KR20200061327A - Bracket for cantilever and cantilever construction method using the bracket - Google Patents

Bracket for cantilever and cantilever construction method using the bracket Download PDF

Info

Publication number
KR20200061327A
KR20200061327A KR1020200057197A KR20200057197A KR20200061327A KR 20200061327 A KR20200061327 A KR 20200061327A KR 1020200057197 A KR1020200057197 A KR 1020200057197A KR 20200057197 A KR20200057197 A KR 20200057197A KR 20200061327 A KR20200061327 A KR 20200061327A
Authority
KR
South Korea
Prior art keywords
cantilever
bracket
girder
fixing
fixed
Prior art date
Application number
KR1020200057197A
Other languages
Korean (ko)
Other versions
KR102361339B1 (en
Inventor
이성원
Original Assignee
주식회사 신원알피씨
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 신원알피씨 filed Critical 주식회사 신원알피씨
Priority to KR1020200057197A priority Critical patent/KR102361339B1/en
Publication of KR20200061327A publication Critical patent/KR20200061327A/en
Application granted granted Critical
Publication of KR102361339B1 publication Critical patent/KR102361339B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/268Composite concrete-metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to a bracket for a cantilever and a cantilever construction method using the same and, more specifically, to a bracket for a cantilever including a support frame, a fixing plate, a guide piece, a pulling means and a supporter, and a cantilever construction method using the bracket for a cantilever, which comprises a cantilever bracket manufacturing step, a cantilever bracket assembly installation step, a welding fixing step, a precast panel placement installation step, a concrete placement and curing step, and a cantilever bracket supporter separation step. Therefore, the bracket can be installed and fixed by freely selecting a position in the longitudinal direction of a girder without the need for anchor work which is the procedure of pre-installing an anchor bolt on the girder. Thus, constructability can be considerably improved with a simplified cantilever construction process, while a supporter can be semi-permanently reused by being separated after the construction of a cantilever, which can lead to a significant reduction in construction costs.

Description

캔틸레버용 브래킷 및 이를 이용한 캔틸레버 시공방법{Bracket for cantilever and cantilever construction method using the bracket}Bracket for cantilever and cantilever construction method using the bracket

본 발명은 캔틸레버용 브래킷 및 이를 이용한 캔틸레버 시공방법에 관한 것으로서, 더욱 상세하게는 지지프레임, 고정플레이트, 가이드 편, 당김수단 및 받침대를 포함하는 캔틸레버용 브래킷 및 캔틸레버용 브래킷 제작단계, 캔틸레버용 브래킷 조립설치단계, 용접고정단계, 프리캐스트 패널 안착 설치단계, 콘크리트 타설 및 양생단계, 캔틸레버용 브래킷의 받침대 분리단계를 포함하는 캔틸레버용 브래킷을 이용한 캔틸레버 시공방법이 적용됨으로써 거더 상에 사전의 앵커볼트에 대한 설치과정인 앵커작업이 요구됨이 없으면서 거더의 길이방향으로 자유롭게 위치를 선정하여 설치고정할 수 있으며, 이를 통하여 캔틸레버 시공공정이 단순화되어 시공성을 현격히 향상시킬 수 있도록 하는 한편, 캔틸레버의 시공 후 받침대를 분리하여 반영구적으로 재사용할 수 있으며, 이에 따라 시공비용을 현격히 절감시킬 수 있도록 한 캔틸레버용 브래킷 및 이를 이용한 캔틸레버 시공방법에 관한 것이다.The present invention relates to a cantilever bracket and a cantilever construction method using the same, and more specifically, a cantilever bracket and a cantilever bracket manufacturing step, including a support frame, a fixing plate, a guide piece, a pulling means and a stand, assembling the cantilever bracket By applying the cantilever construction method using the cantilever bracket, which includes the installation step, the welding fixation step, the precast panel seating installation step, the concrete pouring and curing step, and the cantilever bracket bracket separation step, the anchor bolt for the anchor bolt on the girder is applied. It is possible to freely select and fix the installation position in the longitudinal direction of the girder without the need for anchoring, which is the installation process. Through this, the cantilever construction process is simplified to significantly improve the constructability, while the cantilever is removed after construction. Therefore, it can be reused semi-permanently. Accordingly, the present invention relates to a cantilever bracket and a cantilever construction method using the same, which can significantly reduce construction costs.

일반적인 교량의 구조를 살펴보면 크게 일정 간격으로 설치되는 교각, 상기 교각 사이를 연결하도록 설치되는 거더(girder), 상기 거더 위에 설치되는 슬래브 및 상기 슬래브 양측에 설치되는 캔틸레버(Cantilever)로 이루어진다.Looking at the structure of a general bridge, it is largely composed of a bridge installed at regular intervals, a girder installed to connect the bridges, a slab installed on the girder, and a cantilever installed on both sides of the slab.

상기 종래 캔틸레버의 구조를 살펴보면 대한민국 등록특허 제1101209호(2011.12.26.등록.)에 게재된 바와 같이 상기 거더의 측면에 일정 간격으로 강재 영구받침대를 설치하고, 상기 강재 영구받침대의 끝단을 장선재로 연결하는 한편, 상기 강재 영구받침대와 장선재 위에 프리캐스트 바닥판을 올려 설치한 것이다.Looking at the structure of the conventional cantilever, as shown in Korean Patent Registration No. 1101209 (registered on December 26, 2011.), a steel permanent support is installed at regular intervals on the side of the girder, and the end of the steel permanent support is made of a long wire. On the other hand, the precast floor plate is installed on the steel base and joist.

여기서, 상기 강재 영구받침대는 패널을 올려놓기 위한 장선재의 설치와 작업통로의 하중을 포함하므로 규모가 크고 설치방법상 영구받침대의 처짐 및 교량 바닥판의 구배를 조정할 수 없는 문제점이 있다.Here, since the steel permanent support includes the installation of a joist material for placing the panel and the load of the work passage, there is a problem in that the size of the permanent support is large and the method of installation cannot adjust the deflection of the permanent support and the gradient of the bridge deck.

도 1은 종래의 캔틸레버용 브래킷을 이용한 캔틸레버 시공구조를 도시한 단면예시도이다.1 is an exemplary cross-sectional view showing a cantilever construction structure using a conventional cantilever bracket.

앞선 문제점을 해결하기 위한 수단으로서, 도 1에 도시된 바와 같은 일측 단부가 상기 거더(1) 위에 올려지도록 하면서 상기 일측 단부에는 상기 거더(1)의 상부로 돌출된 앵커 볼트와 체결하도록 체결구(11a)가 형성된 수평 패널(11); 상기 수평 패널(11)의 일측 단부가 거더(1)에 위에 올려진 상태에서 상기 거더(1)의 측면에 밀착하여 지지하도록 상기 수평 패널(11)의 일측 단부측 하부에 형성되는 수직 패널(12); 및 상기 수직패널(12)의 타측과 수평 패널(11)의 하부 사이의 공간에 설치하여 보강력을 증대될 수 있도록 하되, 일측 단면은 상기 수직 패널에 지지되고 상부는 상기 수평 패널을 받쳐주도록 형성된 지지대(13);를 포함하여 구성된 캔틸레버용 브래킷(10)이 제공되어 있다.As a means for solving the above problems, while the one end as shown in Figure 1 is placed on the girder (1) while the fastening to fasten the anchor bolt protruding to the top of the girder (1) at one end. A horizontal panel 11 on which 11a) is formed; The vertical panel 12 formed on one side of the lower end of the horizontal panel 11 to support the horizontal panel 11 in close contact with the side surface of the girder 1 in a state where one end of the horizontal panel 11 is placed on the girder 1. ); And it is installed in the space between the other side of the vertical panel 12 and the lower portion of the horizontal panel 11 to increase the reinforcing force, one side cross-section is supported by the vertical panel and the upper portion is formed to support the horizontal panel Support (13); is provided with a cantilever bracket (10) configured to include.

그러나 전술한 바와 같은 캔틸레버용 브래킷(10)은 상기 수평 패널(11)의 체결구(11a)가 거더(1)의 앵커볼트에 볼팅 체결된 상태에서 수평 패널(11)의 하부에 수직 패널(12)과 지지대(13)가 일체로 형성되어 있기 때문에 캔틸레버의 시공 후에는 수평 패널(11)은 물론 수평 패널(11)의 하부에 일체로 고정된 수직 패널(12) 및 지지대(13) 등을 철거할 수 없는 구조적 단점이 있다.However, as described above, the cantilever bracket 10 has a vertical panel 12 under the horizontal panel 11 in a state where the fastener 11a of the horizontal panel 11 is bolted to the anchor bolt of the girder 1. ) Since the support 13 is integrally formed, after the cantilever is constructed, the horizontal panel 11 as well as the vertical panel 12 and the support 13 integrally fixed to the lower part of the horizontal panel 11 are removed. There are structural disadvantages that cannot be done.

다시 말하면, 전술한 바와 같은 종래의 캔틸레버용 브래킷은 캔틸레버의 시공 후 재활용이 불가능하기 때문에 자원 측면에서 많은 낭비를 초래하는 결점이 있고, 캔틸레버의 시공 비용을 가중시키는 원인이 되며, 시공 후 캔틸레버용 브래킷이 항시 외부로 노출된 상태로 방치되어 있어 부식 등과 관련하여 지속적으로 유지비용이 과다하게 발생하는 등의 문제점이 있었다.In other words, the conventional cantilever bracket as described above has a drawback that causes a lot of waste in terms of resources because it cannot be recycled after construction of the cantilever, and increases the construction cost of the cantilever, and the bracket for cantilevers after construction At this time, there was a problem in that the maintenance cost was excessively caused in relation to corrosion because it was left exposed to the outside at all times.

더욱이, 전술한 바와 같은 종래의 캔틸레버용 브래킷은 거더 상에 사전에 매립된 앵커볼트와 앵커볼트에 체결되는 너트를 통해 거더 상에 설치되는 것으로, 설치를 위하여서는 거더의 제작과정에서 사전에 앵커를 매립하여야 하므로 거더의 제작공정이 길어지게 되어 결론적으로 캔틸레버 시공에 대한 공기가 늦춰지는 문제가 있었다.Moreover, the conventional cantilever bracket as described above is installed on the girder through an anchor bolt previously embedded on the girder and a nut fastened to the anchor bolt, and for installation, an anchor is previously installed in the manufacturing process of the girder. Since the process of manufacturing the girder becomes longer because of the need to be buried, there was a problem in that the air for the cantilever construction was delayed.

아울러, 종래의 캔틸레버용 브래킷은 거더 상에 사전에 매립된 앵커볼트와 앵커볼트에 체결되는 너트를 통해 거더 상에 설치됨에 따라 거더 제작시 기 매립된 앵커볼트 위치와 대응되는 위치에만 설치 가능하므로, 거더의 길이방향으로 설치위치에 대한 일정위치로 국한됨이 없이 자유롭게 조절하여 설치할 수 없는 문제가 있었다.In addition, as the conventional cantilever bracket is installed on the girder through an anchor bolt previously embedded on the girder and a nut fastened to the anchor bolt, it can be installed only at a position corresponding to the previously embedded anchor bolt position when manufacturing the girder. There was a problem that it could not be freely adjusted and installed without being limited to a fixed position relative to the installation position in the longitudinal direction of the girder.

그러므로 거더 상에 사전의 앵커볼트에 대한 설치과정인 앵커작업이 요구됨이 없으면서 거더의 길이방향으로 자유롭게 위치를 선정하여 설치고정할 수 있으며, 이를 통하여 캔틸레버 시공공정이 단순화되어 시공성을 현격히 향상시킬 수 있도록 하는 한편, 캔틸레버의 시공 후 캔틸레버용 브래킷을 분리하여 반영구적으로 재사용할 수 있으며, 이에 따라 시공비용을 현격히 절감시킬 수 있도록 한 캔틸레버용 브래킷 및 그를 이용한 캔틸레버 시공방법에 대한 연구 및 개발이 요구되는 실정이다.Therefore, it is possible to freely select and fix the position in the longitudinal direction of the girder without requiring the anchor work, which is the installation process for the anchor bolt in advance on the girder. Through this, the cantilever construction process is simplified to significantly improve the workability. On the other hand, after the cantilever is installed, the cantilever bracket can be separated and reused semi-permanently. Therefore, research and development of the cantilever bracket and the cantilever construction method using the same can be required to significantly reduce the construction cost. .

대한민국 등록특허 제0727172호 2007.06.04.등록.Registered Korean Patent No. 0721172 2007.06.04. 대한민국 등록특허 제1101209호 2011.12.26.등록.Registered Republic of Korea Patent No. 1101209 2011.12.26. 대한민국 등록특허 제1101204호 2011.12.26.등록.Registered Republic of Korea Patent No. 1101204 December 26, 2011. 대한민국 등록특허 제1699888호 2017.01.19.등록.Registered Republic of Korea Patent No. 1699888 2017.01.19. 대한민국 등록특허 제1765762호 2017.08.01.등록.Republic of Korea Registered Patent No. 1576576 2017.08.01. 대한민국 공개특허 제2017-0107308호 2017.09.25.공개.Republic of Korea Patent Publication No. 2017-0107308 2017.09.25.

상기와 같은 문제점을 해결하기 위하여, 본 발명은 지지프레임, 고정플레이트, 가이드 편, 당김수단 및 받침대를 포함하는 캔틸레버용 브래킷 및 캔틸레버용 브래킷 제작단계, 캔틸레버용 브래킷 조립설치단계, 용접고정단계, 프리캐스트 패널 안착 설치단계, 콘크리트 타설 및 양생단계, 캔틸레버용 브래킷의 받침대 분리단계를 포함하는 캔틸레버용 브래킷을 이용한 캔틸레버 시공방법이 적용됨으로써 거더 상에 사전의 앵커볼트에 대한 설치과정인 앵커작업이 요구됨이 없으면서 거더의 길이방향으로 자유롭게 위치를 선정하여 설치고정할 수 있으며, 이를 통하여 캔틸레버 시공공정이 단순화되어 시공성을 현격히 향상시킬 수 있도록 한 캔틸레버용 브래킷 및 이를 이용한 캔틸레버 시공방법을 제공하는 것을 목적으로 한다.In order to solve the above problems, the present invention is a cantilever bracket and a cantilever bracket manufacturing step including a support frame, a fixed plate, a guide piece, a pulling means and a support, a cantilever bracket assembly installation step, a welding fixing step, a free By applying the cantilever construction method using the cantilever bracket, which includes the cast panel seating installation step, the concrete placing and curing step, and the cantilever bracket stand separation step, the anchor work, which is the installation process for the anchor bolts in advance on the girder, is required. The purpose of the present invention is to provide a cantilever bracket and a cantilever construction method using the same, which can freely select a position in the longitudinal direction of the girder and fix and install the cantilever, thereby simplifying the cantilever construction process and greatly improving the constructability.

본 발명에 따른 기술의 다른 목적은 지지프레임, 고정플레이트, 가이드 편, 당김수단 및 받침대를 포함하는 캔틸레버용 브래킷 및 캔틸레버용 브래킷 제작단계, 캔틸레버용 브래킷 조립설치단계, 용접고정단계, 프리캐스트 패널 안착 설치단계, 콘크리트 타설 및 양생단계, 캔틸레버용 브래킷의 받침대 분리단계를 포함하는 캔틸레버용 브래킷을 이용한 캔틸레버 시공방법이 적용됨으로써 캔틸레버의 시공 후 받침대를 분리하여 반영구적으로 재사용할 수 있으며, 이에 따라 시공비용을 현격히 절감시킬 수 있도록 함에 있다.Another object of the technology according to the present invention is a cantilever bracket and a cantilever bracket manufacturing step including a support frame, a fixing plate, a guide piece, a pulling means and a stand, a cantilever bracket assembly installation step, a welding fixing step, a precast panel seating By applying the cantilever construction method using the cantilever bracket, which includes the installation step, the concrete pouring and curing step, and the cantilever bracket separation step, after the cantilever is installed, the pedestal can be separated and reused semi-permanently, thereby reducing the construction cost. It is aimed at making significant savings.

전술한 목적을 달성하기 위한 본 발명은 다음과 같다. 즉, 본 발명에 따른 캔틸레버용 브래킷은 상면에 일정간격을 가지고 봉 타입의 돌출근이 돌출형성된 교각의 최외측에 배치되는 거더 측부에 외향 돌출토록 설치되어 캔틸레버를 시공하기 위한 캔틸레버용 브래킷에 있어서, 교각의 최외측에 배치된 거더의 상부로 돌출된 돌출근 일 측에 밀착지지되도록, 일정길이를 갖는 'U'자형 프레임 또는 'L'자형 프레임으로 제공되어 수직 부의 길이방향 중앙에 통공이 관통형성되는 지지프레임; 판 상의 플레이트로 제공되어, 일 측 상면의 폭 방향 중앙에 'L'자 형으로 제공되어 수직부 중앙에 통공이 관통형성된 고정브래킷의 하측이 용접고정되고, 일 측 일정길이만큼 거더의 폭 방향 일 측 상면에 밀착 배치되며, 타 측에 2열로 일정간격을 가지고 통공이 관통형성되는 고정플레이트; 고정플레이트의 일 측이 거더의 상부로 돌출된 돌출근 사이에 끼워져 고정될 수 있도록, 장방형 판 형상으로 제공되어 고정플레이트의 일 측 폭 방향 양측으로부터 일단이 고정프레이트 일 측 단 상면에 용접고정되어 고정플레이트 일 측으로부터 외향 일정길이 돌출 배치되는 가이드 편; 고정플레이트를 기준으로 지지프레임이 거더의 돌출근에 밀착 지지된 상태로 체결력을 통해 당김 고정될 수 있도록, 고정프레이트 상에 구비된 고정브래킷의 통공과 지지프레임의 통공을 관통하여 설치되는 고정볼트와 고정볼트의 단부에 체결고정되는 고정너트로 구성된 당김수단; 및 거더의 측부에 외향 돌출토록 일단 측부가 거더의 측부에 밀착되면서 일단 상면 부분이 볼트와 너트를 통해 고정플레이트와 고정설치되며, 캔틸레버의 시공시 프리캐스트 패널이 안착 설치되면서 프리캐스트 패널의 하면이 받쳐지도록 하는 받침대를 포함하여 이루어진다.The present invention for achieving the above object is as follows. That is, the bracket for a cantilever according to the present invention has a predetermined interval on an upper surface and is installed to protrude outwardly on a girder side that is disposed on the outermost side of a pier where a rod-type protruding root is protruded, in a bracket for a cantilever for constructing a cantilever, It is provided as a'U'-shaped frame or'L'-shaped frame having a certain length so as to be closely supported on one side of the protruding muscle protruding to the top of the girder disposed on the outermost side of the pier, through-holes are formed in the center of the vertical portion in the longitudinal direction. Support frame; It is provided as a plate on the plate, and is provided in an'L' shape in the center of the width direction of one side, and the lower side of the fixing bracket having a through hole formed in the center of the vertical portion is welded and fixed, and the width direction of the girder is fixed by a certain length. A fixed plate disposed in close contact with the upper surface of the side and having a predetermined interval in two rows on the other side, through-holes are formed; It is provided in a rectangular plate shape so that one side of the fixed plate is sandwiched between the protruding muscles projecting to the top of the girder, and one end is fixed to the upper surface of one end of the fixed plate by welding from both sides in the width direction of the fixed plate. A guide piece protruding out of a predetermined length from one side of the plate; The fixing frame is installed through the through hole of the fixing bracket provided on the fixing plate and the through hole of the supporting frame so that the supporting frame can be fixed by pulling through the fastening force in a state in which the supporting frame is closely supported to the protruding muscle of the girder. Pulling means consisting of a fixing nut fastened to the end of the fixing bolt; And once the side is in close contact with the side of the girder so that the side of the girder protrudes outward to the side of the girder, the upper part is fixedly installed with the fixing plate through bolts and nuts, and when the cantilever is installed, the precast panel is seated and the lower surface of the precast panel is installed. It comprises a pedestal to support.

여기서, 상기 당김수단은 고정볼트와 고정너트를 포함하되, 2세트 이상으로 적용되는 한편, 지지프레임의 통공 및 고정브래킷의 통공은 당김수단의 세트와 대응되어 2개 이상으로 관통형성될 수 있다.Here, the pulling means includes a fixing bolt and a fixing nut, but is applied to two or more sets, while the through holes of the support frame and the through holes of the fixing bracket may correspond to the set of pulling means and be formed through two or more.

더욱이, 상기 받침대는 일정길이를 갖는 H 빔 타입으로 제공되어 상측 수평패널 부분의 일단 측에 2열로 통공이 관통형성되는 본체 및 본체의 일단에 수직 판 상으로 구비되어 일면이 거더의 측부에 밀착되는 수직밀착판을 포함하여 이루어지는 것이 바람직하다.Moreover, the pedestal is provided in an H beam type having a certain length, and is provided in a vertical plate on one end of the main body and the main body through which two holes are formed through one row of the upper horizontal panel part, and one side is in close contact with the side of the girder. It is preferably made to include a vertical adhesion plate.

한편, 본 발명에 따른 캔틸레버용 브래킷을 이용한 캔틸레버 시공방법은 교각의 최외측에 배치되되 상면에 일정간격을 가지고 봉 타입의 돌출근이 돌출형성된 거더의 측부에 외향 돌출토록 설치되는 캔틸레버용 브래킷을 적용하여 교량의 캔틸레버를 시공하는 캔틸레버용 브래킷을 이용한 캔틸레버 시공방법에 있어서, 교각의 최외측에 배치된 거더 측부에 길이방향으로 일정간격을 가지고 설치하여 프리캐스트 패널을 안착 설치하기 위한 것으로, 일정길이를 갖는 'U'자형 프레임 또는 'L'자형 프레임으로 제공되어 수직 부의 길이방향 중앙에 통공이 관통형성되는 지지프레임, 일 측 상면에 고정브래킷이 용접고정된 고정플레이트, 고정플레이트의 일 측 폭 방향 양측으로부터 일단이 용접고정되어 고정플레이트 일 측으로부터 외향 일정길이 돌출배치되는 가이드 편, 고정볼트와 고정너트로 제공되어 고정플레이트를 기준으로 지지프레임이 거더의 돌출근에 밀착 지지된 상태로 체결력을 통해 당김 고정되도록 하는 당김수단 및 거더의 측부에 외향 돌출토록 일단 측부가 거더의 측부에 밀착되면서 일단 상면 부분이 볼트와 너트를 통해 고정플레이트와 고정설치되어 캔틸레버의 시공시 프리캐스트 패널이 안착 설치되면서 프리캐스트 패널의 하면이 받쳐지도록 하는 받침대를 포함하여 구성된 캔틸레버용 브래킷을 제작하는 캔틸레버용 브래킷 제작단계; 캔틸레버용 브래킷 제작단계를 거쳐 제작된 캔틸레버용 브래킷을 거더의 일 측 상부로부터 측벽에 걸쳐 배치되도록 조립하되 거더의 측벽으로부터 받침대가 일정길이 돌출되게 조립설치하며, 거더의 길이방향으로 일정간격을 가지고 다수의 세트로 조립설치하는 캔틸레버용 브래킷 조립설치단계; 캔틸레버용 브래킷 조립설치단계를 거쳐 거더의 측벽으로부터 받침대가 일정길이 돌출되게 조립설치된 캔틸레버용 브래킷의 지지프레임 폭 방향 양측 하단에 대하여 가이드 편 상면과 밀착된 상태로 용접고정하는 용접고정단계; 용접고정단계 이후에 진행되며, 거더의 길이방향으로 프리캐스트 패널이 연이어 안착되도록 캔틸레버용 브래킷 조립설치단계를 통해 조립설치된 캔틸레버용 브래킷의 받침대에 대한 이웃하는 사이에 각각 프리캐스트 패널을 안착시키는 프리캐스트 패널 안착 설치단계; 프리캐스트 패널 안착 설치단계를 거쳐 안착 설치된 프리캐스트 패널 상면에 현장에서 철근을 배근한 후, 콘크리트를 타설하여 양생시키는 콘크리트 타설 및 양생단계; 및 콘크리트 타설 및 양생단계를 거쳐 양생이 완료된 후에 고정플레이트와 고정설치된 받침대의 외부로 노출되게 고정된 볼트를 풀어 캔틸레버용 브래킷의 받침대를 분리하는 캔틸레버용 브래킷의 받침대 분리단계를 포함한다.On the other hand, the cantilever construction method using the cantilever bracket according to the present invention is applied to the cantilever bracket which is disposed on the outermost side of the pier but is installed to protrude outwardly to the side of the girder with a certain distance on the upper surface and the rod-type protruding muscle is protruding. In the cantilever construction method using a cantilever bracket for constructing a cantilever of a bridge, a precast panel is installed and installed at a girder side disposed at the outermost side of the bridge with a certain interval in the longitudinal direction. It is provided as an'U'-shaped frame or'L'-shaped frame, a support frame through which a through hole is formed in the longitudinal center of the vertical part. One end is fixed by welding and is provided with guide pieces, fixed bolts and fixed nuts, which are arranged with a fixed length outward from one side of the fixed plate. Once the side is in close contact with the side of the girder so that the pulling means to be fixed and the side of the girder protrude outward, once the upper part is fixedly installed with the fixing plate through bolts and nuts, the precast panel is seated and installed during the construction of the cantilever. A cantilever bracket manufacturing step of manufacturing a cantilever bracket comprising a pedestal for supporting a lower surface of the panel; Assemble and install the cantilever bracket manufactured through the cantilever bracket manufacturing step so as to be disposed over the side wall from the top of one side of the girder, but assemble and install the pedestal from the side wall of the girder to protrude a certain length, and have a certain interval in the longitudinal direction of the girder. Assembling and installing the cantilever bracket assembly with a set of steps; A welding fixing step in which the cantilever bracket is installed in such a manner that the base is protruded from the side wall of the girder through a step of assembling and installing the cantilever bracket, and the welding frame is fixed in close contact with the top surface of the guide against the bottom of both sides of the support frame width of the cantilever bracket; It is performed after the welding fixing step, and the precast panel is mounted between the neighbors to the brackets of the cantilever bracket installed through the assembly installation step of the cantilever bracket so that the precast panels are successively seated in the longitudinal direction of the girder. Panel seating installation step; After the precast panel seating installation step, the reinforcement in the field on the upper surface of the precast panel installed, the concrete pouring and curing step of pouring concrete to cure; And after curing is completed through the pouring and curing steps of the concrete, the fixing plate and the fixing bolt to be exposed to the outside of the fixedly installed base are released to separate the base of the cantilever bracket to release the bracket of the cantilever bracket.

이때, 상기 캔틸레버용 브래킷 조립설치단계는 캔틸레버용 브래킷 제작단계를 거쳐 제작된 캔틸레버용 브래킷을 거더의 일 측 상부로부터 측벽에 걸쳐 거더의 측벽으로부터 받침대가 일정길이 돌출되도록 조립설치하되, 지지프레임을 거더의 상부에 돌출된 돌출근 일 측에 밀착 지지가 되게 배치하고, 타 측에 받침대의 일단이 조립고정된 고정플레이트를 가이드 편에 대해 돌출근 사이를 통해 끼워지게 하면서 거더 상면에 일 측이 일정길이 밀착되어 타 측이 일정길이 돌출되게 안착시킨 후, 당김수단인 고정볼트와 고정너트를 지지프레임의 통공과 고정브래킷의 통공을 관통하여 상호 체결시킨 상태에서, 고정너트를 조이면서 받침대의 본체 일단에 구비된 수직밀착판이 거더의 측벽에 밀착 지지되도록 하는 과정으로 이루어지는 것이 바람직하다.At this time, the cantilever bracket assembly installation step is to assemble and install the cantilever bracket produced through the cantilever bracket manufacturing step from the top of one side of the girder so that the pedestal protrudes from the side wall of the girder by a certain length, and supports the support frame. Arranged so as to be in close contact with one side of the protruding muscle protruding from the upper side, and having one end of the pedestal assembled and fixed to the other side through the between the protruding muscles with respect to the guide piece, one side of the girder has a certain length on the upper surface. After being seated so that the other side is in close contact with a certain length, the fixing bolts and fixing nuts, which are pulling means, are penetrated through the through holes of the support frame and through the holes of the fixing brackets, and tighten the fixing nuts to one end of the main body of the pedestal. It is preferable that the provided vertical adhesion plate is made of a process of being in close contact with the side wall of the girder.

더욱이, 상기 캔틸레버용 브래킷 제작단계를 거쳐 제작된 캔틸레버용 브래킷 중 받침대는 일정길이를 갖는 H 빔 타입으로 제공되어 상측 수평패널 부분의 일단 측에 2열로 통공이 관통형성되는 본체 및 본체의 일단에 수직 판 상으로 구비되어 일면이 거더의 측부에 밀착되는 수직밀착판을 포함하여 이루어지는 것이 양호하다.Moreover, of the cantilever brackets produced through the steps of manufacturing the cantilever bracket, the pedestal is provided in an H beam type having a certain length, and is perpendicular to one end of the main body and the body through which two holes are formed in one row of the upper horizontal panel portion. It is preferable that it is provided in a plate shape, and one surface includes a vertical adhesion plate that is in close contact with the side of the girder.

본 발명에 따른 캔틸레버용 브래킷 및 이를 이용한 캔틸레버 시공방법의 효과를 설명하면 다음과 같다.The effects of the cantilever bracket according to the present invention and the cantilever construction method using the same are as follows.

첫째, 지지프레임, 고정플레이트, 가이드 편, 당김수단 및 받침대를 포함하는 캔틸레버용 브래킷 및 캔틸레버용 브래킷 제작단계, 캔틸레버용 브래킷 조립설치단계, 용접고정단계, 프리캐스트 패널 안착 설치단계, 콘크리트 타설 및 양생단계, 캔틸레버용 브래킷의 받침대 분리단계를 포함하는 캔틸레버용 브래킷을 이용한 캔틸레버 시공방법이 적용됨으로써 거더 상에 사전의 앵커볼트에 대한 설치과정인 앵커작업이 요구됨이 없으면서 거더의 길이방향으로 자유롭게 위치를 선정하여 설치고정할 수 있으며, 이를 통하여 캔틸레버 시공공정이 단순화되어 시공성을 현격히 향상시킬 수 있다.First, the cantilever bracket and the cantilever bracket manufacturing step, including the support frame, fixing plate, guide piece, pull means and support, the cantilever bracket assembly installation step, welding fixing step, precast panel seating installation step, concrete pouring and curing Step, the cantilever construction method using the cantilever bracket including the step of removing the bracket for the cantilever is applied to freely select the position in the longitudinal direction of the girder without requiring the anchor work, which is the installation process for the anchor bolt in advance on the girder. It can be installed and fixed, and through this, the cantilever construction process is simplified to significantly improve the workability.

둘째, 지지프레임, 고정플레이트, 가이드 편, 당김수단 및 받침대를 포함하는 캔틸레버용 브래킷 및 캔틸레버용 브래킷 제작단계, 캔틸레버용 브래킷 조립설치단계, 용접고정단계, 프리캐스트 패널 안착 설치단계, 콘크리트 타설 및 양생단계, 캔틸레버용 브래킷의 받침대 분리단계를 포함하는 캔틸레버용 브래킷을 이용한 캔틸레버 시공방법이 적용됨으로써 캔틸레버의 시공 후 받침대를 분리하여 반영구적으로 재사용할 수 있으며, 이에 따라 시공비용을 현격히 절감시킬 수 있다.Second, the cantilever bracket and the cantilever bracket manufacturing step including the support frame, the fixing plate, the guide piece, the pulling means and the base, the cantilever bracket assembly installation step, the welding fixing step, the precast panel seating installation step, the concrete pouring and curing By applying the cantilever construction method using the cantilever bracket including the step, the cantilever bracket separation step, the cantilever can be separated and reused semi-permanently, thereby significantly reducing the construction cost.

도 1은 종래의 캔틸레버용 브래킷을 이용한 캔틸레버 시공구조를 도시한 단면예시도.
도 2는 본 발명에 따른 캔틸레버용 브래킷 및 이를 이용한 캔틸레버 시공방법에 의해 시공된 캔틸레버의 시공구조를 나타낸 단면예시도.
도 3은 본 발명에 따른 캔틸레버용 브래킷을 나타낸 분리 사시구성도.
도 4는 본 발명에 따른 캔틸레버용 브래킷이 거더에 고정설치되는 구조를 나타낸 예시도.
도 5는 본 발명에 따른 캔틸레버용 브래킷이 거더에 고정설치된 후 프리캐스트 패널이 안착설치되는 구조를 나타낸 예시도.
도 6a 및 6b는 본 발명을 적용하여 캔틸레버를 시공한 후 받침대를 분리시키는 구조를 나타낸 예시도.
도 7은 본 발명에 따른 캔틸레버용 브래킷을 이용한 캔틸레버 시공방법을 단계별로 나타낸 블록도.
1 is a cross-sectional exemplary view showing a cantilever construction structure using a conventional cantilever bracket.
Figure 2 is a cross-sectional example showing the construction structure of the cantilever constructed by the cantilever bracket and the cantilever construction method using the same according to the present invention.
Figure 3 is an exploded perspective configuration diagram showing a cantilever bracket according to the present invention.
Figure 4 is an exemplary view showing a structure in which the bracket for a cantilever according to the present invention is fixedly installed on a girder.
Figure 5 is an exemplary view showing a structure in which the precast panel is seated and installed after the cantilever bracket according to the present invention is fixedly installed on the girder.
Figures 6a and 6b is an exemplary view showing a structure for separating the pedestal after constructing a cantilever by applying the present invention.
7 is a block diagram showing the cantilever construction method step by step using the cantilever bracket according to the present invention.

이하, 첨부된 도면을 참조하여 본 발명에 따른 캔틸레버용 브래킷 및 이를 이용한 캔틸레버 시공방법의 바람직한 실시예를 상세히 설명한다.Hereinafter, preferred embodiments of the cantilever bracket and the cantilever construction method using the same according to the present invention will be described in detail with reference to the accompanying drawings.

도 2는 본 발명에 따른 캔틸레버용 브래킷 및 이를 이용한 캔틸레버 시공방법에 의해 시공된 캔틸레버의 시공구조를 나타낸 단면예시도이며, 도 3은 본 발명에 따른 캔틸레버용 브래킷을 나타낸 분리 사시구성도이다.Figure 2 is a cross-sectional exemplary view showing the construction structure of a cantilever constructed by a cantilever bracket and a cantilever construction method using the same according to the present invention, Figure 3 is an exploded perspective view showing a bracket for a cantilever according to the present invention.

도 4는 본 발명에 따른 캔틸레버용 브래킷이 거더에 고정설치되는 구조를 나타낸 예시도이고, 도 5는 본 발명에 따른 캔틸레버용 브래킷이 거더에 고정설치된 후 프리캐스트 패널이 안착설치되는 구조를 나타낸 예시도이며, 도 6a 및 6b는 본 발명을 적용하여 캔틸레버를 시공한 후 받침대를 분리시키는 구조를 나타낸 예시도이다.4 is an exemplary view showing a structure in which the bracket for a cantilever according to the present invention is fixedly installed on a girder, and FIG. 5 is an example showing a structure in which a precast panel is seated and installed after the cantilever bracket according to the present invention is fixedly installed on a girder. 6A and 6B are exemplary views showing a structure for separating a pedestal after constructing a cantilever by applying the present invention.

도 2 내지 6b에서 보는 바와 같이, 본 발명의 바람직한 실시예에 따른 캔틸레버용 브래킷(100)은 캔틸레버를 시공하기 위하여 거더(10) 상에 설치되어 프리캐스트 패널(20)을 안착 설치하기 위한 브래킷 구조를 이루는 것이다.2 to 6b, the cantilever bracket 100 according to a preferred embodiment of the present invention is installed on the girder 10 to construct the cantilever, the bracket structure for seating and installing the precast panel 20 Is achieved.

본 발명을 설명하기에 앞서, 먼저 상기와 같은 본 발명에 따른 캔틸레버용 브래킷(100)이 캔틸레버 시공을 위하여 설치되는 거더(10)에 대하여 설명하면, 거더(10)는 봉 타입의 돌출근(11), 즉 도면에서 보는 바와 같이 통상의 볼트 형상으로 상면의 길이방향으로 일정간격을 가지고 상향 돌출되는 돌출근(11)을 포함하는 구조의 콘크리트 타입 거더인 것이다.Prior to explaining the present invention, first, as described with respect to the girder 10, the cantilever bracket 100 according to the present invention is installed for cantilever construction as described above, the girder 10 is a rod-type protruding muscle 11 ), that is, it is a concrete type girder of a structure including a protruding muscle 11 protruding upward with a predetermined interval in the longitudinal direction of the upper surface in a normal bolt shape as shown in the drawing.

상기와 같은 거더(10) 상에 캔틸레버 시공을 위해 설치되는 본 발명에 따른 캔틸레버용 브래킷(100)은 크게 분류하면 지지프레임(110), 고정플레이트(120), 가이드 편(130), 당김수단(140) 및 받침대(150)를 포함하여 이루어진다.When the bracket 100 for a cantilever according to the present invention is installed for cantilever construction on the girder 10 as described above, the support frame 110, the fixing plate 120, the guide piece 130, the pulling means ( 140) and the pedestal 150.

구체적으로, 상기 지지프레임(110)은 교각의 최외측에 배치된 거더(10)의 상부로 돌출된 봉 타입의 돌출근(11) 일 측에 밀착 지지가 되도록, 일정길이를 갖는 'U'자형 프레임으로 제공되며, 수직 부의 길이방향 중앙에 통공(111)이 관통형성되는 것이다.Specifically, the support frame 110 has a'U' shape having a predetermined length so as to be in close contact with one side of the rod-shaped protruding muscle 11 protruding to the top of the girder 10 disposed on the outermost side of the pier. It is provided as a frame, and the through hole 111 is formed through the center of the vertical portion in the longitudinal direction.

즉, 상기 지지프레임(110)은 'U'자형 프레임의 한 쌍의 마주하는 수직 부 중앙에 통공(111)이 관통형성되는 것이 바람직하며, 물론 'L'자형 프레임으로 제공되어 수직 부 중앙에 통공이 관통형성될 수도 있는 것이다.That is, the support frame 110 is preferably formed through the through hole 111 in the center of the vertical portion facing a pair of'U' shaped frame, of course, provided as an'L' shaped frame through the vertical portion This may be formed through.

또한, 상기 고정플레이트(120)는 판 상의 플레이트로 제공되어, 일 측 상면의 폭 방향 중앙에 'L'자 형으로 제공되어 수직부 중앙에 통공(121a)이 관통형성된 고정브래킷(120a)의 하측이 용접고정되고, 일 측 일정길이만큼 거더(10)의 폭 방향 일 측 상면에 밀착 배치되며, 타 측에 2열로 일정간격을 가지고 통공(121)이 관통형성되는 것이다.In addition, the fixing plate 120 is provided as a plate on a plate, and is provided in an'L' shape in the center of the width direction of one side, the lower side of the fixing bracket 120a through which the through hole 121a is formed in the center of the vertical portion. This welding is fixed, and is arranged in close contact with the upper surface of one side in the width direction of the girder 10 by a predetermined length on one side, and the through holes 121 are formed through the other side with a predetermined interval in two rows.

그리고 상기 가이드 편(130)은 고정플레이트(121)의 일 측이 거더(10)의 상부로 돌출된 돌출근(11) 사이에 끼워져 고정될 수 있도록, 장방형 판 형상으로 제공되어 고정플레이트(120)의 일 측 폭 방향 양측으로부터 일단이 고정프레이트(120) 일 측 단 상면에 용접고정되어 고정플레이트(120) 일 측으로부터 외향 일정길이 돌출 배치되는 것이다.In addition, the guide piece 130 is provided in a rectangular plate shape so that one side of the fixing plate 121 is sandwiched between the protruding muscles 11 protruding to the top of the girder 10, and is provided in a rectangular plate shape. One end of the fixed plate 120 is welded to the upper surface of one end of the fixed plate 120 from both sides of the width direction, so that a fixed length of the fixed plate 120 protrudes outward.

즉, 상기 가이드 편(130)은 고정플레이트(121)의 일 측이 거더(10)의 상부로 돌출된 돌출근(11) 사이에 끼워져 고정될 수 있도록 하는 것으로, 한 쌍으로 일단이 고정프레이트(120) 일 측 단 상면에 용접고정되는 것이다.That is, the guide piece 130 is one side of the fixing plate 121 to be sandwiched between the protruding muscles 11 protruding to the top of the girder 10 to be fixed, one pair of fixed plate ( 120) It is fixed to the welding on one side.

또한, 상기 당김수단(140)은 고정플레이트(120)를 기준으로 지지프레임(110)이 거더(10)의 돌출근(11)에 밀착 지지된 상태로 체결력을 통해 당김 고정될 수 있도록 하는 것이다.In addition, the pulling means 140 is to enable the support frame 110, based on the fixing plate 120, to be fixedly pulled through a fastening force in a state in close contact with the protruding muscle 11 of the girder 10.

이러한 당김수단(140)은 고정프레이트(120) 상에 구비된 고정브래킷(120a)의 통공(121a)과 지지프레임(110)의 통공(111)을 관통하여 설치되는 고정볼트(141)와 고정볼트(141)의 단부에 체결고정되는 고정너트(142)로 구성됨이 바람직하다.The pulling means 140 are fixed bolts 141 and fixing bolts installed through the through holes 121a of the fixing brackets 120a provided on the fixing plate 120 and through holes 111 of the supporting frame 110. It is preferably composed of a fixing nut 142 that is fastened to the end of (141).

물론, 상기 당김수단(140)은 도면으로 구체적으로 도시하지는 않았으나, 양단 일정길이에 걸쳐 나사산이 형성된 스터드볼트와 스터드볼트의 양단에 체결되는 2개의 너트로 적용될 수도 있는 것이다.Of course, the pulling means 140 is not specifically shown in the drawings, but may be applied with two nuts fastened to both ends of the stud bolt and the stud bolt having threads formed over a predetermined length at both ends.

한편, 상기 받침대(150)는 거더(10)의 측부에 외향 돌출토록 일단 측부가 거더(10)의 측부에 밀착되면서 일단 상면 부분이 볼트(B)와 너트(N)를 통해 고정플레이트(120)와 고정설치되며, 캔틸레버의 시공시 프리캐스트 패널(20)이 안착 설치되면서 프리캐스트 패널(20)의 하면이 받쳐지도록 하는 것이다.On the other hand, the pedestal 150 is fixed to the side of the upper surface through the bolt (B) and the nut (N) once the side is in close contact with the side of the girder 10 so as to protrude outward on the side of the girder 10 It is fixedly installed, and when the precast panel 20 is seated and installed during the construction of the cantilever, the lower surface of the precast panel 20 is supported.

상기와 같은 받침대(150)는 특히, 일정길이를 갖는 H 빔 타입으로 제공되어 상측 수평패널 부분의 일단 측에 2열로 통공(151a)이 관통형성되는 본체(151) 및 본체(151)의 일단에 수직 판 상으로 구비되어 일면이 거더(10)의 측부에 밀착되는 수직밀착판(153)을 포함하여 이루어지는 것이 바람직하다.In particular, the pedestal 150 is provided in an H beam type having a predetermined length, and is provided at one end of the main body 151 and the main body 151 through which the through holes 151a are formed in two rows on one side of the upper horizontal panel portion. It is preferably made of a vertical plate is provided on the vertical side of the girder 10 is in close contact with the side plate (153).

이때, 상기 받침대(150)의 본체(151)에 대한 상측에 위치하는 수평패널 부분 상면에는 캔틸레버를 시공할 때 상면에 프리캐스트 패널(20)의 안착 설치과정에서 프리캐스트 패널(20)의 미끄러짐 방지를 위하여, 폭 방향 양측으로 고무패드(P)가 더 부착 설치됨이 바람직한 것이다.At this time, when the cantilever is installed on the upper surface of the horizontal panel portion positioned above the main body 151 of the pedestal 150, the precast panel 20 is prevented from slipping during the installation of the precast panel 20 on the upper surface. For this, it is preferable that rubber pads P are further attached to both sides in the width direction.

더욱이, 전술한 바와 같은 구성으로 이루어진 본 발명에 따른 캔틸레버용 브래킷(100)에서의 상기 당김수단(140)은 고정볼트(141)와 고정너트(142)를 포함하되, 2세트 이상으로 적용되는 한편, 이러한 경우에는 지지프레임(110)의 통공(111) 및 고정브래킷(120a)의 통공(121a)은 당김수단(140)의 세트와 대응되어 2개 이상으로 관통형성될 수 있는 것이다.Moreover, the pulling means 140 in the cantilever bracket 100 according to the present invention having the above-described configuration includes a fixing bolt 141 and a fixing nut 142, while being applied in two or more sets , In this case, the through-hole 111 of the support frame 110 and the through-hole 121a of the fixing bracket 120a correspond to the set of the pulling means 140 and may be formed through two or more.

다시 말하면, 상기 당김수단(150)은 단일의 세트로 적용될 수 있으나 2개 이상의 세트로 적용되어 더욱 안정적인 구조를 구현할 수도 있는 것이다.In other words, the pulling means 150 may be applied as a single set, but may be applied as two or more sets to implement a more stable structure.

도 7은 본 발명에 따른 캔틸레버용 브래킷을 이용한 캔틸레버 시공방법을 단계별로 나타낸 블록도이다.7 is a block diagram showing the cantilever construction method step by step using the cantilever bracket according to the present invention.

도 2 내지 6b와 함께, 도 7을 참고하면 본 발명에 따른 캔틸레버용 브래킷을 이용한 캔틸레버 시공방법은 교각의 최외측에 배치되되 상면에 일정간격을 가지고 봉 타입의 돌출근(11)이 돌출형성된 거더(10)의 측부에 외향 돌출토록 설치되는 캔틸레버용 브래킷(100)을 적용하여 교량의 캔틸레버를 시공하는 방법이다.2 to 6b, referring to FIG. 7, the cantilever construction method using the cantilever bracket according to the present invention is disposed on the outermost side of the pier but has a certain distance on the upper surface, and the rod-type protrusive muscle 11 is protruded. It is a method of constructing a cantilever of a bridge by applying the cantilever bracket 100 installed to protrude outward on the side of (10).

이러한 본 발명에 따른 캔틸레버용 브래킷을 이용한 캔틸레버 시공방법은 크게 캔틸레버용 브래킷 제작단계(S110), 캔틸레버용 브래킷 조립설치단계(S120), 용접고정단계(S130), 프리캐스트 패널 안착 설치단계(S140), 콘크리트 타설 및 양생단계(S150) 및 캔틸레버용 브래킷의 받침대 분리단계(S160)를 포함한다.The cantilever construction method using the cantilever bracket according to the present invention is largely a cantilever bracket manufacturing step (S110), a cantilever bracket assembly installation step (S120), a welding fixing step (S130), and a precast panel seating installation step (S140). , Concrete pouring and curing step (S150) and cantilever bracket bracket separation step (S160).

상세히, 상기 캔틸레버용 브래킷 제작단계(S110)는 교각의 최외측에 배치된 거더(10) 측부에 길이방향으로 일정간격을 가지고 설치하여 프리캐스트 패널(20)을 안착 설치하기 위한 것으로, 일정길이를 갖는 'U'자형 프레임 또는 'L'자형 프레임으로 제공되어 수직 부의 길이방향 중앙에 통공(111)이 관통형성되는 지지프레임(110), 일 측 상면에 고정브래킷(120a)이 용접고정된 고정플레이트(120), 고정플레이트(120)의 일 측 폭 방향 양측으로부터 일단이 용접고정되어 고정플레이트(120) 일 측으로부터 외향 일정길이 돌출배치되는 가이드 편(130), 고정볼트(141)와 고정너트(142)로 제공되어 고정플레이트(120)를 기준으로 지지프레임(110)이 거더(10)의 돌출근(11)에 밀착 지지된 상태로 체결력을 통해 당김 고정되도록 하는 당김수단(140) 및 거더(10)의 측부에 외향 돌출토록 일단 측부가 거더(10)의 측부에 밀착되면서 일단 상면 부분이 볼트(B)와 너트(N)를 통해 고정플레이트(130)와 고정설치되어 캔틸레버의 시공시 프리캐스트 패널(20)이 안착 설치되면서 프리캐스트 패널(20)의 하면이 받쳐지도록 하는 받침대(150)를 포함하여 구성된 캔틸레버용 브래킷(100)을 제작하는 과정으로 이루어진다.In detail, the cantilever bracket manufacturing step (S110) is to install and install the precast panel 20 at a predetermined interval in the longitudinal direction on the side of the girder 10 disposed on the outermost side of the pier, and a fixed length. It is provided as an'U'-shaped frame or an'L'-shaped frame, a support frame 110 through which a through hole 111 is formed in the longitudinal center of the vertical portion, and a fixed plate with a fixed bracket 120a welded to an upper surface of one side. (120), one end of the fixed plate 120 is fixed to the welding end from both sides in the width direction, the fixed plate 120, the guide piece 130 is arranged to protrude outward from one side, the fixed bolt 141 and the fixed nut ( It is provided as 142, the support frame 110 based on the fixing plate 120, the pulling means 140 and the girder to be fixed through the fastening force in a state supported in close contact with the protruding muscle 11 of the girder 10 (girder) Once the side is in close contact with the side of the girder 10 so that the side protrudes outward on the side of 10), the upper part is fixedly installed with the fixing plate 130 through bolts (B) and nuts (N), and precast during construction of the cantilever. As the panel 20 is seated, the process of manufacturing the cantilever bracket 100 including the pedestal 150 to support the lower surface of the precast panel 20 is made.

또한, 상기 캔틸레버용 브래킷 조립설치단계(S120)는 캔틸레버용 브래킷 제작단계(S110)를 거쳐 제작된 캔틸레버용 브래킷(100)을 거더(10)의 일 측 상부로부터 측벽에 걸쳐 배치되도록 조립하되 거더(10)의 측벽으로부터 받침대(150)가 일정길이 돌출되게 조립설치하며, 거더(10)의 길이방향으로 일정간격을 가지고 다수의 세트로 조립설치하는 과정으로 이루어진다.In addition, the cantilever bracket assembly installation step (S120) is assembled so that the cantilever bracket 100 produced through the cantilever bracket manufacturing step (S110) is disposed across the side wall from the upper side of one side of the girder 10. It consists of a process of assembling and installing the pedestal 150 so as to protrude a certain length from the side wall of 10), and assembling and installing a plurality of sets with a predetermined interval in the longitudinal direction of the girder 10.

그리고 상기 용접고정단계(S130)는 캔틸레버용 브래킷 조립설치단계(S120)를 거쳐 거더(10)의 측벽으로부터 받침대(150)가 일정길이 돌출되게 조립설치된 캔틸레버용 브래킷(100)의 지지프레임(110) 폭 방향 양측 하단에 대하여 가이드 편(130) 상면과 밀착된 상태로 용접고정하는 과정으로 이루어진다.And the welding fixing step (S130) is a cantilever bracket assembly installation step (S120) through the side wall of the girder 10, the support 150 of the cantilever bracket 100 is assembled and installed to protrude a certain length from the side wall of the girder 10 (110) It consists of a process of welding and fixing in a state in close contact with the upper surface of the guide piece 130 with respect to the bottom of both sides in the width direction.

또한, 상기 프리캐스트 패널 안착 설치단계(S130)는 용접고정단계(S130) 이후에 진행되며, 거더(10)의 길이방향으로 프리캐스트 패널(20)이 연이어 안착되도록 캔틸레버용 브래킷 조립설치단계(S120)를 통해 조립설치된 캔틸레버용 브래킷(100)의 받침대(150)에 대한 이웃하는 사이에 각각 프리캐스트 패널(20)을 안착시키는 과정으로 이루어진다.In addition, the precast panel seating installation step (S130) proceeds after the welding fixing step (S130), and the cantilever bracket assembly installation step (S120) so that the precast panel 20 is successively seated in the longitudinal direction of the girder 10 (S120). It is made through the process of seating each of the precast panel 20 between the neighboring to the pedestal 150 of the bracket 100 for cantilevers installed and assembled through ).

이때, 상기와 같은 프리캐스트 패널 안착 설치단계(S130)에서 안착 설치되는 프리캐스트 패널(20)은 "L"자 형 패널로 제공되는 통상의 프리캐스트 패널로 적용되는 것이며, 특히 캔틸레버용 브래킷(100)의 고정플레이트(130) 부분과 간섭이 없도록 거더(10) 측을 향하는 단부의 길이방향 양측 모서리 부분에 함몰홈(21)이 형성됨이 바람직한 것이다.At this time, the precast panel 20 that is seated and installed in the precast panel seating installation step (S130) is applied as a normal precast panel provided as an "L" shaped panel, and in particular, the cantilever bracket 100 ) It is preferable that the recessed grooves 21 are formed at both corners in the longitudinal direction of the end toward the girder 10 side so that there is no interference with the fixed plate 130 portion.

한편, 상기 콘크리트 타설 및 양생단계(S140)는 프리캐스트 패널 안착 설치단계(S130)를 거쳐 안착 설치된 프리캐스트 패널(20) 상면에 현장에서 철근(미부호)을 배근한 후, 콘크리트를 타설하여 양생시키는 과정으로 이루어진다.On the other hand, the concrete pouring and curing step (S140) is a precast panel seating installation step (S130) through the precast panel 20 seated and installed on the top surface of the reinforcement (unsigned) in the field after placing the concrete, and then curing the concrete It consists of a process.

이때, 철근(미부호)은 도면에 도시된 바와 같이, 프리캐스트 패널(20) 상면에 돌출된 전단연결재(미부호)와 직교하도록 배근함이 바람직한 것이다.At this time, the reinforcing bar (unsigned), as shown in the drawing, it is desirable to reinforce the precast panel 20 so as to be orthogonal to the shear connector (unsigned) protruding on the upper surface.

그리고 상기 캔틸레버용 브래킷의 받침대 분리단계(S150)는 콘크리트 타설 및 양생단계(S150)를 거쳐 양생이 완료된 후에 고정플레이트(120)와 고정설치된 받침대(150)의 외부로 노출되게 고정된 볼트(B)를 풀어 캔틸레버용 브래킷(100)의 받침대(150)를 분리하는 과정으로 이루어진다.And the cantilever bracket bracket separation step (S150) is a bolt (B) fixed to be exposed to the outside of the fixed plate 120 and the fixed installation base 150 after curing is completed through the concrete pouring and curing step (S150). It consists of a process of separating the base 150 of the cantilever bracket 100 by releasing the.

전술한 바와 같은 과정들로 이루어진 본 발명에 따른 캔틸레버용 브래킷을 이용한 캔틸레버 시공방법에서, 특히 상기 캔틸레버용 브래킷 조립설치단계(S120)는 캔틸레버용 브래킷 제작단계(S110)를 거쳐 제작된 캔틸레버용 브래킷(100)을 거더(10)의 일 측 상부로부터 측벽에 걸쳐 거더(10)의 측벽으로부터 받침대(150)가 일정길이 돌출되도록 조립설치하되, 먼저 지지프레임(110)을 거더(10)의 상부에 돌출된 돌출근(11) 일 측에 밀착 지지가 되게 배치한다.In the cantilever construction method using the cantilever bracket according to the present invention made of the above-described processes, in particular, the cantilever bracket assembly installation step (S120) is a cantilever bracket produced through the cantilever bracket manufacturing step (S110) ( 100) from one side of the girder 10 to the side wall over the side wall is assembled and installed so that the pedestal 150 from the side wall of the girder 10 protrudes a certain length, first protruding the support frame 110 to the top of the girder 10 The protruding muscles 11 are disposed to be in close contact with one side.

그리고 나서, 타 측에 받침대(150)의 일단이 조립고정된 고정플레이트(120)를 가이드 편(130)에 대해 돌출근(11) 사이를 통해 끼워지게 하면서 거더(10) 상면에 일 측이 일정길이 밀착되어 타 측이 일정길이 돌출되게 안착시킨다.Then, one side of the top surface of the girder 10 is fixed while having the one end of the pedestal 150 fixed to the other side through the between the protruding muscles 11 with respect to the guide piece 130. It is in close contact with the length so that the other side protrudes a certain length.

이후, 당김수단(140)인 고정볼트(141)와 고정너트(142)를 지지프레임(110)의 통공(111)과 고정브래킷(120a)의 통공(121a)을 관통하여 상호 체결시킨 상태에서, 고정너트(142)를 조이면서 받침대(150)의 본체(151) 일단에 구비된 수직밀착판(153)이 거더(10)의 측벽에 밀착 지지되도록 한다.Subsequently, in a state in which the fixing bolt 141 and the fixing nut 142, which are the pulling means 140, penetrate the through hole 111 of the support frame 110 and the through hole 121a of the fixing bracket 120a, and fasten each other. While tightening the fixing nut 142, the vertical adhesion plate 153 provided at one end of the main body 151 of the pedestal 150 is in close contact with the side wall of the girder 10.

즉, 상기와 같은 과정으로 이루어진 캔틸레버용 브래킷 조립설치단계(S120)에 의해, 거더(10)의 측벽으로부터 받침대(150)가 일정길이 돌출되게 조립설치되며, 특히 당김수단(140)의 고정너트(142)를 조이면서 받침대(150)의 본체(151) 일단에 구비된 수직밀착판(153)이 거더(10)의 측벽에 밀착 지지되도록 할 수 있게 된다.That is, by the cantilever bracket assembly installation step (S120) made of the above process, the base 150 from the side wall of the girder 10 is assembled and installed to protrude a certain length, in particular the fixing nut of the pulling means 140 ( While tightening 142, the vertical adhesion plate 153 provided at one end of the body 151 of the pedestal 150 can be supported in close contact with the side wall of the girder 10.

전술한 바와 같은 과정을 거쳐 캔틸레버용 브래킷을 조립설치한 이후에는 앞서 설명한 용접고정단계(S130)를 거쳐 지지프레임(110)에 대한 유동이 방지되도록 하면서 더욱 견고하게 캔틸레버용 브래킷(100)의 조립설치 상태를 유지시킬 수 있게 되는 것이다.After assembling and installing the cantilever bracket through the above-described process, through the welding fixing step (S130) described above, while preventing the flow to the support frame 110, the assembly and installation of the cantilever bracket 100 is more robust. It is possible to maintain the state.

한편, 전술한 바와 같은 과정들로 이루어진 본 발명에 따른 캔틸레버용 브래킷을 이용한 캔틸레버 시공방법에서의 상기 캔틸레버용 브래킷 제작단계(S110)를 거쳐 제작된 캔틸레버용 브래킷(100) 중 받침대(150)는 본체(151) 및 수직밀착판(153)을 포함하여 이루어지는 것이 바람직하다.On the other hand, the base 150 of the cantilever bracket 100 produced through the cantilever bracket manufacturing step (S110) in the cantilever construction method using the cantilever bracket according to the present invention consisting of the above-described processes It is preferably made to include (151) and the vertical adhesion plate (153).

이때, 상기 본체(151)는 일정길이를 갖는 H 빔 타입으로 제공되어 상측 수평패널 부분의 일단 측에 2열로 통공(151a)이 관통형성되는 것이 바람직한 것이다.At this time, it is preferable that the main body 151 is provided in an H beam type having a predetermined length, and through holes 151a are formed through two rows on one side of the upper horizontal panel portion.

또한, 상기 수직밀착판(153)은 본체(151)의 일단에 수직 판 상으로 구비되어 일면이 거더(10)의 측부에 밀착되는 것이 바람직하다.In addition, the vertical adhesion plate 153 is preferably provided on one end of the main body 151 in the form of a vertical plate in close contact with one side of the girder 10.

물론, 상기 받침대(150)는 단순히 'ㄱ'자 형 프레임으로 제공될 수도 있는 것이다.Of course, the pedestal 150 may simply be provided in an'a' shaped frame.

더욱이, 전술한 바와 같은 과정들로 이루어진 본 발명에 따른 캔틸레버용 브래킷을 이용한 캔틸레버 시공방법에서, 캔틸레버용 브래킷 조립설치단계(S120)와 용접고정단계(S130)가 진행된 이후에는 받침대(150)의 본체(151)에 대한 상측에 위치하는 수평패널 부분 상면에 캔틸레버를 시공할 때 상면에 프리캐스트 패널(20)의 안착 설치과정에서 프리캐스트 패널(20)의 미끄러짐 방지를 위하여, 폭 방향 양측으로 고무패드(P)를 부착 설치하는 과정이 더 이루어짐이 더욱 바람직한 것이다.Moreover, in the cantilever construction method using the cantilever bracket according to the present invention made up of the processes described above, after the cantilever bracket assembly installation step (S120) and welding fixing step (S130) are performed, the main body of the pedestal 150 When the cantilever is installed on the upper surface of the horizontal panel portion located on the upper side of the (151), rubber pads on both sides in the width direction to prevent slipping of the precast panel 20 during the installation and installation of the precast panel 20 on the upper surface It is more preferable that the process of attaching and installing (P) is further performed.

전술한 바와 같은 본 발명에 따른 캔틸레버용 브래킷 및 이를 이용한 캔틸레버 시공방법에 의하면, 지지프레임, 고정플레이트, 가이드 편, 당김수단 및 받침대를 포함하는 캔틸레버용 브래킷 및 캔틸레버용 브래킷 제작단계, 캔틸레버용 브래킷 조립설치단계, 용접고정단계, 프리캐스트 패널 안착 설치단계, 콘크리트 타설 및 양생단계, 캔틸레버용 브래킷의 받침대 분리단계를 포함하는 캔틸레버용 브래킷을 이용한 캔틸레버 시공방법이 적용됨으로써 거더 상에 사전의 앵커볼트에 대한 설치과정인 앵커작업이 요구됨이 없으면서 거더의 길이방향으로 자유롭게 위치를 선정하여 설치고정할 수 있으며, 이를 통하여 캔틸레버 시공공정이 단순화되어 시공성을 현격히 향상시킬 수 있다.According to the cantilever bracket and the cantilever construction method using the same according to the present invention as described above, the cantilever bracket and the cantilever bracket manufacturing step including the support frame, the fixing plate, the guide piece, the pulling means and the base, assembling the cantilever bracket By applying the cantilever construction method using the cantilever bracket, which includes the installation step, the welding fixation step, the precast panel seating installation step, the concrete pouring and curing step, and the cantilever bracket bracket separation step, the anchor bolt for the anchor bolt on the girder is applied. It is possible to freely select and fix the position in the longitudinal direction of the girder without the need for anchoring, which is the installation process. Through this, the cantilever construction process is simplified to significantly improve the workability.

더욱이, 지지프레임, 고정플레이트, 가이드 편, 당김수단 및 받침대를 포함하는 캔틸레버용 브래킷 및 캔틸레버용 브래킷 제작단계, 캔틸레버용 브래킷 조립설치단계, 용접고정단계, 프리캐스트 패널 안착 설치단계, 콘크리트 타설 및 양생단계, 캔틸레버용 브래킷의 받침대 분리단계를 포함하는 캔틸레버용 브래킷을 이용한 캔틸레버 시공방법이 적용됨으로써 캔틸레버의 시공 후 받침대를 분리하여 반영구적으로 재사용할 수 있으며, 이에 따라 시공비용을 현격히 절감시킬 수 있는 것이다.Moreover, the cantilever bracket and cantilever bracket manufacturing steps including the support frame, fixing plate, guide piece, pulling means and base, assembling and installing bracket for cantilever, welding fixing step, precast panel seating installation step, concrete pouring and curing By applying the cantilever construction method using the cantilever bracket including the step, the cantilever bracket separation step, the pedestal can be separated and reused semi-permanently after construction of the cantilever, thereby significantly reducing construction costs.

이상에서 본 발명의 구체적인 실시예를 상세히 설명하였으나, 본 발명은 이에 한정되는 것은 아니며, 본 발명은 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자에 의해 다양한 변형의 실시가 가능하며, 이러한 변형은 본 발명의 범위에 포함된다.Although specific embodiments of the present invention have been described in detail above, the present invention is not limited thereto, and the present invention can be implemented by various persons skilled in the art to which the present invention pertains. Is included in the scope of the present invention.

100: 캔틸레버용 브래킷
110: 지지프레임 111: 통공
120: 고정플레이트 121: 통공
120a: 고정브래킷 121a: 통공
130: 가이드 편 140: 당김수단
141: 고정볼트 142: 고정너트
150: 받침대 151: 본체
151a: 통공 153: 수직밀착판
P: 고무패드
B: 볼트
N: 너트
10: 거더
11: 돌출근
20: 프리캐스트 패널
21: 함몰홈
100: cantilever bracket
110: support frame 111: through
120: fixed plate 121: through
120a: fixing bracket 121a: through
130: Guide section 140: Pulling means
141: fixing bolt 142: fixing nut
150: pedestal 151: main body
151a: through 153: vertical contact plate
P: Rubber pad
B: Bolt
N: Nut
10: girder
11: Extruder
20: precast panel
21: depression groove

Claims (6)

상면에 일정간격을 가지고 봉 타입의 돌출근(11)이 돌출형성된 교각의 최외측에 배치되는 거더(10) 측부에 외향 돌출토록 설치되어 캔틸레버를 시공하기 위한 캔틸레버용 브래킷(100)에 있어서,
교각의 최외측에 배치된 거더(10)의 상부로 돌출된 돌출근(11) 일 측에 밀착지지되도록, 일정길이를 갖는 'U'자형 프레임 또는 'L'자형 프레임으로 제공되어 수직 부의 길이방향 중앙에 통공(111)이 관통형성되는 지지프레임(110);
판 상의 플레이트로 제공되어, 일 측 상면의 폭 방향 중앙에 'L'자 형으로 제공되어 수직부 중앙에 통공(121a)이 관통형성된 고정브래킷(120a)의 하측이 용접고정되고, 일 측 일정길이만큼 거더(10)의 폭 방향 일 측 상면에 밀착 배치되며, 타 측에 2열로 일정간격을 가지고 통공(121)이 관통형성되는 고정플레이트(120);
고정플레이트(121)의 일 측이 거더의 상부로 돌출된 돌출근(11) 사이에 끼워져 고정될 수 있도록, 장방형 판 형상으로 제공되어 고정플레이트(120)의 일 측 폭 방향 양측으로부터 일단이 고정프레이트(120) 일 측 단 상면에 용접고정되어 고정플레이트(120) 일 측으로부터 외향 일정길이 돌출 배치되는 가이드 편(130);
고정플레이트(120)를 기준으로 지지프레임(110)이 거더(10)의 돌출근(11)에 밀착 지지된 상태로 체결력을 통해 당김 고정될 수 있도록, 고정프레이트(120) 상에 구비된 고정브래킷(120a)의 통공(121a)과 지지프레임(110)의 통공(111)을 관통하여 설치되는 고정볼트(141)와 고정볼트(141)의 단부에 체결고정되는 고정너트(142)로 구성된 당김수단(140); 및
거더(10)의 측부에 외향 돌출토록 일단 측부가 거더(10)의 측부에 밀착되면서 일단 상면 부분이 볼트(B)와 너트(N)를 통해 고정플레이트(120)와 고정설치되며, 캔틸레버의 시공시 프리캐스트 패널(20)이 안착 설치되면서 프리캐스트 패널(20)의 하면이 받쳐지도록 하는 받침대(150)를 포함하여 이루어진 캔틸레버용 브래킷.
In the bracket 100 for a cantilever for installing a cantilever is provided so as to be projected outwardly on the side of the girder (10) is disposed on the outermost side of the pier formed with a certain distance on the upper surface of the rod-type protruding roots (11),
It is provided in a'U'-shaped frame or a'L'-shaped frame having a predetermined length so as to be closely supported on one side of the protruding muscle 11 protruding to the top of the girder 10 disposed on the outermost side of the pier, the longitudinal direction of the vertical part Support frame 110 through-hole 111 is formed through the center;
It is provided as a plate on a plate, and is provided in an'L' shape in the center of the width direction of one side, and the lower side of the fixing bracket 120a through which the through hole 121a is formed in the center of the vertical portion is fixed by welding, and one side has a fixed length. As much as the width direction of the girder 10 is disposed in close contact with the upper surface on one side, the fixed plate 120 through which the through hole 121 is formed with a predetermined interval in two rows on the other side;
It is provided in a rectangular plate shape so that one side of the fixing plate 121 is sandwiched between the protruding muscles 11 protruding to the upper part of the girder, and one end is fixed plate from both sides in one width direction of the fixing plate 120 (120) a guide piece 130 fixed to the upper surface of one end by welding and fixedly protruding from the side of the fixed plate 120;
A fixing bracket provided on the fixing plate 120 so that the support frame 110 based on the fixing plate 120 is pulled and fixed through a fastening force in a state in close contact with the protruding muscle 11 of the girder 10 Pulling means consisting of a fixing bolt 141 installed through the through hole 121a of the support frame 110 and a fixing nut 142 fastened to the end of the fixing bolt 141 (140); And
Once the side is in close contact with the side of the girder 10 so that it protrudes outward on the side of the girder 10, once the upper surface part is fixedly installed with the fixing plate 120 through bolts (B) and nuts (N), the construction of the cantilever When the precast panel 20 is seated and installed, a bracket for a cantilever comprising a pedestal 150 to support the lower surface of the precast panel 20.
제1항에 있어서,
상기 당김수단(140)은 고정볼트(141)와 고정너트(142)를 포함하되, 2세트 이상으로 적용되는 한편,
지지프레임(110)의 통공(111) 및 고정브래킷(120a)의 통공(121a)은 당김수단(140)의 세트와 대응되어 2개 이상으로 관통형성되는 것을 특징으로 하는 캔틸레버용 브래킷.
According to claim 1,
The pulling means 140 includes a fixing bolt 141 and a fixing nut 142, while being applied in two or more sets,
The through-hole 111 of the support frame 110 and the through-hole 121a of the fixing bracket 120a correspond to the set of the pulling means 140, and cantilever brackets characterized by being formed through two or more.
제1항에 있어서,
상기 받침대(150)는 일정길이를 갖는 H 빔 타입으로 제공되어 상측 수평패널 부분의 일단 측에 2열로 통공(151a)이 관통형성되는 본체(151) 및
본체(151)의 일단에 수직 판 상으로 구비되어 일면이 거더(10)의 측부에 밀착되는 수직밀착판(153)을 포함하여 이루어지는 것을 특징으로 하는 캔틸레버용 브래킷.
According to claim 1,
The pedestal 150 is provided in an H beam type having a predetermined length, and the main body 151 through which the through holes 151a are formed in two rows on one side of the upper horizontal panel portion, and
Bracket for a cantilever is provided on one end of the main body 151 on a vertical plate comprises a vertical adhesion plate 153, one side of which is in close contact with the side of the girder (10).
교각의 최외측에 배치되되 상면에 일정간격을 가지고 봉 타입의 돌출근(11)이 돌출형성된 거더(10)의 측부에 외향 돌출토록 설치되는 캔틸레버용 브래킷(100)을 적용하여 교량의 캔틸레버를 시공하는 캔틸레버용 브래킷을 이용한 캔틸레버 시공방법에 있어서,
교각의 최외측에 배치된 거더(10) 측부에 길이방향으로 일정간격을 가지고 설치하여 프리캐스트 패널(20)을 안착 설치하기 위한 것으로, 일정길이를 갖는 'U'자형 프레임 또는 'L'자형 프레임으로 제공되어 수직 부의 길이방향 중앙에 통공(111)이 관통형성되는 지지프레임(110), 일 측 상면에 고정브래킷(120a)이 용접고정된 고정플레이트(120), 고정플레이트(120)의 일 측 폭 방향 양측으로부터 일단이 용접고정되어 고정플레이트(120) 일 측으로부터 외향 일정길이 돌출배치되는 가이드 편(130), 고정볼트(141)와 고정너트(142)로 제공되어 고정플레이트(120)를 기준으로 지지프레임(110)이 거더(10)의 돌출근(11)에 밀착 지지된 상태로 체결력을 통해 당김 고정되도록 하는 당김수단(140) 및 거더(10)의 측부에 외향 돌출토록 일단 측부가 거더(10)의 측부에 밀착되면서 일단 상면 부분이 볼트(B)와 너트(N)를 통해 고정플레이트(130)와 고정설치되어 캔틸레버의 시공시 프리캐스트 패널(20)이 안착 설치되면서 프리캐스트 패널(20)의 하면이 받쳐지도록 하는 받침대(150)를 포함하여 구성된 캔틸레버용 브래킷(100)을 제작하는 캔틸레버용 브래킷 제작단계(S110);
캔틸레버용 브래킷 제작단계(S110)를 거쳐 제작된 캔틸레버용 브래킷(100)을 거더(10)의 일 측 상부로부터 측벽에 걸쳐 배치되도록 조립하되 거더(10)의 측벽으로부터 받침대(150)가 일정길이 돌출되게 조립설치하며, 거더(10)의 길이방향으로 일정간격을 가지고 다수의 세트로 조립설치하는 캔틸레버용 브래킷 조립설치단계(S120);
캔틸레버용 브래킷 조립설치단계(S120)를 거쳐 거더(10)의 측벽으로부터 받침대(150)가 일정길이 돌출되게 조립설치된 캔틸레버용 브래킷(100)의 지지프레임(110) 폭 방향 양측 하단에 대하여 가이드 편(130) 상면과 밀착된 상태로 용접고정하는 용접고정단계(S130);
용접고정단계(S130) 이후에 진행되며, 거더(10)의 길이방향으로 프리캐스트 패널(20)이 연이어 안착되도록 캔틸레버용 브래킷 조립설치단계(S120)를 통해 조립설치된 캔틸레버용 브래킷(100)의 받침대(150)에 대한 이웃하는 사이에 각각 프리캐스트 패널(20)을 안착시키는 프리캐스트 패널 안착 설치단계(S140);
프리캐스트 패널 안착 설치단계(S140)를 거쳐 안착 설치된 프리캐스트 패널(20) 상면에 현장에서 철근을 배근한 후, 콘크리트를 타설하여 양생시키는 콘크리트 타설 및 양생단계(S150); 및
콘크리트 타설 및 양생단계(S150)를 거쳐 양생이 완료된 후에 고정플레이트(120)와 고정설치된 받침대(150)의 외부로 노출되게 고정된 볼트(B)를 풀어 캔틸레버용 브래킷(100)의 받침대(150)를 분리하는 캔틸레버용 브래킷의 받침대 분리단계(S160)를 포함하여 이루어진 캔틸레버용 브래킷을 이용한 캔틸레버 시공방법.
Construction of the cantilever of the bridge by applying the cantilever bracket (100), which is disposed on the outermost side of the pier and has an interval on the upper surface and is installed so as to protrude outward to the side of the girder (10) with the rod-shaped protruding root (11) protruding. In the cantilever construction method using the cantilever bracket,
For seating and installing the precast panel 20 at regular intervals in the longitudinal direction on the side of the girder 10 disposed on the outermost side of the pier, the'U' shaped frame or'L' shaped frame having a fixed length It is provided as a support frame 110 through which the through hole 111 is formed in the longitudinal center of the vertical portion, the fixing plate 120a fixed to the fixing bracket 120a on one side of the welding surface, one side of the fixing plate 120 It is provided as a guide piece 130, fixed bolt 141 and fixed nut 142, which are fixed by welding at one end from both sides in the width direction and fixedly protruding outward from one side of the fixed plate 120, based on the fixed plate 120 As the support frame 110 is supported in close contact with the protruding muscle 11 of the girder 10, the side of the girder is protruded outward to the side of the pulling means 140 and the girder 10 so as to be pulled and fixed through the fastening force. As it is in close contact with the side of (10), once the upper surface part is fixedly installed with the fixing plate 130 through the bolt (B) and the nut (N), the precast panel 20 is seated and installed during the construction of the cantilever ( 20) a cantilever bracket manufacturing step (S110) of manufacturing a cantilever bracket 100 comprising a base 150 to support the lower surface of the cantilever;
Assembling the cantilever bracket 100 produced through the cantilever bracket manufacturing step (S110) so as to be disposed over the sidewall from the upper side of one side of the girder 10, but the pedestal 150 protrudes a certain length from the sidewall of the girder 10 Assembled and installed, the cantilever bracket assembly installation step (S120) of assembling and installing a plurality of sets at regular intervals in the longitudinal direction of the girder (10);
The guide piece (with respect to the bottom of both sides of the support frame 110) in the width direction of the support frame 110 of the cantilever bracket 100 installed in such a way that the base 150 is protruded a certain length from the side wall of the girder 10 through the assembly installation step (S120) of the cantilever 130) a welding fixing step of welding fixing in a state in close contact with the upper surface (S130);
Proceeding after the welding fixing step (S130), the bracket of the cantilever bracket 100 installed and assembled through the cantilever bracket assembly installation step (S120) so that the precast panel 20 is seated one after another in the longitudinal direction of the girder 10 A precast panel seating installation step (S140) of seating the precast panels 20 between neighbors with respect to 150;
After the precast panel seating installation step (S140) and the reinforcement in the field on the upper surface of the precast panel 20 installed, the concrete pouring and curing step of pouring concrete to cure it (S150); And
After curing is completed through the concrete pouring and curing step (S150), the fixing plate 120 and the fixed bolt (B) exposed to the outside of the fixed installation base (150) are released to release the fixing bolt (B) of the cantilever bracket (100) Cantilever construction method using a bracket for a cantilever, comprising a step of removing the base of the cantilever bracket for separating (S160).
제4항에 있어서,
상기 캔틸레버용 브래킷 조립설치단계(S120)는 캔틸레버용 브래킷 제작단계(S110)를 거쳐 제작된 캔틸레버용 브래킷(100)을 거더(10)의 일 측 상부로부터 측벽에 걸쳐 거더(10)의 측벽으로부터 받침대(150)가 일정길이 돌출되도록 조립설치하되,
지지프레임(110)을 거더(10)의 상부에 돌출된 돌출근(11) 일 측에 밀착 지지가 되게 배치하고,
타 측에 받침대(150)의 일단이 조립고정된 고정플레이트(120)를 가이드 편(130)에 대해 돌출근(11) 사이를 통해 끼워지게 하면서 거더(10) 상면에 일 측이 일정길이 밀착되어 타 측이 일정길이 돌출되게 안착시킨 후,
당김수단(140)인 고정볼트(141)와 고정너트(142)를 지지프레임(110)의 통공(111)과 고정브래킷(120a)의 통공(121a)을 관통하여 상호 체결시킨 상태에서, 고정너트(142)를 조이면서 받침대(150)의 본체(151) 일단에 구비된 수직밀착판(153)이 거더(10)의 측벽에 밀착 지지되도록 하는 과정으로 이루어지는 것을 특징으로 하는 캔틸레버용 브래킷을 이용한 캔틸레버 시공방법.
The method of claim 4,
The cantilever bracket assembly installation step (S120) supports the cantilever bracket 100 produced through the cantilever bracket manufacturing step (S110) from the upper side of one side of the girder 10 to the side wall from the side wall of the girder 10. Assemble and install so that 150 is protruding a certain length,
The support frame 110 is disposed to be in close contact with one side of the protruding muscle 11 protruding from the top of the girder 10,
One side of the pedestal 150 is fixed to the other side of the upper surface of the girder 10 while being fitted through the protruding muscles 11 with respect to the guide piece 130 with one end fixed to the other side of the pedestal 150. After the other side is seated to protrude a certain length,
In the state in which the fixing bolt 141 and the fixing nut 142, which are the pulling means 140, penetrate the through hole 111 of the supporting frame 110 and the through hole 121a of the fixing bracket 120a, and then fasten each other. Cantilever using a bracket for a cantilever, characterized in that it consists of a process in which the vertical adhesion plate 153 provided at one end of the body 151 of the pedestal 150 is tightly supported on the side wall of the girder 10 while tightening the 142. Construction method.
제4항에 있어서,
상기 캔틸레버용 브래킷 제작단계(S110)를 거쳐 제작된 캔틸레버용 브래킷(100) 중 받침대(150)는 일정길이를 갖는 H 빔 타입으로 제공되어 상측 수평패널 부분의 일단 측에 2열로 통공(151a)이 관통형성되는 본체(151) 및
본체(151)의 일단에 수직 판 상으로 구비되어 일면이 거더(10)의 측부에 밀착되는 수직밀착판(153)을 포함하여 이루어지는 것을 특징으로 하는 캔틸레버용 브래킷을 이용한 캔틸레버 시공방법.
The method of claim 4,
Among the cantilever brackets 100 manufactured through the cantilever bracket manufacturing step (S110), the pedestal 150 is provided in an H beam type having a certain length, and has two rows of holes 151a on one side of the upper horizontal panel. The body 151 to be formed through and
A cantilever construction method using a bracket for a cantilever, characterized in that it is provided on one end of the main body (151) on a vertical plate and includes a vertical adhesion plate (153), one surface of which is in close contact with the side of the girder (10).
KR1020200057197A 2020-05-13 2020-05-13 Bracket for cantilever and cantilever construction method using the bracket KR102361339B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020200057197A KR102361339B1 (en) 2020-05-13 2020-05-13 Bracket for cantilever and cantilever construction method using the bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020200057197A KR102361339B1 (en) 2020-05-13 2020-05-13 Bracket for cantilever and cantilever construction method using the bracket

Publications (2)

Publication Number Publication Date
KR20200061327A true KR20200061327A (en) 2020-06-02
KR102361339B1 KR102361339B1 (en) 2022-02-11

Family

ID=71090836

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020200057197A KR102361339B1 (en) 2020-05-13 2020-05-13 Bracket for cantilever and cantilever construction method using the bracket

Country Status (1)

Country Link
KR (1) KR102361339B1 (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102186545B1 (en) * 2020-07-21 2020-12-03 조우일 Detachable support bracket of cantilever bridge and construction method of cantilever bridge using the same
KR102402326B1 (en) * 2021-05-21 2022-05-25 나성준 Detachable support bracket of cantilever bridge and construction method of cantilever bridge using the same
CN114606873A (en) * 2022-01-14 2022-06-10 浙江交工宏途交通建设有限公司 Steel case roof beam cantilever concrete placement bracket
KR102416758B1 (en) * 2022-03-07 2022-07-06 (주)한맥기술 Cantilever structure for bridge and construction method of cantilever structure for bridge
KR102470469B1 (en) * 2022-05-13 2022-11-25 (주)한맥기술 Cantilever structure for bridge
KR102487850B1 (en) * 2022-03-25 2023-01-12 (주)한맥기술 Cantilever precast half-deck including integral support and cantilever structure construction method using same
KR102487856B1 (en) * 2022-04-29 2023-01-12 (주)한맥기술 Foldable support for cantilever slab of bridge and construction method for cantilever structure using the support
KR20230034002A (en) * 2021-09-02 2023-03-09 (주)이알코리아 Bridge support integrated cantilever structure and its construction method
KR102658930B1 (en) * 2024-01-03 2024-04-18 (주)효명피씨 Cantilever bracket and gfrp deck construction method using the same

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100727172B1 (en) 2005-11-21 2007-06-13 강필규 Precast Concrete Panel and Nonsupport Construction Method of Bridge's Cantilever Work Utilizing P.C.P
KR101101204B1 (en) 2011-06-03 2012-01-04 (주) 효성 Cantilever of slab for steel box bridge using steel supporter and the method thereof
KR101101209B1 (en) 2011-06-03 2012-01-04 (주) 효성 Cantilever of slab for bridge using precast supporter and the method thereof
KR101699888B1 (en) 2016-08-11 2017-01-26 (주) 효성 Cantilever part of bridge and method thereof
KR101765762B1 (en) 2015-12-16 2017-08-07 주식회사 신원알피씨 Cantilever part for bridge and constructing method thereof
KR20170107308A (en) 2016-03-15 2017-09-25 주식회사 신원알피씨 Bracket for cantilever and cantilever construction method using the bracket
KR101796210B1 (en) * 2016-12-14 2017-11-09 이성원 Bracket for cantilever and cantilever construction method using the bracket
KR101970950B1 (en) * 2018-05-29 2019-04-23 주식회사 승은 Cantilever installation structure for extension roads
KR20190124615A (en) * 2018-05-30 2019-11-05 주식회사 신원알피씨 Foundation of girder for bridge cantilever bracket construction Magnetic type jig for bolt installation and method of making girder using the jig

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100727172B1 (en) 2005-11-21 2007-06-13 강필규 Precast Concrete Panel and Nonsupport Construction Method of Bridge's Cantilever Work Utilizing P.C.P
KR101101204B1 (en) 2011-06-03 2012-01-04 (주) 효성 Cantilever of slab for steel box bridge using steel supporter and the method thereof
KR101101209B1 (en) 2011-06-03 2012-01-04 (주) 효성 Cantilever of slab for bridge using precast supporter and the method thereof
KR101765762B1 (en) 2015-12-16 2017-08-07 주식회사 신원알피씨 Cantilever part for bridge and constructing method thereof
KR20170107308A (en) 2016-03-15 2017-09-25 주식회사 신원알피씨 Bracket for cantilever and cantilever construction method using the bracket
KR101699888B1 (en) 2016-08-11 2017-01-26 (주) 효성 Cantilever part of bridge and method thereof
KR101796210B1 (en) * 2016-12-14 2017-11-09 이성원 Bracket for cantilever and cantilever construction method using the bracket
KR101970950B1 (en) * 2018-05-29 2019-04-23 주식회사 승은 Cantilever installation structure for extension roads
KR20190124615A (en) * 2018-05-30 2019-11-05 주식회사 신원알피씨 Foundation of girder for bridge cantilever bracket construction Magnetic type jig for bolt installation and method of making girder using the jig

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102186545B1 (en) * 2020-07-21 2020-12-03 조우일 Detachable support bracket of cantilever bridge and construction method of cantilever bridge using the same
KR102307943B1 (en) * 2020-07-21 2021-09-30 조우일 Detachable support bracket of cantilever bridge and construction method of cantilever bridge using the same
KR102402326B1 (en) * 2021-05-21 2022-05-25 나성준 Detachable support bracket of cantilever bridge and construction method of cantilever bridge using the same
KR20230034002A (en) * 2021-09-02 2023-03-09 (주)이알코리아 Bridge support integrated cantilever structure and its construction method
CN114606873A (en) * 2022-01-14 2022-06-10 浙江交工宏途交通建设有限公司 Steel case roof beam cantilever concrete placement bracket
KR102416758B1 (en) * 2022-03-07 2022-07-06 (주)한맥기술 Cantilever structure for bridge and construction method of cantilever structure for bridge
KR102487850B1 (en) * 2022-03-25 2023-01-12 (주)한맥기술 Cantilever precast half-deck including integral support and cantilever structure construction method using same
KR102487856B1 (en) * 2022-04-29 2023-01-12 (주)한맥기술 Foldable support for cantilever slab of bridge and construction method for cantilever structure using the support
KR102470469B1 (en) * 2022-05-13 2022-11-25 (주)한맥기술 Cantilever structure for bridge
KR102658930B1 (en) * 2024-01-03 2024-04-18 (주)효명피씨 Cantilever bracket and gfrp deck construction method using the same

Also Published As

Publication number Publication date
KR102361339B1 (en) 2022-02-11

Similar Documents

Publication Publication Date Title
KR20200061327A (en) Bracket for cantilever and cantilever construction method using the bracket
KR100888941B1 (en) Concrete-composite crossbeam and construction methods using the same
US6250041B1 (en) Hold down bracket
US8359797B2 (en) Structure constructed using precast members and method of constructing the same
KR100748629B1 (en) Device for connecting a precast deck slab with a beam on a bridge and method for connecting the slab with the beam using the device
JP4499006B2 (en) Seismic isolation device mounting structure, construction method thereof, and base plate for seismic isolation device mounting
KR101170956B1 (en) Reinforcing assembly and method of structure using micro pile and hydraulic system
KR101400226B1 (en) Angle type light weigt steel material cross beam structure
JP3818020B2 (en) Cross-section precast segment method
KR20140061032A (en) Prestressed precast retaining wall and retaining wall construction method
KR101692488B1 (en) Prestressed concrete girder having reinforcing member and the construction method thereof
KR101326170B1 (en) Psc girder segment with connecting anchor block, psc girder and modular psc girder bridge construction method using the same
KR20100025160A (en) Apparatus having a girder connection anchor plate and the continuous construction method for a psc girder bridge by using the same apparatus
KR20070027432A (en) A fastener for fixing a reinforcing bar assembly, a mold panel, and a ceiling panel by fixing pin
KR101217790B1 (en) Steel structure reinforcing method with tendon using normal partial force
KR20060053030A (en) Net type external prestress strengthening apparatus and method for slab bridges
KR100984248B1 (en) Bridge construction method using strength connector detail for curing pannel of upper strength reinforcing block
KR100542616B1 (en) Temporary tension bracket for truss girder
KR200278091Y1 (en) Devices to shrengthen a bridge by exfermal presfressing cable
KR20110012200A (en) Form clamp
KR102546964B1 (en) Bridge cantilever construction method
KR102534104B1 (en) Girder having continuous structure and construction method using the same
KR102702361B1 (en) Shear reinforcement system for interior column of Non-Limited plate slab by thought structural support
KR20060072723A (en) Continuous rolled beam girder bridge with prestressed connection
KR101980550B1 (en) Method of aseismic reinforcement for reinforcing columns of building

Legal Events

Date Code Title Description
E902 Notification of reason for refusal
E90F Notification of reason for final refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant