KR20210042435A - Flange structure for sewage pipe with improved bonding force - Google Patents

Flange structure for sewage pipe with improved bonding force Download PDF

Info

Publication number
KR20210042435A
KR20210042435A KR1020190124951A KR20190124951A KR20210042435A KR 20210042435 A KR20210042435 A KR 20210042435A KR 1020190124951 A KR1020190124951 A KR 1020190124951A KR 20190124951 A KR20190124951 A KR 20190124951A KR 20210042435 A KR20210042435 A KR 20210042435A
Authority
KR
South Korea
Prior art keywords
fastening
flange
flange portion
thread
hole
Prior art date
Application number
KR1020190124951A
Other languages
Korean (ko)
Other versions
KR102276831B1 (en
Inventor
김돈희
신희정
Original Assignee
(주)동명기술공단종합건축사사무소
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)동명기술공단종합건축사사무소 filed Critical (주)동명기술공단종합건축사사무소
Priority to KR1020190124951A priority Critical patent/KR102276831B1/en
Publication of KR20210042435A publication Critical patent/KR20210042435A/en
Application granted granted Critical
Publication of KR102276831B1 publication Critical patent/KR102276831B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/04Pipes or fittings specially adapted to sewers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L23/00Flanged joints
    • F16L23/02Flanged joints the flanges being connected by members tensioned axially
    • F16L23/036Flanged joints the flanges being connected by members tensioned axially characterised by the tensioning members, e.g. specially adapted bolts or C-clamps

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Mechanical Engineering (AREA)
  • Sewage (AREA)

Abstract

The present invention relates to a flange structure for a sewer pipe with improved bonding strength. More particularly, the flange structure comprises: a first flange portion provided at one end of a first sewer pipe; a second flange portion provided at the other end of a second sewer pipe to correspond to the first flange portion; a sealing portion for sealing between the first flange portion and the second flange portion; and a fastening portion for fastening the first flange portion and the second flange portion. According to the present invention, the first and second flange portions can be firmly and easily coupled to each other, so that the first sewer pipe and the second sewer pipe can be firmly and easily coupled to each other. Therefore, construction time and cost can be reduced, and work efficiency can be improved.

Description

결합력이 향상된 하수도관용 플랜지구조{Flange structure for sewage pipe with improved bonding force}Flange structure for sewage pipe with improved bonding force}

본 발명은 플랜지구조에 관한 것으로, 더욱 상세하게는 하수도용배관들을 연결하도록 각 플랜지부를 고정시키되, 간편한 조작으로 상호 견고하게 고정시킬 수 있어 공사시간과 비용을 절감시킴은 물론, 작업효율을 향상시킬 수 있는 결합력이 향상된 하수도관용 플랜지구조에 관한 것이다.The present invention relates to a flange structure, and more particularly, fixing each flange portion to connect sewer pipes, but it can be firmly fixed to each other by simple operation, thereby reducing construction time and cost, as well as improving work efficiency. It relates to a flange structure for sewer pipes with improved bonding force.

일반적으로, 배관은 일정 길이로 제작된 다수 개를 연결하여 형성되는 것으로, 각 배관의 단부에는 플랜지 등이 형성되어 고정볼트와 너트로 고정되어 연결된다.In general, a pipe is formed by connecting a plurality of pipes manufactured to a predetermined length, and a flange or the like is formed at the end of each pipe to be fixed and connected with fixing bolts and nuts.

이러한 배관의 연결부위는 견고함을 더하기 위해 용접을 하기도 한다.The joints of these pipes are also welded to add rigidity.

종래 등록특허 10-1045662호에서 개진된 바와 같이, 일측 배관의 이음 단부에 다수개의 결합공이 형성된 플랜지가 용접에 의하여 결합되고, 타측 배관 역시 이음 단부에 플랜지가 용접에 의하여 결합된다.As previously disclosed in Patent Registration No. 10-1045662, a flange having a plurality of coupling holes formed at a joint end of one pipe is coupled by welding, and a flange is also joined to the joint end of the other pipe by welding.

플랜지를 상호 맞닿는 형태로 배치한 이후에, 볼트를 플랜지에 형성된 결합공에 삽입하고, 너트로 체결하는 것에 의하여 배관이 상호 연결된다.After arranging the flanges in contact with each other, the pipes are interconnected by inserting a bolt into a coupling hole formed in the flange and fastening with a nut.

배관 내부를 흐르는 액체 또는 기체가 플랜지의 결합부분을 통해 누설하는 것을 방지하기 위하여, 체결되는 한 쌍의 플랜지 사이에는 합성수지, 우레탄, 가죽 등으로 제조된 패킹이 부착된다.A packing made of synthetic resin, urethane, leather, etc. is attached between the pair of flanges to be fastened to prevent the liquid or gas flowing through the pipe from leaking through the coupling portion of the flange.

이러한 플랜지를 사용하여 배관을 연결하는 경우에, 연결된 배관의 이음 단부에 플랜지를 각각 용접한 이후에, 맞닿는 양 플랜지의 결합공을 일치시키고, 볼트와 너트로 체결하므로, 플랜지에 각각 형성된 결합공을 상호 맞추는 작업이 상당히 번거롭다.In the case of connecting pipes using such flanges, after welding the flanges to the joint ends of the connected pipes, the coupling holes of both flanges are matched and fastened with bolts and nuts. It is very cumbersome to work with each other.

특히, 설치하고자 하는 배관의 플랜지를 기 설치된 배관의 플랜지와 일치시키도록 새로운 배관을 상하좌우 등으로 이동시켜야 됨에 따라, 필요한 공간을 확보하기 위해 굴착공간을 넓게 형성해야 되어 불필요한 작업공정과 비용이 발생되는 문제점이 있다.In particular, as the new pipe has to be moved up, down, left and right to match the flange of the pipe to be installed with the flange of the previously installed pipe, the excavation space must be formed wide to secure the necessary space, resulting in unnecessary work processes and costs. There is a problem.

