하고 또한 용융금속으로 채워진 주형을 이동시키는 장치 및 방법에 관한 것이다.TECHNICAL FIELD The present invention relates to the manufacture of cast metal products, and more particularly, to fix a mold filled with molten metal from the injection portion while moving the hollow mold on the injection portion, and to move the mold filled with the molten metal. An apparatus and method are provided.

기차바퀴와 같은 주조금속제품의 제조에 있어서는, 비용절감 및 에너지절감의 견지에서 그러한 바퀴를 최종주물에 요구되는 정밀도를 유지하면서 가능한한 신속하게 제조하는 것이 중요하다. 대표적인 바퀴주조공장의 레이-아웃(lay-out)이 미국특허 제 2, 999, 281호에 기술되어 있다. 상부 주형부분 즉 상주형(cope)이 저부 주형부분 즉 하주형(drag)위에 배치됨으로써 완전한 주형을 형성한다. 대개, 그 주형은 재사용이 가능한 흑연주형이다. 완전한 주형이 컨베이어를 따라 주입부에 인접한 픽업부(pick up station)로 이동되면 픽업크레인이 그주형을 들어올려 주입탱크위의 주입부(pouring station)에 놓는다. 그 주형은 주입탱크위에 배치되는데, 이는 용융금속을 주형내에 주입하기 위하여 바닥주입식 주조방법(bottom pressure pouring method)이 이용되기 때문이다. 용융금속을 수용하고 있는 래들이 주입탱크내에 배치된다. 주입탱크는 공기로써 가압될 수 있으므로, 이에 의해 용융금속이 내화주입관을 통해 상방으로 주형의저부로 강제로 흐르도록 할 수 있다. 주형을 채우기전에, 주형은 통상 상주형에 접촉하도록 하방으로 연장하는 공기 실린더에 의해 제위치에 지지되어야 한다.In the manufacture of cast metal products such as train wheels, it is important to manufacture such wheels as quickly as possible while maintaining the precision required for the final casting in terms of cost and energy savings. The lay-out of a representative wheel foundry is described in US Pat. No. 2,999,281. An upper mold portion, or cope, is placed over the bottom mold portion, or drag, to form a complete mold. Usually, the mold is a reusable graphite mold. When the complete mold is moved along the conveyor to a pick up station adjacent to the inlet, the pick-up crane lifts the mold and places it in a pouring station on the infusion tank. The mold is placed on an injection tank because a bottom pressure pouring method is used to inject molten metal into the mold. Ladles containing molten metal are placed in the injection tanks. The injection tank can be pressurized with air, thereby forcing molten metal to flow upward through the refractory injection pipe to the bottom of the mold. Before filling the mold, the mold must be held in place by an air cylinder which normally extends downward to contact the permanent mold.

또한, 주형스톱퍼조립체는 주형의 스톱퍼구멍위로 다시 공기실린더에 의해 하강되어야 한다. 마지막으로, 라이저(riser)높이 제어기구가 주형라이저내로 하강되어야하며, 이에따라 라이저내의 용융금속의 높이가 측정되고, 이와같이하여 주입조작이 자동적으로 제어되는 것이다.In addition, the mold stopper assembly must be lowered by the air cylinder back onto the stopper hole of the mold. Finally, the riser height control mechanism must be lowered into the mold riser, whereby the height of the molten metal in the riser is measured and thus the injection operation is automatically controlled.

이들 3가지 기구들, 즉 고정실린더(hold down cylinder), 주형스톱퍼 및 라이저높이 제어기구들은 용융금속으로 채워진 주형을 픽업하여 주형이 컨베이어를 따라 계속 처리되기 시작하는 주형세트 다운위치까지 이송시키는데 사용되는 주형세트다운 크레인 다리(legs)에 미리 위치한다.These three instruments, the hold down cylinder, the mold stopper and the riser height control mechanism, are used to pick up the mold filled with molten metal and transport it to the mold set down position where the mold continues to be processed along the conveyor. Pre-positioned on the mold set-down crane legs.

상기 주형배출부로부터 충만된 주형은 컨베이어들을 따라 연속이동된다. 주형 세트-다운 크레인 및 주형 픽업크레인 각각 2개의 다리를 가지는 지주조립체(column assembly)에 각각 루비하고 있으며, 양지주 조립체들은 하나의 상부프레임 조립체상(top frame assembly)에 장착된다. 그러한 상부 프레임 조립체는 부(副)거어더(secondary girder)를 따라 측방으로 이동가능하며, 부(副)거어더 자신은 부거어더로 하여금 주입부에 관하여 종방향으로 이동할 수 있게 하는 주(主)거어더상에 장착된 크레인 조립체를 포함한다.The mold filled from the mold discharge portion is continuously moved along the conveyors. The mold set-down crane and the mold pick-up crane are each rubbed in a column assembly with two legs, and the bipedal assemblies are mounted on one top frame assembly. Such an upper frame assembly is laterally movable along the secondary girder, and the secondary girder itself is capable of allowing the girder to move longitudinally relative to the inlet. And a crane assembly mounted on the girder.

픽업 크레인과 세트-다운크레인이 하나의 상부프레임 조립체상에 장착되어있기때문에, 부(副)거어더를 따라 이동하는 그 크레인의 측방운동은 동시에 행해지고 그들의 측방이동거리는 동일하다.Since the pick-up crane and the set-down crane are mounted on one upper frame assembly, the lateral movements of the crane moving along the secondary girder are performed simultaneously and their lateral travel distances are the same.

공지구조의 주입과정에 있어서, 용융금속으로 방금 채워진 주형은 주입부에 위치하고 빈 주형은 주형픽업부에 위치한다. 주형고정조립체, 주형스톱퍼 및 라이저높이 제어지구는 세트-다운크레인에 부착되어있고, 주입완료후, 주형으로부터 들어올려진다. 다음, 세트-다운 크레인이 용융금속으로 충만된 주형을 들어 올리고 동시에 픽업 크레인은 빈 주형을 들어 올린다.In the injection process of the known structure, the mold just filled with molten metal is placed in the injection section and the empty mold is located in the mold pickup section. The mold clamping assembly, mold stopper and riser height control strip are attached to the set-down crane and lifted out of the mold after completion of injection. Next, the set-down crane lifts the mold filled with molten metal and at the same time the pickup crane lifts the empty mold.

그후, 양크레인을 지지하는 프레임 조립체가 부(剖)거어더를 따라 측방으로 이동된다. 용융금속으로 채워진 주형은 세트-다운 크레인에의해 세트다운지점에 위치되며, 빈주형은 픽업크레인에 의해 주입부에 위치된다.Thereafter, the frame assembly for supporting both cranes is moved laterally along the secondary girder. The mold filled with molten metal is placed at the set down point by the set-down crane, and the empty mold is placed in the injection section by the pickup crane.

다음, 세트다운 크레인과 픽업크레인은 그들의 프레임조립체를 통해 부(副)거어더를 따라 측방으로 이동된다. 세트-다운 크레인이 주입부에 도달하면 주형 고정조립체 및 라이저높이 제어기구는 빈 주형까지 하강되고 주입조작이 시작된다. 주형이 채워진후 주형스톱퍼가 하강된다.The set down crane and the pick-up crane are then moved laterally along the side girder through their frame assemblies. When the set-down crane reaches the injection section, the mold clamping assembly and riser height control mechanism are lowered to the empty mold and the injection operation starts. After the mold is filled, the mold stopper is lowered.

본 발명의 목적은, 주입부에서의 개량된 주형취급설비를 제공하는데 있다.It is an object of the present invention to provide an improved mold handling facility in an injection section.

본 발명은 바닥주입식 주주공장을 위한 개량된 주형처리시스템을 제공한다.The present invention provides an improved mold processing system for a bottom injection shareholder factory.

본 발명의 주입장치에서는, 용융금속으로 채워진 주형은, 주형고정조립체, 주형스톱퍼 및 라이저높이 제어기구가 주형으로부터 들어올려진후 세트-다운 크레인에 의해 주입부로부터 이동된다. 그 충만된 주형이 세트-다운크레인에 의해 주입부로부터 이동될때 빈 주형은 주형픽업 크레인에 의해 주입부로 이동된다. 그러나, 주형고정 조립체, 주형스톱퍼 및 라이저 높이 제어기구가 세트-다운 크레인에 부착되지 않고 부(부副)거어더에 부착되어있어 빈주형이 주입부에 위치되자마자 주형고정조립체, 주형스톱퍼 및 라이저높이 제어기구가 주형위로 하강될 수 있게 된다.In the injection apparatus of the present invention, the mold filled with molten metal is moved from the injection portion by a set-down crane after the mold fixing assembly, the mold stopper and the riser height control mechanism are lifted from the mold. The empty mold is moved to the injection portion by the mold pick-up crane when the filled mold is moved out of the injection portion by the set-down crane. However, the mold fixing assembly, mold stopper and riser height control mechanism are not attached to the set-down crane but attached to the auxiliary girder so that the mold fixing assembly, the mold stopper and the riser as soon as the empty mold is placed in the injection section. The height control mechanism can be lowered onto the mold.

따라서, 세트-다운 크레인이 주입부로 복귀되기전에 주입동작이 시작될수 있는 것이다. 1회 주조에서 약 8초의 시간이 단축되고 따라서, 24시간에 1000개의 주물을 공장에서 24시간에 약1100개의 생산될 수 있어 10%의 생산성증가가 얻어지게되는 것이다.Thus, the injection operation can be started before the set-down crane is returned to the injection portion. In one casting, the time is reduced by about 8 seconds, and thus 1000 castings can be produced at the plant in 24 hours in 24 hours, resulting in a productivity increase of 10%.

본 발명에 의하면, 상부프레임과 두세트의 다리부를 포함하는 주형이동장치, 브리지(bridge)구조물, 및 래들을 수용한 주입탱크로 이루어지는 주조금속제품 제조에 사용되는 주입조립체가 제공되며, 상기 상부프레임은 상기 브리지구조물을 따라 이동하는 적합하게 되어있으며, 상기 주입탱크는 용융금속이 내부의 래들로부터 상방으로 주입되도록 가입할 수 있으며, 상기 주입탱크는 상기 브리지구조물 아래의 주입부에 위치하며, 상기 주형이동장치의 상기다리부들중 제 1 셋트는 빈주형을 픽업위치에서 상기 주입부로 이동시키는데 적합하게 되어있으며, 상기 주형이송장치의 상기다리부들중 제 2 세트는 용융금속이 채워진 주형을 상기 빈주형의 이동과 상기 주입부로부터 세트-다운 위치까지 이동시키기에 적합하게 되었으며, 상기 브리지구조물은 빈주형이 상기 주입부에 위치되는 직후 채워지기 시작하도록 상기 주형을 상기 주형부에 보지(保持)시키기 위한 수단을 구비한다.According to the present invention, there is provided an injection assembly for use in the manufacture of cast metal products comprising an injection tank containing a mold transfer device, a bridge structure, and a ladle including an upper frame and two sets of legs, the upper frame Is adapted to move along the bridge structure, the injection tank may be joined so that molten metal is injected upward from the ladle therein, and the injection tank is located at the injection portion below the bridge structure, and the mold A first set of the leg portions of the transfer device is adapted to move the empty mold from the pick-up position to the injection portion, and a second set of the leg portions of the mold transfer apparatus is adapted to transfer a mold filled with molten metal to the empty mold. Adapted to move and move from the injection section to the set-down position, the bridge structure The blank mold includes a means for not (保持) of the mold in the state immediately after the male part so as to begin to fill, which is located at said inlet.

본 발명은 또한 용융금속으로 채워진 주형을 주입부로부터 세트-다운 위치로 이동시킴과 동시에 빈주형을 픽-업부로부터 상기 주입부로 이동시키는 단계를 포함하는 주조금속제품 제조방법을 제공한다.The present invention also provides a method of manufacturing a cast metal product comprising moving a mold filled with molten metal from an injection portion to a set-down position and simultaneously moving an empty mold from a pick-up portion to the injection portion.

이하 본 발명의바람직한 실시예를 첨부도면에 따라 설명한다. 주입부 및 주형취급시스템이 제 1 및 제 2 도에 도시되어있다. 주형(10)은 주입부에서 중앙에 위치되고 주입탱크(12)의 상부에 위치하여 내화주입관(14)에 의해 주입탱크(12)와 접속된다. 주형(10)은 상주형(上鑄型)(16)과 하주형(下鑄型)(18)로 이루어져있다.DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, preferred embodiments of the present invention will be described with reference to the accompanying drawings. The injection section and the mold handling system are shown in FIGS. 1 and 2. The mold 10 is located at the center of the injection portion and is positioned above the injection tank 12 and connected to the injection tank 12 by the refractory injection pipe 14. The mold 10 is composed of an upper mold 16 and a lower mold 18.

통상 이같은 주형은 변형하지않는 물질로 되어있으며, 내화물질로서 압축그라파이트를 이용한다. 세트-다운크레인(19)는 전방 다리부(20)과 도시되지않은 후방 다리부를 가지고있고, 픽업 크레인(25)는 전방다리부(22)와 후방다리부(62)를 가지고 있다. 상기 모든 다리부들은 상부프레임조립체(24)에 의해 지지되어 있다.Typically, such a mold is made of a material that does not deform and uses compressed graphite as a refractory material. The set-down crane 19 has a front leg 20 and a rear leg not shown, and the pickup crane 25 has a front leg 22 and a rear leg 62. All of these legs are supported by the upper frame assembly 24.

세트-다운크레인의 전방 다리부(20)의 하부부분(21)과 도시되지않은 후방다리부의 하부부분, 및 픽업크레인의 전방다리부(22)의 하부부분(23)과 후방다리부(62)의 하부부분(64)는 각 크레인내의 압축공기 실린더(50) 및 (51)에 의해 지지되어있는 가동(可動)부분들이다. 세트-다운 크레인(19)의 다리부들의 하부부분들, 및 픽-크레인(25)의 리부들의 하부부분들(23, 64)은 각각 서로 협동하여, 주형(10)에 접촉하고 그 주형을 들어올리도록 작동한다. 상부프레임조립체(24)는 중간지지거어더(26)을 가로질러 횡으로 이동가능한 비임(beam)구조물이다. 중간지지거어더(girder)(26)는 주 지지레일(28, 30)을 가로질러 종방으로 이동할 수 있다.Lower part 21 of the front leg 20 of the set-down crane and lower part of the rear leg, not shown, and lower part 23 and rear leg 62 of the front leg 22 of the pickup crane. Lower portions 64 are movable portions supported by the compressed air cylinders 50 and 51 in each crane. Lower portions of the legs of the set-down crane 19 and lower portions 23 and 64 of the ribs of the pick-crane 25 cooperate with each other to contact the mold 10 and to remove the mold. It works to lift. Upper frame assembly 24 is a beam structure that is movable laterally across intermediate support girder 26. The intermediate support girder 26 can move longitudinally across the main support rails 28, 30.

통상 압축공기 타입의 피스톤실린더인 주형 고정실린더(32, 34)와 내화스톱퍼를 구비한 역시압축공기타입의 실린더인 주형실린더(36) 및 라이저(riser)높이 제어기구(38)이 중간 지지거어더(26)에 매달려 설치되어있다. 상기 내화스톱퍼는 통상주형에 장착되어있고 실린더에는 연결되어있지않다. 라이저높이 제어기구(38)은 각종 형태의 것일 있으나, 대개 주형 이저내로 연장하여있고, 미리 설정된 높이까지 용융금속이 상승한 것을 검출하면, 용융금속의 주입을 중지시키도록 신호를 발생한다.Molded cylinders 32 and 34, which are piston cylinders of compressed air type, and mold cylinders 36 and riser height control mechanism 38, which are also compressed air type cylinders with refractory stoppers, are intermediate supporting girders. 26 is installed hanging. The fire resistant stopper is usually mounted on a mold and is not connected to a cylinder. The riser height control mechanism 38 is of various types, but usually extends into the mold riser, and when it detects that the molten metal has risen to a predetermined height, a signal is generated to stop the injection of the molten metal.

상부프레임 조립체(24)가 도면에서 우측으로 이동하면, 세트-다운 크레인다리부0)이 주입부에서 주형(10)과 정렬된다. 용융금속으로 채워진 주형(10)이 세트-다운 크레인다리부(20)에 의해 들어올려짐과 동시에, 픽업크레인(22)는 주형픽-업부(40)에 위치되며, 그위치에서 픽업크레인이 빈주형을 들어올리게된다. 상부 프레임조립체(24)가 좌측으로 이동함에 따라, 충만된 주형은 주형세트-다운부(42)로 이동되어 세트-다운한다.When the upper frame assembly 24 moves to the right in the figure, the set-down crane leg 0 is aligned with the mold 10 at the inlet. At the same time as the mold 10 filled with molten metal is lifted by the set-down crane leg 20, the pickup crane 22 is located in the mold pick-up portion 40, where the pickup crane is empty. Will lift. As the upper frame assembly 24 moves to the left, the filled mold moves to the mold set-down portion 42 and sets down.

동시에, 픽업크레인다리부(22)가 빈 형을 주입부에 내려놓는다. 고정실린더(32, 34) 라이저높이 제어기구(38)이 빈 주형까지 하강되고 용융금속의 주입이 시작된다. 주형이 채워진후, 주형 스톱퍼(36)이 하강된다. 한편, 상부프레임조립체(24)는 우측으로 이동하여, 세트-다운 크레인다리부(20))에 의해 주입부에서 충만된 주형을 들어올리고 또한 픽업크레인(22)에 의해서 주형픽업부(40),의 빈 주형을 들어올리기 위한 준비를 한다. 2개의 제 2 의 고정실린더(52, 53)은 세트-다운 크레인의 전방다리부(20)과 도시되지않은 후방다리부에 부착되며, 이들 실린더는 대개 압축공기타입의 피스톤실린더이며, 주입부(12)로부터 세트-다운부(set-down position)(42)로 이동될 때, 충만된 주형을 폐쇄된 채 유지시키는 작용을 한다.At the same time, the pick-up crane leg 22 lowers the empty mold into the injection portion. The fixed cylinders 32, 34 riser height control mechanism 38 is lowered to the empty mold and injection of molten metal is started. After the mold is filled, the mold stopper 36 is lowered. On the other hand, the upper frame assembly 24 moves to the right, lifts the mold filled in the injection portion by the set-down crane leg 20, and the mold pickup portion 40 by the pickup crane 22, Be prepared to lift your empty mold. Two second stationary cylinders 52, 53 are attached to the front leg 20 and the rear leg, not shown, of the set-down crane, and these cylinders are usually compressed air type piston cylinders. When moved from 12) to a set-down position 42, it serves to keep the filled mold closed.

Claims (7)

상부프레임과 두셋트의 다리부로 이루어진 주형이동장치, 브릿지구조물, 및 래들을 수용하고있는 주입탱크로 구성되고, 상기 상부프레임이 상기 브릿지구조물을 따라 이동하도록 되어있고, 상기 주입탱크는 용융금속이 내부의 래들로부터 상방으로 주입되도록 가입될수 있고 상기 브릿지구조물 아래 주입부에 위치되어있으며, 상기 주형이동장치의 상기 다리부들중 1 셋트의 다리부는 빈주형을 픽-업위치(40)에서 상기 주입부로 이동시키기에 적합하게 되어있으며 다른 하나의 셋트의 다리부들은 상기 빈주형의 이동과 동시에, 용융금속으로 충만된 주형을 상기 주입부로부터 세트-다운부까지 이동시키는데 적합하게 되어있고, 상기 브릿지구조물은 빈주형이 상기 주입부에 위치된 직후 용융금속으로 채워지기 시작하도록 상기 주형을 주입부에 보지(保持)시키는 수단을 구비하는 구조로된 주조금속제품의 제조를 위한 주입조립체.It consists of an injection tank containing a mold transfer device consisting of an upper frame and two sets of legs, a bridge structure, and a ladle, wherein the upper frame is configured to move along the bridge structure, and the injection tank has molten metal therein. Can be joined so as to be injected upward from the ladle and located at an injection portion below the bridge structure, wherein one set of legs of the legs of the mold transfer device moves the empty mold from the pick-up position 40 to the injection portion. The other set of legs is adapted to move the mold filled with molten metal from the injection section to the set-down section, at the same time as the hollow mold moves. Hold the mold in the inlet to begin filling with molten metal immediately after the mold is placed in the inlet. An injection assembly for the production of cast metal products having a structure having a means for guaranteeing. 제 1 항에 있어서, 상기 브릿지 구조물은 나아가 주형스톱퍼가 폐쇄기구를 포함함을 특징으로하는 주입조립체.The injection assembly of claim 1, wherein the bridge structure further comprises a mold stopper comprising a closing mechanism. 제 1 항에 있어서, 상기 브릿지구조물은 나아가 라이저용융 금속높이 제어기구를 포함함을 특징으로하는 주입조립체.The injection assembly of claim 1, wherein the bridge structure further comprises a riser molten metal height control mechanism. 제 1 항에 있어서, 각 셋트의 상기 다리부들이 주형을 들어올리수 있는 실린더를 구비함을 특징으로하는 주입조립체.The injection assembly of claim 1 wherein each set of legs has a cylinder to lift the mold. 제 1 항에 있어서, 상기 주형을 주입부에 보지시키는 상기 수단은 주형에 접촉하도록 하방으로 연장하는 2개의 공기실린더를 포함함을 특징으로 하는 주입조립체.2. The injection assembly of claim 1, wherein the means for retaining the mold in the injection section includes two air cylinders extending downward to contact the mold. 제 2 항에 있어서, 상기 주형스톱퍼는, 주형에 접촉하도록 하방으로 연장하는 공기실린더상에 장착됨을 특징으로 하는 주입조립체.3. The injection assembly of claim 2, wherein the mold stopper is mounted on an air cylinder extending downward to contact the mold. 제 1 항에 있어서, 충만된 주형을 세트다운부로 이동시키는 상기 다리부들이, 이동중에 그 충만된 주형을 폐쇄된 채 유지하는데 적합하게된 제 2 의 고정공기실린더들을 구비함을 특징으로하는 주입조립체.2. The injection assembly of claim 1, wherein the legs for moving the filled mold to the set-down portion have second fixed air cylinders adapted to hold the filled mold closed during movement. .
KR1019840005698A 1984-09-18 1984-09-18 Mold transfer assembly KR900003062B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1019840005698A KR900003062B1 (en) 1984-09-18 1984-09-18 Mold transfer assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1019840005698A KR900003062B1 (en) 1984-09-18 1984-09-18 Mold transfer assembly

Publications (2)

Publication Number Publication Date
KR860002327A KR860002327A (en) 1986-04-24
KR900003062B1 true KR900003062B1 (en) 1990-05-07

Family

ID=19235436

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1019840005698A KR900003062B1 (en) 1984-09-18 1984-09-18 Mold transfer assembly

Country Status (1)

Country Link
KR (1) KR900003062B1 (en)

Also Published As

Publication number Publication date
KR860002327A (en) 1986-04-24

Similar Documents

Publication Publication Date Title
AU2001291915B2 (en) Method and apparatus for casting metal
US3459312A (en) Car having ladle supporting and positioning means
CN104858404B (en) Spray hangs out method and device
EP0297761B1 (en) Lost foam casting system
CN110681852B (en) Cast steel casting manufacturing system
US4224979A (en) Automatic foundry system
US3530927A (en) Method of fabrication of metals by pressure casting
CN1012261B (en) Locating device of casting pattern
KR900003062B1 (en) Mold transfer assembly
US3989094A (en) Apparatus for producing castings from flaskless sand molds
US6216767B1 (en) Mold handling apparatus
EP0177644B1 (en) Mold transfer assembly
US4585048A (en) Mold transfer assembly
US3446269A (en) Apparatus for the transporting of the intermediate container of continuous casting machines
JPS6167564A (en) Molten metal pouring device for casting and casting method
KR200327673Y1 (en) Cart exchanging and tilting device of torpedo ladle car
JPH0649419Y2 (en) Continuous casting machine pouring equipment
JPS6466050A (en) Device for inserting insulating jig for molten steel
US3877612A (en) Ladle handling apparatus for continuous casting
JPH0232063B2 (en) TATEGATADAIKASUTOKINOKANAGATAKOKANSOCHI
US4741382A (en) Process for producing pigs as finished products
JPS635846A (en) Metallic mold changing device for molding machine
SU1447566A1 (en) Automatic moulding line
JPS6326251A (en) Low-pressure casting device
US4291745A (en) Foundry mold jacket

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
G160 Decision to publish patent application
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 19980430

Year of fee payment: 9

LAPS Lapse due to unpaid annual fee