KR20220067725A - Exterior wall finishing material and exclusive bracket and construction method using it - Google Patents

Exterior wall finishing material and exclusive bracket and construction method using it Download PDF

Info

Publication number
KR20220067725A
KR20220067725A KR1020200154263A KR20200154263A KR20220067725A KR 20220067725 A KR20220067725 A KR 20220067725A KR 1020200154263 A KR1020200154263 A KR 1020200154263A KR 20200154263 A KR20200154263 A KR 20200154263A KR 20220067725 A KR20220067725 A KR 20220067725A
Authority
KR
South Korea
Prior art keywords
finishing material
wall
bracket
wall bracket
jig
Prior art date
Application number
KR1020200154263A
Other languages
Korean (ko)
Other versions
KR102562957B1 (en
Inventor
김시진
Original Assignee
(주)미콘
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)미콘 filed Critical (주)미콘
Priority to KR1020200154263A priority Critical patent/KR102562957B1/en
Publication of KR20220067725A publication Critical patent/KR20220067725A/en
Application granted granted Critical
Publication of KR102562957B1 publication Critical patent/KR102562957B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0832Separate fastening elements without load-supporting elongated furring elements between wall and covering elements
    • E04F13/0833Separate fastening elements without load-supporting elongated furring elements between wall and covering elements not adjustable
    • E04F13/0835Separate fastening elements without load-supporting elongated furring elements between wall and covering elements not adjustable the fastening elements extending into the back side of the covering elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0832Separate fastening elements without load-supporting elongated furring elements between wall and covering elements
    • E04F13/0853Separate fastening elements without load-supporting elongated furring elements between wall and covering elements adjustable perpendicular to the wall
    • E04F13/0855Separate fastening elements without load-supporting elongated furring elements between wall and covering elements adjustable perpendicular to the wall adjustable in several directions, one of which is perpendicular to the wall

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

The present invention relates to a construction method, which comprises: a step of preparing a plurality of finishing materials integrally formed with a fixing bolt; a step of installing a first outer wall bracket by fitting and inserting a first hooking part into the fixing bolt of a first finishing material; a step of positioning an inner wall bracket on an upper surface of the first outer wall bracket, and fixing and installing the inner wall bracket to an inner wall through a connecting member; a bracket assembling step of positioning a second outer wall bracket on an upper surface of the inner wall bracket, and combining the first outer wall bracket, the inner wall bracket, and the second outer wall bracket through a jig bolt; and a step of inserting and installing the fixing bolt of a second finishing material to a second hooking part of the second outer wall bracket. According to the present invention, since construction is performed through a process of inserting an integrally formed fixing bolt, the construction can be performed without separate post-processing or perforation of a finishing material, and thus, a lifespan of the finishing material is extended. Also, the efficiency on costs and time is provided since a finishing material is not damaged during construction, or an adhesive for combination with the finishing material is not applied. In addition, a construction speed of an outer wall finishing material can be dramatically reduced through easy combination and gap adjustment, such that construction costs or time can be reduced. Furthermore, a position or an interval can be corrected for use, such that a defect or discard rate of a finishing material can be remarkably lowered.

Description

외벽 마감재 및 전용 브라켓과 이를 이용한 시공 방법{Exterior wall finishing material and exclusive bracket and construction method using it}Exterior wall finishing material and exclusive bracket and construction method using it

본 발명은 외벽 마감재 및 전용 브라켓과, 이를 이용한 외벽 마감재 시공 방법에 관한 것이다.The present invention relates to an exterior wall finishing material, a dedicated bracket, and a method for constructing an exterior wall finishing material using the same.

일반적인 마감재(마감패널) 시공방법으로는 외벽과 마감재 사이에 시멘트 몰탈을 접착 용제로 사용하여 시공하는 습식공법과 외벽과 마감재 사이에 금속 재질로 구비된 고정 장치를 개재하여 외벽에 고정하는 건식공법이 있다. 습식공법은 상대적으로 장시간의 시멘트 양생 시간이 필요하다는 점을 제외하고도, 그 작업 과정이 비경제적이고 비생산적인 문제점이 있는 반면, 건식공법은 습식공법에 비하여 전체 시공 시간이 짧고 작업의 편의성 및 시공상의 장점으로 인해 널리 사용되고 있다.As a general finishing material (finishing panel) construction method, there is a wet method using cement mortar as an adhesive solvent between the exterior wall and the finishing material, and a dry method of fixing it to the exterior wall with a metal fixing device between the exterior wall and the finishing material. have. Although the wet method requires a relatively long cement curing time, the work process is uneconomical and unproductive, while the dry method has a shorter overall construction time compared to the wet method and has advantages in operation convenience and construction. Because of this, it is widely used.

그러나, 건식공법 역시 외벽에 앙카, 고정부가 고정되도록 한 후 마감재가 장착되는 구성을 가지는데, 이때 마감재의 설치를 위하여 각각의 앙카 및 고정부를 외벽에 일일이 시공하는 과정이 필요하므로, 이로 인해 작업 공기가 길어지고 공사 비용이 증가되는 문제점이 있었다. However, the dry method also has a configuration in which the finishing material is mounted after the anchor and the fixing part are fixed to the outer wall. There was a problem in that the construction period was long and the construction cost was increased.

또한, 앙카 및 고정부를 마감재와 결합하도록 하기 위해 타공하는 과정에서 마감재의 손상이 야기되고, 시간의 흐름에 따라 노후되면서 파손되거나 오염이 발생하는 경우가 빈번하다.In addition, damage to the finishing material is caused in the process of drilling to combine the anchor and the fixing part with the finishing material, and damage or contamination occurs frequently as time passes.

또한, 마감재와 마감재 사이가 긴밀하지 못하고 틈이 벌어지게 되는 경우 누수가 발생되는 가운데 틈을 막기 위해 별도의 실리콘으로 실링하는 과정이 요구되고, 이 경우 시공이 복잡하여 공기가 오래 걸리며, 실리콘이 많이 사용되어 시공 단가가 상승되는 문제점이 있다.In addition, when the gap between the finishing material and the finishing material is not close and the gap is widened, a separate sealing process with silicone is required to close the gap while leakage occurs. There is a problem in that the cost of construction is increased when used.

이러한 문제점을 해소하기 위한 방안으로 등록특허공보 제10-1550156호(2015.08.29)에서는 건축 마감용 외장재의 결합구조 및 그 시공방법이 제안되었고, 제안된 외장재의 결합구조는 외부패널과 내부패널 사이의 측부가 절곡부에 의하여 폐쇄되어 별도의 폐쇄부를 장착하지 않은 상태에서 다수 개의 단열재가 지지부재에 빈틈없이 결합됨으로 서로 인접한 단열재들 간의 기밀성을 얻을 수 있도록 한 것이나, 외부패널과 내부패널 및 단열재로 구비되어 있음으로써, 외장재의 두께가 두꺼워져 하중이 증가되는 문제점이 있었고, 패널을 고정하기 위한 피스등의 결합부재가 외부로 노출됨에 따라 미관이 저해되는 문제점이 있었으며, 이로 인해 시공작업에 많은 시간과 노력이 소요되는 문제가 있었다.As a way to solve this problem, in Patent Registration No. 10-1550156 (2015.08.29), a coupling structure of an exterior material for building finishing and a construction method thereof were proposed, and the proposed bonding structure of the exterior material is between the outer panel and the inner panel. In the state where the side of the panel is closed by the bending part and a separate closing part is not installed, a plurality of insulation materials are tightly coupled to the support member to obtain airtightness between adjacent insulation materials. As it is provided, there was a problem that the thickness of the exterior material was thickened and the load was increased, and there was a problem that the aesthetics was impaired as the coupling member such as a piece for fixing the panel was exposed to the outside, which caused a lot of time for construction work And there was a problem that took effort.

대한민국 등록특허 제10-1550156호(2015.08.29.)Republic of Korea Patent Registration No. 10-1550156 (2015.08.29.)

본 발명은 외벽 마감재 간의 균일한 배열을 통해 미관을 해치지 않고, 신속한 시공을 통해 비용이 현저히 절감되는 외벽 마감재 및 전용 브라켓과 이를 이용한 시공 방법을 제공하기 위한 것이다.An object of the present invention is to provide an exterior wall finishing material and a dedicated bracket that does not impair aesthetics through a uniform arrangement between exterior wall finishing materials and significantly reduces costs through rapid construction, and a construction method using the same.

본 발명에 따르면 직각 벤딩되어 제 1 수평면 및 제 1 수직면을 포함하는 역"ㄱ"형상을 갖고, 상기 제 1 수직면 단부 일부가 개구된 형상의 제 1 걸림부가 형성된 제 1 외벽 브라켓, 직각 벤딩되어 제 3 수평면 및 제 3 수직면을 포함하는 역"ㄴ"형상을 갖고, 상기 제 3 수직면 외면에 내벽과 연결되는 연결부재를 포함하는 내벽 브라켓, 직각 벤딩되어 제 2 수평면 및 제 2 수직면을 포함하는 "ㄴ"형상을 갖고, 상기 제 2 수직면 단부 일부가 개구된 형상의 제 2 걸림부가 형성된 제 2 외벽 브라켓을 포함하고, 상기 제 1 수평면, 상기 제 3 수평면 및 상기 제 2 수평면이 지그볼트를 통해 결합되는 것을 특징으로 하는 외벽 마감재용 브라켓을 제공한다.According to the present invention, the first outer wall bracket is bent at right angles to have an inverted "L" shape including a first horizontal surface and a first vertical surface, and a first locking part of a shape in which an end portion of the first vertical surface is opened is formed. An inner wall bracket having an inverted "b" shape including three horizontal surfaces and a third vertical surface, and including a connecting member connected to the inner wall on the outer surface of the third vertical surface, bent at right angles to include a second horizontal surface and a second vertical surface "It has a shape and includes a second outer wall bracket having a second locking part formed in a shape in which a part of the end of the second vertical surface is opened, and the first horizontal surface, the third horizontal surface and the second horizontal surface are coupled through a jig bolt. It provides a bracket for exterior wall finishing material, characterized in that.

또한, 위의 브라켓을 이용하여 고정볼트가 일체 형성된 복수의 마감재를 준비하는 단계, 제 1 마감재의 고정볼트에 제 1 걸림부를 끼움 삽입하여 제 1 외벽 브라켓을 설치하는 단계, 내벽 브라켓을 상기 제 1 외벽 브라켓 상면에 위치시키고, 연결부재를 통해 상기 내벽 브라켓을 내벽에 고정 설치하는 단계, 제 2 외벽 브라켓을 상기 내벽 브라켓의 상면에 위치시키고, 상기 제 1 외벽 브라켓, 상기 내벽 브라켓 및 상기 제 2 외벽 브라켓을 지그볼트를 통해 결합시키는 브라켓 조립 단계 및 상기 제 2 외벽 브라켓의 상기 제 2 걸림부에 제 2 마감재의 고정볼트를 끼움 삽입하여 설치하는 단계를 포함하는 시공 방법을 제공한다.In addition, the steps of preparing a plurality of finishing materials in which the fixing bolts are integrally formed by using the above brackets, installing the first outer wall brackets by fitting and inserting the first locking parts into the fixing bolts of the first finishing materials, the inner wall brackets of the first Positioning the inner wall bracket on the upper surface of the outer wall bracket, fixing and installing the inner wall bracket to the inner wall through a connecting member, placing a second outer wall bracket on the upper surface of the inner wall bracket, the first outer wall bracket, the inner wall bracket, and the second outer wall It provides a construction method comprising the steps of assembling a bracket for coupling the bracket through a jig bolt and installing the fixing bolt of a second finishing material into the second locking part of the second outer wall bracket.

본 발명에 따르면, 일체 형성된 고정볼트를 끼움 삽입하는 방법을 통해 시공하기 때문에 마감재에 별도의 후가공이나 타공 등을 하지 않고 시공이 가능하다.According to the present invention, since construction is performed through a method of inserting an integrally formed fixing bolt, construction is possible without additional post-processing or perforation on the finishing material.

이로 인해, 마감재의 수명이 늘어나고, 시공 시 마감재가 파손되거나, 마감재간의 결합을 위해 접착제 등을 도포하지 않아도 되기 때문에 비용 및 시간적으로 효율적이다.For this reason, the lifespan of the finishing material is increased, the finishing material is damaged during construction, or it is not necessary to apply an adhesive or the like for bonding between the finishing materials, which is cost-effective and time-efficient.

또한, 본 발명에 따르면 손쉬운 결합 및 간격 조절을 통해 외벽 마감재의 시공 속도를 획기적으로 단축할 수 있다.In addition, according to the present invention, it is possible to dramatically shorten the construction speed of the exterior wall finishing material through easy coupling and spacing adjustment.

또한, 시공 기간이 줄어듬에 따라 발생하는 비용이 줄어들고, 위치나 간격 등을 보정하여 사용가능하기 때문에 마감재의 불량률이 현저하게 낮아진다.In addition, as the construction period is shortened, the cost is reduced, and since it can be used by correcting the position or spacing, the defect rate of the finishing material is significantly lowered.

도 1은 본 발명의 일 실시예에 따른 외벽 마감재 시공 방법을 나타낸 순서도이다.
도 2는 본 발명의 일 실시예에 따른 외벽 마감재를 준비하는 단계를 나타낸 순서도이다.
도 3 내지 6은 본 발명의 일 실시예에 따른 브라켓을 나타낸 도면이다.
도 7은 본 발명의 일 실시예에 따른 브라켓의 결합 관계를 나타낸 도면이다.
도 8 및 도 9는 본 발명의 일 실시예에 따른 브라켓이 외벽 및 내벽에 설치되는 것을 나타낸 도면이다.
도 10 내지 도 13은 본 발명의 일 실시예에 따른 외벽 마감재 시공 방법을 각 단계별로 나타낸 도면이다.
도 14는 본 발명의 추가적인 일례로 양생틀 및 거치부를 통해 양생하는 것을 나타낸 도면이다.
도 15는 본 발명의 일 실시예에 따른 외벽 마감재 시공 방법 중 마감재 준비단계를 나타낸 도면이다.
1 is a flowchart illustrating a method of constructing an exterior wall finishing material according to an embodiment of the present invention.
2 is a flowchart showing the steps of preparing an exterior wall finishing material according to an embodiment of the present invention.
3 to 6 are views showing a bracket according to an embodiment of the present invention.
7 is a view showing a coupling relationship of a bracket according to an embodiment of the present invention.
8 and 9 are views showing that the bracket according to an embodiment of the present invention is installed on the outer wall and the inner wall.
10 to 13 are views showing the exterior wall finishing material construction method according to an embodiment of the present invention in each step.
14 is a view showing curing through a curing frame and a mounting unit as an additional example of the present invention.
15 is a view showing a finishing material preparation step in the exterior wall finishing material construction method according to an embodiment of the present invention.

이하, 첨부된 도면을 참조하여 본 발명의 실시 예에 대하여 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 상세히 설명한다. 그러나 본 발명은 여러 가지 상이한 형태로 구현될 수 있으며 이하에서 개시되는 실시 예에 한정되지 않는다. 또한 도면에서 본 발명을 명확하게 개시하기 위해서 본 발명과 관계없는 부분은 생략하였으며, 도면에서 동일하거나 유사한 부호들은 동일하거나 유사한 구성요소들을 나타낸다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings so that those of ordinary skill in the art can easily implement them. However, the present invention may be implemented in several different forms and is not limited to the embodiments disclosed below. In addition, in order to clearly disclose the present invention in the drawings, parts irrelevant to the present invention are omitted, and the same or similar symbols in the drawings indicate the same or similar components.

본 발명의 목적 및 효과는 하기의 설명에 의해서 자연스럽게 이해되거나 보다 분명해질 수 있으며, 하기의 기재만으로 본 발명의 목적 및 효과가 제한되는 것은 아니다.Objects and effects of the present invention can be naturally understood or more clearly understood by the following description, and the objects and effects of the present invention are not limited only by the following description.

본 발명의 목적, 특징 및 장점은 다음의 상세한 설명을 통하여 보다 분명해질 것이다. 또한, 본 발명을 설명함에 있어서 본 발명과 관련된 공지 기술에 대한 구체적인 설명이, 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우에는 그 상세한 설명을 생략하기로 한다. 이하, 첨부된 도면을 참조하여 본 발명에 따른 실시예를 상세히 설명하기로 한다.The objects, features and advantages of the present invention will become more apparent from the following detailed description. In addition, in the description of the present invention, if it is determined that a detailed description of a known technology related to the present invention may unnecessarily obscure the gist of the present invention, the detailed description thereof will be omitted. Hereinafter, an embodiment according to the present invention will be described in detail with reference to the accompanying drawings.

도 3 내지 도 9를 참고하면, 본 발명의 일 실시예에 따른 외벽 마감재(10)용 브라켓은 마감재(10)와 연결되는 제 1 외벽 브라켓(100) 및 제 2 외벽 브라켓(200)과 내벽(20)과 연결되는 내벽 브라켓(300)을 포함한다. 제 1 외벽 브라켓(100) 및 제 2 외벽 브라켓(200)은 마감재(10)와 손쉽게 연결할 수 있는 구성을 가지며, 여기서 일컫는 마감재(10)는 본 발명만의 특수한 마감재(10)로서 마감재(10)에 고정볼트(11)가 일체화된 것을 특징으로 하는 마감재(10)이고, 브라켓은 여기에 적용되는 전용 브라켓이다. 브라켓을 설명하기 앞서, 마감재(10)는 복수개로 배열되도록 설치되고, 하측에 위치된 마감재(10)를 제 1 마감재(10a) 상측에 위치된 마감재(10)는 제 2 마감재(10b)로 일례를 들어 설명하기로 하고, 각 마감재(10)는 내측면에 고정된 고정볼트(11)가 각 가장자리에 4개가 형성되는 것을 일례로 하며, 개수나 위치 등은 마감재(10)의 형태 재질 등에 따라 다양하게 변형될 수 있다. 앞으로 도면을 참고하여 각 구성에 대하여 상세하게 설명하기로 한다.3 to 9 , the bracket for the exterior wall finishing material 10 according to an embodiment of the present invention includes a first exterior wall bracket 100 and a second exterior wall bracket 200 connected to the finishing material 10 and an inner wall ( 20) and an inner wall bracket 300 connected to it. The first outer wall bracket 100 and the second outer wall bracket 200 have a configuration that can be easily connected to the finishing material 10, and the finishing material 10 referred to here is a special finishing material 10 unique to the present invention. It is a finishing material 10, characterized in that the fixing bolt 11 is integrated there, and the bracket is a dedicated bracket applied here. Before describing the bracket, the finishing material 10 is installed so as to be arranged in plurality, and the finishing material 10 located on the lower side is the first finishing material 10a and the finishing material 10 located on the upper side is the second finishing material 10b. For example, each finishing material 10 has four fixing bolts 11 fixed to the inner surface formed at each edge as an example, and the number or location depends on the shape material of the finishing material 10, etc. It can be variously modified. Hereinafter, each configuration will be described in detail with reference to the drawings.

도 4를 참고하면, 제 1 외벽 브라켓(100)은 제 1 마감재(10a)에 설치되는 구성이다. 제 1 외벽 브라켓(100)은 판 형상을 갖되 직각으로 벤딩되어 단면이 "ㄴ"형상을 갖되, 제 1 마감재(10a)에 설치시에는 역전되어 역"ㄱ"형상을 갖는다. 제 1 외벽 브라켓(100)은 직각 벤딩되어 수평 방향의 면을 제 1 수평면(110)이라 일컫고, 수직 방향의 면을 제 1 수직면(120)이라 정의한다. 제 1 수직면(120)의 끝 단부에는 일부가 개구된 형상의 제 1 걸림부(121)가 형성된다. 제 1 걸림부(121)는 제 1 수직면(120) 끝단의 일부가 "ㄷ"자 형상으로 개구된 형상으로서, 고정볼트(11)에 제 1 수직면(120)의 진행방향으로 끼움 삽입된다. 제 1 걸림부(121)는 "ㄷ" 자 형상으로 개구된 것으로 설명하였으나, 고정볼트(11)의 단면의 형상에 따라 "U"형상 등 다양한 형상으로 구비될 수 있다. 제 1 걸림부(121)가 제 1 마감재(10a)의 고정볼트(11a)에 끼움 삽입하게 됨으로써 제 1 수직면(120)은 제 1 마감재(10a)와 접하게 된다. 제 1 외벽 브라켓(100)의 제 1 수평면(110)은 후술하는 내벽 브라켓(300)의 제 3 수평면(310)과 접하게되고, 후술하는 지그볼트(400)가 삽입되어 고정된다. 제 1 수평면(110)은 지그볼트(400) 삽입을 위한 타공이 형성될 수 있으며, 제 1 수평면(110), 후술하는 제 3 수평면(310) 및 제 2 수평면(210)을 관통하여 하나의 지그볼트(400)로 인해 서로 결합된다. 제 1 수평면(110)에 형성된 타공은 지그 보정을 위해 제 1 지그홈(111)이 형성될 수 있다. 제 1 지그홈(111)은 제 1 수평면(110)을 기준으로 횡 방향(d1)으로 긴 길이의 홈으로서, 지그볼트(400)가 횡 방향(d1)으로 이동될 수 있도록 하여 마감재(10)간의 횡 방향(d1) 위치 및 간격을 보정할 수 있다. 여기서, 횡 방향(d1)은 종 방향(d2)의 수직되는 방향으로서, 종 방향(d2)은 제 1 수평면(110)의 끝단과 제 1 수직면(120)과의 연결 방향이다. Referring to FIG. 4 , the first outer wall bracket 100 is configured to be installed on the first finishing material 10a. The first outer wall bracket 100 has a plate shape and is bent at a right angle to have a "B" shape in cross section, but is reversed when installed on the first finishing material 10a to have an inverted "L" shape. The first outer wall bracket 100 is bent at a right angle so that the horizontal plane is referred to as the first horizontal plane 110 , and the vertical plane is defined as the first vertical plane 120 . At the end of the first vertical surface 120 , a first locking part 121 having a partially opened shape is formed. The first locking part 121 has a shape in which a portion of the end of the first vertical surface 120 is opened in a “C” shape, and is inserted into the fixing bolt 11 in the moving direction of the first vertical surface 120 . Although it has been described that the first locking part 121 is opened in a “C” shape, it may be provided in various shapes such as a “U” shape depending on the shape of the cross-section of the fixing bolt 11 . As the first locking part 121 is inserted into the fixing bolt 11a of the first finishing material 10a, the first vertical surface 120 comes into contact with the first finishing material 10a. The first horizontal surface 110 of the first outer wall bracket 100 comes into contact with a third horizontal surface 310 of the inner wall bracket 300 to be described later, and a jig bolt 400 to be described later is inserted and fixed. The first horizontal surface 110 may be formed with a perforation for inserting the jig bolt 400 , and penetrates the first horizontal surface 110 , the third horizontal surface 310 and the second horizontal surface 210 to be described later, so that a single jig is formed. The bolts 400 are coupled to each other. A first jig groove 111 may be formed in the hole formed in the first horizontal surface 110 for jig correction. The first jig groove 111 is a groove having a long length in the transverse direction d1 with respect to the first horizontal plane 110, and the jig bolt 400 is moved in the transverse direction d1 to allow the finishing material 10. The position and spacing in the lateral direction (d1) between the two sides may be corrected. Here, the transverse direction d1 is a direction perpendicular to the longitudinal direction d2 , and the longitudinal direction d2 is a connection direction between the end of the first horizontal surface 110 and the first vertical surface 120 .

도 5를 참고하면, 제 2 외벽 브라켓(200)은 제 1 외벽 브라켓(100)과 동일한 구성을 갖되, 제 1 외벽 브라켓(100)이 제 1 마감재(10a)와 연결되는 반면, 제 2 외벽 브라켓(200)은 제 2 마감재(10b)와 연결되는 구성이다. 따라서, 제 2 외벽 브라켓(200)이 제 2 마감재(10b)에 설치 시 제 1 외벽 브라켓(100)과 대칭되도록 설치된다. 즉, 제 2 외벽 브라켓(200)은 내벽 브라켓(300)의 제 3 수평면(310)을 기준으로 대칭되도록 단면이 "ㄴ"형상을 갖도록 형성된다. 또한, 제 2 외벽 브라켓(200)은 제 1 수평면(110)과 대응되는 제 2 수평면(210), 제 1 수직면(120)과 대응되는 제 2 수직면(220), 제 1 지그홈(111)과 대응되는 제 2 지그홈(211), 제 1 걸림부(121)와 대응되는 제 2 걸림부(221)를 포함한다. 위와 같이 서로 대칭되되 동일한 형상을 갖는 경우, 브라켓의 제조 단가를 획기적으로 낮출 수 있다.5, the second outer wall bracket 200 has the same configuration as the first outer wall bracket 100, while the first outer wall bracket 100 is connected to the first finishing material 10a, while the second outer wall bracket Reference numeral 200 is a configuration connected to the second finishing material (10b). Accordingly, when the second outer wall bracket 200 is installed on the second finishing material 10b, it is installed to be symmetrical with the first outer wall bracket 100 . That is, the second outer wall bracket 200 is formed to have a “L” shape in cross section so as to be symmetrical with respect to the third horizontal plane 310 of the inner wall bracket 300 . In addition, the second outer wall bracket 200 includes a second horizontal surface 210 corresponding to the first horizontal surface 110 , a second vertical surface 220 corresponding to the first vertical surface 120 , a first jig groove 111 and It includes a corresponding second jig groove 211 , a second locking part 221 corresponding to the first locking part 121 . As above, if they are symmetrical to each other but have the same shape, the manufacturing cost of the bracket can be dramatically reduced.

도 6을 참고하면, 내벽 브라켓(300)은 제 1 외벽 브라켓(100) 및 제 2 외벽 브라켓(200)을 내벽(20)과 연결하는 구성이다. 내벽 브라켓(300)은 판 형상으로 구비되되 직각 벤딩되어 단면이 역"ㄴ"형상을 갖는다. 제 3 수평면(310) 및 제 3 수직면(320)을 포함한다. 제 3 수평면(310)은 제 1 수평면(110) 및 제 2 수평면(210)과 평행한 방향의 면이고, 제 3 수직면(320)은 제 2 수직면(220) 및 제 1 수직면(120)과 평행한 방향의 면이다. 제 3 수평면(310)은 앞서 설명한 바와 같이 제 1 수평면(110) 및 제 2 수평면(210)과의 결합을 위해 지그볼트(400)가 삽입되는 타공이 형성될 수 있다. 더 나아가, 제 3 수평면(310)의 타공은 제 1 지그홈(111) 및 제 2 지그홈(211)과 같이 제 3 지그홈(311)으로 구비될 수 있다. 다만, 제 3 지그홈(311)은 종 방향(d2)으로 개구된 홈으로서, 삽입된 지그볼트(400)가 종 방향(d2)으로 소정 거리 이동될 수 있도록 한다. 제 3 지그홈(311)으로 인해 지그볼트(400) 또는 제 3 수평면(310)을 종 방향(d2) 이동시킴으로써 내벽(20)과 마감재(10)간의 거리를 보정할 수 있다. 내벽 브라켓(300)의 제 3 수직면(320)에는 내벽(20)과 연결되는 연결부재(321)가 돌출 형성될 수 있다. 본 발명에서는 내벽(20) 방향으로 돌출된 원통형상의 연결부재(321)가 내벽(20)에 미리 타공된 구멍으로 삽입되는 것으로 표현하였으나, 내벽(20)에 형성된 너트 등에 삽입되어 결합되거나, 용접 또는 접착 등 다양한 방법으로 내벽(20)과 연결되도록 구성할 수 있다. 추가적인 일례로 제 3 수평면(310)은 끝 단부가 연장된 형태의 간격유지부(312)가 더 형성될 수 있다. 간격유지부(312)는 제 1 마감재(10a)와 제 2 마감재(10b) 사이에 위치되어 제 1 마감재(10a)와 제 2 마감재(10b) 간의 간격을 유지하는 구성이다. 상세하게, 제 1 외벽 브라켓(100), 제 2 외벽 브라켓(200) 및 내벽 브라켓(300)이 서로 결합되었을 때, 제 3 수평면(310)은 끝 단부에 제 1 수직면(120) 또는 제 2 수직면(220)의 위치보다 긴 길이를 갖는 간격유지부(312)가 연장 형성됨으로써 제 1 마감재(10a) 및 제 2 마감재(10b) 사이에 위치된다. 간격유지부(312)는 그 두께를 달리하여 제 1 마감재(10a) 및 제 2 마감재(10b)간의 간격 거리를 미리 지정한 간격 거리로 배열 설치할 수 있기 때문에 외벽 마감재(10)의 설치가 용이하고 정확하며, 공사 기간을 단축시킬 수 있다.Referring to FIG. 6 , the inner wall bracket 300 is configured to connect the first outer wall bracket 100 and the second outer wall bracket 200 to the inner wall 20 . The inner wall bracket 300 is provided in a plate shape and is bent at a right angle to have an inverted "B" shape in cross section. It includes a third horizontal plane 310 and a third vertical plane 320 . The third horizontal plane 310 is a plane in a direction parallel to the first horizontal plane 110 and the second horizontal plane 210 , and the third vertical plane 320 is parallel to the second vertical plane 220 and the first vertical plane 120 . It is a one-way side. As described above, the third horizontal surface 310 may have a hole through which the jig bolt 400 is inserted for coupling with the first horizontal surface 110 and the second horizontal surface 210 . Furthermore, the perforation of the third horizontal surface 310 may be provided as a third jig groove 311 like the first jig groove 111 and the second jig groove 211 . However, the third jig groove 311 is a groove opened in the longitudinal direction d2 so that the inserted jig bolt 400 can be moved a predetermined distance in the longitudinal direction d2. The distance between the inner wall 20 and the finishing material 10 can be corrected by moving the jig bolt 400 or the third horizontal plane 310 in the longitudinal direction d2 due to the third jig groove 311 . A connecting member 321 connected to the inner wall 20 may be formed to protrude from the third vertical surface 320 of the inner wall bracket 300 . In the present invention, it is expressed that the cylindrical connecting member 321 protruding in the direction of the inner wall 20 is inserted through a hole pre-drilled in the inner wall 20, but it is inserted into a nut formed in the inner wall 20, etc. It can be configured to be connected to the inner wall 20 by various methods such as adhesion. As an additional example, the third horizontal plane 310 may further include a gap maintaining part 312 having an extended end. The gap maintaining unit 312 is positioned between the first finishing material 10a and the second finishing material 10b to maintain a gap between the first finishing material 10a and the second finishing material 10b. In detail, when the first outer wall bracket 100, the second outer wall bracket 200, and the inner wall bracket 300 are coupled to each other, the third horizontal surface 310 is the first vertical surface 120 or the second vertical surface at the end end. The gap maintaining part 312 having a length longer than the position of 220 is extended and positioned between the first finishing material 10a and the second finishing material 10b. Since the gap maintaining part 312 can arrange and install the spacing distance between the first finishing material 10a and the second finishing material 10b at a predetermined interval distance by varying the thickness thereof, the installation of the exterior wall finishing material 10 is easy and accurate. and shorten the construction period.

도 1과 도 10 내지 도 13을 참고하면, 본 발명의 일 실시예에 따른 외벽 마감재(10) 시공 방법은 상기 서술한 외벽 마감재(10)용 브라켓을 이용한다. 외벽 마감재(10) 시공 방법은 마감재(10) 준비 단계(S100), 제 1 외벽 브라켓(100) 설치 단계(S200), 내벽 브라켓(300) 설치 단계(S300), 제 2 외벽 브라켓(200) 정 위치 및 브라켓 조립 단계(S400) 및 제 2 마감재(10b) 설치 단계(S500)를 포함할 수 있다. 외벽 마감재(10) 시공 방법은 다양한 순서로 수행될 수 있으나, 외벽 마감재(10)가 지면에서부터 설치되어 순차적으로 상측 방향으로 설치되어 올라가는 것을 기준으로 설명하며, 시공 장소나 환경 등을 고려하여 다양하게 변경될 수 있다.1 and 10 to 13 , the exterior wall finishing material 10 construction method according to an embodiment of the present invention uses the above-described bracket for the exterior wall finishing material 10 . The exterior wall finishing material 10 construction method includes the finishing material 10 preparation step (S100), the first outer wall bracket 100 installation step (S200), the inner wall bracket 300 installation step (S300), the second outer wall bracket 200 still It may include a location and bracket assembly step (S400) and a second finishing material (10b) installation step (S500). The construction method of the exterior wall finishing material 10 may be performed in various orders, but the description is based on the fact that the exterior wall finishing material 10 is installed from the ground and sequentially installed and ascended in the upward direction. can be changed.

마감재(10) 준비 단계(S100)는 고정볼트(11)가 일체로 형성된 마감재(10)를 준비하는 단계이다. 마감재(10) 준비 단계는 마감재(10)를 양생할 때 볼트 등과 같은 거치할 수 있는 구를 마감재(10) 양생 시 일체로 양생함으로써 마감재(10)에 타공이나, 가공 등 후 가공 없이 바로 사용할 수 있게 되어 작업의 신속성을 부여할 수 있다. 마감재(10) 준비 단계의 상세한 과정은 후술하기로 한다.The finishing material 10 preparation step ( S100 ) is a step of preparing the finishing material 10 in which the fixing bolt 11 is integrally formed. In the finishing material 10 preparation step, when the finishing material 10 is cured, a ball that can be mounted such as a bolt is integrally cured when the finishing material 10 is cured, so that the finishing material 10 can be used immediately without any post-processing such as drilling or processing. This can give you the speed of work. The detailed process of the finishing material 10 preparation step will be described later.

제 1 외벽 브라켓(100) 설치 단계(S200)는 제 1 마감재(10a)에 제 1 외벽 브라켓(100)을 설치하는 단계로서, 제 1 외벽 브라켓(100)에 형성된 "ㄷ"형상을 갖는 제 1 걸림부(121)를 제 1 마감재(10a)에 형성된 고정볼트(11a)에 끼움 삽입하는 과정이다. 이때, 제 1 마감재(10a)의 고정볼트(11a)는 상측에 위치된 고정볼트(11a)이고, 제 1 걸림부(121)는 상측에서 하측 방향으로 끼워 삽입함으로써 결합시킨다. 이후, 고정볼트(11a)는 그대로 거치된 상태로 사용될 수 있고, 필요한 경우 너트 결합, 용접 또는 접착 등의 방법을 통해 제 1 걸림부(121)와 결속될 수 있다.The first outer wall bracket 100 installation step (S200) is a step of installing the first outer wall bracket 100 on the first finishing material 10a. This is a process of inserting the locking part 121 into the fixing bolt 11a formed on the first finishing material 10a. At this time, the fixing bolt 11a of the first finishing material 10a is a fixing bolt 11a located on the upper side, and the first locking part 121 is coupled by inserting it from the upper side to the lower side. Thereafter, the fixing bolt 11a may be used as it is, and, if necessary, may be coupled to the first locking portion 121 through a method such as nut coupling, welding, or bonding.

내벽 브라켓(300) 설치 단계(S300)는 제 1 수평면(110) 상면에 내벽 브라켓(300)의 제 3 수평면(310)을 서로 접하도록 위치시키고, 제 3 수직면(320)과 내벽(20)을 연결시켜 고정시키는 단계이다. 제 3 수직면(320)에는 내벽(20)과의 연결을 위해 연결부재(321)가 더 구비될 수 있으며, 연결부재(321)가 내벽(20)에 미리 타공된 부분으로 삽입 및 너트 등의 결합으로 내벽(20)에 설치될 수 있다.In the inner wall bracket 300 installation step (S300), the third horizontal surface 310 of the inner wall bracket 300 is placed in contact with each other on the first horizontal surface 110 upper surface, and the third vertical surface 320 and the inner wall 20 are formed. It is the step of connecting and fixing. A connecting member 321 may be further provided on the third vertical surface 320 for connection with the inner wall 20 , and the connecting member 321 is a pre-drilled portion in the inner wall 20 and is inserted into the inner wall 20 and coupled with a nut, etc. to be installed on the inner wall 20 .

브라켓 조립 단계(S400)는 제 2 외벽 브라켓(200)을 준비하고 각 브라켓을 조립하는 단계로서, 제 2 외벽 브라켓(200)을 내벽 브라켓(300)의 상면에 위치시키고 제 1 외벽 브라켓(100), 내벽 브라켓(300) 및 제 2 외벽 브라켓(200)을 지그볼트(400)를 통해 결합시키는 단계이다.The bracket assembly step (S400) is a step of preparing the second outer wall brackets 200 and assembling each bracket, placing the second outer wall bracket 200 on the upper surface of the inner wall bracket 300 and the first outer wall bracket 100 , a step of coupling the inner wall bracket 300 and the second outer wall bracket 200 through the jig bolt 400 .

여기서, 제 1 수평면(110), 제 2 수평면(210) 및 제 3 수평면(310)에 제 1 지그홈(111), 제 2 지그홈(211) 및 제 3 지그홈(311)이 형성된 경우 브라켓 조립 단계는 각 지그홈을 통해 브라켓 간의 거리를 보정하는 단계를 더 포함할 수 있다. 상세하게, 제 1 외벽 브라켓(100)은 지그볼트(400)가 소정 거리 이동될 수 있도록 횡 방향(d1)의 제 1 지그홈(111)이 형성되고, 제 2 외벽 브라켓(200)은 지그볼트(400)가 소정 거리 이동될 수 있도록 횡 방향(d1)의 제 2 지그홈(211)이 형성되며, 내벽 브라켓(300)은 지그볼트(400)가 소정 거리 이동될 수 있도록 종 방향(d2)의 제 3 지그홈(311)이 형성되는 경우, 브라켓 조립 단계는 지그볼트(400)가 결합되는 제 1 지그홈(111)의 위치를 횡 방향(d1)으로 보정함으로써, 제 1 마감재(10a)의 횡 방향(d1) 위치 및 간격을 보정하고, 지그볼트(400)가 결합되는 제 2 지그홈(211)의 위치를 횡 방향(d1)으로 보정함으로써, 제 2 마감재(10b)의 횡 방향(d1) 위치 및 간격을 보정하며, 지그볼트(400)가 결합되는 제 3 지그홈(311)의 위치를 종 방향(d2)으로 보정함으로써 내벽(20)과 마감재(10)간의 거리를 보정할 수 있다.Here, when the first jig groove 111, the second jig groove 211, and the third jig groove 311 are formed on the first horizontal surface 110, the second horizontal surface 210, and the third horizontal surface 310, the bracket The assembling step may further include correcting the distance between the brackets through each jig groove. In detail, the first outer wall bracket 100 has a first jig groove 111 in the lateral direction d1 so that the jig bolt 400 can be moved a predetermined distance, and the second outer wall bracket 200 is a jig bolt The second jig groove 211 in the transverse direction d1 is formed so that the 400 can be moved a predetermined distance, and the inner wall bracket 300 is formed in the longitudinal direction d2 so that the jig bolt 400 can be moved a predetermined distance. When the third jig groove 311 of By correcting the position and spacing in the transverse direction (d1) of the jig bolt 400 and correcting the position of the second jig groove 211 to which the jig bolt 400 is coupled in the transverse direction d1, the transverse direction ( d1) correcting the position and spacing, and correcting the distance between the inner wall 20 and the finishing material 10 by correcting the position of the third jig groove 311 to which the jig bolt 400 is coupled in the longitudinal direction d2 have.

제 2 마감재(10b) 설치 단계(S500)는 제 1 마감재(10a) 상측에 배열 설치되는 제 2 마감재(10b)를 제 2 외벽 브라켓(200)에 설치하는 과정이다. 제 2 마감재(10b) 설치 단계는 제 2 마감재(10b)의 고정볼트(11b)를 제 2 외벽 브라켓(200)의 제 2 걸림부(221)에 끼움 삽입하여 설치하는 단계이다. 상세하게, 제 2 외벽 브라켓(200)의 단면이 "ㄷ"형상을 갖는 제 2 걸림부(221)가 상측 방향으로 개구되도록 설치되어있는 상태에서 제 2 마감재(10b)의 고정볼트(11b)를 상측에서 하측 방향으로 끼움 삽입시키는 단계이다.The second finishing material 10b installation step ( S500 ) is a process of installing the second finishing material 10b arranged on the upper side of the first finishing material 10a to the second outer wall bracket 200 . The second finishing material 10b installation step is a step of inserting and inserting the fixing bolt 11b of the second finishing material 10b into the second locking part 221 of the second outer wall bracket 200 . In detail, in a state in which the second locking part 221 having a cross-section of the second outer wall bracket 200 having a “c” shape is installed to open upward, the fixing bolt 11b of the second finishing material 10b is tightened. It is a step of inserting the fitting in the direction from the top to the bottom.

도 2 및 도 14 및 도 15를 참고하면, 추가적인 실시예로, 마감재(10) 준비 단계(S100)는 양생틀(500) 준비 단계(S110), 거치부(600) 위치 단계(S120), 고정볼트(11) 위치 단계(S130), 양생 단계(S140) 및 거치부(600) 제거 단계(S150)를 포함할 수 있다. 이는 고정볼트(11)가 일체로 형성된 마감재(10)를 준비하는 단계(S100)로서, 마감재(10)를 양생할 때 볼트 등과 같은 거치할 수 있는 구를 마감재(10) 양생 시 일체로 양생함으로써 마감재(10)에 타공이나, 가공 등 후 가공 없이 바로 사용할 수 있게 하여 작업의 신속성을 부여할 수 있다.2 and 14 and 15 , as an additional embodiment, the finishing material 10 preparation step (S100) includes the curing frame 500 preparation step (S110), the mounting part 600 positioning step (S120), and fixing It may include a bolt 11 positioning step (S130), a curing step (S140), and a removing step (S150) of the mounting unit 600 . This is a step (S100) of preparing the finishing material 10 in which the fixing bolt 11 is integrally formed. When curing the finishing material 10, a sphere that can be mounted such as a bolt is integrally cured when the finishing material 10 is cured. By allowing the finishing material 10 to be used immediately without any post-processing such as drilling or processing, it is possible to impart speed of work.

양생틀(500) 준비 단계(S110)는 상면이 개구되어 박스 형상이 되는 양생틀(500)을 준비하는 과정이다. 여기서 양생틀(500)은 내부에 몰탈(M)을 위치시켜 양생함으로써 마감재(10)를 제조한다. 따라서, 양생틀(500)의 내부 공간은 넓은 판 형상의 공간이 형성되도록 하는 것이 바람직하며, 후술하는 공정에서 가장자리 변 상면에 거치부(600)를 거치시켜야하기 때문에 이를 고려하여 소정의 높이를 갖도록 하는 것이 바람직하다.The preparation step ( S110 ) of the care frame 500 is a process of preparing the care frame 500 , which has an open upper surface and has a box shape. Here, the curing frame 500 manufactures the finishing material 10 by locating and curing the mortar (M) therein. Therefore, it is preferable to form a wide plate-shaped space in the inner space of the curing frame 500, and to have a predetermined height in consideration of the need to mount the mounting part 600 on the upper surface of the edge side in the process to be described later. It is preferable to do

거치부(600) 위치 단계(S120)는 막대 형상의 거치부(600)를 양생틀(500)의 마주보는 변 모서리의 각 상면에 거치되도록 위치시키는 단계이다. 거치부(600)의 상세한 구성은 후술하도록 하나, 거치부(600)는 기본적으로 양 변에 거치되도록 양생틀(500)의 마주보는 변의 모서리간의 길이보다 길거나 같도록 구비해야한다. 또한, 양생된 마감재(10)를 설치된 방향으로 바라보았을 때, 마감재(10)의 지면 및 상측 방향과 수직되는 방향(d3)으로 거치부(600)의 길이 방향(d3)이 되도록 거치시키는 것이 바람직하다. 구체적으로, 마감재(10)의 경우 지그볼트(400)와 제 1 지그홈(111) 및 제 2 지그홈(211)으로 횡 방향(d1)의 보정이 가능하고, 제 3 지그홈(311)으로 종 방향(d2)의 보정이 가능하나, 지면과의 상하 방향(d3)의 보정은 지그볼트(400)의 너트 등의 위치로만 조절이 가능하기 때문에 비교적 보정 거리가 제한적이다. 따라서, 이를 보완하기 위해 거치부(600)를 거치시키는 방향(d3)은 마감재(10)의 상 하 방향(d3)으로 거치함으로써 거치부(600)에 형성된 고정볼트(11)의 위치를 비교적 미리 정밀하게 위치시킴으로써 향후 시공에서의 위치 문제를 해결할 수 있다.The step of positioning the mounting unit 600 ( S120 ) is a step of positioning the rod-shaped mounting unit 600 to be mounted on each upper surface of the edge of the opposite side of the curing frame 500 . The detailed configuration of the mounting unit 600 will be described later, but the mounting unit 600 should be provided to be longer than or equal to the length between the edges of the opposite sides of the curing frame 500 to be mounted on both sides by default. In addition, when the cured finishing material 10 is viewed in the installed direction, it is preferable to mount the finishing material 10 in the longitudinal direction (d3) of the mounting part 600 in a direction (d3) perpendicular to the ground and upward directions of the finishing material 10. do. Specifically, in the case of the finishing material 10, correction in the transverse direction d1 is possible with the jig bolt 400, the first jig groove 111 and the second jig groove 211, and the third jig groove 311 Although the correction in the longitudinal direction d2 is possible, the correction in the vertical direction d3 with the ground can be adjusted only by the position of the nut of the jig bolt 400, so the correction distance is relatively limited. Therefore, in order to compensate for this, the position of the fixing bolt 11 formed on the mounting part 600 is relatively in advance by mounting the mounting part 600 in the direction d3 of the finishing material 10 in the up-down direction d3. By positioning precisely, it is possible to solve the positioning problem in future construction.

고정볼트(11) 위치 단계(S130)는 거치된 거치부(600)에 형성된 타공에 고정볼트(11)를 삽입하는 단계이다. 거치부(600)의 미리 지정된 위치에 타공 형성된 거치구(601)에 고정볼트(11)를 삽입한다. 여기서 거치구(601)는 고정볼트의 헤드보다 작은 크기로 형성되어 고정볼트(11)가 거치되어 위치된다. 또한, 거치 시에 고정볼트(11)의 끝단은 양생틀(500)의 내부에 위치되도록 한다.The fixing bolt 11 positioning step ( S130 ) is a step of inserting the fixing bolt 11 into the hole formed in the mounted cradle 600 . The fixing bolt 11 is inserted into the holder 601 with a hole formed in a predetermined position of the holder 600 . Here, the holder 601 is formed in a size smaller than the head of the fixing bolt, and the fixing bolt 11 is mounted thereto. In addition, the end of the fixing bolt 11 is positioned inside the curing frame 500 during mounting.

양생 단계(S140)는 양생틀(500)에 몰탈(M)을 위치시키는 과정으로서, 양생틀(500)에 몰탈(M)을 위치시켜 거치된 고정볼트(11)의 일부가 몰탈(M)에 잠겨 일체로 양생되도록 하는 단계이다. 양생된 몰탈(M)은 마감재(10)로 명하여 설명한다.The curing step (S140) is a process of placing the mortar M on the curing frame 500, and a part of the fixing bolt 11 mounted by placing the mortar M on the curing frame 500 is attached to the mortar (M). It is a step in which it is submerged and cured integrally. The cured mortar (M) is described by commanding the finishing material (10).

거치부(600) 제거 단계(S150)는 몰탈(M)과 일체 양생되어 형성된 고정볼트(11)로부터 거치부(600)를 제거하는 과정으로서, 거치부(600)는 거치구(601)를 기준으로 양분 또는 분리되도록 구성되기 때문에 이를 제거함으로써 마감재(10)와 일체 형성된 고정볼트(11)를 얻을 수 있다.The cradle 600 removal step (S150) is a process of removing the cradle 600 from the fixing bolt 11 formed by being integrally cured with the mortar M. The cradle 600 is based on the cradle 601. Since it is configured to be divided or separated, it is possible to obtain the fixing bolt 11 integrally formed with the finishing material 10 by removing it.

도 14 및 도 15를 참고하면, 위의 추가적인 실시예에 따른 거치부(600)는 막대 형상으로 구비된다. 거치부(600)는 고정볼트(11)가 삽입되도록 한 쌍의 거치구(601)가 타공된다. 거치부(600)는 거치구(601)의 중심을 기준으로 거치부(600)가 양 분할되어 제 1 거치부재(610) 및 제 2 거치부재(620)로 구비되어 분리됨으로써 거치구(601)에 거치된 고정볼트(11)를 거치부(600)로부터 분리할 수 있다. 분할된 거치부(600)는 자성체를 통해 결합 및 분리되도록 구비되어 양생 과정에서의 거치부(600)가 고정볼트(11)를 지속적으로 지지할 수 있도록 한다. 한편, 거치부(600)는 양 끝단 방향에 손잡이가 타공될 수 있다.14 and 15 , the mounting part 600 according to the above additional embodiment is provided in a bar shape. A pair of mounting holes 601 are perforated in the mounting unit 600 so that the fixing bolt 11 is inserted. The mounting portion 600 is divided into two portions based on the center of the holder 601, and is provided with a first mounting member 610 and a second mounting member 620 and separated by being separated from the holder 601. The fixing bolt 11 mounted on the can be separated from the holder 600 . The divided cradle 600 is provided to be coupled and separated through a magnetic material so that the cradle 600 can continuously support the fixing bolt 11 during the curing process. On the other hand, the mounting portion 600 may have a handle perforated in the direction of both ends.

위와 다른 예로서, 거치부(600`)는 제 1 거치부재(610`) 및 제 2 거치부재(620`)를 포함할 수 있다. 제 1 거치부재(610`)는 양생틀(500)의 마주보는 변 모서리의 각 상면에 거치되는 막대 형상으로 구비되고, 제 2 거치부재(620`)는 고정볼트(11)가 삽입되도록 일측면에 거치구가 타공된다. 거치구는 단면이 "U"형상을 갖도록 하고, 제 2 거치부재(620`)의 일 측면이 개방되도록 타공한다. 제 1 거치부재(610`) 및 복수의 제 2 거치부재(620`)는 자성체를 통해 결합 및 분리되도록 한다. 또한, 제 2 거치부재(620`)는 제 1 거치부재(610`)보다 작은 길이로 구비되도록 한다. 위와 같이 구성한 경우 제 2 거치부재(620`)는 마감재(10)에 일체 형성되는 고정볼트(11)의 위치를 달리 해야하는 경우 손쉽게 제 2 거치부재(620`)의 위치를 이동시킴으로써 고정볼트(11)의 위치를 달리하여 일체 양생시킬 수 있다.As another example from the above, the mounting unit 600 ′ may include a first mounting member 610 ′ and a second mounting member 620 ′. The first mounting member 610 ′ is provided in a bar shape to be mounted on each upper surface of the opposite edge of the curing frame 500 , and the second mounting member 620 ′ has one side so that the fixing bolt 11 is inserted. A cradle is drilled in the The holder has a cross section of a “U” shape, and a hole is punched so that one side of the second holding member 620 ′ is opened. The first mounting member 610 ′ and the plurality of second mounting members 620 ′ are coupled and separated through a magnetic body. In addition, the second holding member 620' is provided with a smaller length than the first holding member 610'. In the case of the above configuration, the second mounting member 620 ′ is the fixing bolt 11 by easily moving the position of the second mounting member 620 ′ when the position of the fixing bolt 11 integrally formed on the finishing material 10 needs to be changed. ) can be cured in one piece by changing the location.

상기한 본 발명의 바람직한 실시 예는 예시의 목적으로 개시된 것이고, 본 발명에 대해 통상의 지식을 가진 당업자라면 본 발명의 사상과 범위 안에서 다양한 수정, 변경 및 부가가 가능할 것이며, 이러한 수정, 변경 및 부가는 상기의 특허청구 범위에 속하는 것으로 보아야 할 것이다.The above-described preferred embodiments of the present invention have been disclosed for the purpose of illustration, and those skilled in the art with common knowledge about the present invention will be able to make various modifications, changes and additions within the spirit and scope of the present invention, such modifications, changes and additions should be considered to be within the scope of the above claims.

본 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면, 본 발명의 기술적 사상을 벗어나지 않는 범위 내에서, 여러 가지 치환, 변형 및 변경이 가능하므로, 본 발명은 전술한 실시 예 및 첨부된 도면에 의해 한정되는 것이 아니다.Those of ordinary skill in the art to which the present invention pertains, within the scope of not departing from the technical spirit of the present invention, various substitutions, modifications and changes are possible, so the present invention is described in the above-described embodiments and the accompanying drawings. not limited by

상술한 예시적인 시스템에서, 방법들은 일련의 단계 또는 블록으로써 순서도를 기초로 설명되고 있지만, 본 발명은 단계들의 순서에 한정되는 것은 아니며, 어떤 단계는 상술한 바와 다른 단계와 다른 순서로 또는 동시에 발생할 수 있다. 또한, 당업자라면 순서도에 나타낸 단계들이 배타적이지 않고, 다른 단계가 포함되거나 순서도의 하나 또는 그 이상의 단계가 본 발명의 범위에 영향을 미치지 않고 삭제될 수 있음을 이해할 수 있을 것이다.In the exemplary system described above, the methods are described on the basis of a flowchart as a series of steps or blocks, however, the present invention is not limited to the order of steps, and some steps may occur in a different order or concurrently with other steps as described above. can In addition, those skilled in the art will understand that the steps shown in the flowchart are not exhaustive and that other steps may be included or that one or more steps of the flowchart may be deleted without affecting the scope of the present invention.

100: 제 1 외벽 브라켓
110: 제 1 수평면 111: 제 1 지그홈
120: 제 1 수직면 121: 제 1 걸림부
200: 제 2 외벽 브라켓
210: 제 2 수평면 211: 제 2 지그홈
220: 제 2 수직면 221: 제 2 걸림부
300: 내벽 브라켓
310: 제 3 수평면 311: 제 3 지그홈
312: 간격유지부
320: 제 3 수직면 321: 연결부재
400: 지그볼트
10: 마감재 11: 고정볼트
10a: 제 1 마감재 10b: 제 2 마감재
20: 내벽
500: 양생틀
600: 거치부 601: 거치구
610: 제 1 거치부재 620: 제 2 거치부재
M: 몰탈
100: first outer wall bracket
110: first horizontal plane 111: first jig groove
120: first vertical surface 121: first engaging portion
200: second outer wall bracket
210: second horizontal plane 211: second jig groove
220: second vertical surface 221: second engaging portion
300: inner wall bracket
310: third horizontal plane 311: third jig groove
312: gap maintaining unit
320: third vertical surface 321: connecting member
400: jig bolt
10: Finishing material 11: Fixing bolt
10a: first finishing material 10b: second finishing material
20: inner wall
500: curing frame
600: holder 601: holder
610: first holding member 620: second holding member
M: mortar

Claims (9)

고정볼트(11)가 일체 형성된 복수의 마감재(10)를 내벽(20)과 일정 간격 유지되도록 고정하는 브라켓에 있어서,
직각 벤딩되어 제 1 수평면(110) 및 제 1 수직면(120)을 포함하는 역"ㄱ"형상을 갖고, 상기 제 1 수직면(120) 단부 일부가 개구된 형상의 제 1 걸림부(121)가 형성된 제 1 외벽 브라켓(100);
직각 벤딩되어 제 3 수평면(310) 및 제 3 수직면(320)을 포함하는 역"ㄴ"형상을 갖고, 상기 제 3 수직면(320) 외면에 내벽(20)과 연결되는 연결부재(321)를 포함하는 내벽 브라켓(300);
직각 벤딩되어 제 2 수평면(210) 및 제 2 수직면(220)을 포함하는 "ㄴ"형상을 갖고, 상기 제 2 수직면(220) 단부 일부가 개구된 형상의 제 2 걸림부(221)가 형성된 제 2 외벽 브라켓(200); 을 포함하고,
상기 제 1 수평면(110), 상기 제 3 수평면(310) 및 상기 제 2 수평면(210)이 지그볼트(400)를 통해 결합되는 것을 특징으로 하는 외벽 마감재용 브라켓.
In the bracket for fixing a plurality of finishing materials (10) integrally formed with a fixing bolt (11) to be maintained at a predetermined distance from the inner wall (20),
It is bent at right angles to have an inverted "L" shape including the first horizontal surface 110 and the first vertical surface 120, and a first locking part 121 having an open end portion of the first vertical surface 120 is formed. a first outer wall bracket 100;
It is bent at right angles to have an inverted "L" shape including a third horizontal surface 310 and a third vertical surface 320, and includes a connecting member 321 connected to the inner wall 20 on the outer surface of the third vertical surface 320 an inner wall bracket 300;
It is bent at right angles to have a "B" shape including a second horizontal surface 210 and a second vertical surface 220, and a second locking part 221 having an open end portion of the second vertical surface 220 is formed. 2 outer wall bracket (200); including,
The first horizontal surface 110, the third horizontal surface 310, and the second horizontal surface 210 is a bracket for exterior wall finishing material, characterized in that coupled through a jig bolt (400).
제 1 항에 있어서,
상기 제 1 수평면(110)은 상기 지그볼트(400)가 소정 거리 이동될 수 있도록 횡 방향(d1)의 제 1 지그홈(111)이 형성되고, 상기 제 2 수평면(210)은 상기 지그볼트(400)가 소정 거리 이동될 수 있도록 횡 방향(d1)의 제 2 지그홈(211)이 형성되어 상기 마감재(10)간의 횡 방향(d1) 위치 및 간격을 보정하는 것을 특징으로 하는 외벽 마감재용 브라켓.
The method of claim 1,
The first horizontal surface 110 is formed with a first jig groove 111 in the transverse direction d1 so that the jig bolt 400 can be moved a predetermined distance, and the second horizontal surface 210 is the jig bolt ( The second jig groove 211 in the transverse direction d1 is formed so that 400) can be moved a predetermined distance, and the position and spacing in the transverse direction d1 between the finishing materials 10 are corrected. .
제 1 항에 있어서,
상기 제 3 수평면(310)은 상기 지그볼트(400)가 소정 거리 이동될 수 있도록 종 방향(d2)의 제 3 지그홈(311)이 형성되어 상기 내벽(20)과 상기 마감재(10)의 거리를 보정하는 것을 특징으로 하는 외벽 마감재용 브라켓.
The method of claim 1,
The third horizontal surface 310 has a third jig groove 311 in the longitudinal direction d2 so that the jig bolt 400 can be moved a predetermined distance, so that the distance between the inner wall 20 and the finishing material 10 is Bracket for exterior wall finishing material, characterized in that it compensates.
제 1 항에 있어서,
상기 제 1 외벽 브라켓(100), 상기 제 2 외벽 브라켓(200) 및 상기 내벽 브라켓(300) 결합 시,
상기 제 3 수평면(310)의 단부에 상기 제 1 수직면(120) 또는 상기 제 2 수직면(220)의 위치보다 긴 길이로 연장된 간격유지부(312)가 형성되는 것을 특징으로 하는 외벽 마감재용 브라켓.
The method of claim 1,
When the first outer wall bracket 100, the second outer wall bracket 200 and the inner wall bracket 300 are combined,
Bracket for exterior wall finishing material, characterized in that at the end of the third horizontal surface 310, a gap maintaining part 312 extending to a length longer than the position of the first vertical surface 120 or the second vertical surface 220 is formed. .
제 1 항의 외벽 마감재용 브라켓을 이용한 외벽 마감재 시공 방법에 있어서,
고정볼트(11)가 일체 형성된 복수의 마감재(10)를 준비하는 단계(S100);
제 1 마감재(10a)의 고정볼트(11a)에 제 1 걸림부(121)를 끼움 삽입하여 제 1 외벽 브라켓(100)을 설치하는 단계(S200);
내벽 브라켓(300)을 상기 제 1 외벽 브라켓(100) 상면에 위치시키고, 연결부재(321)를 통해 상기 내벽 브라켓(300)을 내벽(20)에 고정 설치하는 단계(S300);
제 2 외벽 브라켓(200)을 상기 내벽 브라켓(300)의 상면에 위치시키고, 상기 제 1 외벽 브라켓(100), 상기 내벽 브라켓(300) 및 상기 제 2 외벽 브라켓(200)을 지그볼트(400)를 통해 결합시키는 브라켓 조립 단계(S400); 및
상기 제 2 외벽 브라켓(200)의 상기 제 2 걸림부(221)에 제 2 마감재(10b)의 고정볼트(11b)를 끼움 삽입하여 설치하는 단계(S500); 를 포함하는 것을 특징으로 하는 외벽 마감재 시공 방법.
In the exterior wall finishing material construction method using the bracket for exterior wall finishing material of claim 1,
Preparing a plurality of finishing materials 10 in which the fixing bolts 11 are integrally formed (S100);
Installing the first outer wall bracket 100 by inserting the first locking part 121 into the fixing bolt 11a of the first finishing material 10a (S200);
Positioning the inner wall bracket 300 on the upper surface of the first outer wall bracket 100, and fixing the inner wall bracket 300 to the inner wall 20 through a connecting member 321 (S300);
A second outer wall bracket 200 is placed on the upper surface of the inner wall bracket 300, and the first outer wall bracket 100, the inner wall bracket 300, and the second outer wall bracket 200 are mounted with a jig bolt 400. Bracket assembly step (S400) coupled through; and
installing the fixing bolt 11b of the second finishing material 10b into the second locking part 221 of the second outer wall bracket 200 by inserting (S500); Exterior wall finishing material construction method comprising a.
제 5 항에 있어서,
상기 제 1 외벽 브라켓(100)은 상기 지그볼트(400)가 소정 거리 이동될 수 있도록 횡 방향(d1)의 제 1 지그홈(111)이 형성되고, 상기 제 2 외벽 브라켓(200)은 상기 지그볼트(400)가 소정 거리 이동될 수 있도록 횡 방향(d1)의 제 2 지그홈(211)이 형성되며, 상기 내벽 브라켓(300)은 상기 지그볼트(400)가 소정 거리 이동될 수 있도록 종 방향(d2)의 제 3 지그홈(311)이 형성되고,
상기 브라켓 조립 단계(S400)는,
상기 지그볼트(400) 결합 시 상기 제 1 지그홈(111) 및 상기 제 2 지그홈(211)을 통해 마감재(10)간의 횡 방향(d1) 위치 및 간격을 보정하고, 상기 제 3 지그홈(311)을 통해 내벽(20)과 마감재(10)의 거리를 보정하는 보정 단계를 포함하는 것을 특징으로 하는 외벽 마감재 시공 방법.
6. The method of claim 5,
The first outer wall bracket 100 has a first jig groove 111 in the lateral direction d1 so that the jig bolt 400 can be moved a predetermined distance, and the second outer wall bracket 200 is the jig bolt 400 . The second jig groove 211 in the transverse direction d1 is formed so that the bolt 400 can be moved a predetermined distance, and the inner wall bracket 300 is formed in the longitudinal direction so that the jig bolt 400 can be moved a predetermined distance. A third jig groove 311 of (d2) is formed,
The bracket assembly step (S400) is,
When the jig bolt 400 is coupled, the first jig groove 111 and the second jig groove 211 are used to correct the position and spacing in the transverse direction (d1) between the finishing materials 10, and the third jig groove ( 311) through the outer wall finishing material construction method comprising a correction step of correcting the distance between the inner wall 20 and the finishing material (10).
제 5 항에 있어서,
상기 고정볼트(11)가 일체 형성된 복수의 마감재(10)를 준비하는 단계(S100)는,
상면이 개구된 양생틀(500)을 준비하는 단계(S110);
상기 양생틀(500)의 마주보는 변 모서리의 각 상면에 미리 지정된 위치에 막대 형상의 거치부(600)를 위치시키는 단계(S120);
상기 거치부(600)의 미리 지정된 위치에 타공된 거치구(601)에 고정볼트(11)를 삽입하여 상기 양생틀(500)의 내부에 상기 고정볼트(11) 일부가 위치되도록 거치시키는 단계(S130);
상기 양생틀(500)에 몰탈(M)을 위치시키고 양생하는 단계(S140); 및
상기 몰탈(M)이 양생된 후 상기 양생틀(500)로부터 상기 거치부(600)를 제거하는 단계(S150); 를 포함하는 것을 특징으로 하는 외벽 마감재 시공 방법.
6. The method of claim 5,
The step (S100) of preparing a plurality of finishing materials 10 in which the fixing bolts 11 are integrally formed (S100),
preparing a curing frame 500 with an open top surface (S110);
positioning the rod-shaped cradle 600 at a predetermined position on each upper surface of the opposite edge of the curing frame 500 (S120);
Inserting a fixing bolt 11 into a holder 601 punched in a predetermined position of the holder 600 and mounting the fixing bolt 11 so that a part of the fixing bolt 11 is positioned inside the curing frame 500 ( S130);
locating and curing the mortar (M) on the curing frame 500 (S140); and
removing the mounting part 600 from the curing frame 500 after the mortar M is cured (S150); Exterior wall finishing material construction method comprising a.
제 7 항에 있어서,
상기 거치부(600)는,
상기 고정볼트(11)가 삽입되도록 상기 거치구(601)가 한 쌍 이상 타공되고,
상기 거치구(601)의 중심을 기준으로 상기 거치부(600)가 양 분할되도록 구비되며,
분할된 상기 거치부(600)는 자성체를 통해 결합 및 분리되도록 구비되는 것을 특징으로 하는 외벽 마감재 시공 방법.
8. The method of claim 7,
The holding part 600 is,
One or more pairs of the holder 601 are perforated so that the fixing bolt 11 is inserted,
It is provided so that the mounting portion 600 is divided into both sides based on the center of the holder 601,
The divided mounting part 600 is an exterior wall finishing material construction method, characterized in that it is provided to be coupled and separated through a magnetic material.
제 7 항에 있어서,
상기 거치부는 제 1 거치부재(610`) 및 복수의 제 2 거치부재(620`)를 포함하고,
상기 제 1 거치부재(610`)는 상기 양생틀(500)의 마주보는 변 모서리의 각 상면에 거치되는 막대 형상으로 구비되고,
상기 제 2 거치부재(620`)는 상기 고정볼트(11)가 삽입되도록 일측면에 단면이 "U"을 갖는 상기 거치구(601)가 타공되며,
상기 제 1 거치부재(610`) 및 복수의 상기 제 2 거치부재(620`)는 자성체를 통해 결합 및 분리되도록 구비되되, 상기 제 2 거치부재(620`)는 상기 제 1 거치부재(610`)의 길이보다 작은 길이로 구비되는 것을 특징으로 하는 외벽 마감재 시공 방법.
8. The method of claim 7,
The holding part includes a first holding member 610' and a plurality of second holding members 620',
The first mounting member 610 ′ is provided in the shape of a rod to be mounted on each upper surface of the opposite edge of the curing frame 500 ,
The second holding member 620 ′ is perforated with the mounting hole 601 having a cross section “U” on one side so that the fixing bolt 11 is inserted,
The first mounting member 610 ′ and the plurality of second mounting members 620 ′ are provided to be coupled and separated through a magnetic body, and the second mounting member 620 ′ is the first mounting member 610 ′. ) of the exterior wall finishing material construction method, characterized in that it is provided with a length smaller than the length.
KR1020200154263A 2020-11-18 2020-11-18 Exterior wall finishing material and exclusive bracket and construction method using it KR102562957B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020200154263A KR102562957B1 (en) 2020-11-18 2020-11-18 Exterior wall finishing material and exclusive bracket and construction method using it

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020200154263A KR102562957B1 (en) 2020-11-18 2020-11-18 Exterior wall finishing material and exclusive bracket and construction method using it

Publications (2)

Publication Number Publication Date
KR20220067725A true KR20220067725A (en) 2022-05-25
KR102562957B1 KR102562957B1 (en) 2023-08-18

Family

ID=81800660

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020200154263A KR102562957B1 (en) 2020-11-18 2020-11-18 Exterior wall finishing material and exclusive bracket and construction method using it

Country Status (1)

Country Link
KR (1) KR102562957B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100128842A (en) * 2009-05-29 2010-12-08 (주)대동석재공업 A fixing device for a out side panel of building
KR101550156B1 (en) 2014-11-24 2015-09-03 주종복 Combination Structure of Panel for External of Building and Method for Constructing thereof
KR102077855B1 (en) * 2019-07-04 2020-02-14 주식회사 위시스테크놀로지 High-strength concrete panel manufacturing method, panel structure and panel installation method
KR102122685B1 (en) * 2019-10-30 2020-06-12 우정기 A Finishing Material Fixing Assembly For Building Wall

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100128842A (en) * 2009-05-29 2010-12-08 (주)대동석재공업 A fixing device for a out side panel of building
KR101550156B1 (en) 2014-11-24 2015-09-03 주종복 Combination Structure of Panel for External of Building and Method for Constructing thereof
KR102077855B1 (en) * 2019-07-04 2020-02-14 주식회사 위시스테크놀로지 High-strength concrete panel manufacturing method, panel structure and panel installation method
KR102122685B1 (en) * 2019-10-30 2020-06-12 우정기 A Finishing Material Fixing Assembly For Building Wall

Also Published As

Publication number Publication date
KR102562957B1 (en) 2023-08-18

Similar Documents

Publication Publication Date Title
KR200410714Y1 (en) facing of constrution fixture
KR101445639B1 (en) The Aluminum insulation panel frame for architecture and thereof installation method
JP5188485B2 (en) Positioning parts and joinery
KR20150055519A (en) Brick support apparatus and construction method of brick wall using the same
KR20220067725A (en) Exterior wall finishing material and exclusive bracket and construction method using it
KR100999651B1 (en) Apparatus regulating level of structurol partition
KR200486029Y1 (en) Stone fixing bracket structure and stone complex panel
JP6258540B1 (en) Track device and panel body construction method
JP6660148B2 (en) handrail
JP6666812B2 (en) How to attach ceiling panels to building units
JPH05141040A (en) Precast concrete panel for building
JP6340645B1 (en) Splice plate holding jig
JP2019011617A (en) Positioning member
JP7107485B2 (en) Small beam position adjustment jig and manufacturing method for building unit
JP6758039B2 (en) handrail
KR100693706B1 (en) Tool for setting up height
JP2017101535A (en) Temporary support member of exterior material
KR101806525B1 (en) Fixing device and a method for manufacturing of wall construction for panel
JP2002028830A (en) Manufacturing device for wall panel
JPH0229183Y2 (en)
JP2000017770A (en) Mounting bracket
JPS59185279A (en) Window frame attaching method
JP4418338B2 (en) Exterior wall panel joint structure
JPS6329786Y2 (en)
JP2023139387A (en) System pedestal for air-conditioning outdoor machine, air-conditioning outdoor machine module, installation method of air-conditioning outdoor machine, and assembling method of air-conditioning outdoor machine module

Legal Events

Date Code Title Description
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right