KR20200097947A - Comparative analysis system and method of Bill Of Material - Google Patents

Comparative analysis system and method of Bill Of Material Download PDF

Info

Publication number
KR20200097947A
KR20200097947A KR1020190015430A KR20190015430A KR20200097947A KR 20200097947 A KR20200097947 A KR 20200097947A KR 1020190015430 A KR1020190015430 A KR 1020190015430A KR 20190015430 A KR20190015430 A KR 20190015430A KR 20200097947 A KR20200097947 A KR 20200097947A
Authority
KR
South Korea
Prior art keywords
data
bom
analysis
information
comparison step
Prior art date
Application number
KR1020190015430A
Other languages
Korean (ko)
Other versions
KR102239523B1 (en
Inventor
공석현
Original Assignee
한국항공우주산업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국항공우주산업 주식회사 filed Critical 한국항공우주산업 주식회사
Priority to KR1020190015430A priority Critical patent/KR102239523B1/en
Publication of KR20200097947A publication Critical patent/KR20200097947A/en
Application granted granted Critical
Publication of KR102239523B1 publication Critical patent/KR102239523B1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B71/00Designing vessels; Predicting their performance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Operations Research (AREA)
  • Health & Medical Sciences (AREA)
  • Development Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Game Theory and Decision Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Quality & Reliability (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • General Factory Administration (AREA)

Abstract

The present invention relates to a system and a method for comparative analysis of a bill of material (BOM). The system is to analyze the difference between a pre-stored existing BOM and a newly-input new BOM. The system includes: a data input unit (100) pre-storing at least one existing BOM and receiving the input of at least one new BOM from the outside; a basic analysis unit (200) receiving the existing BOM and the new BOM from the data input unit (100), analyzing basic information in each BOM, comparing the basic information, and extracting common data, additional data, and change data; a unique data analysis unit (300) receiving the existing BOM and the new BOM from the data input unit (100), analyzing the basic information in each BOM, comparing the analyzed basic information, and extracting unique data of each BOM; a detailed analysis unit (400) extracting the additional data and the change data by comparing the unique data; a memory unit (500) receiving the common data, the additional data, and the change data, turning the data into a database, and storing and managing the data; and an output unit (600) transmitting the data in the memory unit (500) in the event of an external request.

Description

BOM 비교 분석 시스템 및 그 방법 {Comparative analysis system and method of Bill Of Material}BOM comparative analysis system and method of Bill Of Material

본 발명은 BOM 비교 분석 시스템 및 그 방법에 관한 것으로, 더욱 상세하게는 생산(수행)하고자 하는 제품이 어떠한 부품 등을 통해 구성되는지에 대한 구성명세서인 EBOM(Engineering BOM)을 토대로 이를 변형하여 생산(제조)공정 및 조립공정의 순서를 반영한 MBOM(Manufacturing BOM)을 도출하는 과정에서, 발생할 수 있는 오류 등을 신속하고 정확하게 도출할 수 있는 BOM 비교 분석 시스템 및 그 방법에 관한 것이다.The present invention relates to a BOM comparison and analysis system and its method, and in more detail, it is modified based on EBOM (Engineering BOM), which is a configuration specification for which parts, etc., a product to be produced (performed), and produced ( The present invention relates to a BOM comparison and analysis system and method that can quickly and accurately derive errors that may occur in the process of deriving MBOM (Manufacturing BOM) reflecting the order of manufacturing) process and assembly process.

통상적으로 BOM(자재 명세서, Bill Of Material)을 기반으로 개발/생산이 이루어지는 산업에서는, 잦은 설계변경으로 인해 BOM 역시 여러번 수정을 진행해야 하는 문제점이 있다. 이 뿐만 아니라, EBOM(Engineering BOM)에서는 특정 기능을 수행하는 특정 부품을 명세하였으나, 실제 생산(제조)공정 및 조립공정을 진행하는 과정에서 부품의 원가 등의 문제로 필요 부품의 모델을 변경하는 등의 임의로 MBOM(Manufacturing BOM)을 변경할 경우, 실제 BOM을 관리하는 실무자들이 EBOM과 MBOM 간의 차이점을 직접 찾아내고 이를 다음 EBOM에 적용하는데 있어서 방대한 데이터 양으로 인해 많은 오류가 나타날 수 밖 에 없는 문제점이 있다.In an industry where development/production is usually based on a bill of material (BOM), there is a problem that the BOM must also be modified several times due to frequent design changes. In addition, EBOM (Engineering BOM) specifies specific parts that perform specific functions, but during the actual production (manufacturing) process and assembly process, the model of necessary parts is changed due to problems such as the cost of the parts. When changing MBOM (Manufacturing BOM) arbitrarily, there is a problem that many errors are inevitable due to the vast amount of data when the actual BOM management practitioners find the difference between EBOM and MBOM directly and apply it to the next EBOM. .

이와 반대로, 일부 기능의 업그레이드 등으로 인해 EBOM의 사소한 부분이 변경되었을 경우, 해당 부분을 MBOM에 적용해야 하나, 이 역시 실제 BOM을 관리하는 실무자들이 기존 EBOM과 업그레이드된 신규 EBOM 간의 차이점을 직접 찾아내고 이를 다음 EBOM에 적용하는데 많은 애로사항이 발생할 수 밖 에 없다.On the contrary, if a minor part of EBOM is changed due to upgrade of some functions, the part must be applied to MBOM, but also, the actual BOM management practitioners find the difference between the existing EBOM and the upgraded new EBOM directly. There are inevitable difficulties in applying this to the next EBOM.

즉, 설계과정의 결과로 도출되는 EBOM과 생산요소가 추가된 MBOM 사이에는 불일치 사항이 발생할 수 있으나, 이러한 불일치 사항(차이점)을 정확하게 찾아내지 못하고 공정이 진행될 경우, 다시 말하자면 MBOM 중 EBOM의 내용이 누락 및 잘못 반영될 경우, 재작업이 진행되거나 파트 SCRAP와 같이 불필요한 시간과 비용이 소모되는 문제점이 있다.In other words, discrepancies may occur between the EBOM derived as a result of the design process and the MBOM with added production factors, but if the process proceeds without accurately finding these discrepancies (differences), in other words, the contents of the EBOM among MBOMs If omitted or incorrectly reflected, there is a problem in that rework is performed or unnecessary time and cost are consumed, such as part SCRAP.

이와 관련해서, 국내등록특허 제10-1871300호("선박설계 시 형강류 절단도면 자동 생성 및 자재 BOM 자동 추출 방법")에서는 선박 모델링 자료와 데이터를 이용하여 도면에 도시되어야 할 정보를 자동으로 만들어주고 부재가 네스팅된 결과값과 도면을 가지고 자재 BOM을 자동으로 추출해 내는 선박설계시 형강류 절단도면 자동 생성 및 자동 BOM 자동 추출 방법을 개시하고 있다.In this regard, in Korean Patent Registration No. 10-1871300 ("Automatic generation of section steel cut drawings and automatic extraction of material BOM during ship design"), information to be shown in the drawings is automatically created using ship modeling data and data. A method of automatically generating section steel cut drawings and automatic BOM extraction when designing a ship that automatically extracts the material BOM with the result values and drawings in which the members are nested is being disclosed.

국내등록특허 제10-1871300호(등록일 2018.06.20.)Domestic Registration Patent No. 10-1871300 (Registration Date 2018.06.20.)

본 발명은 상기한 바와 같은 종래 기술의 문제점을 해결하기 위하여 안출된 것으로, 설계자(Manufacturing engineer)가 생산(수행)하고자 하는 제품이 어떠한 부품 등을 통해 구성되는지에 대해 작성한 구성명세서인 EBOM(Engineering BOM)을 토대로 이를 변형하여 생산(제조)공정 및 조립공정의 순서를 반영한 MBOM(Manufacturing BOM)을 도출하는 과정에서, 발생할 수 있는 오류 등을 신속하고 정확하게 도출할 수 있는 BOM 비교 분석 시스템 및 그 방법을 제공하는 것이다.The present invention was conceived to solve the problems of the prior art as described above, and an engineering BOM (EBOM), which is a configuration specification written about what parts, etc., a product intended to be produced (performed) by a designer ), a BOM comparison and analysis system and method that can quickly and accurately derive errors that may occur in the process of deriving MBOM (Manufacturing BOM) that reflects the order of the production (manufacturing) process and assembly process To provide.

본 발명의 일 실시예에 따른 BOM 비교 분석 시스템은, 기저장되어 있는 기존 BOM(Bill of Material)과 새롭게 입력되는 신규 BOM 간의 차이점을 분석하기 위한 BOM 비교 분석 시스템에 있어서, 적어도 하나의 기존 BOM이 기저장되어 있으며, 외부로부터 적어도 하나의 신규 BOM이 입력되는 데이터 입력부(100), 상기 데이터 입력부(100)로부터 상기 기존 BOM과 신규 BOM을 전달받아, 각각의 BOM에 포함되어 있는 기초정보들을 분석하여, 분석한 상기 기초정보들을 비교하여 공통 데이터, 추가 데이터 및 변경 데이터를 추출하는 기초 분석부(200), 상기 데이터 입력부(100)로부터 상기 기존 BOM과 신규 BOM을 전달받아, 각각의 BOM에 포함되어 있는 기초정보들을 분석하여, 분석한 상기 기초정보들을 비교하여 상기 BOM 각각에만 포함되어 있는 고유 데이터를 추출하는 고유 데이터 분석부(300), 상기 고유 데이터 분석부(300)에서 추출한 각각의 BOM에 포함되어 있는 상기 고유 데이터들을 비교하여, 추가 데이터 및 변경 데이터를 추출하는 상세 분석부(400), 상기 공통 데이터, 추가 데이터 및 변경 데이터들을 전달받아, 각각 데이터베이스화하여 저장 및 관리하는 메모리부(500) 및 외부의 요청에 따라 상기 메모리부(500)에서 저장하고 있는 데이터들을 전송하는 출력부(600)를 포함하여 구성되며, 상기 기존 BOM, 신규 BOM은 EBOM(Engineering BOM) 정보 또는 MBOM(Manufacturing BOM) 정보를 포함하는 것이 바람직하다.In the BOM comparison and analysis system according to an embodiment of the present invention, in the BOM comparison and analysis system for analyzing differences between a previously stored existing bill of material (BOM) and a newly inputted new BOM, at least one existing BOM is A data input unit 100 that is previously stored and inputs at least one new BOM from the outside, and receives the existing BOM and the new BOM from the data input unit 100, and analyzes basic information included in each BOM. , The basic analysis unit 200 for comparing the analyzed basic information to extract common data, additional data, and changed data, the existing BOM and the new BOM are received from the data input unit 100, and are included in each BOM. A unique data analysis unit 300 that analyzes existing basic information, compares the analyzed basic information, and extracts unique data included only in each of the BOM, and includes in each BOM extracted from the unique data analysis unit 300 A detailed analysis unit 400 that compares the unique data and extracts additional data and change data, and a memory unit 500 that receives the common data, additional data, and change data, and stores and manages each database. And an output unit 600 that transmits data stored in the memory unit 500 according to an external request, and the existing BOM and new BOM are EBOM (Engineering BOM) information or MBOM (Manufacturing BOM) It is desirable to include information.

