CN119836728A - 用于超大规模工作负载的爆发数据中心容量 - Google Patents
用于超大规模工作负载的爆发数据中心容量 Download PDFInfo
- Publication number
- CN119836728A CN119836728A CN202280099807.8A CN202280099807A CN119836728A CN 119836728 A CN119836728 A CN 119836728A CN 202280099807 A CN202280099807 A CN 202280099807A CN 119836728 A CN119836728 A CN 119836728A
- Authority
- CN
- China
- Prior art keywords
- primary
- reserved
- load
- capacity
- vcn
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F1/00—Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
- G06F1/26—Power supply means, e.g. regulation thereof
- G06F1/263—Arrangements for using multiple switchable power supplies, e.g. battery and AC
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/50—Allocation of resources, e.g. of the central processing unit [CPU]
- G06F9/5094—Allocation of resources, e.g. of the central processing unit [CPU] where the allocation takes into account power or heat criteria
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F1/00—Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
- G06F1/16—Constructional details or arrangements
- G06F1/18—Packaging or power distribution
- G06F1/189—Power distribution
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F1/00—Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
- G06F1/26—Power supply means, e.g. regulation thereof
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F1/00—Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
- G06F1/26—Power supply means, e.g. regulation thereof
- G06F1/28—Supervision thereof, e.g. detecting power-supply failure by out of limits supervision
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F1/00—Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
- G06F1/26—Power supply means, e.g. regulation thereof
- G06F1/30—Means for acting in the event of power-supply failure or interruption, e.g. power-supply fluctuations
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/30—Monitoring
- G06F11/3058—Monitoring arrangements for monitoring environmental properties or parameters of the computing system or of the computing system component, e.g. monitoring of power, currents, temperature, humidity, position, vibrations
- G06F11/3062—Monitoring arrangements for monitoring environmental properties or parameters of the computing system or of the computing system component, e.g. monitoring of power, currents, temperature, humidity, position, vibrations where the monitored property is the power consumption
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/50—Allocation of resources, e.g. of the central processing unit [CPU]
- G06F9/5061—Partitioning or combining of resources
- G06F9/5072—Grid computing
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J9/00—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
- H02J9/04—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
- H02J9/06—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
- H02J9/062—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems for AC powered loads
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J9/00—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
- H02J9/04—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
- H02J9/06—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
- H02J9/08—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems requiring starting of a prime-mover
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2209/00—Indexing scheme relating to G06F9/00
- G06F2209/50—Indexing scheme relating to G06F9/50
- G06F2209/508—Monitor
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2105/00—Networks for supplying or distributing electric power characterised by their spatial reach or by the load
- H02J2105/40—Networks for supplying or distributing electric power characterised by their spatial reach or by the load characterised by the loads connecting to the networks or being supplied by the networks
- H02J2105/42—Home appliances
- H02J2105/425—Home appliances the loads being an Information and Communication Technology [ICT] facility
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/007—Arrangements for selectively connecting one or more loads to one or more power sources or power lines
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J9/00—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
- H02J9/04—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
- H02J9/06—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
- H02J9/068—Electronic means for switching from one power supply to another power supply, e.g. to avoid parallel connection
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Power Engineering (AREA)
- Software Systems (AREA)
- Computing Systems (AREA)
- Emergency Management (AREA)
- Business, Economics & Management (AREA)
- Quality & Reliability (AREA)
- Mathematical Physics (AREA)
- Human Computer Interaction (AREA)
- Stand-By Power Supply Arrangements (AREA)
- Hardware Redundancy (AREA)
- Power Sources (AREA)
Applications Claiming Priority (5)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US17/903,924 US12547476B2 (en) | 2022-09-06 | 2022-09-06 | Burst datacenter capacity for hyperscale workloads |
| US17/903,924 | 2022-09-06 | ||
| US18/074,332 | 2022-12-02 | ||
| US18/074,332 US11847506B1 (en) | 2022-09-06 | 2022-12-02 | Burst datacenter capacity for hyperscale workloads |
| PCT/US2022/081581 WO2024054239A1 (en) | 2022-09-06 | 2022-12-14 | Burst datacenter capacity for hyperscale workloads |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN119836728A true CN119836728A (zh) | 2025-04-15 |
Family
ID=89170816
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202280099807.8A Pending CN119836728A (zh) | 2022-09-06 | 2022-12-14 | 用于超大规模工作负载的爆发数据中心容量 |
Country Status (5)
| Country | Link |
|---|---|
| US (4) | US12547476B2 (https=) |
| EP (1) | EP4584866A1 (https=) |
| JP (1) | JP7840489B6 (https=) |
| KR (1) | KR20250057805A (https=) |
| CN (1) | CN119836728A (https=) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US12506709B2 (en) * | 2022-11-30 | 2025-12-23 | Lockheed Martin Corporation | Method and system for managing traffic packets |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US10175737B1 (en) * | 2015-12-22 | 2019-01-08 | Amazon Technologies, Inc. | Managing electrical resiliency in a datacenter |
Family Cites Families (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20160370819A1 (en) | 2007-08-28 | 2016-12-22 | Causam Energy, Inc. | System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management |
| US20100036903A1 (en) | 2008-08-11 | 2010-02-11 | Microsoft Corporation | Distributed load balancer |
| US9793752B1 (en) | 2010-06-28 | 2017-10-17 | Amazon Technologies, Inc. | Reserve power system for data center |
| US8707095B2 (en) | 2011-07-14 | 2014-04-22 | Beacon Property Group Llc | Datacenter utilizing modular infrastructure systems and redundancy protection from failure |
| US8963371B2 (en) * | 2011-07-22 | 2015-02-24 | Oracle International Corporation | Power supply with dual asymmetrical inputs |
| US20130054987A1 (en) | 2011-08-29 | 2013-02-28 | Clemens Pfeiffer | System and method for forcing data center power consumption to specific levels by dynamically adjusting equipment utilization |
| JP2014220874A (ja) | 2013-05-02 | 2014-11-20 | 株式会社リコー | 電力供給システム、電力供給システムの制御装置、電力供給システムの制御方法、及び電力供給プログラム |
| US11126242B2 (en) | 2013-10-28 | 2021-09-21 | Virtual Power Systems, Inc. | Time varying power management within datacenters |
| US9857855B2 (en) | 2014-06-25 | 2018-01-02 | Amazon Technologies, Inc. | Redundant secondary power support system |
| US10447075B2 (en) | 2016-10-31 | 2019-10-15 | Oath Inc. | ASTS-less block redundant electrical topology with variable UPS walk-ins |
| JP7584222B2 (ja) | 2020-02-18 | 2024-11-15 | ホーチキ株式会社 | 火災報知設備 |
| US20210344217A1 (en) | 2020-03-20 | 2021-11-04 | Virtual Power Systems, Inc. | Datacenter current injection for power management |
| US12380258B2 (en) | 2020-10-26 | 2025-08-05 | Oracle International Corporation | Techniques for generating a configuration for electrically isolating fault domains in a data center |
-
2022
- 2022-09-06 US US17/903,924 patent/US12547476B2/en active Active
- 2022-12-02 US US18/074,332 patent/US11847506B1/en active Active
- 2022-12-14 EP EP22851307.3A patent/EP4584866A1/en active Pending
- 2022-12-14 JP JP2025513682A patent/JP7840489B6/ja active Active
- 2022-12-14 KR KR1020257007534A patent/KR20250057805A/ko active Pending
- 2022-12-14 CN CN202280099807.8A patent/CN119836728A/zh active Pending
-
2023
- 2023-12-06 US US18/531,445 patent/US12340258B2/en active Active
-
2025
- 2025-12-26 US US19/433,581 patent/US20260119279A1/en active Pending
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US10175737B1 (en) * | 2015-12-22 | 2019-01-08 | Amazon Technologies, Inc. | Managing electrical resiliency in a datacenter |
Also Published As
| Publication number | Publication date |
|---|---|
| US20240078139A1 (en) | 2024-03-07 |
| KR20250057805A (ko) | 2025-04-29 |
| JP7840489B2 (ja) | 2026-04-03 |
| JP2025531772A (ja) | 2025-09-25 |
| JP7840489B6 (ja) | 2026-04-27 |
| US12340258B2 (en) | 2025-06-24 |
| US12547476B2 (en) | 2026-02-10 |
| US20240103936A1 (en) | 2024-03-28 |
| US11847506B1 (en) | 2023-12-19 |
| US20260119279A1 (en) | 2026-04-30 |
| EP4584866A1 (en) | 2025-07-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP7806043B2 (ja) | 非同期領域間ブロックボリューム複製 | |
| CN117280327B (zh) | 使用机器学习模型通过近实时/离线数据来检测数据中心大规模中断 | |
| US12380258B2 (en) | Techniques for generating a configuration for electrically isolating fault domains in a data center | |
| US20130191527A1 (en) | Dynamically building a set of compute nodes to host the user's workload | |
| US20230033667A1 (en) | Methods and systems for creating root-of-trust for computing system components | |
| US20260119279A1 (en) | Burst Datacenter Capacity For Hyperscale Workloads | |
| US20250379830A1 (en) | Cloud computing resource reclamation orchestration | |
| CN118414806B (zh) | 用于云基础设施系统中计算节点授权的边缘证明的方法、系统和非暂态计算机可读介质 | |
| US10860078B2 (en) | Managing power request during cluster operations | |
| CN120981794A (zh) | 平台无关的计算实例启动 | |
| US9143410B1 (en) | Techniques for monitoring guest domains configured with alternate I/O domains | |
| WO2024054239A1 (en) | Burst datacenter capacity for hyperscale workloads | |
| US12210400B2 (en) | Techniques for performing fault tolerance validation for a data center | |
| US20250298650A1 (en) | Watchdog daemons for self-recovering hypervisors | |
| US20250030542A1 (en) | Replication of customer keys stored in a virtual vault | |
| US20250377950A1 (en) | Cloud computing resource reclamation orchestration | |
| US20250377954A1 (en) | Cloud computing resource reclamation orchestration | |
| US12001350B2 (en) | Dynamically configurable motherboard | |
| US20240028776A1 (en) | Input/output (i/o) attack prevention system and method of using the same | |
| US20260030073A1 (en) | Daily Spending Limit Increase Enforcement | |
| CN119604834A (zh) | 利用无功功率封顶的数据中心级电力管理 | |
| WO2025193491A1 (en) | Techniques for scaling a reduced footprint data center |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination |