KR20250057805A - 하이퍼스케일 작업 부하들을 위한 버스트 데이터센터 용량 - Google Patents
하이퍼스케일 작업 부하들을 위한 버스트 데이터센터 용량 Download PDFInfo
- Publication number
- KR20250057805A KR20250057805A KR1020257007534A KR20257007534A KR20250057805A KR 20250057805 A KR20250057805 A KR 20250057805A KR 1020257007534 A KR1020257007534 A KR 1020257007534A KR 20257007534 A KR20257007534 A KR 20257007534A KR 20250057805 A KR20250057805 A KR 20250057805A
- Authority
- KR
- South Korea
- Prior art keywords
- load
- standby
- base
- capacity
- vcn
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F1/00—Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
- G06F1/26—Power supply means, e.g. regulation thereof
- G06F1/263—Arrangements for using multiple switchable power supplies, e.g. battery and AC
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/50—Allocation of resources, e.g. of the central processing unit [CPU]
- G06F9/5094—Allocation of resources, e.g. of the central processing unit [CPU] where the allocation takes into account power or heat criteria
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F1/00—Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
- G06F1/16—Constructional details or arrangements
- G06F1/18—Packaging or power distribution
- G06F1/189—Power distribution
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F1/00—Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
- G06F1/26—Power supply means, e.g. regulation thereof
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F1/00—Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
- G06F1/26—Power supply means, e.g. regulation thereof
- G06F1/28—Supervision thereof, e.g. detecting power-supply failure by out of limits supervision
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F1/00—Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
- G06F1/26—Power supply means, e.g. regulation thereof
- G06F1/30—Means for acting in the event of power-supply failure or interruption, e.g. power-supply fluctuations
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/30—Monitoring
- G06F11/3058—Monitoring arrangements for monitoring environmental properties or parameters of the computing system or of the computing system component, e.g. monitoring of power, currents, temperature, humidity, position, vibrations
- G06F11/3062—Monitoring arrangements for monitoring environmental properties or parameters of the computing system or of the computing system component, e.g. monitoring of power, currents, temperature, humidity, position, vibrations where the monitored property is the power consumption
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/50—Allocation of resources, e.g. of the central processing unit [CPU]
- G06F9/5061—Partitioning or combining of resources
- G06F9/5072—Grid computing
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J9/00—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
- H02J9/04—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
- H02J9/06—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
- H02J9/062—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems for AC powered loads
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J9/00—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
- H02J9/04—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
- H02J9/06—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
- H02J9/08—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems requiring starting of a prime-mover
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2209/00—Indexing scheme relating to G06F9/00
- G06F2209/50—Indexing scheme relating to G06F9/50
- G06F2209/508—Monitor
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2105/00—Networks for supplying or distributing electric power characterised by their spatial reach or by the load
- H02J2105/40—Networks for supplying or distributing electric power characterised by their spatial reach or by the load characterised by the loads connecting to the networks or being supplied by the networks
- H02J2105/42—Home appliances
- H02J2105/425—Home appliances the loads being an Information and Communication Technology [ICT] facility
-
- H02J2310/16—
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/007—Arrangements for selectively connecting one or more loads to one or more power sources or power lines
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J9/00—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
- H02J9/04—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
- H02J9/06—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
- H02J9/068—Electronic means for switching from one power supply to another power supply, e.g. to avoid parallel connection
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Power Engineering (AREA)
- Software Systems (AREA)
- Computing Systems (AREA)
- Emergency Management (AREA)
- Business, Economics & Management (AREA)
- Quality & Reliability (AREA)
- Mathematical Physics (AREA)
- Human Computer Interaction (AREA)
- Stand-By Power Supply Arrangements (AREA)
- Hardware Redundancy (AREA)
- Power Sources (AREA)
Applications Claiming Priority (5)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US17/903,924 US12547476B2 (en) | 2022-09-06 | 2022-09-06 | Burst datacenter capacity for hyperscale workloads |
| US17/903,924 | 2022-09-06 | ||
| US18/074,332 | 2022-12-02 | ||
| US18/074,332 US11847506B1 (en) | 2022-09-06 | 2022-12-02 | Burst datacenter capacity for hyperscale workloads |
| PCT/US2022/081581 WO2024054239A1 (en) | 2022-09-06 | 2022-12-14 | Burst datacenter capacity for hyperscale workloads |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| KR20250057805A true KR20250057805A (ko) | 2025-04-29 |
Family
ID=89170816