이에 본 발명은 상기와 같은 문제점들을 해소하기 위해 안출된 것으로써, 제1하수도배관의 일단부에 구비되는 제1플랜지부, 상기 제1플랜지부와 대응되도록 제2하수도배관의 타단부에 구비되는 제2플랜지부, 상기 제1플랜지부와 제2플랜지부 사이를 밀폐시키기 위한 밀폐부, 및 상기 제1플랜지부와 제2플랜지부를 체결시키기 위한 체결부,를 포함하여 제1플랜지부와 제2플랜지부를 견고하고 용이하게 결합시킬 수 있어 제1하수도배관과 제2하수도배관을 견고하고 용이하게 결합시킬 수 있어 공사시간과 비용을 절감시킴은 물론, 작업효율을 향상시킬 수 있는 결합력이 향상된 하수도관용 플랜지구조를 제공하는 것이 목적이다.Accordingly, the present invention was conceived to solve the above problems, and the first flange portion provided at one end of the first sewage pipe, and the other end of the second sewage pipe corresponding to the first flange portion. The first flange portion and the first flange portion including a second flange portion, a sealing portion for sealing between the first flange portion and the second flange portion, and a fastening portion for fastening the first flange portion and the second flange portion. 2 The flange part can be firmly and easily combined, so that the first and second sewer pipes can be firmly and easily combined, reducing construction time and cost, as well as improving the bonding force that can improve work efficiency. It is an object to provide a flange structure for sewer pipes.

상기 목적을 이루기 위한 본 발명은, 제1하수도배관의 일단부에 구비되는 제1플랜지부, 상기 제1플랜지부와 대응되도록 제2하수도배관의 타단부에 구비되는 제2플랜지부, 상기 제1플랜지부와 제2플랜지부 사이를 밀폐시키기 위한 밀폐부, 및 상기 제1플랜지부와 제2플랜지부를 체결시키기 위한 체결부,를 포함한다.The present invention for achieving the above object is a first flange portion provided at one end of the first sewage pipe, a second flange portion provided at the other end of the second sewage pipe so as to correspond to the first flange portion, the first And a sealing portion for sealing between the flange portion and the second flange portion, and a fastening portion for fastening the first flange portion and the second flange portion.

바람직하게, 상기 체결부는, 상기 제2플랜지부방향으로 개방되도록 상기 제1플랜지부의 내부에 형성되는 제1체결공, 상기 제1체결공에 대응되며, 상기 제1플랜지부방향으로 개방되도록 상기 제2플랜지부의 내부에 형성되되, 내주면에 나사산이 형성되는 제2체결공, 상기 제2체결공의 나사산에 체결되도록 외주면에 나사산을 갖고, 내주면에 나사산이 형성되며, 상기 제1체결공에서 인출 가능하게 구비되는 체결링, 상기 체결링의 내주면 나사산에 대응되도록 외주면에 나사산을 갖고, 상기 제2체결공에서 인출 가능하게 구비되는 제2체결링, 및 상기 체결링을 이동시켜 상기 제2체결공으로 삽입시킴과 동시에 상기 제2체결링을 상기 제1체결링으로 삽입시키기 위한 체결구동부,를 포함한다.Preferably, the fastening part corresponds to the first fastening hole formed in the first flange part so as to be opened in the direction of the second flange part, the first fastening hole, and is opened in the direction of the first flange part. The second fastening hole is formed inside the second flange part, and has a second fastening hole in which a thread is formed on the inner circumferential surface, has a thread on the outer circumferential surface so as to be fastened to the thread of the second fastening hole, and a thread is formed on the inner circumferential surface, and in the first fastening hole A fastening ring provided to be retractable, a second fastening ring provided with a thread on the outer circumferential surface to correspond to the thread on the inner circumferential surface of the fastening ring, and a second fastening ring provided to be able to be withdrawn from the second fastening hole, and the second fastening by moving the fastening ring And a fastening driving part for inserting the second fastening ring into the first fastening ring while being inserted into the ball.

그리고 상기 체결구동부는, 상기 체결링의 나사산에 치합되도록 상기 제1체결공에 위치되는 체결구동웜, 상기 체결구동웜을 제1플랜지부에 회전 가능하도록 위치시키는 체결구동축, 및 상기 체결구동축을 회전시키기 위한 체결구동손잡이;를 포함하고, 상기 체결구동손잡이를 이용하여 체결구동축과 체결구동웜을 회전시켜 상기 제1플랜지부의 제1체결공에 위치된 상기 체결링을 상기 제2플랜지부의 제2체결공으로 이동시킴에 따라, 체결링의 나사산이 제2플랜지부의 나사산에 결합되어 체결된다.In addition, the fastening drive unit rotates a fastening drive worm positioned in the first fastening hole so as to engage a thread of the fastening ring, a fastening drive shaft for rotating the fastening drive worm to the first flange, and the fastening drive shaft. And a fastening drive handle for rotating the fastening drive shaft and the fastening drive worm using the fastening drive handle, so that the fastening ring located in the first fastening hole of the first flange part is placed in the second flange part. As it moves to the 2 fastening hole, the thread of the fastening ring is coupled to the thread of the second flange and is fastened.

또한, 상기 제1플랜지부와 제2플랜지부를 결합시키되, 상호 대응되는 형상으로 끼워지는 결합수단;을 더 포함하는 하수도관용 플랜지구조.In addition, coupling means for coupling the first flange portion and the second flange portion, but fitted in a shape corresponding to each other; a flange structure for a sewer pipe further comprising.

그리고 상기 결합수단은, 상기 제1플랜지부와 제2플랜지부 중 어느 하나에 다수 개 형성되는 결합돌기, 및 상기 결합돌기에 대응되도록 상기 제1플랜지부와 제2플랜지부 중 다른 하나에 다수 개 형성되는 결합홈,을 포함한다.And the coupling means, a plurality of coupling protrusions formed in any one of the first flange portion and the second flange portion, and a plurality of the coupling protrusions in the other one of the first flange portion and the second flange portion so as to correspond to the coupling protrusion. It includes a coupling groove, which is formed.

또한, 상기 결합돌기와 결합홈은, 상기 체결부가 형성된 해당 플랜지부의 가장자리를 따라 수직방향으로 길게 형성되고, 수평방향으로 일정 간격으로 복수 개 형성된다.In addition, the coupling protrusion and the coupling groove are formed to be elongated in the vertical direction along the edge of the flange portion in which the coupling portion is formed, and are formed in a plurality of horizontal directions at regular intervals.

그리고 상기 결합수단에 의해 결합된 제1플랜지부와 제2플랜지부가 수직방향으로 유동되는 것을 방지하는 수직유동방지부,가 더 포함된다.And it further includes a vertical flow preventing portion for preventing the first flange portion and the second flange portion from flowing in the vertical direction coupled by the coupling means.

또한, 상기 수직유동방지부는, 연결된 상기 제1하수도배관과 제2하수도배관을 기준으로, 상측으로 위치된 상기 제1플랜지부와 제2플랜지부 부분에 구비된 제1수직유동방지부, 및 연결된 두 개의 배관을 기준으로, 하측으로 위치된 상기 제1플랜지부와 제2플랜지부 부분에 구비된 제2수직유동방지부,를 포함한다.In addition, the vertical flow prevention unit, a first vertical flow prevention unit provided in the first flange portion and the second flange portion located upward based on the connected first and second sewage pipes, and connected And a second vertical flow prevention part provided in the first flange part and the second flange part located downward based on the two pipes.

그리고 상기 각 수직유동방지부는, 결합된 상기 결합돌기와 결합홈을 수평방향으로 관통 형성된 수직삽입공, 및 상기 수직삽입공에 끼워지기 위한 수직삽입편,을 포함한다.In addition, each of the vertical flow prevention units includes a vertical insertion hole formed through the combined coupling protrusion and the coupling groove in a horizontal direction, and a vertical insertion piece for fitting into the vertical insertion hole.

또한, 상기 체결부에 의해 체결된 상기 제1플랜지부와 제2플랜지부를 고정시키기 위한 고정부재,를 더 포함한다.In addition, it further includes a fixing member for fixing the first flange portion and the second flange portion fastened by the fastening portion.

그리고 상기 고정부재는, 상기 제1플랜지부 가장자리를 따라 일정간격으로 다수 개 형성된 제1고정공, 상기 제1고정공에 대응되도록 상기 제2플랜지부 가장자리를 따라 일정간격으로 다수 개 형성된 제2고정공, 일직선상에 위치된 상기 제1고정공과 제2고정공에 관통 삽입되기 위한 고정볼트, 및 상기 제1고정공과 제2고정공을 통과한 고정볼트의 단부에 나사결합되어 제1플랜지부와 제2플랜지부를 고정시킴에 따라, 결합된 상기 결합돌기와 결합홈이 가압된 상태를 유지하는 고정너트,를 포함한다.And the fixing member includes a plurality of first fixing holes formed at predetermined intervals along the edge of the first flange portion, and a second fixing member formed at predetermined intervals along the edge of the second flange portion so as to correspond to the first fixing holes. A ball, a fixing bolt to be inserted through the first fixing hole and the second fixing hole positioned in a straight line, and the first flange portion and the first flange portion by screwing into the end of the fixing bolt passing through the first fixing hole and the second fixing hole. As the second flange portion is fixed, a fixing nut for maintaining a pressurized state of the combined coupling protrusion and the coupling groove is included.

또한, 상기 제1고정공과 제2고정공 사이에 대응되는 제3고정공이 상기 수직삽입편에 형성된다.In addition, a third fixing hole corresponding between the first fixing hole and the second fixing hole is formed in the vertical insertion piece.

그리고 상기 결합돌기는 상단부에서 하단부로 갈수록 경사지게 돌출 형성되고, 상기 결합홈은 결합돌기에 대응되도록 형성된다.In addition, the coupling protrusion is formed to protrude obliquely from the upper end to the lower end, and the coupling groove is formed to correspond to the coupling protrusion.

또한, 상기 결합돌기는 상단부에서 하단부로 갈수록 굴곡지게 돌출 형성되고, 상기 결합홈은 결합돌기에 대응되도록 형성된다.In addition, the coupling protrusion is formed to be curved from the upper end to the lower end, and the coupling groove is formed to correspond to the coupling protrusion.

상기한 바와 같이, 본 발명에 의한 하수도관용 플랜지구조에 의하면, 제1플랜지부와 제2플랜지부를 견고하고 용이하게 결합시킬 수 있어 제1하수도배관과 제2하수도배관을 견고하고 용이하게 결합시킬 수 있어 공사시간과 비용을 절감시킴은 물론, 작업효율을 향상시킬 수 있게 하는 매우 유용하고 효과적인 발명이다.As described above, according to the flange structure for a sewer pipe according to the present invention, the first flange portion and the second flange portion can be firmly and easily coupled, so that the first sewer pipe and the second sewer pipe can be rigidly and easily coupled. It is a very useful and effective invention that can reduce construction time and cost, as well as improve work efficiency.

도 1은 본 발명에 따른 하수도관용 플랜지구조를 도시한 도면이고,
도 2는 본 발명에 따른 체결부를 도시한 도면이며,
도 3은 본 발명에 따른 결합수단이 더 구비된 상태를 도시한 도면이고,
도 4는 본 발명에 따른 결합수단의 다른 실시 예를 도시한 도면이며,
도 5는 본 발명에 따른 결합수단의 또 다른 실시 예를 도시한 도면이고,
도 6은 본 발명에 따른 수직유동방지부가 더 구비된 상태를 도시한 도면이다.
1 is a view showing a flange structure for a sewer pipe according to the present invention,
2 is a view showing a fastening part according to the present invention,
3 is a view showing a state in which the coupling means according to the present invention is further provided,
4 is a view showing another embodiment of the coupling means according to the present invention,
5 is a view showing another embodiment of the coupling means according to the present invention,
6 is a view showing a state in which the vertical flow prevention unit according to the present invention is further provided.

이하, 본 발명에 따른 바람직한 실시 형태를 첨부된 도면을 참조하여 상세하게 설명한다. 첨부된 도면과 함께 이하에 개시될 상세한 설명은 본 발명의 예시적인 실시형태를 설명하고자 하는 것이며, 본 발명이 실시될 수 있는 유일한 실시형태를 나타내고자 하는 것이 아니다. 이하의 상세한 설명은 본 발명의 완전한 이해를 제공하기 위해서 구체적 세부사항을 포함한다. 그러나, 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자는 본 발명이 이러한 구체적 세부사항 없이도 실시될 수 있음을 안다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. DETAILED DESCRIPTION OF THE INVENTION The detailed description to be disclosed below together with the accompanying drawings is intended to describe exemplary embodiments of the present invention and is not intended to represent the only embodiments in which the present invention may be practiced. The following detailed description includes specific details to provide a thorough understanding of the present invention. However, those of ordinary skill in the art to which the present invention pertains knows that the present invention may be practiced without these specific details.

몇몇 경우, 본 발명의 개념이 모호해지는 것을 피하기 위하여 공지의 구조 및 장치는 생략되거나, 각 구조 및 장치의 핵심기능을 중심으로 한 블록도 형식으로 도시될 수 있다.In some cases, in order to avoid obscuring the concept of the present invention, well-known structures and devices may be omitted, or may be illustrated in a block diagram form centering on core functions of each structure and device.

명세서 전체에서, 어떤 부분이 어떤 구성요소를 "포함(comprising 또는 including)"한다고 할 때, 이는 특별히 반대되는 기재가 없는 한 다른 구성요소를 제외하는 것이 아니라 다른 구성요소를 더 포함할 수 있는 것을 의미한다. 또한, 명세서에 기재된 "…부"의 용어는 적어도 하나의 기능이나 동작을 처리하는 단위를 의미한다. 또한, "일(a 또는 an)", "하나(one)", "그(the)" 및 유사 관련어는 본 발명을 기술하는 문맥에 있어서(특히, 이하의 청구항의 문맥에서) 본 명세서에 달리 지시되거나 문맥에 의해 분명하게 반박되지 않는 한, 단수 및 복수 모두를 포함하는 의미로 사용될 수 있다.Throughout the specification, when a part is said to "comprising or including" a certain component, it means that other components may be further included rather than excluding other components unless specifically stated to the contrary. do. In addition, the term "... unit" described in the specification means a unit that processes at least one function or operation. In addition, "a or an", "one", "the" and similar related words are different from the present specification in the context of describing the present invention (especially in the context of the following claims). Unless indicated or clearly contradicted by context, it may be used in the sense of including both the singular and the plural.

본 발명의 실시예들을 설명함에 있어서 공지 기능 또는 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우에는 그 상세한 설명을 생략할 것이다. 그리고 후술되는 용어들은 본 발명의 실시예에서의 기능을 고려하여 정의된 용어들로서 이는 사용자, 운용자의 의도 또는 관례 등에 따라 달라질 수 있다. 그러므로 그 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 할 것이다.In describing embodiments of the present invention, if it is determined that a detailed description of a known function or configuration may unnecessarily obscure the subject matter of the present invention, a detailed description thereof will be omitted. In addition, terms to be described later are terms defined in consideration of functions in an embodiment of the present invention, which may vary according to the intention or custom of users or operators. Therefore, the definition should be made based on the contents throughout the present specification.

이하, 본 발명의 바람직한 실시 예를 첨부된 도면을 참조하여 설명한다.Hereinafter, preferred embodiments of the present invention will be described with reference to the accompanying drawings.

도 1은 본 발명에 따른 하수도관용 플랜지구조를 도시한 도면이고, 도 2는 본 발명에 따른 체결부를 도시한 도면이며, 도 3은 본 발명에 따른 결합수단이 더 구비된 상태를 도시한 도면이고, 도 4는 본 발명에 따른 결합수단의 다른 실시 예를 도시한 도면이며, 도 5는 본 발명에 따른 결합수단의 또 다른 실시 예를 도시한 도면이고, 도 6은 본 발명에 따른 수직유동방지부가 더 구비된 상태를 도시한 도면이다.1 is a view showing a flange structure for a sewer pipe according to the present invention, FIG. 2 is a view showing a fastening part according to the present invention, and FIG. 3 is a view showing a state in which a coupling means according to the present invention is further provided. , Figure 4 is a view showing another embodiment of the coupling means according to the present invention, Figure 5 is a view showing another embodiment of the coupling means according to the present invention, Figure 6 is a vertical flow prevention according to the present invention It is a view showing a state in which additional parts are further provided.

도면에서 도시한 바와 같이, 결합력이 향상된 하수도관용 플랜지구조는 제1플랜지부(100)와 제2플랜지부(200), 밀폐부(300) 및 체결부(400)를 포함한다.As shown in the drawing, the flange structure for a sewer pipe with improved coupling force includes a first flange portion 100 and a second flange portion 200, a sealing portion 300, and a fastening portion 400.

제1플랜지부(100)는 제1하수도배관(1)의 일단부에 구비된다.The first flange portion 100 is provided at one end of the first sewage pipe 1.

그리고 제2플랜지부(200)는 제1플랜지부(100)와 대응되도록 제2하수도배관(2)의 타단부에 구비된다.In addition, the second flange portion 200 is provided at the other end of the second sewer pipe 2 so as to correspond to the first flange portion 100.

밀폐부(300)는 제1플랜지부(100)와 제2플랜지부(200) 사이를 밀폐시키기 위해 구비된다.The sealing part 300 is provided to seal between the first flange part 100 and the second flange part 200.

또한 체결부(400)는 제1플랜지부(100)와 제2플랜지부(200)를 체결시키기 위해 구비된다.In addition, the fastening part 400 is provided to fasten the first flange part 100 and the second flange part 200.

체결부(400)는 도 2에서 도시한 바와 같이, 제1체결공(410)과 제2체결공(420), 체결링(430), 제2체결링(450) 및 체결구동부(440)를 포함한다.As shown in FIG. 2, the fastening part 400 includes a first fastening hole 410 and a second fastening hole 420, a fastening ring 430, a second fastening ring 450, and a fastening driving part 440. Includes.

제1체결공(410)은 제2플랜지부(200)방향으로 개방되도록 제1플랜지부(100)의 내부에 형성된다.The first fastening hole 410 is formed inside the first flange portion 100 to open in the direction of the second flange portion 200.

그리고 제2체결공(420)은 제1체결공(410)에 대응되며, 제1플랜지부(100)방향으로 개방되도록 제2플랜지부(200)의 내부에 형성되되, 내주면에 나사산이 형성된다.In addition, the second fastening hole 420 corresponds to the first fastening hole 410 and is formed inside the second flange part 200 so as to be opened in the direction of the first flange part 100, and a thread is formed on the inner circumferential surface. .

체결링(430)은 제2체결공(420)의 나사산에 체결되도록 외주면에 나사산을 갖고, 내주면에 나사산이 형성되며, 제1체결공(410)에서 인출 가능하게 구비된다.The fastening ring 430 has a thread on the outer circumferential surface so as to be fastened to the thread of the second fastening hole 420, a thread is formed on the inner circumferential surface, and is provided to be withdrawn from the first fastening hole 410.

또한 제2체결링(450)은 체결링(430)의 내주면 나사산에 대응되도록 외주면에 나사산을 갖고, 제2체결공(420)에서 인출 가능하게 구비된다.In addition, the second fastening ring 450 has a thread on the outer circumferential surface so as to correspond to the thread on the inner circumferential surface of the fastening ring 430 and is provided to be withdrawn from the second fastening hole 420.

체결구동부(440)는 체결링(430)을 이동시켜 제2체결공(420)으로 삽입시킴과 동시에 제2체결링(450)을 제1체결링(410)으로 삽입시킨다.The fastening driver 440 moves the fastening ring 430 to insert it into the second fastening hole 420 and inserts the second fastening ring 450 into the first fastening ring 410.

여기서, 체결구동부(440)는 체결구동웜(442)과 체결구동축(444) 및 체결구동손잡이(446)를 포함한다.Here, the fastening drive unit 440 includes a fastening drive worm 442, a fastening drive shaft 444, and a fastening drive handle 446.

체결구동웜(442)은 체결링(430)의 나사산에 치합되도록 제1체결공(410)에 위치된다.The fastening drive worm 442 is positioned in the first fastening hole 410 so as to engage with the thread of the fastening ring 430.

그리고 체결구동축(444)은 체결구동웜(442)을 제1플랜지부(100)에 회전 가능하도록 위치시킨다.In addition, the fastening drive shaft 444 is positioned so that the fastening drive worm 442 is rotatable in the first flange unit 100.

체결구동손잡이(446)는 체결구동축(444)을 회전시키기 위해 구비된다.The fastening drive handle 446 is provided to rotate the fastening drive shaft 444.

이러한 체결부(400)의 동작상태를 살펴보면, 체결구동손잡이(446)를 이용하여 체결구동축(444)과 체결구동웜(442)을 회전시켜 제1플랜지부(100)의 제1체결공(410)에 위치된 체결링(430)을 제2플랜지부(200)의 제2체결공(420)으로 이동시킨다.Looking at the operating state of the fastening part 400, the fastening drive shaft 444 and the fastening drive worm 442 are rotated using the fastening drive handle 446, so that the first fastening hole 410 of the first flange part 100 is rotated. ) To move the fastening ring 430 located in the second fastening hole 420 of the second flange portion 200.

이에 따라, 체결링(430)의 나사산이 제2플랜지부(200)의 나사산에 결합되어 제1플랜지부(100)와 제2플랜지부(200)가 체결된다.Accordingly, the thread of the fastening ring 430 is coupled to the thread of the second flange portion 200 so that the first flange portion 100 and the second flange portion 200 are fastened.

이와 동시에, 체결링(430) 내주면에 형성된 나사산이 제2체결링(450)의 나사산과 치합되어 제2체결링(450)이 제1체결공(410)으로 삽입된다.At the same time, the thread formed on the inner circumferential surface of the fastening ring 430 is engaged with the thread of the second fastening ring 450, so that the second fastening ring 450 is inserted into the first fastening hole 410.

다시 말해, 체결링(430)은 제1체결공(410)에서 회전 가능하게 구비되고, 제2체결링(450)은 제2체결공(420)에서 회전 가능하게 구비되며, 체결구동웜(442)에 치합되어 나선방향으로 회전되며 제2체결공(420)으로 이동되면서 제2플랜지부(200)의 나사산에 결합되는 것이다.In other words, the fastening ring 430 is rotatably provided in the first fastening hole 410, the second fastening ring 450 is rotatably provided in the second fastening hole 420, and the fastening drive worm 442 ) Is engaged with and rotated in the helical direction, and is coupled to the thread of the second flange portion 200 while being moved to the second fastening hole 420.

또한 제2체결링(450)의 나사산이 체결링(430) 내주면의 나사산과 치합됨에 따라, 제2체결링(450)이 제1체결공(410)으로 이동됨에 따라, 더욱 견고하게 결합시킬 수 있다.In addition, as the threads of the second fastening ring 450 are engaged with the threads of the inner circumferential surface of the fastening ring 430, as the second fastening ring 450 moves to the first fastening hole 410, it can be more firmly coupled. have.

여기서, 밀폐부(300)는 제1밀폐부(310)와 제2밀폐부(320)를 포함한다.Here, the sealing part 300 includes a first sealing part 310 and a second sealing part 320.

제1밀폐부(310)는 체결부(400)의 각 체결공(410, 420)을 기준으로, 내측에 위치되고, 제2밀폐부(320)는 각 체결공(410, 420)을 기준으로, 외측에 위치되어 2중으로 밀폐된다.The first sealing part 310 is located inside, based on each of the fastening holes 410 and 420 of the fastening part 400, and the second sealing part 320 is based on each of the fastening holes 410 and 420. , It is located on the outside and is double-sealed.

여기서, 하수도관용 플랜지구조는 도 3에서 도시한 바와 같이, 결합수단(500)을 더 포함한다.Here, the flange structure for the sewer pipe further includes a coupling means 500 as shown in FIG. 3.

이 결합수단(500)은 제1플랜지부(100)와 제2플랜지부(200)를 결합시키되, 상호 대응되는 형상으로 끼워진다.The coupling means 500 couples the first flange portion 100 and the second flange portion 200 to each other, and are fitted in a shape corresponding to each other.

이러한 결합수단(500)은 결합돌기(510)와 결합홈(520)을 포함한다.This coupling means 500 includes a coupling protrusion 510 and a coupling groove 520.

결합돌기(510)는 제1플랜지부(100)와 제2플랜지부(200) 중 어느 하나에 다수 개 형성된다.A plurality of coupling protrusions 510 are formed on any one of the first flange portion 100 and the second flange portion 200.

그리고 결합홈(520)은 결합돌기(510)에 대응되도록 제1플랜지부(100)와 제2플랜지부(200) 중 다른 하나에 다수 개 형성된다.In addition, a plurality of coupling grooves 520 are formed in the other one of the first flange portion 100 and the second flange portion 200 so as to correspond to the coupling protrusion 510.

이와 같은, 결합돌기(510)와 결합홈(520)은 체결부(400)가 형성된 해당 플랜지부(100, 200)의 면에 형성되는 것으로, 수직방향으로 길게 형성되고, 수평방향으로 일정 간격으로 복수 개 형성된다.As such, the coupling protrusion 510 and the coupling groove 520 are formed on the surfaces of the flange portions 100 and 200 on which the coupling portion 400 is formed, are formed to be elongated in the vertical direction, and are formed at regular intervals in the horizontal direction. It is formed in plural.

이 결합돌기(510)와 결합홈(520)은 제1플랜지부(100)와 제2플랜지부(200)가 상호 접하는 면의 가장자리에 형성된다.The coupling protrusion 510 and the coupling groove 520 are formed on the edge of the surface where the first flange portion 100 and the second flange portion 200 are in contact with each other.

제1플랜지부(100)와 제2플랜지부(200)의 결합 시, 결합돌기(510)와 결합홈(520)을 결합시켜 가결합시킬 수 있으며, 이 후, 체결부(400)에 의해 제1플랜지부(100)와 제2플랜지부(200)를 상호 체결시킨다.When the first flange portion 100 and the second flange portion 200 are coupled, the coupling protrusion 510 and the coupling groove 520 may be temporarily coupled. The first flange portion 100 and the second flange portion 200 are coupled to each other.

여기서, 결합돌기(510)와 결합홈(520) 중 어느 하나가 다른 하나의 상측에 위치되도록 각 플랜지부(100, 200)를 위치시킨 후, 수직방향으로 이동시켜 상호 결합시켜 가결합시킬 수 있다.Here, after positioning each of the flange portions 100 and 200 such that one of the coupling protrusion 510 and the coupling groove 520 is positioned above the other, it can be temporarily coupled by moving it in a vertical direction to mutually couple. .

이에, 종래 하수도배관 설치 및 교체 시, 해당 하수도배관의 길이보다 크게 굴착하여 일정 높이에서 길이방향으로 이동시키는 과정이 본 발명의 하수도관용 플랜지구조에 의해 굴착부위를 절감시킴은 물론, 상측에서 하측으로 이동시키며 상호 결합시킬 수 있어 작업시간과 비용을 절감시킬 수 있다.Thus, when installing and replacing conventional sewer pipes, the process of excavating larger than the length of the sewer pipe and moving it in the longitudinal direction from a certain height reduces the excavation site by the flange structure for sewer pipes of the present invention, as well as from the upper side to the lower side. It can be moved and combined with each other, saving working time and cost.

또한 하수도관용 플랜지구조는 고정부재(530)는 결합수단(300)에 의해 결합된 제1플랜지(100)와 제2플랜지(200)를 고정시키기 위해 구비된다.In addition, the flange structure for the sewer pipe is provided for fixing the fixing member 530 to fix the first flange 100 and the second flange 200 coupled by the coupling means 300.

이 고정부재(530)는 제1고정공(532)과 제2고정공(534), 고정볼트(536) 및 고정너트(538)로 구성된다.The fixing member 530 is composed of a first fixing hole 532 and a second fixing hole 534, a fixing bolt 536, and a fixing nut 538.

제1고정공(532)은 제1플랜지부(100) 가장자리를 따라 일정간격으로 다수 개 형성되고, 제2고정공(534)은 제1고정공(532)에 대응되도록 제2플랜지부(200) 가장자리를 따라 일정간격으로 다수 개 형성된다.A plurality of first fixing holes 532 are formed along the edge of the first flange part 100 at regular intervals, and the second fixing holes 534 correspond to the first fixing holes 532. ) A number of them are formed at regular intervals along the edge.

그리고 고정볼트(536)는 일직선상에 위치된 제1고정공(532)과 제2고정공(534)에 관통 삽입되기 위해 구비된다.And the fixing bolt 536 is provided to be inserted through the first fixing hole 532 and the second fixing hole 534 positioned in a straight line.

고정너트(538)는 제1고정공(532)과 제2고정공(534)을 통과한 고정볼트(536)의 단부에 나사결합되어 제1플랜지부(100)와 제2플랜지부(200)를 고정시킴에 따라, 결합된 결합돌기(510)와 결합홈(520)이 가압된 상태를 유지하게 된다.The fixing nut 538 is screwed to the end of the fixing bolt 536 that has passed through the first fixing hole 532 and the second fixing hole 534 so that the first flange portion 100 and the second flange portion 200 are formed. By fixing the, the combined coupling protrusion 510 and the coupling groove 520 are maintained in a pressed state.

또한 도 4에서 도시한 바와 같이, 결합돌기(310)는 상단부에서 하단부로 갈수록 경사지게 돌출 형성되고, 결합홈(320)은 결합돌기(310)에 대응되도록 형성된다.In addition, as shown in FIG. 4, the coupling protrusion 310 is formed to protrude obliquely from the upper end to the lower end, and the coupling groove 320 is formed to correspond to the coupling protrusion 310.

다시 말해, 결합돌기(310)와 결합홈(320)은 상단에서 하단으로 갈수록 외측으로 경사지거나 내측으로 경사지게 형성된다.In other words, the coupling protrusion 310 and the coupling groove 320 are formed to be inclined outward or inclined inward from the top to the bottom.

또한 상단에서 하단으로 갈수록 외측으로 경사지거나 내측으로 경사지게 형성된다.In addition, it is formed to be inclined outward or inclined inward as it goes from the top to the bottom.

그리고 도 5에서 도시한 바와 같이, 결합돌기(310)는 상단부에서 하단부로 갈수록 굴곡지게 돌출 형성되고, 결합홈(320)은 결합돌기(310)에 대응되도록 형성된다.And, as shown in FIG. 5, the coupling protrusion 310 is formed to protrude to be curved from the upper end to the lower end, and the coupling groove 320 is formed to correspond to the coupling protrusion 310.

다시 말해, 결합돌기(310)와 결합홈(320)은 상단에서 하단으로 갈수록 외측으로 굴곡지거나 내측으로 굴곡지게 형성된다.In other words, the coupling protrusion 310 and the coupling groove 320 are formed to be bent outward or bent inward from the top to the bottom.

또한 상단에서 하단으로 갈수록 외측으로 굴곡지거나 내측으로 굴곡지게 형성된다.In addition, as it goes from the top to the bottom, it is formed to be bent outward or bent inward.

그리고 패킹(400)은 결합돌기(310)와 결합홈(320)의 형상에 대응되도록 형성되어 결합돌기(310)와 결합홈(320) 사이에 위치된다.In addition, the packing 400 is formed to correspond to the shape of the coupling protrusion 310 and the coupling groove 320 and is positioned between the coupling protrusion 310 and the coupling groove 320.

그리고 하수도관용 플랜지구조는 도 6에서 도시한 바와 같이, 수직유동방지부(600)를 더 포함한다.And the flange structure for the sewer pipe further includes a vertical flow prevention part 600 as shown in FIG. 6.

이 수직유동방지부(600)는 결합수단(500)에 의해 결합된 제1플랜지부(100)와 제2플랜지부(200)가 수직방향으로 유동되는 것을 방지한다.The vertical flow prevention part 600 prevents the first flange part 100 and the second flange part 200 coupled by the coupling means 500 from flowing in the vertical direction.

이러한 수직유동방지부(600)는 제1수직유동방지부(610)와 제2수직유동방지부(620)를 포함한다.The vertical flow prevention part 600 includes a first vertical flow prevention part 610 and a second vertical flow prevention part 620.

제1수직유동방지부(610)는 연결된 제1하수도배관(1)과 제2하수도배관(2)을 기준으로, 상측으로 위치된 제1플랜지부(100)와 제2플랜지부(200) 부분에 구비된다.The first vertical flow prevention part 610 is a part of the first flange part 100 and the second flange part 200 positioned upward based on the connected first sewage pipe 1 and the second sewage pipe 2 It is equipped with.

그리고 제2수직유동방지부(620)는 연결된 두 개의 배관(1, 2)을 기준으로, 하측으로 위치된 제1플랜지부(100)와 제2플랜지부(200) 부분에 구비된다.In addition, the second vertical flow prevention part 620 is provided in the first flange part 100 and the second flange part 200 located downward based on the two connected pipes 1 and 2.

이 각 수직유동방지부(610, 620)는 수직삽입공(612, 622)과 수직삽입편(614, 624)을 포함한다.Each of the vertical flow prevention units 610 and 620 includes vertical insertion holes 612 and 622 and vertical insertion pieces 614 and 624.

수직삽입공(612, 622)은 결합된 결합돌기(510)와 결합홈(520)을 수평방향으로 관통 형성된다.The vertical insertion holes 612 and 622 are formed through the combined coupling protrusion 510 and the coupling groove 520 in the horizontal direction.

또한 수직삽입편(614, 624)은 수직삽입공(612, 622)에 끼워지기 위해 구비된다.In addition, the vertical insertion pieces 614 and 624 are provided to fit into the vertical insertion holes 612 and 622.

수직삽입공(612, 622)은 결합된 결합돌기(310)와 결합홈(320)을 수평방향으로 관통 형성되고, 수직삽입편(614, 624)은 수직삽입공(612, 622)에 끼워지기 위해 구비된다.The vertical insertion holes 612 and 622 are formed through the combined coupling protrusion 310 and the coupling groove 320 in the horizontal direction, and the vertical insertion pieces 614 and 624 are inserted into the vertical insertion holes 612 and 622. Is equipped for.

그리고 각 수직삽입편(614, 624)은 제1고정공(510)과 제2고정공(520) 사이에 대응되는 제3고정공(550)이 형성된다.In addition, in each of the vertical insertion pieces 614 and 624, a third fixing hole 550 corresponding to between the first fixing hole 510 and the second fixing hole 520 is formed.

100 : 제1플랜지부 200 : 제2플랜지부
300 : 밀폐부 400 : 체결부
410 : 제1체결공 420 : 제2체결공
430 : 체결링 440 : 체결구동부
450 : 제2체결링
500 : 결합수단 510 : 결합돌기
520 : 결합홈 530 : 고정부재
600 : 수직유동방지부
100: first flange portion 200: second flange portion
300: sealing part 400: fastening part
410: 1st fastening 420: 2nd fastening
430: fastening ring 440: fastening drive
450: second fastening ring
500: coupling means 510: coupling protrusion
520: coupling groove 530: fixing member
600: vertical flow prevention part

Claims (2)

제1하수도배관의 일단부에 구비되는 제1플랜지부;
상기 제1플랜지부와 대응되도록 제2하수도배관의 타단부에 구비되는 제2플랜지부;
상기 제1플랜지부와 제2플랜지부 사이를 밀폐시키기 위한 밀폐부;
상기 제1플랜지부와 제2플랜지부를 체결시키기 위한 체결부; 및
상기 제1플랜지부와 제2플랜지부를 결합시키되, 상호 대응되는 형상으로 끼워지는 결합수단;을 포함하고,
상기 체결부는,
상기 제2플랜지부방향으로 개방되도록 상기 제1플랜지부의 내부에 형성되는 제1체결공;
상기 제1체결공에 대응되며, 상기 제1플랜지부방향으로 개방되도록 상기 제2플랜지부의 내부에 형성되되, 내주면에 나사산이 형성되는 제2체결공;
상기 제2체결공의 나사산에 체결되도록 외주면에 나사산을 갖고, 내주면에 나사산이 형성되며, 상기 제1체결공에서 인출 가능하게 구비되는 체결링;
상기 체결링의 내주면 나사산에 대응되도록 외주면에 나사산을 갖고, 상기 제2체결공에서 인출 가능하게 구비되는 제2체결링; 및
상기 체결링을 이동시켜 상기 제2체결공으로 삽입시킴과 동시에 상기 제2체결링을 상기 제1체결링으로 삽입시키기 위한 체결구동부;를 포함하는 결합력이 향상된 하수도관용 플랜지구조.
A first flange portion provided at one end of the first sewer pipe;
A second flange portion provided at the other end of the second sewer pipe to correspond to the first flange portion;
A sealing portion for sealing between the first flange portion and the second flange portion;
A fastening part for fastening the first flange part and the second flange part; And
Including; coupling means for coupling the first flange portion and the second flange portion, but fitted in a shape corresponding to each other,
The fastening part,
A first fastening hole formed in the first flange portion so as to be opened toward the second flange portion;
A second fastening hole that corresponds to the first fastening hole and is formed inside the second flange part so as to be opened in a direction of the first flange part, and has a thread formed on an inner circumferential surface thereof;
A fastening ring having a thread on an outer circumferential surface so as to be fastened to a thread of the second fastening hole, a thread formed on the inner circumferential surface, and provided to be retractable from the first fastening hole;
A second fastening ring having a thread on an outer circumferential surface so as to correspond to a thread on the inner circumferential surface of the fastening ring, and provided to be retractable from the second fastening hole; And
A flange structure for sewage pipes having improved coupling force, comprising: a fastening driving part for moving the fastening ring to insert it into the second fastening hole and inserting the second fastening ring into the first fastening ring.
제1항에 있어서, 상기 체결구동부는,
상기 체결링의 나사산에 치합되도록 상기 제1체결공에 위치되는 체결구동웜;
상기 체결구동웜을 제1플랜지부에 회전 가능하도록 위치시키는 체결구동축; 및
상기 체결구동축을 회전시키기 위한 체결구동손잡이;를 포함하고,
상기 체결구동손잡이를 이용하여 체결구동축과 체결구동웜을 회전시켜 상기 제1플랜지부의 제1체결공에 위치된 상기 체결링을 상기 제2플랜지부의 제2체결공으로 이동시킴에 따라, 체결링의 나사산이 제2플랜지부의 나사산에 결합되어 체결되는 것을 특징으로 하는 결합력이 향상된 하수도관용 플랜지구조.
The method of claim 1, wherein the fastening driving part,
A fastening drive worm positioned in the first fastening hole so as to engage with the thread of the fastening ring;
A fastening drive shaft for positioning the fastening drive worm to be rotatable in the first flange; And
Including; a fastening drive handle for rotating the fastening drive shaft,
As the fastening drive shaft and the fastening drive worm are rotated using the fastening drive handle to move the fastening ring located in the first fastening hole of the first flange part to the second fastening hole of the second flange part, the fastening ring Flange structure for sewage pipes, characterized in that the thread of the second flange is coupled to the thread of the second flange to be fastened.
KR1020190124951A 2019-10-09 2019-10-09 Flange structure for sewage pipe with improved bonding force KR102276831B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020190124951A KR102276831B1 (en) 2019-10-09 2019-10-09 Flange structure for sewage pipe with improved bonding force

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020190124951A KR102276831B1 (en) 2019-10-09 2019-10-09 Flange structure for sewage pipe with improved bonding force

Publications (2)

Publication Number Publication Date
KR20210042435A true KR20210042435A (en) 2021-04-20
KR102276831B1 KR102276831B1 (en) 2021-07-14

Family

ID=75743051

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020190124951A KR102276831B1 (en) 2019-10-09 2019-10-09 Flange structure for sewage pipe with improved bonding force

Country Status (1)

Country Link
KR (1) KR102276831B1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200342279Y1 (en) * 2003-10-30 2004-02-18 허형무 Connecting structure of sewage using jacket cover and jacket press member
KR101792571B1 (en) * 2017-03-07 2017-11-02 주식회사 메가조인트 Pipe connection apparatus
KR20190016641A (en) * 2017-08-08 2019-02-19 (주)동명기술공단종합건축사사무소 Flange structure for water supply pipe

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200342279Y1 (en) * 2003-10-30 2004-02-18 허형무 Connecting structure of sewage using jacket cover and jacket press member
KR101792571B1 (en) * 2017-03-07 2017-11-02 주식회사 메가조인트 Pipe connection apparatus
KR20190016641A (en) * 2017-08-08 2019-02-19 (주)동명기술공단종합건축사사무소 Flange structure for water supply pipe

Also Published As

Publication number Publication date
KR102276831B1 (en) 2021-07-14

Similar Documents

Publication Publication Date Title
US9731253B2 (en) Standpipe arrangement and fastening for holding and for supplying gas to aerators in a waste water clarifying basin
TW201437531A (en) Segment for rehabilitation pipe and pipe rehabilitation method
KR200471627Y1 (en) Water slide having with water leakage prevention function
KR102131489B1 (en) Flange structure for water supply pipe
US7322382B2 (en) Segment for a rehabilitating pipe
KR102247270B1 (en) Flange structure for water pipe
KR20210042435A (en) Flange structure for sewage pipe with improved bonding force
KR102276835B1 (en) Flange structure for sewage pipe
JP6526447B2 (en) Valve body removal device
KR100817812B1 (en) Joint for manhole
JP2011231561A (en) Upper and lower steel pipes jointing structure for steel pipe column and jointing method thereof
TWI801865B (en) Setting method of flow restrictor and fluid control device with flow restrictor
JP5103148B2 (en) Branch pipe connection method and branch pipe connection device
JP6970587B2 (en) Flange reinforcement
EP3256694B1 (en) Modular tunnel lining system and method
US20090290951A1 (en) Sleeve For a T-Bolt and a Sleeve and T-Bolt Combination to Prevent T-Bolt Rotation
CN112368504B (en) Frame body device and mounting method of frame body device
KR20080030427A (en) Pipe connecting pin
JP5998003B2 (en) Branch pipe connection device
JP2007032762A (en) Underground pipe and its laying method
KR100917951B1 (en) A connection pipe device for manhole
KR20090084519A (en) The structure coupling flange and pipe
KR100398789B1 (en) a flange coupling tube
JP6156977B2 (en) Flexible joint fixing structure
KR101992423B1 (en) Flange structure for water pipes with improved connection

Legal Events

Date Code Title Description
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant