KR20210150746A - Kelly bar with multi-stage piping for remicon injection and spraying solidifying agent - Google Patents

Kelly bar with multi-stage piping for remicon injection and spraying solidifying agent Download PDF

Info

Publication number
KR20210150746A
KR20210150746A KR1020200067547A KR20200067547A KR20210150746A KR 20210150746 A KR20210150746 A KR 20210150746A KR 1020200067547 A KR1020200067547 A KR 1020200067547A KR 20200067547 A KR20200067547 A KR 20200067547A KR 20210150746 A KR20210150746 A KR 20210150746A
Authority
KR
South Korea
Prior art keywords
stage
pipe
ready
kelly bar
mixed concrete
Prior art date
Application number
KR1020200067547A
Other languages
Korean (ko)
Other versions
KR102477617B1 (en
Inventor
고영식
Original Assignee
고영식
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 고영식 filed Critical 고영식
Priority to KR1020200067547A priority Critical patent/KR102477617B1/en
Publication of KR20210150746A publication Critical patent/KR20210150746A/en
Application granted granted Critical
Publication of KR102477617B1 publication Critical patent/KR102477617B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0038Production methods using an auger, i.e. continuous flight type

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Earth Drilling (AREA)

Abstract

The present invention relates to a Kelly bar into which multistage pipe is inserted for ready-mixed concrete injection and solidification agent spraying, capable of reducing the size of excavation equipment and making excavation work quicker by installing a multistage pipe for injecting ready-mixed concrete or a solidification agent into a drilling hole, on the inside of the Kelly bar. The Kelly bar having a lower part combined with a bit to be rotated by a driver comprises a multistage rod, a multistage pipe for injecting ready-mixed concrete or a solidification agent into a drilling hole is inserted into the multistage rod, the multistage pipe is formed to be rotated, contracted and expanded together with the multistage rod, and a plurality of transfer holes connected to a lower part of the multistage pipe are formed on the inside of the bit to spray the ready-mixed concrete or the solidification agent into the drilling hole. Therefore, in accordance with the present invention, since the ready-mixed concrete or the solidification agent is injected into the multistage pipe installed on the inside of the multistage rod to be rotated together with the rod, the size of the excavation equipment can be reduced, and also, since the multistage pipe is formed to be contracted and expanded together with the multistage rod, there can be an effect of enabling convenient use and quicker excavation work. Moreover, when the multistage pipe is being removed, there is no risk of contact with the drilling hole and the Kelly bar, which can lead to the prevention of damage, and also, the removal work can become quicker, which can lead to a considerable reduction in time for the excavation work.

Description

레미콘 주입 및 고화제 분사용 다단 배관이 삽입된 켈리바{Kelly bar with multi-stage piping for remicon injection and spraying solidifying agent}Kelly bar with multi-stage piping for remicon injection and spraying solidifying agent

본 발명은 연약지반에 PHC 파일을 삽입하기 위하여 굴착기에 설치되어 천공을 형성하는 켈리바에 관한 것으로, 더욱 상세하게는 천공의 내측에 레미콘 또는 고화제를 주입하는 다단 배관을 켈리바의 내측에 설치하여 굴착장비의 규모를 축소하고 굴착작업이 더욱 신속하게 이루어지는 레미콘 주입 및 고화제 분사용 다단 배관이 삽입된 켈리바에 관한 것이다.The present invention relates to a Kelly bar installed in an excavator to form a perforation in order to insert a PHC pile into soft ground, and more particularly, a multi-stage pipe for injecting ready-mixed concrete or a solidifying agent inside the perforation is installed inside the Kelly bar. It relates to a Kelly bar in which a multi-stage pipe for injection of ready-mixed concrete and solidifying agent injection is inserted, which reduces the scale of excavation equipment and makes excavation work faster.

도 1은 굴착기의 베이스머신에 설치된 암과 암 실린더를 작동시켜 드릴부의 높낮이를 주변 지형에 적합하게 조절하여 기동성과 이동성을 크게 향상시킬 수 있으며, 윈치를 작동시켜 켈리바만 상하로 움직여 길이를 조절하므로 와이어와 윈치에 작용하는 하중이 감소하고 안전성이 향상되며, 베이스머신과 드릴부를 직접 결합하여 사용할 수 있으므로 대형 마스터를 형성하여 사용할 필요가 없고 결합 및 분리 사용이 가능하며, 드릴링리그를 소형화함으로써 드릴링리그의 이동 및 작동이 간편해지고, 구동장치로서 2속 유압모터와 2속 감속기를 사용함으로써 구동장치의 부품수를 감소시키면서도 속도는 더욱 다양하게 다단계로 조절하여 작업상황에 적합하게 조절하여 드릴링리그를 작동시킬 수 있는 드릴링 리그가 부착된 굴착기에 관한 것이다.1 shows that by operating the arm and the arm cylinder installed in the base machine of the excavator, the height of the drill part can be adjusted to suit the surrounding terrain, thereby greatly improving the maneuverability and mobility, and by operating the winch, only the Kelly bar moves up and down to adjust the length. Therefore, the load acting on the wire and winch is reduced and safety is improved, and since the base machine and the drill part can be used directly combined, there is no need to form and use a large master, combined and separate use is possible, and drilling by miniaturizing the drilling rig The movement and operation of the rig is simplified, and by using a two-speed hydraulic motor and a two-speed speed reducer as the driving device, the number of parts for the driving device is reduced, while the speed is adjusted in multiple stages to be more diversified and adjusted to suit the working situation. It relates to an excavator with an operable drilling rig attached.

상기 굴착기는 마스터를 사용하지 않고 드릴링리그의 기능을 수행할 수 있어서, 소형화 및 경량화되는 장점이 있다. 이에 따라 고도제한이나 기존 구조물의 간섭 등에 의해 드릴링리그가 진입하기 어려웠던 장소에도 쉽게 작업할 수 있고, 이동성과 기동성이 향상되며, 켈리하우징(22)은 암(14)과 암 실린더(16)에 의해 지지되고, 주윈치(30)와 보조윈치(32)는 와이어(34) 길이를 조절하여 켈리바(24) 길이만 조절하면 되므로 하중을 적게 받게 된다.Since the excavator can perform the function of a drilling rig without using a master, there is an advantage of miniaturization and light weight. Accordingly, it is possible to easily work in places where it is difficult for a drilling rig to enter due to height restrictions or interference from existing structures, and mobility and maneuverability are improved. It is supported, and the main winch 30 and the auxiliary winch 32 receive less load because only the length of the kelly bar 24 is adjusted by adjusting the length of the wire 34 .

그러나 이러한 종래의 굴착기는 켈리바(24)가 구동장치에 의해 회전하기 때문에 천공의 내측에 레미콘 또는 고화제를 주입하기 위한 호스(H)를 켈리바(24)의 외측에 설치함으로써 회전에 의해 호스(H)가 꼬여 파손되는 것을 방지하였는데, 이에 따라 굴착장비가 비대해지고 호스(H)를 설치하거나 수거할 때 천공 및 켈리바(24)와의 마찰에 의해 파손될 우려가 있어 유지관리가 용이하지 않은 문제점이 있었다.However, in this conventional excavator, since the Kelly bar 24 is rotated by the driving device, the hose (H) for injecting the ready-mixed concrete or solidifying agent inside the perforation is installed on the outside of the Kelly bar 24 by rotation of the hose. (H) was prevented from being twisted and damaged. As a result, the excavation equipment becomes enlarged and there is a risk of damage due to perforation and friction with the Kelly bar 24 when installing or collecting the hose (H), which makes maintenance difficult. there was

본 발명은 상기와 같은 문제점을 해결하기 위한 것으로, 천공의 내측에 레미콘 또는 고화제를 주입하는 배관을 켈리바의 내측에 설치하여 장비의 축소 및 작업성을 개선한 레미콘 주입 및 고화제 분사용 다단 배관이 삽입된 켈리바를 제공하는 데 목적이 있다.The present invention is to solve the above problems, and by installing a pipe for injecting the ready-mixed concrete or solidifying agent inside the perforation inside the Kelly bar to improve the reduction and workability of equipment and multi-stage for injection of ready-mixed concrete and solidifying agent An object of the present invention is to provide a Kelly bar in which a pipe is inserted.

본 발명에 의한 레미콘 주입 및 고화제 분사용 다단 배관이 삽입된 켈리바는 하측에 비트가 결합되어 구동장치에 의해 회전하는 켈리바는 다단의 로드로 이루어지고, 상기 다단 로드의 내측에는 천공에 레미콘 또는 고화제를 주입하는 다단 배관이 삽입되며, 상기 다단 배관은 다단 로드와 동시에 회전, 수축 및 확장되도록 구성되고, 상기 비트의 내측에는 다단 배관의 하측과 연통되는 복수의 이송홀이 형성되어 천공의 내측으로 레미콘 또는 고화제를 분사하는 것을 특징으로 한다.The Kelly bar in which the multi-stage pipe for injection of ready-mixed concrete and solidifying agent injection according to the present invention is inserted, the bit is coupled to the lower side and the Kelly bar rotated by the driving device is made of a multi-stage rod, and the ready-mixed concrete is drilled inside the multi-stage rod. Alternatively, a multi-stage pipe for injecting a solidifying agent is inserted, the multi-stage pipe is configured to rotate, contract, and expand at the same time as the multi-stage rod, and a plurality of transfer holes communicating with the lower side of the multi-stage pipe are formed inside the bit to form a hole It is characterized in that the ready-mixed concrete or solidifying agent is sprayed inside.

본 발명에 따른 레미콘 주입 및 고화제 분사용 다단 배관이 삽입된 켈리바에 의하면, 다단으로 이루어진 로드의 내측에 설치되어 함께 회전할 수 있도록 구성된 다단 배관의 내측으로 레미콘 또는 고화제를 주입함에 따라 굴착장비의 규모를 축소할 수 있으며, 다단 로드와 함께 수축 및 확장되도록 구성됨으로써 사용이 편리하고 굴착작업이 더욱 신속하게 이루어지는 효과가 있다.According to the Kelly bar in which the multi-stage pipe for injection of ready-mixed concrete and solidifying agent is inserted according to the present invention, the ready-mixed concrete or solidifying agent is injected into the inside of the multi-stage pipe configured to rotate together and installed inside the rod composed of multiple stages. Excavation equipment can be reduced in size, and it is convenient to use and has the effect that the excavation work is made more quickly by being configured to contract and expand together with the multi-stage rod.

또한, 다단 배관을 수거할 때 천공 및 켈리바에 닿을 염려가 없어 파손을 방지할 수 있으며, 더욱 신속히 수거할 수 있어 굴착작업에 소요되는 시간을 대폭 절약할 수 있는 장점이 있다.In addition, when collecting multi-stage pipes, there is no fear of touching the perforations and the kelly bars, so damage can be prevented, and the time required for excavation work can be greatly saved because it can be collected more quickly.

도 1은 종래의 굴착장치를 나타낸 정면도
도 2는 본 발명의 켈리바가 적용된 굴착장치를 나타낸 정면도
도 3은 본 발명에 의한 켈리바를 나타낸 단면도
도 4는 본 발명에 의한 다단 배관의 단면도
1 is a front view showing a conventional excavator
Figure 2 is a front view showing an excavator to which the Kelly bar of the present invention is applied;
3 is a cross-sectional view showing a Kelly bar according to the present invention;
4 is a cross-sectional view of a multi-stage pipe according to the present invention;

본 발명의 바람직한 실시 예를 첨부된 도면을 통해 상세히 설명한다.A preferred embodiment of the present invention will be described in detail with reference to the accompanying drawings.

본 발명의 레미콘 주입 및 고화제 분사용 다단 배관이 삽입된 켈리바는 도 2에서 나타낸 바와 같이 베이스머신(1)에 설치되어 지반이 연약한 지면에 천공을 형성하기 위하여 사용되는 것으로서, DSM(Deep Soil Mixing) 공법을 이용하여 PHC 파일을 천공에 삽입하고 연약지반을 치환할 때 적용할 수 있다.As shown in FIG. 2, the Kelly bar into which the multi-stage piping for injection of ready-mixed concrete and solidifying agent injection of the present invention is inserted is installed in the base machine 1 and used to form a hole in the ground with soft ground, DSM (Deep Soil) Mixing) method can be used to insert a PHC file into the hole and apply it when replacing soft ground.

상기 켈리바(100)는 베이스머신(1)에 의해 수직으로 설치된 마스터(2)의 상측에 와이어(3)로 결합되어 있으며, 다단의 로드(120)(121)(122)로 구성된 켈리바(100)의 제3로드(122) 하단부에는 로드홀더(4)가 결합되어 켈리바(100)를 지지하고, 제3로드(122)의 상단부에는 켈리바(100)를 회전시키는 구동장치(5)가 실린더(6)에 의해 승강할 수 있도록 설치되어 있다.The Kelly bar 100 is coupled with a wire 3 to the upper side of the master 2 vertically installed by the base machine 1, and the Kelly bar 100 is composed of multi-stage rods 120, 121 and 122 ( A rod holder 4 is coupled to the lower end of the third rod 122 of 100 to support the Kelly bar 100, and the upper end of the third rod 122 is a driving device 5 for rotating the Kelly bar 100. is provided so that it can be raised and lowered by the cylinder (6).

본 발명 켈리바(100)는 도 3에서 나타낸 바와 같이 다단의 로드(120)(121)(122)로 이루어져 하방으로 확장하거나 상방으로 수축할 수 있도록 구성되고, 로드(120)(121)(122)의 내측에는 천공의 내측으로 레미콘 또는 고화제를 주입할 수 있도록 다단으로 이루어진 배관(150)(151)(152)이 삽입 설치된다.As shown in FIG. 3 , the Kelly bar 100 of the present invention is configured to be expanded downward or contracted upward, and the rods 120 , 121 , 122 are composed of multi-stage rods 120 , 121 , 122 ), a multi-stage pipe 150, 151, 152 is inserted and installed so as to inject ready-mixed concrete or solidifying agent into the inside of the perforation.

상기 켈리바(100)의 다단 로드(120)(121)(122)는 본 발명에서 일실시 예로 3개의 단으로 이루어진 로드(120)(121)(122)를 나타내었으나, 이에 국한되는 것이 아니고 필요에 따라 로드의 개수 및 길이를 증감하여 구성할 수 있음은 물론이다.The multi-stage rods 120, 121, and 122 of the Kelly bar 100 show the rods 120, 121, and 122 composed of three stages as an embodiment in the present invention, but the present invention is not limited thereto. Of course, it can be configured by increasing or decreasing the number and length of the rods according to the requirement.

이렇게 제1로드(120), 제2로드(121), 제3로드(122)로 이루어진 다단 로드는 와이어(3)의 작동에 의해 상하로 수축 및 확장할 수 있도록 구성되며, 도면에서는 나타내지 않았으나 확장시 각각의 로드(120)(121)(122)가 하중에 의해 이탈하지 않도록 연결부위에 고정부가 형성되어 있다.In this way, the multi-stage rod consisting of the first rod 120 , the second rod 121 , and the third rod 122 is configured to be contracted and expanded vertically by the operation of the wire 3 , and is expanded although not shown in the drawing. A fixing part is formed in the connection part so that each rod 120, 121, 122 does not deviate by a load.

상기 제1로드(120)의 상측에는 중앙부에 구멍이 형성된 고정판(130)이 결합되어 있으며, 상기 다단 로드(120)(121)(122)의 내측에는 도 5에서 나타낸 바와 같은 다단 배관(150)(151)(152)이 상기 고정판(130)을 관통하여 설치되어 있는데, 본 발명에서는 3개의 단으로 이루어진 배관(150)(151)(152)을 나타내었으나 필요에 따라 배관의 길이 및 개수를 증감할 수 있다.A fixing plate 130 having a hole formed in the center is coupled to the upper side of the first rod 120, and the multi-stage pipe 150 as shown in FIG. 5 is inside the multi-stage rods 120, 121 and 122. 151 and 152 are installed through the fixing plate 130. In the present invention, the pipes 150, 151, and 152 composed of three stages are shown, but the length and number of pipes can be increased or decreased as needed. can do.

상기 고정판(130)의 상측으로 돌출된 제1배관(150)에는 도 3에서와 같이 입력배관(160)이 결합되며, 상기 입력배관(160)의 선단에는 다단 배관으로 레미콘 또는 고화제를 주입하기 위한 입력호스(161)가 결합되어 있다.An input pipe 160 is coupled to the first pipe 150 protruding upward of the fixing plate 130 as shown in FIG. 3, and to the tip of the input pipe 160, ready-mixed concrete or a solidifying agent is injected through a multi-stage pipe. For the input hose 161 is coupled.

이렇게 제1배관(150), 제2배관(151), 제3배관(152)으로 이루어진 다단 배관의 외측에는 도 5의 확대도에서 나타낸 바와 같이 레미콘 및 토사로부터 다단 배관(150)(151)(152)을 보호하기 위한 보호관(170)이 결합되어 있는데, 상기 보호관(170)은 다단 배관(150)(151)(152)의 수축 및 확장에 따라 유기적으로 대응할 수 있도록 주름관으로 구성한다.In this way, on the outside of the multi-stage pipe consisting of the first pipe 150, the second pipe 151, and the third pipe 152, as shown in the enlarged view of FIG. 5, the multi-stage pipe 150, 151) ( A protective tube 170 for protecting the 152 is coupled, and the protective tube 170 is configured as a corrugated tube to respond organically according to the contraction and expansion of the multi-stage pipes 150, 151, and 152.

상기 다단 배관(150)(151)(152)이 확장될 때 각각의 배관(150)(151)(152)이 분리되지 않도록 연결부위에는 고정부(도면 미표시)가 형성되어 있으며, 다단 배관(150)(151)(152) 및 보호관(170)은 와이어(3)에 의해 다단 로드(120)(121)(122)와 함께 수축 및 확장하게 된다.A fixing part (not shown) is formed at the connection portion so that the respective pipes 150, 151, and 152 are not separated when the multi-stage pipes 150, 151, and 152 are expanded. ) 151 , 152 and the protective tube 170 are contracted and expanded together with the multi-stage rods 120 , 121 and 122 by the wire 3 .

한편, 다단의 로드(120)(121)(122) 및 배관(150)(151)(152)의 결합으로 이루어진 켈리바(100)는 도 3과 같이 제1로드(120)와 고정판(130)의 사이에 수평회전 베어링(131)이 결합되어 도 2와 같이 마스터(2)에 설치되며, 상기 고정판(130)의 상측으로 돌출된 제1배관(150)의 상측에는 수직회전 베어링(162)이 결합되고, 상기 수직회전 베어링(162)에는 입력배관(160)이 결합되어 배관홀더(110)에 의해 마스터(2)에 고정된다.On the other hand, the kelly bar 100 made of a combination of the multi-stage rods 120 , 121 , 122 and the pipes 150 , 151 , 152 is a first rod 120 and a fixing plate 130 as shown in FIG. 3 . A horizontal rotation bearing 131 is coupled between The input pipe 160 is coupled to the vertical rotation bearing 162 and is fixed to the master 2 by the pipe holder 110 .

그리고 상기 제3배관(152)의 하측은 조인트(142)에 결합되어 있으며, 상기 조인트(142)의 상측에는 제3로드(122)의 하측이 결합되고, 조인트(142)의 하측에는 다단 로드(120)(121)(122)의 회전에 의해 천공을 형성하기 위한 비트(140)가 결합되어 있다.And the lower side of the third pipe 152 is coupled to the joint 142, the lower side of the third rod 122 is coupled to the upper side of the joint 142, and the multi-stage rod ( A bit 140 for forming a perforation by rotation of 120, 121 and 122 is coupled.

상기 비트(140)의 내측에는 조인트(142) 및 다단 배관(150)(151)(152)의 내측과 연통되는 복수의 이송홀(141)이 외주면에 방사상으로 형성되어 있으며, 하측에도 형성되어 있어 회전하는 비트(140)와 함께 하방과 측면으로 레미콘 또는 고화제를 분사하게 된다.A plurality of transfer holes 141 communicating with the inner side of the joint 142 and the multi-stage pipes 150, 151, and 152 are radially formed on the outer peripheral surface of the bit 140 and are also formed on the lower side of the bit 140. The ready-mixed concrete or solidifying agent is sprayed downward and sideways together with the rotating bit 140 .

따라서 다단 로드(120)(121)(122)가 회전하면 조인트(142)에 의해 다단 배관(150)(151)(152)이 함께 회전하게 되며, 이때 수평회전 베어링(131)에 의해 원활한 회전이 이루어지고, 제1배관(150)에 결합된 수직회전 베어링(162)의 내측에는 입력호스(161)가 결합됨으로써 다단 배관(150)(151)(152)은 입력호스(16)의 간섭을 받지 않고 다단 로드(120)(121)(122)와 함께 회전할 수 있으며, 이에 따라 입력호스(161)를 통해 레미콘 또는 고화제를 천공의 바닥부로 용이하게 주입할 수 있다.Therefore, when the multi-stage rod 120, 121, 122 rotates, the multi-stage pipe 150, 151, 152 rotates together by the joint 142, and at this time, smooth rotation is performed by the horizontal rotation bearing 131. The input hose 161 is coupled to the inside of the vertical rotation bearing 162 coupled to the first pipe 150 , so that the multi-stage pipes 150 , 151 , 152 do not receive interference from the input hose 16 . It can rotate together with the multi-stage rods 120, 121, and 122 without it, and accordingly, the ready-mixed concrete or the solidifying agent can be easily injected into the bottom part of the perforation through the input hose 161.

이와 같이 구성된 본 발명의 레미콘 주입 및 고화제 분사용 다단 배관이 삽입된 켈리바는 다단 로드(120)(121)(122)가 도 4와 같이 확장되어 구동장치(5)에 의해 다단 배관(150)(151)(152)과 동시에 회전하며 비트(140)로 천공을 형성하게 되고, 다단 배관(150)(151)(152)은 비트(140)의 이송홀(141)을 통해 천공의 내측으로 레미콘 또는 고화제를 분사하게 된다.In the Kelly bar into which the multi-stage piping for injection of ready-mixed concrete and solidifying agent of the present invention configured as described above is inserted, the multi-stage rods 120, 121, and 122 are expanded as shown in FIG. 4 and the multi-stage piping 150 by the driving device 5 ) (151) and (152) rotate at the same time to form a perforation with the bit 140, and the multi-stage pipe 150, 151, 152 is through the transfer hole 141 of the bit 140 to the inside of the perforation. Ready-mixed concrete or solidifying agent will be sprayed.

따라서 본 발명은 다단으로 이루어진 로드(120)(121)(122)의 내측에 설치되어 함께 회전할 수 있도록 구성된 다단 배관(150)(151)(152)의 내측으로 레미콘 또는 고화제를 주입함에 따라 굴착장비의 규모를 축소할 수 있으며, 다단 로드(120)(121)(122)와 함께 수축 및 확장되도록 구성됨으로써 사용이 편리하고 굴착작업이 더욱 신속하게 이루어지는 효과가 있다.Therefore, the present invention is installed on the inside of the rods 120, 121, and 122 made of multi-stage, as the ready-mixed concrete or solidifying agent is injected into the multi-stage pipe 150, 151, 152 configured to rotate together. The scale of the excavation equipment can be reduced, and by being configured to contract and expand together with the multi-stage rods 120, 121, and 122, it is convenient to use and the excavation work is performed more quickly.

또한, 다단 배관(150)(151)(152)을 수거할 때 천공 및 켈리바에 닿을 염려가 없어 파손을 방지할 수 있으며, 더욱 신속히 수거할 수 있어 굴착작업에 소요되는 시간을 대폭 절약할 수 있는 장점이 있다. In addition, when collecting the multi-stage pipes 150, 151, and 152, there is no fear of touching the drilling or the Kelly bar, so damage can be prevented, and the time required for excavation work can be greatly saved because it can be collected more quickly. There are advantages.

110 : 배관홀더 120 : 제1로드
121 : 제2로드 122 : 제3로드
130 : 고정판 131 : 수평회전 베어링
140 : 비트 141 : 이송홀
142 : 조인트 150 : 제1배관
151 : 제2배관 152 : 제3배관
160 : 입력배관 161 : 입력호스
162 : 수직회전 베어링 170 : 보호관
100 : 켈리바
110: pipe holder 120: first rod
121: second rod 122: third rod
130: fixed plate 131: horizontal rotation bearing
140: bit 141: transfer hole
142: joint 150: first pipe
151: second pipe 152: third pipe
160: input pipe 161: input hose
162: vertical rotation bearing 170: protective tube
100 : Keliva

Claims (4)

하측에 비트(140)가 결합되어 구동장치(5)에 의해 회전하는 켈리바(100)는 다단의 로드(120)(121)(122)로 이루어지고, 상기 다단 로드(120)(121)(122)의 내측에는 천공에 레미콘 또는 고화제를 주입하는 다단 배관(150)(151)(152)이 삽입되며,
상기 다단 배관(150)(151)(152)은 다단 로드(120)(121)(122)와 동시에 회전, 수축 및 확장되도록 구성되고, 상기 비트(140)의 내측에는 다단 배관(150)(151)(152)의 하측과 연통되는 복수의 이송홀(141)이 형성되어 천공의 내측으로 레미콘 또는 고화제를 분사하는 것을 특징으로 하는 레미콘 주입 및 고화제 분사용 다단 배관이 삽입된 켈리바.
The bit 140 is coupled to the lower side and the kelly bar 100 rotated by the driving device 5 is composed of multi-stage rods 120, 121 and 122, and the multi-stage rods 120, 121, ( 122) is inserted into the multi-stage pipe 150, 151, 152 for injecting ready-mixed concrete or solidifying agent into the perforation,
The multi-stage pipes 150 , 151 , 152 are configured to rotate, contract and expand simultaneously with the multi-stage rods 120 , 121 and 122 , and the multi-stage pipes 150 , 151 are located inside the bit 140 . A plurality of transfer holes 141 communicating with the lower side of the ) 152 are formed to inject ready-mixed concrete or a solidifying agent into the inside of the perforation, and a multi-stage pipe for injecting ready-mixed concrete and solidifying agent is inserted Kelly bar.
제1항에 있어서,
상기 다단 배관(150)(151)(152)의 외측에는 주름관으로 이루어진 보호관(170)이 결합된 것을 특징으로 하는 레미콘 주입 및 고화제 분사용 다단 배관이 삽입된 켈리바.
The method of claim 1,
The multi-stage pipe for injection of ready-mixed concrete and solidifying agent injection, characterized in that a protective pipe 170 made of a corrugated pipe is coupled to the outside of the multi-stage pipe 150, 151, 152. Kelly bar.
제1항에 있어서,
상기 다단 로드(120)(121)(122)의 상측에는 고정판(130)이 결합되고, 상기 고정판(130)의 하측에는 수평회전 베어링(131)이 결합되며, 상기 고정판(130)의 상측으로 돌출된 다단 배관(150)(151)(152)의 상측에는 수직회전 베어링(162)이 결합되고, 상기 수직회전 베어링(162)에는 입력배관(160)이 결합된 것을 특징으로 하는 레미콘 주입 및 고화제 분사용 다단 배관이 삽입된 켈리바.
The method of claim 1,
A fixing plate 130 is coupled to an upper side of the multi-stage rods 120 , 121 , 122 , and a horizontal rotation bearing 131 is coupled to a lower side of the fixing plate 130 , and protrudes upward of the fixing plate 130 . Ready-mixed concrete injection and solidifying agent, characterized in that the vertical rotation bearing 162 is coupled to the upper side of the multi-stage pipe 150, 151, 152, and the input pipe 160 is coupled to the vertical rotation bearing 162 Kelly bar with multi-stage piping for injection.
제1항에 있어서,
상기 다단 로드(120)(121)(122) 및 다단 배관(150)(151)(152)의 하측은 조인트(142)의 상측에 결합되고, 상기 조인트(142)의 하측에는 비트(140)가 결합된 것을 특징으로 하는 레미콘 주입 및 고화제 분사용 다단 배관이 삽입된 켈리바.
The method of claim 1,
The lower sides of the multi-stage rods 120 , 121 , 122 and the multi-stage pipes 150 , 151 , 152 are coupled to the upper side of the joint 142 , and the bit 140 is disposed on the lower side of the joint 142 . Kelly bar with multi-stage piping for injection of ready-mixed concrete and solidifying agent characterized in that it is combined.
KR1020200067547A 2020-06-04 2020-06-04 Kelly bar with multi-stage piping for remicon injection and spraying solidifying agent KR102477617B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020200067547A KR102477617B1 (en) 2020-06-04 2020-06-04 Kelly bar with multi-stage piping for remicon injection and spraying solidifying agent

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020200067547A KR102477617B1 (en) 2020-06-04 2020-06-04 Kelly bar with multi-stage piping for remicon injection and spraying solidifying agent

Publications (2)

Publication Number Publication Date
KR20210150746A true KR20210150746A (en) 2021-12-13
KR102477617B1 KR102477617B1 (en) 2022-12-15

Family

ID=78832131

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020200067547A KR102477617B1 (en) 2020-06-04 2020-06-04 Kelly bar with multi-stage piping for remicon injection and spraying solidifying agent

Country Status (1)

Country Link
KR (1) KR102477617B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06185055A (en) * 1992-12-15 1994-07-05 Raito Kogyo Co Ltd Sound arrester
JPH0656194U (en) * 1992-12-28 1994-08-05 三和機材株式会社 Working fluid guide structure for telescopic work rod
JPH11257000A (en) * 1998-03-16 1999-09-21 Dainichi Kasei Kk Ground hardening construction method
JP2003301449A (en) * 2002-04-11 2003-10-24 Yoshio Tanaka Foundation pile and cement milk injecting head

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06185055A (en) * 1992-12-15 1994-07-05 Raito Kogyo Co Ltd Sound arrester
JPH0656194U (en) * 1992-12-28 1994-08-05 三和機材株式会社 Working fluid guide structure for telescopic work rod
JPH11257000A (en) * 1998-03-16 1999-09-21 Dainichi Kasei Kk Ground hardening construction method
JP2003301449A (en) * 2002-04-11 2003-10-24 Yoshio Tanaka Foundation pile and cement milk injecting head

Also Published As

Publication number Publication date
KR102477617B1 (en) 2022-12-15

Similar Documents

Publication Publication Date Title
JP6081100B2 (en) Existing pile pulling device
CN108662281A (en) Conduit jacking and pipe jacking construction method
CN113090192B (en) Complex stratum rotary drilling steel sleeve matched hole forming method
CN112982400A (en) Pile casing follow-up type drilling bored concrete pile drilling tool
CN109630123A (en) Deep shaft rock ripper
JP2007332559A (en) Removal method for existing underground pile
RU2358107C2 (en) Drilling facility for shaft deepening and method of shaft deepening
KR20210150746A (en) Kelly bar with multi-stage piping for remicon injection and spraying solidifying agent
JP6570184B2 (en) Drilling rig
CN208431000U (en) Deep shaft rock ripper
JP3500387B1 (en) Underground existing structure extraction method
KR101387303B1 (en) Down the hole drilling method using the TBM
JPS6041198B2 (en) vertical hole drilling machine
CN210343215U (en) Construction device for protecting wall and preventing hole shrinkage and hole collapse of rotary drilling bucket
JP2002349171A (en) Vertical hole excavator and vertical hole excavation method
JP2005281972A (en) Reverse circulation drill
JPH08100436A (en) Rotary press-in device for settlement correcting steel pipe pile
JP4091526B2 (en) Manufacturing method of dry columnar body of foundation ground
CN214997449U (en) Rotary drilling and steel sleeve lowering device
JP2009144366A (en) Joint device for use in pile pressing-in apparatus
KR200144175Y1 (en) Casing rod lift device of casing auger in ground drilling device
CN217734160U (en) Civil engineering foundation pit excavating device
JP2006028920A (en) Method of settling cylindrical precast concrete member, and apparatus for use therein
JP3396025B2 (en) Vertical excavation method and device
CN212479074U (en) Hard rock drilling construction system for foundation pit secant pile in height-limited area

Legal Events

Date Code Title Description
AMND Amendment
AMND Amendment
E601 Decision to refuse application
E801 Decision on dismissal of amendment
AMND Amendment
X701 Decision to grant (after re-examination)