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| KR1020257007534A Pending KR20250057805A (ko) | 2022-09-06 | 2022-12-14 | 하이퍼스케일 작업 부하들을 위한 버스트 데이터센터 용량 |
Country Status (5)
| Country | Link |
|---|---|
| US (4) | US12547476B2 (https=) |
| EP (1) | EP4584866A1 (https=) |
| JP (1) | JP7840489B6 (https=) |
| KR (1) | KR20250057805A (https=) |
| CN (1) | CN119836728A (https=) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US12506709B2 (en) * | 2022-11-30 | 2025-12-23 | Lockheed Martin Corporation | Method and system for managing traffic packets |
Family Cites Families (14)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20160370819A1 (en) | 2007-08-28 | 2016-12-22 | Causam Energy, Inc. | System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management |
| US20100036903A1 (en) | 2008-08-11 | 2010-02-11 | Microsoft Corporation | Distributed load balancer |
| US9793752B1 (en) | 2010-06-28 | 2017-10-17 | Amazon Technologies, Inc. | Reserve power system for data center |
| US8707095B2 (en) | 2011-07-14 | 2014-04-22 | Beacon Property Group Llc | Datacenter utilizing modular infrastructure systems and redundancy protection from failure |
| US8963371B2 (en) * | 2011-07-22 | 2015-02-24 | Oracle International Corporation | Power supply with dual asymmetrical inputs |
| US20130054987A1 (en) | 2011-08-29 | 2013-02-28 | Clemens Pfeiffer | System and method for forcing data center power consumption to specific levels by dynamically adjusting equipment utilization |
| JP2014220874A (ja) | 2013-05-02 | 2014-11-20 | 株式会社リコー | 電力供給システム、電力供給システムの制御装置、電力供給システムの制御方法、及び電力供給プログラム |
| US11126242B2 (en) | 2013-10-28 | 2021-09-21 | Virtual Power Systems, Inc. | Time varying power management within datacenters |
| US9857855B2 (en) | 2014-06-25 | 2018-01-02 | Amazon Technologies, Inc. | Redundant secondary power support system |
| US10175737B1 (en) * | 2015-12-22 | 2019-01-08 | Amazon Technologies, Inc. | Managing electrical resiliency in a datacenter |
| US10447075B2 (en) | 2016-10-31 | 2019-10-15 | Oath Inc. | ASTS-less block redundant electrical topology with variable UPS walk-ins |
| JP7584222B2 (ja) | 2020-02-18 | 2024-11-15 | ホーチキ株式会社 | 火災報知設備 |
| US20210344217A1 (en) | 2020-03-20 | 2021-11-04 | Virtual Power Systems, Inc. | Datacenter current injection for power management |
| US12380258B2 (en) | 2020-10-26 | 2025-08-05 | Oracle International Corporation | Techniques for generating a configuration for electrically isolating fault domains in a data center |
-
2022
- 2022-09-06 US US17/903,924 patent/US12547476B2/en active Active
- 2022-12-02 US US18/074,332 patent/US11847506B1/en active Active
- 2022-12-14 EP EP22851307.3A patent/EP4584866A1/en active Pending
- 2022-12-14 JP JP2025513682A patent/JP7840489B6/ja active Active
- 2022-12-14 KR KR1020257007534A patent/KR20250057805A/ko active Pending
- 2022-12-14 CN CN202280099807.8A patent/CN119836728A/zh active Pending
-
2023
- 2023-12-06 US US18/531,445 patent/US12340258B2/en active Active
-
2025
- 2025-12-26 US US19/433,581 patent/US20260119279A1/en active Pending
Also Published As
| Publication number | Publication date |
|---|---|
| US20240078139A1 (en) | 2024-03-07 |
| JP7840489B2 (ja) | 2026-04-03 |
| JP2025531772A (ja) | 2025-09-25 |
| JP7840489B6 (ja) | 2026-04-27 |
| US12340258B2 (en) | 2025-06-24 |
| CN119836728A (zh) | 2025-04-15 |
| US12547476B2 (en) | 2026-02-10 |
| US20240103936A1 (en) | 2024-03-28 |
| US11847506B1 (en) | 2023-12-19 |
| US20260119279A1 (en) | 2026-04-30 |
| EP4584866A1 (en) | 2025-07-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US12045123B2 (en) | Detecting datacenter mass outage with near real-time/offline using ml models | |
| US12380258B2 (en) | Techniques for generating a configuration for electrically isolating fault domains in a data center | |
| US12007734B2 (en) | Datacenter level power management with reactive power capping | |
| US20260119279A1 (en) | Burst Datacenter Capacity For Hyperscale Workloads | |
| US20240339834A1 (en) | Techniques for orchestrated load shedding | |
| US20250379830A1 (en) | Cloud computing resource reclamation orchestration | |
| US20250165360A1 (en) | Replicating resources between regional data centers | |
| CN120981794A (zh) | 平台无关的计算实例启动 | |
| WO2024054239A1 (en) | Burst datacenter capacity for hyperscale workloads | |
| US12429840B2 (en) | Datacenter level power management with reactive power capping | |
| US12210400B2 (en) | Techniques for performing fault tolerance validation for a data center | |
| US20250377954A1 (en) | Cloud computing resource reclamation orchestration | |
| US20250377950A1 (en) | Cloud computing resource reclamation orchestration | |
| WO2025193491A1 (en) | Techniques for scaling a reduced footprint data center |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PA0105 | International application |
St.27 status event code: A-0-1-A10-A15-nap-PA0105 |
|
| PG1501 | Laying open of application |
St.27 status event code: A-1-1-Q10-Q12-nap-PG1501 |
|
| D16 | Fast track examination requested |
Free format text: ST27 STATUS EVENT CODE: A-1-2-D10-D16-EXM-PA0302 (AS PROVIDED BY THE NATIONAL OFFICE) |
|
| P11 | Amendment of application requested |
Free format text: ST27 STATUS EVENT CODE: A-2-2-P10-P11-NAP-X000 (AS PROVIDED BY THE NATIONAL OFFICE) |
|
| P11-X000 | Amendment of application requested |
St.27 status event code: A-2-2-P10-P11-nap-X000 |
|
| PA0302 | Request for accelerated examination |
St.27 status event code: A-1-2-D10-D16-exm-PA0302 |
|
| D21 | Rejection of application intended |
Free format text: ST27 STATUS EVENT CODE: A-1-2-D10-D21-EXM-PE0902 (AS PROVIDED BY THE NATIONAL OFFICE) |
|
| PE0902 | Notice of grounds for rejection |
St.27 status event code: A-1-2-D10-D21-exm-PE0902 |
|
| P22-X000 | Classification modified |
St.27 status event code: A-2-2-P10-P22-nap-X000 |