KR860000403Y1 - Prefabricated roof - Google Patents

Prefabricated roof Download PDF

Info

Publication number
KR860000403Y1
KR860000403Y1 KR2019830008951U KR830008951U KR860000403Y1 KR 860000403 Y1 KR860000403 Y1 KR 860000403Y1 KR 2019830008951 U KR2019830008951 U KR 2019830008951U KR 830008951 U KR830008951 U KR 830008951U KR 860000403 Y1 KR860000403 Y1 KR 860000403Y1
Authority
KR
South Korea
Prior art keywords
thread
ridge
roof
stopper
present
Prior art date
Application number
KR2019830008951U
Other languages
Korean (ko)
Other versions
KR850003325U (en
Inventor
신민순
Original Assignee
신민순
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 신민순 filed Critical 신민순
Priority to KR2019830008951U priority Critical patent/KR860000403Y1/en
Publication of KR850003325U publication Critical patent/KR850003325U/en
Application granted granted Critical
Publication of KR860000403Y1 publication Critical patent/KR860000403Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D1/00Roof covering by making use of tiles, slates, shingles, or other small roofing elements
    • E04D1/30Special roof-covering elements, e.g. ridge tiles, gutter tiles, gable tiles, ventilation tiles
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
    • E04D13/15Trimming strips; Edge strips; Fascias; Expansion joints for roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D1/00Roof covering by making use of tiles, slates, shingles, or other small roofing elements
    • E04D1/30Special roof-covering elements, e.g. ridge tiles, gutter tiles, gable tiles, ventilation tiles
    • E04D2001/304Special roof-covering elements, e.g. ridge tiles, gutter tiles, gable tiles, ventilation tiles at roof intersections, e.g. valley tiles, ridge tiles
    • E04D2001/305Ridge or hip tiles

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

내용 없음.No content.

Description

조립식 지붕Prefab roof

제1도는 본 고안의 설치 상태 단면도.1 is a cross-sectional view of the installation state of the present invention.

제2도는 본 고안의 분해 사시도.2 is an exploded perspective view of the present invention.

제3도는 본 고안의 용마루 종 단면도.3 is a ridged longitudinal section of the present invention.

제4도는 본 고안의 용마루에 마개를 설치한 상태의 종단면도.Figure 4 is a longitudinal cross-sectional view of the plug installed on the ridge of the present invention.

제5도 및 제6도는 본 고안의 용마루에 마개를 설치하는 상태를 나타낸 횡 단면도.5 and 6 are lateral cross-sectional view showing a state where a stopper is installed on the ridge of the present invention.

제7도는 본 고안의 지붕 하부에 설치되는 스레트의 단면도.7 is a cross-sectional view of the thread installed in the lower part of the roof of the present invention.

제8도는 본 고안의 지붕 최상부에 설치되는 스레트의 단면도.8 is a cross-sectional view of a thread installed on the top of the roof of the present invention.

제9도는 본 고안의 지붕 최상부에 설치되는 스레트의 평면도.9 is a plan view of a thread installed on the top of the roof of the present invention.

* 도면의 주요 부분에 대한 부호 설명* Explanation of symbols on the main parts of the drawing

1 : 지붕 골재 2 : 고정구1: roof aggregate 2: fixture

4, 5 : 스레트 6 : 단열판4, 5: thread 6: heat insulation board

7 : 삽입구 8 : 스레트(5)에 설치한 고정구7: Insertion hole 8: Fixture installed in the thread 5

10, 16 : 결합구 11 : 용마루10, 16: coupler 11: ridge

13 : 삽입구 15 : 마개13: insertion hole 15: stopper

본 고안은 스레트를 이용하는 지붕에 스레트와 용마루를 용이하게 조립 설치토록 하므로서 설치 시공이 용이하도록 한 조립식 지붕에 관한 것이다.The present invention relates to a prefabricated roof to facilitate the installation and construction by allowing the easy installation and mounting of the split and ridge on the roof using the split.

종래의 스레트를 이용하는 지붕에는 스레트를 여러 개의 긴 못으로 지붕이 고정 설치하고 이의 상단에 석회질이나, 콘크리트재의 용마루를 적층시켜 큰크리트 등으로 접합토록 하여 설치 시공하고 있었다.On the roof using a conventional thread, the roof is fixedly installed with a plurality of long nails, and a laminate of calcite or concrete material is laminated on the upper end of the roof to be joined with large concrete.

그러나 이와 같은 것은 스레트를 설치하는 과정에서 스레트를 못으로 박아야 하므로서 시공시 스레트의 파손이 염려가 되고 또 용마루를 콘크리트 등을 이용하여 축조해야 하는 불편한 점이 있으며, 또 강풍 등에 의하여 축조 상태가 흐트러지거나 파손될 염려가 있고 스레트의 상단에 용마루를 설치하는 작업이 매우 까다롭게 되는 점 등의 문제점을 지니고 있었다. 한편, 상기와 같은 점을 감안하여 용마루나 기와를 조립식으로 한 것이 본 출원인에 의하여 안출된 바 있으나(실용신안 공고 제 83-911호 및 제 83-912호 참조), 이는 연결구와 고정구를 절곡 형성하므로서 결합되는 부분이 적고 따라서 조립된 상태에서도 유동되거나 조립 상태가 불안해지는 점 등의 결점이 있었다.However, such a thing may cause the damage of the thread during construction because it must be nailed with the nail during the installation of the thread, and it is inconvenient to construct the ridge using concrete, etc. There was a risk of breakage, and the installation of the ridge on the top of the thread was very difficult to work. On the other hand, in view of the above, it was proposed by the present applicant to prefabricated the ridge or tile (see Utility Model Publication Nos. 83-911 and 83-912), which forms the bent connector and the fixture As a result, there are few defects such as a small number of parts to be joined and thus the flow or assembly state becomes unstable even in the assembled state.

본 고안은 종래의 이러한 결점을 해결하기 위하여 안출한 것으로 이를 첨부된 도면에 의하여 상세히 설명하면 다음과 같다.The present invention has been devised to solve the above-described drawbacks, which will be described in detail with reference to the accompanying drawings.

지붕 골재(1)의 상면에 수개의 고정구(2)(3)를 설치하고, 저면에 단열판(6)을 형성한 스레트(4)(5)의 저면부에 각 스레트(4)(5)의 높이에 따른 원뿔형 삽입구(7)를 수개 형성하며 최상부 스레트(5)의 상부 상면에는 상기 삽입구(7)의 직각 방향으로 절결부(9)를 형성한 고정구(8)와 결합구(l0)를 설치하고 스레트(4)(5)의 삽입구(7)가 지붕 골재(1)의 고정구(2)(3)에 설치되도록 하며, 표면에 사기질 티막(12)을 도포한 용마루(11)의 저면에 원뿔형 삽입구(13)를 지지편(14)으로 여러개 고정 설치하여 이 삽입구(13)가 스레트(5)의 고정구(8)에 결합토록 하고 용마루(11)에는 절결부(l7)를 형성하고 지지편(18)을 가진 결합구(16)를 저면에 형성한 마개(15)를 설치하되, 이의 결합구(16)는 스레트(5)의 결합구(10)에 결합도록 구성하여서 된 것이다.Each of the threads 4 and 5 is provided at the bottom of the struts 4 and 5 in which several fasteners 2 and 3 are provided on the top surface of the roof aggregate 1 and the heat insulation plate 6 is formed on the bottom surface. A plurality of conical insertion holes 7 are formed according to the height, and a fastener 8 and a coupling device 10 formed with cutouts 9 formed at right angles of the insertion hole 7 on the upper upper surface of the uppermost thread 5. And inserting holes 7 of the slits 4 and 5 are installed in the fasteners 2 and 3 of the roof aggregate 1, and conical on the bottom surface of the ridge 11 coated with an enamel tee film 12 on the surface. A plurality of insertion holes 13 are fixedly installed with the support pieces 14 so that the insertion holes 13 are coupled to the fasteners 8 of the thread 5, and a cutout l7 is formed on the ridge 11 and a support piece ( 18 is provided with a stopper 15 having a coupling member 16 formed on the bottom thereof, the coupling tool 16 of which is configured to be coupled to the coupling tool 10 of the thread 5.

이상과 같이 구성된 본 고안은 제1도에서와 같이 지붕 골재(1)에 설치된 고정구(2)에 삽입구(7)를 가진 스레트(4)를 하방으로부터 차례로 적층하되, 이의 삽입구(7)가 고정구(2)에 삽입 설치되도록 하고 적층된 스레트(4)의 최상부에는 삽입구(7), 고정구(8) 및 결합구(10)를 가진 스레트(5)를 설치하며 이의 삽입구(7)는 지붕 골재(1)의 고정구(3)에 삽입 설치되도록 한다.The present invention constituted as described above is laminated with a thread 4 having an insertion hole 7 in order from the bottom in the fastener 2 installed in the roof aggregate 1, as shown in Figure 1, the insertion hole 7 of the fastener ( 2) and a thread 5 having an insertion hole 7, a fixture 8, and a coupling 10 is installed at the top of the stacked thread 4, and the insertion hole 7 is a roof aggregate (1). Insert into the fixture (3) of the).

이와 같이 지붕 골재(1)에 스레트(4)(5)의 설치가 끝나면, 최상부 스레트(5)의 고정구(8)에 용마루(11)의 삽입구(13)가 삽입 설치되도록 하되, 이의 수직 부분이 절결부(9) 사이에 삽입되도록 하여 용마루(11)를 설치하고, 최선단 및 최후단의 용마루(11)에는 마개(15)를 끼우되, 제5도 및 제6도와 같이 마개(15)를 용마루(11)의 결합 방향과 반대 방향으로 끼운 상태에서 이를 다시 빼내면서 마개(15)의 결합구(16)가 상기 스레트(5)의 결합구(10)에 결합토록 하되, 결합구(10)의 수직 부분이 결합구(l6)의 절결부(17)에 삽입되도록하며, 지붕 골재(1)에 스레트(4)(5)와 용마루(11) 및 마개(15)의 설치가 완료된 다음 마개(15)와 용마루(11)를 접착 고정토록 하여 시공한다. 이와 같이 스레트(4)(5)와 용마루(11), 지붕 골재(1)에 삽입구, 고정구, 결합구 등을 설치하여 이들을 상호 결합토록 하므로서 조립 시공이 용이하고 종래와 같이 긴 못과 콘크리트등을 이용하지 않기 때문에 시공 도중 스레트나 용마루 등이 파손될 염려가 없으며 상호 결합되는 삽입구, 고정구, 결합구 등이 원뿔형으로 되어 있고 절결부가 형성되어 있어 서로 협지하는 상태로 결합되므로 결합상태가 양호하고 견고하며 이에 따라 강풍 등에도 충분히 견딜 수 있으며 스레트(4)(5)의 저면에 단열판(6)을 형성하므로서 단열 효과까지도 얻을 수 있는 점 등의 특징을 지닌 것이다.After the installation of the splits 4 and 5 on the roof aggregate 1 as described above, the insertion hole 13 of the ridge 11 is inserted into the fixing tool 8 of the uppermost thread 5, but the vertical portion thereof is The ridge 11 is installed to be inserted between the cutouts 9, and a stopper 15 is inserted into the top and bottom ridges 11, and the stopper 15 is attached as shown in FIGS. 5 and 6. While engaging in the opposite direction to the engagement direction of the ridge 11, the coupling sphere 16 of the stopper 15 is to be coupled to the coupling sphere 10 of the thread 5, the coupling sphere 10 The vertical portion of the joint (l6) to be inserted into the cutout 17, the roof aggregate (1) after the installation of the thread (4) (5) and the ridge (11) and the stopper (15) is completed 15) and the ridge floor (11) to be fixed to the installation. Thus, inserts, fixtures, couplings, etc. are installed on the thread 4, 5, ridge 11, and roof aggregate 1 so that they can be combined with each other. Since it is not used, there is no fear that the thread or ridge will be damaged during construction, and the inserts, fixtures, and couplings that are joined to each other are conical, and the cutouts are formed so that they are joined together in a state of being sandwiched with each other. Accordingly, it has a feature such that it can withstand strong winds and the like, and can also obtain a heat insulating effect by forming the heat insulating plate 6 on the bottom of the struts 4 and 5.

Claims (1)

고정구(2)(3)를 설치한 지붕 골재(1)에 저면에 단열판(6)을 형성하고 삽입구(7)를 설치한 스레트(4)(5)를 차례로 적층 설치하며 스레트(5)의 상부에는 고정구(8)와 결합구(10)를 설치하고 스레트(5)의 고정구(8)에는 삽입구(13)를 가진 용마루(11)를 설치하며 최후단 용마루(11)에는 결합구(16)를 가진 마개(15)를 설치하되, 마개(15)의 결합구(16)는 스레트(5)의 결합구(10)에 결합 설치되도록 구성하여서 된 조립식 지붕.Insulation plate 6 is formed on the bottom of the roof aggregate 1 on which the fasteners 2 and 3 are installed, and the stacks 4 and 5 with the insertion holes 7 are stacked in turn, and the upper part of the thread 5 is installed. The fastener 8 and the coupling unit 10 is installed in the fitting, and the fastener 8 of the thread 5 is provided with a ridge 11 having an insertion hole 13, and the coupling end 16 is mounted at the last ridge 11. Install the having a stopper (15), the coupling port 16 of the stopper (15) is prefabricated roof is configured to be installed coupled to the coupler (10) of the thread (5).
KR2019830008951U 1983-10-20 1983-10-20 Prefabricated roof KR860000403Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2019830008951U KR860000403Y1 (en) 1983-10-20 1983-10-20 Prefabricated roof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2019830008951U KR860000403Y1 (en) 1983-10-20 1983-10-20 Prefabricated roof

Publications (2)

Publication Number Publication Date
KR850003325U KR850003325U (en) 1985-06-17
KR860000403Y1 true KR860000403Y1 (en) 1986-03-26

Family

ID=70158598

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2019830008951U KR860000403Y1 (en) 1983-10-20 1983-10-20 Prefabricated roof

Country Status (1)

Country Link
KR (1) KR860000403Y1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100689269B1 (en) * 2006-12-15 2007-03-12 (주)태원종합기술단건축사사무소 A ridge of building roof

Also Published As

Publication number Publication date
KR850003325U (en) 1985-06-17

Similar Documents

Publication Publication Date Title
US5806263A (en) Glass block connector strip
US3953949A (en) Prefabricated, modular building structure
US4894963A (en) Building kit
KR860000403Y1 (en) Prefabricated roof
JP4288271B2 (en) Flexible partition structure
JP7188740B2 (en) FIXING METHOD OF BUILDING BOARD MATERIAL AND FIXING STRUCTURE THEREOF
JPH0310265Y2 (en)
KR910004968Y1 (en) Heat insulating panel
JPH036740Y2 (en)
JPS6015864Y2 (en) Connection tool for side-by-side plate-shaped bodies
KR200187432Y1 (en) Mats for a bathroom
KR20230156201A (en) Fixture for wiring equipment
JPS634165A (en) Clamp construction method of hollow molded outer wall panel edge part
JPS59405Y2 (en) block connector
KR20210001954U (en) Insulation fixture
JPS6113636Y2 (en)
JPS6349447Y2 (en)
JPS647147Y2 (en)
JPH0544421Y2 (en)
JPH067148Y2 (en) Hollow molded outer wall plate
JPH0217057Y2 (en)
JPS5817865Y2 (en) Connection device for Kasagi and upper chord material
JPS62325Y2 (en)
JPH0142599Y2 (en)
JPS6329075Y2 (en)

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
REGI Registration of establishment
LAPS Lapse due to unpaid annual fee