KR20190114068A - Slab panel drop construction method and device used therein - Google Patents

Slab panel drop construction method and device used therein Download PDF

Info

Publication number
KR20190114068A
KR20190114068A KR1020180035746A KR20180035746A KR20190114068A KR 20190114068 A KR20190114068 A KR 20190114068A KR 1020180035746 A KR1020180035746 A KR 1020180035746A KR 20180035746 A KR20180035746 A KR 20180035746A KR 20190114068 A KR20190114068 A KR 20190114068A
Authority
KR
South Korea
Prior art keywords
slab panel
supporter
prop head
fixing piece
fastened
Prior art date
Application number
KR1020180035746A
Other languages
Korean (ko)
Other versions
KR102041392B1 (en
Inventor
백희정
김귀환
임남기
Original Assignee
백희정
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 백희정 filed Critical 백희정
Priority to KR1020180035746A priority Critical patent/KR102041392B1/en
Publication of KR20190114068A publication Critical patent/KR20190114068A/en
Application granted granted Critical
Publication of KR102041392B1 publication Critical patent/KR102041392B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • E04G11/486Dropheads supporting the concrete after removal of the shuttering; Connecting means on beams specially adapted for dropheads

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present invention relates to a slab panel drop construction method, capable of minimizing noise, dust and civil complaints during construction and improving working safety and construction efficiency, and an apparatus used therefor. The present invention includes: an SL body (1100) comprising a wall panel fixing piece (1110), and a beam fixing piece (1130); a beam fixing SL (1300) comprising a coupling block (1310); a soffit length (SL, 1000) comprising a beam fixing piece (1500) with an elongated groove (1510); a beam (2000) into which a slab panel is inserted; a prop head (3000) connecting the beam (2000); a prop head guide (4000) adjusting the beam; a descending machine (5000) dropping the beam and the slab panel slowly; a fall prevention device (6000) preventing the beam from falling forcibly; a supporter connection member (7000) preventing a supporter from falling to one side; and a supporter (9000) dropping the slab panel when released.

Description

슬라브패널 드롭시공공법 및 그에 사용되는 장치{Slab panel drop construction method and device used therein}Slab panel drop construction method and device used therein}

본 발명은 천정콘크리트 타설 후 양생과정에서 발생되는 콘크리트자중과 콘크리트자중을 받치는 고정형 앙카가 부착된 프롭헤드, 프롭헤드에 설치된 존치형 서포트를 활용한 슬라브패널 드롭시공공법 및 그에 사용되는 장치에 관한 것으로, 더욱 상세하게는 빔, 존치형서포트, 슬라브패널 순으로 설치하여 콘크리트를 타설하고 천장콘크리트를 양생시킨 후 존치형서포를 축으로 빔과 슬라브패널을 일체로 드롭하여 해체함으로써 거푸집 시공시 슬라브패널의 설치 및 해체가 용이할 뿐만 아니라, 더욱 향상된 작업안전성 및 시공 효율성과 공사중 발생하는 소음, 분진, 민원을 최소화한 슬라브패널 드롭시공공법 및 그에 사용되는 장치에 관한 것이다.The present invention relates to a slab panel drop construction method and a device used therein using a prop head with fixed anchors for supporting concrete weight and concrete weight generated during curing after ceiling concrete pouring, and a support type installed on the prop head. More specifically, install concrete in the order of beam, zone type support, slab panel, and then cure concrete and ceiling concrete, and then drop and disassemble beam and slab panel integrally with zone type support as the axis. The present invention relates to a slab panel drop construction method and an apparatus used therefor that are easy to install and dismantle, and further improve work safety and construction efficiency, and minimize noise, dust and civil complaints.

일반적으로 아파트나 빌딩과 같은 다층(多層) 구조의 건축물 시공시 먼저, 벽체 거푸집을 설치하고 양생시킨 후 거푸집을 해체하고 상부층으로 자재를 인양하여 설치 및 해체하므로써 반복적 시공방법으로 이루어진다.In general, when building a multi-layered structure such as an apartment or a building, first, a wall formwork is installed and cured, and then the formwork is dismantled, and the material is lifted and installed and dismantled to the upper layer, thereby making a repetitive construction method.

상기 슬라브패널은 주로 일정한 면적을 가지는 합판이 사용되며, 예를 들면 가설지주 형태의 지지체에 지지되면서 슬라브패널 영역에 편평한 자세로 위치되도록 설치된다.The slab panel is mainly used a plywood having a constant area, for example, is installed to be positioned in a flat position in the slab panel area while being supported by the support of the temporary column.

상기와 같이 슬라브패널을 지지하는 지지체는 주로 각목(角木)이 사용되며, 상기 벽체 거푸집의 상부에서 서로 직교하는 자세 예를 들면, 바둑무늬 구조로 배치됨과 아울러 슬라브패널이 수직 하중 즉, 타설된 콘크리트 중량에 의해 셋팅된 자세가 변화되지 않도록 견고하게 설치된다.The support for supporting the slab panel as described above is mainly used in the wood (角 木), the postures orthogonal to each other in the upper portion of the wall form, for example, arranged in a checkered structure and the slab panel is vertical load, that is, It is installed firmly so that the posture set by the concrete weight does not change.

상기 슬라브패널의 설치 과정을 간략하게 설명하면, 슬라브패널 영역에 대응하도록 지지체를 설치한 후, 이 지지체의 상부에 슬라브패널을 설치한다.Briefly describing the installation process of the slab panel, after installing the support to correspond to the slab panel area, the slab panel is installed on the upper portion of the support.

상기 지지체의 설치 작업은 작업자가 바닥면에서 이격된 슬라브패널 영역에 별도의 사다리를 이용하거나 벽체 거푸집을 타고 올라가서 못과 같은 체결부재를 이용하여 벽체거푸집에 설치하고, 상기와 같이 설치된 지지체와 바닥면 사이에는 상기 지지체의 지지력을 확보하기 위하여 다수개의 서포터들이 이격 설치된다.The installation of the support is installed on the wall formwork using a fastening member such as a nail using a separate ladder or climb up the wall formwork to the slab panel area spaced from the floor, and the support and the bottom surface installed as above Between the plurality of supporters are spaced apart to secure the support of the support.

그리고 슬라브패널 양생 후 상기 슬라브패널을 해체할 때에도 작업자가 상기 지지체와 거푸집, 슬라브패널 하부에서 해체 작업을 행한다.And when dismantling the slab panel after the slab panel curing, the operator performs the dismantling work on the support, the formwork, the slab panel lower part.

그러나 상기 종래의 슬라브패널 지지체는 파이프나 각목들이 못이나 와이어 등으로 설치되어 슬라브패널을 지지하는 구조이므로 만족할만한 지지력을 얻을 수 없다. 이와 같은 이유로 작업장의 바닥에는 상기 지지체를 지지하기 위한 다수개의 서포터를 설치하여야 하므로 이에 따른 추가 비용은 물론이거니와 작업자의 안전성과 공사중 발생하는 소음 및 분진,민원발생 방지가 어렵다.However, the conventional slab panel support has a structure that supports the slab panel by installing pipes or squares with nails or wires, and thus cannot obtain satisfactory support. For this reason, a plurality of supporters for supporting the support should be installed on the floor of the workplace, and thus, additional costs are difficult, as well as safety of workers and prevention of noise, dust, and civil complaints generated during construction.

게다가, 상기 지지체를 설치하려면 거푸집이 설치되는 영역으로 작업자가 직접 올라가서 설치작업을 해야 하므로 작업 중 추락과 같은 사고를 유발하는 요인이 되고, 매번 못을 이용하여 체결작업을 수행하게 되므로 과다한 작업시간이 소요되어 공기(工期)의 지연은 물론이거니와 작업능률을 저하시키는 문제가 있다.In addition, in order to install the support, the worker has to go up to the area where the formwork is installed, so the installation work has to be performed, which causes an accident such as a fall during the work. There is a problem of deteriorating air efficiency as well as delay of air.

또한, 상기 지지체는 시공되는 해당 슬라브패널 크기에만 대응하도록 제작되므로 그 구조상 1회 시공 후 다른 공사현장에서의 재활용이나 호환성을 기대할 수 없으므로 대부분 그대로 폐기 처분되어 이에 따른 비용은 물론이거니와 환경오염을 가중시키는 문제가 있다.In addition, since the support is manufactured to correspond only to the size of the slab panel to be constructed, it cannot be expected to be recycled or compatible at other construction sites after one construction due to its structure, and thus, most of the support is disposed of as it is disposed of as it is, resulting in increased costs and environmental pollution. there is a problem.

그리고 슬라브패널 양생 후 슬라브패널을 해체할 때에도 작업자가 지지체와 거푸집 아래서 해체작업을 행하게 되므로 상기 지지체와 거푸집이 한꺼번에 떨어져서 협착사고 등을 유발하는 요인이 되므로 구조적으로 안전사고를 유발하는 한 요인이 된다.In addition, when dismantling the slab panel after the slab panel curing, the operator performs the dismantling work under the support and the formwork, so the support and the formwork drop off at the same time, thereby causing a stenosis accident, which is a factor causing structural safety accidents.

대한민국 공개특허공보 제10-2005-0029967호Republic of Korea Patent Publication No. 10-2005-0029967

본 발명은 상술한 종래기술의 문제점을 해결하기 위한 것으로서, 본 발명의 목적은 빔, 존치형서포트, 슬라브패널 순으로 설치하여 콘크리트를 타설하고 천장콘크리트를 양생시킨 후 존치형서포를 축으로 빔과 슬라브패널을 일체로 드롭하여 해체함으로써 거푸집 시공시 슬라브패널의 설치 및 해체가 용이할 뿐만 아니라, 더욱 향상된 작업안전성 및 시공 효율성과 공사중 발생하는 소음, 분진, 민원을 최소화한 슬라브패널 드롭시공공법 및 그에 사용되는 장치를 제공함에 그 목적이 있다.The present invention is to solve the above-mentioned problems of the prior art, the object of the present invention is to install the beam, the zoned support, the slab panel in order to pour concrete, and to cure the ceiling concrete, and then the zoned support to the beam and the axis The slab panel drop construction method that can easily install and dismantle the slab panel during formwork by dropping and dismantling the slab panel as a whole, further improve work safety and construction efficiency, and minimize noise, dust and civil complaints during construction. It is an object to provide a device to be used.

상기 목적을 달성하기 위한 본 발명의 일 실시 예에 따른 본 발명 슬라브패널 드롭시공에 사용되는 장치는Apparatus used in the present invention slab panel drop construction according to an embodiment of the present invention for achieving the above object

벽면에 체결되는 벽체패널 상부에 설치되고, 빔(BEAM, 2000)과 슬라브패널(S)이 설치되는 것으로, 벽체패널 상부에 설치할 수 있도록 형성된 벽체패널 고정편(1110)과, 고정편에서 상부 "n" 형상으로 연장·절곡되어 일측에 빔과 슬라브패널을 체결할 수 있도록 하며 내측에 빔고정SL(1300)이 슬라이딩되어 체결될 수 있도록 단턱(1150)이 형성된 빔고정편(1130)으로 이루어진 SL본체(1100)와; 본체 내부에 삽입설치되되, 빔고정편(1500)을 고정핀(P)으로 체결할 수 있도록 하는 체결블록(1310)으로 이루어진 빔고정SL(1300)과; 빔고정SL(1300)에 일측에 고정핀(P)으로 체결되며, 타측은 빔에 고정핀(P)으로 체결되어 빔을 고정함과 아울러 빔을 낙하시킬 때 일정거리만 낙하하도록 장홈(1510)이 형성된 빔고정편(1500)으로 구성된 SL(SOFFIT LENGTH, 1000)과;It is installed on the upper wall panel fastened to the wall, the beam (BEAM, 2000) and the slab panel (S) is installed, the wall panel fixing piece 1110 formed to be installed on the upper wall panel, and the upper part " SL is made of a beam fixing piece 1130 formed with a stepped 1150 so that the beam fixing SL (1300) can be fastened by sliding and extending in the n "shape so as to fasten the beam and the slab panel on one side. A main body 1100; A beam fixing SL 1300 which is inserted into the main body and is formed of a fastening block 1310 for fastening the beam fixing piece 1500 to the fixing pin P; It is fastened to the beam fixing SL (1300) by a fixing pin (P) on one side, and the other side is fastened to the beam by a fixing pin (P) to secure the beam and to drop only a certain distance when dropping the beam long groove (1510) SL (SOFFIT LENGTH, 1000) consisting of the formed beam fixing piece (500);

SL에 설치되며, 슬라브패널(SLAB PANEL)이 삽입설치되는 빔(BEAM, 2000)과; A beam (BEAM, 2000) installed in the SL and into which the slab panel is inserted;

빔(BEAM, 2000)을 연결하는 프롭헤드(PROP HEAD, 3000)와; A prop head 3000 connecting the beam BEAM 2000;

프롭헤드 하부 및 서포터(9000)의 하부에 구비되어 프롭헤드를 지지하고 빔을 조정하는 분리형 프롭헤드 가이드(4000)와; A detachable prophead guide 4000 provided under the prophead and the lower part of the supporter 9000 to support the prophead and adjust the beam;

프롭헤드가이드 하부의 서포터(9000)에 구비되어 빔과 슬라브패널을 서서히 하강시키는 완강장치(5000)와; 서포터의 외측에 체결되어 프롭헤드 또는 프롭헤드가이드의 하부에 위치하여 빔과 프롭헤드 또는 프롭헤드가이드를 지지하여 빔이 하부로 강제 낙하하는 것을 방지하는 낙하방지장치(6000)와; 서포터의 외측에 체결되어 프롭헤드 또는 프롭헤드가이드의 하부에 위치하여 빔과 프롭헤드 또는 프롭헤드가이드가 일정거리 만큼 낙하하도록 하고, 연결빔으로 서로연결하는 서포터연결부재(7000)과; 프롭헤드 하부에서 프롭헤드를 지지하며, 해제시에는 슬라브패널을 자중에 의해 하강시키는 서포터(9000)를 포함하는 것을 특징으로 한다.A lowering device 5000 provided in the supporter 9000 below the prop head guide to gradually lower the beam and the slab panel; A fall prevention device 6000 which is fastened to the outside of the supporter and positioned below the prop head or the prop head guide to support the beam and the prop head or prop head guide to prevent the beam from falling downward; A supporter connection member 7000 which is fastened to the outside of the supporter and positioned below the prop head or the prop head guide so that the beam and the prop head or prop head guide fall by a predetermined distance and are connected to each other by a connecting beam; The prop head is supported by the lower part of the prop head, and when released, the supporter 9000 lowers the slab panel by its own weight.

이때 상기 빔(BEAM, 2000)은 빔고정SL에 안착설치되며 슬라브패널(SLAB PANEL)이 삽입설치되는 것으로, 일단은 해체과정 중 SL과 밀착을 최소화할 수 있도록 우측 하부로 기울어지도록 형성되는 제1경사면부(2100)와, 타단은 프롭헤드(PROP HEAD, 3000)의 경사면과 밀착되고, 이후 하부로 낙하할 수 있도록 형성된 제2경사면부(2300)와, 전·후면에 형성되어 프롭헤드(PROP HEAD, 3000)에 고정편(3700) 및 고정핀(P)으로 체결할 수 있도록 하는 고정편 삽입홈(2500) 및 슬라브패널 삽입홈(2600), 고정핀 삽입공(2700)으로 구성된 것을 특징으로 한다.In this case, the beam BEAM 2000 is seated and installed in the beam fixing SL, and the slab panel is inserted and installed. The first beam BEAM is first formed to be inclined to the lower right side so as to minimize close contact with the SL during dismantling. The inclined surface portion 2100 and the other end are in close contact with the inclined surface of the prop head 3000, and the second inclined surface portion 2300, which is formed to fall downward, and is formed on the front and rear surfaces of the prop head. Characterized in that it consists of a fixed piece insertion groove 2500 and the slab panel insertion groove (2600), a fixed pin insertion hole (2700) to be fastened to the HEAD, 3000 with a fixed piece 3700 and a fixed pin (P). do.

또한 상기 프롭헤드(PROP HEAD, 3000)는 빔(BEAM, 2000)을 연결하고 하부에서 서포터로 지지받아 슬라브패널과 빔을 지지 및 설치를 용이하게 하는 것으로, 빔에 밀착되는 밀착면(3100)과; In addition, the prop head (PROP HEAD, 3000) is connected to the beam (BEAM, 2000) and is supported by the supporter from the bottom to facilitate the support and installation of the slab panel and the beam, the contact surface (3100) in close contact with the beam ;

슬라브패널이 밀착되는 슬라브패널밀착면(3200)과; A slab panel adhesion surface 3200 to which the slab panel is in close contact;

낙하방지장치를 고정하는 단턱(3310)으로 이루어진 지주(3300)와; Shoji (3300) consisting of a step (3310) for fixing the fall prevention device;

고정편(3700)을 고정하여 슬라브패널의 하중을 지지하도록 형성되는 고정핀(P)이 체결되는 핀삽입공(3400)과; A pin insertion hole 3400 to which a fixing pin P formed to fix the fixing piece 3700 to support the load of the slab panel;

시공되는 천장에 고정될 수 있도록 하는 앙카볼트(3500)와; An anchor bolt 3500 to be fixed to the ceiling to be constructed;

빔과 프롭헤드에 체결되어 슬라브패널을 짖지하는 고정편(3700)으로 구성된 것을 특징으로 한다.Is fastened to the beam and the prop head, characterized in that consisting of a fixed piece 3700 barking the slab panel.

또한 상기 분리형 프롭헤드 가이드(4000)는 프롭헤드 하부 및 서포터(9000)의 하부에 구비되어 프롭헤드를 지지하고 빔을 조정하는 것으로, 프롭헤드(3000) 양측에 체결되는 양측의 빔(2000) 하부 내측에 삽입되어 고정편(3700)과 같이 빔을 고정하는 고정편(4100)과; In addition, the separate prophead guide 4000 is provided at the lower part of the prophead and the lower part of the supporter 9000 to support the prophead and to adjust the beam. The lower part of the beam 2000 is fastened to both sides of the prophead 3000. A fixing piece 4100 inserted into the inside to fix the beam like the fixing piece 3700;

고정편(4100)의 하부에 형성되어 프롭헤드의 하부에 밀착되어 프롭헤드를 지지하는 지지편(4300)으로 구성된 것을 특징으로 한다.It is formed in the lower portion of the fixing piece 4100 is in close contact with the lower portion of the prop head, characterized in that composed of a support piece 4300 for supporting the prop head.

또한 상기 완강장치(5000)는 "+" 형상으로 형성되되 중앙에 원형 또는 다각형으로 형성되는 서포트 상부에서 삽입하여 고정할 있도록 형성되는 중앙삽입공(5110)과, 다른 부위 3부위에 형성되어 마찰부재를 체결할 수 있도록 하는 체결공(5150)으로 이루어지는 2개의 몸체(5100)와; In addition, the stiffening device 5000 is formed in a "+" shape, the center insertion hole (5110) formed to be inserted and fixed at the upper portion of the support is formed in a circular or polygonal in the center and the friction member is formed in three parts Two bodies 5100 formed of fastening holes 5150 to fasten the fasteners 5150;

2개의 몸체 각각의 단부에 구비되어 슬라이딩시켜 몸체를 결합할 수 있도록 하는 고리(5230) 및 고리체결홈(5210)으로 이루어지는 체결부(5200)와; A fastening part 5200 provided at an end of each of the two bodies and configured to include a ring 5230 and a ring fastening groove 5210 to engage the body by sliding;

몸체(5100)의 체결공에 체결되어 서포트의 외주면을 가압하는 것으로, 일단에 마찰패드(5310)가 구비되며, 타단에는 삼각핀(5330)이 삽입되는 장홈(5321)이 형성된 마찰봉(5320)과, 마찰봉을 서포트 측으로 가압하되, 장홈(5321)에 삽입되는 삼각핀의 길이에 따라 가압하는 가압력이 조절되는 스프링(5340)으로 이루어진 마찰부재(5300)로 구성된 것을 특징으로 한다.A friction rod 5320 having a long groove 5321, which is fastened to a fastening hole of the body 5100 and pressurizes an outer circumferential surface of the support, and has a friction pad 5310 at one end and a triangular pin 5330 is inserted at the other end. And, while pressing the friction bar to the support side, characterized in that consisting of a friction member (5300) made of a spring (5340) the pressing force to be pressed in accordance with the length of the triangular pin is inserted into the long groove (5321).

또한 상기 낙하방지장치(6000)는 상부에 프롭헤드(3000)가 외측으로는 프롭헤드가이드(4000)가 체결되며, 빔을 지지하는 고정편(37000) 하부에 위치하여 콘크리트 슬래브패널 하중을 지지하며, 해체시 슬래브패널 및 빔을 용이하게 해체할 수 있도록 하는 것으로, 다각형의 몸체(6310)를 갖는 낙하방지부재(6300)는 내측에 즉, 단턱(3410)과 대응되도록 2면에 형성되는 슬라이딩홈(6330)과; In addition, the drop prevention device 6000 is a prop head 3000 is fastened to the outside of the prop head guide 4000 on the upper side, is located under the fixing piece (37000) for supporting the beam to support the concrete slab panel load In order to easily dismantle the slab panel and the beam during disassembly, the drop preventing member 6300 having the body 6310 of the polygon is formed on two sides so as to correspond to the step 3410 inside. 6630;

2면의 슬라이딩홈(6330)과 대응되도록 2면에 형성되는 단턱부(6350)와; A stepped section 6350 formed on two surfaces to correspond to the sliding grooves 6330 on two surfaces;

낙하방지부재를 서포터(9000)로 슬라이딩시켜 체결할 때 서포터의 일측이 수용되는 수용부(6370)와; An accommodating part 6370 in which one side of the supporter is accommodated when the drop preventing member is slid and fastened to the supporter 9000;

몸체(6310)를 관통하여 삼각핀(F)을 삽입하여 고정할 수 있도록 형성되는 핀삽입공(6380)으로 구성된 것을 특징으로 한다.Penetrating through the body 6310 is characterized in that consisting of a pin insertion hole (6380) is formed to be fixed by inserting a triangular pin (F).

또한 낙하방지장치(6000)는 완강장치(5000)의 하부에 설치하여 시공할 수 있도록 한 것을 특징으로 한다.In addition, the fall prevention device 6000 is characterized in that the construction to be installed on the lower portion of the stiffening device (5000).

또한 상기 서포터연결부재(7000)는 서포터의 외측에 체결되어 프롭헤드 또는 프롭헤드가이드의 하부에 위치하여 빔과 프롭헤드 또는 프롭헤드가이드가 일정거리 만큼 낙하하도록 하강하는 거리를 조절하며, 연결빔으로 서로연결하는 것으로, 서포트에 체결할 수 있도록 형성되는 수용부(7100)와; 수용부를 기점으로 4면에 연결빔을 연결할 수 있도록 형성되는 연결부(7300)로 구성된 것을 특징으로 한다.In addition, the supporter connecting member 7000 is fastened to the outside of the supporter is located below the prop head or prop head guide to adjust the distance to drop the beam and the prop head or prop head guide fall by a predetermined distance, and as a connection beam By connecting to each other, the receiving portion 7100 is formed to be fastened to the support; It is characterized by consisting of a connection portion 7300 is formed so as to connect the connection beam on the four sides from the receiving portion.

그리고 슬라브패널 드롭시공공법은 And slab panel drop construction method

사면에 벽체패널을 설치한 후 After installing the wall panel on the slope

벽체패널 상부에 SL본체를 설치한 후 After installing SL main body on the top of wall panel

드롭 헤드에 엔드빔과 미들빔을 고정편을 이용하여 체결하여 빔과 드롭 헤드를 일체화한 후 After the end beam and the middle beam are fastened to the drop head using the fixing piece, the beam and the drop head are integrated.

SL본체 내부에 슬라브패널고정SL과, 빔고정SL을 설치한 후 After installing slab panel fixing SL and beam fixing SL inside the SL body

SL에 일체화된 빔을 빔고정SL에 설치한 후 After installing the beam integrated in the SL to the beam fixing SL

프롭헤드의 하부에 서포터를 설치하고, Install the supporter on the bottom of the prophead,

빔과 프롭헤드, 슬라브패널고정SL에 슬라브패널을 설치한 후 슬라브패널에 시멘트를 부어 타설한 후 양생하는 하는 설치단계(S1000)와;An installation step (S1000) of installing the slab panel on the beam, the prop head, and the slab panel fixing SL and then curing by pouring cement on the slab panel;

시멘트의 타설이 끝나면 벽체패널을 해체한 후 After the cement is finished, dismantle the wall panel

SL본체에서 슬라브패널고정SL과, 빔고정SL을 해체한 후 After disassembling the slab panel fixing SL and beam fixing SL from the SL body,

드롭 헤드에 빔 및 슬라브패널을 고정하고 있는 핀들을 해체한 후 After dismantling the pins securing the beam and slab panel to the drop head

빔과 빔에 설치되어 있는 슬라브패널의 자중에 의해 저속장치을 따라 서서히 하강시켜 낙하방지턱에 안착시킨 후 빔과 빔에 설치되어 있는 슬라브패널을 해체하되, After slowly descending along the low speed device by the weight of the slab panel installed on the beam and the beam, it is placed on the drop prevention jaw, and then the slab panel installed on the beam and the beam is dismantled.

낙하방지장치(6000)를 이용하여 By using the anti-drop device 6000

다각형의 몸체를 갖는 낙하방지장치를 서포터에 체결하는 것으로, 서포터의 단턱부에 낙하방지장치의 슬라이딩홈이 서포터의 슬라이딩홈에 낙하방지장치의 단턱부이 위치하도록 한 후 서포터의 상부에서 하부로 슬라이딩시킨 후 The fall prevention device having a polygonal body is fastened to the supporter, and the sliding groove of the drop prevention device is positioned at the stepped part of the supporter so that the stepped part of the drop prevention device is located in the sliding groove of the supporter and then slides from the upper part of the supporter to the lower part. after

낙하방지장치를 일측으로 슬라이딩시켜 몸체가 단터으로 삽입되도록 함에 따라 상기 낙하방지장치의 단턱부가 단턱과 동일선상에 위치하므로 낙하방지장치가 서포터와 일체형과 같이 체결되어 하중을 받는 빔을 안정되게 지지할 수 있도록 한 후 As the body is inserted into the danter by sliding the anti-drop device to one side, the step of the anti-drop device is located on the same line as the step, so that the anti-drop device is securely supported as a unit with the supporter to stably support the beam under load. After you let

이후 시공이 끝나면 핀를 제거한 후 다각형의 몸체를 타격하여 타측으로 슬라이딩시켜 단턱에서 이탈시킨 후 프롭헤드에 빔을 조정하기 위한 핀을 제거하면 빔이 서포트를 따라 하강하도로 하는 해체단계(S2000)를 포함하는 것을 특징으로 한다.After the construction is completed, the pin is removed and then hitting the body of the polygon to slide to the other side to move away from the step, and then remove the pin for adjusting the beam to the prop head, the beam includes a decommission step (S2000) to fall along the support Characterized in that.

본 발명에 따르면, 본 발명은 종래 슬라브패널 해체시의 문제점을 해결하기 위하여 창안된 것으로, 빔, 존치형서포트, 슬라브패널 순으로 설치하여 콘크리트를 타설하고 천장콘크리트를 양생시킨 후 존치형서포를 축으로 빔과 슬라브패널을 일체로 드롭하여 해체함으로써 거푸집 시공시 슬라브패널의 설치 및 해체가 용이할 뿐만 아니라, 더욱 향상된 작업안전성 및 시공 효율성과 공사중 발생하는 소음, 분진,민원을 최소화하는 효과가 있다.According to the present invention, the present invention was devised to solve the problem of dismantling the conventional slab panel, and installed in the order of beam, zone type support, slab panel, cast concrete and cured ceiling concrete, and then axial type support shaft By dismantling and dismantling the beam and slab panel integrally, the slab panel can be easily installed and dismantled during formwork, as well as improved work safety and construction efficiency, and minimizing noise, dust, and civil complaints.

슬라브패널을 용이하게 설치 및 해체할 수 있을 뿐만 아니라, 상기 지지체 어셈블리를 바닥에서 설치할 수 있으므로 작업중 발생되는 안전사고를 미연에 방지하여 작업 안전성을 최대한 확보할 수 있다.Not only can the slab panel be easily installed and dismantled, but also the support assembly can be installed from the floor, thereby preventing safety accidents occurring during operation, thereby ensuring maximum work safety.

그리고 본 발명에 따른 시공방법은 작업 공정이 간단하여 슬라브패널의 설치에 소요되는 시간을 대폭 단축시켜서 작업 능률은 물론이거니와 시공 품질을 향상시킬 수 있는 효과가 있다.In addition, the construction method according to the present invention has an effect of improving the construction quality as well as the work efficiency by greatly shortening the time required for installation of the slab panel due to the simple work process.

도 1은 본 발명의 일 실시 예에 따른 분해 사시도
도 2는 본 발명의 일 실시 예에 따른 사시도,
도 3은 본 발명의 일 실시 예에 따른 슬라브패널이체결상태를 나타낸 사시도,
도 4 및 도 5는 본 발명의 요부 확대 사시도,
도 6 ~ 13은 본 발명의 일 실시 예에 따른 해체과정을 나타낸 도면,
도 14는 본 발명의 다른 실시 예에 따른 해체과정을 나타낸 도면,
1 is an exploded perspective view according to an embodiment of the present invention
2 is a perspective view according to an embodiment of the present invention;
Figure 3 is a perspective view showing a slab panel fastening state according to an embodiment of the present invention,
4 and 5 is an enlarged perspective view of the main portion of the present invention,
6 to 13 is a view showing a dismantling process according to an embodiment of the present invention,
14 is a view showing a dismantling process according to another embodiment of the present invention;

본 명세서 및 청구범위에서 사용하는 용어나 단어는, 통상적이거나 사전적인의미로 한정하여 해석될 것이 아니라, '발명자는 그 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다'는 원칙에 입각하여 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다.The terms or words used in this specification and claims are not to be construed as being limited to ordinary or dictionary meanings, but the inventors will appropriately define the concept of terms in order to best describe their invention. Can be interpreted as meanings and concepts corresponding to the technical spirit of the present invention.

또한, 본 명세서에 기재된 실시 예와 도면에 도시한 구성은, 본 발명의 바람직한 실시 예에 불과한 것일 뿐이고, 본 발명의 기술적 사상을 모두 대변하는 2것은 아니므로, 본 출원시점에 있어서 이들을 대체할 수 있는 다양한 균등물과 변형 예들이 있을 수 있음을 이해해야 한다.In addition, the embodiments described in the specification and the drawings shown in the drawings are only preferred embodiments of the present invention, and do not represent two of the technical idea of the present invention, it is possible to replace them at the time of the present application It should be understood that there may be various equivalents and variations.

이하, 첨부한 도면을 참조하여 본 발명의 바람직한 실시 예를 상세히 설명하기로 한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

본 발명은 도시한 바와 같이, 콘크리트천장 시공에 사용되는 건축자재는 벽면 일측에 설치되는 벽체패널 상부에 설치되고, 빔(BEAM, 2000)과 슬라브패널(S)이 설치되는 소피트 렝스(SOFFIT LENGTH, 1000, 이하 "SL"이라 함)와; SL에 설치되며, 슬라브패널(SLAB PANEL)이 삽입설치되는 빔(BEAM, 2000)과; 빔(BEAM, 2000)을 연결하는 프롭헤드(PROP HEAD, 3000)와; 프롭헤드 하부 및 서포터(9000)의 하부에 구비되어 프롭헤드를 지지하고 빔을 조정하는 분리형 프롭헤드 가이드(4000)와; 프롭헤드가이드 하부의 서포터(9000)에 구비되어 빔과 슬라브패널을 서서히 하강시키는 완강장치(5000)와; 서포터의 외측에 체결되어 프롭헤드 또는 프롭헤드가이드의 하부에 위치하여 빔과 프롭헤드 또는 프롭헤드가이드를 지지하여 빔이 하부로 강제 낙하하는 것을 방지하는 낙하방지장치(6000)와; 서포터의 외측에 체결되어 프롭헤드 또는 프롭헤드가이드의 하부에 위치하여 빔과 프롭헤드 또는 프롭헤드가이드가 일정거리 만큼 낙하하도록 하고, 연결빔으로 서로연결하는 서포터연결부재(7000)과; 프롭헤드 하부에서 프롭헤드를 지지하며, 해제시에는 슬라브패널을 자중에 의해 하강시키는 서포터(9000)를 포함한다As shown in the present invention, the building material used for the construction of the concrete ceiling is installed on the wall panel is installed on one side of the wall, Sofit length (SOFFIT LENGTH) is installed beam (BEAM, 2000) and slab panel (S) , 1000, hereinafter referred to as "SL"); A beam (BEAM, 2000) installed in the SL and into which the slab panel is inserted; A prop head 3000 connecting the beam BEAM 2000; A detachable prophead guide 4000 provided under the prophead and the lower part of the supporter 9000 to support the prophead and adjust the beam; A lowering device 5000 provided in the supporter 9000 below the prop head guide to gradually lower the beam and the slab panel; A fall prevention device 6000 which is fastened to the outside of the supporter and positioned below the prop head or the prop head guide to support the beam and the prop head or prop head guide to prevent the beam from falling downward; A supporter connection member 7000 which is fastened to the outside of the supporter and positioned below the prop head or the prop head guide so that the beam and the prop head or prop head guide fall by a predetermined distance and are connected to each other by a connecting beam; The prop head is supported under the prop head, and includes a supporter 9000 for lowering the slab panel by its own weight when released.

SL(SOFFIT LENGTH, 1000)은 벽면에 체결되는 벽체패널 상부에 설치되고, 빔(BEAM, 2000)과 슬라브패널(S)이 설치되는 것으로, 벽체패널 상부에 설치할 수 있도록 형성된 벽체패널 고정편(1110)과, 고정편에서 상부 "n" 형상으로 연장·절곡되어 일측에 빔과 슬라브패널을 체결할 수 있도록 하며 내측에 빔고정SL(1300)이 슬라이딩되어 체결될 수 있도록 단턱(1150)이 형성된 빔고정편(1130)으로 이루어진 SL본체(1100)와; 본체 내부에 삽입설치되되, 빔고정편(1500)을 고정핀(P)으로 체결할 수 있도록 하는 체결블록(1310)으로 이루어진 빔고정SL(1300)과; 빔고정SL(1300)에 일측에 고정핀(P)으로 체결되며, 타측은 빔에 고정핀(P)으로 체결되어 빔을 고정함과 아울러 빔을 낙하시킬 때 일정거리만 낙하하도록 장홈(1510)이 형성된 빔고정편(1500)으로 구성된다.SL (SOFFIT LENGTH, 1000) is installed on the top of the wall panel fastened to the wall, the beam (BEAM, 2000) and the slab panel (S) is installed, the wall panel fixing piece 1110 formed to be installed on the top of the wall panel ) And a beam having a stepped portion 1150 formed so that the beam fixing SL 1300 can be fastened by sliding and extending in an upper portion of the fixing piece in an upper "n" shape to be able to fasten the beam and the slab panel. SL body 1100 made of a fixed piece (1130); A beam fixing SL 1300 which is inserted into the main body and is formed of a fastening block 1310 for fastening the beam fixing piece 1500 to the fixing pin P; It is fastened to the beam fixing SL (1300) by a fixing pin (P) on one side, and the other side is fastened to the beam by a fixing pin (P) to secure the beam and to drop only a certain distance when dropping the beam long groove (1510) The formed beam fixing piece 1500 is formed.

이때 상기 체결블록(1310)에서 빔고정편(1500)을 분리하지 않으면 빔고정편의 장홈길이만큼 슬라브패패널이 낙하하고, 체결블록(1310)에서 빔고정편(1500)을 분리하면, 서포터연결부재(7000)의 상부까지 슬라브패널이 낙하하게 된다.In this case, if the beam fixing piece 1500 is not separated from the fastening block 1310, the slab panel is dropped by the long groove length of the beam fixing piece, and if the beam fixing piece 1500 is separated from the fastening block 1310, the supporter connection member The slab panel falls to the top of the (7000).

빔(BEAM, 2000)은 빔고정SL에 안착설치되며 슬라브패널(SLAB PANEL)이 삽입설치되는 것으로, 일단은 해체과정 중 SL과 밀착을 최소화할 수 있도록 우측 하부로 기울어지도록 형성되는 제1경사면부(2100)와, 타단은 프롭헤드(PROP HEAD, 3000)의 경사면과 밀착되고, 이후 하부로 낙하할 수 있도록 형성된 제2경사면부(2300)와, 전·후면에 형성되어 프롭헤드(PROP HEAD, 3000)에 고정편(3700) 및 고정핀(P)으로 체결할 수 있도록 하는 고정편 삽입홈(2500) 및 슬라브패널 삽입홈(2600), 고정핀 삽입공(2700)으로 구성된다.The beam BEAM 2000 is mounted on the beam fixing SL, and the slab panel is inserted and installed. The first slope surface part is formed to be inclined to the lower right side so as to minimize the close contact with the SL during dismantling. The second end 2100 and the other end are in close contact with the inclined surface of the prop head 3000 and are formed on the front and rear surfaces of the second inclined surface portion 2300 formed so as to fall downward. It consists of a fixing piece insertion groove 2500 and the slab panel insertion groove 2600, the fixing pin insertion hole 2700 to be fastened to the fixing piece 3700 and the fixing pin (P) to the 3000.

프롭헤드(PROP HEAD, 3000)는 빔(BEAM, 2000)을 연결하고 하부에서 서포터로 지지받아 슬라브패널과 빔을 지지 및 설치를 용이하게 하는 것으로, 빔에 밀착되는 밀착면(3100)과; 슬라브패널이 밀착되는 슬라브패널밀착면(3200)과; 낙하방지장치를 고정하는 단턱(3310)으로 이루어진 지주(3300)와; 고정편(3700)을 고정하여 슬라브패널의 하중을 지지하도록 형성되는 고정핀(P)이 체결되는 핀삽입공(3400)과; 시공되는 천장에 고정될 수 있도록 하는 앙카볼트(3500)와; 빔과 프롭헤드에 체결되어 슬라브패널을 짖지하는 고정편(3700)으로 구성된다The prop head (PROP HEAD, 3000) is connected to the beam (BEAM, 2000) and is supported by the supporter from the bottom to facilitate the support and installation of the slab panel and the beam, the contact surface 3100 in close contact with the beam; A slab panel adhesion surface 3200 to which the slab panel is in close contact; Shoji (3300) consisting of a step (3310) for fixing the fall prevention device; A pin insertion hole 3400 to which a fixing pin P formed to fix the fixing piece 3700 to support the load of the slab panel; An anchor bolt 3500 to be fixed to the ceiling to be constructed; It is composed of a fixing piece 3700 is fastened to the beam and the prop head barking the slab panel

이때 상기 앙카볼트는 공법에 따라 제외할 수 있다.At this time, the anchor bolt may be excluded according to the method.

상기 분리형 프롭헤드 가이드(4000)는 프롭헤드 하부 및 서포터(9000)의 하부에 구비되어 프롭헤드를 지지하고 빔을 조정하는 것으로, 프롭헤드(3000) 양측에 체결되는 양측의 빔(2000) 하부 내측에 삽입되어 고정편(3700)과 같이 빔을 고정하는 고정편(4100)과; 고정편(4100)의 하부에 형성되어 프롭헤드의 하부에 밀착되어 프롭헤드를 지지하는 지지편(4300)으로 구성된다.The separate prophead guide 4000 is provided at the lower part of the prophead and the lower part of the supporter 9000 to support the prophead and adjust the beam, and the lower inner side of the beam 2000 on both sides fastened to both sides of the prophead 3000. A fixing piece 4100 inserted into the fixing piece to fix the beam, such as a fixing piece 3700; It is formed in the lower portion of the fixing piece 4100 is in close contact with the lower portion of the prop head is composed of a support piece 4300 for supporting the prop head.

완강장치(5000)는 "+" 형상으로 형성되되 중앙에 원형 또는 다각형으로 형성되는 서포트 상부에서 삽입하여 고정할 있도록 형성되는 중앙삽입공(5110)과, 다른 부위 3부위에 형성되어 마찰부재를 체결할 수 있도록 하는 체결공(5150)으로 이루어지는 2개의 몸체(5100)와; 2개의 몸체 각각의 단부에 구비되어 슬라이딩시켜 몸체를 결합할 수 있도록 하는 고리(5230) 및 고리체결홈(5210)으로 이루어지는 체결부(5200)와; 몸체(5100)의 체결공에 체결되어 서포트의 외주면을 가압하는 것으로, 일단에 마찰패드(5310)가 구비되며, 타단에는 삼각핀(5330)이 삽입되는 장홈(5321)이 형성된 마찰봉(5320)과, 마찰봉을 서포트 측으로 가압하되, 장홈(5321)에 삽입되는 삼각핀의 길이에 따라 가압하는 가압력이 조절되는 스프링(5340)으로 이루어진 마찰부재(5300)로 구성된다.The stiffening device 5000 is formed in a "+" shape, but is formed in the center insertion hole (5110) formed to be fixed by inserting from the upper portion of the support formed in a circular or polygonal in the center, and formed in three other parts to fasten the friction member Two bodies 5100 formed of a fastening hole 5150 to enable the assembly; A fastening part 5200 provided at an end of each of the two bodies and configured to include a ring 5230 and a ring fastening groove 5210 to engage the body by sliding; A friction rod 5320 having a long groove 5321, which is fastened to a fastening hole of the body 5100 and pressurizes an outer circumferential surface of the support, and has a friction pad 5310 at one end and a triangular pin 5330 is inserted at the other end. And, while pressing the friction bar to the support side, consisting of a friction member (5300) made of a spring (5340) for adjusting the pressing force to be pressed in accordance with the length of the triangular pin inserted into the long groove (5321).

이때 가압봉에 장홈(5321) 대신에 나사를 형성한 후 너트로 체결함으로써 너트의 조임에 따라 스프링을 가압력을 조절할 수 도 있다.At this time, by forming a screw in place of the long groove (5321) in the pressure rod and then tightening with a nut may adjust the pressing force of the spring according to the tightening of the nut.

또한 상기 몸체는 분리형이 아닌 일체형으로 제작할 수 있다.In addition, the body may be manufactured in one piece instead of a separate type.

상기 낙하방지장치(6000)는 상부에 프롭헤드(3000)가 외측으로는 프롭헤드가이드(4000)가 체결되며, 빔을 지지하는 고정편(37000) 하부에 위치하여 콘크리트 슬래브패널 하중을 지지하며, 해체시 슬래브패널 및 빔을 용이하게 해체할 수 있도록 하는 것으로, 원형 또는 다각형으로 형성되는 몸체(6310)를 갖으며, 서포터의 외측에 체결되어 프롭헤드 또는 프롭헤드가이드의 하부에 위치하여 빔이 하부로 강제낙하하는 것을 방지하는 낙하방지부재(6300)를 포함한다.The drop prevention device 6000 is a prop head 3000 is fastened to the outside of the prop head guide 4000 on the upper side, is located under the fixing piece (37000) for supporting the beam to support the concrete slab panel load, In order to easily dismantle the slab panel and the beam during disassembly, it has a body (6310) formed in a circular or polygonal shape, and is fastened to the outside of the supporter is located in the lower portion of the prop head or prop head guide to lower the beam Falling prevention member 6300 to prevent the falling to the fork.

좀더 자세히 살펴보면 다각형의 몸체(6310)를 갖는 낙하방지부재(6300)는 내측에 즉, 단턱(3410)과 대응되도록 2면에 형성되는 슬라이딩홈(6330)과; 2면의 슬라이딩홈(6330)과 대응되도록 2면에 형성되는 단턱부(6350)와; 낙하방지부재를 서포터(9000)로 슬라이딩시켜 체결할 때 서포터의 일측이 수용되는 수용부(6370)와; 몸체(6310)를 관통하여 삼각핀(F)을 삽입하여 고정할 수 있도록 형성되는 핀삽입공(6380)으로 구성된다. Looking in more detail, the anti-drop member 6300 having a polygonal body (6310) and the inner side, that is, the sliding groove (6330) formed on two sides to correspond to the step (3410); A stepped section 6350 formed on two surfaces to correspond to the sliding grooves 6330 on two surfaces; An accommodating part 6370 in which one side of the supporter is accommodated when the drop preventing member is slid and fastened to the supporter 9000; It is composed of a pin insertion hole (6380) is formed so as to penetrate the body (6310) by inserting a triangular pin (F).

이때 낙하방지장치(6000)는 완강장치(5000)의 하부에 설치할 수도 있다.At this time, the fall prevention device 6000 may be installed in the lower portion of the stiffening device (5000).

서포터연결부재(7000)는 서포터의 외측에 체결되어 프롭헤드 또는 프롭헤드가이드의 하부에 위치하여 빔과 프롭헤드 또는 프롭헤드가이드가 일정거리 만큼 낙하하도록 하강하는 거리를 조절하며, 연결빔으로 서로연결하는 것으로, 서포트에 체결할 수 있도록 수용부(7100)가 형성되며, 수용부를 기점으로 4면에 연결빔을 연결할 수 있도록 연결부(7300)가 구비되어 서포터에 체결된다.The supporter connecting member 7000 is fastened to the outside of the supporter and positioned below the prophead or prophead guide to adjust the distance that the beam and the prophead or prophead guide fall down by a predetermined distance, and are connected to each other by a connecting beam. The receiving part 7100 is formed to be fastened to the support, and the connection part 7300 is provided to connect the connection beam to four surfaces from the receiving part and is fastened to the supporter.

이때 연결부 상부에 완충부재를 더 구비하여 슬라브패널 및 빔이 하강할 때 충격을 흡수하게 할 수도 있다. In this case, a buffer member may be further provided on the connection part to absorb shock when the slab panel and the beam descend.

시공과정을 살펴보면 빔과 슬라브패널 등을 설치하는 설치 및 시멘트로 천장을 타설 및 양생하는 설치단계와, 시멘트의 양생이 끝나면 빔과 슬라브패널 등을 해체하는 해체단계로 이루어진 시공방법에 있어서,In the construction process, in the installation method of installing the beam and slab panel, and the installation step of placing and curing the ceiling with cement, and the dismantling step of dismantling the beam and the slab panel after the curing of the cement,

사면에 벽체패널을 설치한 후 After installing the wall panel on the slope

벽체패널 상부에 SL본체를 설치한 후 After installing SL main body on the top of wall panel

드롭 헤드에 엔드빔과 미들빔을 고정편을 이용하여 체결하여 빔과 드롭 헤드를 일체화한 후 After the end beam and the middle beam are fastened to the drop head using the fixing piece, the beam and the drop head are integrated.

SL본체 내부에 슬라브패널고정SL과, 빔고정SL을 설치한 후 After installing slab panel fixing SL and beam fixing SL inside the SL body

SL에 일체화된 빔을 빔고정SL에 설치한 후 After installing the beam integrated in the SL to the beam fixing SL

프롭헤드의 하부에 서포터를 설치하고, Install the supporter on the bottom of the prophead,

빔과 프롭헤드, 슬라브패널고정SL에 슬라브패널을 설치한 후 슬라브패널에 시멘트를 부어 타설한 후 양생하는 하는 설치단계(S1000)와;An installation step (S1000) of installing the slab panel on the beam, the prop head, and the slab panel fixing SL and then curing by pouring cement on the slab panel;

시멘트의 타설이 끝나면 벽체패널을 해체한 후 After the cement is finished, dismantle the wall panel

SL본체에서 슬라브패널고정SL과, 빔고정SL을 해체한 후 After disassembling the slab panel fixing SL and beam fixing SL from the SL body,

드롭 헤드에 빔 및 슬라브패널을 고정하고 있는 핀들을 해체한 후 After dismantling the pins securing the beam and slab panel to the drop head

빔과 빔에 설치되어 있는 슬라브패널의 자중에 의해 저속장치을 따라 서서히 하강시켜 낙하방지턱에 안착시킨 후 빔과 빔에 설치되어 있는 슬라브패널을 해체하되, After slowly descending along the low speed device by the weight of the slab panel installed on the beam and the beam, it is placed on the drop prevention jaw, and then the slab panel installed on the beam and the beam is dismantled.

낙하방지장치(6000)를 이용하여 By using the anti-drop device 6000

다각형의 몸체를 갖는 낙하방지장치를 서포터에 체결하는 것으로, 서포터의 단턱부에 낙하방지장치의 슬라이딩홈이 서포터의 슬라이딩홈에 낙하방지장치의 단턱부이 위치하도록 한 후 서포터의 상부에서 하부로 슬라이딩시킨 후 The fall prevention device having a polygonal body is fastened to the supporter, and the sliding groove of the drop prevention device is positioned at the stepped part of the supporter so that the stepped part of the drop prevention device is located in the sliding groove of the supporter and then slides from the upper part of the supporter to the lower part. after

낙하방지장치를 일측으로 슬라이딩시켜 몸체가 단터으로 삽입되도록 함에 따라 상기 낙하방지장치의 단턱부가 단턱과 동일선상에 위치하므로 낙하방지장치가 서포터와 일체형과 같이 체결되어 하중을 받는 빔을 안정되게 지지할 수 있도록 한 후 As the body is inserted into the danter by sliding the anti-drop device to one side, the stepped portion of the anti-drop device is positioned on the same line as the step, so that the anti-drop device is securely supported as a unit with the supporter to stably support the beam under load. After you let

이후 시공이 끝나면 핀를 제거한 후 다각형의 몸체를 타격하여 타측으로 슬라이딩시켜 단턱에서 이탈시킨 후 프롭헤드에 빔을 조정하기 위한 핀을 제거하면 빔이 서포트를 따라 하강하도로 하는 해체단계(S2000)를 포함한다.After the construction is completed, remove the pin and then hit the body of the polygon to slide to the other side to move away from the step, and then remove the pin for adjusting the beam on the prop head, the beam includes a dismantling step (S2000) to fall along the support do.

즉, 벽체판넬해체-SL에서 빔고정편체거-SL과 연결된 핀제거-낙하방지장치하강- 마찰을 조정하는 삼각핀 제거- 프롭헤드와 연결된 슬리브패널제거-해체공구로 프롭헤드와 연결된 슬리브패널을 콘크리트에서 해체-빔과 슬라브패널 전체가 서포터연결부재에 안착-슬라브패널제거-빔조인트제거-빔제거-드롭가이드제거-SL제거순으로 이루어진다.In other words, dismantle the wall panel-SL, remove the pin from the beam fixing piece-SL, remove the fall prevention device, remove the triangular pin to adjust the friction, remove the sleeve panel connected to the prop head, and remove the sleeve panel connected to the prop head with the disassembly tool. In the concrete, the dismantling-beam and slab panel are all settled on the supporter connecting member-slab panel removal-beam joint removal-beam removal-drop guide removal-SL removal.

※ 이상에서 설명한 본 발명은 전술한 실시 예 및 첨부된 도면에 의해 한정되는 것이 아니고, 본 발명의 기술적 사상을 벗어나지 않는 범위 내에서 여러 가지 치환, 변형 및 변경할 수 있다는 것이 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자에게 있어 명백할 것이다.※ The present invention described above is not limited to the above-described embodiments and the accompanying drawings, and various substitutions, modifications, and changes can be made without departing from the technical spirit of the present invention. It will be apparent to those of ordinary knowledge.

1000 : SL(SOFFIT LENGTH)
1100 : 벽체패널 고정편 1300 : 빔고정SL
1500 : 빔고정편
2000 : 빔(BEAM) 2100 : 제1밀착부
2300 : 제2밀착부 2500 : 고정편 삽입홈
2700 : 고정핀 삽입공
3000 : 프롭헤드(PROP HEAD)는 3100 : 밀착면
3310 : 단턱 3500 : 앙카볼트
4000 : 분리형 프롭헤드 가이드 4100 : 고정편
4300 : 지지편
5000 : 완강장치 5100 : 몸체
5330 : 마찰부재
6000 :낙하방지장치 6310 : 다각형의 몸체
6330 : 슬라이딩홈 6350 : 단턱부
6370 : 수용부 6380 : 핀삽입공
7000 : 서포터연결부재 7100 : 수용부
7300 : 연결부
9000 : 서포터
1000: SL (SOFFIT LENGTH)
1100: wall panel fixing 1300: beam fixing SL
1500: beam fixing piece
2000 beam BEAM 2100 first contact portion
2300: second contact portion 2500: fixing piece insertion groove
2700: fixing pin insertion hole
3000: Prop head is 3100: Contact surface
3310: step 3500: anchor bolt
4000: detachable prophead guide 4100: fixed piece
4300: support piece
5000: steel bar 5100: body
5330: friction member
6000: Fall prevention device 6310: Polygonal body
6330: sliding groove 6350: stepped portion
6370: accommodating part 6380: pin insertion hole
7000: supporter connecting member 7100: receiving portion
7300: Connection
9000: Supporters

Claims (9)

벽면에 체결되는 벽체패널 상부에 설치되고, 빔(BEAM, 2000)과 슬라브패널(S)이 설치되는 것으로, 벽체패널 상부에 설치할 수 있도록 형성된 벽체패널 고정편(1110)과, 고정편에서 상부 "n" 형상으로 연장·절곡되어 일측에 빔과 슬라브패널을 체결할 수 있도록 하며 내측에 빔고정SL(1300)이 슬라이딩되어 체결될 수 있도록 단턱(1150)이 형성된 빔고정편(1130)으로 이루어진 SL본체(1100)와; 본체 내부에 삽입설치되되, 빔고정편(1500)을 고정핀(P)으로 체결할 수 있도록 하는 체결블록(1310)으로 이루어진 빔고정SL(1300)과; 빔고정SL(1300)에 일측에 고정핀(P)으로 체결되며, 타측은 빔에 고정핀(P)으로 체결되어 빔을 고정함과 아울러 빔을 낙하시킬 때 일정거리만 낙하하도록 장홈(1510)이 형성된 빔고정편(1500)으로 구성된 SL(SOFFIT LENGTH, 1000)과;
SL에 설치되며, 슬라브패널(SLAB PANEL)이 삽입설치되는 빔(BEAM, 2000)과;
빔(BEAM, 2000)을 연결하는 프롭헤드(PROP HEAD, 3000)와;
프롭헤드 하부 및 서포터(9000)의 하부에 구비되어 프롭헤드를 지지하고 빔을 조정하는 분리형 프롭헤드 가이드(4000)와;
프롭헤드가이드 하부의 서포터(9000)에 구비되어 빔과 슬라브패널을 서서히 하강시키는 완강장치(5000)와; 서포터의 외측에 체결되어 프롭헤드 또는 프롭헤드가이드의 하부에 위치하여 빔과 프롭헤드 또는 프롭헤드가이드를 지지하여 빔이 하부로 강제 낙하하는 것을 방지하는 낙하방지장치(6000)와; 서포터의 외측에 체결되어 프롭헤드 또는 프롭헤드가이드의 하부에 위치하여 빔과 프롭헤드 또는 프롭헤드가이드가 일정거리 만큼 낙하하도록 하고, 연결빔으로 서로연결하는 서포터연결부재(7000)과; 프롭헤드 하부에서 프롭헤드를 지지하며, 해제시에는 슬라브패널을 자중에 의해 하강시키는 서포터(9000)를 포함하는 것을 특징으로 하는 슬라브패널 드롭시공에 사용되는 장치.
It is installed on the upper wall panel fastened to the wall, the beam (BEAM, 2000) and the slab panel (S) is installed, the wall panel fixing piece 1110 formed to be installed on the upper wall panel, and the upper part " SL is made of a beam fixing piece 1130 formed with a stepped 1150 so that the beam fixing SL (1300) can be fastened by sliding and extending in the n "shape so as to fasten the beam and the slab panel on one side. A main body 1100; A beam fixing SL 1300 which is inserted into the main body and is formed of a fastening block 1310 for fastening the beam fixing piece 1500 to the fixing pin P; It is fastened to the beam fixing SL (1300) by a fixing pin (P) on one side, and the other side is fastened to the beam by a fixing pin (P) to secure the beam and to drop only a certain distance when dropping the beam long groove (1510) SL (SOFFIT LENGTH, 1000) consisting of the formed beam fixing piece (500);
A beam (BEAM, 2000) installed in the SL and into which the slab panel is inserted;
A prop head 3000 connecting the beam BEAM 2000;
A detachable prophead guide 4000 provided under the prophead and the lower part of the supporter 9000 to support the prophead and adjust the beam;
A lowering device 5000 provided in the supporter 9000 below the prop head guide to gradually lower the beam and the slab panel; A fall prevention device 6000 which is fastened to the outside of the supporter and positioned below the prop head or the prop head guide to support the beam and the prop head or prop head guide to prevent the beam from falling downward; A supporter connection member 7000 which is fastened to the outside of the supporter and positioned below the prop head or the prop head guide so that the beam and the prop head or prop head guide fall by a predetermined distance and are connected to each other by a connecting beam; The prop head is supported at the lower part of the prop head, the device used in the slab panel drop construction, characterized in that it comprises a supporter (9000) for lowering the slab panel by its own weight when released.
제1항에 있어서,
상기 체결블록(1310)에서 빔고정편(1500)을 분리하지 않으면 빔고정편의 장홈길이만큼 슬라브패패널이 낙하하고, 체결블록(1310)에서 빔고정편(1500)을 분리하면, 서포터연결부재(7000)의 부까지 슬라브패널이 낙하하도록 한 것을 특징으로 하는 슬라브패널 드롭시공에 사용되는 장치
The method of claim 1,
If the beam fixing piece 1500 is not separated from the fastening block 1310, the slab panel is dropped by the long groove length of the beam fixing piece, and if the beam fixing piece 1500 is separated from the fastening block 1310, the supporter connection member ( Apparatus used in slab panel drop construction, characterized in that the slab panel to fall to the portion of 7000)
제1항에 있어서,
상기 프롭헤드(PROP HEAD, 3000)는 빔(BEAM, 2000)을 연결하고 하부에서 서포터로 지지받아 슬라브패널과 빔을 지지 및 설치를 용이하게 하는 것으로, 빔에 밀착되는 밀착면(3100)과;
슬라브패널이 밀착되는 슬라브패널밀착면(3200)과;
낙하방지장치를 고정하는 단턱(3310)으로 이루어진 지주(3300)와;
고정편(3700)을 고정하여 슬라브패널의 하중을 지지하도록 형성되는 고정핀(P)이 체결되는 핀삽입공(3400)과;
시공되는 천장에 고정될 수 있도록 하는 앙카볼트(3500)와;
빔과 프롭헤드에 체결되어 슬라브패널을 짖지하는 고정편(3700)으로 구성된 것을 특징으로 하는 슬라브패널 드롭시공에 사용되는 장치.
The method of claim 1,
The prop head (PROP HEAD, 3000) is connected to the beam (BEAM, 2000) and is supported by the supporter from the bottom to facilitate the support and installation of the slab panel and the beam, the contact surface 3100 in close contact with the beam;
A slab panel adhesion surface 3200 to which the slab panel is in close contact;
Shoji (3300) consisting of a step (3310) for fixing the fall prevention device;
A pin insertion hole 3400 to which a fixing pin P formed to fix the fixing piece 3700 to support the load of the slab panel;
An anchor bolt 3500 to be fixed to the ceiling to be constructed;
Apparatus used in the slab panel drop construction, characterized in that consisting of a fixed piece (3700) is fastened to the beam and the prop head barking the slab panel.
제1항에 있어서,
상기 분리형 프롭헤드 가이드(4000)는 프롭헤드 하부 및 서포터(9000)의 하부에 구비되어 프롭헤드를 지지하고 빔을 조정하는 것으로, 프롭헤드(3000) 양측에 체결되는 양측의 빔(2000) 하부 내측에 삽입되어 고정편(3700)과 같이 빔을 고정하는 고정편(4100)과;
고정편(4100)의 하부에 형성되어 프롭헤드의 하부에 밀착되어 프롭헤드를 지지하는 지지편(4300)으로 구성된 것을 특징으로 하는 슬라브패널 드롭시공에 사용되는 장치.
The method of claim 1,
The separate prophead guide 4000 is provided at the lower part of the prophead and the lower part of the supporter 9000 to support the prophead and adjust the beam, and the lower inner side of the beam 2000 on both sides fastened to both sides of the prophead 3000. A fixing piece 4100 inserted into the fixing piece to fix the beam, such as a fixing piece 3700;
Apparatus used in the slab panel drop construction, characterized in that formed in the lower portion of the fixing piece (4100) is in close contact with the lower portion of the prop head to support the prop head (4300).
제1항에 있어서,
상기 완강장치(5000)는 "+" 형상으로 형성되되 중앙에 원형 또는 다각형으로 형성되는 서포트 상부에서 삽입하여 고정할 있도록 형성되는 중앙삽입공(5110)과, 다른 부위 3부위에 형성되어 마찰부재를 체결할 수 있도록 하는 체결공(5150)으로 이루어지는 2개의 몸체(5100)와;
2개의 몸체 각각의 단부에 구비되어 슬라이딩시켜 몸체를 결합할 수 있도록 하는 고리(5230) 및 고리체결홈(5210)으로 이루어지는 체결부(5200)와;
몸체(5100)의 체결공에 체결되어 서포트의 외주면을 가압하는 것으로, 일단에 마찰패드(5310)가 구비되며, 타단에는 삼각핀(5330)이 삽입되는 장홈(5321)이 형성된 마찰봉(5320)과, 마찰봉을 서포트 측으로 가압하되, 장홈(5321)에 삽입되는 삼각핀의 길이에 따라 가압하는 가압력이 조절되는 스프링(5340)으로 이루어진 마찰부재(5300)로 구성된 것을 특징으로 하는 슬라브패널 드롭시공에 사용되는 장치.
The method of claim 1,
The stiffening device 5000 is formed in a "+" shape, but is formed in the center insertion hole (5110) to be inserted and fixed in the upper portion of the support formed in a circular or polygonal center, and formed in three other parts of the friction member Two bodies 5100 formed of fastening holes 5150 for fastening;
A fastening part 5200 provided at an end of each of the two bodies and configured to include a ring 5230 and a ring fastening groove 5210 to engage the body by sliding;
A friction rod 5320 having a long groove 5321, which is fastened to a fastening hole of the body 5100 and pressurizes an outer circumferential surface of the support, and has a friction pad 5310 at one end and a triangular pin 5330 is inserted at the other end. And, slab panel drop construction, characterized in that consisting of a friction member 5300 made of a spring (5340) to press the friction bar to the support side, the pressing force to press according to the length of the triangular pin inserted into the long groove (5321) The device used for.
제1항에 있어서,
상기 낙하방지장치(6000)는 상부에 프롭헤드(3000)가 외측으로는 프롭헤드가이드(4000)가 체결되며, 빔을 지지하는 고정편(37000) 하부에 위치하여 콘크리트 슬래브패널 하중을 지지하며, 해체시 슬래브패널 및 빔을 용이하게 해체할 수 있도록 하는 것으로, 다각형의 몸체(6310)를 갖는 낙하방지부재(6300)는 내측에 즉, 단턱(3410)과 대응되도록 2면에 형성되는 슬라이딩홈(6330)과;
2면의 슬라이딩홈(6330)과 대응되도록 2면에 형성되는 단턱부(6350)와;
낙하방지부재를 서포터(9000)로 슬라이딩시켜 체결할 때 서포터의 일측이 수용되는 수용부(6370)와;
몸체(6310)를 관통하여 삼각핀(F)을 삽입하여 고정할 수 있도록 형성되는 핀삽입공(6380)으로 구성된 것을 특징으로 하는 슬라브패널 드롭시공에 사용되는 장치.
The method of claim 1,
The drop prevention device 6000 is a prop head 3000 is fastened to the outside of the prop head guide 4000 on the upper side, is located under the fixing piece (37000) for supporting the beam to support the concrete slab panel load, In order to easily dismantle the slab panel and the beam during disassembly, the drop prevention member 6300 having a polygonal body 6310 is formed on the inner surface, that is, sliding grooves formed on two surfaces corresponding to the step 3410 ( 6330);
A stepped section 6350 formed on two surfaces to correspond to the sliding grooves 6330 on two surfaces;
An accommodating part 6370 in which one side of the supporter is accommodated when the drop preventing member is slid and fastened to the supporter 9000;
Device for use in slab panel drop construction, characterized in that consisting of a pin insertion hole (6380) is formed so as to penetrate through the body (6310) to insert a triangular pin (F).
제6항에 있어서,
상기 낙하방지장치(6000)는 완강장치(5000)의 하부에 설치하여 시공할 수 있도록 한 것을 특징으로 하는 슬라브패널 드롭시공에 사용되는 장치.
The method of claim 6,
The drop preventing device 6000 is used in the slab panel drop construction, characterized in that the installation to be installed on the lower portion of the stiffening device (5000).
제1항에 있어서,
상기 서포터연결부재(7000)는 서포터의 외측에 체결되어 프롭헤드 또는 프롭헤드가이드의 하부에 위치하여 빔과 프롭헤드 또는 프롭헤드가이드가 일정거리 만큼 낙하하도록 하강하는 거리를 조절하며, 연결빔으로 서로연결하는 것으로, 서포트에 체결할 수 있도록 형성되는 수용부(7100)와;
수용부를 기점으로 4면에 연결빔을 연결할 수 있도록 형성되는 연결부(7300)로 구성된 것을 특징으로 하는 슬라브패널 드롭시공에 사용되는 장치.
The method of claim 1,
The supporter connecting member 7000 is fastened to the outside of the supporter and positioned below the prophead or prophead guide to adjust the distance from which the beam and the prophead or prophead guide fall down by a predetermined distance, and each other as a connecting beam. By connecting, the receiving portion 7100 is formed to be fastened to the support;
Apparatus used in the slab panel drop construction, characterized in that consisting of a connection portion 7300 formed to connect the connection beam on the four sides from the receiving portion.
벽체판넬해체-SL에서 빔고정편체거-SL과 연결된 핀제거-낙하방지장치하강- 마찰을 조정하는 삼각핀 제거- 프롭헤드와 연결된 슬리브패널제거-해체공구로 프롭헤드와 연결된 슬리브패널을 콘크리트에서 해체-빔과 슬라브패널 전체가 서포터연결부재에 안착-슬라브패널제거-빔조인트제거-빔제거-드롭가이드제거-SL제거순을 포함하는 것을 특징으로 하는 슬라브패널 드롭시공공법.
Wall panel disassembly-SL to beam fixing piece-removing pin-removing pin-falling device-removing device-removing triangular pin adjusting friction-removing sleeve-panel to sleeve-removing sleeve panel to concrete A slab panel drop construction method, wherein the entire dismantling-beam and slab panel includes seating on the supporter connecting member-slab panel removal-beam joint removal-beam removal-drop guide removal-SL removal.
KR1020180035746A 2018-03-28 2018-03-28 Slab panel drop construction method and device used therein KR102041392B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020180035746A KR102041392B1 (en) 2018-03-28 2018-03-28 Slab panel drop construction method and device used therein

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020180035746A KR102041392B1 (en) 2018-03-28 2018-03-28 Slab panel drop construction method and device used therein

Publications (2)

Publication Number Publication Date
KR20190114068A true KR20190114068A (en) 2019-10-10
KR102041392B1 KR102041392B1 (en) 2019-11-07

Family

ID=68206608

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020180035746A KR102041392B1 (en) 2018-03-28 2018-03-28 Slab panel drop construction method and device used therein

Country Status (1)

Country Link
KR (1) KR102041392B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102247611B1 (en) * 2019-11-22 2021-05-03 김준년 Supporting Device for Deck Support Frame and Method for dropping the Deck Support Frame using the same
CN112962960A (en) * 2021-02-09 2021-06-15 广西建工集团第三建筑工程有限责任公司 Early formwork stripping support system of coincide floor rigid coupling independent stay
KR20230094091A (en) * 2021-12-20 2023-06-27 홍종화 Supporting apparatus for slab forms

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050029967A (en) 2003-09-24 2005-03-29 고려개발 주식회사 Support frame assembly for supporting concrete slab form and form setting method using the same
KR101007538B1 (en) * 2008-04-07 2011-01-14 삼목정공주식회사 Connecting Device For Slab Wall Form
KR101832180B1 (en) * 2017-05-15 2018-02-28 주식회사 넥스시스템즈 Once step the let down slab panel
KR20180029144A (en) * 2016-09-09 2018-03-20 백희정 Restoration type support with the axis with a drop bangbeop and drop device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050029967A (en) 2003-09-24 2005-03-29 고려개발 주식회사 Support frame assembly for supporting concrete slab form and form setting method using the same
KR101007538B1 (en) * 2008-04-07 2011-01-14 삼목정공주식회사 Connecting Device For Slab Wall Form
KR20180029144A (en) * 2016-09-09 2018-03-20 백희정 Restoration type support with the axis with a drop bangbeop and drop device
KR101832180B1 (en) * 2017-05-15 2018-02-28 주식회사 넥스시스템즈 Once step the let down slab panel

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102247611B1 (en) * 2019-11-22 2021-05-03 김준년 Supporting Device for Deck Support Frame and Method for dropping the Deck Support Frame using the same
CN112962960A (en) * 2021-02-09 2021-06-15 广西建工集团第三建筑工程有限责任公司 Early formwork stripping support system of coincide floor rigid coupling independent stay
KR20230094091A (en) * 2021-12-20 2023-06-27 홍종화 Supporting apparatus for slab forms

Also Published As

Publication number Publication date
KR102041392B1 (en) 2019-11-07

Similar Documents

Publication Publication Date Title
US10036158B2 (en) Concrete anchor
KR102041392B1 (en) Slab panel drop construction method and device used therein
KR101871280B1 (en) Restoration type support with the axis with a drop bangbeop and drop device
EP2267243B1 (en) Concrete slab form system
KR101415915B1 (en) Supporter for concrete forms of slab
KR20190114731A (en) Apparaurs for constructing slab of building and method for the same
CN108442693A (en) One kind fast moving installation support system
JP2021529275A (en) Architectural system scaffolding
CA2967108C (en) Anchoring device and method for installation
KR100757321B1 (en) Support for yoke of zenith mold
KR20060037137A (en) Space preservation device for construction support
KR20180107396A (en) soffit length for fixing beam
US11306495B2 (en) System, method and apparatus for fall protection of workers at a construction site
WO2004015219A1 (en) Post and rail assembly
KR20060095220A (en) The protective net installation apparatus and method thereof
KR101861327B1 (en) Restoration type support with the axis with a drop bangbeop and drop device
KR20090051796A (en) Adjustment debris net system
KR20110108902A (en) Exterior fixing device of building
KR200489405Y1 (en) A customized fixing tool for installation of safety nets
KR101578763B1 (en) Temporary handrails for stairs
KR100482272B1 (en) A supprot pipe for construction
RU188527U1 (en) Device for cutting reinforced concrete structures
KR200375139Y1 (en) Lower Part Fixing Structure of Gang Form
KR20120008636U (en) Toe-board of Scaffold
KR200497116Y1 (en) Safety guard fixing device

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant