Hydro power unit Download PDF

Info

Publication number
KR840003739A
KR840003739A KR1019830000702A KR830000702A KR840003739A KR 840003739 A KR840003739 A KR 840003739A KR 1019830000702 A KR1019830000702 A KR 1019830000702A KR 830000702 A KR830000702 A KR 830000702A KR 840003739 A KR840003739 A KR 840003739A
Authority
KR
South Korea
Prior art keywords
water
reservoir
pump
generator
primary
Prior art date
Application number
KR1019830000702A
Other languages
Korean (ko)
Inventor
김관치
Original Assignee
김관치
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김관치 filed Critical 김관치
Priority to KR1019830000702A priority Critical patent/KR840003739A/en
Publication of KR840003739A publication Critical patent/KR840003739A/en
Priority to KR2019880001263U priority patent/KR880001856Y1/en

Links

Abstract

내용 없음No content

Description

수력 발전 장치Hydro power unit

본 내용은 요부공개 건이므로 전문내용을 수록하지 않았음As this is a public information case, the full text was not included.

제1도는 본 발명의 소규모 발전기의 특징을 나타내는 단면도.1 is a cross-sectional view showing features of the small scale generator of the present invention.

제2도는 본 발명의 수로관과 소규모 발전기의 사시도.2 is a perspective view of the water pipe and the small-scale generator of the present invention.

제3도는 본 발명의 설치와 보수성이 간편함을 나타내는 상태도이다.3 is a state diagram showing the ease of installation and maintenance of the present invention.

Claims (7)

높은 위치의 저수지(12)보다 낮은 위치에 있는 주(主) 수차발전기(20)의 구동을 위해 높은 위치에 수로(14)(16)(18)과 주수차발전기(20)를 연결하는 일차수로관(18) 내에 일정간격으로 다수의 수차(水車)(42)를 배치한 것 중에서 연결하여 수차 발전기(20)를 구성하며 낮은 위치의 주(主)를 형성하여 주수차발전기(2)와 수차발전기의 전체수력발전의 출력을 배전망(配電網)(46)에서 합하는 것.Primary water line pipe connecting the waterway 14, 16, 18 and the main water generator 20 at a high position to drive the main water generator 20 located at a lower position than the reservoir 12 in the high position. The aberration generator 20 is formed by connecting a plurality of aberrations 42 arranged at regular intervals within the 18 to form a main position of a low position, and thus, the main and second generators 2 and the aberration generators. Summation of the total hydropower output from the power distribution grid (46). 제1항의 수력발전계통(10)에서 1차 수로관(18)내에 배치된 수개의 수차(42)중에서 선택된 수차(42)에 접근 가능토록 한 것.The hydropower system of claim 1, wherein the selected aberration 42 is accessible from among several aberrations 42 arranged in the primary water pipe 18. 제2항의 수력발전계통(10)은 수로관(14)(16)(18)의 개방부분을 덮을 수 있는 덮개부(60)가 있게한 것.Hydroelectric system of claim 2 is to have a cover portion 60 that can cover the open portion of the water pipes (14, 16, 18). 제1항에서 수력발전계통(10)은 수원(水源)과 주(主) 수차발전기(2)를 연결하는 2차수로관(16)과 부하(부荷)측의 수용(需用)전력 및 높은위치(高位)에 있는 저수지(12)의 수위조절 그리고 수차발전기중 하나를 수리할 때 1차-2차 수로관(14)(16)의 물의 흐름을 선택적으로 가능케하는 수문(22)(24)(26) 장치.The hydraulic power generation system (10) of claim 1 is characterized in that the secondary water pipe (16) connecting the water source and the main water generator (2) and the receiving power of the load side and the high side are high. Water gates (22) and (24), which selectively enable the flow of water in the primary and secondary waterway pipes (14) and (16) when repairing one of the water generators and the level control of the reservoir (12) in position. 26) Device. 제1항에서 수력발전계통(10)은 수원과 1차내지 3차 수로관(14)(16)(18)을 형성 부하측의 수력전력 및 고위(考位) 저수지(12)의 수위조절과 수차발전기중 하나를 수리 할 때 1차 내지 3차의 수로관(14)(16)(18)내의 물흐름을 선택적으로 가능토록 한 수문(22)(24)(26) 장치.In claim 1, the hydroelectric system 10 forms a water source and primary or tertiary waterway pipes 14, 16, and 18. The hydroelectric power on the load side and the water level control of the high-level reservoir 12 and the aberration generator A hydrologic (22) (24) (26) device that selectively enables the flow of water in the primary to tertiary waterways (14) (16) (18) when repairing either. 제1항에서 수력발전계통(10)은 2차 저수지(16)를 형성하며 양수펌프(38)은 부하측의 수용전력과 고위 저수지(12)의 수위조절을 위하여 2차 저수지(30)로부터 고위저수지(12)로 양수할 수 있도록 연결(36)하는 것.In claim 1, the hydroelectric system (10) forms a secondary reservoir (16), and the pump pump (38) is a high reservoir from the secondary reservoir (30) to adjust the power of the load side and the level of the high reservoir (12). (36) To be able to pump over (36). 제5항에서 수력발전계통(10)은 수차발전기(44) 하부에 흘러내린물을 모으는 2차저수지(30)를 형성하며 양수펌프(38)는 부하측의 수용전력과 고위저수지(12)의 수위조절을 위해 2차 저수지(30)로부터 고위저수지(12)로 양수할 수 있게 2차 저수지(30)에서 양수펌프(38)를 고위저수지에 연결함을 특징으로 한 것.In claim 5, the hydroelectric system 10 forms a secondary reservoir 30 for collecting the water flowing down the water generator 44, the pump pump 38 is the receiving power of the load side and the water level of the high reservoir 12 Characterized in that connecting the pump pump (38) to the high reservoir in the secondary reservoir (30) to be pumped from the secondary reservoir (30) to the high reservoir (12) for adjustment. ※ 참고사항 : 최초출원 내용에 의하여 공개하는 것임.※ Note: The disclosure is based on the initial application.
KR1019830000702A 1983-02-21 1983-02-21 Hydro power unit KR840003739A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
KR1019830000702A KR840003739A (en) 1983-02-21 1983-02-21 Hydro power unit
KR2019880001263U KR880001856Y1 (en) 1983-02-21 1988-02-04 Conduit type hydroelectric power generating installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1019830000702A KR840003739A (en) 1983-02-21 1983-02-21 Hydro power unit

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR2019880001263U Division KR880001856Y1 (en) 1983-02-21 1988-02-04 Conduit type hydroelectric power generating installation

Publications (1)

Publication Number Publication Date
KR840003739A true KR840003739A (en) 1984-09-15

Family

ID=55176478

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1019830000702A KR840003739A (en) 1983-02-21 1983-02-21 Hydro power unit

Country Status (1)

Country Link
KR (1) KR840003739A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20170013801A (en) 2016-03-16 2017-02-07 강석철 Water power generation system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20170013801A (en) 2016-03-16 2017-02-07 강석철 Water power generation system

Similar Documents

Publication Publication Date Title
US4241283A (en) Hydro-electric power plant
KR840001293A (en) Tide Power Plant
US6396162B1 (en) Underground hydroelectric plant
US20110278845A1 (en) Waterfall High Pressure Energy Conversion Machine
Campbell Small hydro and low-head hydro power technologies and prospects
Bakis Electricity production opportunities from multipurpose dams (case study)
JPS5862378A (en) Hydraulic power generating system in multistage dam
KR840003739A (en) Hydro power unit
Zhdanovich et al. Investigations on possible places for installation of small hydro plants at municipal industrial wastewaters
DE19502953C2 (en) Power generation device
Ramos et al. Small hydro as one of the oldest renewable energy sources
CN105089913A (en) Cycle hydro electric generating set
Hwee et al. Converting dam: From water supply to hydropower generation
SU973698A1 (en) Water supply arrangement for hydroelectric power plant
Tasdemiroglu Development of small hydropower in Türkiye
Karanitsch et al. South Africa’s hydropower options
RICHARDS TIDAL POWER: ITS DEVELOPMENT AND UTILIZATION.
KR890000011B1 (en) Delta-connected tidal power plant
Borota Mini Hydro Power Plants—Green Power for Users
Radford et al. Some conservational problems posed by hydroelectric power installations in Alberta
Barta Water for energy in restoration of Hartbeespoort Dam impoundment
Pali et al. A novel approach for hydropower generation using photovoltaic electricity as driving energy
Munaaim et al. Application of MICRO hydro electric system attached to effluent discharge point of sewerage treatment plant
Hidayat et al. Study on Selection of Turbine Design and Sizing of Transmission Cable for Development of Pico HydroPower Plant at Dewi Bukit Mangggung Tourism Place Tanjungsiang, Subang, West Java
Balzannikov et al. On structures and control methods of joint streams regulation by two water power developments in satisfying water consumers’ demands

Legal Events

Date Code Title Description
E902 Notification of reason for refusal
E902 Notification of reason for refusal
E601 Decision to refuse application
WICV Withdrawal of application forming a basis of a converted application