KR20200057519A - Appratus and method for controlling darkcurrent of vehicle - Google Patents

Appratus and method for controlling darkcurrent of vehicle Download PDF

Info

Publication number
KR20200057519A
KR20200057519A KR1020180142021A KR20180142021A KR20200057519A KR 20200057519 A KR20200057519 A KR 20200057519A KR 1020180142021 A KR1020180142021 A KR 1020180142021A KR 20180142021 A KR20180142021 A KR 20180142021A KR 20200057519 A KR20200057519 A KR 20200057519A
Authority
KR
South Korea
Prior art keywords
vehicle
time
current
power
priority
Prior art date
Application number
KR1020180142021A
Other languages
Korean (ko)
Other versions
KR102587088B1 (en
Inventor
신원호
김수연
이희준
이동열
서재암
김진
Original Assignee
현대자동차주식회사
기아자동차주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 현대자동차주식회사, 기아자동차주식회사 filed Critical 현대자동차주식회사
Priority to KR1020180142021A priority Critical patent/KR102587088B1/en
Publication of KR20200057519A publication Critical patent/KR20200057519A/en
Application granted granted Critical
Publication of KR102587088B1 publication Critical patent/KR102587088B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60RVEHICLES, VEHICLE FITTINGS, OR VEHICLE PARTS, NOT OTHERWISE PROVIDED FOR
    • B60R16/00Electric or fluid circuits specially adapted for vehicles and not otherwise provided for; Arrangement of elements of electric or fluid circuits specially adapted for vehicles and not otherwise provided for
    • B60R16/02Electric or fluid circuits specially adapted for vehicles and not otherwise provided for; Arrangement of elements of electric or fluid circuits specially adapted for vehicles and not otherwise provided for electric constitutive elements
    • B60R16/03Electric or fluid circuits specially adapted for vehicles and not otherwise provided for; Arrangement of elements of electric or fluid circuits specially adapted for vehicles and not otherwise provided for electric constitutive elements for supply of electrical power to vehicle subsystems or for
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60RVEHICLES, VEHICLE FITTINGS, OR VEHICLE PARTS, NOT OTHERWISE PROVIDED FOR
    • B60R16/00Electric or fluid circuits specially adapted for vehicles and not otherwise provided for; Arrangement of elements of electric or fluid circuits specially adapted for vehicles and not otherwise provided for
    • B60R16/005Electro-mechanical devices, e.g. switched
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/60Software deployment
    • G06F8/65Updates

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Software Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Security & Cryptography (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Direct Current Feeding And Distribution (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)

Abstract

According to the present invention, a dark current control apparatus of a vehicle comprises: a calculation unit which calculates a required current of a plurality of devices provided in the vehicle and a required time to which the required current is to be applied when the ignition of the vehicle is turned off; a determining unit for setting a priority based on the calculated required current and required time, but when a required current of a new device is additionally generated, variably setting the priority by reflecting the required current of the new device and a required time to which the required current should be applied; and a control unit which cuts off power to the plurality of devices and the new device based on the variably set priority. Accordingly, a dark current can be effectively controlled by changing a sequence of cut-off time by reflecting the additional required power generated from the vehicle update.

Description

차량의 암전류 제어 장치 및 방법{APPRATUS AND METHOD FOR CONTROLLING DARKCURRENT OF VEHICLE}Vehicle dark current control device and method {APPRATUS AND METHOD FOR CONTROLLING DARKCURRENT OF VEHICLE}

본 발명은 차량의 암전류 제어 장치 및 방법에 관한 것이다.The present invention relates to a dark current control device and method for a vehicle.

차량의 시동을 정지시키면 배터리에서 시동장치 및 라디오 등과 같은 각종 액세서리 장치에 공급되는 전류의 흐름은 차단시키지만, 즉각적인 시동을 위한 전류의 공급 및 기타 다른 컨트롤러 등과 같은 장치에는 배터리의 전류가 지속적으로 공급되게 되며, 이러한 전류를 암전류(dark current)라 한다.When the vehicle is stopped from starting, the current flow from the battery to various accessories such as the starter and radio is blocked, but the current from the battery and other controllers are continuously supplied with battery current. This current is called the dark current.

이로 인해, 시동을 걸기 위한 최소한의 전압을 확보하지 못한 상태로 배터리가 방전되어 운전자의 불편을 초래하고 있다. 이러한 불편을 해결하기 위해, 배터리 잔량(SOC, State Of Charge) 정보를 이용해서 배터리 잔량이 특정 값 이하로 떨어지기 전에 스위치를 오프시키거나 특정 시간을 기준으로 전장 시스템을 순차적으로 차단하는 기술이 개발되고 있다.Due to this, the battery is discharged in a state in which a minimum voltage for starting is not secured, causing inconvenience to the driver. In order to solve this inconvenience, a technology has been developed to turn off the switch or shut off the electric system sequentially based on a specific time using the state of charge (SOC) information before the battery level falls below a certain value. Is becoming.

그러나, 이러한 기술들에 따르면 전원 차단 시스템 및 시간은 사전에 정의되기 때문에 해당 시간이 도래하면 전원이 차단되고, 차단 시점 이후에는 해당 시스템을 작동할 수 없다. 따라서, 시간에 따라 사전에 정의된 시간 순서대로 전원을 차단하기 어려운 상황이 발생되는 문제가 있다.However, according to these technologies, the power-off system and time are predefined, so when the time arrives, the power is cut off and the system cannot be operated after the cut-off point. Therefore, there is a problem in that it is difficult to cut off the power in a predetermined time sequence according to time.

본 발명의 일 목적은 차량 업데이트에 따라 변경된 필요 전력을 재산출하여 암전류를 제어하는데 있다. One object of the present invention is to control the dark current by recalculating the required power changed according to the vehicle update.

본 발명의 기술적 과제들은 이상에서 언급한 기술적 과제들로 제한되지 않으며, 언급되지 않은 또 다른 기술적 과제들은 아래의 기재들로부터 당업자에게 명확하게 이해될 수 있을 것이다.The technical problems of the present invention are not limited to the technical problems mentioned above, and other technical problems not mentioned will be clearly understood by those skilled in the art from the following descriptions.

본 발명의 일 실시예에 따른 암전류 제어 장치는 차량의 시동이 오프된 시점에서 차량 내 구비된 복수의 장치의 요구전류 및 상기 요구전류가 인가되어야 하는 요구시간을 산출하는 산출부와, 상기 산출된 요구전류 및 상기 요구시간을 기반으로 우선순위를 설정하되, 신규 장치의 요구전류가 추가적으로 발생되는 경우, 상기 신규 장치의 요구전류 및 상기 요구전류가 인가되어야 하는 요구시간을 반영하여 상기 우선순위를 가변적으로 설정하는 판단부 및 상기 가변적으로 설정된 우선순위를 기반으로 상기 복수의 장치 및 상기 신규 장치의 전원을 차단하는 제어부를 포함한다.The dark current control device according to an embodiment of the present invention includes a calculation unit that calculates the required currents of the plurality of devices provided in the vehicle and the required time to which the requested currents are to be applied when the vehicle is started off, and the calculated Priority is set based on the requested current and the requested time, but when the requested current of the new device is additionally generated, the priority is variable by reflecting the requested current of the new device and the requested time to which the requested current should be applied. It includes a determination unit for setting and a control unit for turning off the power of the plurality of devices and the new device based on the variable set priority.

그리고, 상기 복수의 장치는 상기 차량의 시동 오프 이후 상기 요구시간 동안 상기 차량에서 동작하여야 하는 장치들을 포함한다.In addition, the plurality of devices include devices that must be operated in the vehicle for the required time after the vehicle is started off.

그리고, 상기 신규 장치의 요구전류가 추가적으로 발생하는 경우는 차량 업데이트가 수행되는 경우를 포함한다.In addition, when the required current of the new device is additionally generated, a case in which a vehicle update is performed is included.

그리고, 상기 차량 업데이트는 OTA(Over The Air) 방식으로 수행된다.In addition, the vehicle update is performed by OTA (Over The Air).

그리고, 상기 차량 업데이트는 AVN 장치의 업데이트를 포함한다.In addition, the vehicle update includes an update of the AVN device.

그리고, 상기 추가된 상기 신규 장치의 상기 요구전류 및 상기 요구시간은 상기 산출부로부터 산출된다.Then, the required current and the requested time of the added new device are calculated from the calculation unit.

그리고, 상기 우선순위 및 상기 가변적으로 설정된 우선순위는 상기 요구시간이 긴 순서대로 설정된다.In addition, the priority and the variably set priority are set in the order in which the request time is long.

그리고, 상기 제어부는 상기 복수의 장치의 전원 차단을 제어하는 복수의 스위치를 포함한다.In addition, the control unit includes a plurality of switches for controlling the power off of the plurality of devices.

그리고, 상기 제어부는 상기 가변적으로 설정된 우선순위를 기반으로 전원 차단시간 순서를 설정하고, 상기 전원 차단시간 순서에 따라 상기 복수의 장치 및 상기 신규 장치의 전원을 차단한다.Then, the control unit sets a power-off time sequence based on the variably set priority, and cuts off the power of the plurality of devices and the new device according to the power-off time sequence.

그리고, 상기 전원 차단시간 순서는 상기 요구전류가 인가되어야 할 시간이 짧은 순서대로 설정된다. In addition, the power-off time sequence is set in the order in which the time at which the requested current is to be applied is short.

본 발명의 일 실시예에 따른 차량의 암전류 제어 방법은 차량의 시동이 오프된 시점에서 차량 내 구비된 복수의 장치의 요구전류 및 상기 요구전류가 인가되어야 하는 요구시간을 산출하는 단계와, 상기 산출된 요구전류 및 상기 요구시간을 기반으로 우선순위를 설정하되, 신규 장치의 요구전류가 추가적으로 발생되는 경우, 상기 신규 장치의 요구전류 및 상기 요구전류가 인가되어야 하는 요구시간을 반영하여 우선순위를 가변적으로 설정하는 단계 및 상기 가변적으로 설정된 우선순위를 기반으로 상기 복수의 장치 및 상기 신규 장치의 전원을 차단하는 단계를 포함한다.The method for controlling the dark current of a vehicle according to an embodiment of the present invention includes calculating the required currents of the plurality of devices provided in the vehicle and the required time to which the requested currents should be applied when the vehicle is started off, and the calculation Priority is set based on the requested current and the requested time, but when the current required for the new device is additionally generated, the priority is variable by reflecting the requested current of the new device and the requested time to which the requested current should be applied. And turning off the power of the plurality of devices and the new device based on the set priority and the variably set priority.

그리고, 상기 복수의 장치는 상기 차량의 시동 오프 이후 상기 요구시간 동안 상기 차량에서 동작하여야 하는 장치들을 포함한다.In addition, the plurality of devices include devices that must be operated in the vehicle for the required time after the vehicle is started off.

그리고, 상기 신규 장치의 요구전류가 추가적으로 발생하는 경우는 차량 업데이트가 수행되는 경우를 포함한다.In addition, when the required current of the new device is additionally generated, a case in which a vehicle update is performed is included.

그리고, 상기 차량 업데이트는 OTA(Over The Air) 방식으로 수행된다.In addition, the vehicle update is performed by OTA (Over The Air).

그리고, 상기 차량 업데이트는 AVN 장치의 업데이트를 포함한다.In addition, the vehicle update includes an update of the AVN device.

그리고, 상기 신규 장치의 요구전류가 추가적으로 발생하는 경우, 추가된 상기 신규 장치의 상기 요구전류 및 상기 요구시간를 산출하는 단계를 더 포함한다.In addition, when the required current of the new device is additionally generated, the method further includes calculating the required current and the required time of the added new device.

그리고, 상기 우선순위 및 상기 가변적으로 설정된 우선순위는 상기 요구시간이 긴 순서대로 설정된다.In addition, the priority and the variably set priority are set in the order in which the request time is long.

그리고, 상기 복수의 장치 및 상기 신규 장치의 전원을 차단하는 단계는 상기 복수의 장치와 연결된 복수의 스위치를 통해 제어되는 포함한다.And, the step of turning off the power of the plurality of devices and the new device includes being controlled through a plurality of switches connected to the plurality of devices.

그리고, 상기 복수의 장치 및 상기 신규 장치의 전원을 차단하는 단계는 상기 가변적으로 설정된 우선순위를 기반으로 전원 차단시간 순서를 설정하고, 상기 전원 차단시간 순서에 따라 상기 복수의 장치 및 상기 신규 장치의 전원을 차단한다.In addition, the step of turning off the power of the plurality of devices and the new device sets a power-off time sequence based on the variably set priority, and the plurality of devices and the new device according to the power-off time order. Turn off the power.

그리고, 상기 전원 차단시간 순서는 상기 요구전류가 인가되어야 할 시간이 짧은 순서대로 설정된다.In addition, the power-off time sequence is set in the order in which the time at which the requested current is to be applied is short.

본 발명의 일 실시예에 따른 차량의 암전류 제어 장치 및 방법은 시간 순서에 따라 전원을 차단하여 암전류를 제어하되, 차량 업데이트에서 발생된 추가 요구 전원을 반영하여 차단 시간 순서를 변경함으로써, 암전류 제어의 효율성을 높일 수 있다. In the dark current control apparatus and method of a vehicle according to an embodiment of the present invention, the dark current is controlled by cutting off the power according to the time sequence, but by changing the order of the breaking time by reflecting the additional required power generated in the vehicle update, Increase efficiency.

또한, 암전류 제어의 효율성이 높아짐에 따라 차량으로의 안정적인 전력 공급이 가능할 수 있다.In addition, as the efficiency of dark current control increases, stable power supply to the vehicle may be possible.

도 1은 본 발명의 일 실시예에 따른 암전류 제어 장치의 블록도이다.
도 2는 본 발명의 일 실시예에 따른 암전류 제어 장치의 상세 블록도이다.
도 3은 본 발명의 일 실시예에 따른 암전류 제어 방법을 나타낸 순서도이다.
도 4는 본 발명의 일 실시예에 따른 암전류 제어를 나타낸 그래프이다.
도 5는 본 발명의 일 실시예에 따른 암전류 제어 방법을 실행하는 컴퓨팅 시스템을 보여주는 블록도이다.
1 is a block diagram of a dark current control device according to an embodiment of the present invention.
2 is a detailed block diagram of a dark current control device according to an embodiment of the present invention.
3 is a flowchart illustrating a dark current control method according to an embodiment of the present invention.
4 is a graph showing dark current control according to an embodiment of the present invention.
5 is a block diagram showing a computing system executing a dark current control method according to an embodiment of the present invention.

이하, 본 발명의 일부 실시예들을 예시적인 도면을 통해 상세하게 설명한다. 각 도면의 구성요소들에 참조부호를 부가함에 있어서, 동일한 구성요소들에 대해서는 비록 다른 도면상에 표시되더라도 가능한 한 동일한 부호를 가지도록 하고 있음에 유의해야 한다. 또한, 본 발명의 실시예를 설명함에 있어, 관련된 공지 구성 또는 기능에 대한 구체적인 설명이 본 발명의 실시예에 대한 이해를 방해한다고 판단되는 경우에는 그 상세한 설명은 생략한다.Hereinafter, some embodiments of the present invention will be described in detail through exemplary drawings. It should be noted that in adding reference numerals to the components of each drawing, the same components have the same reference numerals as possible even though they are displayed on different drawings. In addition, in describing the embodiments of the present invention, when it is determined that detailed descriptions of related well-known configurations or functions interfere with the understanding of the embodiments of the present invention, detailed descriptions thereof will be omitted.

본 발명의 실시예의 구성 요소를 설명하는 데 있어서, 제 1, 제 2, A, B, (a), (b) 등의 용어를 사용할 수 있다. 이러한 용어는 그 구성 요소를 다른 구성 요소와 구별하기 위한 것일 뿐, 그 용어에 의해 해당 구성 요소의 본질이나 차례 또는 순서 등이 한정되지 않는다. 또한, 다르게 정의되지 않는 한, 기술적이거나 과학적인 용어를 포함해서 여기서 사용되는 모든 용어들은 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자에 의해 일반적으로 이해되는 것과 동일한 의미를 가진다. 일반적으로 사용되는 사전에 정의되어 있는 것과 같은 용어들은 관련 기술의 문맥상 가지는 의미와 일치하는 의미를 가진 것으로 해석되어야 하며, 본 출원에서 명백하게 정의하지 않는 한, 이상적이거나 과도하게 형식적인 의미로 해석되지 않는다.In describing the components of the embodiments of the present invention, terms such as first, second, A, B, (a), and (b) may be used. These terms are only for distinguishing the component from other components, and the nature, order, or order of the component is not limited by the term. In addition, unless defined otherwise, all terms used herein, including technical or scientific terms, have the same meaning as commonly understood by a person skilled in the art to which the present invention pertains. Terms such as those defined in a commonly used dictionary should be interpreted as having meanings consistent with meanings in the context of related technologies, and should not be interpreted as ideal or excessively formal meanings unless explicitly defined in the present application. Does not.

도 2는 본 발명의 일 실시예에 따른 암전류 제어 장치의 블록도이다.2 is a block diagram of a dark current control device according to an embodiment of the present invention.

도 2에 도시된 바와 같이, 암전류 제어 장치는 산출부(11), 판단부(12) 및 제어부(13)를 포함할 수 있다.As shown in FIG. 2, the dark current control device may include a calculation unit 11, a determination unit 12, and a control unit 13.

산출부(11)는 차량의 시동이 오프된 시점 즉, 통신부가 슬립모드로 진입하기 전에 차량 내 구비된 복수의 장치들을 구동하는데 요구되는 전류 및 요구되는 전류가 인가되어야 하는 시간을 산출할 수 있다.The calculator 11 may calculate a time when the vehicle is started off, that is, a current required to drive a plurality of devices provided in the vehicle and a time required to be applied before the communication unit enters the sleep mode. .

본 발명의 실시예에 따라 차량 내 구비된 복수의 장치는 운전자의 스마트키로부터 RF 신호를 수신하는 SMK(Smart Key) 모듈, 운전자가 소유한 휴대 기기와 연동을 위한 모뎀 웨이크업을 위한 I-Box, 램프 제어기 등을 포함할 수 있다.According to an embodiment of the present invention, a plurality of devices provided in a vehicle include a Smart Key (SMK) module that receives an RF signal from a driver's smart key, and an I-Box for modem wake-up for interworking with a mobile device owned by the driver. , Lamp controller, and the like.

일 예로, 산출부(11)는 SMK 모듈의 요구전류를 800mA, 요구전류가 인가되어야 하는 시간을 336시간으로 산출할 수 있고, I-Box의 요구전류를 500mA, 요구전류가 인가되어야 하는 시간을 168시간으로 산출할 수 있고, 램프 제어의 요구전류를 1A, 요구전류가 인가되어야 하는 시간을 12시간으로 산출할 수 있다.As an example, the calculator 11 may calculate the required current of the SMK module as 800mA and the time at which the requested current should be applied to 336 hours, and the required current of the I-Box as 500mA and the time at which the requested current should be applied. It can be calculated as 168 hours, the required current of the lamp control can be calculated as 1A, and the time at which the required current should be applied can be calculated as 12 hours.

또한, 산출부(11)는 차량 업데이트로 인해 신규 장치가 추가되면, 신규 장치에 요구되는 전류 및 시간을 산출할 수 있다. In addition, when a new device is added due to a vehicle update, the calculator 11 may calculate a current and time required for the new device.

일 예로, 산출부(11)는 차량 업데이트로 인해 추가된 신규 장치가 AVN인 경우, AVN의 요구전류를 300mA, 요구전류가 인가되어야 하는 시간을 0.5 시간으로 산출할 수 있다. For example, when the new device added due to the vehicle update is an AVN, the calculator 11 may calculate the required current of the AVN as 300 mA and the time at which the requested current should be applied as 0.5 hours.

판단부(12)는 산출부(11)에서 산출된 요구전류 및 시간을 기반으로 우선순위를 설정한다. 여기서, 우선순위는 요구전류가 인가되어야 할 시간이 긴 순서를 의미할 수 있다. 일 예로 판단부(12)는 우선순위를 SMK 모듈, I-Box, 램프 제어기 순으로 우선순위를 설정할 수 있다. The determination unit 12 sets the priority based on the requested current and time calculated by the calculation unit 11. Here, the priority may refer to a long order in which the required current should be applied. For example, the determination unit 12 may set the priority in order of SMK module, I-Box, and lamp controller.

판단부(12)는 차량 업데이트 여부를 판단하고, 차량 업데이트가 된 것으로 판단하면, 업데이트 대상 장치에 요구되는 전류 및 시간을 기반으로 우선순위를 가변적으로 설정할 수 있다. The determination unit 12 may determine whether the vehicle is updated, and if it is determined that the vehicle has been updated, the priority may be variably set based on the current and time required for the device to be updated.

차량 업데이트는 OTA(Over The Air)방식으로 수행될 수 있는데, 여기서 OTA는 서버로부터 차량 시스템 등록에 관한 정보를 송, 수신하기 위해 제정한 무선통신 방식을 의미할 수 있다. 본 발명의 실시예에 따라 차량 업데이트는 AVN장치의 업데이트를 포함할 수 있다. Vehicle update may be performed in an OTA (Over The Air) method, where OTA may refer to a wireless communication method established to transmit and receive information regarding vehicle system registration from a server. Vehicle update according to an embodiment of the present invention may include an update of the AVN device.

판단부(12)는 차량 시동이 오프된 시점에서 OTA 방식으로 업데이트가 수행되어 신규 장치가 추가되는 경우, 신규 장치에 요구되는 전류 및 시간을 반영하여 우선순위를 가변적으로 설정하기 때문에 종래에 기 설정된 우선순위에 따라 장치들의 전원이 차단되지 않고, 새로 추가된 신규 장치가 반영됨에 따라 가변되는 우선순위에 따라 전원이 차단되도록 할 수 있다. Since the determination unit 12 updates the OTA method at the time when the vehicle starts off, when a new device is added, the priority is variably set by reflecting the current and time required for the new device. The power of the devices may not be cut off according to the priority, and the power may be cut off according to the changed priority as the newly added new device is reflected.

즉, 판단부(12)는 차량 시동이 오프된 시점에서 OTA 방식으로 AVN 장치를 업데이트 하는 경우, AVN을 업데이트 하는데 요구되는 전류 및 시간을 반영하여 우선순위를 가변적으로 설정할 수 있다. That is, when the AVN device is updated by the OTA method when the vehicle starts off, the determination unit 12 may variably set the priority by reflecting the current and time required to update the AVN.

제어부(13)는 판단부(12)가 가변적으로 설정한 우선순위를 기반으로 전원 차단시간 순서를 설정하고, 설정된 전원 차단시간 순서에 따라 장치의 전원을 차단할 수 있다. The control unit 13 may set a power-off time sequence based on a priority set by the determination unit 12 variably, and cut off power to the device according to the set power-off time sequence.

여기서, 전원 차단시간은 차량의 시동 오프 시점으로부터 장치의 요구전류가 인가되어야 하는 시간이 경과한 시점을 의미할 수 있다. Here, the power-off time may refer to a time point when a time at which the required current of the device should be applied has elapsed from the time when the vehicle is started off.

제어부(13)는 전원 차단시간 순서를 상기 요구전류가 인가되어야 할 시간이 짧은 순서대로 설정할 수 있다.The controller 13 may set the power-off time sequence in the order in which the time at which the requested current is to be applied is short.

일 예로, 제어부(13)는 판단부(12)에서 우선순위가 가변적으로 설정되기 전의 전원 차단시간 T1은 램프 제어기의 전원을 차단하는 시간, T2는 I-Box의 전원을 차단하는 시간, T3는 SMK 모듈의 전원을 차단하는 시간으로 설정할 수 있다.For example, the control unit 13, the power cut-off time T1 before the priority is variably set in the determination unit 12 is the time to cut off the power of the lamp controller, T2 is the time to cut off the power of the I-Box, T3 is It can be set as the time to power off the SMK module.

그러나, 본 발명에서는 제어부(13)는 가변적으로 설정된 우선순위를 기반으로 전원 차단시간의 순서를 설정하기 때문에 전원 차단시간 T1 이전 NT를 새롭게 설정할 수 있으며, NT는 AVN 장치의 전원을 차단하는 시간을 의미할 수 있다.However, in the present invention, since the control unit 13 sets the sequence of the power-off time based on the variably set priority, the NT before the power-off time T1 can be newly set, and the NT sets the time to power off the AVN device. Can mean

도 3은 본 발명의 일 실시예에 따른 암전류 제어 장치의 상세 블록도이다.3 is a detailed block diagram of a dark current control device according to an embodiment of the present invention.

도 3에 도시된 바와 같이, 본 발명의 일 실시예에 따른 암전류 제어 장치는 보다 상세하게 장치(10), 산출부(11), 판단부(12), 제어부(13), 스위치(14) 및 배터리(15)를 포함할 수 있다. As shown in Figure 3, the dark current control device according to an embodiment of the present invention in more detail the device 10, the calculation unit 11, the determination unit 12, the control unit 13, the switch 14 and It may include a battery 15.

장치(10)는 차량의 시동 오프 이후 차량에서 동작하여야 하는 장치를 포함할 수 있으며, 차량 시동 온 시에 동작이 즉각적으로 이루어지게 함과 더불어 전기장치의 기본적인 작동이 지속적으로 이루어지게 하기 위한 각종 컨트롤러 등을 포함할 수 있다.The device 10 may include a device that must be operated in the vehicle after the vehicle is started off, and various controllers for allowing the operation to be immediately performed when the vehicle is started and to continuously perform the basic operation of the electric device And the like.

장치(10)는 복수개로 구비될 수 있으며, 도 3에 도시된 갯수에 한정되지 않는다.The device 10 may be provided in plural, and is not limited to the number shown in FIG. 3.

장치(10)의 일측은 산출부(11)와 연결되며, 장치(10)의 타측은 스위치부(14)와 연결될 수 있다.One side of the device 10 is connected to the calculation unit 11, the other side of the device 10 may be connected to the switch unit 14.

산출부(11)는 장치(10)와 연결되어 차량 시동 오프 시점에 장치에 요구되는 요구전류 및 시간을 산출할 수 있다. The calculator 11 may be connected to the device 10 to calculate the required current and time required for the device at the time of starting the vehicle off.

판단부(12)는 산출부(11)와 캔 통신방식으로 통신할 수 있다.The determination unit 12 may communicate with the calculation unit 11 in a can communication method.

제어부(13)는 판단부(12)와 이더넷 네트워크를 통해 통신할 수 있으며, 배터리(15)로부터 공급된 전원을 차단하는 스위치부(14)를 포함할 수 있다. 스위치부(14)의 개수는 도 4의 갯수에 한정되지 않는다. The control unit 13 may communicate with the determination unit 12 through an Ethernet network, and may include a switch unit 14 to cut off power supplied from the battery 15. The number of switch parts 14 is not limited to the number of FIG. 4.

스위치부(14)는 판단부(12)에서 판단된 차량 업데이트로 인해 가변적으로 설정된 우선순위를 기반으로 설정된 전원 차단시간에 따라 배터리(15)로부터 장치(10)에 공급되는 전원을 차단할 수 있다. The switch unit 14 may cut off the power supplied to the device 10 from the battery 15 according to a set power-off time based on a variable priority set by the vehicle update determined by the determination unit 12.

제어부(13)는 배터리(15)의 SOC, SOC 변화량, SOH를 기반으로 스위치부(14)의 스위치 온/오프를 제어하여 장치(10)로 공급되는 전원의 차단여부를 제어하는 MCU(Micro Control Unit)을 포함할 수 있다.The control unit 13 controls a switch on / off of the switch unit 14 based on SOC, SOC change amount, and SOH of the battery 15 to control whether or not the power supplied to the device 10 is cut off. Unit).

도 4는 본 발명의 일 실시예에 따른 암전류 제어 방법을 나타낸 순서도이다.4 is a flowchart illustrating a dark current control method according to an embodiment of the present invention.

도 4에 도시된 바와 같이, 판단부(12)는 차량의 시동 오프 시점을 판단한다(S41). 또한, 판단부(12)는 차량의 시동 오프 이후 차량에서 동작하여야 하는 장치들이 필요로 하는 요구전류를 요청하는 신호를 산출부(11)에 전송한다(S42). 여기서, 장치는 운전자의 스마트키로부터 RF 신호를 수신하는 SMK(Smart Key) 모듈, 운전자가 소유한 휴대 기기와 연동을 위한 모뎀 웨이크업을 위한 I-Box, 램프 제어기 등을 포함할 수 있다.As illustrated in FIG. 4, the determination unit 12 determines the starting time of the vehicle to be turned off (S41). Further, the determination unit 12 transmits a signal requesting the required current required by devices that must be operated in the vehicle after the vehicle is started off to the calculation unit 11 (S42). Here, the device may include a Smart Key (SMK) module that receives an RF signal from the driver's smart key, an I-Box for modem wake-up for interworking with a portable device owned by the driver, a lamp controller, and the like.

산출부(11)는 차량의 시동 오프 이후 차량에서 동작하여야 하는 장치들이 필요로 하는 요구전류 및 요구전류가 인가되어야 하는 요구시간을 산출하고, 산출된 요구전류 및 요구시간을 판단부(12)로 전송한다(S43).The calculation unit 11 calculates the required current and the required time to which the required current is applied by devices that must be operated in the vehicle after the vehicle is started off, and calculates the requested current and the requested time to the determination unit 12 And transmit (S43).

S43에서 산출부(11)는 SMK 모듈의 요구전류를 800mA, 요구전류가 인가되어야 하는 시간을 336시간으로 산출할 수 있고, I-Box의 요구전류를 500mA, 요구전류가 인가되어야 하는 시간을 168시간으로 산출할 수 있고, 램프 제어의 요구전류를 1A, 요구전류가 인가되어야 하는 시간을 12시간으로 산출할 수 있다.In S43, the calculator 11 may calculate the required current of the SMK module as 800 mA and the time at which the requested current should be applied to 336 hours, the required current of the I-Box as 500 mA, and the time at which the requested current should be applied 168 It can be calculated as time, and the required current of lamp control can be calculated as 1A and the time at which the requested current should be applied can be calculated as 12 hours.

판단부(12)는 산출된 요구전류 및 요구시간을 기반으로 우선순위를 설정한다(S44). The determination unit 12 sets a priority based on the calculated request current and request time (S44).

S44에서 판단부(12)가 설정한 우선순위는 요구전류가 인가되어야 할 시간이 긴 순서를 의미할 수 있다. 일 예로 판단부(12)는 우선순위를 SMK 모듈, I-Box, 램프 제어기 순으로 우선순위를 설정할 수 있다. The priority set by the determination unit 12 in S44 may mean an order in which the time for which the requested current is to be applied is long. For example, the determination unit 12 may set the priority in order of SMK module, I-Box, and lamp controller.

그리고, 판단부(12)는 설정된 우선순위를 제어부(13)에 전송한다(S45).Then, the determination unit 12 transmits the set priority to the control unit 13 (S45).

이때, 판단부(12)는 차량 업데이트를 판단하고, 차량 업데이트가 된 것으로 판단하면, 산출부(11)는 업데이트 대상 장치를 신규 장치로 추가한다(S46).At this time, the determination unit 12 determines the vehicle update, and if it is determined that the vehicle has been updated, the calculation unit 11 adds the device to be updated as a new device (S46).

차량 업데이트는 OTA(Over The Air)방식으로 수행될 수 있는데, 여기서 OTA는 서버로부터 차량 시스템 등록에 관한 정보를 송, 수신하기 위해 제정한 무선통신 방식을 의미할 수 있다. 본 발명의 실시예에 따라 차량 업데이트는 AVN장치의 업데이트를 포함할 수 있다. Vehicle update may be performed in an OTA (Over The Air) method, where OTA may refer to a wireless communication method established to transmit and receive information regarding vehicle system registration from a server. Vehicle update according to an embodiment of the present invention may include an update of the AVN device.

산출부(11)는 추가된 신규 장치의 요구전류 및 요구전류가 인가되어야 할 요구시간을 산출하고 판단부(12)로 전송한다(S47).The calculating unit 11 calculates the required current and the required time to which the requested current of the added new device is to be applied and transmits it to the determination unit 12 (S47).

S47에서 산출부(11)는 차량 업데이트로 인해 추가된 신규 장치가 AVN인 경우, AVN의 요구전류를 300mA, 요구전류가 인가되어야 하는 시간을 0.5 시간으로 산출할 수 있다. In S47, when the new device added due to the vehicle update is the AVN, the calculator 11 may calculate the required current of the AVN as 300mA and the time at which the requested current should be applied as 0.5 hours.

판단부(12)는 산출부(11)로부터 수신한 신규 장치의 요구전류 및 요구시간을 기반으로 우선순위를 가변적으로 설정할 수 있다(S48). The determining unit 12 may variably set the priority based on the requested current and the requested time of the new device received from the calculating unit 11 (S48).

판단부(12)는 차량 시동이 오프된 시점에서 OTA 방식으로 업데이트가 수행되어 신규 장치가 추가되는 경우, 신규 장치에 요구되는 전류 및 시간을 반영하여 우선순위를 가변적으로 설정하기 때문에 종래에 기 설정된 우선순위에 따라 장치들의 전원이 차단되지 않고, 새로 추가된 신규 장치가 반영된 우선순위에 따라 전원이 차단되도록 할 수 있다. Since the determination unit 12 updates the OTA method at the time when the vehicle starts off, when a new device is added, the priority is variably set by reflecting the current and time required for the new device. The power of the devices is not cut off according to the priority, but the power is cut off according to the priority in which the newly added new device is reflected.

즉, 판단부(12)는 차량 시동이 오프된 시점에서 OTA 방식으로 AVN 장치를 업데이트 하는 경우, AVN을 업데이트 하는데 요구되는 전류 및 시간을 반영하여 우선순위를 가변적으로 설정할 수 있다.That is, when the AVN device is updated by the OTA method when the vehicle starts off, the determination unit 12 may variably set the priority by reflecting the current and time required to update the AVN.

그리고, 판단부(12)는 가변적으로 설정된 우선순위를 제어부(13)로 전송한다(S49).Then, the determination unit 12 transmits the variablely set priority to the control unit 13 (S49).

제어부(13)는 판단부(12)가 가변적으로 설정한 우선순위를 기반으로 전원 차단시간 순서를 설정하고, 설정된 전원 차단시간 순서에 따라 장치의 전원을 차단한다(S50)The control unit 13 sets the power-off time sequence based on the priority set by the determination unit 12 variably, and cuts off the power of the device according to the set power-off time sequence (S50).

전원 차단시간은 차량의 시동 오프 시점으로부터 장치의 요구전류가 인가되어야 하는 시간이 경과한 시점을 의미할 수 있다. The power-off time may refer to a time when a time at which the required current of the device should be applied has elapsed from the time when the vehicle is started off.

S50에서 제어부(13)는 전원 차단시간 순서를 상기 요구전류가 인가되어야 할 시간이 짧은 순서대로 설정할 수 있다.In S50, the controller 13 may set the power-off time sequence in the order in which the time at which the requested current is to be applied is short.

일 예로, 제어부(13)는 판단부(12)에서 우선순위가 가변적으로 설정되기 전의 전원 차단시간 T1은 램프 제어기의 전원을 차단하는 시간, T2는 I-Box의 전원을 차단하는 시간, T3는 SMK 모듈의 전원을 차단하는 시간으로 설정할 수 있다.For example, the control unit 13 is the power-off time T1 before the priority is variably set in the determination unit 12 is the time to cut off the power of the lamp controller, T2 is the time to cut off the power of the I-Box, T3 is It can be set as the time to power off the SMK module.

그러나, 본 발명의 실시예에 따르면 제어부(13)는 가변적으로 설정된 우선순위를 기반으로 전원 차단시간의 순서를 설정하기 때문에 전원 차단시간 T1 이전 NT를 새롭게 설정할 수 있으며, NT는 AVN 장치의 전원을 차단하는 시간을 의미할 수 있다.However, according to an embodiment of the present invention, since the control unit 13 sets the sequence of the power-off time based on a variablely set priority, NT can be newly set before the power-off time T1, and NT powers the AVN device. It can mean the time to cut off.

도 5는 본 발명의 일 실시예에 따른 암전류 제어를 나타낸 그래프이다.5 is a graph showing dark current control according to an embodiment of the present invention.

도 5에 도시된 바와 같이, 제어부(13)는 판단부(12)에서 우선순위가 가변적으로 설정되기 전의 전원 차단시간을 T1 내지 T4로 설정할 수 있다. 제어부(13)가 설정하는 전원 차단시간은 실시예에 따른 것으로 T1 내지 T4에 한정되는 것은 아니다. 여기서, T1은 램프 제어기의 전원을 차단하는 시간, T2는 I-Box의 전원을 차단하는 시간, T3는 SMK 모듈의 전원을 차단하는 시간을 의미할 수 있다. As shown in FIG. 5, the control unit 13 may set the power-off time before the priority is variably set in the determination unit 12 to T1 to T4. The power-off time set by the control unit 13 is according to the embodiment and is not limited to T1 to T4. Here, T1 may mean a time for powering off the lamp controller, T2 for a time for powering off the I-Box, and T3 for a time for powering off the SMK module.

상술한 바와 같이 T1 내지 T4로 설정된 전원 차단시간에 따라 장치의 전원이 차단되는 경우 'A'와 같이 T1 내지 T4에서 순차적으로 전원이 차단되어 암전류가 감소한다.As described above, when the power of the device is cut off according to the power cutoff time set to T1 to T4, the power is cut off sequentially at T1 to T4 as in 'A', thereby reducing the dark current.

본 발명의 실시예에 따르면, 제어부(13)는 가변적으로 설정된 우선순위를 기반으로 전원 차단시간의 순서를 설정하기 때문에 전원 차단시간 T1 이전 NT를 새롭게 설정할 수 있으며, 일 예로 NT는 AVN 장치의 전원을 차단하는 시간을 의미할 수 있다.According to an embodiment of the present invention, since the control unit 13 sets the order of the power-off time based on the variablely set priority, NT may be newly set before the power-off time T1, for example, NT is the power of the AVN device. It can mean time to cut off.

따라서, 새롭게 설정된 NT부터 T4까지 순차적으로 장치의 전원이 차단되는 경우, 'B'와 같이 NT 내지 T4에서 순차적으로 전원이 차단되어 암전류가 감소할 수 있다. Accordingly, when the power of the device is sequentially cut off from the newly set NT to T4, the power is cut off sequentially from NT to T4 as shown in 'B', so that the dark current can be reduced.

본 발명은 차량 시동이 오프된 시점에서 OTA 방식으로 업데이트가 수행되어 신규 장치가 추가되는 경우, 신규 장치에 요구되는 전류 및 시간을 반영하여 우선순위를 가변적으로 설정하기 때문에 종래에 기 설정된 우선순위를 기반으로 설정된 전원 차단시간에 따라 장치들의 전원이 차단되지 않고, 새로 추가된 신규 장치가 반영된 우선순위를 기반으로 설정된 전원차단 시간에 따라 전원이 차단되도록 할 수 있다. In the present invention, when an update is performed in an OTA manner when a vehicle is started off and a new device is added, the priority is previously set because the priority is variably set by reflecting the current and time required for the new device. The power of the devices is not cut off according to the power cut-off time set as a basis, and the power can be cut off according to the power cut-off time set based on the priority reflected by the newly added new device.

도 5 본 발명의 일 실시예에 따른 방법을 실행하는 컴퓨팅 시스템의 구성을 도시한 도면이다.5 is a diagram illustrating a configuration of a computing system executing a method according to an embodiment of the present invention.

도 5 참조하면, 컴퓨팅 시스템(1000)은 버스(1200)를 통해 연결되는 적어도 하나의 프로세서(1100), 메모리(1300), 사용자 인터페이스 입력 장치(1400), 사용자 인터페이스 출력 장치(1500), 스토리지(1600), 및 네트워크 인터페이스(1700)를 포함할 수 있다. Referring to FIG. 5, the computing system 1000 includes at least one processor 1100, a memory 1300, a user interface input device 1400, a user interface output device 1500, and storage (connected through a bus 1200) 1600), and a network interface 1700.

프로세서(1100)는 중앙 처리 장치(CPU) 또는 메모리(1300) 및/또는 스토리지(1600)에 저장된 명령어들에 대한 처리를 실행하는 반도체 장치일 수 있다. 메모리(1300) 및 스토리지(1600)는 다양한 종류의 휘발성 또는 불휘발성 저장 매체를 포함할 수 있다. 예를 들어, 메모리(1300)는 ROM(Read Only Memory) 및 RAM(Random Access Memory)을 포함할 수 있다. The processor 1100 may be a central processing unit (CPU) or a semiconductor device that executes processing for instructions stored in the memory 1300 and / or storage 1600. The memory 1300 and the storage 1600 may include various types of volatile or nonvolatile storage media. For example, the memory 1300 may include read only memory (ROM) and random access memory (RAM).

따라서, 본 명세서에 개시된 실시예들과 관련하여 설명된 방법 또는 알고리즘의 단계는 프로세서(1100)에 의해 실행되는 하드웨어, 소프트웨어 모듈, 또는 그 2 개의 결합으로 직접 구현될 수 있다. 소프트웨어 모듈은 RAM 메모리, 플래시 메모리, ROM 메모리, EPROM 메모리, EEPROM 메모리, 레지스터, 하드 디스크, 착탈형 디스크, CD-ROM과 같은 저장 매체(즉, 메모리(1300) 및/또는 스토리지(1600))에 상주할 수도 있다. 예시적인 저장 매체는 프로세서(1100)에 커플링되며, 그 프로세서(1100)는 저장 매체로부터 정보를 판독할 수 있고 저장 매체에 정보를 기입할 수 있다. 다른 방법으로, 저장 매체는 프로세서(1100)와 일체형일 수도 있다. 프로세서 및 저장 매체는 주문형 집적회로(ASIC) 내에 상주할 수도 있다. ASIC는 사용자 단말기 내에 상주할 수도 있다. 다른 방법으로, 프로세서 및 저장 매체는 사용자 단말기 내에 개별 컴포넌트로서 상주할 수도 있다.Thus, steps of a method or algorithm described in connection with the embodiments disclosed herein may be directly implemented by hardware, software modules, or a combination of the two, executed by processor 1100. The software modules reside in storage media (ie, memory 1300 and / or storage 1600) such as RAM memory, flash memory, ROM memory, EPROM memory, EEPROM memory, registers, hard disk, removable disk, CD-ROM. You may. An exemplary storage medium is coupled to the processor 1100, which can read information from and write information to the storage medium. Alternatively, the storage medium may be integral with the processor 1100. Processors and storage media may reside within an application specific integrated circuit (ASIC). The ASIC may reside in a user terminal. Alternatively, the processor and storage medium may reside as separate components within the user terminal.

이상의 설명은 본 발명의 기술 사상을 예시적으로 설명한 것에 불과한 것으로서, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자라면 본 발명의 본질적인 특성에서 벗어나지 않는 범위에서 다양한 수정 및 변형이 가능할 것이다. The above description is merely illustrative of the technical idea of the present invention, and those skilled in the art to which the present invention pertains may make various modifications and variations without departing from the essential characteristics of the present invention.

따라서, 본 발명에 개시된 실시예들은 본 발명의 기술 사상을 한정하기 위한 것이 아니라 설명하기 위한 것이고, 이러한 실시예에 의하여 본 발명의 기술 사상의 범위가 한정되는 것은 아니다. 본 발명의 보호 범위는 아래의 청구범위에 의하여 해석되어야 하며, 그와 동등한 범위 내에 있는 모든 기술 사상은 본 발명의 권리범위에 포함되는 것으로 해석되어야 할 것이다.Therefore, the embodiments disclosed in the present invention are not intended to limit the technical spirit of the present invention, but to explain, and the scope of the technical spirit of the present invention is not limited by these embodiments. The scope of protection of the present invention should be interpreted by the claims below, and all technical spirits within the equivalent range should be interpreted as being included in the scope of the present invention.

장치 10
산출부 11
판단부 12
제어부 13
스위치부 14
배터리 15
프로세서 1100
버스 1200
메모리 1300
ROM 1310
RAM 1320
사용자 인터페이스 입력 장치 1400
용자 인터페이스 출력 장치 1500
스토리지 1600
네트워크 인터페이스 1700
Device 10
Output 11
Judgment 12
Control 13
Switch part 14
Battery 15
Processor 1100
Bus 1200
Memory 1300
ROM 1310
RAM 1320
User interface input device 1400
User interface output device 1500
Storage 1600
Network interface 1700

Claims (20)

차량의 시동이 오프된 시점에서 차량 내 구비된 복수의 장치의 요구전류 및 상기 요구전류가 인가되어야 하는 요구시간을 산출하는 산출부;
상기 산출된 요구전류 및 상기 요구시간을 기반으로 우선순위를 설정하되, 신규 장치의 요구전류가 추가적으로 발생되는 경우, 상기 신규 장치의 요구전류 및 상기 요구전류가 인가되어야 하는 요구시간을 반영하여 상기 우선순위를 가변적으로 설정하는 판단부; 및
상기 가변적으로 설정된 우선순위를 기반으로 상기 복수의 장치 및 상기 신규 장치의 전원을 차단하는 제어부를 포함하는 차량의 암전류 제어 장치.
A calculation unit for calculating a request current of a plurality of devices provided in the vehicle and a request time to which the request current is to be applied when the vehicle is started off;
Priority is set based on the calculated required current and the requested time, but when the requested current of the new device is additionally generated, the priority is reflected by reflecting the requested current of the new device and the requested time to which the requested current should be applied. A determination unit for variably setting the ranking; And
A dark current control device for a vehicle including a control unit for turning off the power of the plurality of devices and the new device based on the variably set priority.
청구항 1에 있어서,
상기 복수의 장치는
상기 차량의 시동 오프 이후 상기 요구시간 동안 상기 차량에서 동작하여야 하는 장치들을 포함하는 차량의 암전류 제어 장치.
The method according to claim 1,
The plurality of devices
A dark current control device for a vehicle including devices that must be operated in the vehicle for the required time after the vehicle is turned off.
청구항 1에 있어서,
상기 신규 장치의 요구전류가 추가적으로 발생하는 경우는 차량 업데이트가 수행되는 경우를 포함하는 차량의 암전류 제어 장치.
The method according to claim 1,
A dark current control device for a vehicle, including a case in which a vehicle update is performed when the required current of the new device is additionally generated.
청구항 3에 있어서,
상기 차량 업데이트는 OTA(Over The Air) 방식으로 수행되는 차량의 암전류 제어 장치.
The method according to claim 3,
The vehicle update is a dark current control device for a vehicle that is performed by OTA (Over The Air) method.
청구항 3에 있어서,
상기 차량 업데이트는 AVN 장치의 업데이트를 포함하는 차량의 암전류 제어 장치.
The method according to claim 3,
The vehicle update includes an update of the AVN device Dark current control device of the vehicle.
청구항 1에 있어서,
상기 추가된 상기 신규 장치의 상기 요구전류 및 상기 요구시간은 상기 산출부로부터 산출되는 차량의 암전류 제어 장치.
The method according to claim 1,
The dark current control device of the vehicle, wherein the required current and the requested time of the added new device are calculated from the calculation unit.
청구항 1에 있어서,
상기 우선순위 및 상기 가변적으로 설정된 우선순위는 상기 요구시간이 긴 순서대로 설정되는 차량의 암전류 제어 장치.
The method according to claim 1,
The priority and the variably set priority is a dark current control device for a vehicle that is set in the order in which the request time is long.
청구항 1에 있어서,
상기 제어부는
상기 복수의 장치의 전원 차단을 제어하는 복수의 스위치를 포함하는 차량의 암전류 제어 장치.
The method according to claim 1,
The control unit
A dark current control device for a vehicle including a plurality of switches for controlling power-off of the plurality of devices.
청구항 1에 있어서,
상기 제어부는
상기 복수의 장치의 전원 차단을 제어하는 복수의 스위치를 포함하는 차량의 암전류 제어 장치.
The method according to claim 1,
The control unit
A dark current control device for a vehicle including a plurality of switches for controlling power-off of the plurality of devices.
청구항 9에 있어서,
상기 전원 차단시간 순서는 상기 요구전류가 인가되어야 할 시간이 짧은 순서대로 설정되는 차량의 암전류 제어 장치.
The method according to claim 9,
The power cut-off time sequence is a dark current control device for a vehicle that is set in a short order in which the time at which the requested current should be applied.
차량의 시동이 오프된 시점에서 차량 내 구비된 복수의 장치의 요구전류 및 상기 요구전류가 인가되어야 하는 요구시간을 산출하는 단계;
상기 산출된 요구전류 및 상기 요구시간을 기반으로 우선순위를 설정하되, 신규 장치의 요구전류가 추가적으로 발생되는 경우, 상기 신규 장치의 요구전류 및 상기 요구전류가 인가되어야 하는 요구시간을 반영하여 우선순위를 가변적으로 설정하는 단계; 및
상기 가변적으로 설정된 우선순위를 기반으로 상기 복수의 장치 및 상기 신규 장치의 전원을 차단하는 단계를 포함하는 차량의 암전류 제어 방법.
Calculating a request current of a plurality of devices provided in the vehicle and a request time to which the request current is to be applied when the vehicle is started off;
Priority is set based on the calculated demand current and the request time, but when a request current of the new device is additionally generated, the priority is reflected by reflecting the request current of the new device and the request time to which the request current must be applied. Variably setting; And
And powering off the plurality of devices and the new device based on the variably set priority.
청구항 11에 있어서,
상기 복수의 장치는
상기 차량의 시동 오프 이후 상기 요구시간 동안 상기 차량에서 동작하여야 하는 장치들을 포함하는 차량의 암전류 제어 방법.
The method according to claim 11,
The plurality of devices
A method for controlling dark current of a vehicle including devices that must be operated in the vehicle for the required time after the vehicle is turned off.
청구항 11에 있어서,
상기 신규 장치의 요구전류가 추가적으로 발생하는 경우는 차량 업데이트가 수행되는 경우를 포함하는 차량의 암전류 제어 방법.
The method according to claim 11,
A method of controlling a dark current of a vehicle, including when a vehicle update is performed when the required current of the new device is additionally generated.
청구항 13에 있어서,
상기 차량 업데이트는 OTA(Over The Air) 방식으로 수행되는 차량의 암전류 제어 방법.
The method according to claim 13,
The vehicle update is a dark current control method of the vehicle is performed by OTA (Over The Air) method.
청구항 13에 있어서,
상기 차량 업데이트는 AVN 장치의 업데이트를 포함하는 차량의 암전류 제어 방법.
The method according to claim 13,
The vehicle update is a method of controlling a dark current of a vehicle including an update of an AVN device.
청구항 11에 있어서,
상기 신규 장치의 요구전류가 추가적으로 발생하는 경우, 추가된 상기 신규 장치의 상기 요구전류 및 상기 요구시간를 산출하는 단계를 더 포함하는 차량의 암전류 제어 방법.
The method according to claim 11,
And when the required current of the new device is additionally generated, calculating the required current and the required time of the added new device.
청구항 11에 있어서,
상기 우선순위 및 상기 가변적으로 설정된 우선순위는 상기 요구시간이 긴 순서대로 설정되는 차량의 암전류 제어 방법.
The method according to claim 11,
The priority and the variably set priority is a dark current control method of the vehicle is set in the order that the request time is long.
청구항 11에 있어서,
상기 복수의 장치 및 상기 신규 장치의 전원을 차단하는 단계는
상기 복수의 장치와 연결된 복수의 스위치를 통해 제어되는 포함하는 차량의 암전류 제어 방법.
The method according to claim 11,
The step of turning off the power of the plurality of devices and the new device is
A control method for a dark current of a vehicle, which is controlled through a plurality of switches connected to the plurality of devices.
청구항 11에 있어서,
상기 복수의 장치 및 상기 신규 장치의 전원을 차단하는 단계는
상기 가변적으로 설정된 우선순위를 기반으로 전원 차단시간 순서를 설정하고, 상기 전원 차단시간 순서에 따라 상기 복수의 장치 및 상기 신규 장치의 전원을 차단하는 차량의 암전류 제어 방법.
The method according to claim 11,
The step of turning off the power of the plurality of devices and the new device is
A dark current control method of a vehicle that sets a power-off time sequence based on the variably set priority and cuts off the power of the plurality of devices and the new device according to the power-off time sequence.
청구항 19에 있어서,
상기 전원 차단시간 순서는 상기 요구전류가 인가되어야 할 시간이 짧은 순서대로 설정되는 차량의 암전류 제어 방법.
The method according to claim 19,
The power-off time sequence is a vehicle dark current control method that is set in the order in which the time to which the required current is applied is short.
KR1020180142021A 2018-11-16 2018-11-16 Appratus and method for controlling darkcurrent of vehicle KR102587088B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020180142021A KR102587088B1 (en) 2018-11-16 2018-11-16 Appratus and method for controlling darkcurrent of vehicle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020180142021A KR102587088B1 (en) 2018-11-16 2018-11-16 Appratus and method for controlling darkcurrent of vehicle

Publications (2)

Publication Number Publication Date
KR20200057519A true KR20200057519A (en) 2020-05-26
KR102587088B1 KR102587088B1 (en) 2023-10-11

Family

ID=70915380

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020180142021A KR102587088B1 (en) 2018-11-16 2018-11-16 Appratus and method for controlling darkcurrent of vehicle

Country Status (1)

Country Link
KR (1) KR102587088B1 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040003244A (en) * 2002-07-02 2004-01-13 기아자동차주식회사 Method and Apparatus for Managing Dark Current in Vehicle Using Non Volatile Memory
JP2004194495A (en) * 2002-10-15 2004-07-08 Denso Corp Load driving and controlling device for vehicle

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040003244A (en) * 2002-07-02 2004-01-13 기아자동차주식회사 Method and Apparatus for Managing Dark Current in Vehicle Using Non Volatile Memory
JP2004194495A (en) * 2002-10-15 2004-07-08 Denso Corp Load driving and controlling device for vehicle

Also Published As

Publication number Publication date
KR102587088B1 (en) 2023-10-11

Similar Documents

Publication Publication Date Title
US9008907B2 (en) Intelligent vehicle power control system and method
TWI453566B (en) Power control manager and method
KR102587084B1 (en) Apparatus and method for providing update of vehicle
CN112659978B (en) Charging and heating control method and device for power battery, medium, equipment and vehicle
KR20200072018A (en) Apparatus and method for coltrolling update of vehicle controller, and vehicle system
KR20060119569A (en) Booting control apparatus and method for mobile communication device
US20150089260A1 (en) Electronic Apparatus, Method, and Storage Medium
CN112009270B (en) Motor output power control method, power automobile and readable storage medium
KR20200057519A (en) Appratus and method for controlling darkcurrent of vehicle
CN108241361B (en) Vehicle power supply control method, controller and vehicle
US11573826B2 (en) Control system, control method, and program
KR20180101756A (en) Appratus and method for wake-up sleep mode mcu
TW201305800A (en) Method and system for adjusting power supply of CPU
CN108839581B (en) Power supply control method, device and equipment for electric automobile
KR20200099416A (en) Method to charge battery and electronic device applying the method
WO2017020592A1 (en) Discharging method, terminal equipment, and computer storage medium
JP2006072698A (en) Power-saving-adapted device
CN112737023A (en) Method and device for controlling powered device in fast charging mode and powered device
KR20160013715A (en) Apparatus and method for controlling of multimedia service device for vehicle
KR102554928B1 (en) System amd method for balancing battery pack
KR102374759B1 (en) Apparatus for controlling power of cigar jack of vehicle
CN114024356B (en) Power management method, device and circuit
CN114811880B (en) Method and device for defrosting direct-current air conditioner and direct-current air conditioner
JPWO2019175614A1 (en) Current control method and current control device for in-vehicle charger
US20230030558A1 (en) Electronic control unit, information processing method, and non-transitory storage medium

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant