KR20240038280A - Prefabricated reinforcement method of T-shaped junction wall for reinforced concrete with structural wall system - Google Patents

Prefabricated reinforcement method of T-shaped junction wall for reinforced concrete with structural wall system Download PDF

Info

Publication number
KR20240038280A
KR20240038280A KR1020220116863A KR20220116863A KR20240038280A KR 20240038280 A KR20240038280 A KR 20240038280A KR 1020220116863 A KR1020220116863 A KR 1020220116863A KR 20220116863 A KR20220116863 A KR 20220116863A KR 20240038280 A KR20240038280 A KR 20240038280A
Authority
KR
South Korea
Prior art keywords
wall
reinforcing bar
mesh
constructed
rebar
Prior art date
Application number
KR1020220116863A
Other languages
Korean (ko)
Inventor
김현기
박정식
Original Assignee
다스코 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 다스코 주식회사 filed Critical 다스코 주식회사
Priority to KR1020220116863A priority Critical patent/KR20240038280A/en
Publication of KR20240038280A publication Critical patent/KR20240038280A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • E04C5/06Reinforcing elements of metal, e.g. with non-structural coatings of high bending resistance, i.e. of essentially three-dimensional extent, e.g. lattice girders
    • E04C5/0604Prismatic or cylindrical reinforcement cages composed of longitudinal bars and open or closed stirrup rods
    • E04C5/0609Closed cages composed of two or more coacting cage parts, e.g. transversally hinged or nested parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/02Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
    • E04C2/04Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres
    • E04C2/06Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres reinforced

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

본 발명은 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법를 개시한다. 본 발명에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법은, 용접철근매트 1쌍을 일정 간격 이격시켜 나란하게 배열된 상태로 결속하여 제1철근망을 조립하는 단계와, 제1철근망에 U-메쉬의 절곡부가 중첩되도록 직교하는 방향으로 정렬하고 결속하여 제2철근망을 조립하는 단계와, 제1철근망의 용접철근매트와 U-메쉬의 절곡부가 직교하도록 연결되는 중첩부에 복수의 단위 철근이 연결되도록 결속하여 제3철근망을 조립하는 단계 및 제3철근망을 인양하여 슬라브에 T형 연결벽체 패턴으로 배열되어 돌출되도록 배근 정착용으로 시공된 연결 철근에 세팅하고 결속하여 조립하는 단계를 포함하는 구성적 특징을 가진다. 이와 같은 구성적 특징에 따르면, 규격화되고 세트화된 철근유닛을 이용하여 선조립함으로써 철근 배근의 정밀도 향상과 조립 배근 시간의 효율적인 단축 뿐만 아니라 현장 시공성 향상과 인력절감의 효과를 용이하게 유도해 낼 수 있으므로 철근 배근의 정밀도를 높여 철근콘크리트 품질향상에 기여할 수 있는 동시에 조립 배근 시간의 효율적인 단축에 의해 공사비의 절감 뿐만 아니라 부품의 간소화와 핸들링 및 관리가 용이하여 안전성 향상에 기여할 수 있다.The present invention discloses a method for assembling and arranging rebar for a T-type connecting wall in a reinforced concrete wall structure building. The method of assembling and arranging reinforcing bars for a T-type connecting wall of a reinforced concrete wall structure according to the present invention includes the steps of assembling a first reinforcing bar network by binding a pair of welded reinforcing bar mats in a parallel arrangement at regular intervals, Assembling a second rebar network by aligning and binding it in a perpendicular direction so that the bends of the U-mesh overlap with the first rebar network, and overlapping the welded rebar mat of the first rebar network and the bends of the U-mesh to be connected to be orthogonal. A step of assembling a third reinforcing bar network by binding a plurality of unit reinforcing bars to the part, and lifting the third reinforcing bar network and setting it on the connecting reinforcing bars constructed for anchoring the reinforcement so that they are arranged in a T-shaped connecting wall pattern on the slab and protrude. It has structural characteristics that include the step of binding and assembling. According to these structural characteristics, pre-assembly using standardized and set rebar units not only improves the precision of rebar placement and efficiently reduces assembly time, but also improves on-site constructability and reduces manpower. Therefore, it can contribute to improving the quality of reinforced concrete by increasing the precision of reinforcing bar arrangement. At the same time, it can not only reduce construction costs by efficiently shortening the assembly and arranging time, but also contribute to improving safety by simplifying parts and making handling and management easier.

Description

철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법{Prefabricated reinforcement method of T-shaped junction wall for reinforced concrete with structural wall system}Prefabricated reinforcement method of T-shaped junction wall for reinforced concrete with structural wall system}

본 발명은 철근콘크리트 벽식구조 건축물의 벽체 철근 선조립 배근방법에 관한 것으로서, 보다 상세하게는 용접철근매트(WBM; Welded Wire/Bar Reinforcement Mat)와 용접철근매트를 벤딩에 의해 면가공하여 "U" 형태로 형성한 U-메쉬(U-Mesh)를 규격화된 조립철근 유닛으로 선택 및/또는 조합하여 T형 연결 외벽(T-junction outer wall) 및 내벽(T-junction inner wall)의 주배근으로 선조립하는 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법에 관한 것이다.The present invention relates to a method for assembling and arranging wall reinforcing bars of a reinforced concrete wall structure building. More specifically, the present invention relates to a method of forming a "U" by surface processing a welded wire/bar reinforcement mat (WBM) and a welded reinforcing bar mat by bending. The U-Mesh formed in the shape is selected and/or combined as a standardized assembled rebar unit and selected as the main reinforcement of the T-junction outer wall and the T-junction inner wall. This relates to the pre-assembled reinforcement method for the T-shaped connecting wall of a reinforced concrete wall structure building.

일반적으로, 철근콘크리트 벽식구조 건축물은 골조가 슬래브와 벽체로 이루어져 갱폼(Gang Form)이나 유로폼(Euro Form)과 같은 시스템 거푸집을 이용하여 얇은 골조를 간편하게 시공할 수 있다는 장점 등으로 인해 주로 아파트와 같은 공동주택 시공에 많이 적용되고 있다. 이와 같은 철근콘크리트 벽식구조 건축물은 통상적으로 도1에 예시해 보인 바와 같이 가로방향 벽체(W1)에 세로방향 벽체(W2)의 끝단이 만나 직교하는 상태로 연결되어 T형 연결벽체(T-Junction Wall)로 이루어지는 외벽(outer wall)(T1)과 내벽(T-junction inner wall)(T2)을 형성하는 내력 벽체를 포함하도록 시공되는 평면 구조를 가진다.In general, reinforced concrete wall structures have a frame composed of a slab and a wall, and have the advantage of being able to easily construct a thin frame using system formwork such as Gang Form or Euro Form. It is widely applied in the construction of apartment complexes. As shown in Figure 1, such a reinforced concrete wall structure building is usually connected to the horizontal wall (W1) at right angles to the end of the vertical wall (W2), forming a T-junction wall (T-Junction Wall). It has a planar structure constructed to include a load-bearing wall forming an outer wall (T1) and an inner wall (T-junction inner wall) (T2) made of ).

그런데, 종래의 철근콘크리트 벽식구조 건축물의 T형 연결벽체(T-Junction Wall)로 이루어지는 외벽(T1) 및 내벽(T2)의 철근 배근작업은 현장 인력의 수작업에 의해 T형 연결벽체에 배근되는 주근(主筋)인 수직근에 대하여 수평근을 하나하나의 단위 가닥 철근으로 결속하여 격자로 배근하고, 수직근들에 대해서는 일정한 간격을 유지하도록 하나하나의 단위 U-바(U-Bar)를 결속하도록 배근작업이 이루어진다.However, the reinforcement work of the outer wall (T1) and the inner wall (T2), which are composed of a T-junction wall of a conventional reinforced concrete wall structure building, is done manually by field personnel. For the vertical bars, which are the main lines, the horizontal bars are arranged in a grid by binding each unit strand of reinforcing bar, and for the vertical bars, each unit U-Bar is tied to maintain a constant spacing. Reinforcement work is done.

따라서, 기존의 통상적인 철근콘크리트 벽식구조 건축물의 T형 연결벽체(T-Junction Wall)의 철근 배근작업은 많은 인력이 투입되는 노동집약적인 공사로 이루어지게 됨에 따라 작업공정과 인건비 및 철근 손실률의 증가로 인해 시공비용이 상승하는 문제점이 있다.Therefore, the reinforcement work of the T-junction wall of the existing reinforced concrete wall structure is a labor-intensive construction that requires a large number of manpower, resulting in an increase in the work process, labor costs, and reinforcement loss rate. There is a problem that construction costs increase due to this.

또한, 기존의 통상적인 철근콘크리트 벽식구조 건축물의 T형 연결벽체(T-Junction Wall)의 철근 배근작업은 선행적으로 외측에 갱폼(Gang Form)이나 유로폼(Euro Form)과 같은 거푸집을 시공한 상태에서 이루어지게 되므로, 철근조립에 여러 제약이 가해져 배근작업이 더욱 복잡하고 어렵게 이루어지는 단점이 있다.In addition, the reinforcement work of the T-junction wall of an existing reinforced concrete wall structure is preceded by constructing a form such as a gang form or Euro form on the outside. Since this is done in , there are several restrictions on the assembly of rebar, which has the disadvantage of making the reinforcement work more complicated and difficult.

따라서, 기존의 통상적인 철근콘크리트 벽식구조 건축물의 T형 연결벽체(T-Junction Wall)의 철근 배근작업은 작업자의 숙련도 차이에 따른 배근요령의 미숙과 외국인 근로자의 사용에 따른 의사소통의 어려움으로 등으로 인해 설계도에 맞춘 정확하고 정밀한 배근작업이 어려워 작업량과 시공기간이 증가하는 문제점이 있으며, 이로 인해 철근콘크리트의 시공품질이 저하되는 문제점이 있다.Therefore, the rebar placement work for the T-junction wall of an existing reinforced concrete wall structure building is difficult due to the lack of placement techniques due to differences in workers' skills and communication difficulties due to the use of foreign workers. As a result, there is a problem in that accurate and precise reinforcement work according to the design drawing is difficult, increasing the amount of work and construction period, and this causes the construction quality of reinforced concrete to deteriorate.

그러므로, 철근콘크리트 벽식구조 건축물의 T형 연결벽체(T-Junction Wall)의 철근 배근작업은 보다 규격화된 철근 가공을 바탕으로 정확하고 정밀한 조립이 이루어져 시공의 용이성과 정밀성이 유효하게 확보될 수 있도록 개선된 철근 배근방법에 대한 시공기술이 절실히 요구되고 있다.Therefore, the reinforcement work of the T-junction wall of a reinforced concrete wall structure building has been improved to ensure the ease and precision of construction through accurate and precise assembly based on more standardized reinforcement processing. There is an urgent need for construction technology for the reinforced reinforcement method.

본 발명은 상술한 바와 같은 기술적 배경하에서 도출된 것으로서, 상술한 배경 기술의 문제점은 본 출원인이 본 발명의 도출을 위해 보유하고 있었거나 본 발명의 도출 과정에서 습득한 내용으로서, 반드시 본 발명의 출원 전에 일반 공중에게 공지된 내용이라 할 수는 없다.The present invention was derived from the technical background as described above, and the problems of the above-described background technology are the content that the applicant possessed for deriving the present invention or learned in the process of deriving the present invention, and must be submitted to the applicant for the present invention. This cannot be said to have been previously known to the general public.

대한민국 등록특허공보 제10-2236828호Republic of Korea Patent Publication No. 10-2236828 대한민국 등록특허공보 제10-1184511호Republic of Korea Patent Publication No. 10-1184511 대한민국 공개특허공보 제10-2015-0144398호Republic of Korea Patent Publication No. 10-2015-0144398 일본국 공개특허공보 특개평(特開平)4-289355Japanese Patent Publication No. 4-289355

본 발명은 상기한 바와 같은 종래의 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법이 지니고 있는 단점과 문제점을 감안하여 이를 개선하기 위해 창출된 것으로서, 본 발명의 목적은 시트 형태의 메쉬망으로 이루어진 용접철근매트 및 용접철근매트를 벤딩에 의해 "U" 형태로 면가공하여 형성한 U-메쉬(mesh)를 각각 규격화된 선조립 철근유닛으로 선택 및/또는 조합하여 주배근으로 선조립함으로써 시공의 용이성과 정밀성 및 경제성 향상을 효과적으로 도모할 수 있는 철근콘크리트 벽식구조 건축물의 외벽(outer wall)과 내벽(inner wall)으로 형성되는 T형 연결벽체(T-Junction Wall) 벽체의 철근 선조립 배근방법를 제공하기 위한 것이다.The present invention was created to improve the disadvantages and problems of the T-type connection wall rebar pre-assembly arrangement method of the conventional reinforced concrete wall structure building as described above. The purpose of the present invention is to provide a sheet-shaped mesh The welded rebar mat made of a network and the U-mesh formed by surface processing the welded rebar mat into a "U" shape by bending are selected and/or combined as standardized pre-assembled rebar units and pre-assembled into the main reinforcement. Pre-assembly of rebar for the T-Junction Wall wall formed by the outer and inner walls of a reinforced concrete wall structure building, which effectively improves ease of construction, precision, and economic efficiency by doing so. It is intended to provide a root arrangement method.

상기한 바와 같은 목적을 달성하기 위하여 본 발명의 청구항1에 따른 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법은, 철근콘크리트 벽식구조 건축물의 외벽 및 내벽으로 시공되는 제1벽체에 직교하는 방향으로 제2벽체의 일단이 연결되도록 시공되는 T형 연결벽체(T-junction wall) 철근 선조립 배근방법에 있어서, 상기 제1벽체에는 1쌍의 용접철근매트가 일정 간격 이격된 상태로 나란하게 배근되는 동시에 상기 제2벽체에는 용접철근매트가 벤딩에 의해 면가공되어 절곡부를 가지도록 "U" 형태로 성형된 U-메쉬가 배근되도록 시공되는 것으로, 상기 용접철근매트 1쌍을 일정 간격 이격시켜 나란하게 배열된 상태로 결속하여 제1철근망을 조립하는 단계와; 상기 제1철근망에 상기 U-메쉬의 절곡부가 중첩되도록 직교하는 방향으로 정렬하고 결속하여 제2철근망을 조립하는는 단계와; 상기 제1철근망의 용접철근매트와 상기 U-메쉬의 절곡부가 직교하도록 연결되는 중첩부에 복수의 단위 철근이 연결되도록 결속하여 제3철근망을 조립하는 단계; 및 상기 제3철근망)을 인양하여 슬라브에 상기 T형 연결벽체 패턴으로 배열되어 돌출되도록 배근 정착용으로 시공된 연결 철근에 세팅하고 결속하여 조립하는 단계;를 포함하는 것을 특징으로 한다.In order to achieve the above-described object, the T-type connection wall rebar pre-assembly arrangement method of the reinforced concrete wall structure building according to claim 1 of the present invention is perpendicular to the first wall constructed as the outer and inner walls of the reinforced concrete wall structure building. In the T-junction wall rebar pre-assembly arrangement method, which is constructed so that one end of the second wall is connected in the direction of At the same time, the second wall is constructed so that the welded reinforcing bar mat is surface-processed by bending and a U-mesh formed in a "U" shape is placed to have a bent part, and a pair of the welded reinforcing bar mats is spaced at a certain interval. assembling the first reinforcing bar network by binding them in a parallel arrangement; assembling a second reinforcing bar network by aligning and binding the first reinforcing bar network in a perpendicular direction so that the bent portions of the U-mesh overlap; Assembling a third reinforcing bar network by binding a plurality of unit reinforcing bars to be connected to an overlapping portion where the welded reinforcing bar mat of the first reinforcing bar network and the bent portion of the U-mesh are connected to be perpendicular to each other; And the step of lifting the third reinforcing bar network) and assembling it by setting and binding the connecting reinforcing bars constructed for reinforcement anchorage so that they are arranged on the slab in the T-shaped connecting wall pattern and protrude.

상기한 바와 같은 목적을 달성하기 위하여 본 발명의 청구항2에 따른 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법은, 철근콘크리트 벽식구조 건축물의 외벽 및 내벽으로 시공되는 제1벽체에 직교하는 방향으로 제2벽체의 일단이 연결되도록 시공되어 이루어지는 T형 연결벽체(T-junction wall) 철근 선조립 배근방법에 있어서, 상기 제1벽체와 제2벽체에 각각 용접철근매트가 벤딩에 의해 면가공되어 절곡부를 가지도록 "U" 형태로 성형된 U-메쉬가 배근되도록 시공되는 것으로,상기 U-메쉬 1쌍을 직교하도록 T형으로 배열하고 결속하여 제1철근망을 조립하는 단계와; 상기 U-메쉬의 절곡부에 각각 복수의 단위 철근이 연결되도록 결속하여 제2철근망을 조립하는 단계; 및 상기 제2철근망을 인양하여 슬라브에 상기 T형 연결벽체 패턴으로 배열되어 돌출되도록 배근 정착용으로 시공된 연결 철근에 세팅하고 결속하여 조립하는 단계;를 포함하는 것을 특징으로 한다.In order to achieve the above-described object, the T-type connection wall rebar pre-assembly arrangement method of the reinforced concrete wall structure building according to claim 2 of the present invention is perpendicular to the first wall constructed as the outer and inner walls of the reinforced concrete wall structure building. In the T-junction wall rebar pre-assembly arrangement method, which is constructed so that one end of the second wall is connected in the direction of It is constructed so that a U-mesh, which is processed and formed into a "U" shape to have a bend, is arranged, and assembling a first reinforcing bar network by arranging and binding a pair of the U-meshes in a T shape so that they are orthogonal; assembling a second reinforcing bar network by binding a plurality of unit reinforcing bars to each bent portion of the U-mesh; And the step of lifting the second reinforcing bar network and assembling it by setting and binding the second reinforcing bar network to the connecting reinforcing bars constructed for reinforcement fixation so that they are arranged on the slab in the T-shaped connecting wall pattern and protrude.

상기한 바와 같은 목적을 달성하기 위하여 본 발명의 청구항3에 따른 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법은, 철근콘크리트 벽식구조 건축물의 외벽 및 내벽으로 시공되는 제1벽체에 직교하는 방향으로 제2벽체의 일단이 연결되도록 시공되어 이루어지는 T형 연결벽체(T-junction wall) 철근 선조립 배근방법에 있어서, 상기 제1벽체에는 1쌍의 용접철근매트가 일정 간격 이격된 상태로 나란하게 배근되는 동시에 상기 제2벽체에는 복수의 단위 U-바아가 배근되도록 시공되는 것으로, 슬라브에 T형 연결벽체 패턴으로 배열되어 돌출되도록 배근 정착용으로 시공된 연결 철근에 단위 U-바아를 결속하는 단계와; 상기 제1벽체에 대응하도록 1쌍의 용접철근매트를 일정 간격 이격시켜 나란하게 배열된 상태로 결속하는 단계와; 상기 제2벽체에 대응하도록 복수의 단위 U-바아의 절곡부를 각각 상기 용접철근매트의 높이 방향으로 일정 간격으로 결속하는 단계; 및 상기 용접철근매트와 상기 U-바아의 절곡부가 겹치는 중첩부에 복수의 단위 철근이 연결되도록 결속하는 단계;를 포함하는 것을 특징으로 한다.In order to achieve the above-described object, the T-type connection wall rebar pre-assembly arrangement method of the reinforced concrete wall structure building according to claim 3 of the present invention is perpendicular to the first wall constructed as the outer and inner walls of the reinforced concrete wall structure building. In the T-junction wall rebar pre-assembly arrangement method, which is constructed so that one end of the second wall is connected in the direction of It is constructed so that a plurality of unit U-bars are arranged in the second wall at the same time as they are arranged in parallel, and the unit U-bars are tied to the connecting reinforcing bars installed for anchoring the reinforcement so that they are arranged in a T-shaped connecting wall pattern on the slab and protrude. steps and; Binding a pair of welded reinforcing bar mats in a parallel arrangement at a predetermined interval to correspond to the first wall; Binding the bent portions of a plurality of unit U-bars at regular intervals in the height direction of the welded reinforcing bar mat to correspond to the second wall; And a step of binding a plurality of unit reinforcing bars to be connected to an overlapping portion where the welded reinforcing bar mat and the bent portion of the U-bar overlap.

상기한 바와 같은 목적을 달성하기 위하여 본 발명의 청구항4에 따른 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법은, 철근콘크리트 벽식구조 건축물의 외벽 및 내벽으로 시공되는 제1벽체에 직교하는 방향으로 제2벽체의 일단이 연결되도록 시공되어 이루어지는 T형 연결벽체(T-junction wall) 철근 선조립 배근방법에 있어서, 상기 제1벽체에는 1쌍의 용접철근매트가 일정 간격 이격된 상태로 나란하게 배근되는 동시에 상기 제2벽체에는 용접철근매트가 벤딩에 의해 면가공되어 절곡부를 가지도록 "U" 형태로 성형된 U-메쉬가 배근되도록 시공되는 것으로, 슬라브에 상기 T형 연결벽체 패턴으로 배열되어 돌출되도록 배근 정착용으로 시공된 연결 철근에 각각 상기 제1벽체에 대응하도록 4개의 단위 철근을 2단으로 연결하여 결속하고, 상기 제2벽체에 대응하도록 1쌍의 단위 U-바아를 2단으로 연결하여 결속하는 단계와; 상기 제1벽체에 대응하도록 1쌍의 용접철근매트의 하단 수평근 2개를 제거한 상태로 일정 간격 이격시켜 나란하게 배열된 상태로 결속하는 단계와; 상기 제2벽체에 대응하도록 상기 U-메쉬의 하단 수평근 2개를 제거한 상태로 상기 연결 철근에 결속하여 절곡부가 상기 용접철근매트에 겹쳐져 중첩되도록 조립하는 단계; 및 상기 U-메쉬의 절곡부와 상기 용접철근매트의 중첩부에 복수의 단위 철근이 연결되도록 결속하여 조립하는 단계;를 포함하는 것을 특징으로 한다.In order to achieve the above-described object, the T-type connection wall rebar pre-assembly arrangement method of the reinforced concrete wall structure building according to claim 4 of the present invention is perpendicular to the first wall constructed as the outer and inner walls of the reinforced concrete wall structure building. In the T-junction wall rebar pre-assembly arrangement method, which is constructed so that one end of the second wall is connected in the direction of At the same time, the second wall is constructed so that the welded reinforcing bar mat is surface-processed by bending and a U-mesh formed into a "U" shape to have a bend is arranged in the second wall, and the T-shaped connecting wall pattern is applied to the slab. Four unit reinforcing bars are connected and bound in two stages to correspond to the first wall, respectively, to the connecting reinforcing bars constructed for reinforcement fixation so that they are arranged and protruding, and a pair of unit U-bars is connected to 2 to correspond to the second wall. A step of connecting and binding into stages; Removing the two lower horizontal bars of a pair of welded reinforcing bar mats to correspond to the first wall, spaced them apart at a predetermined interval and binding them in a parallel arrangement; Removing the two lower horizontal bars of the U-mesh to correspond to the second wall, assembling them by binding them to the connecting bars so that the bent portion overlaps the welded reinforcing bar mat; And assembling by binding a plurality of unit reinforcing bars to be connected to the bent portion of the U-mesh and the overlapping portion of the welded reinforcing bar mat.

상기한 바와 같은 목적을 달성하기 위하여 본 발명의 청구항5에 따른 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법은, 철근콘크리트 벽식구조 건축물의 외벽 및 내벽으로 시공되는 제1벽체에 직교하는 방향으로 제2벽체의 일단이 연결되도록 시공되어 이루어지는 T형 연결벽체(T-junction wall) 철근 선조립 배근방법에 있어서, 상기 제1벽체에는 1쌍의 용접철근매트가 일정 간격 이격된 상태로 나란하게 배근되는 동시에 상기 제2벽체에는 용접철근매트가 벤딩에 의해 면가공되어 절곡부를 가지도록 "U" 형태로 성형된 U-메쉬가 배근되도록 시공되는 것으로, 슬라브에 상기 T형 연결벽체 패턴으로 배열되어 돌출되도록 배근 정착용으로 시공된 연결 철근에 상기 제2벽체에 대응하도록 단위 U-바아를 연결하여 결속하는 단계와; 상기 제1벽체에 대응하도록 1쌍의 용접철근매트를 일정 간격 이격시켜 나란하게 배열된 상태로 연결하여 결속하는 단계와; 상기 제2벽체에 대응하도록 상기 U-메쉬의 하단 수평근 1개를 제거한 상태로 상기 연결 철근에 결속하여 절곡부가 상기 용접철근매트에 겹쳐져 중첩되도록 조립하는 단계; 및 상기 U-메쉬의 절곡부와 상기 용접철근매트의 중첩부에 복수의 단위 철근이 연결되도록 결속하여 조립하는 단계;를 포함하는 것을 특징으로 한다.In order to achieve the above-described object, the T-type connecting wall rebar pre-assembly arrangement method of the reinforced concrete wall structure building according to claim 5 of the present invention is perpendicular to the first wall constructed as the outer and inner walls of the reinforced concrete wall structure building. In the T-junction wall rebar pre-assembly arrangement method, which is constructed so that one end of the second wall is connected in the direction of At the same time, the second wall is constructed so that the welded reinforcing bar mat is surface-processed by bending and a U-mesh formed into a "U" shape to have a bend is arranged in the second wall, and the T-shaped connecting wall pattern is applied to the slab. A step of connecting and binding unit U-bars to correspond to the second wall to connecting reinforcing bars constructed for anchoring the reinforcement so that they are arranged and protruding; connecting and binding a pair of welded reinforcing bar mats arranged in parallel at a predetermined interval to correspond to the first wall; Assembling the U-mesh by removing one lower horizontal bar of the U-mesh to correspond to the second wall and binding it to the connecting rebar so that the bent portion overlaps the welded rebar mat; And assembling by binding a plurality of unit reinforcing bars to be connected to the bent portion of the U-mesh and the overlapping portion of the welded reinforcing bar mat.

상기한 바와 같은 목적을 달성하기 위하여 본 발명의 청구항6에 따른 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법은, 철근콘크리트 벽식구조 건축물의 외벽 및 내벽으로 시공되는 제1벽체에 직교하는 방향으로 제2벽체의 일단이 연결되도록 시공되어 이루어지는 T형 연결벽체(T-junction wall) 철근 선조립 배근방법에 있어서, 상기 제1벽체에는 1쌍의 용접철근매트가 일정 간격 이격된 상태로 나란하게 배근되는 동시에 상기 제2벽체에는 용접철근매트가 벤딩에 의해 면가공되어 절곡부를 가지도록 "U" 형태로 성형된 U-메쉬가 배근되도록 시공되는 것으로, 상기 제1벽체에 대응하도록 1쌍의 용접철근매트를 일정 간격 이격시켜 나란하게 배열된 상태로 연결하여 결속하는 단계와; 슬라브에 상기 T형 연결벽체 패턴으로 배열되어 돌출되도록 배근 정착용으로 시공된 연결 철근에 상기 제2벽체에 대응하도록 단위 L-바아 4개를 2단으로 연결하여 결속하는 단계와; 상기 제2벽체에 대응하도록 상기 U-메쉬의 하단 수평근 2개를 제거한 상태로 상기 연결 철근에 결속하여 절곡부가 상기 용접철근매트에 겹쳐져 중첩되도록 조립하는 단계; 및 상기 U-메쉬의 절곡부와 상기 용접철근매트의 중첩부에 복수의 단위 철근이 연결되도록 결속하여 조립하는 단계;를 포함하는 것을 특징으로 한다.In order to achieve the above-described object, the T-type connecting wall rebar pre-assembly arrangement method of the reinforced concrete wall structure building according to claim 6 of the present invention is perpendicular to the first wall constructed as the outer and inner walls of the reinforced concrete wall structure building. In the T-junction wall rebar pre-assembly arrangement method, which is constructed so that one end of the second wall is connected in the direction of At the same time, the second wall is constructed so that the welded reinforcing bar mat is surface-processed by bending and a U-mesh formed in a “U” shape to have a bent portion is arranged in parallel, so that the second wall is arranged to correspond to the first wall. A step of connecting and binding the welded reinforcing bar mats in a parallel arrangement at regular intervals; Connecting four unit L-bars in two stages to correspond to the second wall and binding them to the connecting reinforcing bars constructed for reinforcement fixation so that they are arranged in the T-shaped connecting wall pattern on the slab and protrude; Removing the two lower horizontal bars of the U-mesh to correspond to the second wall, assembling them by binding them to the connecting bars so that the bent portion overlaps the welded reinforcing bar mat; And assembling by binding a plurality of unit reinforcing bars to be connected to the bent portion of the U-mesh and the overlapping portion of the welded reinforcing bar mat.

상기한 바와 같은 목적을 달성하기 위하여 본 발명의 청구7에 따른 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법은, 철근콘크리트 벽식구조 건축물의 외벽 및 내벽으로 시공되는 제1벽체에 직교하는 방향으로 제2벽체의 일단이 연결되도록 시공되어 이루어지는 T형 연결벽체(T-junction wall) 철근 선조립 배근방법에 있어서, 상기 제1벽체에는 1쌍의 용접철근매트가 일정 간격 이격된 상태로 나란하게 배근되는 동시에 상기 제2벽체에는 용접철근매트가 벤딩에 의해 면가공되어 절곡부를 가지도록 "U" 형태로 성형된 U-메쉬가 배근되도록 시공되는 것으로, 상기 용접철근매트 1쌍을 일정 간격 이격시켜 나란하게 배열된 상태로 결속하여 제1철근망을 조립하는 단계와; 슬라브에 상기 T형 연결벽체 패턴으로 배열되어 돌출되도록 배근 정착용으로 시공된 연결 철근에 상기 제2벽체에 대응하도록 단위 U-바아를 연결하여 결속하는 단계와; 상기 제2벽체에 대응하도록 상기 U-메쉬의 하단 수평근 1개를 제거한 상태로 상기 연결 철근에 결속하여 절곡부가 상기 용접철근매트에 겹쳐져 중첩되도록 조립하는 단계; 및 상기 U-메쉬의 절곡부와 상기 용접철근매트의 중첩부에 복수의 단위 철근이 연결되도록 결속하여 조립하는 단계;를 포함하는 것을 특징으로 한다.In order to achieve the above-described object, the T-type connecting wall rebar pre-assembly arrangement method of the reinforced concrete wall structure building according to claim 7 of the present invention is perpendicular to the first wall constructed as the outer and inner walls of the reinforced concrete wall structure building. In the T-junction wall rebar pre-assembly arrangement method, which is constructed so that one end of the second wall is connected in the direction of At the same time, the second wall is constructed so that the welded reinforcing bar mat is surface-processed by bending and a U-mesh formed in a "U" shape to have a bent portion is arranged in parallel, and a pair of the welded reinforcing bar mats is placed at regular intervals. Assembling the first reinforcing bar network by spacing it apart and binding it in a parallel arrangement; A step of connecting and binding unit U-bars to correspond to the second wall to connection reinforcing bars constructed for reinforcement anchorage so as to protrude and are arranged in the T-shaped connection wall pattern on the slab; Assembling the U-mesh by removing one lower horizontal bar of the U-mesh to correspond to the second wall and binding it to the connecting rebar so that the bent portion overlaps the welded rebar mat; And assembling by binding a plurality of unit reinforcing bars to be connected to the bent portion of the U-mesh and the overlapping portion of the welded reinforcing bar mat.

상기한 바와 같은 목적을 달성하기 위하여 본 발명의 청구항8에 따른 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법은, 철근콘크리트 벽식구조 건축물의 외벽 및 내벽으로 시공되는 제1벽체에 직교하는 방향으로 제2벽체의 일단이 연결되도록 시공되어 이루어지는 T형 연결벽체(T-junction wall) 철근 선조립 배근방법에 있어서, 상기 제1벽체에는 1쌍의 용접철근매트가 일정 간격 이격된 상태로 나란하게 배근되는 동시에 상기 제2벽체에는 용접철근매트가 벤딩에 의해 면가공되어 절곡부(121)를 가지도록 "U" 형태로 성형된 U-메쉬가 배근되도록 시공되는 것으로, 상기 용접철근매트 1쌍을 일정 간격 이격시켜 나란하게 배열된 상태로 결속하여 제1철근망을 조립하는 단계와; 슬라브에 상기 T형 연결벽체 패턴으로 배열되어 돌출되도록 배근 정착용으로 시공된 연결 철근에 상기 제2벽체에 대응하도록 단위 L-바아 4개를 2단으로 연결하여 결속하는 단계와; 상기 제2벽체에 대응하도록 상기 U-메쉬의 하단 수평근 2개를 제거한 상태로 상기 연결 철근에 결속하여 절곡부가 상기 용접철근매트에 겹쳐져 중첩되도록 조립하는 단계; 및 상기 U-메쉬의 절곡부와 상기 용접철근매트의 중첩부에 복수의 단위 철근이 연결되도록 결속하여 조립하는 단계;를 포함하는 것을 특징으로 한다.In order to achieve the above-described object, the T-type connection wall rebar pre-assembly arrangement method of the reinforced concrete wall structure building according to claim 8 of the present invention is perpendicular to the first wall constructed as the outer and inner walls of the reinforced concrete wall structure building. In the T-junction wall rebar pre-assembly arrangement method, which is constructed so that one end of the second wall is connected in the direction of At the same time, the welded reinforcing bar mat is installed in the second wall so that a U-mesh formed in a "U" shape is arranged by surface processing by bending and having a bent portion 121, and the welded reinforcing bar mat 1 Assembling the first reinforcing bar network by binding the pairs in a parallel arrangement at a predetermined interval; Connecting four unit L-bars in two stages to correspond to the second wall and binding them to the connecting reinforcing bars constructed for reinforcement fixation so that they are arranged in the T-shaped connecting wall pattern on the slab and protrude; Removing the two lower horizontal bars of the U-mesh to correspond to the second wall, assembling them by binding them to the connecting bars so that the bent portion overlaps the welded reinforcing bar mat; And assembling by binding a plurality of unit reinforcing bars to be connected to the bent portion of the U-mesh and the overlapping portion of the welded reinforcing bar mat.

상기한 바와 같은 목적을 달성하기 위하여 본 발명의 청구항9에 따른 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법은, 철근콘크리트 벽식구조 건축물의 외벽 및 내벽으로 시공되는 제1벽체에 직교하는 방향으로 제2벽체의 일단이 연결되도록 시공되어 이루어지는 T형 연결벽체(T-junction wall) 철근 선조립 배근방법에 있어서, 상기 제1벽체에는 용접철근매트가 벤딩에 의해 면가공되어 절곡부를 가지도록 "U" 형태로 성형된 U-메쉬 및 그 U-메쉬에 1쌍의 용접철근매트가 일정 간격 이격된 상태로 나란하게 배근되는 동시에 상기 제2벽체에는 용접철근매트가 벤딩에 의해 면가공되어 절곡부를 가지도록 "U" 형태로 성형된 U-메쉬가 배근되도록 시공되는 것으로, 슬라브에 상기 T형 연결벽체 패턴으로 배열되어 돌출되도록 배근 정착용으로 시공된 연결 철근에 상기 제2벽체에 대응하도록 단위 U-바아를 연결하여 결속하는 단계와; 상기 제1벽체에 대응하도록 상기 연결 철근에 상기 U-메쉬를 연결하여 결속하는 단계와; 상기 제2벽체에 대응하도록 상기 U-메쉬의 하단 수평근 1개를 제거한 상태로 상기 연결 철근에 결속하여 절곡부가 상기 U-메쉬에 겹쳐져 중첩되도록 결속하는 단계와; 상기 제1벽체에 대응하도록 상기 U-메쉬와 상기 연결 철근에 각각 상기 용접철근매트 1쌍을 일정 간격 이격시켜 나란하게 배열한 상태로 연결하여 결속하는 단계; 및 상기 U-메쉬의 절곡부에 각각 복수의 단위 철근이 연결되도록 결속하여 조립하는 단계;를 포함하는 것을 특징으로 한다.In order to achieve the above-described object, the T-type connecting wall rebar pre-assembly arrangement method of the reinforced concrete wall structure building according to claim 9 of the present invention is perpendicular to the first wall constructed as the outer and inner walls of the reinforced concrete wall structure building. In the T-junction wall rebar pre-assembly arrangement method, which is constructed so that one end of the second wall is connected in the direction of In the picture, a U-mesh formed in a "U" shape and a pair of welded reinforcing bar mats are arranged side by side on the U-mesh at a certain interval, and at the same time, the welded reinforcing bar mat is surface processed by bending on the second wall. It is constructed so that the U-mesh, which is formed in a "U" shape to have a bend, is reinforced, and is arranged on the slab in the T-shaped connecting wall pattern and protrudes to correspond to the second wall to the connecting reinforcing bars constructed for reinforcement fixation. A step of connecting and binding unit U-bars; Connecting and binding the U-mesh to the connecting reinforcing bar to correspond to the first wall; Removing one lower horizontal bar of the U-mesh to correspond to the second wall and binding it to the connecting reinforcing bar so that the bent portion overlaps the U-mesh; Connecting and binding a pair of welded reinforcing bar mats to the U-mesh and the connecting reinforcing bar in a parallel arrangement at a predetermined interval to correspond to the first wall; And a step of assembling and binding a plurality of unit reinforcing bars to be connected to each bent portion of the U-mesh.

상기한 바와 같은 목적을 달성하기 위하여 본 발명의 청구항10에 따른 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법은, 철근콘크리트 벽식구조 건축물의 외벽 및 내벽으로 시공되는 제1벽체에 직교하는 방향으로 제2벽체의 일단이 연결되도록 시공되어 이루어지는 T형 연결벽체(T-junction wall) 철근 선조립 배근방법에 있어서, 상기 제1벽체에는 용접철근매트가 벤딩에 의해 면가공되어 절곡부를 가지도록 "U" 형태로 성형된 U-메쉬 및 그 U-메쉬에 1쌍의 용접철근매트가 일정 간격 이격된 상태로 나란하게 배근되는 동시에 상기 제2벽체에는 용접철근매트가 벤딩에 의해 면가공되어 절곡부를 가지도록 "U" 형태로 성형된 U-메쉬(120)가 배근되도록 시공되는 것으로, 슬라브에 상기 T형 연결벽체 패턴으로 배열되어 돌출되도록 배근 정착용으로 시공된 연결 철근에 상기 제1벽체에 대응하도록 상기 U-메쉬를 연결하여 결속하는 단계와; 상기 제2벽체에 대응하도록 상기 U-메쉬의 하단 수평근 2개를 제거한 상태로 상기 연결 철근에 결속하여 절곡부가 상기 U-메쉬에 겹쳐져 중첩되도록 결속하는 단계와; 상기 제2벽체에 대응하도록 상기 연결 철근에 2쌍의 L-바아를 2단으로 연결하여 결속하는 단계와; 상기 제1벽체에 대응하도록 상기 U-메쉬와 상기 연결 철근에 각각 상기 용접철근매트 1쌍을 일정 간격 이격시켜 나란하게 배열한 상태로 연결하여 결속하는 단계; 및 상기 U-메쉬의 절곡부에 각각 복수의 단위 철근이 연결되도록 결속하여 조립하는 단계;를 포함하는 것을 특징으로 한다.In order to achieve the above-described object, the T-type connection wall rebar pre-assembly arrangement method of the reinforced concrete wall structure building according to claim 10 of the present invention is perpendicular to the first wall constructed as the outer and inner walls of the reinforced concrete wall structure building. In the T-junction wall rebar pre-assembly arrangement method, which is constructed so that one end of the second wall is connected in the direction of In the picture, a U-mesh formed in a "U" shape and a pair of welded reinforcing bar mats are arranged side by side on the U-mesh at a certain interval, and at the same time, the welded reinforcing bar mat is surface processed by bending on the second wall. It is constructed so that the U-mesh 120, which is formed in a "U" shape to have a bend, is reinforced, and the first wall is connected to the connecting reinforcing bars constructed for reinforcement fixation so that they are arranged in the T-shaped connecting wall pattern on the slab and protrude. connecting and binding the U-mesh to correspond to; Removing the two lower horizontal bars of the U-mesh to correspond to the second wall and binding them to the connecting reinforcing bars so that the bent portion overlaps the U-mesh; Connecting and binding two pairs of L-bars in two stages to the connecting reinforcing bars to correspond to the second wall; Connecting and binding a pair of welded reinforcing bar mats to the U-mesh and the connecting reinforcing bar in a parallel arrangement at a predetermined interval to correspond to the first wall; And a step of assembling and binding a plurality of unit reinforcing bars to be connected to each bent portion of the U-mesh.

상기한 바와 같은 목적을 달성하기 위하여 본 발명의 청구항11에 따른 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법은, 철근콘크리트 벽식구조 건축물의 외벽 및 내벽으로 시공되는 제1벽체에 직교하는 방향으로 제2벽체의 일단이 연결되도록 시공되어 이루어지는 T형 연결벽체(T-junction wall) 철근 선조립 배근방법에 있어서, 상기 제1벽체에는 2쌍의 용접철근매트가 일정 간격 이격된 상태로 나란하게 배근되는 동시에 상기 제2벽체에는 용접철근매트가 벤딩에 의해 면가공되어 절곡부를 가지도록 "U" 형태로 성형된 U-메쉬가 배근되도록 시공되는 것으로, 슬라브에 상기 T형 연결벽체 패턴으로 배열되어 돌출되도록 배근 정착용으로 시공된 연결 철근에 상기 제2벽체에 대응하도록 상기 U-메쉬를 연결하여 결속하는 단계와; 상기 제1벽체에 대응하도록 상기 U-메쉬의 어느 일측으로 상기 용접철근매트 1쌍을 일정 간격 이격시켜 나란하게 배열한 상태로 상기 연결 철근에 연결하여 결속하는 단계와; 상기 제1벽체에 대응하도록 상기 U-메쉬의 다른 일측으로 상기 용접철근매트 1쌍을 일정 간격 이격시켜 나란하게 배열한 상태로 상기 연결 철근에 연결하여 결속하는 단계; 및 상기 U-메쉬의 절곡부에 복수의 단위 철근이 연결되도록 결속하여 조립하는 단계;를 포함하는 것을 특징으로 한다.In order to achieve the above-described object, the T-type connection wall rebar pre-assembly arrangement method of the reinforced concrete wall structure building according to claim 11 of the present invention is perpendicular to the first wall constructed as the outer and inner walls of the reinforced concrete wall structure building. In the T-junction wall rebar pre-assembly arrangement method, which is constructed so that one end of the second wall is connected in the direction of At the same time, the second wall is constructed so that the welded reinforcing bar mat is surface-processed by bending and a U-mesh formed into a "U" shape to have a bend is arranged in the second wall, and the T-shaped connecting wall pattern is applied to the slab. connecting and binding the U-mesh to the connecting reinforcing bars constructed for anchoring the reinforcement so that they are arranged and protruding so as to correspond to the second wall; Arranging a pair of welded reinforcing bar mats in parallel at a predetermined interval on one side of the U-mesh to correspond to the first wall, and connecting and binding them to the connecting reinforcing bars; Arranging a pair of welded reinforcing bar mats in parallel at a predetermined interval on the other side of the U-mesh to correspond to the first wall, and connecting and binding them to the connecting reinforcing bars; and assembling by binding a plurality of unit reinforcing bars so that they are connected to bent portions of the U-mesh.

상기한 바와 같은 목적을 달성하기 위하여 본 발명의 청구항12에 따른 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법은, 철근콘크리트 벽식구조 건축물의 외벽 및 내벽으로 시공되는 제1벽체에 직교하는 방향으로 제2벽체의 일단이 연결되도록 시공되어 이루어지는 T형 연결벽체(T-junction wall) 철근 선조립 배근방법에 있어서, 상기 제1벽체에는 2쌍의 용접철근매트가 일정 간격 이격된 상태로 나란하게 배근되는 동시에 상기 제2벽체에는 용접철근매트가 벤딩에 의해 면가공되어 절곡부를 가지도록 "U" 형태로 성형된 U-메쉬가 배근되도록 시공되는 것으로, 슬라브에 상기 T형 연결벽체 패턴으로 배열되어 돌출되도록 배근 정착용으로 시공된 연결 철근에 상기 제2벽체에 대응하도록 단위 U-바아를 연결하여 결속하는 단계와; 상기 제1벽체에 대응하도록 상기 U-바아의 어느 일측으로 상기 용접철근매트 1쌍을 일정 간격 이격시켜 나란하게 배열한 상태로 상기 연결 철근에 연결하여 결속하는 단계와; 상기 제2벽체에 대응하도록 상기 U-메쉬의 하단 수평근 1개를 제거한 상태로 상기 연결 철근에 연결하여 결속하는 단계와; 상기 제1벽체에 대응하도록 상기 U-바아의 다른 일측으로 상기 용접철근매트 1쌍을 일정 간격 이격시켜 나란하게 배열한 상태로 상기 연결 철근에 연결하여 결속하는 단계; 및 상기 U-메쉬의 절곡부에 복수의 단위 철근이 연결되도록 결속하여 조립하는 단계;를 포함하는 것을 특징으로 한다.In order to achieve the above-described object, the T-type connection wall rebar pre-assembly arrangement method of the reinforced concrete wall structure building according to claim 12 of the present invention is perpendicular to the first wall constructed as the outer and inner walls of the reinforced concrete wall structure building. In the T-junction wall rebar pre-assembly arrangement method, which is constructed so that one end of the second wall is connected in the direction of At the same time, the second wall is constructed so that the welded reinforcing bar mat is surface-processed by bending and a U-mesh formed into a "U" shape to have a bend is arranged in the second wall, and the T-shaped connecting wall pattern is applied to the slab. A step of connecting and binding unit U-bars to correspond to the second wall to connecting reinforcing bars constructed for anchoring the reinforcement so that they are arranged and protruding; Arranging a pair of welded reinforcing bar mats in parallel at a predetermined interval on one side of the U-bar to correspond to the first wall, and connecting and binding them to the connecting reinforcing bars; Removing one lower horizontal bar of the U-mesh to correspond to the second wall and connecting it to the connecting reinforcing bar to bind it; Arranging a pair of welded reinforcing bar mats in parallel at a predetermined interval on the other side of the U-bar to correspond to the first wall, and connecting and binding them to the connecting reinforcing bars; and assembling by binding a plurality of unit reinforcing bars so that they are connected to bent portions of the U-mesh.

상기한 바와 같은 목적을 달성하기 위하여 본 발명의 청구항13에 따른 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법은, 철근콘크리트 벽식구조 건축물의 외벽 및 내벽으로 시공되는 제1벽체에 직교하는 방향으로 제2벽체의 일단이 연결되도록 시공되어 이루어지는 T형 연결벽체(T-junction wall) 철근 선조립 배근방법에 있어서, 상기 제1벽체에는 2쌍의 용접철근매트가 일정 간격 이격된 상태로 나란하게 배근되는 동시에 상기 제2벽체에는 용접철근매트가 벤딩에 의해 면가공되어 절곡부를 가지도록 "U" 형태로 성형된 U-메쉬가 배근되도록 시공되는 것으로, 상기 제1벽체에 대응하도록 상기 제2벽체의 어느 일측으로 상기 용접철근매트 1쌍을 일정 간격 이격시켜 나란하게 배열한 상태로 슬라브에 상기 T형 연결벽체 패턴으로 배열되어 돌출되도록 배근 정착용으로 시공된 연결 철근에 연결하여 결속하는 단계와; 상기 제2벽체에 대응하도록 상기 U-메쉬의 하단 수평근 2개를 제거한 상태로 상기 연결 철근에 연결하여 결속하는 단계와; 상기 제1벽체에 대응하도록 상기 제2벽체의 다른 일측으로 상기 용접철근매트 1쌍을 일정 간격 이격시켜 나란하게 배열한 상태로 상기 연결 철근에 연결하여 결속하는 단계와; 상기 제2벽체에 대응하도록 상기 U-메쉬의 하단에 2쌍의 L-바아를 상기 연결 철근에 2단으로 연결하여 결속하는 단계; 및 상기 U-메쉬의 절곡부에 복수의 단위 철근이 연결되도록 결속하여 조립하는 단계;를 포함하는 것을 특징으로 한다.In order to achieve the above-described object, the T-type connection wall rebar pre-assembly arrangement method of the reinforced concrete wall structure building according to claim 13 of the present invention is perpendicular to the first wall constructed as the outer and inner walls of the reinforced concrete wall structure building. In the T-junction wall rebar pre-assembly arrangement method, which is constructed so that one end of the second wall is connected in the direction of At the same time, the second wall is constructed so that the welded reinforcing bar mat is surface processed by bending and a U-mesh formed in a “U” shape is arranged to have a bent portion, so as to correspond to the first wall. 2. A step of arranging a pair of welded reinforcing bar mats side by side on one side of the wall at a certain interval and connecting them to the connecting reinforcing bars constructed for reinforcement fixation so that they are arranged on the slab in the T-shaped connecting wall pattern and protrude. and; Removing the two lower horizontal bars of the U-mesh to correspond to the second wall and connecting them to the connecting bars to bind them; Arranging a pair of welded reinforcing bar mats in parallel at a predetermined interval on the other side of the second wall to correspond to the first wall, and connecting and binding the pair of welded reinforcing bar mats to the connecting reinforcing bars; Connecting and binding two pairs of L-bars at the bottom of the U-mesh to the connecting reinforcing bars in two stages to correspond to the second wall; and assembling by binding a plurality of unit reinforcing bars so that they are connected to bent portions of the U-mesh.

본 발명에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법에 따르면, 시트 형태의 메쉬망으로 이루어진 용접철근매트 및 용접철근매트를 각각 벤딩에 의해 "U" 형태로 면가공하여 형성한 U-메쉬를 각각 규격화되고 세트화된 철근유닛으로 선택 및/또는 조합하여 주배근으로 선조립함으로써, 수직근과 수평근의 가닥 철근 하나 하나의 결속작업을 배제할 수 있게 됨에 따라 철근 배근의 정밀도를 높여 철근콘크리트 품질향상에 기여할 수 있으며, 조립 배근 시간의 효율적인 단축에 의해 공사비의 절감 뿐만 아니라 부품의 간소화와 핸들링 및 관리가 용이하여 안전성 향상에 기여할 수 있다.According to the method of pre-assembling and arranging rebar for a T-type connecting wall of a reinforced concrete wall structure building according to the present invention, a welded rebar mat and a welded rebar mat made of a sheet-shaped mesh network are formed by processing each of the welded rebar mats into a "U" shape by bending. By selecting and/or combining one U-mesh into each standardized and set rebar unit and pre-assembling it into the main bars, it is possible to exclude the work of tying each strand of vertical and horizontal bars, thereby improving the quality of the rebar arrangement. It can contribute to improving the quality of reinforced concrete by increasing precision, and not only can it reduce construction costs by efficiently shortening the assembly and placement time, but it can also contribute to improving safety by simplifying parts and making handling and management easier.

도1은 본 발명에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법이 적용된 건축물의 단위 유닛 평면을 예시적으로 나타내 보인 개략적 평면 구성도.
도2는 본 발명에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법에 이용되도록 규격화된 철근유닛을 개략적으로 도시해 보인 것으로서, (a)는 (b)에 도시해 보인 용접철근매트를 벤딩에 의해 "U" 형태로 면가공하여 형성한 U-메쉬를 예시적으로 나타내 보인 개략적 사시도이고, (b)는 시트 형태의 메쉬망으로 이루어진 용접철근매트를 에시적으로 나타내 보인 개략적 평면도이다.
도3은 본 발명의 제1실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법의 공정 (a)단계 내지 (e)단계를 순차적으로 도시해 보인 개략적 사시도.
도4는 본 발명의 제2실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법의 공정 (a)단계 내지 (e)단계를 순차적으로 도시해 보인 개략적 사시도.
도5는 본 발명의 제3실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법의 공정 (a)단계 내지 (e)단계를 순차적으로 도시해 보인 개략적 사시도.
도6은 본 발명의 제4실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법의 공정 (a)단계 내지 (e)단계를 순차적으로 도시해 보인 개략적 사시도.
도7은 본 발명의 제5실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법의 공정 (a)단계 내지 (e)단계를 순차적으로 도시해 보인 개략적 사시도.
도8은 본 발명의 제6실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법의 공정 (a)단계 내지 (e)단계를 순차적으로 도시해 보인 개략적 사시도.
도9는 본 발명의 제7실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법의 공정 (a)단계 내지 (e)단계를 순차적으로 도시해 보인 개략적 사시도.
도10은 본 발명의 제8실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법의 공정 (a) 내지 (e)를 순차적으로 도시해 보인 개략적 사시도.
도11은 본 발명의 제9실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법의 공정 (a)단계 내지 (e)단계를 순차적으로 도시해 보인 개략적 사시도.
도12는 본 발명의 제10실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법의 공정 (a)단계 내지 (f)단계를 순차적으로 도시해 보인 개략적 사시도.
도13은 본 발명의 제11실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법의 공정 (a)단계 내지 (e)단계를 순차적으로 도시해 보인 개략적 사시도.
도14는 본 발명의 제12실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법의 공정 (a)단계 내지 (e)단계를 순차적으로 도시해 보인 개략적 사시도.
도15는 본 발명의 제13실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법의 공정 (a)단계 내지 (e)단계를 순차적으로 도시해 보인 개략적 사시도.
Figure 1 is a schematic plan configuration diagram illustrating the unit unit plane of a building to which the T-type connecting wall rebar pre-assembly arrangement method of a reinforced concrete wall structure building according to the present invention is applied.
Figure 2 schematically shows a standardized rebar unit to be used in the T-type connecting wall rebar pre-assembly arrangement method of a reinforced concrete wall structure building according to the present invention, where (a) is the welded rebar shown in (b). It is a schematic perspective view illustrating a U-mesh formed by surface processing the mat into a "U" shape by bending, and (b) is a schematic plan view illustrating a welded rebar mat made of a sheet-shaped mesh network. am.
Figure 3 is a schematic perspective view sequentially showing steps (a) to (e) of the process of the T-type connecting wall rebar pre-assembly arrangement method of the reinforced concrete wall structure building according to the first embodiment of the present invention.
Figure 4 is a schematic perspective view sequentially showing steps (a) to (e) of the process of the T-type connection wall rebar pre-assembly arrangement method of the reinforced concrete wall structure building according to the second embodiment of the present invention.
Figure 5 is a schematic perspective view sequentially showing steps (a) to (e) of the T-type connecting wall rebar pre-assembly arrangement method of a reinforced concrete wall structure building according to the third embodiment of the present invention.
Figure 6 is a schematic perspective view sequentially showing steps (a) to (e) of the T-type connecting wall rebar pre-assembly arrangement method of a reinforced concrete wall structure building according to the fourth embodiment of the present invention.
Figure 7 is a schematic perspective view sequentially showing steps (a) to (e) of the T-type connecting wall rebar pre-assembly arrangement method of a reinforced concrete wall structure building according to the fifth embodiment of the present invention.
Figure 8 is a schematic perspective view sequentially showing steps (a) to (e) of the process of the T-type connecting wall rebar pre-assembly arrangement method of the reinforced concrete wall structure building according to the sixth embodiment of the present invention.
Figure 9 is a schematic perspective view sequentially showing steps (a) to (e) of the T-type connecting wall rebar pre-assembly arrangement method of a reinforced concrete wall structure building according to the seventh embodiment of the present invention.
Figure 10 is a schematic perspective view sequentially showing steps (a) to (e) of the T-type connecting wall rebar pre-assembly arrangement method of a reinforced concrete wall structure building according to the eighth embodiment of the present invention.
Figure 11 is a schematic perspective view sequentially showing steps (a) to (e) of the process of the T-type connection wall rebar pre-assembly arrangement method of the reinforced concrete wall structure building according to the ninth embodiment of the present invention.
Figure 12 is a schematic perspective view sequentially showing steps (a) to (f) of the process of the T-type connection wall rebar pre-assembly arrangement method of the reinforced concrete wall structure building according to the tenth embodiment of the present invention.
Figure 13 is a schematic perspective view sequentially showing steps (a) to (e) of the T-type connection wall rebar pre-assembly arrangement method of a reinforced concrete wall structure building according to the 11th embodiment of the present invention.
Figure 14 is a schematic perspective view sequentially showing steps (a) to (e) of the T-type connection wall rebar pre-assembly arrangement method of a reinforced concrete wall structure building according to the 12th embodiment of the present invention.
Figure 15 is a schematic perspective view sequentially showing steps (a) to (e) of the process of the T-type connection wall rebar pre-assembly arrangement method of the reinforced concrete wall structure building according to the 13th embodiment of the present invention.

이하, 첨부된 도면을 참조하여 본 발명에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법을 상세하게 설명한다. 이하의 설명 내용과 첨부된 도면은 본 발명의 바람직한 실시예에 불과한 것으로서, 청구범위에 기재된 본 발명을 한정하는 것은 아니다.Hereinafter, with reference to the attached drawings, the method of assembling and arranging reinforcement bars for a T-type connecting wall of a reinforced concrete wall structure building according to the present invention will be described in detail. The following description and accompanying drawings are merely preferred embodiments of the present invention and do not limit the invention as set forth in the claims.

도1은 본 발명에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법이 적용되는 건축물의 단위 유닛 평면을 예시적으로 나타내 보인 개략적 평면 구성도이다.Figure 1 is a schematic plan configuration diagram illustrating the unit unit plane of a building to which the T-type connecting wall rebar pre-assembly arrangement method of a reinforced concrete wall structure building according to the present invention is applied.

도1을 참조하면 본 발명에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법은, 예시된 건축물의 단위 유닛 평면에서 길이방향(도면의 가로 방향)으로 배열되도록 시공되는 가로방향 벽체(이하, 제1벽체)(W1)에 폭방향(도면의 세로 방향)으로 배열되도록 시공되는 세로방향 벽체(이하, 제2벽체)(W2)의 끝단이 만나 직교하는 상태로 연결되어 T형 연결벽체로 이루어지는 외벽(T-junction outer wall)(T1)과 내벽(T-junction inner wall)(T2)의 철근 배근에 적용된다.Referring to Figure 1, the T-type connection wall rebar pre-assembly arrangement method of a reinforced concrete wall structure building according to the present invention is a horizontal wall constructed to be arranged in the longitudinal direction (transverse direction in the drawing) on the unit unit plane of the exemplified building. (hereinafter, the first wall) (hereinafter, the second wall) (W2), which is constructed to be arranged in the width direction (vertical direction in the drawing) on the (W1), the ends meet and are connected in a perpendicular state to form a T-shaped connection. It is applied to the reinforcement of the T-junction outer wall (T1) and the T-junction inner wall (T2) made of walls.

도2는 본 발명에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법에 이용되도록 규격화된 철근유닛을 개략적으로 도시해 보인 것으로서, (a)는 (b)에 도시해 보인 용접철근매트(110)를 벤딩에 의해 "U" 형태로 면가공하여 형성한 U-메쉬(120)를 예시적으로 나타내 보인 개략적 사시도이고, (b)는 시트 형태의 메쉬망으로 이루어진 용접철근매트(110)를 예시적으로 나타내 보인 개략적 평면도이다.Figure 2 schematically shows a standardized rebar unit to be used in the T-type connecting wall rebar pre-assembly arrangement method of a reinforced concrete wall structure building according to the present invention, where (a) is the welded rebar shown in (b). It is a schematic perspective view illustrating the U-mesh 120 formed by surface processing the mat 110 into a “U” shape by bending, and (b) is a welded reinforcing bar mat 110 made of a sheet-shaped mesh network. ) is a schematic floor plan showing an example.

도2를 참조하면, 상기 용접철근매트(110)는 고강도의 냉간 신선 또는 열간 압연 구조부재 철근을 와이어 메쉬와 같이 복수의 수직근(111)과 수평근(112)이 X-Y 좌표상으로 직교하도록 격자구조로 배열되어 각각의 교차점이 KS 철근 기준을 충족하는 조건 하에서 전기저항용접 공정을 통해 결속되어 메쉬(mesh) 형태의 단위 매트 또는 단위 시트로 이루어진 선조립 철근유닛으로 이용된다.Referring to Figure 2, the welded rebar mat 110 is made of high-strength cold-drawn or hot-rolled structural member rebar in a grid such that a plurality of vertical bars 111 and horizontal bars 112 are orthogonal in the X-Y coordinates, like a wire mesh. It is arranged in a structure and connected through an electric resistance welding process under the condition that each intersection meets the KS rebar standards, and is used as a pre-assembled rebar unit made of mesh-shaped unit mats or unit sheets.

상기 U-메쉬(120)는 상기 용접철근매트(110)의 중앙부 절곡선(113)이 벤딩에 의해 면가공되어 형성된 절곡부(121)에서 양단부의 자유단이 일정 간격 이격된 상태로 나란하게 마주보도록 연장되어 "U" 형태로 형성되는 선조립 철근유닛으로 이용된다.The U-mesh 120 faces each other side by side with the free ends of both ends spaced apart at a certain distance at a bent portion 121 formed by surface processing the central bend line 113 of the welded rebar mat 110 by bending. It is used as a pre-assembled rebar unit that is extended to be seen and formed into a "U" shape.

따라서, 본 발명에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법에서는 상기 용접철근매트(110)와 상기 U-메쉬(mesh)(120)가 각각 규격화된 조립철근 유닛으로 선택되거나 조합되는 주배근으로 시공되는 구성적 특징을 가진다.Therefore, in the pre-assembly arrangement method of the T-type connecting wall rebar of a reinforced concrete wall structure building according to the present invention, the welded rebar mat 110 and the U-mesh 120 are each selected as standardized assembled rebar units or It has the structural characteristic of being constructed with main reinforcements that are combined.

도3은 본 발명의 제1실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법의 공정 (a)단계 내지 (e)단계를 순차적으로 도시해 보인 개략적 사시도로서, 도3의 부호 "310"은 T형 연결벽체로 시공되는 외벽(T-Junction outer wall)(T1) 및 내벽(T-junction inner wall)(T2)의 배근작업에 선행하여 시공되는 거푸집을 나타내 보인 것이다.Figure 3 is a schematic perspective view sequentially showing steps (a) to (e) of the process of the T-type connection wall rebar pre-assembly arrangement method of the reinforced concrete wall structure building according to the first embodiment of the present invention. The symbol "310" indicates the formwork constructed prior to the reinforcement work of the T-junction outer wall (T1) and the T-junction inner wall (T2), which are constructed as T-type connection walls.

도3을 참조하면 본 발명의 제1실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법은, 도3의 (a)에 개략적으로 나타내 보인 바와 같이 상기 용접철근매트(110) 1쌍을 스페이스 철근(S) 등을 이용하여 일정 간격 이격시켜 나란하게 배열한 상태에서 예를 들어 띠철근(Hoop)이나 U-바(Bar) 또는 앵커-바(Anchor-Bar) 등과 같은 통상적인 결속수단(미도시)에 의해 결속하여 제1철근망(1A)을 조립하는 공정단계를 가진다.Referring to Figure 3, the T-type connection wall rebar pre-assembly arrangement method of a reinforced concrete wall structure building according to the first embodiment of the present invention is, as schematically shown in Figure 3 (a), the welded rebar mat (110) ) A pair is arranged side by side at a certain interval using space reinforcing bars (S), etc. There is a process step of assembling the first reinforcing bar network (1A) by binding with a binding means (not shown).

이어서, 도3의 (a) 및 (b)에 개략적으로 나타내 보인 바와 같이 상기 제1철근망(1A)에 상기 U-메쉬(120)의 절곡부(121)가 중첩되도록 직교하는 방향으로 정렬하여 상기한 통상적인 결속수단(미도시)에 의해 결속하여 제2철근망(2A)을 조립하는 공정단계를 가진다.Subsequently, as schematically shown in (a) and (b) of Figure 3, the bent portions 121 of the U-mesh 120 are aligned in a perpendicular direction to overlap the first reinforcing bar network 1A. There is a process step of assembling the second rebar network (2A) by binding using the above-mentioned conventional binding means (not shown).

다음 공정으로, 도3의 (b)에 예시해 보인 바와 같이 상기 제1철근망(1A)의 용접철근매트(110)와 상기 U-메쉬(120)의 절곡부(121)가 직교하도록 연결되는 중첩부에 복수의 단위 철근(10)이 연결되도록 상기한 통상적인 결속수단(미도시)에 의해 결속하여 도3의 (c)에 나타내 보인 바와 같은 제3철근망(1C)을 조립하는 공정단계를 가진다.In the next process, as illustrated in (b) of FIG. 3, the welded reinforcing bar mat 110 of the first reinforcing bar network 1A and the bent portion 121 of the U-mesh 120 are connected so as to be orthogonal. A process step of assembling the third reinforcing bar network (1C) as shown in (c) of Figure 3 by binding a plurality of unit reinforcing bars (10) to the overlapping portion by the above-mentioned conventional binding means (not shown). has

다음 공정으로, 도3의 (c)에 예시해 보인 바와 같이 상기 제1철근망(1A)을 직립되도록 세팅한 상태에서 도3의 (d)에 나타내 보인 바와 같이 크레인(미도시) 등의 장비를 통해 인양하여 상기 용접철근매트(110)와 상기 U-메쉬(120)가 각각 상기 제1벽체(W1)와 제2벽체(W2)에 대응하도록 정렬하고, 도3의 (d)에서와 같이 슬라브(210)에 상방 돌출되도록 배근 정착용으로 설치된 연결철근(start bar)(211)에 수직상태로 세팅한 상태에서 통상적인 결속수단(미도시)에 의해 결속하여 배근작업을 완료한다.In the next process, as shown in (c) of Figure 3, the first reinforcing bar network (1A) is set to be upright, and equipment such as a crane (not shown) is installed as shown in (d) of Figure 3. Lifted through, the welded reinforcing bar mat 110 and the U-mesh 120 are aligned to correspond to the first wall (W1) and the second wall (W2), respectively, as shown in (d) of Figure 3. The reinforcement work is completed by setting the connecting reinforcing bar (start bar) 211 installed to protrude upward from the slab 210 in a vertical state and tying it using a conventional binding means (not shown).

상기한 바와 같은 공정단계로 이루어지는 본 발명의 제1실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법에 따르면, 상기 제1벽체(W1)에는 1쌍의 용접철근매트(110)가 일정 간격 이격된 상태로 나란하게 배열되도록 규격화된 철근유닛이 주배근으로 시공되는 동시에 상기 제2벽체(W1)에는 용접철근매트(110)가 벤딩에 의해 면가공되어 절곡부(121)를 가지도록 "U" 형태로 성형된 U-메쉬(120)가 규격화된 철근유닛이 주배근으로 시공된다.According to the method of assembling and arranging reinforcement bars for a T-type connecting wall of a reinforced concrete wall structure building according to the first embodiment of the present invention, which consists of the above-described process steps, the first wall (W1) includes a pair of welded reinforcement mats ( 110) is constructed as the main bar, and at the same time, the welded rebar mat 110 is surface-processed by bending on the second wall (W1) to form a bent portion 121 so that the bars are arranged side by side at a certain interval. A standardized rebar unit with a U-mesh 120 formed in a “U” shape is constructed as the main reinforcement.

도4는 본 발명의 제2실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법의 공정 (a)단계 내지 (e)단계를 순차적으로 도시해 보인 개략적 사시도로서, 도4의 부호 "310"은 T형 연결벽체로 시공되는 외벽(T-Junction outer wall)(T1) 및 내벽(T-junction inner wall)(T2)의 배근작업에 선행하여 시공되는 거푸집을 나타내 보인 것이다.Figure 4 is a schematic perspective view sequentially showing steps (a) to (e) of the process of the T-type connecting wall rebar pre-assembly arrangement method of the reinforced concrete wall structure building according to the second embodiment of the present invention. The symbol "310" indicates the formwork constructed prior to the reinforcement work of the T-junction outer wall (T1) and the T-junction inner wall (T2), which are constructed as T-type connection walls.

도4를 참조하면 본 발명의 제2실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법은, 도4의 (a)에 개략적으로 나타내 보인 바와 같이 상기 U-메쉬(120) 1쌍을 직교하도록 T형으로 배열하고, 도4의 (b)에 나타낸 바와 같이 예를 들어 띠철근(Hoop)이나 U-바(Bar) 또는 앵커-바(Anchor-Bar) 등과 같은 통상적인 결속수단(미도시)에 의해 결속하여 제1철근망(2A)을 조립하는 공정단계를 가진다.Referring to Figure 4, the T-type connection wall rebar pre-assembly arrangement method of a reinforced concrete wall structure building according to the second embodiment of the present invention is, as schematically shown in Figure 4 (a), the U-mesh (120) ) One pair is arranged in a T shape so as to be orthogonal, and as shown in Figure 4 (b), for example, conventional bars such as hoops, U-bars, or anchor-bars are used. There is a process step of assembling the first reinforcing bar network (2A) by binding by binding means (not shown).

이어서, 도4의 (b)에 도시된 바와 같이 상기 U-메쉬(120)의 절곡부(121)에 각각 복수의 단위 철근(10)이 연결되도록 상기한 통상적인 결속수단(미도시)에 의해 결속하여 제2철근망(2B)을 조립하는 공정단계를 가진다.Subsequently, as shown in (b) of FIG. 4, a plurality of unit reinforcing bars 10 are connected to the bent portions 121 of the U-mesh 120 by the above-described conventional binding means (not shown). There is a process step of assembling the second rebar network (2B) by binding.

다음 공정으로, 도4의 (c)에 도시해 보인 바와 같이 상기 제2철근망(2B)을 직립되도록 세팅한 상태에서 도4의 (d)에 예시한 바와 같이 크레인(미도시) 등의 장비를 통해 상기 제2철근망(2B)을 인양하여 상기 U-메쉬(120)가 각각 상기 제1벽체(W1)와 제2벽체(W2)에 대응하도록 정렬하고, 도4의 (e)에 나타내 보인 같이 슬라브(210)에 상방 돌출되도록 배근 정착용으로 설치된 연결 철근(start bar)(211)에 수직상태로 세팅한 상태에서 통상적인 결속수단(미도시)에 의해 결속하여 조립하는 공정단계를 거쳐 배근작업을 완료한다.In the next process, as shown in (c) of Figure 4, the second reinforcing bar network (2B) is set to be upright, and equipment such as a crane (not shown) is installed as shown in (d) of Figure 4. The second reinforcing bar network (2B) is lifted and aligned so that the U-mesh 120 corresponds to the first wall (W1) and the second wall (W2), respectively, as shown in (e) of Figure 4. As shown, the starting bar (211) installed to protrude upward from the slab (210) is set in a vertical position and goes through a process of assembling by binding with a conventional binding means (not shown). Complete the reinforcement work.

상기한 바와 같은 공정단계로 이루어지는 본 발명의 제2실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법에 따르면, 상기 제1벽체(W1)와 제2벽체(W1)에는 각각 상기 U-메쉬(120)가 규격화된 철근유닛이 주배근으로 시공된다.According to the method of assembling and arranging reinforcement bars for a T-type connecting wall of a reinforced concrete wall structure building according to the second embodiment of the present invention, which consists of the above-described process steps, the first wall (W1) and the second wall (W1) are Each standardized reinforcing bar unit of the U-mesh 120 is constructed as the main reinforcement.

도5는 본 발명의 제3실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법의 공정 (a)단계 내지 (e)단계를 순차적으로 도시해 보인 개략적 사시도로서, 도5의 부호 "310"은 T형 연결벽체로 시공되는 외벽(T-Junction outer wall)(T1) 및 내벽(T-junction inner wall)(T2)의 배근작업에 선행하여 시공되는 거푸집을 나타내 보인 것이다.Figure 5 is a schematic perspective view sequentially showing steps (a) to (e) of the process of the T-type connecting wall rebar pre-assembly arrangement method of the reinforced concrete wall structure building according to the third embodiment of the present invention. The symbol "310" indicates the formwork constructed prior to the reinforcement work of the T-junction outer wall (T1) and the T-junction inner wall (T2), which are constructed as T-type connection walls.

도5를 참조하면 본 발명의 제3실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법은, 도5의 (a)에 도시된 바와 같이 슬라브(210)에 T형 연결벽체 패턴으로 배열되는 상기 제1벽체(W1)와 제2벽체(W2) 중에서 제2벽체(W2)에 돌출되도록 배근 정착용으로 시공된 연결 철근(211)에 단위 U-바아(11)를 결속하는 공정단계를 가진다.Referring to Figure 5, the T-shaped connection wall rebar pre-assembly arrangement method of a reinforced concrete wall structure building according to the third embodiment of the present invention is a T-shaped connection to the slab 210 as shown in (a) of Figure 5. Among the first wall (W1) and the second wall (W2) arranged in a wall pattern, the unit U-bar (11) is bound to the connecting reinforcing bar (211) constructed for anchoring so that it protrudes from the second wall (W2). It has a process step of:

이어서, 도5의 (b) 및 (c)에 나타내 보인 바와 같이 상기 용접철근매트(110) 1쌍을 각각 상기 제1벽체(W1)를 따라 배열되도록 일정 간격 이격시켜 나란하게 배열된 상태로 예를 들어 띠철근(Hoop)이나 U-바(Bar) 또는 앵커-바(Anchor-Bar) 등과 같은 통상적인 결속수단(미도시)에 의해 결속하여 조립하는 공정단계를 가진다.Subsequently, as shown in (b) and (c) of Figure 5, each pair of welded reinforcing bar mats 110 are arranged side by side at a certain interval so as to be arranged along the first wall W1. For example, there is a process step of assembling by binding using common binding means (not shown) such as hoops, U-bars, or anchor-bars.

다음 공정으로, 도5의 (c) 및 (d)에 도시해 보인 바와 같이 복수의 단위 U-바아(11)가 상기 제2벽체(W2)를 따라 일정한 간격의 높이 방향으로 배열되도록 상기 용접철근매트(110)의 각 수평근에 결속하여 조립하는 공정단계를 가진다.In the next process, as shown in (c) and (d) of Figure 5, the welded reinforcing bars are arranged so that a plurality of unit U-bars 11 are arranged in the height direction at regular intervals along the second wall W2. There is a process step of assembling by binding to each horizontal bar of the mat 110.

다음 공정으로, 도5의 (d) 및 (e)에 도시해 보인 바와 같이 상기 용접철근매트(110)와 상기 U-바아(11)의 절곡부가 겹치는 중첩부에 복수의 단위 철근(10)이 연결되도록 통상적인 상기한 결속수단(미도시)에 의해 결속하여 조립하는 공정단계를 거쳐 배근작업을 완료한다.In the next process, as shown in (d) and (e) of Figure 5, a plurality of unit reinforcing bars 10 are formed in the overlapping portion where the bent portions of the welded reinforcing bar mat 110 and the U-bar 11 overlap. The reinforcement work is completed through the process of assembling and binding by the usual binding means (not shown) so as to be connected.

상기한 바와 같은 공정단계로 이루어지는 본 발명의 제3실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법에 따르면, 상기 제1벽체(W1)에는 1쌍의 용접철근매트(110)가 일정 간격 이격된 상태로 나란하게 배근되는 동시에 상기 제2벽체(W2)에는 복수의 단위 U-바아(11)가 배근되도록 시공된다.According to the method of assembling and arranging reinforcement bars for a T-type connecting wall of a reinforced concrete wall structure building according to the third embodiment of the present invention, which consists of the above-described process steps, the first wall (W1) includes a pair of welded reinforcement mats ( 110) are installed in parallel at a certain interval and at the same time, a plurality of unit U-bars 11 are installed on the second wall W2.

도6은 본 발명의 제4실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법의 공정 (a)단계 내지 (e)단계를 순차적으로 도시해 보인 개략적 사시도로서, 도5의 부호 "310"은 T형 연결벽체로 시공되는 외벽(T-Junction outer wall)(T1) 및 내벽(T-junction inner wall)(T2)의 배근작업에 선행하여 시공되는 거푸집을 나타내 보인 것이다.Figure 6 is a schematic perspective view sequentially showing steps (a) to (e) of the T-type connecting wall rebar pre-assembly arrangement method of a reinforced concrete wall structure building according to the fourth embodiment of the present invention. The symbol "310" indicates the formwork constructed prior to the reinforcement work of the T-junction outer wall (T1) and the T-junction inner wall (T2), which are constructed as T-type connection walls.

도6를 참조하면 본 발명의 제4실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법은, 도6의 (a) 및 (b)에 도시된 바와 같이 슬라브(210)에 상기 T형 연결벽체 패턴으로 배열되어 돌출되도록 배근 정착용으로 시공된 연결 철근(211)에 각각 상기 제1벽체(W1)를 따라 대응하여 배열되도록 4개의 단위 철근(10)을 2단으로 연결하여 결속하고, 상기 제2벽체(W2)를 따라 대응하여 배열되도록 1쌍의 단위 U-바아(11)를 2단으로 연결하여 결속하는 공정단계를 가진다.Referring to Figure 6, the T-type connection wall rebar pre-assembly arrangement method of the reinforced concrete wall structure building according to the fourth embodiment of the present invention is the slab 210 as shown in Figures 6 (a) and (b). Four unit reinforcing bars (10) are connected in two stages so as to be arranged correspondingly along the first wall (W1) to the connecting reinforcing bars (211) constructed for anchoring and protruding in the T-shaped connecting wall pattern. and binding, and a process step of connecting and binding a pair of unit U-bars 11 in two stages so as to be correspondingly arranged along the second wall W2.

이어서, 도6의 (b) 및 (c)에 도시된 바와 같이 상기 제1벽체(W1)를 따라 대응하여 배열되도록 1쌍의 용접철근매트(110)의 하단 수평근 2개를 제거한 상태(110b)로 일정 간격 이격시켜 나란하게 배열된 상태로 예를 들어 띠철근(Hoop)이나 U-바(Bar) 또는 앵커-바(Anchor-Bar) 등과 같은 통상적인 결속수단(미도시)에 의해 결속하여 조립하는 공정단계를 가진다.Next, as shown in (b) and (c) of Figure 6, the two lower horizontal bars of the pair of welded reinforcing bar mats 110 are removed so that they are correspondingly arranged along the first wall W1 (110b). ) are arranged side by side at regular intervals and are tied together by conventional binding means (not shown) such as hoops, U-bars, or anchor-bars. It has an assembly process step.

다음 공정으로, 도6의 (c) 및 (d)에 도시된 바와 같이 상기 제2벽체(W2)를 따라 대응하여 배열되도록 상기 U-메쉬(120)의 하단 수평근 2개를 제거한 상태(120b)로 상기 연결 철근(211)에 결속하여 절곡부(121)가 상기 용접철근매트(110)에 겹쳐져 중첩되도록 조립하는 공정단계를 가진다.In the next process, as shown in (c) and (d) of Figure 6, the two lower horizontal bars of the U-mesh 120 are removed so that they are correspondingly arranged along the second wall W2 (120b). ) has a process step of assembling the connecting reinforcing bar 211 so that the bent portion 121 overlaps and overlaps the welded reinforcing bar mat 110.

다음 공정으로, 도6의 (d) 및 (e)에 도시된 바와 같이 상기 U-메쉬(120b)의 절곡부(121)와 상기 용접철근매트(110b)의 중첩부에 복수의 단위 철근(10)이 연결되도록 결속하여 조립하는 공정단계를 거쳐 배근작업을 완료한다.In the next process, as shown in (d) and (e) of Figure 6, a plurality of unit reinforcing bars (10) are formed in the overlapping portion of the bent portion 121 of the U-mesh 120b and the welded reinforcing bar mat 110b. ) is completed by going through the assembly process step of tying and assembling them so that they are connected.

상기한 바와 같은 공정단계로 이루어지는 본 발명의 제4실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법에 따르면, 상기 제1벽체(W1)에는 1쌍의 용접철근매트(110)가 일정 간격 이격된 상태로 나란하게 배근되는 동시에 상기 제2벽체(W2)에는 용접철근매트(110)가 벤딩에 의해 면가공되어 절곡부(121)를 가지도록 "U" 형태로 성형된 U-메쉬(120)가 배근되도록 시공된다.According to the method of assembling and arranging reinforcement bars for a T-type connecting wall of a reinforced concrete wall structure building according to the fourth embodiment of the present invention, which consists of the above-described process steps, the first wall (W1) includes a pair of welded reinforcement mats ( 110) are arranged side by side at regular intervals, and at the same time, the welded reinforcing bar mat 110 is surface processed by bending in the second wall (W2) and is formed into a “U” shape to have a bent portion 121. It is constructed so that the U-mesh 120 is placed.

도7은 본 발명의 제5실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법의 공정 (a)단계 내지 (e)단계를 순차적으로 도시해 보인 개략적 사시도로서, 도7의 부호 "310"은 T형 연결벽체로 시공되는 외벽(T-Junction outer wall)(T1) 및 내벽(T-junction inner wall)(T2)의 배근작업에 선행하여 시공되는 거푸집을 나타내 보인 것이다.Figure 7 is a schematic perspective view sequentially showing steps (a) to (e) of the process of the T-type connection wall rebar pre-assembly arrangement method of the reinforced concrete wall structure building according to the fifth embodiment of the present invention. The symbol "310" indicates the formwork constructed prior to the reinforcement work of the T-junction outer wall (T1) and the T-junction inner wall (T2), which are constructed as T-type connection walls.

도7을 참조하면 본 발명의 제5실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법은, 도7의 (a) 및 (b)에 도시된 바와 같이 슬라브(210)에 상기 T형 연결벽체 패턴으로 배열되어 돌출되도록 배근 정착용으로 시공된 연결 철근(211)에 상기 제2벽체(W2)를 따라 대응하여 배열되도록 단위 U-바아(11)를 연결하여 결속하는 공정단계를 가진다.Referring to Figure 7, the T-type connection wall rebar pre-assembly arrangement method of the reinforced concrete wall structure building according to the fifth embodiment of the present invention is the slab 210 as shown in (a) and (b) of Figure 7. A process of connecting and binding unit U-bars 11 to be arranged correspondingly along the second wall W2 to the connecting reinforcing bars 211 constructed for anchoring and protruding in the T-shaped connecting wall pattern. It has steps.

이어서, 도7의 (b) 및 (c)에 도시된 바와 같이 상기 제1벽체(W1)를 따라 대응하여 배열되도록 1쌍의 용접철근매트(110)를 일정 간격 이격시켜 나란하게 배열된 상태로 연결하여 결속하는 공정단계를 가진다.Next, as shown in (b) and (c) of Figure 7, a pair of welded reinforcing bar mats 110 are arranged side by side at a certain interval so as to be correspondingly arranged along the first wall W1. It has a process step of connecting and binding.

다음 공정으로, 도7의 (c) 및 (d)에 도시된 바와 같이 상기 제2벽체(W2)를 따라 대응하여 배열되도록 상기 U-메쉬(120)의 하단 수평근 1개를 제거한 상태(120a)로 상기 연결 철근(211)에 결속하여 절곡부(121)가 상기 용접철근매트(110)에 겹쳐져 중첩되도록 조립하는 공정단계를 가진다.In the next process, as shown in (c) and (d) of Figure 7, one lower horizontal bar of the U-mesh 120 is removed so that it is correspondingly arranged along the second wall (W2) (120a) ) has a process step of assembling the connecting reinforcing bar 211 so that the bent portion 121 overlaps and overlaps the welded reinforcing bar mat 110.

다음 공정으로, 도7의 (d) 및 (e)에 도시된 바와 같이 상기 U-메쉬(120a)의 절곡부(121)와 상기 용접철근매트(110)의 중첩부에 복수의 단위 철근(10)이 연결되도록 결속하여 조립하는 공정단계를 거쳐 배근작업을 완료한다.In the next process, as shown in (d) and (e) of Figure 7, a plurality of unit reinforcing bars (10) are formed in the overlapping portion of the bent portion 121 of the U-mesh 120a and the welded reinforcing bar mat 110. ) is completed by going through the assembly process step of tying and assembling them so that they are connected.

상기한 바와 같은 공정단계로 이루어지는 본 발명의 제5실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법에 따르면, 상기 제1벽체(W1)에는 1쌍의 용접철근매트(110)가 일정 간격 이격된 상태로 나란하게 배근되는 동시에 상기 제2벽체(W2)에는 용접철근매트(110)가 벤딩에 의해 면가공되어 절곡부(121)를 가지도록 "U" 형태로 성형된 U-메쉬(120)가 배근되도록 시공된다.According to the T-type connecting wall rebar pre-assembly arrangement method of a reinforced concrete wall structure building according to the fifth embodiment of the present invention consisting of the process steps as described above, the first wall (W1) includes a pair of welded rebar mats ( 110) are arranged side by side at regular intervals, and at the same time, the welded reinforcing bar mat 110 is surface processed by bending in the second wall (W2) and is formed into a “U” shape to have a bent portion 121. It is constructed so that the U-mesh 120 is placed.

도8은 본 발명의 제6실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법의 공정 (a)단계 내지 (e)단계를 순차적으로 도시해 보인 개략적 사시도로서, 도8의 부호 "310"은 T형 연결벽체로 시공되는 외벽(T-Junction outer wall)(T1) 및 내벽(T-junction inner wall)(T2)의 배근작업에 선행하여 시공되는 거푸집을 나타내 보인 것이다.Figure 8 is a schematic perspective view sequentially showing steps (a) to (e) of the process of the T-type connection wall rebar pre-assembly arrangement method of the reinforced concrete wall structure building according to the sixth embodiment of the present invention. The symbol "310" indicates the formwork constructed prior to the reinforcement work of the T-junction outer wall (T1) and the T-junction inner wall (T2), which are constructed as T-type connection walls.

도8을 참조하면 본 발명의 제6실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법은, 도8의 (a) 및 (b)에 도시된 바와 같이 상기 제1벽체(W1)를 따라 대응하여 배열되도록 1쌍의 용접철근매트(110)를 일정 간격 이격시켜 나란하게 배열된 상태로 연결하여 결속하는 공정단계를 가진다.Referring to Figure 8, the T-type connecting wall rebar pre-assembly arrangement method of the reinforced concrete wall structure building according to the sixth embodiment of the present invention is as shown in Figures 8 (a) and (b), the first wall There is a process step of connecting and binding a pair of welded reinforcing bar mats 110 arranged side by side at a certain interval so that they are arranged correspondingly along (W1).

이어서, 도8의 (b) 및 (c)에 도시된 바와 같이 슬라브(210)에 상기 T형 연결벽체 패턴으로 배열되어 돌출되도록 배근 정착용으로 시공된 연결 철근(211)에 상기 제2벽체(W2)를 따라 대응하여 배열되도록 단위 L-바아(12) 4개를 2단으로 연결하여 결속하는 공정단계를 가진다.Subsequently, as shown in (b) and (c) of Figure 8, the second wall ( There is a process step of connecting and binding four unit L-bars (12) in two stages so that they are arranged correspondingly along W2).

다음 공정으로, 도8의 (c) 및 (d)에 도시된 바와 같이 상기 제2벽체(W2)를 따라 대응하여 배열되도록 상기 U-메쉬(120)의 하단 수평근 2개를 제거한 상태(120b)로 상기 연결 철근(211)에 결속하여 절곡부(121)가 상기 용접철근매트(110)에 겹쳐져 중첩되도록 결속하여 조립하는 공정단계를 가진다.In the next process, as shown in (c) and (d) of Figure 8, the two lower horizontal bars of the U-mesh 120 are removed so that they are correspondingly arranged along the second wall W2 (120b). ) has a process step of binding and assembling the connecting reinforcing bar 211 so that the bent portion 121 overlaps and overlaps the welded reinforcing bar mat 110.

다음 공정으로, 도8의 (d) 및 (e)에 도시된 바와 같이 상기 U-메쉬(120b)의 절곡부(121)와 상기 용접철근매트(110)의 중첩부에 복수의 단위 철근(10)이 연결되도록 결속하여 조립하는 공정단계를 거쳐 배근작업을 완료한다.In the next process, as shown in (d) and (e) of Figure 8, a plurality of unit reinforcing bars (10) are formed in the overlapping portion of the bent portion 121 of the U-mesh 120b and the welded reinforcing bar mat 110. ) is completed by going through the assembly process step of tying and assembling them so that they are connected.

상기한 바와 같은 공정단계로 이루어지는 본 발명의 제6실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법에 따르면, 상기 제1벽체(W1)에는 1쌍의 용접철근매트(110)가 일정 간격 이격된 상태로 나란하게 배근되는 동시에 상기 제2벽체(W2)에는 용접철근매트(110)가 벤딩에 의해 면가공되어 절곡부(121)를 가지도록 "U" 형태로 성형된 U-메쉬(120)가 배근되도록 시공된다.According to the T-type connecting wall rebar pre-assembly arrangement method of a reinforced concrete wall structure building according to the sixth embodiment of the present invention, which consists of the above-described process steps, the first wall (W1) includes a pair of welded rebar mats ( 110) are arranged side by side at regular intervals, and at the same time, the welded reinforcing bar mat 110 is surface processed by bending in the second wall (W2) and is formed into a “U” shape to have a bent portion 121. It is constructed so that the U-mesh 120 is placed.

도9는 본 발명의 제7실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법의 공정 (a)단계 내지 (e)단계를 순차적으로 도시해 보인 개략적 사시도로서, 도9의 부호 "310"은 T형 연결벽체로 시공되는 외벽(T-Junction outer wall)(T1) 및 내벽(T-junction inner wall)(T2)의 배근작업에 선행하여 시공되는 거푸집을 나타내 보인 것이다.Figure 9 is a schematic perspective view sequentially showing steps (a) to (e) of the process of the T-type connection wall rebar pre-assembly arrangement method of the reinforced concrete wall structure building according to the seventh embodiment of the present invention. The symbol "310" indicates the formwork constructed prior to the reinforcement work of the T-junction outer wall (T1) and the T-junction inner wall (T2), which are constructed as T-type connection walls.

도9를 참조하면 본 발명의 제7실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법은, 도9의 (a)에 도시된 바와 같이 상기 용접철근매트(110) 1쌍을 스페이스 철근(S) 등을 이용하여 일정 간격 이격시켜 나란하게 배열한 상태에서 예를 들어 띠철근(Hoop)이나 U-바(Bar) 또는 앵커-바(Anchor-Bar) 등과 같은 통상적인 결속수단(미도시)에 의해 결속하여 제1철근망(1A)을 조립하는 공정단계를 가진다.Referring to Figure 9, the method of assembling and arranging reinforcement for a T-shaped connecting wall of a reinforced concrete wall structure building according to the seventh embodiment of the present invention is as shown in (a) of Figure 9, the welded reinforcement mat (110) 1 Pairs are arranged side by side at regular intervals using space reinforcing bars (S), etc., and are then used for conventional binding such as hoops, U-bars, or anchor-bars. There is a process step of assembling the first reinforcing bar network (1A) by binding by means (not shown).

이어서, 도9의 (b) 및 (c)에 도시된 바와 같이 슬라브(210)에 상기 T형 연결벽체 패턴으로 배열되어 돌출되도록 배근 정착용으로 시공된 연결 철근(211)에 상기 제1철근망(1A)을 상기 제1벽체(W1)를 따라 대응하여 배열되도록 상기 제1철근망(1A)을 조립하는 단계와, 상기 제2벽체(W2)를 따라 대응하여 배열되도록 연결 철근(211)에 단위 U-바아(11)를 연결하여 결속하는 공정단계를 가진다.Subsequently, as shown in (b) and (c) of Figure 9, the first reinforcing bar network is connected to the connecting reinforcing bars 211 constructed for anchoring the reinforcement so that they are arranged in the T-shaped connecting wall pattern and protrude from the slab 210. (1A) assembling the first reinforcing bar network (1A) to be correspondingly arranged along the first wall (W1), and attaching the connecting reinforcing bars (211) to be correspondingly arranged along the second wall (W2). It has a process step of connecting and binding the unit U-bars (11).

다음 공정으로, 도9의 (c) 및 (d)에 도시된 바와 같이 상기 U-메쉬(120)의 하단 수평근 1개를 제거한 상태(120a)로 상기 제2벽체(W2)를 따라 대응하여 배열되도록 상기 연결 철근(211)에 결속하여 상기 U-메쉬(120)의 절곡부(121)가 상기 용접철근매트(110)에 겹쳐져 중첩되도록 조립하는 공정단계를 가진다.In the next process, as shown in Figures 9 (c) and (d), one lower horizontal bar of the U-mesh 120 is removed (120a) and correspondingly along the second wall (W2). There is a process step of assembling the connecting reinforcing bars 211 so that the bent portions 121 of the U-mesh 120 overlap with the welded reinforcing bar mat 110.

다음 공정으로, 도9의 (d) 및 (e)에 도시된 바와 같이 상기 U-메쉬(120a)의 절곡부(121)와 상기 용접철근매트(110)의 중첩부에 복수의 단위 철근(10)이 연결되도록 결속하여 조립하는 공정단계를 거쳐 배근작업을 완료한다.In the next process, as shown in (d) and (e) of Figure 9, a plurality of unit reinforcing bars (10) are formed in the overlapping portion of the bent portion 121 of the U-mesh 120a and the welded reinforcing bar mat 110. ) is completed by going through the assembly process step of tying and assembling them so that they are connected.

상기한 바와 같은 공정단계로 이루어지는 본 발명의 제7실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법에 따르면, 상기 제1벽체(A1)에는 1쌍의 용접철근매트(110)가 일정 간격 이격된 상태로 나란하게 주배근으로 시공되는 동시에 상기 제2벽체(W2)에는 용접철근매트(110)가 벤딩에 의해 면가공되어 절곡부(121)를 가지도록 "U" 형태로 성형된 U-메쉬(120) 및 단위 U-바아(11)가 배근되도록 시공된다.According to the T-type connecting wall rebar pre-assembly arrangement method of a reinforced concrete wall structure building according to the seventh embodiment of the present invention, which consists of the above-described process steps, the first wall (A1) includes a pair of welded rebar mats ( 110) are constructed as main bars in parallel at regular intervals, and at the same time, the welded reinforcing bar mat 110 is processed by bending on the second wall (W2) to form a "U" shape to have a bent portion 121. The formed U-mesh 120 and the unit U-bar 11 are constructed to be reinforced.

도10은 본 발명의 제8실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법의 공정 (a)단계 내지 (e)단계를 순차적으로 도시해 보인 개략적 사시도로서, 도10의 부호 "310"은 T형 연결벽체로 시공되는 외벽(T-Junction outer wall)(T1) 및 내벽(T-junction inner wall)(T2)의 배근작업에 선행하여 시공되는 거푸집을 나타내 보인 것이다.Figure 10 is a schematic perspective view sequentially showing steps (a) to (e) of the process of the T-type connection wall rebar pre-assembly arrangement method of the reinforced concrete wall structure building according to the eighth embodiment of the present invention. The symbol "310" indicates the formwork constructed prior to the reinforcement work of the T-junction outer wall (T1) and the T-junction inner wall (T2), which are constructed as T-type connection walls.

도10을 참조하면 본 발명의 제8실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법은, 도10의 (a) 및 (b)에 도시된 바와 같이상기 용접철근매트(110) 1쌍을 스페이스 철근 등을 이용하여 일정 간격 이격시켜 나란하게 배열한 상태에서 예를 들어 띠철근(Hoop)이나 U-바(Bar) 또는 앵커-바(Anchor-Bar) 등과 같은 통상적인 결속수단(미도시)에 의해 결속하여 조립하는 공정단계를 가진다.Referring to Figure 10, the T-type connection wall rebar pre-assembly arrangement method of a reinforced concrete wall structure building according to the eighth embodiment of the present invention is as shown in Figures 10 (a) and (b), the welded rebar mat (110) A pair is arranged side by side at a certain interval using space bars, etc., and then, for example, conventional bars such as hoops, U-bars, or anchor-bars are used. It has a process step of assembling and binding by binding means (not shown).

이어서, 도10의 (b) 및 (c)에 도시된 바와 같이 슬라브(210)에 상기 T형 연결벽체 패턴으로 배열되어 돌출되도록 배근 정착용으로 시공된 연결 철근(211)에 상기 제2벽체(W2)를 따라 대응하여 배열되도록 상기한 결속수단(미도시)에 의해 단위 L-바아(12) 4개를 2단으로 연결하여 결속하는 공정단계를 가진다.Next, as shown in (b) and (c) of Figure 10, the second wall ( There is a process step of connecting and binding the four unit L-bars 12 in two stages by the above-mentioned binding means (not shown) so that they are arranged correspondingly along W2).

다음 공정으로, 도10의 (c) 및 (d)에 도시된 바와 같이 상기 제2벽체(W2)를 따라 대응하여 배열되도록 상기 U-메쉬(120)의 하단 수평근 2개를 제거한 상태(120b)로 상기 연결 철근(211)에 결속하여 상기 U-메쉬(120b)의 절곡부(121)가 상기 용접철근매트(110)에 겹쳐져 중첩되도록 조립하는 공정단계를 가진다.In the next process, as shown in (c) and (d) of Figure 10, the two lower horizontal bars of the U-mesh 120 are removed so that they are correspondingly arranged along the second wall W2 (120b). ) has a process step of assembling the connecting reinforcing bar 211 so that the bent portion 121 of the U-mesh 120b overlaps with the welded reinforcing bar mat 110.

다음 공정으로, 도10의 (d) 및 (e)에 도시된 바와 같이 상기 U-메쉬(120b)의 절곡부(121)와 상기 용접철근매트(110)의 중첩부에 복수의 단위 철근(10)이 연결되도록 결속하여 조립하는 공정단계를 거쳐 배근작업을 완료한다.In the next process, as shown in (d) and (e) of Figure 10, a plurality of unit reinforcing bars (10) are formed in the overlapping portion of the bent portion 121 of the U-mesh 120b and the welded reinforcing bar mat 110. ) is completed by going through the assembly process step of tying and assembling them so that they are connected.

상기한 바와 같은 공정단계로 이루어지는 본 발명의 제8실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법에 따르면, 상기 제1벽체(W1)에는 1쌍의 용접철근매트(110)가 일정 간격 이격된 상태로 나란하게 주배근으로 시공되는 동시에 상기 제2벽체(W2)에는 용접철근매트(110)가 벤딩에 의해 면가공되어 절곡부(121)를 가지도록 "U" 형태로 성형된 U-메쉬(120)와 단위 L-바아(12) 2쌍이 2단으로 배근되도록 시공된다. According to the T-type connecting wall rebar pre-assembly arrangement method of a reinforced concrete wall structure building according to the eighth embodiment of the present invention, which consists of the above-described process steps, the first wall (W1) includes a pair of welded rebar mats ( 110) are constructed as main bars in parallel at regular intervals, and at the same time, the welded reinforcing bar mat 110 is processed by bending on the second wall (W2) to form a "U" shape to have a bent portion 121. The formed U-mesh (120) and two pairs of unit L-bars (12) are constructed so that they are arranged in two stages.

도11은 본 발명의 제9실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법의 공정 (a)단계 내지 (e)단계를 순차적으로 도시해 보인 개략적 사시도로서, 도11의 부호 "310"은 T형 연결벽체로 시공되는 외벽(T-Junction outer wall)(T1) 및 내벽(T-junction inner wall)(T2)의 배근작업에 선행하여 시공되는 거푸집을 나타내 보인 것이다.Figure 11 is a schematic perspective view sequentially showing steps (a) to (e) of the process of the T-type connection wall rebar pre-assembly arrangement method of the reinforced concrete wall structure building according to the ninth embodiment of the present invention. The symbol "310" indicates the formwork constructed prior to the reinforcement work of the T-junction outer wall (T1) and the T-junction inner wall (T2), which are constructed as T-type connection walls.

도11을 참조하면 본 발명의 제9실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법은, 도11의 (a) 및 (b)에 도시된 바와 같이 슬라브(210)에 상기 T형 연결벽체 패턴으로 배열되어 돌출되도록 배근 정착용으로 시공된 연결 철근(211)에 상기 제2벽체(W2)를 따라 대응하여 배열되도록 단위 U-바아(11)를 연결하여 결속하고, 상기 제1벽체(W1)를 따라 대응하여 어느 일측으로 배열되도록 상기 연결 철근(211)에 예를 들어 띠철근(Hoop)이나 U-바(Bar) 또는 앵커-바(Anchor-Bar) 등과 같은 통상적인 결속수단(미도시)을 통해 상기 U-메쉬(120)를 연결하여 결속하는 공정단계를 가진다.Referring to Figure 11, the T-type connection wall rebar pre-assembly arrangement method of the reinforced concrete wall structure building according to the ninth embodiment of the present invention is the slab 210 as shown in Figures 11 (a) and (b). Unit U-bars 11 are connected and bound to the connecting reinforcing bars 211 constructed for reinforcement fixation so as to protrude and are arranged in the T-shaped connecting wall pattern, so as to be correspondingly arranged along the second wall W2, Conventional reinforcement such as, for example, a hoop, a U-bar, or an anchor-bar is attached to the connecting reinforcing bar 211 so that it is arranged on one side correspondingly along the first wall (W1). There is a process step of connecting and binding the U-mesh 120 through a phosphor binding means (not shown).

이어서, 도11의 (b) 및 (c)에 도시된 바와 같이 상기 U-메쉬(120)의 하단 수평근 1개를 제거한 상태(120a)로 상기 제2벽체(W2)를 따라 대응하여 배열되도록 상기 연결 철근(211)에 결속하여 상기 U-메쉬(120a)의 절곡부(121)가 상기 U-메쉬(120)에 겹쳐져 중첩되도록 결속하는 공정단계를 가진다.Subsequently, as shown in (b) and (c) of Figure 11, one lower horizontal bar of the U-mesh 120 is removed (120a) and arranged correspondingly along the second wall (W2). There is a process step of binding to the connecting reinforcing bar 211 so that the bent portion 121 of the U-mesh 120a overlaps the U-mesh 120.

다음 공정으로, 도11의 (c) 및 (d)에 도시된 바와 같이 상기 제1벽체(W1)를 따라 대응하여 다른 일측으로 배열되도록 상기 U-메쉬(120)와 상기 연결 철근(211)에 상기 용접철근매트(110) 1쌍을 일정 간격 이격시켜 나란하게 배열한 상태로 연결하여 결속하는 공정단계를 가진다.In the next process, as shown in (c) and (d) of Figure 11, the U-mesh 120 and the connecting reinforcing bar 211 are arranged on the other side correspondingly along the first wall W1. There is a process step of connecting and binding a pair of the welded reinforcing bar mats 110 in a parallel arrangement at a certain interval.

다음 공정으로, 도11의 (d) 및 (e)에 도시된 바와 같이 상기 U-메쉬(120)(120a)의 절곡부(121)에 각각 복수의 단위 철근(10)이 연결되도록 상기한 결속수단(미도시)에 의해 결속하여 조립하는 공정단계를 거쳐 배근작업을 완료한다.In the next process, as shown in (d) and (e) of Figure 11, the plurality of unit reinforcing bars 10 are connected to the bent portions 121 of the U-mesh 120 (120a), respectively. The reinforcement work is completed through the process of binding and assembling by means (not shown).

상기한 바와 같은 공정단계로 이루어지는 본 발명의 제9실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법에 따르면, 상기 제1벽체(W1)에는 상기 U-메쉬(120) 및 그 U-메쉬(120)에 1쌍의 용접철근매트(110)가 일정 간격 이격된 상태로 나란하게 주배근으로 시공되는 동시에 상기 제2벽체(W2)에는 상기 U-메쉬(120)가 배근되도록 시공된다.According to the method of assembling and arranging reinforcement bars for a T-type connecting wall of a reinforced concrete wall structure building according to the ninth embodiment of the present invention, which consists of the process steps as described above, the U-mesh 120 is provided in the first wall (W1). And a pair of welded reinforcing bar mats 110 are installed as main bars on the U-mesh 120 in parallel with a certain distance apart, and at the same time, the U-mesh 120 is placed on the second wall W2. It is constructed as much as possible.

도12는 본 발명의 제10실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법의 공정 (a)단계 내지 (f)단계를 순차적으로 도시해 보인 개략적 사시도로서, 도12의 부호 "310"은 T형 연결벽체로 시공되는 외벽(T-Junction outer wall)(T1) 및 내벽(T-junction inner wall)(T2)의 배근작업에 선행하여 시공되는 거푸집을 나타내 보인 것이다.Figure 12 is a schematic perspective view sequentially showing steps (a) to (f) of the process of the T-type connection wall rebar pre-assembly arrangement method of the reinforced concrete wall structure building according to the tenth embodiment of the present invention. The symbol "310" indicates the formwork constructed prior to the reinforcement work of the T-junction outer wall (T1) and the T-junction inner wall (T2), which are constructed as T-type connection walls.

도12를 참조하면 본 발명의 제10실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법은, 도12의 (a) 및 (b)에 도시된 바와 같이 슬라브(210)에 상기 T형 연결벽체 패턴으로 배열되어 돌출되도록 배근 정착용으로 시공된 연결 철근(211)에 상기 제1벽체(W1)를 따라 대응하여 어느 일측으로 배열되도록 상기 U-메쉬(120)를 예를 들어 띠철근(Hoop)이나 U-바(Bar) 또는 앵커-바(Anchor-Bar) 등과 같은 통상적인 결속수단(미도시)을 통해 연결하여 결속하는 공정단계를 가진다.Referring to Figure 12, the T-type connecting wall rebar pre-assembly arrangement method of the reinforced concrete wall structure building according to the tenth embodiment of the present invention is the slab 210 as shown in Figures 12 (a) and (b). For example, the U-mesh 120 is arranged on one side corresponding to the first wall W1 to the connecting reinforcing bars 211 constructed for anchoring and protruding in the T-shaped connecting wall pattern. For example, there is a process step of connecting and binding through common binding means (not shown) such as hoops, U-bars, or anchor-bars.

이어서, 도12의 (b) 및 (c)에 도시된 바와 같이 상기 제2벽체(W2)를 따라 대응하여 배열되도록 상기 U-메쉬(120)의 하단 수평근 2개를 제거한 상태(120b)로 상기 연결 철근(211)에 결속하여 상기 U-메쉬(120b)의 절곡부(121)가 상기 U-메쉬(120)에 겹쳐져 중첩되도록 결속하는 공정단계를 가진다.Next, as shown in (b) and (c) of FIG. 12, the two lower horizontal bars of the U-mesh 120 are removed so as to be correspondingly arranged along the second wall W2 (120b). There is a process step of binding to the connecting reinforcing bar 211 so that the bent portion 121 of the U-mesh 120b overlaps the U-mesh 120.

다음 공정으로, 도12의 (c) 및 (d)에 도시된 바와 같이 상기 U-메쉬(120b)의 하단에 상기 제2벽체(W2)를 따라 대응하여 배열되도록 상기 연결 철근(211)에 2쌍의 L-바아(12)를 2단으로 연결하여 결속하는 공정단계를 가진다.In the next process, as shown in (c) and (d) of Figure 12, 2 is added to the connecting reinforcing bar 211 to be correspondingly arranged along the second wall (W2) at the bottom of the U-mesh (120b). There is a process step of connecting and binding a pair of L-bars (12) in two stages.

다음 공정으로, 도12의 (d) 및 (e)에 도시된 바와 같이 상기 제1벽체(W1)를 따라 대응하여 다른 일측으로 배열되도록 상기 U-메쉬(120)와 상기 연결 철근(211)에 각각 상기 용접철근매트(110) 1쌍을 일정 간격 이격시켜 나란하게 배열한 상태로 연결하여 결속하는 공정단계를 가진다.In the next process, as shown in (d) and (e) of Figure 12, the U-mesh 120 and the connecting reinforcing bar 211 are arranged on the other side correspondingly along the first wall W1. Each has a process step of connecting and binding a pair of the welded rebar mats 110 in a parallel arrangement at a certain interval.

다음 공정으로, 도12의 (e) 및 (f)에 도시된 바와 같이 상기 U-메쉬(120)(120b)의 절곡부(121)에 각각 복수의 단위 철근(10)이 연결되도록 상기한 결속수단(미도시)에 의해 결속하여 조립하는 공정단계를 거쳐 배근작업을 완료한다.In the next process, as shown in (e) and (f) of Figure 12, the plurality of unit reinforcing bars 10 are connected to the bent portions 121 of the U-mesh 120 and 120b, respectively. The reinforcement work is completed through the process of binding and assembling by means (not shown).

상기한 바와 같은 공정단계로 이루어지는 본 발명의 제10실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법에 따르면, 상기 제1벽체(W1)에는 상기 U-메쉬(120) 및 그 U-메쉬(120)에 1쌍의 용접철근매트(110)가 일정 간격 이격된 상태로 나란하게 주배근으로 시공되는 동시에 상기 제2벽체(W2)에는 상기 U-메쉬(120) 및 그 하단에 2쌍의 L-바아(12)가 2단으로 배근되도록 시공된다.According to the method of assembling and arranging reinforcement bars for a T-type connecting wall of a reinforced concrete wall structure building according to the tenth embodiment of the present invention, which consists of the process steps described above, the U-mesh 120 is provided in the first wall W1. And a pair of welded reinforcing bar mats 110 are constructed side by side as main reinforcement on the U-mesh 120 at a predetermined interval, and at the same time, the U-mesh 120 and the second wall W2 are installed on the U-mesh 120. At the bottom, two pairs of L-bars (12) are constructed so that they are arranged in two stages.

도13은 본 발명의 제11실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법의 공정 (a)단계 내지 (e)단계를 순차적으로 도시해 보인 개략적 사시도로서, 도13의 부호 "310"은 T형 연결벽체로 시공되는 외벽(T-Junction outer wall)(T1) 및 내벽(T-junction inner wall)(T2)의 배근작업에 선행하여 시공되는 거푸집을 나타내 보인 것이다.Figure 13 is a schematic perspective view sequentially showing steps (a) to (e) of the process of the T-type connection wall rebar pre-assembly arrangement method of the reinforced concrete wall structure building according to the 11th embodiment of the present invention. The symbol "310" indicates the formwork constructed prior to the reinforcement work of the T-junction outer wall (T1) and the T-junction inner wall (T2), which are constructed as T-type connection walls.

도13을 참조하면 본 발명의 제11실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법은, 도13의 (a) 및 (b)에 도시된 바와 같이 슬라브(210)에 상기 T형 연결벽체 패턴으로 배열되어 돌출되도록 배근 정착용으로 시공된 연결 철근(211)에 상기 제2벽체(W2)를 따라 대응하여 배열되도록 상기 U-메쉬(120)를 예를 들어 띠철근(Hoop)이나 U-바(Bar) 또는 앵커-바(Anchor-Bar) 등과 같은 통상적인 결속수단(미도시)을 통해 연결하여 결속하는 공정단계를 가진다.Referring to Figure 13, the T-type connecting wall rebar pre-assembly arrangement method of the reinforced concrete wall structure building according to the 11th embodiment of the present invention is the slab 210 as shown in Figures 13 (a) and (b). For example, the U-mesh 120 is arranged in the T-shaped connecting wall pattern and is arranged in a corresponding manner along the second wall W2 to the connecting reinforcing bars 211 constructed for anchoring and protruding. There is a process step of connecting and binding through common binding means (not shown) such as (Hoop), U-Bar, or Anchor-Bar.

이어서, 도13의 (b) 및 (c)에 도시된 바와 같이 상기 제1벽체(W1)를 따라 대응하여 배열되도록 상기 U-메쉬(120)의 어느 일측으로 상기 용접철근매트(110) 1쌍을 일정 간격 이격시켜 나란하게 배열한 상태로 상기 연결 철근(211)에 연결하여 결속하는 공정단계를 가진다.Subsequently, as shown in (b) and (c) of Figure 13, a pair of the welded reinforcing bar mats 110 are placed on either side of the U-mesh 120 to be correspondingly arranged along the first wall W1. There is a process step of connecting and binding to the connecting reinforcing bar 211 in a state in which they are arranged side by side at regular intervals.

다음 공정으로, 도13의 (c) 및 (d)에 도시된 바와 같이 상기 제1벽체(W1)를 따라 대응하여 배열되도록 상기 U-메쉬(120)의 다른 일측으로 상기 용접철근매트(110) 1쌍을 일정 간격 이격시켜 나란하게 배열한 상태로 상기 연결 철근(211)에 연결하여 결속하는 공정단계를 가진다.In the next process, the welded reinforcing bar mat 110 is placed on the other side of the U-mesh 120 to be correspondingly arranged along the first wall W1, as shown in (c) and (d) of Figure 13. There is a process step of connecting and binding the pair to the connecting reinforcing bar 211 in a state where the pair is arranged side by side at a certain interval.

다음 공정으로, 도13의 (d) 및 (e)에 도시된 바와 같이 상기 U-메쉬(120)의 절곡부(121)에 복수의 단위 철근(10)이 연결되도록 상기한 결속수단(미도시)에 의해 결속하여 조립하는 공정단계를 거쳐 배근작업을 완료한다.In the next process, the binding means (not shown) is used to connect a plurality of unit reinforcing bars 10 to the bent portion 121 of the U-mesh 120, as shown in (d) and (e) of Figure 13. ) to complete the placement work through the binding and assembling process.

상기한 바와 같은 공정단계로 이루어지는 본 발명의 제11실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법에 따르면, 상기 제1벽체(W1)에는 2쌍의 용접철근매트(110)가 일정 간격 이격된 상태로 나란하게 주배근으로 시공되는 동시에 상기 제2벽체(W2)에는 상기 U-메쉬(120)가 배근되도록 시공된다.According to the T-type connecting wall rebar pre-assembly arrangement method of a reinforced concrete wall structure building according to the 11th embodiment of the present invention, which consists of the process steps as described above, the first wall (W1) includes two pairs of welded rebar mats ( 110) is constructed as the main reinforcement in parallel at a certain interval, and at the same time, the U-mesh 120 is installed on the second wall (W2).

도14는 본 발명의 제12실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법의 공정 (a)단계 내지 (e)단계를 순차적으로 도시해 보인 개략적 사시도로서, 도14의 부호 "310"은 T형 연결벽체로 시공되는 외벽(T-Junction outer wall)(T1) 및 내벽(T-junction inner wall)(T2)의 배근작업에 선행하여 시공되는 거푸집을 나타내 보인 것이다.Figure 14 is a schematic perspective view sequentially showing steps (a) to (e) of the process of the T-type connection wall rebar pre-assembly arrangement method of the reinforced concrete wall structure building according to the 12th embodiment of the present invention. The symbol "310" indicates the formwork constructed prior to the reinforcement work of the T-junction outer wall (T1) and the T-junction inner wall (T2), which are constructed as T-type connection walls.

도14를 참조하면 본 발명의 제12실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법은, 도14의 (a) 및 (b)에 도시된 바와 같이 슬라브(210)에 상기 T형 연결벽체 패턴으로 배열되어 돌출되도록 배근 정착용으로 시공된 연결 철근(211)에 상기 제2벽체(W2)를 따라 대응하여 배열되도록 단위 U-바아(11)를 연결하여 결속하고, 상기 제1벽체(W1)를 따라 대응하여 상기 U-바아(11)의 어느 일측으로 배열되도록 상기 용접철근매트(110) 1쌍을 일정 간격 이격시켜 나란한 상태로 상기 연결 철근(211)에 예를 들어 띠철근(Hoop)이나 U-바(Bar) 또는 앵커-바(Anchor-Bar) 등과 같은 통상적인 결속수단(미도시)을 통해 연결하여 결속하는 공정단계를 가진다.Referring to Figure 14, the T-type connection wall rebar pre-assembly arrangement method of the reinforced concrete wall structure building according to the 12th embodiment of the present invention is the slab 210 as shown in Figures 14 (a) and (b). Unit U-bars 11 are connected and bound to the connecting reinforcing bars 211 constructed for reinforcement fixation so as to protrude and are arranged in the T-shaped connecting wall pattern, so as to be correspondingly arranged along the second wall W2, For example, a pair of welded reinforcing bar mats 110 are spaced apart at a certain interval and placed side by side on the connecting reinforcing bar 211 so as to be arranged on one side of the U-bar 11 correspondingly along the first wall W1. For example, there is a process step of connecting and binding through common binding means (not shown) such as hoops, U-bars, or anchor-bars.

이어서, 도14의 (b) 및 (c)에 도시된 바와 같이 상기 제2벽체(W2)를 따라 대응하여 배열되도록 상기 U-메쉬(120)의 하단 수평근 1개를 제거한 상태(120a)로 상기 연결 철근(211)에 연결하여 결속하는 공정단계를 가진다.Subsequently, as shown in (b) and (c) of FIG. 14, one lower horizontal bar of the U-mesh 120 is removed so as to be correspondingly arranged along the second wall W2 (120a). It has a process step of connecting and binding to the connecting reinforcing bar 211.

다음 공정으로, 도14의 (c) 및 (d)에 도시된 바와 같이 상기 제1벽체(W1)를 따라 대응하여 상기 U-바아(11)의 다른 일측으로 배열되도록 다른 용접철근매트(110) 1쌍을 일정 간격 이격시켜 나란한 상태로 상기 연결 철근(211)에 연결하여 결속하는 공정단계를 가진다.In the next process, as shown in (c) and (d) of Figure 14, another welded reinforcing bar mat 110 is arranged on the other side of the U-bar 11 correspondingly along the first wall W1. There is a process step of connecting and binding one pair to the connecting reinforcing bar 211 in a side-by-side state at a certain interval.

다음 공정으로, 도14의 (d) 및 (e)에 도시된 바와 같이 상기 U-메쉬(120)의 절곡부(121)에 복수의 단위 철근(10)이 연결되도록 상기한 결속수단(미도시)에 의해 결속하여 조립하는 공정단계를 거쳐 배근작업을 완료한다.In the next process, the binding means (not shown) is used to connect a plurality of unit reinforcing bars 10 to the bent portion 121 of the U-mesh 120, as shown in (d) and (e) of Figure 14. ) to complete the placement work through the binding and assembling process.

상기한 바와 같은 공정단계로 이루어지는 본 발명의 제12실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법에 따르면, 상기 제1벽체에는 2쌍의 용접철근매트(110)가 일정 간격 이격된 상태로 나란하게 배근되는 동시에 상기 제2벽체에는 용접철근매트(110)가 벤딩에 의해 면가공되어 절곡부(121)를 가지도록 "U" 형태로 성형된 U-메쉬(120)가 배근되도록 시공된다.According to the T-type connecting wall rebar pre-assembly arrangement method of a reinforced concrete wall structure building according to the 12th embodiment of the present invention, which consists of the process steps as described above, two pairs of welded rebar mats 110 are provided in the first wall. A U-mesh 120 formed in a “U” shape is arranged side by side at a certain interval and has a bent portion 121 in the second wall by processing the welded reinforcing bar mat 110 by bending. It is constructed so that it is supported.

도15는 본 발명의 제13실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법의 공정 (a)단계 내지 (e)단계를 순차적으로 도시해 보인 개략적 사시도로서, 도5의 부호 "310"은 T형 연결벽체로 시공되는 외벽(T-Junction outer wall)(T1) 및 내벽(T-junction inner wall)(T2)의 배근작업에 선행하여 시공되는 거푸집을 나타내 보인 것이다.Figure 15 is a schematic perspective view sequentially showing steps (a) to (e) of the process of the T-type connection wall rebar pre-assembly arrangement method of the reinforced concrete wall structure building according to the 13th embodiment of the present invention. The symbol "310" indicates the formwork constructed prior to the reinforcement work of the T-junction outer wall (T1) and the T-junction inner wall (T2), which are constructed as T-type connection walls.

도15를 참조하면 본 발명의 제13실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법은, 도15의 (a) 및 (b)에 도시된 바와 같이 상기 제1벽체(W1)를 따라 대응하여 상기 제2벽체(W2)의 어느 일측으로 배열되도록 상기 용접철근매트(110) 1쌍을 일정 간격 이격시켜 나란하게 배열한 상태로 슬라브(210)에 상기 T형 연결벽체 패턴으로 배열되어 돌출되도록 배근 정착용으로 시공된 연결 철근(211)에 연결하여 결속하는 공정단계를 가진다.Referring to Figure 15, the T-type connecting wall rebar pre-assembly arrangement method of a reinforced concrete wall structure building according to the 13th embodiment of the present invention is as shown in Figures 15 (a) and (b), the first wall The T-shaped connecting wall is placed on the slab 210 with a pair of welded reinforcing bar mats 110 arranged side by side at a certain interval so as to be arranged on one side of the second wall W2 correspondingly along (W1). There is a process step of connecting and binding the connecting reinforcing bars 211 constructed for anchoring the reinforcement so that they are arranged in a pattern and protrude.

이어서, 도15의 (b) 및 (c)에 도시된 바와 같이 상기 제2벽체(W2)를 따라 대응하여 배열되도록 상기 U-메쉬(120)의 하단 수평근 2개를 제거한 상태(120b)로 상기 연결 철근(211)에 연결하여 결속하는 공정단계를 가진다.Next, as shown in (b) and (c) of Figure 15, the two lower horizontal bars of the U-mesh 120 are removed so as to be correspondingly arranged along the second wall W2 (120b). It has a process step of connecting and binding to the connecting reinforcing bar 211.

다음 공정으로, 도15의 (c) 및 (d)에 도시된 바와 같이 상기 제1벽체(W1)를 따라 대응하여 상기 제2벽체(W2)의 다른 일측으로 배열되도록 상기 용접철근매트(110) 1쌍을 일정 간격 이격시켜 나란한 상태로 상기 연결 철근(211)에 예를 들어 띠철근(Hoop)이나 U-바(Bar) 또는 앵커-바(Anchor-Bar) 등과 같은 통상적인 결속수단(미도시)을 통해 연결하여 결속하는 공정단계를 가진다.In the next process, the welded reinforcing bar mat 110 is arranged on the other side of the second wall W2 correspondingly along the first wall W1, as shown in (c) and (d) of Figure 15. A pair is placed side by side at a certain interval, and a conventional binding means (not shown) such as a hoop, a U-bar, or an anchor-bar is attached to the connecting reinforcing bar 211. ) has a process step of connecting and binding through ).

다음 공정으로, 도15의 (d) 및 (e)에 도시된 바와 같이 상기 제2벽체(W2)를 따라 대응하여 배열되도록 2쌍의 L-바아(12)를 상기 U-메쉬(120)의 하단 연결 철근(211)에 2단으로 연결하여 결속하고, 상기 U-메쉬(120)의 절곡부(121)에 복수의 단위 철근(10)이 연결되도록 상기한 결속수단(미도시)에 의해 결속하여 조립하는 공정단계를 거쳐 배근작업을 완료한다.In the next process, two pairs of L-bars 12 are formed into the U-mesh 120 so as to be correspondingly arranged along the second wall W2, as shown in (d) and (e) of Figure 15. Connected and bound in two stages to the bottom connecting reinforcing bar 211, and bound by the above-mentioned binding means (not shown) so that a plurality of unit reinforcing bars 10 are connected to the bent portion 121 of the U-mesh 120. After completing the assembly process, the placement work is completed.

상기한 바와 같은 공정단계로 이루어지는 본 발명의 제13실시예에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법에 따르면, 상기 제1벽체에는 2쌍의 용접철근매트(110)가 일정 간격 이격된 상태로 나란하게 배근되는 동시에 상기 제2벽체에는 용접철근매트(110)가 벤딩에 의해 면가공되어 절곡부(121)를 가지도록 "U" 형태로 성형된 U-메쉬(120)가 배근되도록 시공된다.According to the T-type connecting wall rebar pre-assembly arrangement method of a reinforced concrete wall structure building according to the 13th embodiment of the present invention, which consists of the process steps as described above, two pairs of welded rebar mats 110 are provided in the first wall. A U-mesh 120 formed in a “U” shape is arranged side by side at a certain interval and has a bent portion 121 in the second wall by processing the welded reinforcing bar mat 110 by bending. It is constructed so that it is supported.

이상에서 설명한 바와 같이 본 발명의 실시예들에 의한 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법에 따르면, 기존의 통상적인 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법에서 행하여지는 수직근과 수평근의 가닥 철근 하나 하나의 결속작업을 배제할 수 있게 된다. 이로써, 철근 배근의 정밀도 향상과 조립 배근 시간의 효율적인 단축 뿐만 아니라 현장의 시공성 향상과 인력 절감의 효과를 용이하게 유도해 낼 수 있는 동시에 철근 배근의 정밀도를 높여 철근콘크리트 품질향상에 기여할 수 있으며, 조립 배근 시간의 효율적인 단축에 의해 공사비의 절감 뿐만 아니라 부품의 간소화와 핸들링 및 관리가 용이하여 안전성 향상에 기여할 수 있다.As described above, according to the pre-assembly arrangement method of T-type connection wall reinforcement of a reinforced concrete wall structure building according to the embodiments of the present invention, the existing conventional method of pre-assembly arrangement of reinforcement bars of a T-type connection wall of a reinforced concrete wall structure building It is possible to exclude the binding work of each strand of vertical and horizontal bars that is performed in . As a result, not only can the precision of reinforcement reinforcement be improved and the assembly arrangement time be efficiently reduced, but the effect of improving on-site constructability and manpower can be easily derived. At the same time, the precision of reinforcement arrangement can be improved, thereby contributing to the improvement of reinforced concrete quality and assembly. Not only can construction costs be reduced by efficiently shortening the placement time, but it can also contribute to improving safety by simplifying parts and making handling and management easier.

이상에서 설명한 바와 같은 본 발명은 상술한 특정의 바람직한 실시예에 의해 한정되지 않으며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진자라면 누구든지 다양한 변형 실시예가 가능한 것은 물론이고, 그와 같은 변경은 기재된 청구범위 내에 있게 된다.The present invention as described above is not limited to the specific preferred embodiments described above, and anyone skilled in the art to which the invention pertains can do so without departing from the gist of the present invention as claimed in the claims. While various modifications are possible, such modifications are within the scope of the written claims.

10 : 단위 철근(Long Bar) 11 : U-바아(U-Bar)
12 : L-바아(L-Bar) 110 : 용접철근매트(WBM)
111 : 수직근 112 : 수평근
120 : U-메쉬 121 : 절곡부
210 : 슬라브 211 : 연결 철근(Start Bar)
310 : 거푸집 1A, 2A : 제1철근망
1B, 2B : 제2철근망 1C : 제2철근망
T1 : T형 연결 외벽(T-junction outer wall)
T2 : T형 연결 내벽(T-junction inner wall)
10: Unit rebar (Long Bar) 11: U-Bar (U-Bar)
12: L-Bar 110: Welded Reinforcement Mat (WBM)
111: vertical root 112: horizontal root
120: U-mesh 121: Bend part
210: Slab 211: Connecting rebar (Start Bar)
310: Form 1A, 2A: 1st rebar net
1B, 2B: 2nd rebar network 1C: 2nd rebar network
T1: T-junction outer wall
T2: T-junction inner wall

Claims (13)

철근콘크리트 벽식구조 건축물의 외벽 및 내벽으로 시공되는 제1벽체(W1)에 직교하는 방향으로 제2벽체(W2)의 일단이 연결되도록 시공되는 T형 연결벽체(T-junction wall) 철근 선조립 배근방법에 있어서,
상기 제1벽체(W1)에는 1쌍의 용접철근매트(110)가 일정 간격 이격된 상태로 나란하게 배근되는 동시에 상기 제2벽체(W2)에는 용접철근매트(110)가 벤딩에 의해 면가공되어 절곡부(121)를 가지도록 "U" 형태로 성형된 U-메쉬(120)가 배근되도록 시공되는 것으로,
상기 용접철근매트(110) 1쌍을 일정 간격 이격시켜 나란하게 배열된 상태로 결속하여 제1철근망(1A)을 조립하는 단계와;
상기 제1철근망(1A)에 상기 U-메쉬(120)의 절곡부(121)가 중첩되도록 직교하는 방향으로 정렬하고 결속하여 제2철근망(2A)을 조립하는는 단계와;
상기 제1철근망(1A)의 용접철근매트(110)와 상기 U-메쉬(120)의 절곡부(121)가 직교하도록 연결되는 중첩부에 복수의 단위 철근(10)이 연결되도록 결속하여 제3철근망(1C)을 조립하는 단계; 및
상기 제3철근망(1C)을 인양하여 슬라브(210)에 상기 T형 연결벽체 패턴으로 배열되어 돌출되도록 배근 정착용으로 시공된 연결 철근(211)에 세팅하고 결속하여 조립하는 단계;를 포함하는 것을 특징으로 하는 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법.
T-junction wall, which is constructed so that one end of the second wall (W2) is connected in a direction perpendicular to the first wall (W1), which is constructed as the exterior and interior walls of a reinforced concrete wall structure building, pre-assembly and arrangement of reinforcing bars. In the method,
In the first wall (W1), a pair of welded reinforcing bar mats (110) are arranged side by side at a certain interval, and at the same time, in the second wall (W2), a welded reinforcing bar mat (110) is surface processed by bending. It is constructed so that the U-mesh 120, which is formed in a “U” shape to have a bent portion 121, is reinforced.
assembling a first reinforcing bar network (1A) by binding a pair of the welded reinforcing bar mats (110) arranged in parallel at a certain interval;
assembling a second reinforcing bar network (2A) by aligning and binding the first reinforcing bar network (1A) in a perpendicular direction so that the bent portions 121 of the U-mesh 120 overlap;
The welded reinforcing bar mat 110 of the first reinforcing bar network 1A and the bent portion 121 of the U-mesh 120 are connected so that the overlapped portion is perpendicular to each other so that a plurality of unit reinforcing bars 10 are connected to each other. 3Steps of assembling the rebar network (1C); and
Lifting the third reinforcing bar network (1C), setting it on the connecting reinforcing bars 211 constructed for reinforcement fixation so that they are arranged in the T-shaped connecting wall pattern on the slab 210 and protruding, and assembling them by binding them. A T-type connection wall rebar pre-assembly arrangement method for a reinforced concrete wall structure building.
철근콘크리트 벽식구조 건축물의 외벽 및 내벽으로 시공되는 제1벽체(W1)에 직교하는 방향으로 제2벽체(W2)의 일단이 연결되도록 시공되어 이루어지는 T형 연결벽체(T-junction wall) 철근 선조립 배근방법에 있어서,
상기 제1벽체(W1)와 제2벽체(W2)에 각각 용접철근매트(110)가 벤딩에 의해 면가공되어 절곡부(121)를 가지도록 "U" 형태로 성형된 U-메쉬(120)가 배근되도록 시공되는 것으로,
상기 U-메쉬(120) 1쌍을 직교하도록 T형으로 배열하고 결속하여 제1철근망(2A)을 조립하는 단계와;
상기 U-메쉬(120)의 절곡부(121)에 각각 복수의 단위 철근(10)이 연결되도록 결속하여 제2철근망(2B)을 조립하는 단계; 및
상기 제2철근망(2B)을 인양하여 슬라브(210)에 상기 T형 연결벽체 패턴으로 배열되어 돌출되도록 배근 정착용으로 시공된 연결 철근(211)에 세팅하고 결속하여 조립하는 단계;를 포함하는 것을 특징으로 하는 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법.
Pre-assembly of rebar for a T-junction wall, which is constructed so that one end of the second wall (W2) is connected in a direction perpendicular to the first wall (W1), which is constructed as the outer and inner walls of a reinforced concrete wall structure building. In the root arrangement method,
A U-mesh (120) formed in a “U” shape by processing the welded reinforcing bar mat (110) by bending each of the first wall (W1) and the second wall (W2) to have a bent portion (121). It is constructed so that it is placed,
assembling a first reinforcing bar network (2A) by arranging and binding a pair of the U-mesh (120) in a T shape so as to be perpendicular to each other;
Assembling a second reinforcing bar network (2B) by binding a plurality of unit reinforcing bars (10) to each bent portion (121) of the U-mesh (120); and
Lifting the second reinforcing bar network (2B), setting it on the connecting reinforcing bars 211 constructed for reinforcement fixation so that they are arranged in the T-shaped connecting wall pattern on the slab 210 and protruding, and assembling them by binding them. A T-type connection wall rebar pre-assembly arrangement method for a reinforced concrete wall structure building.
철근콘크리트 벽식구조 건축물의 외벽 및 내벽으로 시공되는 제1벽체(W1)에 직교하는 방향으로 제2벽체(W2)의 일단이 연결되도록 시공되어 이루어지는 T형 연결벽체(T-junction wall) 철근 선조립 배근방법에 있어서,
상기 제1벽체(W1)에는 1쌍의 용접철근매트(110)가 일정 간격 이격된 상태로 나란하게 배근되는 동시에 상기 제2벽체(W2)에는 복수의 단위 U-바아(11)가 배근되도록 시공되는 것으로,
슬라브(210)에 상기 T형 연결벽체 패턴으로 배열되어 돌출되도록 배근 정착용으로 시공된 연결 철근(211)에 단위 U-바아(11)를 결속하는 단계와;
상기 제1벽체(W1)에 대응하도록 1쌍의 용접철근매트(110)를 일정 간격 이격시켜 나란하게 배열된 상태로 결속하는 단계와;
상기 제2벽체(W2)에 대응하도록 복수의 단위 U-바아(11)의 절곡부를 각각 상기 용접철근매트(110)의 높이 방향으로 일정 간격으로 결속하는 단계와;
상기 용접철근매트(110)와 상기 U-바아(11)의 절곡부가 겹치는 중첩부에 복수의 단위 철근(10)이 연결되도록 결속하는 단계;를 포함하는 것을 특징으로 하는 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법.
Pre-assembly of rebar for a T-junction wall, which is constructed so that one end of the second wall (W2) is connected in a direction perpendicular to the first wall (W1), which is constructed as the outer and inner walls of a reinforced concrete wall structure building. In the root arrangement method,
A pair of welded reinforcing bar mats 110 are arranged in parallel at a certain distance from each other on the first wall (W1), and at the same time, a plurality of unit U-bars (11) are arranged on the second wall (W2). By becoming,
Binding the unit U-bar (11) to the connecting reinforcing bars (211) constructed for reinforcement anchorage so that they are arranged in the T-shaped connecting wall pattern and protrude from the slab (210);
Binding a pair of welded reinforcing bar mats 110 in a parallel arrangement at a predetermined interval to correspond to the first wall W1;
Binding the bent portions of a plurality of unit U-bars (11) at regular intervals in the height direction of the welded reinforcing bar mat (110) to correspond to the second wall (W2);
T of a reinforced concrete wall structure building comprising: a step of binding a plurality of unit reinforcing bars (10) to an overlapping portion where the bent portions of the welded reinforcing bar mat (110) and the U-bar (11) overlap; Type connection wall rebar pre-assembly arrangement method.
철근콘크리트 벽식구조 건축물의 외벽 및 내벽으로 시공되는 제1벽체(W1)에 직교하는 방향으로 제2벽체(W2)의 일단이 연결되도록 시공되어 이루어지는 T형 연결벽체(T-junction wall) 철근 선조립 배근방법에 있어서,
상기 제1벽체(W1)에는 1쌍의 용접철근매트(110)가 일정 간격 이격된 상태로 나란하게 배근되는 동시에 상기 제2벽체(W2)에는 용접철근매트(110)가 벤딩에 의해 면가공되어 절곡부(121)를 가지도록 "U" 형태로 성형된 U-메쉬(120)가 배근되도록 시공되는 것으로,
슬라브(210)에 상기 T형 연결벽체 패턴으로 배열되어 돌출되도록 배근 정착용으로 시공된 연결 철근(211)에 각각 상기 제1벽체(W1)에 대응하도록 4개의 단위 철근(10)을 2단으로 연결하여 결속하고, 상기 제2벽체(W2)에 대응하도록 1쌍의 단위 U-바아(11)를 2단으로 연결하여 결속하는 단계와;
상기 제1벽체(W1)에 대응하도록 1쌍의 용접철근매트(110)의 하단 수평근 2개를 제거한 상태(110b)로 일정 간격 이격시켜 나란하게 배열된 상태로 결속하는 단계와;
상기 제2벽체(W2)에 대응하도록 상기 U-메쉬(120)의 하단 수평근 2개를 제거한 상태(120b)로 상기 연결 철근(211)에 결속하여 절곡부(121)가 상기 용접철근매트(110)에 겹쳐져 중첩되도록 조립하는 단계; 및
상기 U-메쉬(120b)의 절곡부(121)와 상기 용접철근매트(110b)의 중첩부에 복수의 단위 철근(10)이 연결되도록 결속하여 조립하는 단계;를 포함하는 것을 특징으로 하는 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법.
Pre-assembly of rebar for a T-junction wall, which is constructed so that one end of the second wall (W2) is connected in a direction perpendicular to the first wall (W1), which is constructed as the outer and inner walls of a reinforced concrete wall structure building. In the root arrangement method,
In the first wall (W1), a pair of welded reinforcing bar mats (110) are arranged side by side at a certain interval, and at the same time, in the second wall (W2), a welded reinforcing bar mat (110) is surface processed by bending. It is constructed so that the U-mesh 120, which is formed in a “U” shape to have a bent portion 121, is reinforced.
Four unit reinforcing bars (10) are arranged in two stages to correspond to the first wall (W1) on the connecting reinforcing bars (211) arranged in the T-shaped connecting wall pattern on the slab (210) and installed to protrude. connecting and binding a pair of unit U-bars (11) in two stages to correspond to the second wall (W2);
A step of binding the two lower horizontal bars of a pair of welded reinforcing bar mats 110 in a removed state (110b) to correspond to the first wall (W1) and arranging them side by side at a certain interval;
The two lower horizontal bars of the U-mesh 120 have been removed (120b) to correspond to the second wall (W2) and are bound to the connecting rebar 211 so that the bent portion 121 is the welded rebar mat ( 110) assembling to overlap each other; and
Reinforced concrete comprising a step of assembling a plurality of unit reinforcing bars 10 to be connected to the bent portion 121 of the U-mesh 120b and the overlapping portion of the welded reinforcing bar mat 110b. T-type connection wall rebar pre-assembly arrangement method for wall-type structures.
철근콘크리트 벽식구조 건축물의 외벽 및 내벽으로 시공되는 제1벽체(W1)에 직교하는 방향으로 제2벽체(W2)의 일단이 연결되도록 시공되어 이루어지는 T형 연결벽체(T-junction wall) 철근 선조립 배근방법에 있어서,
상기 제1벽체(W1)에는 1쌍의 용접철근매트(110)가 일정 간격 이격된 상태로 나란하게 배근되는 동시에 상기 제2벽체(W2)에는 용접철근매트(110)가 벤딩에 의해 면가공되어 절곡부(121)를 가지도록 "U" 형태로 성형된 U-메쉬(120)가 배근되도록 시공되는 것으로,
슬라브(210)에 상기 T형 연결벽체 패턴으로 배열되어 돌출되도록 배근 정착용으로 시공된 연결 철근(211)에 상기 제2벽체(W2)에 대응하도록 단위 U-바아(11)를 연결하여 결속하는 단계와;
상기 제1벽체(W1)에 대응하도록 1쌍의 용접철근매트(110)를 일정 간격 이격시켜 나란하게 배열된 상태로 연결하여 결속하는 단계와;
상기 제2벽체(W2)에 대응하도록 상기 U-메쉬(120)의 하단 수평근 1개를 제거한 상태(120a)로 상기 연결 철근(211)에 결속하여 절곡부(121)가 상기 용접철근매트(110)에 겹쳐져 중첩되도록 조립하는 단계; 및
상기 U-메쉬(120a)의 절곡부(121)와 상기 용접철근매트(110)의 중첩부에 복수의 단위 철근(10)이 연결되도록 결속하여 조립하는 단계;를 포함하는 것을 특징으로 하는 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법.
Pre-assembly of rebar for a T-junction wall, which is constructed so that one end of the second wall (W2) is connected in a direction perpendicular to the first wall (W1), which is constructed as the outer and inner walls of a reinforced concrete wall structure building. In the root arrangement method,
In the first wall (W1), a pair of welded reinforcing bar mats (110) are arranged side by side at a certain interval, and at the same time, in the second wall (W2), a welded reinforcing bar mat (110) is surface processed by bending. It is constructed so that the U-mesh 120, which is formed in a “U” shape to have a bent portion 121, is reinforced.
The unit U-bar 11 is connected and bound to correspond to the second wall (W2) to the connecting reinforcing bars 211 constructed for reinforcement fixation so that they are arranged in the T-shaped connecting wall pattern on the slab 210 and protrude. Steps and;
connecting and binding a pair of welded reinforcing bar mats 110 in a parallel arrangement at a predetermined interval to correspond to the first wall W1;
One lower horizontal bar of the U-mesh 120 has been removed (120a) to correspond to the second wall (W2) and is bound to the connecting rebar 211 so that the bent portion 121 is the welded rebar mat ( 110) assembling to overlap each other; and
Reinforced concrete comprising a step of assembling a plurality of unit reinforcing bars 10 to be connected to the bent portion 121 of the U-mesh 120a and the overlapping portion of the welded reinforcing bar mat 110. T-type connection wall rebar pre-assembly arrangement method for wall-type structures.
철근콘크리트 벽식구조 건축물의 외벽 및 내벽으로 시공되는 제1벽체(W1)에 직교하는 방향으로 제2벽체(W2)의 일단이 연결되도록 시공되어 이루어지는 T형 연결벽체(T-junction wall) 철근 선조립 배근방법에 있어서,
상기 제1벽체(W1)에는 1쌍의 용접철근매트(110)가 일정 간격 이격된 상태로 나란하게 배근되는 동시에 상기 제2벽체에는 용접철근매트(110)가 벤딩에 의해 면가공되어 절곡부(121)를 가지도록 "U" 형태로 성형된 U-메쉬(120)가 배근되도록 시공되는 것으로,
상기 제1벽체(W1)에 대응하도록 1쌍의 용접철근매트(110)를 일정 간격 이격시켜 나란하게 배열된 상태로 연결하여 결속하는 단계와;
슬라브(210)에 상기 T형 연결벽체 패턴으로 배열되어 돌출되도록 배근 정착용으로 시공된 연결 철근(211)에 상기 제2벽체에 대응하도록 단위 L-바아(12) 4개를 2단으로 연결하여 결속하는 단계와;
상기 제2벽체(W2)에 대응하도록 상기 U-메쉬(120)의 하단 수평근 2개를 제거한 상태(120b)로 상기 연결 철근(211)에 결속하여 절곡부(121)가 상기 용접철근매트(110)에 겹쳐져 중첩되도록 조립하는 단계; 및
상기 U-메쉬(120b)의 절곡부(121)와 상기 용접철근매트(110)의 중첩부에 복수의 단위 철근(10)이 연결되도록 결속하여 조립하는 단계;를 포함하는 것을 특징으로 하는 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법.
Pre-assembly of rebar for a T-junction wall, which is constructed so that one end of the second wall (W2) is connected in a direction perpendicular to the first wall (W1), which is constructed as the outer and inner walls of a reinforced concrete wall structure building. In the root arrangement method,
In the first wall (W1), a pair of welded reinforcing bar mats 110 are arranged side by side at a predetermined interval, and at the same time, in the second wall, the welded reinforcing bar mats 110 are surface processed by bending to form a bent portion ( It is constructed so that the U-mesh 120, which is formed in a “U” shape to have 121), is arranged,
connecting and binding a pair of welded reinforcing bar mats 110 in a parallel arrangement at a predetermined interval to correspond to the first wall W1;
Four unit L-bars (12) are connected in two stages to correspond to the second wall to the connecting reinforcing bars (211) constructed for anchoring and protruding from the slab (210) in the T-shaped connecting wall pattern. a binding step;
The two lower horizontal bars of the U-mesh 120 have been removed (120b) to correspond to the second wall (W2) and are bound to the connecting rebar 211 so that the bent portion 121 is the welded rebar mat ( 110) assembling to overlap each other; and
Reinforced concrete comprising: assembling a plurality of unit reinforcing bars 10 to be connected to the bent portion 121 of the U-mesh 120b and the overlapping portion of the welded reinforcing bar mat 110; T-type connection wall rebar pre-assembly arrangement method for wall-type structures.
철근콘크리트 벽식구조 건축물의 외벽 및 내벽으로 시공되는 제1벽체(W1)에 직교하는 방향으로 제2벽체(W2)의 일단이 연결되도록 시공되어 이루어지는 T형 연결벽체(T-junction wall) 철근 선조립 배근방법에 있어서,
상기 제1벽체(W1)에는 1쌍의 용접철근매트(110)가 일정 간격 이격된 상태로 나란하게 배근되는 동시에 상기 제2벽체(W2)에는 용접철근매트(110)가 벤딩에 의해 면가공되어 절곡부(121)를 가지도록 "U" 형태로 성형된 U-메쉬(120)가 배근되도록 시공되는 것으로,
상기 용접철근매트(110) 1쌍을 일정 간격 이격시켜 나란하게 배열된 상태로 결속하여 제1철근망(1A)을 조립하는 단계와;
슬라브(210)에 상기 T형 연결벽체 패턴으로 배열되어 돌출되도록 배근 정착용으로 시공된 연결 철근(211)에 상기 제2벽체에 대응하도록 단위 U-바아(11)를 연결하여 결속하는 단계와;
상기 제2벽체(W2)에 대응하도록 상기 U-메쉬(120)의 하단 수평근 1개를 제거한 상태(120a)로 상기 연결 철근(211)에 결속하여 절곡부(121)가 상기 용접철근매트(110)에 겹쳐져 중첩되도록 조립하는 단계; 및
상기 U-메쉬(120a)의 절곡부(121)와 상기 용접철근매트(110)의 중첩부에 복수의 단위 철근(10)이 연결되도록 결속하여 조립하는 단계;를 포함하는 것을 특징으로 하는 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법.
Pre-assembly of rebar for a T-junction wall, which is constructed so that one end of the second wall (W2) is connected in a direction perpendicular to the first wall (W1), which is constructed as the outer and inner walls of a reinforced concrete wall structure building. In the root arrangement method,
In the first wall (W1), a pair of welded reinforcing bar mats (110) are arranged side by side at a certain interval, and at the same time, in the second wall (W2), a welded reinforcing bar mat (110) is surface processed by bending. It is constructed so that the U-mesh 120, which is formed in a “U” shape to have a bent portion 121, is reinforced.
assembling a first reinforcing bar network (1A) by binding a pair of the welded reinforcing bar mats (110) arranged in parallel at a certain interval;
Connecting and binding unit U-bars (11) to correspond to the second wall to the connecting reinforcing bars (211) constructed for reinforcement fixation so as to protrude and are arranged in the T-shaped connecting wall pattern on the slab (210);
One lower horizontal bar of the U-mesh 120 has been removed (120a) to correspond to the second wall (W2) and is bound to the connecting rebar 211 so that the bent portion 121 is the welded rebar mat ( 110) assembling to overlap each other; and
Reinforced concrete comprising a step of assembling a plurality of unit reinforcing bars 10 to be connected to the bent portion 121 of the U-mesh 120a and the overlapping portion of the welded reinforcing bar mat 110. T-type connection wall rebar pre-assembly arrangement method for wall-type structures.
철근콘크리트 벽식구조 건축물의 외벽 및 내벽으로 시공되는 제1벽체(W1)에 직교하는 방향으로 제2벽체(W2)의 일단이 연결되도록 시공되어 이루어지는 T형 연결벽체(T-junction wall) 철근 선조립 배근방법에 있어서,
상기 제1벽체(W1)에는 1쌍의 용접철근매트(110)가 일정 간격 이격된 상태로 나란하게 배근되는 동시에 상기 제2벽체(W2)에는 용접철근매트(110)가 벤딩에 의해 면가공되어 절곡부(121)를 가지도록 "U" 형태로 성형된 U-메쉬(120)가 배근되도록 시공되는 것으로,
상기 용접철근매트(110) 1쌍을 일정 간격 이격시켜 나란하게 배열된 상태로 결속하여 제1철근망(1A)을 조립하는 단계와;
슬라브(210)에 상기 T형 연결벽체 패턴으로 배열되어 돌출되도록 배근 정착용으로 시공된 연결 철근(211)에 상기 제2벽체(W2)에 대응하도록 단위 L-바아(12) 4개를 2단으로 연결하여 결속하는 단계와;
상기 제2벽체(W2)에 대응하도록 상기 U-메쉬(120)의 하단 수평근 2개를 제거한 상태(120b)로 상기 연결 철근(211)에 결속하여 절곡부(121)가 상기 용접철근매트(110)에 겹쳐져 중첩되도록 조립하는 단계; 및
상기 U-메쉬(120b)의 절곡부(121)와 상기 용접철근매트(110)의 중첩부에 복수의 단위 철근(10)이 연결되도록 결속하여 조립하는 단계;를 포함하는 것을 특징으로 하는 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법.
Pre-assembly of rebar for a T-junction wall, which is constructed so that one end of the second wall (W2) is connected in a direction perpendicular to the first wall (W1), which is constructed as the outer and inner walls of a reinforced concrete wall structure building. In the root arrangement method,
In the first wall (W1), a pair of welded reinforcing bar mats (110) are arranged side by side at a certain interval, and at the same time, in the second wall (W2), a welded reinforcing bar mat (110) is surface processed by bending. It is constructed so that the U-mesh 120, which is formed in a “U” shape to have a bent portion 121, is reinforced.
assembling a first reinforcing bar network (1A) by binding a pair of the welded reinforcing bar mats (110) arranged in parallel at a certain interval;
Four unit L-bars (12) are placed in two stages to correspond to the second wall (W2) on the connecting reinforcing bars (211) constructed for reinforcement anchorage so that they are arranged in the T-shaped connecting wall pattern on the slab (210) and protrude. A step of connecting and binding;
The two lower horizontal bars of the U-mesh 120 have been removed (120b) to correspond to the second wall (W2) and are bound to the connecting rebar 211 so that the bent portion 121 is the welded rebar mat ( 110) assembling to overlap each other; and
Reinforced concrete comprising: assembling a plurality of unit reinforcing bars 10 to be connected to the bent portion 121 of the U-mesh 120b and the overlapping portion of the welded reinforcing bar mat 110; T-type connection wall rebar pre-assembly arrangement method for wall-type structures.
철근콘크리트 벽식구조 건축물의 외벽 및 내벽으로 시공되는 제1벽체(W1)에 직교하는 방향으로 제2벽체(W2)의 일단이 연결되도록 시공되어 이루어지는 T형 연결벽체(T-junction wall) 철근 선조립 배근방법에 있어서,
상기 제1벽체(W1)에는 용접철근매트(110)가 벤딩에 의해 면가공되어 절곡부(121)를 가지도록 "U" 형태로 성형된 U-메쉬(120) 및 그 U-메쉬(120)에 1쌍의 용접철근매트(110)가 일정 간격 이격된 상태로 나란하게 배근되는 동시에 상기 제2벽체(W2)에는 용접철근매트(110)가 벤딩에 의해 면가공되어 절곡부(121)를 가지도록 "U" 형태로 성형된 U-메쉬(120)가 배근되도록 시공되는 것으로,
슬라브(210)에 상기 T형 연결벽체 패턴으로 배열되어 돌출되도록 배근 정착용으로 시공된 연결 철근(211)에 상기 제2벽체(W2)에 대응하도록 단위 U-바아(11)를 연결하여 결속하는 단계와;
상기 제1벽체(W1)에 대응하도록 상기 연결 철근(211)에 상기 U-메쉬(120)를 연결하여 결속하는 단계와;
상기 제2벽체(W2)에 대응하도록 상기 U-메쉬(120)의 하단 수평근 1개를 제거한 상태(120a)로 상기 연결 철근(211)에 결속하여 절곡부(121)가 상기 U-메쉬(120)에 겹쳐져 중첩되도록 결속하는 단계와;
상기 제1벽체(W1)에 대응하도록 상기 U-메쉬(120)와 상기 연결 철근(211)에 각각 상기 용접철근매트(110) 1쌍을 일정 간격 이격시켜 나란하게 배열한 상태로 연결하여 결속하는 단계; 및
상기 U-메쉬(120a)(120)의 절곡부(121)에 각각 복수의 단위 철근(10)이 연결되도록 결속하여 조립하는 단계;를 포함하는 것을 특징으로 하는 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법.
Pre-assembly of rebar for a T-junction wall, which is constructed so that one end of the second wall (W2) is connected in a direction perpendicular to the first wall (W1), which is constructed as the outer and inner walls of a reinforced concrete wall structure building. In the root arrangement method,
In the first wall (W1), the welded reinforcing bar mat 110 is surface processed by bending, and a U-mesh 120 is formed into a “U” shape to have a bent portion 121, and the U-mesh 120 A pair of welded reinforcing bar mats 110 are arranged side by side at a predetermined interval, and at the same time, the welded reinforcing bar mat 110 is surface processed by bending on the second wall (W2) to have a bent portion 121. As shown in the figure, the U-mesh 120 formed in a “U” shape is constructed to be reinforced.
The unit U-bar 11 is connected and bound to correspond to the second wall (W2) to the connecting reinforcing bars 211 constructed for reinforcement fixation so that they are arranged in the T-shaped connecting wall pattern on the slab 210 and protrude. Steps and;
Connecting and binding the U-mesh 120 to the connecting reinforcing bar 211 to correspond to the first wall W1;
One lower horizontal bar of the U-mesh 120 has been removed (120a) to correspond to the second wall (W2), and the bent portion 121 is connected to the connecting reinforcing bar 211 to form the U-mesh (120a). 120) overlapping and binding to overlap;
A pair of welded reinforcing bar mats 110 are connected and bound to the U-mesh 120 and the connecting reinforcing bar 211 in a parallel arrangement at a certain interval to correspond to the first wall W1. step; and
T-shaped connection of a reinforced concrete wall structure building, comprising the step of assembling a plurality of unit reinforcing bars 10 so that they are connected to the bent portions 121 of the U-mesh 120a and 120, respectively. Wall rebar pre-assembly arrangement method.
철근콘크리트 벽식구조 건축물의 외벽 및 내벽으로 시공되는 제1벽체(W1)에 직교하는 방향으로 제2벽체(W2)의 일단이 연결되도록 시공되어 이루어지는 T형 연결벽체(T-junction wall) 철근 선조립 배근방법에 있어서,
상기 제1벽체(W1)에는 용접철근매트(110)가 벤딩에 의해 면가공되어 절곡부(121)를 가지도록 "U" 형태로 성형된 U-메쉬(120) 및 그 U-메쉬(120)에 1쌍의 용접철근매트(110)가 일정 간격 이격된 상태로 나란하게 배근되는 동시에 상기 제2벽체(W2)에는 용접철근매트(110)가 벤딩에 의해 면가공되어 절곡부(121)를 가지도록 "U" 형태로 성형된 U-메쉬(120)가 배근되도록 시공되는 것으로,
슬라브(210)에 상기 T형 연결벽체 패턴으로 배열되어 돌출되도록 배근 정착용으로 시공된 연결 철근(211)에 상기 제1벽체에 대응하도록 상기 U-메쉬(120)를 연결하여 결속하는 단계와;
상기 제2벽체(W2)에 대응하도록 상기 U-메쉬(120)의 하단 수평근 2개를 제거한 상태(120b)로 상기 연결 철근(211)에 결속하여 절곡부(121)가 상기 U-메쉬(120)에 겹쳐져 중첩되도록 결속하는 단계와;
상기 제2벽체(W2)에 대응하도록 상기 연결 철근(211)에 2쌍의 L-바아(12)를 2단으로 연결하여 결속하는 단계와;
상기 제1벽체(W1)에 대응하도록 상기 U-메쉬(120)와 상기 연결 철근(211)에 각각 상기 용접철근매트(110) 1쌍을 일정 간격 이격시켜 나란하게 배열한 상태로 연결하여 결속하는 단계; 및
상기 U-메쉬(120b)(120)의 절곡부(121)에 각각 복수의 단위 철근(10)이 연결되도록 결속하여 조립하는 단계;를 포함하는 것을 특징으로 하는 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법.
Pre-assembly of rebar for a T-junction wall, which is constructed so that one end of the second wall (W2) is connected in a direction perpendicular to the first wall (W1), which is constructed as the outer and inner walls of a reinforced concrete wall structure building. In the root arrangement method,
In the first wall (W1), the welded reinforcing bar mat 110 is surface processed by bending, and a U-mesh 120 is formed into a “U” shape to have a bent portion 121, and the U-mesh 120 A pair of welded reinforcing bar mats 110 are arranged side by side at a predetermined interval, and at the same time, the welded reinforcing bar mat 110 is surface processed by bending on the second wall (W2) to have a bent portion 121. As shown in the figure, the U-mesh 120 formed in a “U” shape is constructed to be reinforced.
Connecting and binding the U-mesh 120 to correspond to the first wall to the connecting reinforcing bars 211 constructed for anchoring the reinforcement and protruding from the slab 210 in the T-shaped connecting wall pattern;
The two lower horizontal bars of the U-mesh 120 have been removed (120b) to correspond to the second wall (W2), and the bent portion 121 is connected to the connecting reinforcing bar 211 to form the U-mesh (120b). 120) overlapping and binding to overlap;
Connecting and binding two pairs of L-bars (12) in two stages to the connecting reinforcing bars (211) to correspond to the second wall (W2);
A pair of welded reinforcing bar mats 110 are connected and bound to the U-mesh 120 and the connecting reinforcing bar 211 in a parallel arrangement at a certain interval to correspond to the first wall W1. step; and
T-type connection of a reinforced concrete wall structure building, comprising the step of assembling a plurality of unit reinforcing bars 10 so that they are connected to the bent portions 121 of the U-mesh 120b 120, respectively. Wall rebar pre-assembly arrangement method.
철근콘크리트 벽식구조 건축물의 외벽 및 내벽으로 시공되는 제1벽체(W1)에 직교하는 방향으로 제2벽체(W2)의 일단이 연결되도록 시공되어 이루어지는 T형 연결벽체(T-junction wall) 철근 선조립 배근방법에 있어서,
상기 제1벽체(W1)에는 2쌍의 용접철근매트(110)가 일정 간격 이격된 상태로 나란하게 배근되는 동시에 상기 제2벽체(W2)에는 용접철근매트(110)가 벤딩에 의해 면가공되어 절곡부(121)를 가지도록 "U" 형태로 성형된 U-메쉬(120)가 배근되도록 시공되는 것으로,
슬라브(210)에 상기 T형 연결벽체 패턴으로 배열되어 돌출되도록 배근 정착용으로 시공된 연결 철근(211)에 상기 제2벽체(W2)에 대응하도록 상기 U-메쉬(120)를 연결하여 결속하는 단계와;
상기 제1벽체(W1)에 대응하도록 상기 U-메쉬(120)의 어느 일측으로 상기 용접철근매트(110) 1쌍을 일정 간격 이격시켜 나란하게 배열한 상태로 상기 연결 철근(211)에 연결하여 결속하는 단계와;
상기 제1벽체(W1)에 대응하도록 상기 U-메쉬(120)의 다른 일측으로 상기 용접철근매트(110) 1쌍을 일정 간격 이격시켜 나란하게 배열한 상태로 상기 연결 철근(211)에 연결하여 결속하는 단계; 및
상기 U-메쉬(120)의 절곡부(121)에 복수의 단위 철근(10)이 연결되도록 결속하여 조립하는 단계;를 포함하는 것을 특징으로 하는 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법.
Pre-assembly of rebar for a T-junction wall, which is constructed so that one end of the second wall (W2) is connected in a direction perpendicular to the first wall (W1), which is constructed as the outer and inner walls of a reinforced concrete wall structure building. In the root arrangement method,
In the first wall (W1), two pairs of welded reinforcing bar mats (110) are arranged side by side at a certain interval, and at the same time, in the second wall (W2), a welded reinforcing bar mat (110) is surface processed by bending. It is constructed so that the U-mesh 120, which is formed in a “U” shape to have a bent portion 121, is reinforced.
Connecting and binding the U-mesh 120 to correspond to the second wall (W2) to the connecting reinforcing bars 211 constructed for reinforcement fixation so that they are arranged in the T-shaped connecting wall pattern on the slab 210 and protrude. Steps and;
A pair of welded reinforcing bar mats 110 are arranged side by side at a certain interval on one side of the U-mesh 120 to correspond to the first wall W1 and connected to the connecting reinforcing bars 211. a binding step;
A pair of welded reinforcing bar mats 110 are arranged side by side at a certain interval and connected to the connecting reinforcing bar 211 on the other side of the U-mesh 120 to correspond to the first wall W1. Binding step; and
Pre-assembling T-type connection wall reinforcement of a reinforced concrete wall structure building, comprising the step of assembling a plurality of unit reinforcement bars 10 so that they are connected to the bent portion 121 of the U-mesh 120. How to place muscles.
철근콘크리트 벽식구조 건축물의 외벽 및 내벽으로 시공되는 제1벽체(W1)에 직교하는 방향으로 제2벽체(W2)의 일단이 연결되도록 시공되어 이루어지는 T형 연결벽체(T-junction wall) 철근 선조립 배근방법에 있어서,
상기 제1벽체(W1)에는 2쌍의 용접철근매트(110)가 일정 간격 이격된 상태로 나란하게 배근되는 동시에 상기 제2벽체(W2)에는 용접철근매트(110)가 벤딩에 의해 면가공되어 절곡부(121)를 가지도록 "U" 형태로 성형된 U-메쉬(120)가 배근되도록 시공되는 것으로,
슬라브(210)에 상기 T형 연결벽체 패턴으로 배열되어 돌출되도록 배근 정착용으로 시공된 연결 철근(211)에 상기 제2벽체에 대응하도록 단위 U-바아(11)를 연결하여 결속하는 단계와;
상기 제1벽체(W1)에 대응하도록 상기 U-바아(11)의 어느 일측으로 상기 용접철근매트(110) 1쌍을 일정 간격 이격시켜 나란하게 배열한 상태로 상기 연결 철근(211)에 연결하여 결속하는 단계와;
상기 제2벽체(W2)에 대응하도록 상기 U-메쉬(120)의 하단 수평근 1개를 제거한 상태(120a)로 상기 연결 철근(211)에 연결하여 결속하는 단계와;
상기 제1벽체(W1)에 대응하도록 상기 U-바아(11)의 다른 일측으로 상기 용접철근매트(110) 1쌍을 일정 간격 이격시켜 나란하게 배열한 상태로 상기 연결 철근(211)에 연결하여 결속하는 단계; 및
상기 U-메쉬(120)의 절곡부(121)에 복수의 단위 철근(10)이 연결되도록 결속하여 조립하는 단계;를 포함하는 것을 특징으로 하는 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법.
Pre-assembly of rebar for a T-junction wall, which is constructed so that one end of the second wall (W2) is connected in a direction perpendicular to the first wall (W1), which is constructed as the outer and inner walls of a reinforced concrete wall structure building. In the root arrangement method,
In the first wall (W1), two pairs of welded reinforcing bar mats (110) are arranged side by side at a certain interval, and at the same time, in the second wall (W2), a welded reinforcing bar mat (110) is surface processed by bending. It is constructed so that the U-mesh 120, which is formed in a “U” shape to have a bent portion 121, is reinforced.
Connecting and binding unit U-bars (11) to correspond to the second wall to the connecting reinforcing bars (211) constructed for reinforcement fixation so as to protrude and are arranged in the T-shaped connecting wall pattern on the slab (210);
A pair of welded reinforcing bar mats 110 are arranged side by side at a certain interval on one side of the U-bar 11 to correspond to the first wall W1 and connected to the connecting reinforcing bars 211. a binding step;
Connecting and binding one lower horizontal bar of the U-mesh 120 to the connecting reinforcing bar 211 in a removed state (120a) to correspond to the second wall (W2);
A pair of welded reinforcing bar mats 110 are arranged side by side at a certain interval and connected to the connecting reinforcing bar 211 on the other side of the U-bar 11 to correspond to the first wall W1. Binding step; and
Pre-assembling T-type connection wall reinforcement of a reinforced concrete wall structure building, comprising the step of assembling a plurality of unit reinforcement bars 10 so that they are connected to the bent portion 121 of the U-mesh 120. How to place muscles.
철근콘크리트 벽식구조 건축물의 외벽 및 내벽으로 시공되는 제1벽체(W1)에 직교하는 방향으로 제2벽체(W2)의 일단이 연결되도록 시공되어 이루어지는 T형 연결벽체(T-junction wall) 철근 선조립 배근방법에 있어서,
상기 제1벽체(W1)에는 2쌍의 용접철근매트(110)가 일정 간격 이격된 상태로 나란하게 배근되는 동시에 상기 제2벽체(W2)에는 용접철근매트(110)가 벤딩에 의해 면가공되어 절곡부(121)를 가지도록 "U" 형태로 성형된 U-메쉬(120)가 배근되도록 시공되는 것으로,
상기 제1벽체(W1)에 대응하도록 상기 제2벽체의 어느 일측으로 상기 용접철근매트(110) 1쌍을 일정 간격 이격시켜 나란하게 배열한 상태로 슬라브(210)에 상기 T형 연결벽체 패턴으로 배열되어 돌출되도록 배근 정착용으로 시공된 연결 철근(211)에 연결하여 결속하는 단계와;
상기 제2벽체(W2)에 대응하도록 상기 U-메쉬(120)의 하단 수평근 2개를 제거한 상태(120b)로 상기 연결 철근(211)에 연결하여 결속하는 단계와;
상기 제1벽체(W1)에 대응하도록 상기 제2벽체의 다른 일측으로 상기 용접철근매트(110) 1쌍을 일정 간격 이격시켜 나란하게 배열한 상태로 상기 연결 철근(211)에 연결하여 결속하는 단계와;
상기 제2벽체(W2)에 대응하도록 상기 U-메쉬(120)의 하단에 2쌍의 L-바아(12)를 상기 연결 철근(211)에 2단으로 연결하여 결속하는 단계; 및
상기 U-메쉬(120)의 절곡부(121)에 복수의 단위 철근(10)이 연결되도록 결속하여 조립하는 단계;를 포함하는 것을 특징으로 하는 철근콘크리트 벽식구조 건축물의 T형 연결벽체 철근 선조립 배근방법.
Pre-assembly of rebar for a T-junction wall, which is constructed so that one end of the second wall (W2) is connected in a direction perpendicular to the first wall (W1), which is constructed as the outer and inner walls of a reinforced concrete wall structure building. In the root arrangement method,
In the first wall (W1), two pairs of welded reinforcing bar mats (110) are arranged side by side at a certain interval, and at the same time, in the second wall (W2), a welded reinforcing bar mat (110) is surface processed by bending. It is constructed so that the U-mesh 120, which is formed in a “U” shape to have a bent portion 121, is reinforced.
A pair of welded rebar mats 110 are arranged side by side at a certain interval on one side of the second wall to correspond to the first wall W1, and are placed on the slab 210 in the T-shaped connecting wall pattern. Connecting and binding the connecting reinforcing bars (211) constructed for anchoring the reinforcement so that they are arranged and protruding;
Connecting and binding the two lower horizontal bars of the U-mesh 120 to the connecting reinforcing bars 211 in a removed state (120b) to correspond to the second wall (W2);
A step of connecting and binding a pair of welded reinforcing bar mats 110 to the connecting reinforcing bar 211 in a state in which a pair of welded reinforcing bar mats 110 are arranged side by side at a certain interval on the other side of the second wall to correspond to the first wall W1. and;
Connecting and binding two pairs of L-bars 12 to the connecting reinforcing bars 211 in two stages at the bottom of the U-mesh 120 to correspond to the second wall W2; and
Pre-assembling T-type connection wall reinforcement of a reinforced concrete wall structure building, comprising the step of assembling a plurality of unit reinforcement bars 10 so that they are connected to the bent portion 121 of the U-mesh 120. How to place muscles.
KR1020220116863A 2022-09-16 2022-09-16 Prefabricated reinforcement method of T-shaped junction wall for reinforced concrete with structural wall system KR20240038280A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020220116863A KR20240038280A (en) 2022-09-16 2022-09-16 Prefabricated reinforcement method of T-shaped junction wall for reinforced concrete with structural wall system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020220116863A KR20240038280A (en) 2022-09-16 2022-09-16 Prefabricated reinforcement method of T-shaped junction wall for reinforced concrete with structural wall system

Publications (1)

Publication Number Publication Date
KR20240038280A true KR20240038280A (en) 2024-03-25

Family

ID=90473924

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020220116863A KR20240038280A (en) 2022-09-16 2022-09-16 Prefabricated reinforcement method of T-shaped junction wall for reinforced concrete with structural wall system

Country Status (1)

Country Link
KR (1) KR20240038280A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04289355A (en) 1991-03-15 1992-10-14 Utsumi Bussan:Kk Method for constructing reinforced concrete wall
KR101184511B1 (en) 2010-07-06 2012-09-19 이창남 Site Reinforcing Method of Thick Wall with Using Plant Welded Steel Bar Frames
KR20150144398A (en) 2014-06-16 2015-12-28 삼성물산 주식회사 Reinforced Concrete Walls by Triangular Reinforcing Bar Details and Construction Method Thereof
KR102236828B1 (en) 2019-10-01 2021-04-06 (주)센벡스 Construction method of prefabricated wall using prefabricated wall module

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04289355A (en) 1991-03-15 1992-10-14 Utsumi Bussan:Kk Method for constructing reinforced concrete wall
KR101184511B1 (en) 2010-07-06 2012-09-19 이창남 Site Reinforcing Method of Thick Wall with Using Plant Welded Steel Bar Frames
KR20150144398A (en) 2014-06-16 2015-12-28 삼성물산 주식회사 Reinforced Concrete Walls by Triangular Reinforcing Bar Details and Construction Method Thereof
KR102236828B1 (en) 2019-10-01 2021-04-06 (주)센벡스 Construction method of prefabricated wall using prefabricated wall module

Similar Documents

Publication Publication Date Title
KR20150114299A (en) Apparatus for manufacturing and assembling reinforcing steel bar net and construction method of foundation reinforcement using the same
KR101028372B1 (en) Construction for connection of the truss assembled deck plates
KR20240038280A (en) Prefabricated reinforcement method of T-shaped junction wall for reinforced concrete with structural wall system
CN209760544U (en) Floor slab with overhanging rectangular ribs and shear wall structure
CN116220266B (en) Floor structure
TW201420848A (en) Steel structure for reinforced concrete wall panel and method thereof
KR20240038283A (en) Prefabricated reinforcement method of T-shaped Junction inner wall for reinforced concrete with structural wall system
CA2282676C (en) Structural core of the three-dimensional concrete reinforcing mat and method of its fabrication
CN108360724A (en) A kind of concrete folding plate of resistance to deformation
JP5652959B2 (en) Reinforcement structure of unit rebar
KR20230144775A (en) L-shaped corner inner wall of reinforced concrete wall structure building Reinforcement line assembly method
KR20230144774A (en) L-shaped corner wall reinforcement pre-assembled reinforcement method of reinforced concrete wall structure building
CN210508018U (en) Concrete prefabricated floor slab
KR20230100984A (en) Prefabrication reinforcement structure of reinforced concrete wall-type structure construction wall
CN210562997U (en) Prefabricated column assembly
KR20220027411A (en) Construction Method of Reinforced Concrete Wall Using U-Bar Prefabricated Assembly
CN113027020B (en) Prefabricated floor slab installation node and construction method thereof
CN217232309U (en) Vertical connecting structure of prefabricated concrete wall horizontally extending out of reinforcement and stirrup
KR102182537B1 (en) Connecting structure and connecting method of PC wall members using welded wire mesh
DK2175079T3 (en) A method of forming flexurally rigid corner reinforcement for reinforced concrete structure, flexurally rigid reinforcing member and the gusset
CN214219948U (en) Cast-in-place formula reinforcing bar splits concrete member tied in a bundle
CN214169642U (en) Prefabricated floor structure of stand system module building
CN210369492U (en) Orthogonal reinforcing bar net rack laminated slab
CN218522059U (en) Reinforced concrete laminated slab for modular building
CN211229202U (en) A shaping steel reinforcement cage and two skin wall prefabs for two skin walls