KR20190036612A - system and method for controlling mining device of bitcoin - Google Patents

system and method for controlling mining device of bitcoin Download PDF

Info

Publication number
KR20190036612A
KR20190036612A KR1020170125714A KR20170125714A KR20190036612A KR 20190036612 A KR20190036612 A KR 20190036612A KR 1020170125714 A KR1020170125714 A KR 1020170125714A KR 20170125714 A KR20170125714 A KR 20170125714A KR 20190036612 A KR20190036612 A KR 20190036612A
Authority
KR
South Korea
Prior art keywords
mining equipment
control unit
power control
signal
management server
Prior art date
Application number
KR1020170125714A
Other languages
Korean (ko)
Inventor
박창희
고태훈
Original Assignee
박창희
고태훈
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 박창희, 고태훈 filed Critical 박창희
Priority to KR1020170125714A priority Critical patent/KR20190036612A/en
Publication of KR20190036612A publication Critical patent/KR20190036612A/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/07Responding to the occurrence of a fault, e.g. fault tolerance
    • G06F11/14Error detection or correction of the data by redundancy in operation
    • G06F11/1402Saving, restoring, recovering or retrying
    • G06F11/1415Saving, restoring, recovering or retrying at system level
    • G06F11/1417Boot up procedures
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B11/00Automatic controllers
    • G05B11/01Automatic controllers electric
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F1/00Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
    • G06F1/26Power supply means, e.g. regulation thereof
    • G06F1/28Supervision thereof, e.g. detecting power-supply failure by out of limits supervision
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/30Monitoring
    • G06F11/3055Monitoring arrangements for monitoring the status of the computing system or of the computing system component, e.g. monitoring if the computing system is on, off, available, not available

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • Quality & Reliability (AREA)
  • Computing Systems (AREA)
  • Automation & Control Theory (AREA)
  • Power Sources (AREA)

Abstract

Disclosed are a control system of virtual money mining equipment and a control method thereof. The present invention provides the control system of virtual money mining equipment, which monitors an operation state of mining equipment installed in a virtual money mining field and controls the mining equipment to be rebooted in accordance with a user request if the mining equipment is down, and the control method thereof. The virtual money mining equipment includes at least one mining equipment control unit and a management server.

Description

가상화폐 채굴장비 제어시스템 및 제어방법{system and method for controlling mining device of bitcoin}TECHNICAL FIELD [0001] The present invention relates to a system and method for controlling a mining device,

본 발명은 가상화폐 채굴장비 제어시스템 및 방법에 관한 발명으로서, 더욱 상세하게는 가상화폐 채굴장에 설치된 채굴장비의 동작상태를 모니터링 하여 채굴장비의 다운이 발생하면 사용자의 요청에 따라 채굴장비가 재부팅되도록 제어하는 가상화폐 채굴장비 제어시스템 및 제어방법에 관한 것이다.The present invention relates to a system and a control method for a virtual currency mining equipment, and more particularly, to a system and method for controlling a mining equipment in a virtual money mine, such that when the mining equipment is down, the mining equipment is re- And more particularly, to a control system and a control method of a virtual money mining equipment.

네트워크가 발달함에 따라, 포털 사이트에서는 가입자에게 활동에 따른 이득을 제공하는 사이버머니(cyber money)의 개념인 가상화폐가 등장하였다. As the network developed, virtual money, which is the concept of cyber money that provides the benefits to subscribers in a portal site, has appeared.

이러한 가상화폐는 특정 웹 사이트에서만 가치가 있으나, 나카모토 사토시는 전세계인 모두가 사용할 수 있는 암호 화폐인 비트코인(Bitcoin: BTC)을 생각해 발표하였다.While these virtual currencies are only worthy of certain websites, Nakamoto Satoshi has come up with the idea of Bitcoin (BTC), a cryptic currency that everyone in the world can use.

비트코인은 비트(bit)로 이루어진 디지털 통화로, 통화를 관리하는 중앙 서버가 존재하지 않는 대신 P2P(Peerto-Peer) 기반 분산 데이터베이스에 의해 거래가 이루어진다. A bit coin is a digital call made up of bits, and a central server for managing calls does not exist, but instead is traded by a P2P (Peer-Peer) based distributed database.

이 거래는 공개키 암호화 방식을 기반으로 이루어지고, 비트코인의 주체에 대한 익명성이 보장되며, 비트코인의 거래 내역은 블록 체인(block chain)이라는 형태로 공개된다.This transaction is based on a public key cryptosystem, ensuring anonymity of the subject of the bit coin, and the transaction details of the bit coin are disclosed in the form of a block chain.

이러한 가상화폐의 거래를 보호하기 위한 방법은 한국 공개특허공보 공개번호 제10-2016-0095720호(발명의 명칭: 암호화 화폐의 거래를 보호하는 방법 및 장치)에 개시되어 있다.A method for protecting the transaction of such a virtual currency is disclosed in Korean Patent Laid-Open Publication No. 10-2016-0095720 entitled " Method and Apparatus for Protecting Transactions in Encrypted Money. &Quot;

한편, 가상화폐의 거래 내역인 블록은 가상화폐들의 거래장부로서, 해당 코인으로 거래된 모든 거래가 기록되고, 거래는 네트워크로 연결된 각 관련 노드(사용자 컴퓨터)로 즉시 공유되며, 거래가 기록된 장부는 10분마다 집계해 작업의 완성을 알린다.Meanwhile, the transaction block of the virtual currency is a transaction book of virtual currencies, all transactions traded with the coin are recorded, the transaction is instantly shared with each related node (user computer) connected to the network, It compiles every minute and announces the completion of the work.

이를 승인이라 하고 그 보상으로 가상화폐(예를 들면, 비트코인)를 받게 되지만, 이러한 일련의 작업 과정은 매우 복잡한 연산 과정을 거쳐 이루어져 가상화폐를 얻기 위한 채굴(Mining) 과정에 매우 높은 성능의 메인보드와 그래픽카드 등을 이용한 채굴장비가 사용되고 있다.(Eg, bit coin). However, this series of operations is carried out through a very complicated calculation process, so that the mining process for obtaining virtual money has a high performance main And mining equipment using boards and graphics cards are being used.

최근에는 블록 체인의 난이도가 높아져 고성능 전용 채굴장비를 수 만대 병렬로 연결하여 컴퓨팅 파워를 향상시킨 채굴전문 기업도 등장했다.In recent years, the difficulty of the block chain has increased, and a mining specialist has appeared that improves computing power by connecting several high-performance dedicated mining equipment in parallel.

한편, 가상화폐를 채굴하기 위한 채굴장비의 채산성은 가상화폐 채굴을 위해 투입된 전기세와 채굴된 가상화폐의 양에 따라 정해지기 때문에 대체로 임대료가 낮으며, 산업용 전기를 사용할 수 있는 외곽지역에 다수의 채굴장비가 설치된 채굴장이 마련된다.On the other hand, the profitability of mining equipment for mining virtual currency is generally low because it is determined by the amount of electricity charged for virtual money mining and the amount of virtual money mined, and a large number of mining The mine is equipped with equipment.

그러나 이러한 채굴장은 원거리에 설치되기 때문에 채굴장비가 다운되는 경우 사용자가 대응하기 어려운 문제점이 있다.However, since these mines are installed at a remote location, there is a problem that users are not able to cope when the mining equipment is down.

문헌 1. 한국 공개특허공보 공개번호 제10-2016-0095720호(발명의 명칭: 암호화 화폐의 거래를 보호하는 방법 및 장치)Document 1: Korean Patent Laid-Open Publication No. 10-2016-0095720 (Title: Method and Apparatus for Protecting Transaction of Encrypted Currency)

이러한 문제점을 해결하기 위하여, 본 발명은 가상화폐 채굴장에 설치된 채굴장비의 동작상태를 모니터링 하여 채굴장비의 다운이 발생하면 사용자의 요청에 따라 채굴장비가 재부팅되도록 제어하는 가상화폐 채굴장비 제어시스템 및 제어방법을 제공하는 것을 목적으로 한다.In order to solve the above problems, the present invention provides a virtual money mining equipment control system and a control system for controlling the mining equipment to be rebooted upon request of a mining equipment when the mining equipment is down, And a method thereof.

상기한 목적을 달성하기 위하여 본 발명은 임의의 채굴장비에 대한 동작 상태를 확인하여 관리서버로 전송하고, 상기 관리서버에서 전송되는 채굴장비의 전원제어신호에 따라 상기 채굴장비가 온/오프 되도록 제어하는 적어도 하나의 채굴장비 제어부; 및 상기 채굴장비로 응답(ack)신호의 전송을 요청하여 미수신되면, 상기 채굴장비 제어부로 채굴장비의 동작 상태 확인을 요청하고, 상기 채굴장비 제어부에서 전송된 채굴장비의 동작 상태가 시스템 다운이면, 상기 채굴장비 제어부로 재부팅을 위한 전원제어신호를 출력하는 관리서버를 포함한다.According to an aspect of the present invention, there is provided an apparatus for controlling a mining equipment, including a mining equipment, a mining equipment, At least one mining equipment controller; And requesting transmission of an ack signal to the mining equipment and requesting confirmation of the operation status of the mining equipment by the mining equipment controller when the mining equipment controller does not receive the request, And a management server for outputting a power control signal for rebooting to the mining equipment control unit.

또한, 본 발명에 따른 상기 제어시스템은 상기 관리서버와 네트워크로 접속되고, 상기 관리서버에서 채굴장비의 동작 상태를 수신하여 디스플레이하며, 사용자로부터 상기 채굴장비의 재부팅을 위한 전원제어신호를 입력받아 상기 관리서버로 전송하는 사용자 단말기를 더 포함한다.In addition, the control system according to the present invention is connected to the management server through a network, receives and displays an operation state of the mining equipment in the management server, receives a power control signal for rebooting the mining equipment from a user, To the management server.

또한, 본 발명에 따른 상기 채굴장비 제어부는 관리서버와 연결되어 상기 관리서버로 일정 주기마다 채굴장비의 동작 상태를 확인한 결과가 전송되도록 하고, 상기 관리서버에서 전송되는 프로토콜을 분석하여 전원제어신호가 상기 채굴장비로 출력되도록 제어하는 전력 제어부; 및 상기 채굴장비와 연결되어 동작 상태를 검출하고, 상기 검출된 동작 상태는 상기 전력 제어부로 입력하며, 상기 전력 제어부에서 전송되는 프로토콜을 분석한 전원제어신호에 따라 해당 채굴장비가 온/오프 되도록 스위칭하는 적어도 하나 이상의 입출력부를 포함한다.In addition, the mining equipment control unit according to the present invention is connected to a management server, and transmits a result of checking the operation status of the mining equipment to the management server at regular intervals, analyzes the protocol transmitted from the management server, A power controller for controlling the mining equipment to output the mining equipment; And a control unit connected to the mining equipment to detect an operation state, input the detected operation state to the power control unit, switch the mining equipment on / off according to a power control signal analyzing a protocol transmitted from the power control unit, At least one input / output unit.

또한, 본 발명에 따른 상기 전력 제어부는 관리서버에서 전송되는 프로토콜로부터 전원제어정보를 분석하여 제어대상 채굴장비를 관리하는 해당 입출력부로 전원제어신호를 출력하는 채굴장비 전원 제어부; 및 일정 주기마다 입출력부가 검출한 채굴장비의 동작 상태 확인 정보를 수신하여 상기 관리서버로 전송하는 채굴장비 상태 관리부를 포함한다.The power control unit according to the present invention includes a mining equipment power control unit for analyzing power control information from a protocol transmitted from a management server and outputting a power control signal to a corresponding input / output unit for managing the mining equipment to be controlled; And a mining equipment state management unit for receiving operation state confirmation information of the mining equipment detected by the input / output unit at predetermined intervals and transmitting the received information to the management server.

또한, 본 발명에 따른 상기 입출력부는 동작용 전원을 공급하는 전원부; 상기 전원 제어부와 일정 포맷의 데이터 통신을 수행하는 통신부; 상기 전원 제어부에서 전송되는 전원제어신호를 분석하여 제어대상 채굴장비가 온/오프되도록 전원신호 출력부의 동작신호를 출력하고, 일정 주기마다 상기 채굴장비의 동작 상태를 검출하여 상기 전원 제어부로 출력하는 입출력 제어부; 상기 채굴장비의 동작 상태를 검출하는 동작신호 검출부; 및 상기 채굴장비가 온/오프 스위칭되도록 동작하는 전원신호 출력부를 포함한다.Also, the input / output unit according to the present invention may include a power supply unit for supplying the operating power; A communication unit for performing data communication with the power control unit in a predetermined format; Outputting an operation signal of the power source signal output unit so as to turn on / off the control target mining equipment by analyzing the power source control signal transmitted from the power source control unit, detecting an operation state of the mining equipment at regular intervals, A control unit; An operation signal detector for detecting an operation state of the mining equipment; And a power supply signal output unit operable to turn on / off the mining equipment.

또한, 본 발명에 따른 상기 동작신호 검출부는 채굴장비의 HDD 신호 단자부와 접속하여 상기 채굴장비의 동작 상태를 검출하고, 상기 전원신호 출력부는 채굴장비의 전원신호 단자부와 접속하여 상기 채굴장비가 온/오프되도록 스위칭한다.The operation signal detecting unit detects the operation state of the mining equipment by connecting to the HDD signal terminal of the mining equipment and the power signal output unit is connected to the power signal terminal of the mining equipment, Off.

또한, 본 발명에 따른 상기 전원신호 출력부는 복수의 릴레이로 구성된다.Also, the power supply signal output unit according to the present invention comprises a plurality of relays.

또한, 본 발명에 따른 상기 채굴장비는 네트워크를 통해 관리서버와 개별 연결되도록 이루어진다.In addition, the mining equipment according to the present invention is connected to a management server through a network.

또한, 본 발명은 a) 관리서버에서 네트워크로 연결된 임의의 채굴장비로 동작 확인 신호를 출력하고, 상기 동작 확인 신호에 대한 응답(ack)신호를 수신하는 단계; b) 상기 임의의 채굴장비 중 어느 하나로부터 응답신호가 미수신되면, 상기 관리서버가 해당 채굴장비를 관리하는 채굴장비 제어부로부터 동작 상태를 수신하여 시스템 다운 여부를 판단하는 단계; 및 c) 상기 판단 결과, 시스템 다운이면, 상기 관리서버가 해당 채굴장비가 재부팅되도록 상기 채굴장비 제어부로 전원제어신호를 출력하는 단계를 포함한다.The method may further include the steps of: a) outputting an operation confirmation signal to an arbitrary mining equipment connected to the network in the management server and receiving a response signal (ack) b) if the response signal is not received from any one of the mining equipment, the management server receives the operation status from the mining equipment control unit managing the mining equipment and determines whether the system is down; And c) if the system is down as a result of the determination, the management server outputs a power control signal to the mining equipment control unit so that the mining equipment is rebooted.

또한, 본 발명에 따른 상기 a) 단계는 채굴장비 제어부로부터 상기 채굴장비의 동작 상태를 일정 주기마다 수신하는 단계를 더 포함하는 것이 바람직하다.In addition, it is preferable that the step a) according to the present invention further includes receiving the operation state of the mining equipment from the mining equipment control unit at regular intervals.

또한, 본 발명에 따른 상기 c) 단계는 상기 관리서버가 사용자 단말기로, 시스템 다운 정보를 전송하고, 상기 사용자 단말기로부터 재부팅 여부를 확인하는 단계를 더 포함하는 것이 바람직하다.In addition, the step c) may further include transmitting the system down information to the user terminal and confirming whether the user terminal is to be rebooted.

또한, 본 발명에 따른 상기 b) 단계는 관리서버가 채굴장비 제어부의 전력 제어부로 채굴장비 동작 상태 확인을 요청하는 단계; 상기 전력 제어부가 채굴장비로부터 동작 확인 신호를 검출하여 시스템 다운 여부를 판단하는 단계; 및 상기 전력 제어부가 상기 판단 결과에 따라 시스템 다운 또는 정상동작 중 어느 하나를 판단하여 결과를 출력하는 단계를 포함한다.In the step b) of the present invention, the management server requests the power control unit of the mining equipment control unit to confirm the operation status of the mining equipment. The power control unit detecting an operation confirmation signal from the mining equipment to determine whether the system is down; And a step of the power control unit determining either a system down or a normal operation according to the determination result and outputting a result.

또한, 본 발명에 따른 상기 동작 상태 확인을 요청하는 단계는 전력 제어부가 입출력부를 통해 상기 채굴장비에서 출력되는 신호값을 검출하는 단계; 상기 검출된 신호값을 미리 설정된 기준값과 비교하여 상기 전력 제어부가 채굴장비의 전원이 온 상태인지 오프 상태인지 여부를 확인하는 단계를 포함한다.The step of requesting confirmation of the operation status according to the present invention may include the steps of: detecting a signal value output from the mining equipment through a power control unit through an input / output unit; And comparing the detected signal value with a preset reference value to confirm whether the power control unit is in the on state or off state of the mining equipment.

또한, 본 발명에 따른 상기 c) 단계의 채굴장비 제어부로 전원제어신호를 출력하는 단계는 상기 관리서버가 전원 제어를 위한 프로토콜 데이터 신호를 채굴장비 제어부의 전력 제어부로 전송하는 단계; 상기 전력 제어부가 수신된 프로토콜을 분석하여 제어대상 채굴장비와, 상기 제어대상 채굴장비에 대한 전원의 온/오프 여부를 판단하는 단계; 및 상기 판단 결과에 따라, 제어대상 채굴장치로 전원 온 신호 또는 전원 오프 신호 중 어느 하나를 출력하는 단계를 포함한다.The step of outputting the power control signal to the mining equipment control unit of the step c) according to the present invention may include the steps of: the management server transmitting the protocol data signal for power supply control to the power control unit of the mining equipment control unit; Analyzing the protocol received by the power control unit to determine whether to turn on / off power to the controlled mining equipment and the controlled mining equipment; And outputting either the power-on signal or the power-off signal to the control subject mining device according to the determination result.

본 발명은 원격지에 설치된 채굴장비의 동작상태를 모니터링 하여 채굴장비의 동작 상태를 용이하게 확인할 수 있는 장점이 있다.The present invention is advantageous in that the operation state of a mining equipment installed at a remote location can be monitored to easily confirm the operation state of the mining equipment.

또한, 본 발명은 채굴장비의 동작상태에 따라 다운이 발생한 채굴장비의 재부팅 제어를 통해 효율적인 유지관리를 수행할 수 있는 장점이 있다.In addition, the present invention is advantageous in that efficient maintenance can be performed through rebooting control of the mining equipment in which the down operation occurs according to the operation state of the mining equipment.

도 1은 본 발명에 따른 가상화폐 채굴장비 제어시스템의 구성을 나타낸 블록도.
도 2는 본 발명에 따른 가상화폐 채굴장비 제어시스템의 채굴장비 제어부 구성을 나타낸 블록도.
도 3은 본 발명에 따른 채굴장비 제어부의 전력 제어부 구성을 나타낸 블록도.
도 4는 본 발명에 따른 채굴장비 제어부의 입출력부와 채굴장비의 구성을 나타낸 블록도.
도 5는 본 발명에 따른 가상화폐 채굴장비 제어시스템의 전력제어 프로토콜 구성을 나타낸 예시도.
도 6은 본 발명에 따른 가상화폐 채굴장비 제어시스템의 다른 전력제어 프로토콜 구성을 나타낸 예시도.
도 7은 본 발명에 따른 가상화폐 채굴장비의 제어과정을 나타낸 흐름도.
도 8은 본 발명에 따른 가상화폐 채굴장비의 다운 확인 과정을 나타낸 흐름도.
도 9는 본 발명에 따른 가상화폐 채굴장비의 전력 제어부 동작 과정을 나타낸 흐름도.
도 10은 본 발명에 따른 가상화폐 채굴장비의 전력 제어 과정을 나타낸 흐름도.
1 is a block diagram showing a configuration of a virtual money mining equipment control system according to the present invention;
2 is a block diagram of a mining equipment control unit of a virtual money mining equipment control system according to the present invention.
3 is a block diagram illustrating a configuration of a power control unit of a mining equipment control unit according to the present invention.
4 is a block diagram illustrating the configuration of an input / output unit and a mining equipment of a mining equipment control unit according to the present invention.
5 is a diagram illustrating a power control protocol configuration of a virtual money mining equipment control system according to the present invention.
6 is a diagram illustrating another power control protocol configuration of a virtual money mining equipment control system according to the present invention.
7 is a flowchart illustrating a process of controlling a virtual money mining equipment according to the present invention.
8 is a flowchart illustrating a down-checking process of the virtual money mining equipment according to the present invention.
9 is a flowchart illustrating a process of operating a power control unit of a virtual money mining equipment according to the present invention.
10 is a flowchart illustrating a power control process of a virtual money mining equipment according to the present invention.

이하에서는 본 발명의 바람직한 실시예 및 첨부하는 도면을 참조하여 본 발명을 상세히 설명하되, 도면의 동일한 참조부호는 동일한 구성요소를 지칭함을 전제하여 설명하기로 한다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT Hereinafter, the present invention will be described in detail with reference to preferred embodiments of the present invention and the accompanying drawings, wherein like reference numerals refer to like elements.

발명의 상세한 설명 또는 특허청구범위에서 어느 하나의 구성요소가 다른 구성요소를 "포함"한다고 할 때, 이는 특별히 반대되는 기재가 없는 한 당해 구성요소만으로 이루어지는 것으로 한정되어 해석되지 아니하며, 다른 구성요소들을 더 포함할 수 있는 것으로 이해되어야 한다.It is to be understood that when an element is referred to as being "comprising" another element in the description of the invention or in the claims, it is not to be construed as being limited to only that element, And the like.

이하에서는 본 발명에 따른 가상화폐 채굴장비 제어시스템 및 제어방법이 구현된 일 예를 특정한 실시예를 통해 설명하기로 한다. Hereinafter, an embodiment in which the virtual money mining equipment control system and the control method according to the present invention are implemented will be described with reference to specific embodiments.

도 1은 본 발명에 따른 가상화폐 채굴장비 제어시스템의 구성을 나타낸 블록도이고, 도 2는 본 발명에 따른 가상화폐 채굴장비 제어시스템의 채굴장비 제어부 구성을 나타낸 블록도이며, 도 3은 본 발명에 따른 채굴장비 제어부의 전력 제어부 구성을 나타낸 블록도이고, 도 4는 본 발명에 따른 채굴장비 제어부의 입출력부와 채굴장비의 구성을 나타낸 블록도이다.FIG. 1 is a block diagram showing a configuration of a virtual money mining equipment control system according to the present invention, FIG. 2 is a block diagram showing a mining equipment control unit configuration of a virtual money mining equipment control system according to the present invention, FIG. 4 is a block diagram illustrating a configuration of an input / output unit and a mining equipment of a mining equipment control unit according to the present invention.

도 1 내지 도 4에 나타낸 바와 같이, 본 발명에 따른 가상화폐 채굴장비 제어시스템은 채굴장비 제어부(100)와, 관리서버(200)와 사용자 단말기(300)와, 채굴장비부(400)를 포함하여 구성된다.1 to 4, the virtual money mining equipment control system according to the present invention includes a mining equipment control unit 100, a management server 200, a user terminal 300, and a mining equipment unit 400 .

상기 채굴장비 제어부(100)는 채굴장에 설치되어 인터넷 등의 네트워크를 통해 관리서버(200)와 연결되고, 복수의 채굴장비(410, 420, 430) 그룹으로 이루어진 채굴 장비부(400)와 연결되어 상기 채굴장비(410, 420, 430)에 대한 동작 상태를 모니터링 하여 관리서버(200)로 전송하고, 상기 관리서버(200)에서 전송되는 채굴장비(410, 420, 430)의 전원제어신호에 따라 상기 채굴장비(410, 420, 430)가 온/오프 되도록 제어하는 구성으로서, 전력 제어부(110)와, 입출력부(120)를 포함하여 구성된다.The mining equipment control unit 100 is connected to the mining equipment unit 400 which is connected to the management server 200 through a network such as the Internet or the like and installed in a group of mining equipment 410, And monitors the operation status of the mining equipment 410, 420 and 430 and transmits the monitoring result to the management server 200. In accordance with the power control signal of the mining equipment 410, 420, 430 transmitted from the management server 200, A power control unit 110 and an input / output unit 120 for controlling the mining equipment 410, 420 and 430 to be turned on / off.

상기 전력 제어부(110)는 관리서버(200)와 연결되고, 일정 주기(예를 들면, 30초) 마다 채굴장비(410), 채굴장비 1(420), 채굴장비 n(430)의 동작 상태를 확인하고, 그 확인 결과를 상기 관리서버(200)로 전송하고, 상기 관리서버(200)에서 전송되는 프로토콜(500)을 분석하여 전원제어신호가 상기 채굴장비(410)로 출력되도록 제어하는 구성으로서, 채굴장비 전원 제어부(111)와, 채굴장비 상태 관리부(112)를 포함하여 구성되고, 라즈베리파이와 같이 소형의 싱글보드 컴퓨터 구성된다.The power control unit 110 is connected to the management server 200 and controls the operation states of the mining equipment 410, mining equipment 1 420 and mining equipment n 430 every predetermined period (for example, 30 seconds) And transmits the confirmation result to the management server 200. The control server 200 analyzes the protocol 500 transmitted from the management server 200 and controls the power supply control signal to be output to the mining equipment 410 A mining equipment power control unit 111, and a mining equipment condition management unit 112, and is configured as a small single board computer such as Raspberry pie.

또한, 상기 전력 제어부(110)는 TCP 소켓통신을 이용하여 관리서버(200)와 접속하고, 접속 후 자신의 맥 어드레스 정보를 관리서버(200)로 전달하여 인증을 수행할 수 있다.In addition, the power control unit 110 may access the management server 200 using TCP socket communication, and may transmit authentication information to the management server 200 after the connection.

또한, 상기 전력 제어부(110)는 하나 이상의 입출력부(120)가 접속될 수 있는데, 입출력부 1(120a) 내지 입출력부 n(120b)까지 n개의 입출력부가 유선 또는 무선 네트워크를 통해 접속될 수 있다.One or more input / output units 120 may be connected to the power control unit 110, and n input / output units may be connected to the input / output unit 120a through the input / output unit n 120b through a wired or wireless network .

상기 채굴장비 전원 제어부(111)는 관리서버(200)에서 전송되는 프로토콜(500)로부터 채굴장비(410)의 전원제어정보를 분석하여 제어대상인 채굴장비(410), 채굴장비 1(420), 채굴장비 n(430)을 관리하는 해당 입출력부(120)로 전원제어신호를 출력한다.The mining equipment power control unit 111 analyzes the power control information of the mining equipment 410 from the protocol 500 transmitted from the management server 200 and controls the mining equipment 410, mining equipment 1 420, And outputs the power control signal to the corresponding input / output unit 120 that manages the equipment n 430.

즉 상기 채굴장비 전원 제어부(111)는 프로토콜(500) 데이터 신호를 분석하여 제어대상 채굴장비가 재부팅되도록 선택하고, 선택된 채굴장비가 온/오프 되도록 한다.That is, the mining equipment power control unit 111 analyzes the protocol 500 data signal to select the target mining equipment to be rebooted, and turns on / off the selected mining equipment.

상기 채굴장비 상태 관리부(112)는 일정 주기마다 입출력부(120)가 검출한 채굴장비들(410, 420, 430)의 동작 상태 확인 정보를 수신하여 관리서버(200)로 전송한다.The mining equipment state management unit 112 receives operational state confirmation information of the mining equipment 410, 420, and 430 detected by the input / output unit 120 at regular intervals and transmits the received information to the management server 200.

상기 입출력부(120)는 채굴장비들(410, 420, 430)과 연결되어 각 채굴장비들(410, 420, 430)의 동작 상태를 검출하고, 상기 검출된 채굴장비들(410, 420, 430)의 동작 상태는 전력 제어부(110)로 입력하며, 상기 전력 제어부(110)에서 전송되는 프로토콜(500)을 분석한 전원제어신호에 따라 해당 채굴장비들(410, 420, 430)이 온/오프 되도록 스위칭 동작을 수행하는 구성으로서, 전원부(121)와, 통신부(122)와, 입출력 제어부(123)와, 검출부(124)와, 전원신호 출력부(125)를 포함하여 구성된다.The input and output unit 120 is connected to the mining equipment 410, 420 and 430 to detect the operating states of the mining equipment 410, 420 and 430 and to detect the mining equipment 410, The operation states of the mining equipments 410, 420, and 430 are inputted to the power control unit 110 and the mining equipments 410, 420, and 430 are turned on / off according to the power control signal analyzing the protocol 500 transmitted from the power control unit 110 And includes a power supply unit 121, a communication unit 122, an input / output control unit 123, a detection unit 124, and a power supply signal output unit 125.

상기 전원부(121)는 입출력부(120)의 동작 전원과, 채굴장비(410)의 재부팅을 위해 전원신호 출력부(125)로 일정 전압이 공급되도록 한다.The power source unit 121 supplies a predetermined voltage to the power source signal output unit 125 for the operation power of the input / output unit 120 and the recharging of the mining equipment 410.

상기 통신부(122)는 전원 제어부(110)와 일정 포맷의 데이터 통신을 수행하여 전원 제어부(110)에서 전송되는 전원제어신호를 수신하여 입출력 제어부(123)로 출력한다.The communication unit 122 performs data communication with the power control unit 110 in a predetermined format to receive a power control signal transmitted from the power control unit 110 and outputs the power control signal to the input / output control unit 123.

또한, 상기 통신부(122)는 동작신호 검출부(124)에서 검출한 동작 신호를 전원 제어부(110)로 출력한다.The communication unit 122 outputs the operation signal detected by the operation signal detection unit 124 to the power control unit 110. [

상기 입출력 제어부(123)는 전원 제어부(110)에서 전송되는 전원제어신호를 분석하여 제어대상 채굴장비들(410, 420, 430)이 온/오프되도록 전원신호 출력부(125)로 동작신호를 출력한다.The input / output control unit 123 analyzes the power control signal transmitted from the power control unit 110 and outputs an operation signal to the power signal output unit 125 to turn on / off the control target mining equipment 410, 420, do.

또한, 상기 입출력 제어부(123)는 일정 주기(예를 들면, 1분)마다 채굴장비들(410, 420, 430)의 동작 상태를 검출하여 전원 제어부(110)로 출력한다.The input / output control unit 123 detects the operation states of the mining equipment 410, 420, and 430 every predetermined period (for example, one minute) and outputs the detection result to the power control unit 110.

상기 동작신호 검출부(124)는 입출력부(120)에 연결된 복수의 채굴장비들(410, 410a)의 동작 상태를 검출하는 구성으로서, 상기 동작신호 검출부(124)는 채굴장비들(410, 410a)의 동작 여부를 확인할 수 있도록 채굴장비들(410, 410a)의 읽기 쓰기 동작을 검출할 수 있는 HDD 신호 단자부(412, 412a)와 접속하여 상기 채굴장비(410, 410a)의 동작 상태를 검출한다.The operation signal detecting unit 124 detects an operation state of a plurality of mining equipment 410 and 410a connected to the input and output unit 120. The operation signal detecting unit 124 includes mining equipment 410 and 410a, 410b are connected to the HDD signal terminal units 412, 412a capable of detecting the read / write operations of the mining equipment 410, 410a so as to confirm whether the mining equipment 410, 410a is operating.

상기 전원신호 출력부(125)는 채굴장비들(410, 410a)의 전원신호 단자부(413, 413a)와 접속하여 상기 채굴장비(410, 420, 430)가 온/오프되도록 스위칭되고, 다수의 채굴장비들(410, 410a)이 연결될 수 있도록 복수의 릴레이(125a, 125b)로 구성된다.The power supply signal output unit 125 is connected to the power supply signal terminal units 413 and 413a of the mining equipment 410 and 410a to switch the mining equipment 410, 420 and 430 on and off, And a plurality of relays 125a and 125b so that the devices 410 and 410a can be connected.

상기 관리서버(200)는 네트워크를 통해 접속된 채굴장비(410, 420, 430)로 상기 채굴장비(410, 420, 430)들이 정상동작하는지 모니터링 하기 위한 확인신호를 출력하여 응답(ack)신호의 전송을 요청하고, 임의의 채굴장비(410, 420, 430)로부터 상기 응답신호가 미수신되면, 상기 응답신호를 미전송한 채굴장비를 관리하는 채굴장비 제어부(100)를 검색하여 상기 미수신된 채굴장비(410, 420, 430)의 동작 상태 확인을 요청한다.The management server 200 outputs an acknowledgment signal for monitoring whether the mining equipments 410, 420, 430 are operating normally to the mining equipment 410, 420, 430 connected through the network, And if the response signal is not received from any of the mining equipment 410, 420 and 430, the mining equipment controller 100 that manages the mining equipment that has not transmitted the response signal is searched, (410, 420, 430).

또한, 상기 관리서버(200)는 채굴장비 제어부(100)에서 전송된 채굴장비(410, 420, 430)의 동작 상태를 판단하여 시스템 다운이면, 상기 채굴장비 제어부(100)로 재부팅을 위한 전원제어신호를 출력하여 채굴장비(410, 420, 430)가 정상동작 상태를 유지할 수 있도록 관리하는 구성으로서, 바람직하게는 데몬서버로 이루어진다.The management server 200 determines the operation states of the mining equipment 410, 420, and 430 transmitted from the mining equipment control unit 100. If the system is down, the mining equipment control unit 100 controls the power supply for rebooting A signal is output to manage the mining equipment 410, 420, 430 to maintain a normal operating state, and preferably a daemon server.

또한, 상기 관리서버(200)는 서로 다른 위치의 채굴장에 설치되는 채굴장비 제어부 1(100a), 채굴장비 제어부n(100b)이 네트워크를 통해 개별 접속되고, 상기 채굴장비 제어부 1(100a) 내지 채굴장비 제어부 n(100b)과 연결된 채굴장비부 1(400a) 내지 채굴장비부 n(400b)과 개별 접속될 수 있다.The mining equipment control unit 1 100a and the mining equipment control unit n 100b installed in the mines at different positions are individually connected through a network and the mining equipment control unit 1 100a, And can be individually connected to the mining equipment part 1 400a or the mining equipment part 400b connected to the equipment control part n 100b.

또한, 상기 관리서버(200)는 채굴장비 제어부(100)와 프로토콜(500)을 이용한 데이터 통신을 수행하여 전원제어가 이루어지도록 동작하고, 도 5 및 도 6에 나타낸 바와 같이, 프로토콜(500)은 통신 프로토콜을 위한 식별코드(510)와, 채굴장비 제어부(100)의 버전정보(520)와, 상기 채굴장비 제어부(100)의 고유 식별코드(530)와, 상기 채굴장비 제어부(100)에 구비된 입출력부(120)의 제어가 가능한 릴레이 갯수(540)와, 프로토콜을 구분하기 위한 프로토콜 ID(S550)와, 전원 제어를 수행할 릴레이 번호(560)와, 릴레이를 통한 전원 제어정보(570)를 포함하여 구성된다.5 and 6, the management server 200 operates to perform power control by performing data communication using the mining equipment controller 100 and the protocol 500, An identification code 510 for the communication protocol, version information 520 of the mining equipment control unit 100, a unique identification code 530 of the mining equipment control unit 100, A protocol ID (S550) for distinguishing protocols, a relay number 560 for performing power control, a power control information 570 via a relay, a number of relays 540 for controlling the input / output unit 120, .

상기 프로토콜(500)에서, 채굴장비의 전원을 온 시키는 경우, 전원 제어정보(570)는 예를 들면 "1"이 되도록 설정하고, 채굴장비의 전원을 오프 시키는 경우 전원 제어정보(570)는 "0"이 되도록 설정한다.In the protocol 500, the power control information 570 is set to, for example, "1" when powering on the mining equipment, and the power control information 570 is set to " 0 ".

또한, 상기 관리서버(200)는 채굴장비(410, 420, 430)의 동작상태가 디스플레이되도록 네트워크를 통해 접속한 사용자 단말기(300)로 동작 상태를 전송하고, 시스템 다운이 발생되면 사용자 단말기(300)로부터 상기 채굴장비(410, 420, 430)의 재부팅을 위한 전원제어신호를 입력받아 채굴장비(410, 420, 430)의 온/오프 제어가 수행되도록 한다.The management server 200 transmits the operation status to the user terminal 300 connected through the network so that the operation status of the mining equipment 410, 420 and 430 is displayed. When the system down occurs, the user terminal 300 420 and 430 from a power supply control signal for re-powering the mining equipment 410, 420, and 430. The on / off control of the mining equipment 410, 420, and 430 is performed.

또한, 상기 관리서버(200)에는 사용자 단말기 1(300a) 내지 사용자 단말기 n(300b) 등 다수의 사용자 단말기가 접속될 수 있다.A plurality of user terminals such as the user terminal 1 300a to the user terminal n 300b may be connected to the management server 200.

상기 사용자 단말기(300)는 관리서버(200)와 네트워크로 접속되고, 상기 관리서버(200)에서 채굴장비(410, 420, 430)의 동작 상태를 수신하여 디스플레이하며, 사용자로부터 상기 채굴장비(410, 420, 430)의 재부팅을 위한 전원제어신호를 입력받아 상기 관리서버(200)로 전송하는 구성으로서, 데스크탑 PC, 노트북 PC, 태블릿 PC, 스마트 폰 등으로 구성될 수 있다.The user terminal 300 is connected to the management server 200 through a network and receives and displays the operating states of the mining equipment 410, 420 and 430 from the management server 200. The mining equipment 410 420, and 430, and transmits the received power control signal to the management server 200. The management server 200 may be a desktop PC, a notebook PC, a tablet PC, a smart phone, or the like.

상기 채굴장비부(400)는 다수의 채굴장비(410, 420, 430)로 구성될 수 있고, 각각의 채굴장비(410, 420, 430)는 네트워크를 통해 관리서버(200)와 개별 연결되도록 이루어진다.The mining equipment 400 may include a plurality of mining equipment 410, 420 and 430 and the mining equipment 410, 420 and 430 may be individually connected to the management server 200 through a network .

다음은 본 발명에 따른 가상화폐 채굴장비의 제어과정을 도 7 내지 도 10을 참조하여 설명한다.Next, a control process of the virtual money mining equipment according to the present invention will be described with reference to FIG. 7 to FIG.

관리서버(200)에서 네트워크로 연결된 임의의 채굴장비(410, 420, 430)로 동작 확인 신호를 출력하고, 상기 동작 확인 신호에 대한 응답(ack)신호를 수신(S100)한다. The management server 200 outputs an operation confirmation signal to any mining equipment 410, 420, or 430 connected to the network and receives a response signal (ack) to the operation confirmation signal (S100).

또한, 상기 S100단계는 임의의 채굴장비 제어부(100)로부터 상기 채굴장비 제어부(100)가 관리하는 채굴장비들의 동작 상태를 일정 주기마다 수신하여 채굴장비들이 동작을 확인할 수 있다.In operation S100, the operation of the mining equipment may be confirmed by receiving the operation state of the mining equipment managed by the mining equipment control unit 100 from the mining equipment control unit 100 at regular intervals.

상기 채굴장비(410, 420, 430)로부터 동작 확인 신호에 대한 응답신호가 수신되는지 여부를 판단(S200)하여 임의의 채굴장비(410, 420, 430)로부터 상기 응답신호가 미수신된 것으로 판단되면, 상기 관리서버(200)는 응답신호가 미수신된 채굴장비의 다운 여부를 확인(S300)한다.If it is determined that a response signal to the operation confirmation signal is received from the mining equipment 410, 420, or 430 (S200) and the response signal is not received from any mining equipment 410, 420, The management server 200 confirms whether the mining equipment where the response signal is not received is down (S300).

상기 S300 단계에서 채굴장비의 다운 여부를 확인하는 과정은 관리서버(200)가 응답신호를 미수신한 채굴장비의 프로토콜 정보로부터 채굴장비 제어부(100)의 정보를 검출하고, 상기 검출된 채굴장비 제어부(100)의 전력 제어부(110)로 응답신호를 미수신한 채굴장비의 동작 상태 확인을 요청(S310)한다. In step S300, the control server 200 detects the information of the mining equipment controller 100 based on the protocol information of the mining equipment in which the management server 200 does not receive a response signal, and the detected mining equipment controller 100 to the power control unit 110 (S310).

상기 S310 단계에서 전력 제어부(110)는 입출력부(120)를 통해 동작 상태 확인을 위한 채굴장비의 읽기 쓰기에 따른 HDD 신호의 신호 값을 검출(S311)한다.In step S310, the power controller 110 detects the signal value of the HDD signal according to the read / write operation of the mining equipment for confirming the operation state through the input / output unit 120 (S311).

상기 입출력부(120)는 채굴장비의 HDD 신호 단자부(412)로 출력되는 HDD 신호를 검출하여 'High' 상태 또는 'Low' 상태인지 여부를 판단(S312)한다.The input / output unit 120 detects the HDD signal output to the HDD signal terminal unit 412 of the mining equipment and determines whether the HDD signal is 'High' or 'Low' (S312).

상기 S132 단계의 판단 결과, 'High' 신호이면, 채굴장비의 전원이 온 상태(S313)이고, 'Low' 신호이면 채굴장비의 전원이 오프 상태(S315)로 하여 결과를 전력 제어부(110)로 전송(S314)한다.If the signal is 'High', the mining equipment is turned on (S313). If the signal is 'Low', the mining equipment is turned off (S315) (S314).

상기 전력 제어부(110)는 채굴장비(410, 420, 430)로부터 전송되는 동작 확인 신호를 검출하여 HDD 신호의 상태가 수신되는지 여부를 확인(S320)한다.The power control unit 110 detects an operation confirmation signal transmitted from the mining equipment 410, 420, and 430 to determine whether the state of the HDD signal is received (S320).

상기 S320 단계에서 'Low' 상태의 HDD 신호가 검출되면, 상기 전력 제어부(110)는 채굴장비가 다운된 것으로 판단하여 관리서버(200)로 다운 신호가 전송(S330)되도록 한다.If it is determined in step S320 that a low level HDD signal is detected, the power control unit 110 determines that the mining equipment is down and transmits a down signal to the management server 200 in step S330.

또한, 상기 S320 단계에서 'High' 상태의 HDD 신호가 검출되면, 상기 전력 제어부(110)는 채굴장비가 정상동작하는 것으로 판단하여 관리서버(200)로 정상동작 신호를 전송하거나 또는 정상동작 확인을 위한 동작 확인신호의 재전송을 요청(S340)할 수 있다.If it is determined in step S320 that the HDD signal is in the 'High' state, the power controller 110 determines that the mining equipment is operating normally and transmits a normal operation signal to the management server 200, It is possible to request the retransmission of the operation confirmation signal (S340).

상기 S300 단계를 수행한 다음 채굴장비의 시스템 다운 여부를 판단(S400)하고, 상기 S400 단계의 판단 결과, 채굴장비가 다운 상태이면, 상기 관리서버(200)는 사용자 단말기(300)로 채굴장비의 시스템 다운 정보를 전송하고, 상기 사용자 단말기(300)로부터 재부팅 여부를 확인(S500)한다.If it is determined in step S400 that the mining equipment is down, the management server 200 determines whether the mining equipment is down by the user terminal 300 System down information, and confirms whether the user terminal 300 is rebooted (S500).

상기 사용자 단말기(300)로부터 재부팅 신호가 입력되면, 관리서버(200)는 채굴장비(410, 420, 430)가 재부팅되도록 상기 채굴장비 제어부(100)로 전원제어신호를 출력(S600)한다.When the rebooting signal is input from the user terminal 300, the management server 200 outputs a power control signal to the mining equipment controller 100 so that the mining equipment 410, 420, and 430 are rebooted (S600).

상기 S600 단계에서, 관리서버(200)는 전원 제어를 위한 프로토콜(500) 데이터 신호를 채굴장비 제어부(100)의 전력 제어부(110)로 전송(S610)하고, 상기 전력 제어부(110)가 수신된 프로토콜(500)을 분석하여 제어대상 채굴장비(410, 420, 430)와, 상기 제어대상 채굴장비에 대한 전원의 온/오프 여부를 판단(S620)한다.In operation S600, the management server 200 transmits a protocol 500 data signal for power control to the power controller 110 of the mining equipment controller 100 in operation S610. When the power controller 110 receives the protocol 500 data signal, The controller 500 analyzes the protocol 500 to determine whether power is turned on or off for the controlled mining equipment 410, 420, and 430 and the controlled mining equipment in step S620.

상기 S620 단계의 판단 결과, 채굴장비의 전원을 온 시키는 프로토콜 신호이면, 상기 전력 제어부(110)는 입출력부(120)의 전원신호 출력부(125)가 적어도 1초간 온 되도록 제어하여 채굴장비가 온(S630) 되도록 한다.The power control unit 110 controls the power signal output unit 125 of the input and output unit 120 to be turned on for at least one second to turn on the mining equipment (S630).

또한, 상기 S620 단계의 판단 결과, 채굴장비의 전원을 오프 시키는 프로토콜 신호이면, 상기 전력 제어부(110)는 상기 전력 제어부(110)는 입출력부(120)의 전원신호 출력부(125)가 적어도 5초간 온 되도록 제어하여 채굴장비가 오프(S650) 되도록 한다.If it is determined in step S620 that the power supply signal output unit 125 of the input / output unit 120 is at least 5 So that the mining equipment is turned off (S650).

상기 S630 단계 및 S650 단계를 수행한 다음, 전력 제어부(110)는 결과 정보를 관리서버(200)로 전송(S640)한다.After performing steps S630 and S650, the power control unit 110 transmits the result information to the management server 200 (S640).

상기 S640 단계의 결과 정보를 수신하면, 상기 관리서버(200)는 다운된 채굴장비가 정상 동작하는지 여부를 확인(S700)하는 과정을 추가 수행한다.Upon receipt of the result information in step S640, the management server 200 further checks whether the mined mining equipment is operating normally (S700).

따라서 원격지에 설치된 채굴장비의 동작상태를 모니터링 하여 채굴장비의 동작 상태를 용이하게 확인할 수 있고, 채굴장비의 동작상태에 따라 다운이 발생한 채굴장비의 재부팅 제어를 통해 효율적인 유지관리를 수행할 수 있게 된다.Therefore, the operation state of the mining equipment can be easily checked by monitoring the operation state of the mining equipment installed at the remote place, and efficient maintenance can be performed by controlling the rebooting of the mining equipment that is down according to the operation state of the mining equipment .

이상 몇 가지의 실시예를 통해 본 발명의 기술적 사상을 살펴보았다.The technical idea of the present invention has been described through several embodiments.

본 발명이 속하는 기술분야에서 통상의 지식을 가진 자가 본 발명의 기재사항으로부터 상기 살펴본 실시예를 다양하게 변형하거나 변경할 수 있음은 자명하다. 또한, 비록 명시적으로 도시되거나 설명되지 아니하였다 하여도 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자가 본 발명의 기재사항으로부터 본 발명에 의한 기술적 사상을 포함하는 다양한 형태의 변형을 할 수 있음은 자명하며, 이는 여전히 본 발명의 권리범위에 속한다. 첨부하는 도면을 참조하여 설명된 상기의 실시예들은 본 발명을 설명하기 위한 목적으로 기술된 것이며 본 발명의 권리범위는 이러한 실시예에 국한되지 아니한다.It will be apparent to those skilled in the art that various changes and modifications may be made to the embodiments described above from the description of the present invention. Further, although not explicitly shown or described, those skilled in the art can make various modifications including the technical idea of the present invention from the description of the present invention Which is still within the scope of the present invention. The above-described embodiments described with reference to the accompanying drawings are for the purpose of illustrating the present invention, and the scope of the present invention is not limited to these embodiments.

100 : 채굴장비 제어부 100a : 채굴장비 제어부 1
100b : 채굴장비 제어부 n 110 : 전력 제어부
111 : 채굴장비 전원 제어부 112 : 채굴장비 상태 관리부
120 : 입출력부 120a : 입출력부 1
120b : 입출력부 n 121 : 전원부
122 : 통신부 123 : 입출력 제어부
124 : 동작신호 검출부 125 : 전원신호 출력부
125a : 릴레이 1 125b : 릴레이 n
200 : 관리서버 300 : 사용자 단말기
300a : 사용자 단말기 1 300b : 사용자 단말기 2
400 : 채굴장비부 400a : 채굴장비부 1
400b : 채굴장비부 n 410 : 채굴장비
411, 411a : 통신부 412, 412a : HDD 신호 단자부
413, 413a : 전원신호 단자부 420 : 채굴장비 2
430 : 채굴장비 n 500 : 프로토콜
100: mining equipment control unit 100a: mining equipment control unit 1
100b: mining equipment control unit n 110: power control unit
111: mining equipment power control unit 112: mining equipment condition management unit
120: input / output unit 120a: input / output unit 1
120b: input / output unit 121: power supply unit
122: communication unit 123: input / output control unit
124: operation signal detecting unit 125: power source signal output unit
125a: Relay 1 125b: Relay n
200: management server 300: user terminal
300a: user terminal 1 300b: user terminal 2
400: mining equipment part 400a: mining equipment part 1
400b: mining equipment part n 410: mining equipment
411, 411a: Communication section 412, 412a: HDD signal terminal section
413, 413a: power source signal terminal part 420: mining equipment 2
430: mining equipment n 500: protocol

Claims (8)

임의의 채굴장비(410, 420, 430)에 대한 동작 상태를 확인하여 관리서버(200)로 전송하고, 상기 관리서버(200)에서 전송되는 채굴장비(410, 420, 430)의 전원제어신호에 따라 상기 채굴장비(410, 420, 430)가 온/오프 되도록 제어하는 적어도 하나의 채굴장비 제어부(100); 및
상기 채굴장비(410, 420, 430)로 응답(ack)신호의 전송을 요청하여 미수신되면, 상기 채굴장비 제어부(100)로 채굴장비(410, 420, 430)의 동작 상태 확인을 요청하고, 상기 채굴장비 제어부(100)에서 전송된 채굴장비(410, 420, 430)의 동작 상태가 시스템 다운이면, 상기 채굴장비 제어부(100)로 재부팅을 위한 전원제어신호를 출력하는 관리서버(200)를 포함하는 가상화폐 채굴장비 제어시스템.
The operation state of any mining equipment 410, 420 and 430 is confirmed and transmitted to the management server 200 and the power control signal of the mining equipment 410, 420, 430 transmitted from the management server 200 At least one mining equipment controller (100) for controlling the mining equipment (410, 420, 430) to be turned on / off; And
Upon receipt of a request for transmission of a response signal to the mining equipment 410, 420 and 430, the mining equipment controller 100 requests the mining equipment 410, 420 and 430 to check the operation status thereof, And a management server 200 for outputting a power control signal for rebooting to the mining equipment control unit 100 when the operation states of the mining equipment 410, 420, 430 transmitted from the mining equipment control unit 100 are system down Virtual money mining equipment control system.
제 1 항에 있어서,
상기 제어시스템은 상기 관리서버(200)와 네트워크로 접속되고, 상기 관리서버(200)에서 채굴장비(410, 420, 430)의 동작 상태를 수신하여 디스플레이하며, 사용자로부터 상기 채굴장비(410, 420, 430)의 재부팅을 위한 전원제어신호를 입력받아 상기 관리서버(200)로 전송하는 사용자 단말기(300)를 더 포함하는 가상화폐 채굴장비 제어시스템.
The method according to claim 1,
The control system is connected to the management server 200 through a network and receives and displays the operating states of the mining equipment 410, 420 and 430 from the management server 200. The mining equipments 410 and 420 And a user terminal 300 for receiving a power control signal for rebooting the server 300 and transmitting the power control signal to the management server 200.
제 1 항 또는 제 2 항에 있어서,
상기 채굴장비 제어부(100)는 관리서버(200)와 연결되어 상기 관리서버(200)로 일정 주기마다 채굴장비(410, 420, 430)의 동작 상태를 확인한 결과가 전송되도록 하고, 상기 관리서버(200)에서 전송되는 프로토콜(500)을 분석하여 전원제어신호가 상기 채굴장비(410, 420, 430)로 출력되도록 제어하는 전력 제어부(110); 및
상기 채굴장비(410, 420, 430)와 연결되어 동작 상태를 검출하고, 상기 검출된 동작 상태는 상기 전력 제어부(110)로 입력하며, 상기 전력 제어부(110)에서 전송되는 프로토콜(500)을 분석한 전원제어신호에 따라 해당 채굴장비(410, 420, 430)가 온/오프 되도록 스위칭하는 적어도 하나 이상의 입출력부(120, 120a, 120b)를 포함하는 가상화폐 채굴장비 제어시스템.
3. The method according to claim 1 or 2,
The mining equipment control unit 100 is connected to the management server 200 so as to transmit the result of checking the operation status of the mining equipment 410, 420, and 430 to the management server 200 at regular intervals, A power control unit 110 for analyzing the protocol 500 transmitted from the mining equipment 200 and controlling the power control signal to be output to the mining equipment 410, 420, 430; And
The power control unit 110 is connected to the mining equipments 410, 420, and 430 to detect the operation state. The detected operation state is inputted to the power control unit 110, and the protocol 500 transmitted from the power control unit 110 is analyzed And at least one input / output unit (120, 120a, 120b) for switching on / off the mining equipment (410, 420, 430) according to a power supply control signal.
제 3 항에 있어서,
상기 전력 제어부(110)는 관리서버(200)에서 전송되는 프로토콜(500)로부터 전원제어정보를 분석하여 제어대상 채굴장비(410, 420, 430)를 관리하는 해당 입출력부(120, 120a, 120b)로 전원제어신호를 출력하는 채굴장비 전원 제어부(111) 및
일정 주기마다 입출력부(120)가 검출한 채굴장비(410, 420, 430)의 동작 상태 확인 정보를 수신하여 상기 관리서버(200)로 전송하는 채굴장비 상태 관리부(112)를 포함하는 가상화폐 채굴장비 제어시스템.
The method of claim 3,
The power control unit 110 includes corresponding input and output units 120, 120a, and 120b that analyze the power control information from the protocol 500 transmitted from the management server 200 and manage the controlled mining equipment 410, 420, and 430, A mining equipment power control unit 111 for outputting a power supply control signal to the mining equipment,
And a mining equipment state management unit (112) for receiving operational state confirmation information of mining equipment (410, 420, 430) detected by the input / output unit (120) Equipment control system.
제 3 항에 있어서,
상기 입출력부(120)는 동작용 전원을 공급하는 전원부(121);
상기 전원 제어부(110)와 일정 포맷의 데이터 통신을 수행하는 통신부(122);
상기 전원 제어부(110)에서 전송되는 전원제어신호를 분석하여 제어대상 채굴장비(410, 420, 430)가 온/오프되도록 전원신호 출력부(125)의 동작신호를 출력하고, 일정 주기마다 상기 채굴장비(410, 420, 430)의 동작 상태를 검출하여 상기 전원 제어부(110)로 출력하는 입출력 제어부(123);
상기 채굴장비(410, 420, 430)의 동작 상태를 검출하는 동작신호 검출부(124); 및
상기 채굴장비(410, 420, 430)가 온/오프 스위칭되도록 동작하는 전원신호 출력부(125)를 포함하는 가상화폐 채굴장비 제어시스템.
The method of claim 3,
The input / output unit 120 includes a power supply unit 121 for supplying the operating power;
A communication unit 122 for performing data communication with the power control unit 110 in a predetermined format;
The power control unit 110 analyzes the power control signal transmitted from the power control unit 110 and outputs an operation signal of the power signal output unit 125 to turn on / off the controlled mining equipment 410, 420, and 430, An input / output control unit (123) for detecting an operation state of the equipment (410, 420, 430) and outputting it to the power supply control unit (110);
An operation signal detector (124) for detecting an operation state of the mining equipment (410, 420, 430); And
And a power supply signal output unit (125) operable to switch the mining equipment (410, 420, 430) on and off.
a) 관리서버(200)에서 네트워크로 연결된 임의의 채굴장비(410, 420, 430)로 동작 확인 신호를 출력하고, 상기 동작 확인 신호에 대한 응답(ack)신호를 수신하는 단계;
b) 상기 임의의 채굴장비(410, 420, 430) 중 어느 하나로부터 응답신호가 미수신되면, 상기 관리서버(200)가 해당 채굴장비(410, 420, 430)를 관리하는 채굴장비 제어부(100)로부터 동작 상태를 수신하여 시스템 다운 여부를 판단하는 단계; 및
c) 상기 판단 결과, 시스템 다운이면, 상기 관리서버(200)가 해당 채굴장비(410, 420, 430)가 재부팅되도록 상기 채굴장비 제어부(100)로 전원제어신호를 출력하는 단계를 포함하는 가상화폐 채굴장비 제어방법.
a) outputting an operation confirmation signal to any mining equipment (410, 420, 430) connected to the network in the management server (200) and receiving a response signal (ack) for the operation confirmation signal;
b) a mining equipment control unit (100) for managing the mining equipment (410, 420, 430) when the management server (200) does not receive a response signal from any one of the mining equipment (410, And determining whether the system is down; And
and c) if the system is down as a result of the determination, outputting a power control signal to the mining equipment controller 100 such that the mining equipment 410, 420, 430 is rebooted by the management server 200, Control method of mining equipment.
제 6 항에 있어서,
상기 b) 단계는 관리서버(200)가 채굴장비 제어부(100)의 전력 제어부(110)로 채굴장비(410, 420, 430)의 동작 상태 확인을 요청하는 단계;
상기 전력 제어부(110)가 채굴장비(410, 420, 430)로부터 동작 확인 신호를 검출하여 시스템 다운 여부를 판단하는 단계; 및
상기 전력 제어부(110)가 상기 판단 결과에 따라 시스템 다운 또는 정상동작 중 어느 하나를 판단하여 결과를 출력하는 단계를 포함하는 가상화폐 채굴장비 제어방법.
The method according to claim 6,
In step b), the management server 200 requests the power control unit 110 of the mining equipment control unit 100 to check the operation status of the mining equipment 410, 420, 430.
Determining whether the system is down by detecting an operation confirmation signal from the mining equipment (410, 420, 430) by the power control unit (110); And
And the power control unit 110 determines whether the system is down or normal according to the determination result, and outputs a result.
제 6 항에 있어서,
상기 동작 상태 확인을 요청하는 단계는 전력 제어부(110)가 입출력부(120)를 통해 상기 채굴장비(410, 420, 430)에서 출력되는 신호값을 검출하는 단계;
상기 검출된 신호값을 미리 설정된 기준값과 비교하여 상기 전력 제어부(110)가 채굴장비(410, 420, 430)의 전원이 온 상태인지 오프 상태인지 여부를 확인하는 단계를 포함하는 가상화폐 채굴장비 제어방법.
The method according to claim 6,
The step of requesting the operation status confirmation includes: detecting a signal value output from the mining equipment (410, 420, 430) through the input / output unit (120) by the power control unit (110);
Comparing the detected signal value with a predetermined reference value to determine whether the power control unit 110 is in the power-on state or the off-state of the mining equipment 410, 420, and 430, Way.
KR1020170125714A 2017-09-28 2017-09-28 system and method for controlling mining device of bitcoin KR20190036612A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020170125714A KR20190036612A (en) 2017-09-28 2017-09-28 system and method for controlling mining device of bitcoin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020170125714A KR20190036612A (en) 2017-09-28 2017-09-28 system and method for controlling mining device of bitcoin

Publications (1)

Publication Number Publication Date
KR20190036612A true KR20190036612A (en) 2019-04-05

Family

ID=66103810

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020170125714A KR20190036612A (en) 2017-09-28 2017-09-28 system and method for controlling mining device of bitcoin

Country Status (1)

Country Link
KR (1) KR20190036612A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20220027793A (en) * 2021-10-29 2022-03-08 박가람 System for mining crypto currency for vehicle
KR102534231B1 (en) 2022-06-28 2023-05-18 이지용 Control method for sport metavers system based on block chain network
KR102584488B1 (en) 2022-06-28 2023-09-27 이동현 Control method of electronic device, included in block chain network, obtaining virtual money by swing of virtual golf club

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160095720A (en) 2015-02-03 2016-08-12 한양대학교 에리카산학협력단 Method and apparatus for protecting transasction of encrypted currency

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160095720A (en) 2015-02-03 2016-08-12 한양대학교 에리카산학협력단 Method and apparatus for protecting transasction of encrypted currency

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20220027793A (en) * 2021-10-29 2022-03-08 박가람 System for mining crypto currency for vehicle
WO2023075036A1 (en) * 2021-10-29 2023-05-04 박가람 Cryptocurrency mining system for vehicle
US11941612B2 (en) 2021-10-29 2024-03-26 Ga Ram Park Vehicle cryptocurrency mining system
KR102534231B1 (en) 2022-06-28 2023-05-18 이지용 Control method for sport metavers system based on block chain network
KR102584488B1 (en) 2022-06-28 2023-09-27 이동현 Control method of electronic device, included in block chain network, obtaining virtual money by swing of virtual golf club

Similar Documents

Publication Publication Date Title
CN103200165B (en) Information dispensing method, information distribution system and car-mounted terminal
US20160253664A1 (en) Attestation by proxy
KR20190036612A (en) system and method for controlling mining device of bitcoin
CN104798111A (en) Cloud-based wireless communication system and method
WO2015151981A1 (en) Communication system, communication terminal, communication method, and program
CN1650579A (en) Auto-detection of wireless network accessibility
CA2950657C (en) Remote diagnosis management system and method for operating the same
US20080040796A1 (en) Electronic apparatus and authentication management method for electronic apparatus system
CN1953393A (en) Software installation within a federation
CN102201842A (en) Information processing system, information processing apparatus, and administration server
Alkar et al. IP based home automation system
US20150188716A1 (en) Service providing system, service providing method, portable communication terminal and server
KR20210097007A (en) Method for maintenance of kiosk
CN102708329A (en) Data security management systems and methods
CN112292845B (en) Information processing apparatus, information processing method, and program
JP2007193481A (en) Authentication system and method
CN116007199A (en) Water heater flue risk prediction method and device, computer equipment and medium
CN111428220A (en) Mobile terminal office system based on remote collaboration platform
JP2007133607A (en) Method for setting card reader and card authentication system
CA3151038C (en) Telemetry system to audit transfers on electronic apparatus or devices for payment
CN114610668B (en) Method and device for interaction between intelligent serial port screen and BMC
CN113708938B (en) Token obtaining method, token obtaining device and terminal equipment
KR102314814B1 (en) Apparatus and method for linking data based the open standard in the wearable communication system
CN104794806A (en) Currency conversion device
US20240193254A1 (en) Systems, devices, and methods for tracking remote equipment location and utilization of computing devices

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right