KR20180092441A KR1020170018112A KR20170018112A KR20180092441A KR 20180092441 A KR20180092441 A KR 20180092441A KR 1020170018112 A KR1020170018112 A KR 1020170018112A KR 20170018112 A KR20170018112 A KR 20170018112A KR 20180092441 A KR20180092441 A KR 20180092441A
Authority
KR
South Korea
Prior art keywords
insert
bolt
mold
outer diameter
electric power
Prior art date
Application number
KR1020170018112A
Other languages
Korean (ko)
Inventor
이강주
이홍재
Original Assignee
주식회사 케이씨산업
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 케이씨산업 filed Critical 주식회사 케이씨산업
Priority to KR1020170018112A priority Critical patent/KR20180092441A/en
Publication of KR20180092441A publication Critical patent/KR20180092441A/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/26Assemblies of separate moulds, i.e. of moulds or moulding space units, each forming a complete mould or moulding space unit independently from each other
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/0025Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects with installation or service material, e.g. tubes for electricity or water
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/0043Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects with gaskets or sealing elements, e.g. for tunnelings or man holes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0007Production methods using a mold

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Moulds, Cores, Or Mandrels (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

The present invention relates to a mold for producing insert-embedded electric power spheres. The mold for producing insert-embedded electric power spheres according to one embodiment of the present invention includes, sequentially, a double bolt in which a first bolt portion, an exponential ring coupling portion and a second bolt portion are formed, an exponential ring coupled to the exponential ring coupling portion, an insert coupled to the first bolt portion, and a mold having a nut portion coupled to the second bolt portion and an insert insertion hole into which the insert is inserted so as to communicate with each other. It is not necessary to separately work for installing a support in the electric power spheres, and the electric power spheres can be precast and the insert can be easily embedded.

Description

인서트가 매입되는 전력구 제작용 거푸집 및 인서트가 매입되는 전력구 제작방법{FORMWORK FOR ELECTRIC POWER MANHOLE AND MANUFACTURING METHOD OF ELECTRIC POWER MANHOLE}TECHNICAL FIELD [0001] The present invention relates to a method of manufacturing a power tool and a method of manufacturing a power tool including an insert,

본 발명은 인서트가 매입되는 전력구 제작용 거푸집에 관한 것으로, 보다 상세하게는 내부에 전기 케이블의 수납을 위한 인서트가 매입되는 전력구를 프리캐스팅 제작 가능한 인서트가 매입되는 전력구 제작용 거푸집에 관한 것이다. BACKGROUND OF THE INVENTION 1. Field of the Invention [0001] The present invention relates to a power tool mold for embedding an insert, and more particularly to a power tool mold for inserting an insert for accommodating an electric cable therein, will be.

전기 케이블은 지상으로 설치되기도 하지만 도심과 같은 복잡한 지역에서는 지중으로 매설되기도 한다. 이는 지상에서는 복잡한 건물들과 노상 구조물 등에 의해 간섭을 받거나 미관을 저해하는 문제가 있기 때문이다.Electrical cables can be installed on the ground, but they can be buried underground in complex areas such as the city center. This is because there are problems on the ground that they are interfered with by complicated buildings and street structures, or they interfere with aesthetics.

이와 같이 지중에 매설된 전기 케이블들은 어느 일정 구간에서 케이블들간의 연결이 이루어져야 하며, 이를 위하여 설치되는 공간이 전력구이다.In this way, the electric cables buried in the ground must be connected to each other at certain intervals.

이러한 전력구는 현장에서 직접 시공되기도 하지만 최근에는 공기단축 등을 위해 별도로 공장에서 제작하여 현장에서는 조립만 하는 방식으로 시공이 이루어지기도 한다. 이를 위하여 프리캐스팅 제작된 복수의 콘크리트 박스 암거를 현장에서 접합하여 전력구를 설치하며, 이러한 전력구를 프리캐스트 콘크리트(Precast Concrete) 전력구(이하, '전력구'라 함)라 부르기도 한다. These electric power is directly applied in the field, but in recent years, it is produced separately at the factory for air shortening, etc., and the construction is carried out only by assembling in the field. To accomplish this, a plurality of pre-cast concrete box culverts are jointed at the site to install power sockets. Such power sockets are also referred to as pre-cast concrete power sockets (hereinafter referred to as "power sockets").

이러한 전력구 내에는 다수개의 전기 케이블이 지나가게 되므로, 이러한 전기 케이블을 수납하여 정리할 필요가 있다. 때문에 도 1 에 도시된 바와 같이, 전력구(1000) 내에는 전기 케이블(1050)를 수납하기 위한 행거(1040)가 설치된다. 또한 행거(1040)를 설치하기 위해 전력구(1000)의 벽체 부분에는 행거를 지지하는 지지대(1030)가 설치된다.Since a plurality of electric cables are passed through these electric power holes, it is necessary to store these electric cables and arrange them. Therefore, as shown in FIG. 1, a hanger 1040 for housing the electric cable 1050 is installed in the electric power tool 1000. In order to install the hanger 1040, a wall 1030 of the power tool 1000 is provided with a support base 1030 for supporting the hanger.

이러한 지지대(1030)를 설치하기 위해 전력구(1000) 내부의 벽체에 지지대(1030)를 볼팅하여 고정하는 것이 필요하다. 종래에는 지지대(1030)를 고정하기 위해 프리캐스팅 제작된 전력구(1000)에 지지대(1030)를 고정하기 위해 주로 세트앙카(1020)를 이용하였다. 세트앙카(1020)를 설치하기 위해서는 전력구(1000)를 설치한 후, 현장에서 드릴 등으로 세트앙카(1020)가 매립될 홈을 일일이 형성하고, 그 홈에 세트앙카(1020)를 설치하여야 했다. It is necessary to bolt the support member 1030 to the wall inside the electric power tool 1000 to fix the support member 1030. [ A set anchor 1020 is mainly used to fix the support stand 1030 to the power tool 1000 precasted to fix the support stand 1030. [ In order to install the set anchor 1020, after the electric power tool 1000 is installed, a groove to be filled with the set anchor 1020 is formed by a drill or the like in the field, and a set anchor 1020 is installed in the groove .

그러나, 지지대(1030)의 설치를 위해서는 매우 많은 수의 세트앙카(1020)의 설치가 필요하므로, 시공비가 올라가고 시공기간도 매우 길어지는 문제가 있었다.However, since a large number of set anchors 1020 are required to install the support stand 1030, there is a problem that the construction cost is increased and the construction period is extremely long.

위와 같이 세트앙카(1020)를 현장에서 설치하지 않고, 전력구를 프리캐스팅 제작할 때 지지대(1030)를 볼팅하기 위한 인서트를 미리 설치하여, 세트앙카(1020) 설치로 인한 비용적 시간적 소모를 없앨 수 있다. 그러나 인서트를 미리 설치하려는 경우 다음과 같은 문제가 있었다.When the power anchor is pre-casted without installing the set anchor 1020 as described above, an insert for bolting the support stand 1030 is provided in advance to eliminate costly and time-consuming expenses due to the installation of the set anchor 1020 have. However, if you want to install the insert in advance, you have the following problems.

도 2 를 참조하면, 일반적으로 전력구를 프리캐스팅 제작하기 위해 거푸집의 설치가 필요하다. 거푸집은 바닥 거푸집(1110), 외부 거푸집(1120), 마구리 거푸집(1130) 및 내부 거푸집(1140)의 순서로 설치된다. Referring to FIG. 2, it is generally necessary to install a mold to pre-cast the power sphere. The formwork is installed in the order of the bottom mold 1110, the outer mold 1120, the rough mold 1130 and the inner mold 1140.

이 때, 전력구의 벽체 내부에 인서트를 설치하기 위해 내부 거푸집(1140)에 인서트 매입 볼트(1142)를 설치하게 되면, 인서트 매입 볼트(1142)가 마구리 거푸집(1130)에 걸려 내부 거푸집(1140)이 설치방향(A)으로 밀려 들어갈 수 없어 내부 거푸집(1140)의 설치가 불가능하게 된다.In this case, when the insert embedding bolt 1142 is installed in the inner form 1140 to install the insert in the wall of the power tool, the insert embedding bolt 1142 is caught by the embossing die 1130, It can not be pushed in the installation direction A and the inner mold 1140 can not be installed.

인서트 매입 볼트(1142)의 길이를 짧게 하면 내부 거푸집(1140)이 밀려 들어갈 수 있으나, 이러한 경우 인서트 매입 볼트에 의해 전력구 벽체에 형성되는 홈의 길이가 너무 짧아져 지지대가 전기 케이블의 하중을 버티지 못하는 문제가 발생하게 된다.If the length of the insert embedding bolt 1142 is shortened, the inner formwork 1140 can be pushed in. However, in this case, the length of the grooves formed in the power tool wall by the insert embedding bolts becomes too short, A problem that can not be solved occurs.

한편, 도 3 을 참조하면, 내부 거푸집(1210)을 설치한 후에 인서트(1230)를 설치하는 것이 가능할 수 있다. 즉, 내부 거푸집(120) 설치 후, 인서트(1230)를 인서트 고정용 볼트(1240)에 의해 인서트 고정용 철판(1220)에 고정시키고, 인서트 고정용 철판(1220)을 내부 거푸집(1210)에 고정시켜 인서트(120)를 설치할 수 있다.3, it is possible to install the insert 1230 after the inner mold 1210 is installed. That is, after the inner mold 120 is installed, the insert 1230 is fixed to the insert fixing steel plate 1220 by the insert fixing bolt 1240, and the insert fixing steel plate 1220 is fixed to the inner mold 1210 The insert 120 can be installed.

그러나, 위의 방법에 의하는 경우, 콘크리트 타설 및 양생 후 인서트 고정용 철판(1220)을 제거하여야 하는 번거로움이 있고, 내부 거푸집(1210)과 인서트 고정용 철판(1220) 사이의 접합 간극(1250)에 밀려 들어간 콘크리트로 인해 철판 자국이 남게 되어 미관상 좋지 않은 문제가 있었다.However, according to the above method, it is troublesome to remove the iron plate 1220 for fixing the insert after the concrete is poured and cured, and the joint gap 1250 between the inner mold 1210 and the insert- ), There was a problem in the appearance of the steel plate due to the concrete that was pushed into the concrete.

한편, 위에 설명한 바와 달리, 인서트 고정용 철판(1220)을 사용하지 않고 인서트(1230)를 내부 거푸집(1210)에 직접 설치하는 경우, 내부 거푸집(1210)와 외부 거푸집(1212) 사이의 인서트(1230)에 작업자의 손이 닿지 않으므로, 작업자가 인서트(1230)를 고정하고 인서트 고정용 볼트(1240)를 회전시켜 인서트(1230)와 인서트 고정용 볼트(1240)를 나사 결합시킬 수 없는 문제가 있었다.The insert 1230 between the inner die 1210 and the outer die 1212 may be inserted into the inner die 1210 directly without using the insert fixing steel plate 1220. [ There is a problem that the operator can not screw the insert 1230 and the insert fixing bolt 1240 by fixing the insert 1230 and rotating the insert fixing bolt 1240.

본 발명은 상기 문제점을 해결하기 위한 것으로, 본 발명의 목적은 지지대 설치를 위한 별도 작업이 필요하지 않고, 거푸집에 미리 인서트를 고정 결합하여 전력구를 프리캐스팅 제작 가능한 인서트가 매입되는 전력구 제작용 거푸집을 제공하는 것이다. SUMMARY OF THE INVENTION The present invention has been made to solve the above problems, and it is an object of the present invention to provide a power tool for manufacturing a power tool in which an insert capable of pre- Molds.

전술한 과제를 해결하기 위한 본 발명의 일 실시예에 따른 인서트가 매입되는 전력구 제작용 거푸집은 순차적으로 제 1 볼트부, 지수링 결합부 및 제 2 볼트부가 형성되는 이중볼트; 상기 지수링 결합부에 결합되는 지수링; 상기 제 1 볼트부와 결합되는 인서트; 및 상기 제 2 볼트부와 결합되는 너트부와 인서트가 삽입되는 인서트 삽입홀이 서로 연통되게 형성되는 몰드;를 포함하는 것을 특징으로 한다.According to an aspect of the present invention, there is provided a power tool mold for embedding an insert according to an embodiment of the present invention, comprising: a double bolt in which a first bolt portion, an exponent ring engaging portion and a second bolt portion are sequentially formed; An exponent ring coupled to the exponent ring engagement portion; An insert coupled with the first bolt portion; And a mold having a nut portion coupled to the second bolt portion and an insert insertion hole into which the insert is inserted, to communicate with each other.

상기 제 1 볼트부의 외경은 상기 제 2 볼트부의 외경 보다 작을 수 있다.The outer diameter of the first bolt portion may be smaller than the outer diameter of the second bolt portion.

상기 지수링 결합부의 외경은 상기 제 2 볼트부의 외경 보다 작을 수 있다.And the outer diameter of the exponent ring engagement portion may be smaller than the outer diameter of the second bolt portion.

상기 인서트의 외경은 상기 너트부의 최소 내경과 동일하거나 보다 작을 수 있다.The outer diameter of the insert may be equal to or less than the minimum inner diameter of the nut.

상기 지수링은 상기 인서트 및 상기 인서트 삽입홀과 밀착될 수 있다.The index ring may be in close contact with the insert and the insert hole.

상기 너트부는 별도 제작되어 상기 몰드에 고정되는 고정부재에 형성될 수 있다.The nut may be formed on a fixing member fixed to the mold.

본 발명의 일 실시예에 따른 인서트가 매입되는 전력구 제작용 거푸집에 의하면, 전력구 내부에 지지대를 설치하기 위한 별도 작업이 필요하지 않고, 전력구를 프리캐스팅 제작함과 동시에 용이하게 인서트가 매입될 수 있으며, 거푸집 등의 해체가 용이하고, 전력구의 벽체에 어떠한 자국도 남지 않는 인서트가 매입되는 전력구 제작용 거푸집을 제공할 수 있다. According to the embodiment of the present invention, it is not necessary to perform a separate operation for installing a support in the power sphere, and the power sphere is precastically manufactured, and at the same time, And it is possible to provide a power tool mold for disassembling a mold or the like and facilitating disassembly of an insert which is not left on the wall of the power tool.

도 1 은 종래 전력구에의 지지대 및 행거의 설치를 설명하기 위한 도면이다.
도 2 는 종래 내부 거푸집 조립 전 인서트 설치 시 문제점을 설명하기 위한 도면이다.
도 3 은 종래 내부 거푸집 조립 후 인서트 설치 시 문제점을 설명하기 위한 도면이다.
도 4 는 본 발명의 일 실시에에 따른 인서트가 매입되는 전력구 제작용 거푸집의 부분 사시도이다.
도 5 는 도 4의 인서트가 매입되는 전력구 제작용 거푸집의 분해 사시도이다.
도 6 은 도 4 의 인서트가 매입되는 전력구 제작용 거푸집의 종 단면도이다.
도 7 은 도 6 에서 이중볼트와 몰드를 제거한 모습을 보인 단면도이다.
1 is a view for explaining installation of a support and a hanger in a conventional electric power tool.
2 is a view for explaining a problem in installing an insert before assembling a conventional inner formwork.
3 is a view for explaining a problem in installing an insert after assembling a conventional inner formwork.
4 is a partial perspective view of a mold for forming a power tool in which an insert according to an embodiment of the present invention is embedded.
Fig. 5 is an exploded perspective view of a power tool mold for embedding the insert of Fig. 4;
FIG. 6 is a longitudinal sectional view of a mold for forming a power tool in which the insert of FIG. 4 is embedded.
FIG. 7 is a cross-sectional view showing a state where the double bolt and the mold are removed in FIG. 6. FIG.

상기와 같은 본 발명의 특징들에 대한 이해를 돕기 위하여, 이하 첨부도면을 참조하여 본 발명의 일 실시예에 따른 인서트가 매입되는 전력구 제작용 거푸집에 대하여 보다 상세하게 설명하도록 한다.BRIEF DESCRIPTION OF THE DRAWINGS The above and other features and advantages of the present invention will become more apparent by describing in detail exemplary embodiments thereof with reference to the attached drawings in which: FIG.

이하, 설명되는 실시예들은 본 발명의 기술적인 특징을 이해시키기에 가장 적합한 실시예들을 기초로 하여 설명될 것이며, 설명되는 실시예들에 의해 본 발명의 기술적인 특징이 제한되는 것이 아니라, 이하 설명되는 실시예들과 같이 본 발명이 구현될 수 있다는 것을 예시하는 것이다. 따라서, 본 발명은 아래 설명된 실시예들을 통해 본 발명의 기술 범위 내에서 다양한 변형 실시가 가능하며, 이러한 변형 실시예는 본 발명의 기술 범위 내에 속한다 할 것이다. 그리고, 이하 설명되는 실시예의 이해를 돕기 위하여 첨부된 도면에 기재된 부호에 있어서, 각 실시예에서 동일한 작용을 하게 되는 구성요소 중 관련된 구성요소는 동일 또는 연장 선상의 숫자로 표기하였다.Hereinafter, exemplary embodiments will be described on the basis of embodiments best suited for understanding the technical characteristics of the present invention, and the technical features of the present invention are not limited by the illustrated embodiments, And that the present invention may be implemented with other embodiments. Therefore, it is intended that the present invention covers the modifications and variations of this invention provided they come within the scope of the appended claims and their equivalents. In order to facilitate the understanding of the embodiments described below, in the reference numerals shown in the accompanying drawings, among the constituent elements that perform the same function in the respective embodiments, the related constituent elements are indicated by the same or an extension line number.

도 4 는 본 발명의 일 실시에에 따른 인서트가 매입되는 전력구 제작용 거푸집의 부분 사시도이고, 도 5 는 도 4의 인서트가 매입되는 전력구 제작용 거푸집의 분해 사시도이며, 도 6 은 도 4 의 인서트가 매입되는 전력구 제작용 거푸집의 종 단면도이고, 도 7 은 도 6 에서 이중볼트와 몰드를 제거한 모습을 보인 단면도이다. FIG. 4 is an exploded perspective view of a mold for forming a power tool in which an insert according to an embodiment of the present invention is embedded, FIG. 5 is an exploded perspective view of a mold for forming a power tool embedded in the insert of FIG. FIG. 7 is a cross-sectional view illustrating a state in which the double bolt and the mold are removed in FIG. 6. FIG.

도 4 및 도 5 에서 몰드(400)는 그 일부분만을 도시하였고, 상기 일부분은 인서트의 설치가 필요한 부분이다.In FIGS. 4 and 5, the mold 400 shows only a part thereof, and this part is a part where installation of the insert is required.

본 발명의 일 실시예에 따른 인서트가 매입되는 전력구 제작용 거푸집은 이중볼트(100), 지수링(200), 인서트(300) 및 몰드(400)을 포함한다.The mold for making a power tool in which an insert according to an embodiment of the present invention is embedded includes a double bolt 100, an exponent ring 200, an insert 300 and a mold 400.

이중볼트(100)는 순차적으로 형성되는 제 1 볼트부(110), 지수링 결합부(120) 및 제 2 볼트부(130)를 포함한다. 제 1 볼트부(110) 및 제 2 볼트부(130)의 외경에는 나사선이 형성된다.The double bolt 100 includes a first bolt portion 110, an exponent ring coupling portion 120 and a second bolt portion 130 which are sequentially formed. A thread is formed on the outer diameters of the first bolt portion 110 and the second bolt portion 130.

지수링(200)은 소정 크기의 중공을 가질 수 있고, 고무 등 탄성을 가지는 소재로 이루어질 수 있다. 지수링(200)의 상기 중공에는 이중볼트(100)의 지수링 결합부(120)가 끼워지게 되며, 이에 의해 지수링(200)이 지수링 결합부(120)에 밀착되어 결합될 수 있다.The exponent ring 200 may have a hollow having a predetermined size, and may be made of a material having elasticity such as rubber. The exponent ring engaging portion 120 of the double bolt 100 is fitted to the hollow of the exponent ring 200 so that the exponent ring 200 can be brought into tight contact with the exponent ring engaging portion 120.

인서트(300)에는 지지대 고정부(310)가 형성된다. 지지대 고정부(310)의 내경에는 제 1 볼트부(110) 외경에 형성되는 나사선에 대응하는 나사선이 형성된다. 상기 나사선에 의해 지지대 고정부(310)와 제 1 볼트부(110)가 나사결합될 수 있다. In the insert 300, a support rest fixing part 310 is formed. A screw thread corresponding to a thread formed on the outer diameter of the first bolt portion 110 is formed on the inner diameter of the support base fixing portion 310. The support base fixing part 310 and the first bolt part 110 can be screwed together by the screw thread.

인서트(300)는 전력구의 프리캐스팅 제작 시 전력구의 벽체에 매입되고, 지지대 고정부(310)는 외부로 드러나게 된다. 이중볼트(100)가 제거된 이후에, 지지대 고정부(310)에는 전기 케이블을 수납하기 위한 지지대가 설치된다. 즉, 지지대 고정부(310)에는 지지대를 고정하는 볼트가 나사 결합될 수 있고, 이에 의해 상기 지지대가 설치될 수 있따.The insert 300 is embedded in the wall of the electric power tool during precast casting of the power sphere, and the support stand fixing part 310 is exposed to the outside. After the double bolts 100 are removed, a support stand for accommodating the electric cables is installed in the support stand fixing part 310. [ That is, bolts for fixing the support rods can be screwed to the support rod fixing portion 310, whereby the support rods can be installed.

인서트(300)의 말단에는 보강용 철근(320)이 형성될 수 있다. 전력구 제작 후 인서트(300)에 설치되는 지지대 및 행거에 전기 케이블이 수납되는 경우, 보강용 철근(320)에 의해 인서트(300)는 전기 케이블 등의 하중을 보다 용이하게 버틸 수 있다. A reinforcing bar 320 may be formed at the distal end of the insert 300. When the electric cable is housed in the support stand and the hanger installed in the insert 300 after the electric power tool is manufactured, the reinforcement reinforcement 320 can more easily hold the load of the electric cable or the like.

몰드(400)는 전력구를 제작하기 위한 거푸집 중 일부를 의미한다. 몰드(400)는 앞서 설명한 내부 거푸집일 수 있고, 내부 거푸집 중 벽면 부분일 수 있다. The mold 400 means a part of a mold for manufacturing a power tool. The mold 400 may be the inner mold as described above and may be a portion of the wall of the inner mold.

몰드(400)에는 서로 연통되는 너트부(410)와 인서트 삽입홀(420)이 형성된다. The mold 400 has a nut portion 410 and an insert insertion hole 420, which communicate with each other.

너트부(410)의 내경에는 이중볼트(100)의 제 2 볼트부(130) 외경의 나사선에 대응하는 나사선이 형성된다. 너트부(410)의 내경 및 제 2 볼트부(130)의 외경에 형성되는 나사선에 의해 너트부(410)와 이중볼트(100)가 결합될 수 있다. A screw thread corresponding to the thread of the outer diameter of the second bolt 130 of the double bolt 100 is formed on the inner diameter of the nut portion 410. The nut portion 410 and the double bolt 100 can be coupled by the thread formed on the inner diameter of the nut portion 410 and the outer diameter of the second bolt portion 130.

인서트 삽입홀(420)에는 인서트(300)가 삽입되며, 인서트 삽입홀(420)은 인서트(300)가 삽입될 수 있는 정도의 내경을 가진다. The insert 300 is inserted into the insert insert hole 420 and the insert insert hole 420 has an inner diameter enough to insert the insert 300.

너트부(410)는 몰드(400)와 별도로 제작되어 몰드(400)에 용접 등의 방법에 의해 몰드(400)에 고정되는 고정부재(430)에 형성될 수 있다. 이러한 경우, 너트부(410) 및 인서트 삽입홀(420)을 형성하기 위해 몰드(400)의 두께를 두껍게 형성할 필요가 없는 효과가 있다. 바꾸어 말하면, 몰드(400)의 두께를 얇게 하면서도 몰드(400)의 두께 상 방향에 너트부(410)와 인서트 삽입홀(420)을 형성할 수 있다. 몰드(400)의 생산비용이 절감될 수 있다.The nut part 410 may be formed on the fixing member 430 which is separately formed from the mold 400 and is fixed to the mold 400 by welding or the like to the mold 400. In this case, it is not necessary to increase the thickness of the mold 400 in order to form the nut portion 410 and the insert insertion hole 420. In other words, the nut portion 410 and the insert insertion hole 420 can be formed in the thickness direction of the mold 400 while the thickness of the mold 400 is reduced. The production cost of the mold 400 can be reduced.

이중볼트(100), 지수링(200), 인서트(300) 및 몰드(400)의 결합은, 이중볼트(100)의 지수링 결합부(120)에 지수링(200)이 결합되고, 이중볼트(100)의 제 1 볼트부(100)에 인서트(300)가 결합되며, 이중볼트(100)의 제 2 볼트부(130)와 몰드(400)의 너트부(410)가 결합되는 순서에 의할 수 있다.The combination of the double bolt 100, the exponent ring 200, the insert 300 and the mold 400 is such that the exponent ring 200 is coupled to the exponent ring engaging portion 120 of the double bolt 100, The insert 300 is coupled to the first bolt portion 100 of the bolt 100 and the second bolt portion 130 of the bolt 100 and the nut portion 410 of the mold 400 are coupled to each other. can do.

위 순서 중 마지막 단계에서는 이중볼트(100), 지수링(200) 및 인서트(300) 결합체가 몰드(400)와 결합되게 된다. In the final step of the above procedure, the double bolt 100, the exponent ring 200, and the insert 300 are combined with the mold 400.

위 순서에 의해 거푸집을 조립한 후, 거푸집에 콘크리트를 타설하고 양생한 후, 이중볼트(100)를 풀어 제거하고 몰드(400)를 포함하는 거푸집을 제거하면, 인서트가 매입되는 전력구가 제작되게 된다(도 7 참조).After assembling the dies according to the above procedure, concrete is laid and cured in the dies, and then the double bolts 100 are loosened to remove the dies including the mold 400, (See FIG. 7).

이중볼트(100)의 제 1 볼트부(110)의 외경은 제 2 볼트부(130)의 외경 보다 작을 수 있다. 제 1 볼트부(110)의 외경이 제 2 볼트부(130)의 외경과 동일하거나 보다 큰 경우, 인서트(300)가 결합된 제 1 볼트부(110)가 몰드(400)의 너트부(410)을 지나 인서트 삽입홀(420)에 삽입될 수 없기 때문이다.The outer diameter of the first bolt portion 110 of the double bolt 100 may be smaller than the outer diameter of the second bolt portion 130. The first bolt portion 110 to which the insert 300 is coupled is inserted into the nut portion 410 of the mold 400. When the outer diameter of the first bolt portion 110 is equal to or larger than the outer diameter of the second bolt portion 130, And can not be inserted into the insert insertion hole 420.

이중볼트(100)의 지수링 결합부(120)의 외경은 제 2 볼트부(130)의 외경 보다 작을 수 있다. 지수링 결합부(120)의 외경이 제 2 볼트부(130)의 외경과 동일하거나 보다 큰 경우, 지수링(200)이 결합된 지수링 결합부(120)가 몰드(400)의 너트부(410)를 통과할 수 없기 때문이다.The outer diameter of the exponent ring engaging portion 120 of the double bolt 100 may be smaller than the outer diameter of the second bolt portion 130. When the outer diameter of the exponent ring engaging portion 120 is equal to or larger than the outer diameter of the second bolt portion 130, the exponent ring engaging portion 120, to which the exponent ring 200 is coupled, 410).

인서트(300)의 외경은 너트부(410)의 최소 내경과 동일하거나 보다 작을 수 있다. 인서트(300)의 외경이 너트부(410)의 내경 보다 큰 경우, 인서트가 몰드(400)의 너트부(410)를 통과할 수 없기 때문이다. 이러한 경우, 인서트(300)의 외경은 이중볼트(100)의 제 2 볼트부(130)의 최소 외경과 같거나 작게 형성되게 된다. 상기 너트부(410)의 최소 내경이란 너트부(410)에 형성되는 나사선의 나사산에 의한 외경을 의미하고, 상기 제 2 볼트부(130)의 최소 외경이란 제 2 볼트부(130)에 형성되는 나사선의 나사골에 의한 외경을 의미한다.The outer diameter of the insert 300 may be equal to or less than the minimum inner diameter of the nut portion 410. This is because if the outer diameter of the insert 300 is larger than the inner diameter of the nut portion 410, the insert can not pass through the nut portion 410 of the mold 400. In this case, the outer diameter of the insert 300 is formed to be equal to or smaller than the minimum outer diameter of the second bolt 130 of the double bolt 100. The minimum inner diameter of the nut portion 410 means the outer diameter of the screw thread formed on the nut portion 410 and the minimum outer diameter of the second bolt portion 130 means the outer diameter of the second bolt portion 130 Means the outer diameter of threaded thread.

지수링(200)은 인서트(300) 및 몰드(400)의 인서트 삽입홀(420)과 밀착되게 배치될 수 있다. 상기 밀착에 의해, 거푸집에 채워지는 콘크리트가 제 1 볼트부(110)와 지지대 고정부(310) 사이 또는 제 2 볼트부(130)와 너트부(410) 사이에 들어가 굳는 것이 방지되어, 상기 굳은 콘크리트에 의해 이중볼트(100)의 해체가 곤란해지는 것이 방지될 수 있다.The indexing ring 200 may be disposed in close contact with the insert 300 and the insert insert hole 420 of the mold 400. By the tightening, the concrete filled in the mold is prevented from getting stuck between the first bolt part 110 and the support bar fixing part 310 or between the second bolt part 130 and the nut part 410, It is possible to prevent the disassembly of the double bolt 100 from being difficult due to the concrete.

100 : 이중볼트 110 : 제 1 볼트부 120 : 지수링 결합부
130 : 제 2 볼트부 200 : 지수링 300 : 인서트
400 : 몰드 410 : 너트부 420 : 인서트 삽입홀
100: double bolt 110: first bolt part 120: exponent ring engaging part
130: second bolt part 200: exponent ring 300: insert
400: mold 410: nut portion 420: insert insert hole

Claims (8)

순차적으로 제 1 볼트부, 지수링 결합부 및 제 2 볼트부가 형성되는 이중볼트;
상기 지수링 결합부에 결합되는 지수링;
상기 제 1 볼트부와 결합되는 인서트; 및
상기 제 2 볼트부와 결합되는 너트부와 인서트가 삽입되는 인서트 삽입홀이 서로 연통되게 형성되는 몰드;
를 포함하는 인서트가 매입되는 전력구 제작용 거푸집.
A double bolt in which a first bolt portion, an exponent ring coupling portion and a second bolt portion are sequentially formed;
An exponent ring coupled to the exponent ring engagement portion;
An insert coupled with the first bolt portion; And
A mold having a nut portion engaged with the second bolt portion and an insert insertion hole into which the insert is inserted so as to communicate with each other;
Wherein the insert is inserted into the mold.
제 1 항에 있어서,
상기 제 1 볼트부의 외경은 상기 제 2 볼트부의 외경 보다 작은 인서트가 매입되는 전력구 제작용 거푸집.
The method according to claim 1,
Wherein an outer diameter of the first bolt portion is smaller than an outer diameter of the second bolt portion.
제 1 항에 있어서,
상기 지수링 결합부의 외경은 상기 제 2 볼트부의 외경 보다 작은 인서트가 매입되는 전력구 제작용 거푸집.
The method according to claim 1,
Wherein an outer diameter of the exponent ring coupling portion is smaller than an outer diameter of the second bolt portion.
제 1 항에 있어서,
상기 인서트의 외경은 상기 너트부의 최소 내경과 동일하거나 보다 작은 인서트가 매입되는 전력구 제작용 거푸집.
The method according to claim 1,
Wherein an outer diameter of the insert is equal to or smaller than a minimum inner diameter of the nut portion.
제 1 항에 있어서,
상기 지수링은 상기 인서트 및 상기 인서트 삽입홀과 밀착되는 인서트가 매입되는 전력구 제작용 거푸집.
The method according to claim 1,
Wherein the index ring is embedded with the insert and the insert which is in close contact with the insert hole.
제 1 항에 있어서,
상기 너트부는 별도 제작되어 상기 몰드에 고정되는 고정부재에 형성되는 인서트가 매입되는 전력구 제작용 거푸집.
The method according to claim 1,
Wherein the nut is separately manufactured and the insert formed on the fixing member fixed to the mold is embedded.
제 1 항 내지 제 6 항 중 어느 한 항에 따른 인서트가 매입되는 전력구 제작용 거푸집에 의해 제작된 전력구.A power tool manufactured by a power tool mold for embedding an insert according to any one of claims 1 to 6. 이중볼트의 지수링 결합부에 지수링을 결합하는 단계;
이중볼트의 제 1 볼트에 인서트를 나사결합하는 단계;
지수링과 제 1 볼트가 결합된 이중볼트를 몰드의 인서트 삽입홀에 삽입하고, 이중볼트의 제 2 볼트부와 몰드의 너트부를 나사결합하는 단계;
거푸집에 콘크리트를 채우고 양생하는 단계; 및
상기 이중볼트를 풀어 제거하는 단계;
를 포함하는 인서트가 매입되는 전력구 제작방법.
Coupling an exponent ring to an exponential ring engagement portion of the double bolt;
Screwing the insert into the first bolt of the double bolt;
Inserting a double bolt combined with an exponent ring and a first bolt into an insert insertion hole of a mold, screwing a second bolt part of the double bolt and a nut part of the mold;
Filling concrete with mold and curing; And
Removing the double bolt to remove it;
Wherein the insert is embedded with the insert.
KR1020170018112A 2017-02-09 2017-02-09 Formwork for electric power manhole and manufacturing method of electric power manhole KR20180092441A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020170018112A KR20180092441A (en) 2017-02-09 2017-02-09 Formwork for electric power manhole and manufacturing method of electric power manhole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020170018112A KR20180092441A (en) 2017-02-09 2017-02-09 Formwork for electric power manhole and manufacturing method of electric power manhole

Publications (1)

Publication Number Publication Date
KR20180092441A true KR20180092441A (en) 2018-08-20

Family

ID=63442943

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020170018112A KR20180092441A (en) 2017-02-09 2017-02-09 Formwork for electric power manhole and manufacturing method of electric power manhole

Country Status (1)

Country Link
KR (1) KR20180092441A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102058712B1 (en) * 2019-02-27 2020-01-22 주식회사 케이씨산업 Formwork for electric power manhole and manufacturing method of electric power manhole
KR102623584B1 (en) * 2023-05-17 2024-01-10 동진파일(주) Step nut assembly and manufacturing method of concrete electric pole using the step nut assembly

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102058712B1 (en) * 2019-02-27 2020-01-22 주식회사 케이씨산업 Formwork for electric power manhole and manufacturing method of electric power manhole
KR102623584B1 (en) * 2023-05-17 2024-01-10 동진파일(주) Step nut assembly and manufacturing method of concrete electric pole using the step nut assembly

Similar Documents

Publication Publication Date Title
KR101975763B1 (en) Precast Concrete Culvert and Method for Constructing the Same
KR101433654B1 (en) Sleeve Lib Joint usable with precast concrete, Manufacturing method for precast concrete having the same, and Installing method for precast concreat structure having the same
KR102294565B1 (en) embeded anchor and construction method thereof
KR20180092441A (en) Formwork for electric power manhole and manufacturing method of electric power manhole
KR20190012801A (en) Formwork for tunnel lining and forming method for precast concrete bracket for supporting airpit slab
JP5498891B2 (en) Hole forming mold and hole forming method
CN205223840U (en) Bridge prefabrication pier stand and cushion cap socket joint formula connection structure
KR102058712B1 (en) Formwork for electric power manhole and manufacturing method of electric power manhole
KR200471167Y1 (en) clamp apparatus for sleeve
KR20130014282A (en) Device fixing insulating material on vertical aluminum molds
KR20150131904A (en) Tension for both steel and precast concrete structures and its production and construction methods
JP2012035524A (en) Formwork for hole forming, and hole forming method
KR100447474B1 (en) Insert for concrete slave
KR200472767Y1 (en) Easy Interchangeable Prefabricated Precast Culvert Block
KR200486198Y1 (en) Cable Wiring Hose Support Bar
KR20140147275A (en) Insert for concrete slab
KR101543961B1 (en) Complex pile
KR101100872B1 (en) bury in ceiling type electric wire box
JP5485339B2 (en) Hand hole cable support pipe connection method and cable support pipe connection structure
JP2645690B2 (en) Forming method of split box culvert and forming tool therefor
KR101402368B1 (en) A anchor nut for fixing the structure
KR100655128B1 (en) A construction method of cable tray
KR20200053874A (en) Centrifugal casted rectangular PC column with hollow section and manufacturing method thereof
KR200263919Y1 (en) Base for fixing support of road facilities
KR100539351B1 (en) method for manufacturing Construction collaborate-box with built-in nuts