더 나아가, 상기 메모리부(500)는 상기 공통 데이터를 저장 및 관리하는 공통 저장부(510), 상기 추가 데이터를 저장 및 관리하는 추가 저장부(520) 및 상기 변경 데이터를 저장 및 관리하는 변경 저장부(530)를 포함하여 구성되는 것이 바람직하다.Further, the memory unit 500 includes a common storage unit 510 for storing and managing the common data, an additional storage unit 520 for storing and managing the additional data, and a change storage unit for storing and managing the changed data. It is preferable to be configured to include the unit 530.

더 나아가, 상기 기초 분석부(200)는 분석한 상기 기초정보들 중 P/N(Part Number) 정보, Revision 정보 및 Synthetic No. 정보 중 선택되는 적어도 어느 하나 이상을 이용하여, 상기 기존 BOM과 신규 BOM 간의 동일한 정보의 존재 여부를 비교 분석하여 상기 공통 데이터, 추가 데이터 및 변경 데이터를 추출하는 것이 바람직하다.Furthermore, the basic analysis unit 200 includes P/N (Part Number) information, Revision information, and Synthetic No. of the analyzed basic information. It is preferable to extract the common data, additional data, and change data by comparing and analyzing the existence of the same information between the existing BOM and the new BOM by using at least one or more selected from the information.

더 나아가, 상기 상세 분석부(400)는 분석한 상기 고유 데이터들 중 P/N 정보와 상위도면 정보를 이용하여, 상기 기존 BOM과 신규 BOM 간의 차이를 상세 비교하여, 상기 추가 데이터 및 변경 데이터를 추출하는 것이 바람직하다.Furthermore, the detailed analysis unit 400 compares the difference between the existing BOM and the new BOM in detail, using P/N information and upper drawing information among the analyzed unique data, and compares the additional data and the changed data. It is desirable to extract.

더 나아가, 상기 출력부(600)는 외부로부터 입력되는 MBOM의 업데이트 요청에 따라, 상기 추가 저장부(520)와 변경 저장부(530)에서 저장 및 관리하고 있는 추가 데이터와 변경 데이터를 전달하는 것이 바람직하다.Furthermore, the output unit 600 may transmit additional data and change data stored and managed by the additional storage unit 520 and the change storage unit 530 according to an update request from the MBOM input from the outside. desirable.

본 발명의 일 실시예에 따른 BOM 비교 분석 방법은, 기저장되어 있는 기존 BOM(Bill of Material)과 새롭게 입력되는 신규 BOM 간의 차이점을 분석하기 위한 BOM 비교 분석 방법에 있어서, 데이터 입력부에서, 기저장되어 있는 기존 BOM(Bill of Material)과 새롭게 입력되는 신규 BOM을 입력받는 데이터 입력단계(S100), 기초 분석부에서, 상기 데이터 입력단계(S100)에 의해 입력된 상기 기존 BOM과 신규 BOM에 포함되어 있는 기초정보들을 각각 분석하고, 상기 기초정보들을 비교하여 공통 데이터, 추가 데이터 및 변경 데이터로 구분하는 제1 분석 비교단계(S200), 고유 데이터 분석부에서, 상기 제1 분석 비교단계(S200)에 의해 상기 변경 데이터로 구분될 경우, 상기 기존 BOM과 신규 BOM에 포함되어 있는 기초정보들을 분석하여, 각각의 BOM에만 포함되어 있는 고유 데이터를 구분하는 고유 데이터 분석단계(S300), 상세 분석부에서, 상기 고유 데이터 분석단계(S300)에서 구분한 각각의 BOM에 포함되어 있는 고유 데이터들 중 P/N(Part Number) 정보와 상위도면 정보를 이용하여 추가 데이터 및 변경 데이터로 재구분하는 제2 분석 비교단계(S400) 및 출력부에서, 상기 제1 분석 비교단계(S200)와 제2 분석 비교단계(S400)에서 추가 데이터 및 변경 데이터로 구분한 데이터들을 전달받아 외부로 전송하는 출력단계(S500)로 이루어지되, 유효성 검증부에서, 상기 제2 분석 비교단계(S400)에 의해 상기 고유 데이터들의 데이터 구분이 불가능할 경우, 상기 신규 BOM의 데이터 유효성 검증을 수행하는 것이 바람직하다.In the BOM comparison and analysis method according to an embodiment of the present invention, in the BOM comparison and analysis method for analyzing a difference between a previously stored existing bill of material (BOM) and a newly inputted new BOM, in the data input unit, pre-save The data input step (S100) of receiving the existing bill of material (BOM) and the newly inputted new bill of materials (S100), in the basic analysis unit, are included in the existing BOM and the new BOM entered by the data input step (S100). A first analysis and comparison step (S200) of analyzing each of the basic information present and dividing the basic information into common data, additional data and changed data (S200), in the unique data analysis unit, the first analysis comparison step (S200) In the case of being classified as the changed data by, in the detailed analysis unit, the basic information included in the existing BOM and the new BOM is analyzed and the unique data included only in each of the BOMs is classified (S300), A second analysis comparison that re-classifies into additional data and changed data using P/N (Part Number) information and upper drawing information among the unique data included in each BOM classified in the unique data analysis step (S300) In the step (S400) and the output unit, the first analysis and comparison step (S200) and the second analysis and comparison step (S400) to the output step (S500) of receiving the data classified as additional data and change data to the outside. However, in the case where the validity verification unit cannot distinguish the data of the unique data by the second analysis and comparison step (S400), it is preferable to perform data validation of the new BOM.

더 나아가, 상기 제1 분석 비교단계(S200)는 분석한 상기 기존 BOM과 신규 BOM에 포함되어 있는 각각의 상기 기초정보들 중 P/N(Part Number) 정보, Revision 정보 및 Synthetic No. 정보 중 선택되는 적어도 어느 하나 이상을 이용하여, P/N 정보의 동일 여부를 판단하는 제1-1 분석 비교단계(S210), 상기 제1-1 분석 비교단계(S210)의 판단 결과에 따라 동일할 경우, Revision 정보의 동일 여부를 판단하는 제1-2 분석 비교단계(S220), 상기 제1-1 분석 비교단계(S210)의 판단 결과에 따라 동일하지 않을 경우, 상기 신규 BOM에 Synthetic No. 정보의 포함 여부를 판단하는 제1-3 분석 비교단계(S230), 상기 제1-3 분석 비교단계(S230)의 판단 결과에 따라 포함되어 있을 경우, Synthetic No. 정보의 동일 여부를 판단하는 제1-4 분석 비교단계(S240), 상기 제1-4 분석 비교단계(S240)의 판단 결과에 따라 동일하지 않을 경우, Revision 정보의 동일 여부를 판단하는 제1-5 분석 비교단계(S250)를 포함하되, 상기 제1-2 분석 비교단계(S220)의 판단 결과에 따라 동일할 경우, 상기 공통 데이터로 구분하고, 상기 제1-2 분석 비교단계(S220)의 판단 결과에 따라 동일하지 않을 경우, 추가 데이터로 구분하고, 상기 제1-3 분석 비교단계(S230)의 판단 결과에 따라 포함되어 있지 않을 경우, 변경 데이터로 구분하고, 상기 제1-4 분석 비교단계(S240)의 판단 결과에 따라 동일할 경우, 공통 데이터로 구분하고, 상기 제1-5 분석 비교단계(S250)의 판단 결과에 따라 동일할 경우, 공통 데이터로 구분하고, 상기 제1-5 분석 비교단계(S250)의 판단 결과에 따라 동일하지 않을 경우, 추가 데이터로 구분하는 것이 바람직하다.Furthermore, in the first analysis and comparison step (S200), P/N (Part Number) information, Revision information, and Synthetic No. of the basic information included in the analyzed existing BOM and the new BOM. The same according to the determination result of the 1-1 analysis and comparison step (S210) and the 1-1 analysis and comparison step (S210) of determining whether P/N information is identical by using at least one selected from among information If the revision information is not the same according to the determination result of the 1-2 analysis and comparison step (S220) and the 1-1 analysis and comparison step (S210) of determining whether the revision information is identical, the Synthetic No. If the information is included according to the determination result of the 1-3 analysis comparison step (S230) and the 1-3 analysis comparison step (S230) of determining whether the information is included, the Synthetic No. If the information is not the same according to the determination result of the 1-4 analysis comparison step (S240) and the 1-4 analysis comparison step (S240), the first to determine whether the revision information is the same Including 5 analysis and comparison step (S250), if the same according to the determination result of the 1-2 analysis and comparison step (S220), is classified as the common data, and the 1-2 analysis and comparison step (S220) If it is not the same according to the determination result, it is classified as additional data, and if it is not included according to the determination result of the 1-3 analysis comparison step (S230), it is classified as changed data, and the 1-4 analysis comparison If it is the same according to the determination result of step S240, it is classified as common data, and if it is the same according to the determination result of the analysis and comparison step 1-5 (S250), it is classified as common data. If it is not the same according to the determination result of the analysis comparison step (S250), it is preferable to classify it as additional data.

더 나아가, 상기 제2 분석 비교단계(S400)는 구분한 각각의 BOM에 포함되어 있는 고유 데이터들 중 P/N(Part Number) 정보와 상위도면 정보를 이용하여, 상기 P/N 정보를 이루고 있는 적어도 6개 이상의 숫자들 중 기설정된 개수 이상의 숫자가 일치하는지 판단하는 제2-1 분석 비교단계(S410), 상기 제2-1 분석 비교단계(S410)의 판단 결과에 따라 일치할 경우, 상위도면 정보의 동일 여부를 판단하는 제2-2 분석 비교단계(S420), 상기 제2-1 분석 비교단계(S410)의 판단 결과에 따라 일치하지 않을 경우, 상위도면 정보의 동일 여부를 판단하는 제2-3 분석 비교단계(S430)를 포함하되, 상기 제2-2 분석 비교단계(S420)의 판단 결과에 따라 동일할 경우, 변경 데이터로 구분하고, 상기 제2-2 분석 비교단계(S420)의 판단 결과에 따라 동일하지 않을 경우, 추가 데이터로 구분하고, 상기 제2-3 분석 비교단계(S430)의 판단 결과에 따라 동일할 경우, 변경 데이터로 구분하고, 상기 제2-3 분석 비교단계(S430)의 판단 결과에 따라 동일하지 않을 경우, 상기 데이터 입력단계(S100)에 의해 입력받은 상기 신규 BOM의 데이터 유효성 검토를 수행하는 것이 바람직하다.Furthermore, in the second analysis and comparison step (S400), the P/N information is formed by using P/N (Part Number) information and upper drawing information among the unique data included in each classified BOM. 2-1 analysis and comparison step (S410) of determining whether or not more than a preset number of at least six or more numbers coincide with each other according to the determination result of the 2-1 analysis and comparison step (S410), the upper drawing The second analysis and comparison step (S420) of determining whether the information is the same, and a second determination of whether the upper drawing information is the same if they do not match according to the determination result of the 2-1 analysis and comparison step (S410). -3 analysis and comparison step (S430), but if the same according to the determination result of the 2-2 analysis and comparison step (S420), it is classified as changed data, and the 2-2 analysis and comparison step (S420) If it is not identical according to the determination result, it is classified as additional data, if it is the same according to the determination result of the 2-3 analysis and comparison step (S430), it is classified as changed data, and the 2-3 analysis and comparison step ( If it is not the same according to the determination result of S430), it is preferable to perform a data validity review of the new BOM received in the data input step S100.

상기와 같은 구성에 의한 본 발명의 BOM 비교 분석 시스템 및 그 방법은 설계자(Manufacturing engineer)가 생산(수행)하고자 하는 제품이 어떠한 부품 등을 통해 구성되는지에 대해 작성한 구성명세서인 EBOM(Engineering BOM)을 토대로 이를 변형하여 생산(제조)공정 및 조립공정의 순서를 반영한 MBOM(Manufacturing BOM)을 도출하는 과정에서, 발생할 수 있는 오류 등을 신속하고 정확하게 도출할 수 있는 장점이 있다.The BOM comparison and analysis system of the present invention and its method according to the configuration as described above include an Engineering BOM (EBOM), which is a configuration specification written by which parts, etc., a product intended to be produced (performed) by a designer. In the process of deriving MBOM (Manufacturing BOM) reflecting the order of the production (manufacturing) process and assembly process by transforming it based on this, it has the advantage of being able to quickly and accurately derive errors that may occur.

또한, 실제 생산(제조)공정 및 조립공정을 수행하는 과정에서, 공정상의 문제나 부품의 원가 절감 등을 위해 MBOM이 변경될 경우, 기존에 저장되어 있는 EBOM 또는 MBOM을 토대로 변경된 MBOM의 '수정 부분'을 신속하고 정확하게 도출할 수 있어, 작업자의 불필요한 업무를 줄일 수 있으며 BOM의 오류로 인한 실패 비용 역시 감소시킬 수 있는 장점이 있다.In addition, in the process of performing the actual production (manufacturing) process and assembly process, if the MBOM is changed for process problems or parts cost reduction, the'modified part of the MBOM changed based on the previously stored EBOM or MBOM. It has the advantage of being able to quickly and accurately derive', reducing unnecessary work of workers and reducing the cost of failure due to errors in the BOM.

뿐만 아니라, 버전 업데이트 등으로 인한 EBOM이 변경될 경우, 기존에 저장되어 있는 EBOM과 변경된 EBOM같의 '수정 부분' 또는 '추가 부분'을 신속하고 정확하게 도출할 수 있어, 버전 업데이트가 반영된 MBOM을 신속하게 도출하고 이에 따른 생산공정 및 조립공정이 정확하게 이루어질 수 있는 장점이 있다.In addition, when the EBOM is changed due to version update, etc., it is possible to quickly and accurately derive the'modified part' or'additional part' such as the previously saved EBOM and the changed EBOM. There is an advantage in that the production process and assembly process can be accurately derived accordingly.

더불어, 본 발명의 BOM 비교 분석 시스템 및 그 방법을 통해서 입력되는 BOM을 동일한 FORMAT으로 변환하여 출력할 수 있어 실제 업무 진행 시, 유관부서 간의 업무 효율을 증진시킬 수 있는 장점이 있다.In addition, since the BOM comparison and analysis system of the present invention and the BOM inputted through the method can be converted into the same format and outputted, there is an advantage of improving work efficiency between related departments during actual work.

도 1은 본 발명의 일 실시예에 따른 BOM 비교 분석 시스템의 구성을 나타낸 도면이다.
도 2는 본 발명의 일 실시예에 따른 BOM 비교 분석 방법의 단계를 나타낸 순서도이다.
도 3 및 도 4는 본 발명의 일 실시예에 따른 BOM 비교 분석 방법의 세부 단계를 나타낸 순서도이다.
1 is a diagram showing the configuration of a BOM comparison and analysis system according to an embodiment of the present invention.
2 is a flow chart showing steps of a method for comparing and analyzing a BOM according to an embodiment of the present invention.
3 and 4 are flowcharts illustrating detailed steps of a method for comparing and analyzing a BOM according to an embodiment of the present invention.

이하 첨부한 도면들을 참조하여 본 발명의 BOM 비교 분석 시스템 및 그 방법을 상세히 설명한다. 다음에 소개되는 도면들은 당업자에게 본 발명의 사상이 충분히 전달될 수 있도록 하기 위해 예로서 제공되는 것이다. 따라서, 본 발명은 이하 제시되는 도면들에 한정되지 않고 다른 형태로 구체화될 수도 있다. 또한, 명세서 전반에 걸쳐서 동일한 참조번호들은 동일한 구성요소들을 나타낸다.Hereinafter, a BOM comparison and analysis system and method of the present invention will be described in detail with reference to the accompanying drawings. The drawings introduced below are provided as examples in order to sufficiently convey the spirit of the present invention to those skilled in the art. Accordingly, the present invention is not limited to the drawings presented below and may be embodied in other forms. In addition, the same reference numbers throughout the specification indicate the same elements.

이 때, 사용되는 기술 용어 및 과학 용어에 있어서 다른 정의가 없다면, 이 발명이 속하는 기술 분야에서 통상의 지식을 가진 자가 통상적으로 이해하고 있는 의미를 가지며, 하기의 설명 및 첨부 도면에서 본 발명의 요지를 불필요하게 흐릴 수 있는 공지 기능 및 구성에 대한 설명은 생략한다.In this case, unless there are other definitions in the technical terms and scientific terms used, they have the meanings commonly understood by those of ordinary skill in the art to which this invention belongs, and the gist of the present invention in the following description and accompanying drawings A description of known functions and configurations that may unnecessarily obscure will be omitted.

더불어, 시스템은 필요한 기능을 수행하기 위하여 조직화되고 규칙적으로 상호 작용하는 장치, 기구 및 수단 등을 포함하는 구성 요소들의 집합을 의미한다.In addition, the system refers to a set of components including devices, devices, and means that are organized and regularly interact to perform a required function.

본 발명의 일 실시예에 따른 BOM 비교 분석 시스템 및 그 방법은 실제 생산(제조)공정 및 조립공정이 수행되는 과정에서, EBOM(Engineering BOM)과 MBOM(Manufacturing BOM)이 변경될 수 있는 경우들을 비교 분석하여, BOM 간의 차이점을 신속하고 정확하게 도출할 수 있는 BOM 비교 분석 시스템 및 그 방법에 관한 것이다.The BOM comparison analysis system and its method according to an embodiment of the present invention compare cases in which EBOM (Engineering BOM) and MBOM (Manufacturing BOM) may be changed during the actual production (manufacturing) process and assembly process. The present invention relates to a system and method for comparing and analyzing a BOM that can quickly and accurately derive differences between BOMs by analyzing them.

상세하게는, 첫 번째 경우는, P/N(Part Number) 정보에 Synthetic No. 정보가 사용되거나, REVISON이 적용된 경우, 또는, 생산에 필요한 부자재 등의 요소가 추가되거나, 설계 변경으로 인해 P/N 정보가 변경/삭제/추가된 경우에는 EBOM과 MBOM 간의 상이한 부분이 나타날 수 있으며,Specifically, in the first case, the Synthetic No. in P/N (Part Number) information. When information is used, REVISON is applied, or when elements such as subsidiary materials necessary for production are added, or P/N information is changed/deleted/added due to a design change, different parts between EBOM and MBOM may appear. ,

두 번재 경우는, REVION이 적용되거나, 설계 변경으로 인해 P/N 정보가 변경/삭제/추가된 경우에는 기존에 저장되어 있는 EBOM과 신규 EBOM 간의 상이한 부분이 나타날 수 있으며,In the second case, when REVION is applied or P/N information is changed/deleted/added due to a design change, a different part between the previously saved EBOM and the new EBOM may appear.

세 번째의 경우는, P/N 정보에 Synthetic No. 정보가 변경되거나, REVISON이 적용된 경우, 또는, 생산에 필요한 부자재 등의 요소가 추가되거나, 설계 변경으로 인해 P/N 정보가 변경/삭제/추가된 경우에는 기존에 저장되어 있는 MBOM과 신규 MBOM 간의 상이한 부분이 나타날 수 있음을 적용하여, BOM 간의 비교 분석을 통해서 차이점을 신속하고 정확하게 도출할 수 있다.In the third case, the Synthetic No. When information is changed, when REVISON is applied, or when elements such as subsidiary materials necessary for production are added, or P/N information is changed/deleted/added due to a design change, the existing MBOM and the new MBOM are By applying that different parts may appear, differences can be quickly and accurately derived through comparative analysis between BOMs.

도 1은 본 발명의 일 실시예에 따른 BOM 비교 분석 시스템을 나타낸 구성도로서, 도 1을 참조로 본 발명의 일 실시예에 따른 BOM 비교 분석 시스템을 상세히 설명한다.1 is a block diagram showing a system for comparing and analyzing a BOM according to an exemplary embodiment of the present invention. Referring to FIG. 1, a system for comparing and analyzing a BOM according to an exemplary embodiment of the present invention will be described in detail.

본 발명의 일 실시예에 따른 BOM 비교 분석 시스템은 미리 저장되어 있는 기존 BOM과 새롭게 입력되는 신규 BOM 간의 차이점을 분석하기 위한 시스템으로서, 도 1에 도시된 바와 같이, 데이터 입력부(100), 기초 분석부(200), 고유 데이터 분석부(300), 상세 분석부(400), 메모리부(500) 및 출력부(600)를 포함하여 구성되는 것이 바람직하다.The BOM comparison and analysis system according to an embodiment of the present invention is a system for analyzing differences between an existing BOM stored in advance and a new BOM that is newly input. As shown in FIG. 1, a data input unit 100, a basic analysis It is preferable to include a unit 200, a unique data analysis unit 300, a detailed analysis unit 400, a memory unit 500, and an output unit 600.

각각의 구성들, 즉, 상기 데이터 입력부(100), 기초 분석부(200), 고유 데이터 분석부(300), 상세 분석부(400), 메모리부(500) 및 출력부(600)는 하나의 MCU를 통해서 제어되는 단말수단을 통해서 동작하는 것이 바람직하나, 이는 본 발명의 일 실시예에 불과하며, 경우에 따라 유선 또는 무선 네트워크를 통해서 연결되는 각각의 MCU를 통해서 제어되는 단말수단들을 통해서 동작할 수도 있다.Each of the components, that is, the data input unit 100, the basic analysis unit 200, the unique data analysis unit 300, the detailed analysis unit 400, the memory unit 500, and the output unit 600 It is preferable to operate through terminal means controlled through the MCU, but this is only an embodiment of the present invention, and in some cases, operation through terminal means controlled through each MCU connected through a wired or wireless network. May be.

본 발명의 일 실시예에 따른 BOM 비교 분석 시스템은 비교 분석하고자 하는 상기 기존 BOM과 신규 BOM을 비교 분석에 앞서서, 데이터의 포맷을 일치시킨 후, 비교 분석을 수행하는 것이 바람직하다.In the BOM comparison and analysis system according to an embodiment of the present invention, it is preferable to perform the comparative analysis after matching the format of the data before the comparison analysis between the existing BOM and the new BOM to be compared and analyzed.

이러한 데이터의 포맷 일치를 통해서, 각각의 구성에서 상기 기존 BOM과 신규 BOM을 신속하고 정확하게 비교 분석할 수 있을 뿐 아니라, 비교 분석에 대한 결과값 역시 일치한 포맷을 기준으로 나오기 때문에 관리자(설계자, 작업자 등)가 용이하게 확인할 수 있는 장점이 있다.By matching the format of these data, not only can the existing BOM and the new BOM in each configuration be compared and analyzed quickly and accurately, but the result of the comparison analysis is also displayed based on the same format, so the manager (designer, operator Etc.) has the advantage that can be easily identified.

더불어, 상술한 바와 같이, 다양한 경우에서의 BOM 간의 비교 분석을 통해서 차이점을 신속하고 정확하게 도출하기 위하여, 상기 기존 BOM과 신규 BOM은 EBOM 또는 MBOM 정보 중 입력되는 BOM으로 구성되는 것이 바람직하며, 어느 하나의 정보 형태로 한정하는 것은 아니다.In addition, as described above, in order to quickly and accurately derive differences through comparative analysis between BOMs in various cases, the existing BOM and the new BOM are preferably composed of a BOM that is input among EBOM or MBOM information. It is not limited to the type of information.

다시 말하자면, 상기 기존 BOM이 EBOM이라 할지라도, 상기 신규 BOM으로 MBOM이 입력될 수 있으며, 이러한 경우에도 신속하게 비교 분석을 수행할 수 있다.In other words, even if the existing BOM is EBOM, MBOM can be input as the new BOM, and even in this case, comparative analysis can be performed quickly.

각 구성에 대해서 자세히 알아보자면,To learn more about each configuration,

상기 데이터 입력부(100)는 적어도 하나의 기존 BOM이 미리 저장되어 있으며, 외부의 관리자(설계자, 작업자 등)로부터 적어도 하나의 신규 BOM이 입력되는 것이 바람직하다.It is preferable that at least one existing BOM is stored in the data input unit 100 in advance, and at least one new BOM is input from an external manager (designer, worker, etc.).

상기 데이터 입력부(100)는 별도의 입력수단을 포함하여 구성되는 것이 바람직하며, 외부의 관리자로부터 하나 이상의 BOM을 동시에 입력받을 수 있으나, 이 경우, 먼저 입력된 BOM을 기존 BOM으로, 나중에 입력된 BOM을 신규 BOM으로 설정하는 것이 바람직하다.The data input unit 100 is preferably configured to include a separate input means, and one or more BOMs can be simultaneously input from an external manager. In this case, the previously input BOM is used as the existing BOM, and the later input BOM It is desirable to set up as a new BOM.

상기 기초 분석부(200)는 상기 데이터 입력부(100)로부터 상기 기존 BOM과 신규 BOM을 전달받아, 각각의 BOM, 즉, 상기 기존 BOM과 신규 BOM에 포함되어 있는 각각의 기초정보들을 분석하는 것이 바람직하다.The basic analysis unit 200 receives the existing BOM and the new BOM from the data input unit 100, and analyzes each of the BOMs, that is, each basic information included in the existing and new BOMs. Do.

이 때, 분석하는 기초정보들로는 P/N(Part Number) 정보, Revision 정보 및 Synthetic No. 정보를 포함하여 분석하는 것이 가장 바람직하다.At this time, the basic information to be analyzed includes P/N (Part Number) information, Revision information, and Synthetic No. It is most desirable to include the information and analyze it.

상기 기초 분석부(200)는 분석한 상기 기초정보들을 비교하여, 공용 데이터, 추가 데이터 및 변경 데이터로 구분, 다시 말하자면, 상기 기존 BOM을 기준으로 새롭게 입력된 상기 신규 BOM이 공용 데이터인지, 추가 데이터인지 또는 변경 데이터인지 추출하는 것이 바람직하다.The basic analysis unit 200 compares the analyzed basic information and divides it into common data, additional data, and changed data, that is, whether the newly inputted new BOM based on the existing BOM is public data or additional data. It is desirable to extract whether it is cognitive or altered data.

이 때, 상기 공용 데이터란, 기존 데이터와 변경사항 없는 동일한 데이터를 의미하며, 상기 추가 데이터란, 기존 데이터와 큰 맥락은 동일하나 업그레이드 등으로 인한 변경된 데이터를 의미하며, 상기 변경 데이터란, 기존 데이터 대비 새롭게 생기거나, 없어진 즉, 삭제된 데이터를 의미한다.In this case, the public data refers to the same data as existing data and no changes, and the additional data refers to data that has the same big context as the existing data but has been changed due to upgrade, etc., and the changed data refers to the existing data. Contrast This means data that is newly created or lost, that is, deleted data.

즉, 상기 기초 분석부(200)는 분석한 상기 기초정보들 중 상기 P/N 정보, Revision 정보 및 Synthetic No. 정보를 이용하여, 상기 기존 BOM과 신규 BOM 간의 동일한 정보의 존재 여부를 비교 분석하여, 상기 공통 데이터, 추가 데이터 및 변경 데이터로 구분할 수 있다.That is, the basic analysis unit 200 includes the P/N information, revision information, and Synthetic No. of the analyzed basic information. Using the information, it is possible to compare and analyze whether the same information exists between the existing BOM and the new BOM, and classify it into the common data, additional data, and change data.

상세하게는, 상기 기초 분석부(200)는 상기 신규 BOM의 데이터가 상기 기존 BOM의 데이터와 비교하여, 상기 P/N 정보가 동일하면서 상기 Revision 정보가 동일할 경우에는 상기 공통 데이터로 구분하는 것이 바람직하며,Specifically, the basic analysis unit 200 compares the data of the new BOM with the data of the existing BOM, and separates the data into the common data when the P/N information is the same and the revision information is the same. Preferred,

상기 P/N 정보는 동일하나 상기 Revision 정보가 상이할 경우에는 상기 추가 데이터로 구분하는 것이 바람직하며,If the P/N information is the same but the revision information is different, it is preferable to classify it as the additional data,

상기 P/N 정보가 동일하지 않으나 상기 Synthetic No. 정보가 동일할 경우에는 상기 공통 데이터로 구분하는 것이 바람직하며,The P/N information is not the same, but the Synthetic No. If the information is the same, it is preferable to classify it with the common data,

상기 P/N 정보가 동일하지 않으며 상기 Synthetic No. 정보 역시 동일하지 않으나, 상기 revision 정보가 동일할 경우에는 상기 공통 데이터로 구분하는 것이 바람직하며,The P/N information is not the same and the Synthetic No. Information is also not the same, but if the revision information is the same, it is preferable to classify it as the common data,

상기 P/N 정보가 동일하지 않으며 상기 Synthetic No. 정보 역시 동일하지 않고 상기 revision 정보 역시 동일하지 않을 경우에는 상기 추가 데이터로 구분하는 것이 바람직하며,The P/N information is not the same and the Synthetic No. If the information is also not the same and the revision information is not the same, it is preferable to divide it into the additional data,

상기 P/N 정보가 동일하지 않으며 상기 Synthetic No. 정보 조차 포함하고 있지 않을 경우에는 상기 변경 데이터로 구분하는 것이 바람직하다.The P/N information is not the same and the Synthetic No. If it does not even contain information, it is preferable to classify it with the change data.

이 때, 상기 기초 분석부(200)를 통해서 상기 변경 데이터로 구분될 경우에는, 상기 고유 데이터 분석부(300)와 상기 상세 분석부(400)에서 다시 한번 상세 분석을 수행하는 것이 바람직하다.In this case, when the change data is classified through the basic analysis unit 200, it is preferable to perform detailed analysis once again in the unique data analysis unit 300 and the detailed analysis unit 400.

상기 고유 데이터 분석부(300)는 상기 데이터 입력부(100)로부터 상기 기존 BOM과 신규 BOM을 전달받아, 각각의 BOM, 즉, 상기 기존 BOM과 신규 BOM 각각에 포함되어 있는 기초 정보들을 분석하여, 분석한 상기 기초정보들을 비교하여 각각의 BOM에만 포함되어 있는 고유 데이터를 추출하는 것이 바람직하다.The unique data analysis unit 300 receives the existing BOM and the new BOM from the data input unit 100, analyzes each of the BOMs, that is, basic information included in each of the existing and new BOMs, and analyzes It is preferable to compare the basic information and extract unique data included only in each BOM.

즉, 상기 고유 데이터 분석부(300)에서 분석을 수행하는 상기 신규 BOM은 상기 기초 분석부(200)에서 상기 변경 데이터로 구분하였기 때문에, 기존 데이터 대비 새롭게 생기거나, 없어진 즉, 삭제된 데이터이다. 그렇기 때문에, 각각의 BOM에만 존재하는 고유 데이터를 추출하는 것이 바람직하다.That is, the new BOM, which is analyzed by the unique data analysis unit 300, is data that is newly created or disappeared, that is, deleted, compared to existing data, since the basic analysis unit 200 has classified it as the changed data. Therefore, it is desirable to extract unique data that exists only in each BOM.

상기 상세 분석부(400)는 상기 고유 데이터 분석부(300)에서 추출한 각각의 BOM의 고유 데이터들을 비교하여 추가 데이터 및 변경 데이터로 다시 한번 재구분하는 것이 바람직하다.It is preferable that the detailed analysis unit 400 compares the unique data of each of the BOMs extracted by the unique data analysis unit 300 and reclassifies them into additional data and change data.

다시 말하자면, 상기 상세 분석부(400)는 상기 고유 데이터 분석부(300)에서 분석을 수행한 각각의 BOM의 상기 고유 데이터들 중 P/N 정보와 상위도면 정보를 이용하여, 상기 기존 BOM과 신규 BOM 간의 차이를 상세 비교하여, 상기 추가 데이터 및 변경 데이터로 재구분하는 것이 바람직하다.In other words, the detailed analysis unit 400 uses P/N information and upper drawing information among the unique data of each BOM analyzed by the unique data analysis unit 300, It is preferable to compare the differences between the BOMs in detail and reclassify them into the additional data and change data.

상세하게는, 상기 기존 BOM의 P/N 정보와 상기 신규 BOM의 P/N 정보는 상이한 고유 데이터이기 때문에, 동일 여부를 판단하는 것이 아니라, 미리 설정된 개수 이상 일치하는지, 즉, 유사한지 판단하여, 상기 P/N 정보가 유사하면서 상기 상위도면 정보가 동일할 경우에는 상기 변경 데이터로 구분하는 것이 바람직하며,In detail, since the P/N information of the existing BOM and the P/N information of the new BOM are different unique data, it is not determined whether they are identical, but whether they match more than a preset number, that is, whether they are similar, When the P/N information is similar and the upper drawing information is the same, it is preferable to classify it as the change data,

상기 P/N 정보가 유사하나 상기 상위도면 정보가 동일하지 않을 경우에는 상기 추가 데이터로 구분하는 것이 바람직하며,If the P/N information is similar but the upper-level drawing information is not the same, it is preferable to classify it as the additional data,

상기 P/N 정보가 유사하지 않으나 상기 상위도면 정보가 동일할 경우에는 상기 변경 데이터로 구분하는 것이 바람직하며,If the P/N information is not similar but the upper drawing information is the same, it is preferable to classify it as the change data,

상기 P/N 정보가 유사하지 않으며 상기 상위도면 정보 조차 동일하지 않을 경우에는 해당 데이터, 즉, 해당하는 상기 신규 BOM의 데이터 유효성 검토를 수행하는 것이 바람직하다.When the P/N information is not similar and even the upper drawing information is not the same, it is preferable to perform a data validity review of the corresponding data, that is, the corresponding new BOM.

이 때, 데이터 유효성 검토는 유효성 검증부(미도시)에서 수행하는 것이 바람직하며, 상기 유효성 검증부 역시 하나의 MCU 또는 각각의 MCU에 구성되어 동작을 수행하는 것이 가장 바람직하다.In this case, it is preferable to perform data validity review by a validity verification unit (not shown), and most preferably, the validity verification unit is also configured in one MCU or each MCU to perform an operation.

상기 메모리부(500)는 상기 공통 데이터, 추가 데이터 및 변경 데이터들을 전달받아, 각각 데이터베이스화하여 저장 및 관리하는 것이 바람직하다.It is preferable that the memory unit 500 receives the common data, additional data, and change data, and stores and manages each database.

상세하게는, 도 1에 도시된 바와 같이, 상기 메모리부(500)는 공통 저장부(510), 추가 저장부(520) 및 변경 저장부(530)를 포함하여 구성되는 것이 바람직하며,In detail, as shown in FIG. 1, the memory unit 500 is preferably configured to include a common storage unit 510, an additional storage unit 520, and a change storage unit 530,

상기 공통 저장부(510)는 상기 공통 데이터를 저장 및 관리하는 것이 바람직하며, 상기 추가 저장부(520)는 상기 추가 데이터를 저장 및 관리하는 것이 바람직하고, 상기 변경 저장부(530)는 상기 변경 데이터를 저장 및 관리하는 것이 바람직하다.The common storage unit 510 preferably stores and manages the common data, the additional storage unit 520 preferably stores and manages the additional data, and the change storage unit 530 stores and manages the change It is desirable to store and manage data.

상기 출력부(600)는 외부 관리자의 요청에 따라 상기 메모리부(500)에서 저장하고 있는 데이터들을 전송하는 것이 바람직하다.It is preferable that the output unit 600 transmits the data stored in the memory unit 500 at the request of an external administrator.

이 때, 상기 출력부(600)는 외부 관리자의 요청에 따라 특히, 외부 관리자로부터 입력되는 MBOM의 업데이트 요청에 따라, 상기 추가 저장부(520)와 상기 변경 저장부(530)에서 저장 및 관리하고 있는 상기 추가 데이터와 변경 데이터를 전송하는 것이 바람직하다.At this time, the output unit 600 stores and manages in the additional storage unit 520 and the change storage unit 530 according to the request of an external manager, especially in response to an update request of the MBOM input from the external manager. It is preferable to transmit the additional data and the change data.

이는 상술한 바와 같이, 상기 공통 데이터는 기존 데이터와 변경사항 없는 동일한 데이터이기 때문에 이를 제외한 나머지인 상기 추가 데이터와 변경 데이터를 전송함으로써, 기존 BOM과 신규 BOM 간의 차이점을 신속하게 제공하여, 이를 토대로 외부 관리자가 BOM의 추가/변경 데이터의 수정을 신속하게 진행할 수 있는 장점이 있다.As described above, since the common data is the same data without changes to the existing data, the difference between the existing BOM and the new BOM is quickly provided by transmitting the additional data and the changed data except for this, and based on this There is an advantage that the manager can quickly modify the data to add/change the BOM.

도 2 내지 도 4는 본 발명의 일 실시예에 따른 BOM 비교 분석 방법을 나타낸 순서도로서, 도 2 내지 도 4를 참조로 본 발명의 일 실시예에 따른 BOM 비교 분석 방법을 상세히 설명한다.2 to 4 are flowcharts illustrating a method of comparing and analyzing a BOM according to an exemplary embodiment of the present invention, and a method of comparing and analyzing a BOM according to an exemplary embodiment of the present invention will be described in detail with reference to FIGS. 2 to 4.

본 발명의 일 실시예에 따른 BOM 비교 분석 방법은 미리 저장되어 있는 기존 BOM과 새롭게 입력되는 신규 BOM 간의 차이점을 분석하기 위한 방법으로서, 도 2에 도시된 바와 같이, 데이터 입력단계(S100), 제1 분석 비교단계(S200), 고유 데이터 분석단계(S300), 제2 분석 비교단계(S400) 및 출력단계(S500)로 이루어지는 것이 바람직하다.The BOM comparison and analysis method according to an embodiment of the present invention is a method for analyzing differences between an existing BOM stored in advance and a new BOM that is newly input. As shown in FIG. 2, the data input step (S100), It is preferable that it consists of a 1 analysis comparison step (S200), a unique data analysis step (S300), a second analysis comparison step (S400), and an output step (S500).

상기 데이터 입력단계(S100)는 상기 데이터 입력부(100)에서, 미리 저장되어 있는 상기 기존 BOM과 새롭게 입력되는 상기 신규 BOM을 입력받을 수 있다.In the data input step S100, the data input unit 100 may receive input of the previously stored existing BOM and the newly inputted new BOM.

이 때, 상기 데이터 입력부(100)의 별도의 입력수단을 포함하여 구성되는 것이 바람직하며, 외부의 관리자로부터 하나 이상의 BOM을 동시에 입력받을 수 있으나, 이 경우, 먼저 입력된 BOM을 기존 BOM으로, 나중에 입력된 BOM을 신규 BOM으로 설정하는 것이 바람직하다.In this case, it is preferable to include a separate input means of the data input unit 100, and one or more BOMs can be simultaneously input from an external manager. In this case, the previously input BOM is converted into an existing BOM, and later It is desirable to set the input BOM as a new BOM.

상기 제1 분석 비교단계(S200)는 상기 기초 분석부(200)에서, 상기 데이터 입력단계(S100)에 의해 입력된 상기 기존 BOM과 신규 BOM에 포함되어 있는 기초정보들을 각각 분석하고, 상기 기초정보들을 비교하여 공통 데이터, 추가 데이터 및 변경 데이터로 구분할 수 있다.In the first analysis and comparison step (S200), each of the basic information included in the existing BOM and the new BOM input by the basic analysis unit 200 is analyzed, and the basic information They can be compared and classified into common data, additional data and changed data.

이 때, 분석하는 기초정보들로는 P/N(Part Number) 정보, Revision 정보 및 Synthetic No. 정보를 포함하여 분석하는 것이 가장 바람직하다.At this time, the basic information to be analyzed includes P/N (Part Number) information, Revision information, and Synthetic No. It is most desirable to include the information and analyze it.

상기 제1 분석 비교단계(S200)는 분석한 상기 기초정보들을 비교하여, 공용 데이터, 추가 데이터 및 변경 데이터로 구분, 다시 말하자면, 상기 기존 BOM을 기준으로 새롭게 입력된 상기 신규 BOM이 공용 데이터인지, 추가 데이터인지 또는 변경 데이터인지 추출하는 것이 바람직하다.In the first analysis and comparison step (S200), the analyzed basic information is compared and classified into common data, additional data and changed data, that is, whether the new BOM newly input based on the existing BOM is public data, It is desirable to extract whether it is additional data or change data.

이 때, 상기 공용 데이터란, 기존 데이터와 변경사항 없는 동일한 데이터를 의미하며, 상기 추가 데이터란, 기존 데이터와 큰 맥락은 동일하나 업그레이드 등으로 인한 변경된 데이터를 의미하며, 상기 변경 데이터란, 기존 데이터 대비 새롭게 생기거나, 없어진 즉, 삭제된 데이터를 의미한다.In this case, the public data refers to the same data as existing data and no changes, and the additional data refers to data that has the same big context as the existing data but has been changed due to upgrade, etc., and the changed data refers to the existing data. Contrast This means data that is newly created or lost, that is, deleted data.

즉, 상기 제1 분석 비교단계(S200)는 분석한 상기 기초정보들 중 상기 P/N 정보, Revision 정보 및 Synthetic No. 정보를 이용하여, 상기 기존 BOM과 신규 BOM 간의 동일한 정보의 존재 여부를 비교 분석하여, 상기 공통 데이터, 추가 데이터 및 변경 데이터로 구분할 수 있다.That is, in the first analysis and comparison step (S200), among the analyzed basic information, the P/N information, the revision information, and the Synthetic No. Using the information, it is possible to compare and analyze whether the same information exists between the existing BOM and the new BOM, and classify it into the common data, additional data, and change data.

상세하게는, 상기 제1 분석 비교단계(S200)는 도 3에 도시된 바와 같이, 제1-1 분석 비교단계(S210), 제1-2 분석 비교단계(S220), 제1-3 분석 비교단계(S230), 제1-4 분석 비교단계(S240), 제1-5 분석 비교단계(S250)를 포함하여 구성되는 것이 바람직하다.Specifically, the first analysis and comparison step (S200), as shown in Figure 3, the 1-1 analysis comparison step (S210), the 1-2 analysis comparison step (S220), the 1-3 analysis comparison It is preferable to include a step S230, a 1-4 analysis comparison step S240, and a 1-5 analysis comparison step S250.

상기 제1-1 분석 비교단계(S210)는 상기 기존 BOM과 신규 BOM의 P/N 정보의 동일 여부를 판단할 수 있다.In the 1-1 analysis and comparison step S210, it may be determined whether P/N information of the existing BOM and the new BOM are the same.

상기 제1-2 분석 비교단계(S220)는 상기 제1-1 분석 비교단계(S210)의 판단 결과에 따라 상기 기존 BOM과 신규 BOM의 P/N 정보가 동일할 경우, 상기 기존 BOM과 신규 BOM의 Revision 정보의 동일 여부를 판단할 수 있다.In the 1-2 analysis comparison step (S220), when the P/N information of the existing BOM and the new BOM are the same according to the determination result of the 1-1 analysis comparison step (S210), the existing BOM and the new BOM It is possible to determine whether the revision information of is the same.

상기 제1-3 분석 비교단계(S230)는 상기 제1-1 분석 비교단계(S210)의 판단 결과에 따라 상기 기존 BOM과 신규 BOM의 P/N 정보가 동일하지 않을 경우, 상기 신규 BOM의 Synthetic No. 정보의 포함 여부를 판단할 수 있다.In the 1-3 analysis comparison step (S230), if the P/N information of the existing BOM and the new BOM are not the same according to the determination result of the 1-1 analysis comparison step (S210), the synthetic of the new BOM No. It is possible to determine whether information is included.

상기 제1-4 분석 비교단계(S240)는 상기 제1-3 분석 비교단계(S230)의 판단 결과에 따라 상기 신규 BOM에 Synthetic No. 정보가 포함되어 있을 경우, 상기 기존 BOM과 신규 BOM의 Synthetic No. 정보의 동일 여부를 판단할 수 있다.The 1-4 analysis comparison step (S240) is based on the determination result of the 1-3 analysis comparison step (S230), the Synthetic No. If information is included, the Synthetic No. of the above existing BOM and new BOM. It is possible to determine whether the information is the same.

상기 제1-5 분석 비교단계(S250)는 상기 제1-4 분석 비교단계(S240)의 판단 결과에 따라 상기 기존 BOM과 신규 BOM의 Synthetic No. 정보가 동일하지 않을 경우, 상기 기존 BOM과 신규 BOM의 revision 정보의 동일 여부를 판단할 수 있다.In the 1-5 analysis comparison step (S250), the Synthetic No. of the existing BOM and the new BOM according to the determination result of the 1-4 analysis comparison step (S240). If the information is not the same, it may be determined whether the revision information of the existing BOM and the new BOM are identical.

각각의 분석 비교단계의 결과에 따라, 상기 제1-2 분석 비교단계(S220)의 판단 결과에 따라 상기 기존 BOM과 신규 BOM의 Revision 정보가 동일할 경우, 상기 공통 데이터로 구분할 수 있다.According to the result of each analysis and comparison step, when the revision information of the existing BOM and the new BOM is the same according to the determination result of the 1-2 analysis and comparison step S220, the common data may be classified.

상기 제1-2 분석 비교단계(S220)의 판단 결과에 따라 상기 기존 BOM과 신규 BOM의 Revision 정보가 동일하지 않을 경우, 상기 추가 데이터로 구분할 수 있다.When the revision information of the existing BOM and the new BOM is not the same according to the determination result of the 1-2 analysis and comparison step S220, it may be classified as the additional data.

상기 제1-3 분석 비교단계(S230)의 판단 결과에 따라 상기 신규 BOM에 Synthetic No. 정보가 포함되어 있지 않을 경우, 상기 변경 데이터로 구분할 수 있다.According to the determination result of the 1-3 analysis and comparison step (S230), the Synthetic No. If the information is not included, it can be classified as the change data.

상기 제1-4 분석 비교단계(S240)의 판단 결과에 따라 상기 기존 BOM과 신규 BOM의 Synthetic No. 정보가 동일할 경우, 상기 공통 데이터로 구분할 수 있다.According to the determination result of the 1-4 analysis and comparison step (S240), the Synthetic No. of the existing BOM and the new BOM. If the information is the same, it can be classified as the common data.

상기 제1-5 분석 비교단계(S250)의 판단 결과에 따라 상기 기존 BOM과 신규 BOM의 Revision 정보가 동일하지 않을 경우, 상기 추가 데이터로 구분할 수 있다.If the revision information of the existing BOM and the new BOM is not the same according to the determination result of the 1-5 analysis and comparison step (S250), it may be classified as the additional data.

이 때, 상기 제1 분석 비교단계(S200)에 의해 상기 변경 데이터로 구분될 경우, 다시 말하자면, 상기 기존 BOM과 신규 BOM의 P/N 정보가 동일하지 않으며 상기 신규 BOM에 Synthetic No. 정보가 포함되어 있지 않을 경우, 상기 고유 데이터 분석단계(S300)를 수행하는 것이 바람직하다.At this time, when the change data is classified by the first analysis and comparison step (S200), in other words, the P/N information of the existing BOM and the new BOM are not the same, and the Synthetic No. If the information is not included, it is preferable to perform the unique data analysis step (S300).

상기 고유 데이터 분석단계(S300)는 상기 고유 데이터 분석부(300)에서, 상기 제1 분석 비교단계(S200)에 의해 상기 변경 데이터로 구분될 경우, 상기 기존 BOM과 신규 BOM에 포함되어 있는 기초정보들을 분석하여, 각각의 BOM에만 포함되어 있는 상기 고유 데이터를 추출할 수 있다.In the intrinsic data analysis step (S300), when the intrinsic data analysis unit 300 is divided into the changed data by the first analysis and comparison step (S200), basic information included in the existing BOM and the new BOM By analyzing the data, the unique data included only in each BOM can be extracted.

상세하게는, 상기 고유 데이터 분석단계(S300)는 상기 제1 분석 비교단계(S200)에 의해 상기 변경 데이터로 구분된, 즉, 기존 데이터 대비 새롭게 생기거나, 없어진 즉, 삭제된 데이터들을 이용하여 각각의 BOM에만 존재하는 고유 데이터를 추출하는 것이 바람직하다.In detail, the unique data analysis step (S300) is performed by using the data that are newly created or lost, that is, deleted compared to the existing data, which are divided into the changed data by the first analysis and comparison step (S200). It is desirable to extract the unique data that exists only in the BOM.

상기 제2 분석 비교단계(S400)는 상기 상세 분석부(400)에서, 상기 고유 데이터 분석단계(S300)에서 구분한 각각의 BOM에 포함되어 있는 고유 데이터들 중 P/N 정보와 상위도면 정보를 이용하여 추가 데이터 및 변경 데이터로 재구분할 수 있다.In the second analysis and comparison step (S400), in the detailed analysis unit 400, P/N information and upper drawing information among the unique data included in each of the BOMs classified in the unique data analysis step (S300) are It can be subdivided into additional data and change data.

즉, 상기 제2 분석 비교단계(S400)는 각각의 BOM의 상기 고유 데이터들 중 P/N 정보와 상위도면 정보를 이용하여, 상기 기존 BOM과 신규 BOM 간의 차이를 상세 비교하여, 상기 추가 데이터 및 변경 데이터로 재구분하는 것이 바람직하다.That is, in the second analysis and comparison step (S400), the difference between the existing BOM and the new BOM is compared in detail using P/N information and upper drawing information among the unique data of each BOM, and the additional data and It is advisable to reclassify into change data.

상세하게는, 상기 제2 분석 비교단계(S400)는 도 4에 도시된 바와 같이, 제2-1 분석 비교단계(S410), 제2-2 분석 비교단계(S420), 제2-3 분석 비교단계(S430)를 포함하여 구성되는 것이 바람직하다.Specifically, the second analysis and comparison step (S400), as shown in Figure 4, 2-1 analysis comparison step (S410), 2-2 analysis comparison step (S420), 2-3 analysis comparison It is preferable to be configured including the step (S430).

상기 제2-1 분석 비교단계(S410)는 상기 기존 BOM과 상기 신규 BOM의 P/N 정보를 이루고 있는 적어도 6개 이상의 숫자들 중 미리 설정된 개수 이상의 숫자가 일치하는지 판단할 수 있다.In the 2-1 analysis and comparison step (S410), it may be determined whether or not a preset number or more of at least six or more numbers constituting P/N information of the existing BOM and the new BOM match.

다시 말하자면, 상기 기존 BOM의 P/N 정보와 상기 신규 BOM의 P/N 정보는 상이한 고유 데이터이기 때문에, 동일 여부를 판단하는 것이 아니라, 미리 설정된 개수 이상 일치하는지, 즉, 유사한지 판단할 수 있다.In other words, since the P/N information of the existing BOM and the P/N information of the new BOM are different unique data, it is not determined whether they are identical, but it is possible to determine whether they match more than a preset number, that is, whether they are similar. .

상기 제2-2 분석 비교단계(S420)는 상기 제2-1 분석 비교단계(S410)의 판단 결과에 따라 상기 기존 BOM과 상기 신규 BOM의 P/N 정보가 유사하다고 판단될 경우, 상기 기존 BOM과 상기 신규 BOM의 상위도면 정보의 동일 여부를 판단할 수 있다.When it is determined that the P/N information of the existing BOM and the new BOM are similar according to the determination result of the 2-1 analysis and comparison step (S410), the 2-2 analysis and comparison step (S420) It can be determined whether or not the upper drawing information of the new BOM is the same.

상기 제2-3 분석 비교단계(S430)는 상기 제2-1 분석 비교단계(S410)의 판단 결과에 따라 상기 기존 BOM과 상기 신규 BOM의 P/N 정보가 유사하지 않을 경우, 상기 상위도면 정보의 동일 여부를 판단할 수 있다.In the 2-3rd analysis and comparison step (S430), when the P/N information of the existing BOM and the new BOM are not similar according to the determination result of the 2-1 analysis and comparison step (S410), the upper drawing information It can be determined whether or not is the same.

각각의 분석 비교단계의 결과에 따라, 상기 2-2 분석 비교단계(S420)의 판단 결과에 따라 상기 기존 BOM과 상기 신규 BOM의 상위도면 정보가 동일할 경우, 상기 변경 데이터로 구분할 수 있다.According to the result of each analysis and comparison step, when the upper drawing information of the existing BOM and the new BOM are the same according to the determination result of the 2-2 analysis and comparison step (S420), the changed data may be classified.

상기 제2-2 분석 비교단계(S420)의 판단 결과에 따라 상기 기존 BOM과 상기 신규 BOM의 상위도면 정보가 동일하지 않을 경우, 상기 추가 데이터로 구분할 수 있다.According to the determination result of the 2-2 analysis and comparison step (S420), when the upper drawing information of the existing BOM and the new BOM is not the same, it may be classified as the additional data.

상기 제2-3 분석 비교단계(S430)의 판단 결과에 따라 상기 기존 BOM과 상기 신규 BOM의 상위도면 정보가 동일할 경우, 상기 변경 데이터로 구분할 수 있다.According to the determination result of the 2-3 analysis and comparison step (S430), when the upper drawing information of the existing BOM and the new BOM are the same, it may be classified as the changed data.

상기 제2-3 분석 비교단계(S430)의 판단 결과에 따라 상기 기존 BOM과 상기 신규 BOM의 상위도면 정보가 일치하지 않을 경우, 상기 데이터 입력단계(S100)에 의해 입력받은 상기 신규 BOM의 데이터 유효성 검토를 수행하는 것이 바람직하다.When the upper drawing information of the existing BOM and the new BOM do not match according to the determination result of the 2-3 analysis and comparison step (S430), the validity of the data of the new BOM received by the data input step (S100) It is desirable to conduct a review.

상기 출력단계(S500)는 상기 출력부(600)에서, 상기 제1 분석 비교단계(S200)와 제2 분석 비교단계(S400)에 의해 상기 추가 데이터 및 변경 데이터로 구분한 데이터들을 전달받아 외부로 전송할 수 있다.In the outputting step (S500), the data divided into the additional data and the changed data are received from the output unit 600 by the first analysis and comparison step (S200) and the second analysis and comparison step (S400). Can be transmitted.

이는 상술한 바와 같이, 상기 공통 데이터는 기존 데이터와 변경사항 없는 동일한 데이터이기 때문에 이를 제외한 나머지인 상기 추가 데이터와 변경 데이터를 전송함으로써, 기존 BOM과 신규 BOM 간의 차이점을 신속하게 제공하여, 이를 토대로 외부 관리자가 BOM의 추가/변경 데이터의 수정을 신속하게 진행할 수 있는 장점이 있다.As described above, since the common data is the same data without changes to the existing data, the difference between the existing BOM and the new BOM is quickly provided by transmitting the additional data and the changed data other than the existing data. There is an advantage that the manager can quickly modify the data to add/change the BOM.

이상과 같이 본 발명에서는 구체적인 구성 소자 등과 같은 특정 사항들과 한정된 실시예 도면에 의해 설명되었으나 이는 본 발명의 보다 전반적인 이해를 돕기 위해서 제공된 것 일 뿐, 본 발명은 상기의 일 실시예에 한정되는 것이 아니며, 본 발명이 속하는 분야에서 통상의 지식을 가진 자라면 이러한 기재로부터 다양한 수정 및 변형이 가능하다.As described above, in the present invention, specific matters such as specific components, etc. and limited embodiments have been described, but this is provided only to aid in a more general understanding of the present invention, and the present invention is limited to the above-described embodiment. It is not, and those of ordinary skill in the field to which the present invention belongs can make various modifications and variations from this description.

따라서, 본 발명의 사상은 설명된 실시예에 국한되어 정해져서는 아니 되며, 후술하는 특허 청구 범위뿐 아니라 이 특허 청구 범위와 균등하거나 등가적 변형이 있는 모든 것들은 본 발명 사상의 범주에 속한다고 할 것이다.Therefore, the spirit of the present invention is limited to the described embodiments and should not be determined, and all things equivalent or equivalent to the claims as well as the claims to be described later belong to the scope of the spirit of the present invention. .

100 : 데이터 입력부
200 : 기초 분석부
300 : 고유 데이터 분석부
400 : 상세 분석부
500 : 메모리부
510 : 공통 저장부 520 : 추가 저장부
530 : 변경 저장부
600 : 출력부
100: data input unit
200: basic analysis unit
300: Unique data analysis unit
400: detailed analysis unit
500: memory unit
510: common storage unit 520: additional storage unit
530: change storage unit
600: output

Claims (8)

기저장되어 있는 기존 BOM(Bill of Material)과 새롭게 입력되는 신규 BOM 간의 차이점을 분석하기 위한 BOM 비교 분석 시스템에 있어서,
적어도 하나의 기존 BOM이 기저장되어 있으며, 외부로부터 적어도 하나의 신규 BOM이 입력되는 데이터 입력부(100);
상기 데이터 입력부(100)로부터 상기 기존 BOM과 신규 BOM을 전달받아, 각각의 BOM에 포함되어 있는 기초정보들을 분석하여, 분석한 상기 기초정보들을 비교하여 공통 데이터, 추가 데이터 및 변경 데이터를 추출하는 기초 분석부(200);
상기 데이터 입력부(100)로부터 상기 기존 BOM과 신규 BOM을 전달받아, 각각의 BOM에 포함되어 있는 기초정보들을 분석하여, 분석한 상기 기초정보들을 비교하여 상기 BOM 각각에만 포함되어 있는 고유 데이터를 추출하는 고유 데이터 분석부(300);
상기 고유 데이터 분석부(300)에서 추출한 각각의 BOM에 포함되어 있는 상기 고유 데이터들을 비교하여, 추가 데이터 및 변경 데이터를 추출하는 상세 분석부(400);
상기 공통 데이터, 추가 데이터 및 변경 데이터들을 전달받아, 각각 데이터베이스화하여 저장 및 관리하는 메모리부(500); 및
외부의 요청에 따라 상기 메모리부(500)에서 저장하고 있는 데이터들을 전송하는 출력부(600);
를 포함하여 구성되며,
상기 기존 BOM, 신규 BOM은
EBOM(Engineering BOM) 정보 또는 MBOM(Manufacturing BOM) 정보를 포함하는 것을 특징으로 하는 BOM 비교 분석 시스템.
In the BOM comparison and analysis system to analyze the difference between the previously stored Bill of Material (BOM) and the newly inputted new BOM,
A data input unit 100 in which at least one existing BOM is previously stored and at least one new BOM is input from the outside;
A basis for receiving the existing BOM and the new BOM from the data input unit 100, analyzing basic information included in each BOM, comparing the analyzed basic information, and extracting common data, additional data, and changed data An analysis unit 200;
Receives the existing BOM and the new BOM from the data input unit 100, analyzes basic information included in each BOM, compares the analyzed basic information, and extracts unique data included only in each of the BOMs. Unique data analysis unit 300;
A detailed analysis unit 400 for comparing the unique data included in each of the BOMs extracted by the unique data analysis unit 300 to extract additional data and changed data;
A memory unit 500 for receiving the common data, additional data, and change data, and storing and managing each database; And
An output unit 600 for transmitting data stored in the memory unit 500 according to an external request;
Consists of including,
The above existing BOM and new BOM are
BOM comparison analysis system comprising EBOM (Engineering BOM) information or MBOM (Manufacturing BOM) information.
제 1항에 있어서,
상기 메모리부(500)는
상기 공통 데이터를 저장 및 관리하는 공통 저장부(510);
상기 추가 데이터를 저장 및 관리하는 추가 저장부(520); 및
상기 변경 데이터를 저장 및 관리하는 변경 저장부(530);
를 포함하여 구성되는 것을 특징으로 하는 BOM 비교 분석 시스템.
The method of claim 1,
The memory unit 500 is
A common storage unit 510 for storing and managing the common data;
An additional storage unit 520 for storing and managing the additional data; And
A change storage unit 530 for storing and managing the change data;
BOM comparison analysis system, characterized in that configured to include.
제 1항에 있어서,
상기 기초 분석부(200)는
분석한 상기 기초정보들 중 P/N(Part Number) 정보, Revision 정보 및 Synthetic No. 정보 중 선택되는 적어도 어느 하나 이상을 이용하여, 상기 기존 BOM과 신규 BOM 간의 동일한 정보의 존재 여부를 비교 분석하여 상기 공통 데이터, 추가 데이터 및 변경 데이터를 추출하는 것을 특징으로 하는 BOM 비교 분석 시스템.
The method of claim 1,
The basic analysis unit 200
Among the analyzed basic information, P/N (Part Number) information, Revision information, and Synthetic No. And extracting the common data, additional data, and changed data by comparing and analyzing the existence of the same information between the existing BOM and the new BOM by using at least one or more selected from the information.
제 1항에 있어서,
상기 상세 분석부(400)는
분석한 상기 고유 데이터들 중 P/N 정보와 상위도면 정보를 이용하여, 상기 기존 BOM과 신규 BOM 간의 차이를 상세 비교하여, 상기 추가 데이터 및 변경 데이터를 추출하는 것을 특징으로 하는 BOM 비교 분석 시스템.
The method of claim 1,
The detailed analysis unit 400
And extracting the additional data and change data by comparing in detail differences between the existing BOM and the new BOM using P/N information and upper drawing information among the analyzed unique data.
제 2항에 있어서,
상기 출력부(600)는
외부로부터 입력되는 MBOM의 업데이트 요청에 따라, 상기 추가 저장부(520)와 변경 저장부(530)에서 저장 및 관리하고 있는 추가 데이터와 변경 데이터를 전달하는 것을 특징으로 하는 BOM 비교 분석 시스템.
The method of claim 2,
The output unit 600 is
In accordance with an update request from the MBOM input from an external source, the additional data and change data stored and managed by the additional storage unit 520 and the change storage unit 530 are transmitted.
기저장되어 있는 기존 BOM(Bill of Material)과 새롭게 입력되는 신규 BOM 간의 차이점을 분석하기 위한 BOM 비교 분석 방법에 있어서,
데이터 입력부에서, 기저장되어 있는 기존 BOM(Bill of Material)과 새롭게 입력되는 신규 BOM을 입력받는 데이터 입력단계(S100);
기초 분석부에서, 상기 데이터 입력단계(S100)에 의해 입력된 상기 기존 BOM과 신규 BOM에 포함되어 있는 기초정보들을 각각 분석하고, 상기 기초정보들을 비교하여 공통 데이터, 추가 데이터 및 변경 데이터로 구분하는 제1 분석 비교단계(S200);
고유 데이터 분석부에서, 상기 제1 분석 비교단계(S200)에 의해 상기 변경 데이터로 구분될 경우, 상기 기존 BOM과 신규 BOM에 포함되어 있는 기초정보들을 분석하여, 각각의 BOM에만 포함되어 있는 고유 데이터를 구분하는 고유 데이터 분석단계(S300);
상세 분석부에서, 상기 고유 데이터 분석단계(S300)에서 구분한 각각의 BOM에 포함되어 있는 고유 데이터들 중 P/N(Part Number) 정보와 상위도면 정보를 이용하여 추가 데이터 및 변경 데이터로 재구분하는 제2 분석 비교단계(S400); 및
출력부에서, 상기 제1 분석 비교단계(S200)와 제2 분석 비교단계(S400)에서 추가 데이터 및 변경 데이터로 구분한 데이터들을 전달받아 외부로 전송하는 출력단계(S500);
로 이루어지되,
유효성 검증부에서, 상기 제2 분석 비교단계(S400)에 의해 상기 고유 데이터들의 데이터 구분이 불가능할 경우, 상기 신규 BOM의 데이터 유효성 검증을 수행하는 것을 특징으로 하는 BOM 비교 분석 방법.
In the BOM comparison and analysis method to analyze the difference between the previously saved Bill of Material (BOM) and the newly inputted new BOM,
In the data input unit, a data input step (S100) of receiving a previously stored bill of material (BOM) and a newly inputted new BOM (S100);
In the basic analysis unit, each of the basic information included in the existing BOM and the new BOM inputted in the data input step (S100) is analyzed, and the basic information is compared and classified into common data, additional data, and changed data. A first analysis and comparison step (S200);
In the unique data analysis unit, when the change data is classified by the first analysis and comparison step (S200), the basic information included in the existing BOM and the new BOM is analyzed, and unique data included only in each BOM Unique data analysis step (S300) to distinguish between;
The detailed analysis unit reclassifies into additional data and changed data by using P/N (Part Number) information and upper drawing information among the unique data included in each BOM divided in the unique data analysis step (S300). A second analysis comparison step (S400); And
An output step (S500) of receiving data classified as additional data and change data in the first analysis and comparison step (S200) and the second analysis and comparison step (S400) and transmitting them to the outside;
Is made of,
When the validity verification unit is unable to classify the data of the unique data by the second analysis and comparison step (S400), the data validation of the new BOM is performed.
제 6항에 있어서,
상기 제1 분석 비교단계(S200)는
분석한 상기 기존 BOM과 신규 BOM에 포함되어 있는 각각의 상기 기초정보들 중 P/N(Part Number) 정보, Revision 정보 및 Synthetic No. 정보 중 선택되는 적어도 어느 하나 이상을 이용하여,
P/N 정보의 동일 여부를 판단하는 제1-1 분석 비교단계(S210);
상기 제1-1 분석 비교단계(S210)의 판단 결과에 따라 동일할 경우, Revision 정보의 동일 여부를 판단하는 제1-2 분석 비교단계(S220);
상기 제1-1 분석 비교단계(S210)의 판단 결과에 따라 동일하지 않을 경우, 상기 신규 BOM에 Synthetic No. 정보의 포함 여부를 판단하는 제1-3 분석 비교단계(S230);
상기 제1-3 분석 비교단계(S230)의 판단 결과에 따라 포함되어 있을 경우, Synthetic No. 정보의 동일 여부를 판단하는 제1-4 분석 비교단계(S240);
상기 제1-4 분석 비교단계(S240)의 판단 결과에 따라 동일하지 않을 경우, Revision 정보의 동일 여부를 판단하는 제1-5 분석 비교단계(S250);
를 포함하되,
상기 제1-2 분석 비교단계(S220)의 판단 결과에 따라 동일할 경우, 상기 공통 데이터로 구분하고,
상기 제1-2 분석 비교단계(S220)의 판단 결과에 따라 동일하지 않을 경우, 추가 데이터로 구분하고,
상기 제1-3 분석 비교단계(S230)의 판단 결과에 따라 포함되어 있지 않을 경우, 변경 데이터로 구분하고,
상기 제1-4 분석 비교단계(S240)의 판단 결과에 따라 동일할 경우, 공통 데이터로 구분하고,
상기 제1-5 분석 비교단계(S250)의 판단 결과에 따라 동일할 경우, 공통 데이터로 구분하고,
상기 제1-5 분석 비교단계(S250)의 판단 결과에 따라 동일하지 않을 경우, 추가 데이터로 구분하는
것을 특징으로 하는 BOM 비교 분석방법.
The method of claim 6,
The first analysis and comparison step (S200)
Among the basic information included in the analyzed existing and new BOM, P/N (Part Number) information, Revision information, and Synthetic No. Using at least one or more selected from the information,
1-1 analysis and comparison step of determining whether the P/N information is identical (S210);
A 1-2 analysis and comparison step (S220) of determining whether revision information is identical if the result is the same according to the determination result of the 1-1 analysis comparison step (S210);
If it is not the same according to the determination result of the 1-1 analysis and comparison step (S210), the Synthetic No. A 1-3 analysis comparison step (S230) of determining whether information is included;
If it is included according to the determination result of the 1-3 analysis and comparison step (S230), Synthetic No. A 1-4 analysis comparison step of determining whether the information is identical (S240);
If not the same according to the determination result of the 1-4 analysis comparison step (S240), the 1-5 analysis comparison step (S250) of determining whether the revision information is the same;
Including,
If they are the same according to the determination result of the 1-2 analysis and comparison step (S220), they are classified as the common data,
If it is not the same according to the determination result of the 1-2 analysis and comparison step (S220), it is classified as additional data,
If it is not included according to the determination result of the 1-3 analysis and comparison step (S230), it is classified as changed data,
If they are the same according to the determination result of the 1-4 analysis comparison step (S240), they are classified as common data,
If they are the same according to the determination result of the 1-5 analysis comparison step (S250), they are classified as common data,
If not the same according to the determination result of the 1-5 analysis comparison step (S250),
BOM comparison analysis method, characterized in that.
제 7항에 있어서,
상기 제2 분석 비교단계(S400)는
구분한 각각의 BOM에 포함되어 있는 고유 데이터들 중 P/N(Part Number) 정보와 상위도면 정보를 이용하여,
상기 P/N 정보를 이루고 있는 적어도 6개 이상의 숫자들 중 기설정된 개수 이상의 숫자가 일치하는지 판단하는 제2-1 분석 비교단계(S410);
상기 제2-1 분석 비교단계(S410)의 판단 결과에 따라 일치할 경우, 상위도면 정보의 동일 여부를 판단하는 제2-2 분석 비교단계(S420);
상기 제2-1 분석 비교단계(S410)의 판단 결과에 따라 일치하지 않을 경우, 상위도면 정보의 동일 여부를 판단하는 제2-3 분석 비교단계(S430);
를 포함하되,
상기 제2-2 분석 비교단계(S420)의 판단 결과에 따라 동일할 경우, 변경 데이터로 구분하고,
상기 제2-2 분석 비교단계(S420)의 판단 결과에 따라 동일하지 않을 경우, 추가 데이터로 구분하고,
상기 제2-3 분석 비교단계(S430)의 판단 결과에 따라 동일할 경우, 변경 데이터로 구분하고,
상기 제2-3 분석 비교단계(S430)의 판단 결과에 따라 동일하지 않을 경우, 상기 데이터 입력단계(S100)에 의해 입력받은 상기 신규 BOM의 데이터 유효성 검토를 수행하는
것을 특징으로 하는 BOM 비교 분석방법.


The method of claim 7,
The second analysis and comparison step (S400)
Using P/N (Part Number) information and upper drawing information among the unique data included in each classified BOM,
A 2-1 analysis and comparison step (S410) of determining whether or not a preset number or more of at least 6 or more numbers constituting the P/N information match;
A second analysis and comparison step (S420) of determining whether or not the upper drawing information is identical if the result of the determination of the second analysis and comparison step (S410) is identical;
A 2-3 analysis and comparison step (S430) of determining whether the upper drawing information is the same when there is no match according to the determination result of the 2-1 analysis comparison step (S410);
Including,
If it is the same according to the determination result of the 2-2 analysis and comparison step (S420), it is classified as changed data,
If it is not the same according to the determination result of the 2-2 analysis and comparison step (S420), it is classified as additional data,
If it is the same according to the determination result of the 2-3 analysis and comparison step (S430), it is classified as changed data,
If not the same according to the determination result of the 2-3 analysis and comparison step (S430), performing a data validity review of the new BOM received by the data input step (S100)
BOM comparison analysis method, characterized in that.


KR1020190015430A 2019-02-11 2019-02-11 Comparative analysis system and method of Bill Of Material KR102239523B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020190015430A KR102239523B1 (en) 2019-02-11 2019-02-11 Comparative analysis system and method of Bill Of Material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020190015430A KR102239523B1 (en) 2019-02-11 2019-02-11 Comparative analysis system and method of Bill Of Material

Publications (2)

Publication Number Publication Date
KR20200097947A true KR20200097947A (en) 2020-08-20
KR102239523B1 KR102239523B1 (en) 2021-04-14

Family

ID=72293131

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020190015430A KR102239523B1 (en) 2019-02-11 2019-02-11 Comparative analysis system and method of Bill Of Material

Country Status (1)

Country Link
KR (1) KR102239523B1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112508520A (en) * 2020-12-08 2021-03-16 安徽巨一科技股份有限公司 Method, system, device and storage medium for rapidly checking bill of material
CN112801621A (en) * 2021-01-30 2021-05-14 深圳捷创电子科技有限公司 BOM bill of material sorting and approving method, system and computer readable storage medium
CN113408989A (en) * 2021-06-29 2021-09-17 奇瑞汽车股份有限公司 Automobile data comparison method and device and computer storage medium
CN113762763A (en) * 2021-09-01 2021-12-07 北京汽车集团越野车有限公司 Engineering change data processing method and device and storage medium
CN114595945A (en) * 2022-02-17 2022-06-07 成都飞机工业(集团)有限责任公司 Manufacturing process-oriented health degree evaluation method for MBOM (moving object model)
CN118071263A (en) * 2024-04-19 2024-05-24 北京谷器数据科技有限公司 Automatic bill of materials changing method, device, electronic equipment and medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018036899A (en) * 2016-08-31 2018-03-08 三菱電機株式会社 Manufacturing bom edition support system, manufacturing bom edition support method, and program
KR101854269B1 (en) * 2016-12-09 2018-05-03 삼성중공업(주) Apparatus and method for providing material information
KR101871300B1 (en) 2011-11-03 2018-06-27 대우조선해양 주식회사 Method for Producing Cutting Drawing of Stainless Steel Section Type and for Abstracting BOM at the Time of Designing Vessels
KR101903082B1 (en) * 2016-11-14 2018-10-02 삼성중공업(주) Apparatus and method for providing material information, and recording medium

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101871300B1 (en) 2011-11-03 2018-06-27 대우조선해양 주식회사 Method for Producing Cutting Drawing of Stainless Steel Section Type and for Abstracting BOM at the Time of Designing Vessels
JP2018036899A (en) * 2016-08-31 2018-03-08 三菱電機株式会社 Manufacturing bom edition support system, manufacturing bom edition support method, and program
KR101903082B1 (en) * 2016-11-14 2018-10-02 삼성중공업(주) Apparatus and method for providing material information, and recording medium
KR101854269B1 (en) * 2016-12-09 2018-05-03 삼성중공업(주) Apparatus and method for providing material information

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112508520A (en) * 2020-12-08 2021-03-16 安徽巨一科技股份有限公司 Method, system, device and storage medium for rapidly checking bill of material
CN112801621A (en) * 2021-01-30 2021-05-14 深圳捷创电子科技有限公司 BOM bill of material sorting and approving method, system and computer readable storage medium
CN113408989A (en) * 2021-06-29 2021-09-17 奇瑞汽车股份有限公司 Automobile data comparison method and device and computer storage medium
CN113408989B (en) * 2021-06-29 2024-04-02 奇瑞汽车股份有限公司 Automobile data comparison method and device and computer storage medium
CN113762763A (en) * 2021-09-01 2021-12-07 北京汽车集团越野车有限公司 Engineering change data processing method and device and storage medium
CN114595945A (en) * 2022-02-17 2022-06-07 成都飞机工业(集团)有限责任公司 Manufacturing process-oriented health degree evaluation method for MBOM (moving object model)
CN114595945B (en) * 2022-02-17 2023-11-10 成都飞机工业(集团)有限责任公司 Manufacturing process-oriented aviation product MBOM health evaluation method
CN118071263A (en) * 2024-04-19 2024-05-24 北京谷器数据科技有限公司 Automatic bill of materials changing method, device, electronic equipment and medium

Also Published As

Publication number Publication date
KR102239523B1 (en) 2021-04-14

Similar Documents

Publication Publication Date Title
KR102239523B1 (en) Comparative analysis system and method of Bill Of Material
US7644055B2 (en) Rule-based database object matching with comparison certainty
US10523502B2 (en) Method and system for configuration of devices of a control system
CN108090073B (en) Configurable bill of material conversion method and device
CN104717085A (en) Log parsing method and device
CN101753619B (en) Method and system for extending service model
CN110941629A (en) Metadata processing method, device, equipment and computer readable storage medium
CN111061733A (en) Data processing method and device, electronic equipment and computer readable storage medium
US20200143369A1 (en) Device for contracting smart contract and method thereof
JP3224375B2 (en) Sheet metal model molding shape recognition method and apparatus, and storage medium storing program of sheet metal model molding shape recognition method
JP2007026379A (en) Individual product design device
CN113918627A (en) Data conversion method, device and readable storage medium
US20030135496A1 (en) Management program, method and apparatus for business process definition
CN103049619A (en) Method for completing chip design integrated functions by forms
US20200334399A1 (en) Design support system, design verification method, and design verification program
KR102045367B1 (en) System and method for feed verification task automation
US8468116B2 (en) Rule creation method and rule creating apparatus
JPWO2009011057A1 (en) Application analysis program, application analysis method, and application analysis apparatus
JP2019101829A (en) Software component management system, computor, and method
CN114153461A (en) Script processing method and device, electronic equipment and storage medium
CN113010489A (en) Data migration method and system
WO2017072872A1 (en) Business program generation assistance system and business program generation assistance method
KR20110009817A (en) Apparatus and method for standard managing data of company name
JP2021068010A (en) Plan generation system construction support device, and plan generation system construction support method
KR102545640B1 (en) Software development system and method of railway vehicle system

Legal Events

Date Code Title Description
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant