KR20180003017U - Reinforced grouting pile using injection, grouting and reinforced material - Google Patents

Reinforced grouting pile using injection, grouting and reinforced material Download PDF

Info

Publication number
KR20180003017U
KR20180003017U KR2020170004307U KR20170004307U KR20180003017U KR 20180003017 U KR20180003017 U KR 20180003017U KR 2020170004307 U KR2020170004307 U KR 2020170004307U KR 20170004307 U KR20170004307 U KR 20170004307U KR 20180003017 U KR20180003017 U KR 20180003017U
Authority
KR
South Korea
Prior art keywords
injection
grouting
diameter
reinforcing
foundation
Prior art date
Application number
KR2020170004307U
Other languages
Korean (ko)
Inventor
전재운
황규억
Original Assignee
전재운
황규억
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 전재운, 황규억 filed Critical 전재운
Priority to KR2020170004307U priority Critical patent/KR20180003017U/en
Publication of KR20180003017U publication Critical patent/KR20180003017U/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

본 고안은 인젝션, 그라우팅, 주입공사 등에 있어서 주입재 주입 중 또는 후에 강관, 빔, 철근, 철근망, 케이싱, 중공관, 다중관, 중첩관, 파일, 중공파일, 스크류파일, 철근케이지 등의 보강재가 삽입되어 주입재의 고결체가 보강재로 보강된 복합기초인 보강그라우팅파일(RGP), 이의 하나인 주입체, 인젝션체, 그라우팅체, 보강재체, 주입체파일, 인젝션파일, 그라우팅파일, 주입체기초, 인젝션기초, 그라우팅기초, 현장타설파일, 현장타설말뚝, 건물기초, 구조물기초, 고결체와 보강재의 복합기초, 보강그라우팅기초(RGF) 등에 관한 것이다.The present invention relates to a method and apparatus for injecting, grouting and injecting a reinforcing material such as a steel pipe, a beam, a reinforcing bar, a reinforcing net, a casing, a hollow tube, a multi pipe, a superimposed pipe, a pile, a hollow file, a screw file, A reinforcement grouting pile (RGP), which is a multi-purpose superhard reinforced with a reinforcement of an injection material, which is inserted into the reinforcement grouting pile (RGP), one of which is injection molding, injection molding, grouting body, reinforcement body, injection molding file, injection file, grouting file, Foundation, grouting foundation, field installation pile, field drilled pile, building foundation, structure foundation, composite foundation of solidification and reinforcement, reinforced grouting foundation (RGF).

Description

인젝션, 그라우팅, 주입공사와 보강재 이용 보강그라우팅파일{Reinforced grouting pile using injection, grouting and reinforced material}[0001] The present invention relates to a grouting pile using injection, grouting and reinforced material,

본 발명은 인젝션, 그라우팅, 주입공사와 보강재 이용 보강그라우팅파일, 이의 하나인 인젝션파일, 그라우팅파일, 주입체기초, 인젝션기초, 그라우팅기초, 고결체와 보강재의 복합기초 등에 관한 것이다.
The present invention relates to injection, grouting, injection grouting, reinforcement grouting files using reinforcing materials, injection files, grouting files, injection molding foundations, injection molding, grouting molding, and composite base of reinforcing and reinforcing materials.

지반, 지중, 지하, 가면, 법면, 기초, 건물, 교량, 구조물, 시설물, 신축건물, 신축구조물, 오래된 건물, 오래된 구조물 등의 대상이 불량, 연약, 약화, 파손 등의 경우에는 보강, 개량, 보수, 보호 등의 작업이 수행되게 된다. 이의 방법으로는 주입공사, 인젝션, 그라우팅 등의 방법이 적용되고 있다. 기존의 주입공사, 인젝션, 그라우팅 등은 주입재, 인젝션재, 그라우팅재 등을 상기에 열거된 대상 등에 주입, 분사주입 등을 하는 것이다.In the case of defective, soft, weakened or damaged objects such as ground, underground, underground, mask, surface, foundation, building, bridge, structure, facility, new building, new construction, old building, old structure, Maintenance, and protection are performed. As the method, injection molding, injection molding, grouting, etc. are applied. Conventional injection work, injection, grouting, etc. inject injection materials, injection materials, grouting materials, etc. into the objects listed above, injection injection, and the like.

상기 종래의 주입공사, 인젝션, 그라우팅 등은 주입재, 인젝션재, 그라우팅재 만을 대상에 분사, 주입 등을 하는 것으로 주입재, 인젝션재, 그라우팅재 만의 고결체에 의하여 대상이 보강, 개량, 보수, 보호 등이 되는 것이다. 따라서 이의 고결체, 주입체, 인젝션체, 그라우팅체 등을 건물이나 구조물 등의 기초, 지지기초 등으로 사용하기에는 강도, 지지력 등이 부족하게 된다. 따라서 주입공사, 인젝션, 그라우팅 등에 의하여 형성된 고결체, 주입체, 인젝션체, 그라우팅체 등을 기초로 사용하기 위해서는 이의 고결체를 보강, 보완하는 것이 필요하게 된다.In the conventional injection molding, injection, and grouting, injection, injection, and grouting materials are injected and injected into the object, and the object is reinforced, improved, repaired, and protected by solidification of only injection material, injection material and grouting material. . Therefore, in order to use the solidified body, injection body, injection body, grouting body, and the like as a foundation for a building or a structure, a support base, etc., strength and support force are insufficient. Therefore, in order to use a solidified body, injection body, injection body, grouting body, or the like formed by injection molding, injection molding, grouting or the like as a base, it is necessary to reinforce and complement the solidification thereof.

이의 일환으로 주입공사, 인젝션, 그라우팅 등을 이용한 기초 발명사례를 살펴보면 등록특허 10-0209247인 콤팩션그라우팅을 이용한 지중기초구축공법, 출원특허 10-2012-0137579인 그라우팅 공법을 이용한 해저 기초용 석션 파일, 등록특허 10-0422216인 교량의 우물통 기초의 지수막이 그라우팅 공법, 10-0657849인 그라우팅을 이용하여 보수된 교량 우물통 기초 등의 기술이 있다. As an example of the basic invention using injection molding, injection, grouting, etc., a ground foundation construction method using a compaction grouting as a registered patent 10-0209247, a suction file for a submarine foundation using a grouting method as a patent application 10-2012-0137579 , And a bridge pouring base that has been repaired using grouting, which is an expansive membrane of a pouring basin of a bridge of the registered patent 10-0422216, 10-0657849, and the like.

따라서 주입공사, 인젝션, 그라우팅 등에 의하여 형성된 고결체, 주입체, 인젝션체, 그라우팅체 등을 기초 등으로 사용하기 위해서는 이의 고결체를 보강, 보완하는 더욱 효과적인 기술개발이 필요하게 된다.
Therefore, in order to use a solidified body, injection body, injection body, grouting body, etc. formed by injection molding, injection, grouting, etc. as a foundation, it is necessary to develop a more effective technique to reinforce and complement the solidified body.

본 고안에서 해결하고자 하는 과제는 상기 고결체, 주입체, 인젝션체, 그라우팅체 등의 보강, 보완 등을 위하여 주입공사, 인젝션, 그라우팅 등에 있어서 상기 기술과는 달리 일정의 보강재를 이용하는 방안을 고안하는 것이다. 이에 의하여 보강재가 삽입되어 보강된 고결체, 주입체, 인젝션체, 그라우팅체 등을 이용한 건물이나 구조물 기초를 얻는 것이다.
A problem to be solved in the present invention is to devise a method of using a certain stiffener in injection molding, injection, grouting, etc., in order to reinforce or supplement the solidified body, injection body, grouting body, etc. will be. Thus, a foundation or structure base is obtained by using a solidified body, injection body, injection body, grouting body, etc. reinforced with a reinforcing material inserted therein.

본 고안의 과제의 해결 수단은 인젝션, 그라우팅, 주입공사 등에 있어서 주입재 주입 중 또는 후에 강관, 빔, 철근, 철근망, 케이싱, 중공관, 다중관, 중첩관, 파일, 중공파일, 스크류파일, 철근케이지 등의 보강재가 삽입되어 주입재의 고결체가 보강재로 보강된 복합기초인 보강그라우팅파일, 이의 하나인 주입체, 인젝션체, 그라우팅체, 보강재체, 주입체파일, 인젝션파일, 그라우팅파일, 주입체기초, 인젝션기초, 그라우팅기초, 현장타설말뚝, 건물기초, 구조물기초 등의 고안을 과제의 해결 수단으로 한다.
The solution of the problem of the present invention is to solve the problems of the present invention in a method of injecting, grouting and injecting a steel pipe, a beam, a reinforcing bar, a reinforcing net, a casing, a hollow tube, a multi pipe, A reinforcement grouting file in which a reinforcing material of a reinforcing material is reinforced by a reinforcing material of a reinforcing material with a reinforcing material inserted into a reinforcing material such as a cage to reinforce the reinforcing grouting pile; , Injection foundation, Grouting foundation, Shot pile, Building foundation, Structure foundation etc.

본 고안에서는 인젝션, 그라우팅, 주입공사 등에 있어서 주입재 주입 중 또는 후에 강관, 빔, 철근, 철근망, 케이싱, 중공관, 다중관, 중첩관, 파일, 중공파일, 스크류파일, 철근케이지 등의 보강재가 삽입되어 주입재의 고결체가 보강재로 보강된 복합기초인 보강그라우팅파일, 이의 하나인 주입체, 인젝션체, 그라우팅체, 보강재체, 주입체파일, 인젝션파일, 그라우팅파일, 주입체기초, 인젝션기초, 그라우팅기초, 현장타설말뚝, 건물기초, 구조물기초 등을 얻는 것이다.
In the present invention, a reinforcing material such as a steel pipe, a beam, a reinforcing bar, a reinforcing net, a casing, a hollow pipe, a multi pipe, a superimposed pipe, a pile, a hollow file, a screw file, and a reinforcing cage is injected during injection or grouting, A reinforcement grouting file which is inserted into the reinforcement grooves and which is reinforced by a reinforcement of a reinforcing material of the injection material; a grouting material, Foundation, field drilled pile, building foundation, foundation foundation etc.

도 1은 본 고안에 의한 인젝션, 그라우팅, 주입공사와 보강재 이용 현장타설기초 조성 공정을 나타낸 모식도
도 2는 본 고안에 의한 인젝션, 그라우팅, 주입공사와 보강재 이용 현장타설기초 조성 공정을 나타낸 모식도
도 3은 본 고안에 의한 현장타설기초, 현장타설파일, RGF, RGP을 나타낸 모식도
도 4은 본 고안에 의한 보강재 보강 인젝션체, 그라우팅체, 주입공사체를 나타낸 모식도
도 5는 본 고안에 의한 2중관 사용 인젝션, 그라우팅, 주입공사를 나타낸 모식도
도 6은 본 고안에 의한 3중관 사용 인젝션, 그라우팅, 주입공사를 나타낸 모식도
Fig. 1 is a schematic view showing the basic composition process of injection molding, grouting, injection work,
Fig. 2 is a schematic view showing the basic composition process of injection molding, grouting, injection work,
Fig. 3 is a schematic diagram showing the basic structure of the spot installation, the installation file, the RGF, and the RGP according to the present invention
Fig. 4 is a schematic view showing a reinforcing material reinforcement injecting body, a grouting body, and an injection work body according to the present invention
Fig. 5 is a schematic view showing the use of the double pipe according to the present invention, grouting,
Fig. 6 is a schematic diagram showing the use of the triple pipe according to the present invention, grouting,

본 고안이 명칭은 인젝션, 그라우팅, 주입공사와 보강재 이용 보강그라우팅파일이고, 이는 인젝션, 그라우팅, 주입공사 등에 있어서 주입재 주입 중 또는 후에 강관, 빔, 철근, 철근망, 케이싱, 중공관, 다중관, 중첩관, 파일, 중공파일, 스크류파일, 철근케이지 등의 보강재가 삽입되어 주입재의 고결체가 보강재로 보강된 복합기초인 보강그라우팅파일(RGP : Reinforced Grouting Pile), 이의 하나인 주입체, 인젝션체, 그라우팅체, 보강재체, 주입체파일, 인젝션파일, 그라우팅파일, 주입체기초, 인젝션기초, 그라우팅기초, 현장타설말뚝, 건물기초, 구조물기초, 고결체와 보강재의 복합기초, 보강그라우팅기초(RGF : Reinforced Grouting Foundation) 등에 관한 것을 특징으로 한다. This design is a reinforcement grouting file using injection, grouting, injection work and reinforcement. It is used for injection, grouting, injection work, etc. during injection or after injection of steel, beam, reinforcing steel, reinforcing net, casing, hollow tube, (RGP: Reinforced Grouting Pile), which is a multi-functional superalloy reinforced with a reinforcing material of a reinforcing material by inserting a reinforcing material such as an overlay pipe, a hollow file, a screw file, and a reinforcing cage, (RGF), reinforced concrete foundation, reinforced concrete foundation, reinforcement material, injection file, grouting file, injection foundation, injection foundation, grouting foundation, Reinforced Grouting Foundation).

본 발명의 보강그라우팅파일(RGP), 이의 하나인 주입체, 인젝션체, 그라우팅체, 보강재체, 주입체파일, 인젝션파일, 그라우팅파일, 주입체기초, 인젝션기초, 그라우팅기초, 현장타설말뚝, 건물기초, 구조물기초, 고결체와 보강재의 복합기초, 보강그라우팅기초(RGF) 등은 인젝션, 그라우팅, 주입공사와 보강재 이용한 기초로서 지반, 지중, 지하, 가면, 법면, 비탈면, 기초, 건물, 교량, 구조물, 시설물, 지하벽, 차수벽, 연약지반, 불량지반, 신축건물, 신축구조물, 오래된 건물, 오래된 구조물 중 하나(9)를 또는 하나의 보강, 개량, 보호, 보수, 지지, 지보, 지탱, 기초, 기초설치 등을 하거나, 등에 이용된다. 이하 본 발명의 청구항에 대하여 설명하고자 한다. The reinforced grouting pile (RGP) of the present invention, the injection body, the injection body, the grouting body, the reinforcement body, the main body file, the injection file, the grouting file, the injection body foundation, the injection foundation, the grouting foundation, Underground, underground, masonry, slope, slope, foundation, building, bridges, etc. are used as foundations of injection, grouting, injection and reinforcement. (9) or one reinforcement, improvement, protection, maintenance, support, support, foundation (9) of a structure, a facility, an underground wall, a water wall, a soft ground, a defective ground, a new building, , A base installation, and the like. Hereinafter, the claims of the present invention will be described.

청구항 1은 a) 드릴, 천공기, 보링기, 굴착기, 비트 구비 로드, 유압식 크롤러드릴, 100∼150kw 용량의 드릴, 천공기, 보링기, 굴착기, 비트 구비 로드, 유압식 크롤러드릴 중 하나 이용 지반 천공 또는 보링공 형성되고, b) 믹서, 배합기, 믹서플랜트, 0.3∼1.0㎥ 용량의 믹서, 배합기, 믹서플랜트 중 하나에 의한 주입재, 인젝션재, 그라우팅재, 이중 하나인 밀크, 몰탈, 약액, 현탁액, 페이스트, 레미콘, 시멘트밀크, 콘크리트 중 하나 재료 혼합 또는 제조되고, c) 압력 펌프 또는 200∼500kg/㎠ 압력의 펌프에 의하여 상기 재료가 가압, 펌핑, 공급 중 하나가 되는 주입공사, 인젝션, 그라우팅, 분사주입공사, 제트주입공사, 제트그라우팅공사, 고압분사주입공사, 저압분사주입공사, 주입공법, 분사주입공법 중 하나에 있어서,Claim 1 is a method of drilling, boring or boring a drill, a perforator, a boring machine, an excavator, a bit load rod, a hydraulic crawler drill, a drill of 100-150 kw capacity, a boring machine, a boring machine, A mixer, a mixer plant, a mixer with a capacity of 0.3 to 1.0 m 3, a mixer, an injection material by one of mixer plants, an injection material, a grouting material, a milk, a mortar, a chemical liquid, a suspension, C) Mixing or manufacturing of materials, such as concrete, concrete, cement milk or concrete, c) injection molding, injection, grouting, injection molding, etc., in which the material is one of pressurized, pumped or fed by a pressure pump or a pump with a pressure of 200 to 500 kg / In one of the construction, jet injection, jet grouting, high pressure injection, low pressure injection, injection, injection injection,

상기 재료 또는 주입재 분사 또는 주입 후, 양생 중, 전, 후 중 하나에, 또는 상기 공급에 의하여 시공 또는 조성되는 상기 주입재 또는 재료의 주입체, 인젝션체, 그라우팅체, 고결체, 고화체, 기둥체 중 하나 대신에, Injecting material, grouting material, solidification material, solid material, or column material of the above-mentioned injection material or material to be constructed or supplied by the above material or injection material injection or after injection, curing, before, Instead of one,

A) a) 직경, 외경, 공칭 직경, 공칭 외경, 하나 직경, 하나 외경, 군 직경, 군 외경 중 하나가 상기 주입공사 보링공, 인젝션공, 그라우팅공 중 하나 직경 또는 내경의 10∼100%, b) 두께가 1∼30mm, c) 강도 또는 극한강도가 250∼3000MPa 중 하나 이상이면서 a) 돌출물, 이의 하나인 핀, 봉, 대, 돌기, 고리, 요철, 막대, 앵카, 볼트, T볼트, Ⅰ볼트, 용접물, 부착물, 스터드볼트, b) 길이 또는 돌출길이가 상기 직경 또는 외경의 1∼90%인 상기 돌출물, c) 마찰력 또는 주면마찰력 증가를 위한 상기 돌출물 중 하나가 부착 또는 용접된 보강재, 이의 하나인 강관, 빔, 철근, 철근망, 케이싱, 중공관, 다중관, 중첩관, 파일, 중공파일, 스크류파일, 철근케이지 중 하나가 a) 매입, 인입, 삽입, 압입, 항타, b) 삽입 또는 압입 후 항타, c) 자중으로 삽입 후 압력, 진동, 충격, 타격, 해머 중 하나로 압입 또는 항타, d) 크레인(110)으로 삽입 후 해머 또는 항타기(110)로 항타, e) 크레인 등(110)으로 삽입 후 바이브레이터(110)로 압입, f) 삽입 또는 압입 후 암반부 또는 상기 보링공 선단부 하향으로 또는 속으로 10∼150cm까지 압입 또는 항타, (이의 이유는 기초의 지지력 또는 선단지지력 등의 증가를 위함 때문임, 이는 도 1 참조), g) 지지력 또는 선단지지력 증가를 위한 상기 압입, 항타, (여기의 매입, 인입, 삽입, 압입, 항타에서 매입, 인입, 삽입 등의 경우에는 암반부 또는 상기 보링공 선단부 등에 상기 보강재가 안착 등이 되고, 그러나 압입, 항타 등의 경우에는 암반부 또는 상기 보링공 선단부 하향으로 또는 속으로 10∼150cm 등까지 압입 또는 항타 등이 되므로 지지력 또는 선단지지력 등이 매입, 인입, 삽입 등에 비하여 증가하게 됨, 이는 도 1 표시 참조), B) 상기 주입재 또는 주입부에 상기 보강재 내지 중첩체 중 하나가 보강, C) 상기 주입재의 고결체와 보강재 내지 중첩체 중 하나의 결합체 형성, D) 상기 보강재가 인입 또는 보강된 주입재 고결체 형성 중 하나가 되어,A) a) one of diameter, outer diameter, nominal diameter, nominal diameter, one diameter, one outer diameter, group diameter, group outer diameter is 10-100% of the diameter or inner diameter of one of the injection molding boring holes, injection holes, grouting holes, b) Thickness of 1 ~ 30mm, c) One or more of strength or ultimate strength of 250 ~ 3000MPa, a) Projection, one of these pins, rods, stands, protrusions, rings, ridges, rods, anchors, bolts, B) the protrusion with a length or protrusion length of 1 to 90% of the diameter or outer diameter, c) a stiffener to which one of the protrusions for increasing frictional force or main surface friction is attached or welded, One of them is a) Steel pipe, beam, reinforcing steel, reinforcing net, casing, hollow pipe, multiple pipe, superstructure pipe, pile, hollow file, screw file, C) After insertion by self weight, pressure, vibration, shock, impact, hammer D) insertion into the crane 110 and hammering with the hammers or the hammers 110; e) insertion into the crane 110 or the like and insertion into the vibrator 110; f) (See Fig. 1), g) to increase the bearing capacity or to increase the bearing capacity of the bearing In the case of embedding, insertion, insertion, insertion, insertion, insertion, etc., in the case of embedding, insertion, insertion, etc., the reinforcement material is seated in the rock part or the tip of the boring ball, The supporting force or the tip supporting force is increased as compared with the case of embedding, pulling-in, and inserting because the pressing or hammering is performed up to 10-150 cm downward or inward of the rocking part or the tip of the boring- (B) reinforcing one of the reinforcing material or the superimposing material on the injection material or the injection part, (C) forming a solidified material of the injection material and one of a reinforcing material or a superimposed material, (D) injecting or reinforcing the reinforcing material, Becoming one of the formation,

조성되는 상기 주입재 또는 재료의 주입체, 인젝션체, 그라우팅체, 고결체, 고화체, 기둥체 중 하나와 보강재의 복합기초인 보강그라우팅파일(RGP : Reinforced Grouting Pile), 이의 하나인 주입체, 인젝션체, 그라우팅체, 보강재체, 주입체파일, 인젝션파일, 그라우팅파일, 주입체기초, 인젝션기초, 그라우팅기초, 현장타설말뚝, 건물기초, 구조물기초, 보강그라우팅기초(RGF : Reinforced Grouting Foundation) 중 하나인 것을 특징으로 하는 인젝션, 그라우팅, 주입공사와 보강재 이용 보강그라우팅파일에 관한 것이다. A reinforcing grouting pile (RGP: Reinforced Grouting Pile), which is a composite material of one of a casting body, an injection body, a grouting body, a solidification body, a solid body, (RGF: Reinforced Grouting Foundation), which is one of the grouting material, reinforcement material, main body file, injection file, grouting file, injection foundation, injection foundation, grouting foundation, The present invention relates to injection, grouting, injection work, and reinforcement grouting using reinforcing materials.

상기를 설명하면 상기 직경, 외경, 공칭 직경, 공칭 외경, 하나 직경, 하나 외경, 군 직경, 군 외경 중에서 공칭은 원형이 아닌 경우 원형으로 환산한 경우의 직경 등이고, 그리고 군 직경, 군 외경에서 군은 2개 이상 군, 2개 이상 고결체, 기둥체, 그라우팅체 등으로 구성된 군의 직경, 외경 등이 해당된다. 그리고 통상 보강재 1개의 길이는 운반트럭, 트레일러 등을 고려하면 약 7m, 8m 정도 등이 된다. 통상 보강재 1개의 길이는 운반트럭, 트레일러 등을 고려하면 약 7m, 8m 정도가 되는데, 기초 설치를 위한 보링공은 40m, 50m 이상이 될 수도 있으므로, 이의 경우에는 2개 이상 보강재를 용접하여 지중에 매입 등을 함, 이의 경우 용접길이는 40m, 50m 이상이 됨, 이의 경우 1개 보강재를 주입공 내에 매입하고, 이의 거치후 상부에 다른 1개 보강재를 용접하여 매입하고, 이의 거치후 상부에 다른 1개 보강재를 용접하여 매입하고 등을 반복하여 실시한다. 상기에서 보강재가 암반부 또는 상기 보링공 선단부 하향으로 또는 속으로 10∼150cm 등까지 압입 또는 항타되는 경우(도 1 표시 참조)에는 용접길이가 상기 100% + 10∼150cm가 된다. 상기에서 두께는 보강재의 두께, 중공형 보강재 또는 강관 보강재의 외피두께 등이 해당된다. In the above description, the diameter, outer diameter, nominal diameter, nominal outer diameter, one diameter, one outer diameter, group diameter, group outer diameter, The diameter, the outer diameter, etc. of the group consisting of two or more groups, two or more groups, columns, grouting bodies, and the like. The length of one reinforcement is usually about 7m and 8m considering the truck and trailer. Normally, the length of one reinforcement is about 7m and 8m considering the truck truck and trailer. The boring hole for the base installation may be 40m or more than 50m. In this case, two or more stiffeners are welded to the underground In this case, one stiffener is embedded in the injection hole, and another stiffener is welded to the top of the stiffener after it is fixed. One stiffener is welded and embedded, and so on. In the above case, when the reinforcing material is press-fitted or moved up to 10 to 150 cm or so in the downward or inward direction of the rock portion or the boring ball (see FIG. 1), the welding length becomes 100% + 10 to 150 cm. In the above, the thickness corresponds to the thickness of the stiffener, the thickness of the hollow stiffener or the shell thickness of the stiffener.

상기 중 둘 이상 복합체, 다중체, 중첩체의 예로는 강관과 이의 내부에 철근망의 복합체, H빔과 철근의 복합체 등이 해당된다. 상기 돌출물(101)은 핀, 봉, 대, 돌기, 고리, 요철, 막대, 앵카, 볼트, T볼트, Ⅰ볼트, 용접물, 부착물, 스터드볼트, 길이(돌출길이, 용접길이, 이 등을 포함한 전체길이 등) 또는 돌출길이(보강재의 외부로 돌출되는 길이 등)가 상기 보강재 등 직경 또는 외경의 1∼90%인 상기 돌출물(101), (이의 예로는 보강재의 직경이 500cm인 경우 이의 1∼90%인 5∼450cm의 길이를 가진 돌출물 등), 마찰력 또는 주면마찰력 (기초, 파일, 기둥 등의 주면, 외부, 외부 마찰력 등, 기초, 파일, 기둥 등의 주면, 외부, 외부와 지반 간의 마찰력 등) 증가를 위한 상기 돌출물 등이 해당된다.Examples of the composite material, the composite material, and the superimposed material include a composite of a steel pipe and a reinforcing net inside thereof, and a composite of H beams and reinforcing bars. The protrusion 101 may be a pin, a rod, a rod, a protrusion, a ring, an unevenness, a rod, an anchor, a bolt, a T bolt, a bolt, a weld, an attachment, a stud bolt, (The length of the reinforcing member protruding to the outside of the stiffener) is 1 to 90% of the diameter or outer diameter of the stiffener, (for example, the diameter of the stiffener is 500 cm, (Such as protrusions having a length of 5 to 450 cm, such as protrusions having a length of 5 to 450 cm), frictional force or main surface friction force (main surface of a foundation, a pile, a column, external or external frictional force, ), And the like.

청구항 1에서 드릴, 천공기, 보링기, 굴착기, 비트 구비 로드, 유압식 크롤러드릴, 100∼150kw 용량의 드릴, 천공기, 보링기, 굴착기, 비트 구비 로드, 유압식 크롤러드릴 등은 지반 천공, 보링, 굴착, 보링공 또는 굴착공 형성 등을 하는 것이고, 여기서 100∼150kw은 상기 장치의 가동 등에 사용되는 전기, 전압, 에너지 등이다. 그리고 믹서, 배합기, 믹서플랜트, 0.3∼1.0㎥ 용량의 믹서, 배합기, 믹서플랜트 등은 주입재, 인젝션재, 그라우팅재, 밀크, 몰탈, 약액, 현탁액, 페이스트, 레미콘, 시멘트밀크, 콘크리트 등의 재료를 교반, 혼합, 제조 등을 하는 것이고, 여기서 0.3∼1.0㎥은 상기 믹서, 배합기, 믹서플랜트, 이중 하나 구비 통, 탱크 등의 크기, 체적, 1회에 또는 연속적으로 가능한 교반, 혼합, 제조 등의 용량 등을 나타낸다. 그리고 압력 펌프, 200∼500kg/㎠ 압력의 펌프는 상기 재료를 가압, 펌핑, 공급 등을 하는 것이다. 이의 공급 재료는 순차적 또는 무순으로 호스, 로드, 주입노즐 등을 통하여 지반에 주입, 분사주입 등이 된다. 여기서 주입노즐은 로드, 이의 모니터 등에 구비 등이 되는 홀, 구멍, 노즐 등이 된다. 그리고 수펌프, 공기압축기, 5∼10㎥/min 용량의 수펌프, 공기압축기 등에 의하여 압축수, 압축공기 중 하나 이상이 상기 로드, 이의 모니터, 이중 하나에 형성된 홀, 구멍 등의 노즐을 통하여 상기 재료 주입 이전에 지반에 분사, 이에 의하여 지반 절삭, 이에 의하여 상기 재료의 주입량, 주입효율, 주입속도 중 하나 이상을 향상시키는 역할을 하게 된다. 여기서 5∼10㎥/min은 수펌프, 공기압축기, 이의 구성 통, 탱크의 규격, 체적 등, 또는 5∼10㎥/min의 압축수, 압축공기 양 등을 나타낸다. The drilling, boring machine, drilling machine, boring machine, excavator, bit load rod, hydraulic crawler drill, drill of 100-150 kw capacity, boring machine, boring machine, excavator, bit load rod, hydraulic crawler drill, Forming a boring hole or a drilling hole, where 100 to 150 kw is electricity, voltage, energy, etc. used for operating the apparatus. The mixer, the mixer, the mixer plant, the mixer, the mixer and the mixer plant having the capacities of 0.3 to 1.0 m 3 are used for the materials such as injection material, injection material, grouting material, milk, mortar, chemical liquid, suspension, paste, remicon, cement milk and concrete Mixing, manufacturing, and the like. Here, 0.3 to 1.0 m < 3 > is a volume of the mixer, a blender, a mixer plant, a single tank, a tank, etc., Capacity and so on. The pressure pump and the pump having the pressure of 200 to 500 kg / cm 2 pressurize, pumped, and supply the material. The feed material may be injected or injected into the ground through a hose, rod, injection nozzle or the like in a sequential or non-sequential manner. Here, the injection nozzle is a hole, a hole, a nozzle, or the like which is provided in a rod, a monitor or the like. At least one of compressed water and compressed air by a water pump, an air compressor, a water pump of 5 to 10 m 3 / min capacity, an air compressor, etc., The material is injected into the ground before the material is injected, thereby cutting the ground, thereby enhancing at least one of the injection amount, the injection efficiency, and the injection speed of the material. Here, 5 to 10 m 3 / min represents the number of compressed water, compressed air, etc., of the water pump, the air compressor, the constituent cylinder of the tank, the size and the volume of the tank, or 5 to 10 m 3 / min.

여기서 상기 a) 내지 i) 중 하나 이상 후에 또는 하나 이상 적용되면서 또는 적용에 있어서 또는 더하여, 또는 상기 중 하나 이상에 의하여 시공 또는 조성되는 상기 주입재 또는 재료의 주입체, 인젝션체, 그라우팅체, 고결체, 고화체, 기둥체 중 하나 외에 또는 대신에 또는 하나에 더하여의 예를 보면 A) 상기 a) 내지 i) 중 말미가 동사에 해당하는 것 중 하나인 주입, 분사주입 등 후에 또는 B) 상기 a) 내지 i) 중 말미가 동사에 해당하는 것 중 하나인 재료, 장치 등이 적용되면서 또는 적용에 있어서 또는 C) 상기 재료, 장치 등에 더하여, 또는 상기 재료, 장치 중 하나 이상에 의하여 시공 또는 조성되는 상기 주입재 또는 재료의 주입체, 인젝션체, 그라우팅체, 고결체, 고화체, 기둥체 중 하나 외에 또는 고화체 대신에 또는 고화체에 더하여 등이 해당된다. Injection bodies, injecting bodies, grouting bodies, consolidating bodies of the above-mentioned injection materials or materials to be constructed or formed by at least one of the above a) to i), or one or more of them, or in application or additionally, A) to i), one of which corresponds to the end of the verb, such as injection, injection or the like, or B) after said a) I) a material, device, etc., which is one of the verbs ending in the end, or in application, or C) in addition to said material, device or the like, Injecting material, injection material, injection material, grouting material, solidification material, solidification material, column material, in addition to solid material or in addition to solid material.

여기서 마찰력, 주면마찰력, 지지력, 선단지지력은 상기 보강재 내지 중첩체, 이중 하나와 인젝션, 그라우팅, 주입공사 등의 고결체, 기둥체, 인젝션체, 그라우팅체, 주입공체 , 상기 중 하나에 의한 파일, 말뚝, 기둥, 지중 등에 형성된 파일, 말뚝, 기둥 등의 마찰력, 주면마찰력, 지지력, 선단지지력 등이 해당된다. Here, the frictional force, the main surface friction force, the supporting force, and the tip end supporting force are selected from the group consisting of the above-mentioned reinforcement or superimposed body, a solidification such as injection, grouting or injection work, a column body, an injection body, a grouting body, Pile, pile, underground, etc .; frictional force of pile, pillar, etc .; frictional force, bearing force, and tip bearing force.

청구항 2는 a) 주입재 등(1)이 지중에 분사, 고결 등이 되어 형성된 주입체, 인젝션체, 그라우팅체 중 하나(90)의 직경 (D) 또는 유효직경(원형이 아닌 경우 원형으로 환산한 경우 등의 직경, D, 통상적으로 인젝션, 그라우팅, 주입공사 등의 설계에서는 또는 목적물은 주입체, 인젝션체, 그라우팅체 등의 직경이 적용됨) 500, 800, 1000, 1200, 1500, 1800, 2000 중 하나 mm에 대한 a) 분사주입시간이 각각 0.5∼1.3 (D 500의 경우), 1.5∼3.6 (D 800의 경우), 2.3∼5.7 (D 1000의 경우), 3.5∼9.0 (D 1200의 경우), 6.5∼13.0 (D 1500의 경우), 8.0∼18.0 (D 1800의 경우), 11∼23.0 (D 2000의 경우) 중 하나 min/m(즉, 분/미터), b) 주입체, 인젝션체, 그라우팅체 중 하나의 직경 또는 유효직경 500, 800, 1000, 1200, 1500, 1800, 2000 중 하나 mm에 대한 평균분사량 또는 단위분사량이 150∼300 L/min 중 하나가 되도록 주입재, 인젝션재, 그라우팅재 중 하나 재료의 주입, 분사주입, 지중주입 중 하나 이상 후에, 또는 하나 이상 적용에 더하여, 또는 상기 중 하나 이상에 의하여 시공 또는 조성되는 상기 주입재 또는 재료의 주입체, 인젝션체, 그라우팅체, 고결체, 고화체, 기둥체 중 하나 대신에, Claim 2 is a method for controlling a diameter (D) or an effective diameter (of a circular shape) of one of a main body, an injection body and a grouting body formed by spraying, solidification or the like of an injection material (1) Injection molding, injection molding, injection molding, grouting, etc. are applied in the design of injection, grouting, injection work, etc.) or 500, 800, 1000, 1200, 1500, 1800, 2000 (In case of D 1200), 1.5 to 3.6 (in case of D 800), 2.3 to 5.7 (in case of D 1000), 3.5 to 9.0 (in case of D 1200) , One min / m (i.e., minutes / meter) of 6.5 to 13.0 (for D 1500), 8.0 to 18.0 for D 1800 and 11 to 23.0 for D 2000, b) The average injection quantity or the unit injection quantity for one of the diameters of the grouting bodies or one of the effective diameters 500, 800, 1000, 1200, 1500, 1800, 2000 is 150-300 L / min. Injection material or grouting of the injection material or material which is to be applied or formed by at least one of injection, injection injection, underground injection, in addition to one or more applications of one of the sealant, grouting material Instead of one of the sieve, solidified body, solidified body and column body,

A) 상기 주입재 또는 재료 분사 또는 주입 후, 양생 중, 전, 후 중 하나에 a) 보강재, 이의 하나인 강관, 빔, 철근, 철근망, 케이싱, 중공관, 다중관, 중첩관, 파일, 중공파일, 스크류파일, 철근케이지, b) 이외 직경, 외경, 공칭 직경, 공칭 외경, 하나 직경, 하나 외경, 군 직경, 군 외경 중 하나가 상기 주입공사 보링공, 인젝션공, 그라우팅공 중 하나 직경 또는 내경의 10∼100%, 두께가 1∼30mm, 강도 또는 극한강도가 250∼3000MPa 중 하나 이상인 상기 보강재, c) 또는 돌출물, 이의 하나인 핀, 봉, 대, 돌기, 고리, 요철, 막대, 앵카, 볼트, T볼트, Ⅰ볼트, 용접물, 부착물, 스터드볼트, 길이 또는 돌출길이가 상기 직경 또는 외경의 1∼90%인 상기 돌출물, 마찰력 또는 주면마찰력 증가를 위한 상기 돌출물 중 하나가 부착 또는 용접된 상기 보강재 내지 철근케이지 중 하나가 a) 매입, 인입, 삽입, 압입, 항타, b) 삽입 또는 압입 후 항타, c) 자중으로 삽입 후 압력, 진동, 충격, 타격, 해머 중 하나로 압입 또는 항타, d) 크레인으로 삽입 후 해머 또는 항타기로 항타, e) 크레인으로 삽입 후 바이브레이터로 압입, f) 삽입 또는 압입 후 암반부 또는 상기 보링공 선단부 하향으로 또는 속으로 10∼150cm까지 압입 또는 항타, g) 지지력 또는 선단지지력 증가를 위한 상기 압입, 항타, A) One or more of: a) steel, beam, reinforcing bar, reinforcing net, casing, hollow tube, multiple tube, superstructure tube, pile, hollow tube One of diameter, outer diameter, nominal diameter, nominal diameter, one diameter, one outer diameter, group diameter, group outer diameter of the injection molding boring ball, injection hole, grouting ball, The reinforcing material having an inner diameter of 10 to 100%, a thickness of 1 to 30 mm, and a strength or an ultimate strength of 250 to 3000 MPa, c) or the projecting material, the pin, the rod, the stand, the projection, the ring, , The bolt, the T-bolt, the I bolt, the weld, the attachment, the stud bolt, the protrusion having a length or protrusion length of 1 to 90% of the diameter or outer diameter, the protrusion for increasing frictional force or main surface friction, One of the stiffener to the reinforcing cage b) insertion or indentation after indentation; c) indentation or hammering into one of pressure, vibration, impact, striking, or hammer after insertion with self weight; d) hammer or anti- E) insertion into a crane and press fitting with a vibrator, f) press-in or hitching to a depth of 10 to 150 cm downward or inward into the rock portion or the forward end of the boring ball after insertion or press-fitting, g) , Horseshoe,

B) 상기 주입재 또는 주입부에 상기 보강재 내지 철근케이지 중 하나가 보강, C) 상기 주입재의 고결체와 보강재 내지 철근케이지 중 하나의 결합체 형성, D) 상기 보강재가 인입 또는 보강된 주입재 고결체 형성, E) 상기 중 하나가 되는 또는 상기 주입과 매입 내지 항타 중 하나가 되는 주입공사, 인젝션, 그라우팅, 분사주입공사, 제트주입공사, 제트그라우팅공사, 고압분사주입공사, 저압분사주입공사, 주입공법, 분사주입공법 중 하나에 의하여, B) reinforcing one of the reinforcing material or the reinforcing cage to the injection material or the injection part, C) forming a solidified body of the injection material and one of a reinforcing material and a reinforcing cage, D) forming a reinforcement material, E) Injection work, injection, grouting, injection injection work, jet injection work, jet grouting work, high pressure injection work, low pressure injection work, injection work, By one of the injection injection techniques,

조성되는 고결체와 보강재의 복합기초인 보강그라우팅파일(RGP), 이의 하나인 주입체, 인젝션체, 그라우팅체, 보강재체, 주입체파일, 인젝션파일, 그라우팅파일, 주입체기초, 인젝션기초, 그라우팅기초, 현장타설말뚝, 건물기초, 구조물기초, 고결체와 보강재의 복합기초, 보강그라우팅기초(RGF) 중 하나인 것을 특징으로 하는 인젝션, 그라우팅, 주입공사와 보강재 이용 보강그라우팅파일에 관한 것이다. A reinforcement grouting pile (RGP) which is a composite machine of a high consolidation material and a reinforcement material to be formed; an injection body, an injection body, a grouting body, a reinforcement body, a main body file, an injection file, a grouting file, a main body foundation, an injection base, Grouting, injection work and reinforcement grouting using reinforcing material, characterized in that the reinforcing grouting pile is one of a ground drilling pile, a building foundation, a structure foundation, a composite foundation of solidification and reinforcement, and a reinforced grouting foundation (RGF).

청구항 3은 지층별 천공시간 또는 천공속도가 점성토 또는 이의 지반에서 3.5 min/m, 사질토 또는 이의 지반에서 5.0 min/m, 자갈 또는 이의 지반에서 9.0 min/m, 전석 또는 호박돌 또는 이의 지반에서 11.0 min/m 중 하나로 천공되고, 상기 천공부에 주입수단 또는 노즐 구비 로드가 인입되어 주입재, 인젝션재, 그라우팅재 중 하나 재료가 주입, 분사주입, 지중주입 중 하나 이상이 된 후에, 또는 하나 이상 적용되면서, 또는 상기 중 하나 이상에 의하여 시공 또는 조성되는 상기 주입재 또는 재료의 주입체, 인젝션체, 그라우팅체, 고결체, 고화체, 기둥체 중 하나 대신에,In claim 3, the perforation time or perforation rate of the stratum is 3.5 min / m at the clayey soil or the ground, 5.0 min / m at the sandy soil or soil, 9.0 min / m at the gravel or soil, 11.0 min / m, and the injection means or the nozzle-equipped rod is drawn into the perforation so that one of the injection material, the injection material, and the grouting material is injected, injected, or grounded, Injecting material, grouting material, solidification material, solid material, and columnar material of the above-mentioned injection material or material to be constructed or formed by at least one of the above-

A) 상기 주입재 또는 재료 분사 또는 주입 후, 양생 중, 전, 후 중 하나에 a) 보강재, 이의 하나인 강관, 빔, 철근, 철근망, 케이싱, 중공관, 다중관, 중첩관, 파일, 중공파일, 스크류파일, 철근케이지, b) 이외 직경, 외경, 공칭 직경, 공칭 외경, 하나 직경, 하나 외경, 군 직경, 군 외경 중 하나가 상기 주입공사 보링공, 인젝션공, 그라우팅공 중 하나 직경 또는 내경의 10∼100%, 두께가 1∼30mm, 강도 또는 극한강도가 250∼3000MPa 중 하나 이상인 상기 보강재, c) 상기 중 둘 이상 복합체, 다중체, 중첩체, d) 또는 돌출물, 이의 하나인 핀, 봉, 대, 돌기, 고리, 요철, 막대, 앵카, 볼트, T볼트, Ⅰ볼트, 용접물, 부착물, 스터드볼트, 길이 또는 돌출길이가 상기 직경 또는 외경의 1∼90%인 상기 돌출물, 마찰력 또는 주면마찰력 증가를 위한 상기 돌출물 중 하나가 부착 또는 용접된 상기 보강재 내지 중첩체 중 하나가 a) 매입, 인입, 삽입, 압입, 항타, b) 삽입 또는 압입 후 항타, c) 자중으로 삽입 후 압력, 진동, 충격, 타격, 해머 중 하나로 압입 또는 항타, d) 크레인으로 삽입 후 해머 또는 항타기로 항타, e) 크레인으로 삽입 후 바이브레이터로 압입, f) 삽입 또는 압입 후 암반부 또는 상기 보링공 선단부 하향으로 또는 속으로 10∼150cm까지 압입 또는 항타, g) 지지력 또는 선단지지력 증가를 위한 상기 압입, 항타, B) 상기 주입재 또는 주입부에 상기 보강재 내지 중첩체 중 하나가 보강, C) 상기 주입재의 고결체와 보강재 내지 중첩체 중 하나의 결합체 형성, D) 상기 보강재가 인입 또는 보강된 주입재 고결체 형성, E) 상기 중 하나가 되는 또는 상기 주입과 매입 내지 항타 중 하나가 되는 주입공사, 인젝션, 그라우팅, 분사주입공사, 제트주입공사, 제트그라우팅공사, 고압분사주입공사, 저압분사주입공사, 주입공법, 분사주입공법 중 하나에 의하여, A) One or more of: a) steel, beam, reinforcing bar, reinforcing net, casing, hollow tube, multiple tube, superstructure tube, pile, hollow tube One of diameter, outer diameter, nominal diameter, nominal diameter, one diameter, one outer diameter, group diameter, group outer diameter of the injection molding boring ball, injection hole, grouting ball, A reinforcing material having an inner diameter of 10 to 100%, a thickness of 1 to 30 mm and a strength or an extreme strength of 250 to 3000 MPa, c) a composite material of two or more of the above, a composite material, a superimposed material, d) A bolt, a weld, an attachment, a stud bolt, a projection or a projection having a length or protrusion length of 1 to 90% of the diameter or outer diameter, One of the projections for increasing the frictional force on the main surface is attached or welded B) insertion or indentation after indentation; c) indentation or insertion into one of pressure, vibration, impact, impact or hammer after insertion by self weight; d) Insert into crane and hammers or hammers; e) Insert into crane and press into vibrator; f) Insert or press into the rock or part of the boring ball downwards or inwards to 10-150cm, g) (B) reinforcing one of the reinforcing material or the superimposed material to the injection material or the injection part, (C) forming a solidified material of the reinforcing material or the superimposed material, (D) E) Injection, injection, grouting, injection injection, injection molding, injection molding, injection molding, injection molding, injection molding, Jet injection work, jet grouting work, high pressure injection work, low pressure injection work, injection work, injection injection work,

조성되는 고결체와 보강재의 복합기초인 보강그라우팅파일(RGP), 이의 하나인 주입체, 인젝션체, 그라우팅체, 보강재체, 주입체파일, 인젝션파일, 그라우팅파일, 주입체기초, 인젝션기초, 그라우팅기초, 현장타설말뚝, 건물기초, 구조물기초, 고결체와 보강재의 복합기초, 보강그라우팅기초(RGF) 중 하나인 것을 특징으로 하는 인젝션, 그라우팅, 주입공사와 보강재 이용 보강그라우팅파일에 관한 것이다. A reinforcement grouting pile (RGP) which is a composite machine of a high consolidation material and a reinforcement material to be formed; an injection body, an injection body, a grouting body, a reinforcement body, a main body file, an injection file, a grouting file, a main body foundation, an injection base, Grouting, injection work and reinforcement grouting using reinforcing material, characterized in that the reinforcing grouting pile is one of a ground drilling pile, a building foundation, a structure foundation, a composite foundation of solidification and reinforcement, and a reinforced grouting foundation (RGF).

여기서 재료가 주입, 분사주입, 지중주입 중 하나 이상이 된 후에 또는 하나 이상 적용되면서 또는 적용됨에 있어서 또는 더하여, 또는 상기 중 하나 이상에 의하여 시공 또는 조성되는 상기 주입재 또는 재료의 주입체, 인젝션체, 그라우팅체, 고결체, 고화체, 기둥체 중 하나 외에 또는 대신에 또는 하나에 더하여의 실시 예를 보면, 재료가 주입된 후에 또는 재료 주입이 적용되면서 또는 재료 주입이 적용됨에 있어서 또는 재료 주입에 더하여, 또는 상기 주입, 분사주입, 지중주입 중 하나 이상에 의하여 시공 또는 조성되는 기둥체 외에 또는 기둥체 대신에 또는 기둥체 에 더하여 등이 해당된다. Wherein the material is injected, injected, ground, or after one or more of the application, addition, or in addition to, or additionally of, In addition to, or instead of, or in addition to one of the grouting bodies, solidification bodies, solid bodies, and columns, it can be seen that, in addition to the material being injected, or material injection being applied, or material injection being applied, Or in addition to, or in addition to, a column body constructed or prepared by one or more of injection, injection injection, and underground injection.

A) 상기 주입재 또는 재료 분사 또는 주입 후, 양생 중, 전, 후 중 하나에 a) 보강재, 이의 하나인 강관, 빔, 철근, 철근망, 케이싱, 중공관, 다중관, 중첩관, 파일, 중공파일, 스크류파일, 철근케이지, b) 이외 직경, 외경, 공칭 직경, 공칭 외경, 하나 직경, 하나 외경, 군 직경, 군 외경 중 하나가 상기 주입공사 보링공, 인젝션공, 그라우팅공 중 하나 직경 또는 내경의 10∼100%, 길이 또는 용접길이가 상기 보링공, 인젝션공, 그라우팅공 중 하나 길이의 10∼100%, 두께가 1∼30mm, 강도 또는 극한강도가 250∼3000MPa 중 하나 이상인 상기 보강재, c) 상기 중 둘 이상 복합체, 다중체, 중첩체, d) 또는 돌출물(101), 이의 하나인 핀, 봉, 대, 돌기, 고리, 요철, 막대, 앵카, 볼트, T볼트, Ⅰ볼트, 용접물, 부착물, 스터드볼트, 길이 또는 돌출길이가 상기 직경 또는 외경의 1∼90%인 상기 돌출물, 마찰력 또는 주면마찰력 증가를 위한 상기 돌출물 중 하나가 부착 또는 용접된 상기 보강재 내지 중첩체 중 하나(100)가 a) 매입, 인입, 삽입, 압입, 항타, b) 삽입 또는 압입 후 항타, c) 자중으로 삽입 후 압력, 진동, 충격, 타격, 해머 중 하나로 압입 또는 항타, d) 크레인(110)으로 삽입 후 해머 또는 항타기(110)로 항타, e) 크레인으로 삽입 후 바이브레이터로 압입, f) 삽입 또는 압입 후 암반부 또는 상기 보링공 선단부 하향으로 또는 속으로 10∼150cm까지 압입 또는 항타, g) 지지력 또는 선단지지력 증가를 위한 상기 압입, 항타, B) 상기 주입재 또는 주입부에 상기 보강재 내지 중첩체 중 하나가 보강, C) 상기 주입재의 고결체와 보강재 내지 중첩체 중 하나의 결합체 형성, D) 상기 보강재가 인입 또는 보강된 주입재 고결체 형성, E) 상기 중 하나가 되는 또는 상기 주입과 매입 내지 항타 중 하나가 되는 주입공사, 인젝션, 그라우팅, 분사주입공사, 제트주입공사, 제트그라우팅공사, 고압분사주입공사, 저압분사주입공사, 주입공법, 분사주입공법 중 하나에 의하여, 시공 또는 조성되는 보강그라우팅파일(RGP), 이의 하나인 주입체, 인젝션체, 그라우팅체, 보강재체, 주입체파일, 인젝션파일, 그라우팅파일, 주입체기초, 인젝션기초, 그라우팅기초, 현장타설말뚝, 건물기초, 구조물기초, 고결체와 보강재의 복합기초, 보강그라우팅기초(RGF) 중 하나인 것을 특징으로 하는 인젝션, 그라우팅, 주입공사와 보강재 이용 보강그라우팅파일에 관한 것이다. A) One or more of: a) steel, beam, reinforcing bar, reinforcing net, casing, hollow tube, multiple tube, superstructure tube, pile, hollow tube One of diameter, outer diameter, nominal diameter, nominal diameter, one diameter, one outer diameter, group diameter, group outer diameter of the injection molding boring ball, injection hole, grouting ball, Wherein said reinforcing material is at least one of a boring hole, an injection hole, a grouting hole having a length of 10 to 100%, a thickness of 1 to 30 mm and a strength or an ultimate strength of 250 to 3000 MPa, c) One or more of two or more of the above complexes, multiple bodies, overlaps, d) or projections 101, one of the pins, rods, rods, projections, rings, ridges, rods, anchors, bolts, T-bolts, , Attachment, stud bolt, length or projecting length of 1 to 90% of the diameter or outer diameter One of said stiffener or superstructure to which one of said projections for attaching or welding to a projection, a frictional force or a frictional force for increasing the frictional force of a main body is a) embed, pull, insert, press fit, hinge, b) D) Insert into crane (110) and hammers with hammers or hammers (110); (e) Insert into crane and press into vibrator; (f) G) insertion or hammering to increase the bearing capacity or end bearing capacity, B) reinforcement or overlapping of the injection material or injection part to the reinforcement material or injection part C) reinforcement of the injection material and formation of one of a reinforcing material or a superimposed material, D) formation of a reinforcing material into which the reinforcing material is introduced or reinforced, E) one of the above Or by one of injection, injection, grouting, injection injection, jet injection, jet grouting, high pressure injection, low pressure injection, injection, injection injection, A reinforcement grouting file (RGP) to be installed or formed, a main body, an injection body, a grouting body, a reinforcement body, a main body file, an injection file, a grouting file, a main body foundation, an injection foundation, a grouting foundation, Grouting, injection work and reinforcement grouting using reinforcing material, characterized in that the reinforcing grouting base is one of a foundation, a foundation, a composite foundation of a solidification and a reinforcement, and a reinforced grouting foundation (RGF).

청구항 4는 A) T1 : 천공시간 = (∑(L1 × t1) + t2) / f1, 상기 L1 : 지층별 천공길이, t1 : 지층별 천공시간, t2 : 로드연결시간 = 3 min (개소당), 상기 로드연결은 천공시 시행되며 천공 중 로드연결이 필요한 경우에 적용, f1 : 작업계수 = 0.8, B) T2 : 분사주입시간 = (∑(L2 × t3) + t4) / f2, 상기 L2 : 유효직경별 분사주입 길이, t3 : 유효직경별 분사주입시간 = 주입체, 인젝션체, 그라우팅체 중 하나의 유효직경 500, 800, 1000, 1200, 1500, 1800, 2000 중 하나 mm에 대하여 각각 0.5∼1.3, 1.5∼3.6, 2.3∼5.7, 3.5∼9.0, 6.5∼13.0, 8.0∼18.0, 11∼23.0 중 하나 min/m(이는 분/미터), t4 : 로드분해시간 = 3 min (개소당), 상기 로드분해는 로드 인발시 시행되며 로드인발 중 로드분해가 필요한 경우에 적용, f2 : 작업계수 = 0.8 중 하나 이상이 적용되어 작업소요시간이 T = T1 + T2로 산정되는 또는 소요되는 주입공사, 이의 하나인 인젝션, 그라우팅, 분사주입공사, 제트주입공사, 제트그라우팅공사, 고압분사주입공사, 저압분사주입공사 중 하나에 있어서, T1 is the perforation time per stratum; t2 is the length of the strand connection time = 3 min (per site); T2 = injection injection time = (Σ (L2 × t3) + t4) / f2, where L2 is the injection time of the injector, Injected injection length per effective diameter = 0.5 to 800 mm for one mm of effective diameter 500, 800, 1000, 1200, 1500, 1800, 2000 of one of the injection molding body, injection body and grouting body, (Min / m), t4: rod decomposition time = 3 min (per site), and 1 / min The load disassembly is performed when the rod is pulled out and the rod disassembly is necessary during the pulling out of the load. F2: When one or more of the work coefficient = 0.8 is applied and the working time is calculated as T = T1 + T2, In one of these, injection, grouting, injection injection, jet injection, jet grouting, high pressure injection, low pressure injection,

주입재, 인젝션재, 그라우팅재 중 하나 재료가 주입, 분사주입, 지중주입 중 하나 적용에 더하여, 또는 상기 중 하나 이상에 의하여 시공 또는 조성되는 상기 주입재 또는 재료의 주입체, 인젝션체, 그라우팅체, 고결체, 고화체, 기둥체 중 하나 외에, Injection material, injection material, grouting material, grouting material, injection material, injection material, grouting material, injection material, injecting material, underground material injection, In addition to one of solidification, solidification, and columnar structure,

A) 상기 주입재 또는 재료 분사 또는 주입 후, 양생 중, 전, 후 중 하나에 a) 보강재, 이의 하나인 강관, 빔, 철근, 철근망, 케이싱, 중공관, 다중관, 중첩관, 파일, 중공파일, 스크류파일, 철근케이지, b) 이외 직경, 외경, 공칭 직경, 공칭 외경, 하나 직경, 하나 외경, 군 직경, 군 외경 중 하나가 상기 주입공사 보링공, 인젝션공, 그라우팅공 중 하나 직경 또는 내경의 10∼100%, 두께가 1∼30mm, 강도 또는 극한강도가 250∼3000MPa 중 하나 이상인 상기 보강재, c) 상기 중 둘 이상 복합체, 다중체, 중첩체, d) 또는 돌출물, 이의 하나인 핀, 봉, 대, 돌기, 고리, 요철, 막대, 앵카, 볼트, T볼트, Ⅰ볼트, 용접물, 부착물, 스터드볼트, 길이 또는 돌출길이가 상기 직경 또는 외경의 1∼90%인 상기 돌출물, 마찰력 또는 주면마찰력 증가를 위한 상기 돌출물 중 하나가 부착 또는 용접된 상기 보강재 내지 중첩체 중 하나가 a) 매입, 인입, 삽입, 압입, 항타, b) 삽입 또는 압입 후 항타, c) 자중으로 삽입 후 압력, 진동, 충격, 타격, 해머 중 하나로 압입 또는 항타, d) 크레인으로 삽입 후 해머 또는 항타기로 항타, e) 크레인으로 삽입 후 바이브레이터로 압입, f) 삽입 또는 압입 후 암반부 또는 상기 보링공 선단부 하향으로 또는 속으로 10∼150cm까지 압입 또는 항타, g) 지지력 또는 선단지지력 증가를 위한 상기 압입, 항타, B) 상기 주입재 또는 주입부에 상기 보강재 내지 중첩체 중 하나가 보강, C) 상기 주입재의 고결체와 보강재 내지 중첩체 중 하나의 결합체 형성, D) 상기 보강재가 인입 또는 보강된 주입재 고결체 형성 중 하나 이상에 의하여,A) One or more of: a) steel, beam, reinforcing bar, reinforcing net, casing, hollow tube, multiple tube, superstructure tube, pile, hollow tube One of diameter, outer diameter, nominal diameter, nominal diameter, one diameter, one outer diameter, group diameter, group outer diameter of the injection molding boring ball, injection hole, grouting ball, A reinforcing material having an inner diameter of 10 to 100%, a thickness of 1 to 30 mm and a strength or an extreme strength of 250 to 3000 MPa, c) a composite material of two or more of the above, a composite material, a superimposed material, d) A bolt, a weld, an attachment, a stud bolt, a projection or a projection having a length or protrusion length of 1 to 90% of the diameter or outer diameter, One of the projections for increasing the frictional force on the main surface is attached or welded B) insertion or indentation after indentation; c) indentation or insertion into one of pressure, vibration, impact, impact or hammer after insertion by self weight; d) Insert into crane and hammers or hammers; e) Insert into crane and press into vibrator; f) Insert or press into the rock or part of the boring ball downwards or inwards to 10-150cm, g) (B) reinforcing one of the reinforcing material or the superimposed material to the injection material or the injection part, (C) forming a solidified material of the reinforcing material or the superimposed material, (D) The reinforcement material may be formed by at least one of the drawn or reinforced injection material consolidation formation,

조성되는 고결체와 보강재의 복합기초인 보강그라우팅파일(RGP), 이의 하나인 주입체, 인젝션체, 그라우팅체, 보강재체, 주입체파일, 인젝션파일, 그라우팅파일, 주입체기초, 인젝션기초, 그라우팅기초, 현장타설말뚝, 건물기초, 구조물기초, 고결체와 보강재의 복합기초, 보강그라우팅기초(RGF) 중 하나인 것을 특징으로 하는 인젝션, 그라우팅, 주입공사와 보강재 이용 보강그라우팅파일에 관한 것이다. A reinforcement grouting pile (RGP) which is a composite machine of a high consolidation material and a reinforcement material to be formed; an injection body, an injection body, a grouting body, a reinforcement body, a main body file, an injection file, a grouting file, a main body foundation, an injection base, Grouting, injection work and reinforcement grouting using reinforcing material, characterized in that the reinforcing grouting pile is one of a ground drilling pile, a building foundation, a structure foundation, a composite foundation of solidification and reinforcement, and a reinforced grouting foundation (RGF).

여기서 작업소요시간 T = T1 + T2의 산정 예를 보면, A) L1 : 지층별 천공길이 2m(미터), t1 : 지층별 천공시간 10min, t2 : 로드연결시간 = 3 min (개소당), f1 : 작업계수 = 0.8인 조건에 대하여 T1 : 천공시간 = (∑(L1 × t1) + t2) / f1 = ((2×10)+3)/0.8 = 28.75min, B) L2 : 유효직경별 분사주입 길이 0.8m(미터), t3 : 유효직경별 분사주입시간 = 5.7min/m, t4 : 로드분해시간 = 3 min (개소당), f2 : 작업계수 = 0.8인 조건에 대하여 T2 : 분사주입시간 = (∑(L2 × t3) + t4) / f2 = ((0.8×5.7)+3)/0.8 = 9.45min, C) 따라서 작업소요시간 T = T1 + T2 = 38.2min = 38.2분 등이 해당된다. In this example, L1: perforation length of 2 m (meters) per stratum, t1: puncture time per stratum of 10 min, t2: load connection time = 3 min (per site), f1 : For the condition that the work coefficient = 0.8, T1: puncture time = (Σ (L1 × t1) + t2) / f1 = ((2 × 10) +3) /0.8 = 28.75 min, B) L2: T3: load injection time per effective diameter = 5.7 min / m, t4: load decomposition time = 3 min (per site), f2: operation condition = 0.8 T2: injection injection time (C), the time required for the operation is T = T1 + T2 = 38.2 min = 38.2 minutes, and so on. .

본 고안에서 인젝션, 그라우팅, 주입공사는 지반, 지중, 지하, 사면, 법면, 비탈면, 건물, 교량, 구조물, 시설물, 지하벽, 차수벽, 연약지반, 불량지반 중 하나(5)를 보강, 개량, 보호, 보수, 지지, 지보, 지탱, 기초설치 등을 위하여 시행 등이 된다. 여기서 필요시 상기 재료의 분사 또는 주입 전에 펌프(15, 16)에 의하여 공급되는 압축수(2), 압축공기(3) 중 하나 이상이 로드, 이의 모니터, 이의 선단 비트 중 하나 이상에 구비된 노즐 또는 1단, 2단, 다단 중 하나로 구비된 노즐을 통하여 수평, 수직, 경사, 상향, 하향 중 하나 이상으로 주입, 분사되어 지반절삭이 되면 상기 재료의 주입, 분사 량, 효율 등이 향상되는 특징이 있다. Injection, grouting, and injection works in this design are designed to reinforce, improve, or improve one of ground, underground, slope, slope, slope, building, bridge, structure, facility, underground wall, water wall, soft ground, Protection, maintenance, support, support, support, and basic installation. Wherein at least one of the compressed water (2), compressed air (3) supplied by the pump (15, 16) before injection or injection of the material if necessary is supplied to at least one of the rod, Or injected into at least one of horizontal, vertical, oblique, upward, and downward through nozzles provided in one of the first, second, and multi-stages to improve the injection, injection amount, and efficiency of the material when the ground is cut .

본 고안에서 주입재, 인젝션재, 그라우팅재, 이중 하나인 밀크, 몰탈, 약액, 현탁액, 페이스트, 레미콘, 콘크리트, 시멘트밀크, 시멘트몰탈, 시멘트페이스트, 시멘트콘크리트, 섬유 또는 화이버 함유 상기 재료, 또는 압축수, 압축공기 등의 주입, 분사 압력은 10㎏/㎠ 이하의 저압, 100㎏/㎠ 이상의 고압, 이둘 사이의 중압, 이외 자유압, 200∼600㎏/㎠압력 등이 해당된다. In the present invention, it is possible to use the filling material, the injection material, the grouting material, and the double material such as milk, mortar, chemical solution, suspension, paste, remicon, concrete, cement milk, cement mortar, cement paste, cement concrete, Injection of compressed air, injection pressure, low pressure of not more than 10 kg / cm 2, high pressure of not less than 100 kg / cm 2, intermediate pressure of two, free pressure of not less than 200 to 600 kg / cm 2.

청구항 5는 a) 저장고(11), 호퍼(12), 배합기(13), 펌프(14, 15, 16), 호스(17), 스위벨(18), 로드(22), 모니터(26), 비트(27), 이중 하나 이상에 형성된 노즐(30, 31, 32) 중 하나 이상이 순차적 또는 무순으로 구성되고, b) 상기 저장고(11)에는 인젝션, 그라우팅, 주입공사 중 하나 원료가 저장되고, c) 상기 호퍼(12)에 상기 또는 다른 원료가 투입되어 배합기로 유입되고, d) 상기 배합기(13)는 상기 원료를 배합하여 인젝션, 그라우팅, 주입공사 중 하나 주입재 또는 재료를 제조하고, e) 상기 펌프(14, 15, 16)에 의하여 주입재(1), 압축수(2), 압축공기(3) 중 하나 이상이 펌핑, 가압, 공급, 또는 10㎏/㎠ 이하의 저압, 100㎏/㎠ 이상의 고압, 이둘 사이의 중압, 이외 자유압, 200∼600㎏/㎠압, 10ℓ/min 이하의 소량, 100ℓ/min 이상의 대량, 이 둘 사이의 중량, 이외 자유량, 50∼300ℓ/min 중 하나 이상으로 펌핑, 가압, 공급 중 하나가 되고, f) 상기 로드(22)는 단관, 2중관, 3중관, 다중관, 중공관, 내관(23)과 외관(24)이 구비된 2중관, 내관(23)과 중관(24)과 외관(25)이 구비된 3중관 중 하나이고, g) 상기 로드(22)는 지중(5)에서 관입, 정지, 인발 중 하나 이상이 되고, h) 상기 내관(23)으로 주입재, 2중관의 외관(24)으로 압축수 또는 압축공기, 3중관의 중관(24)으로 압축수, 외관(25)으로 압축공기 중 하나 이상이 공급 또는 유입되고, i) 상기 스위벨(18)에 주입재, 압축수, 압축공기 중 하나 이상 유입구, 유입수단, 이의 하나인 호스, 파이프(17, 19, 20), 상기 로드 회전수단, 이의 하나인 회전모터, 이에 연결된 톱니, 벨트 중 하나 이상이 구비되고, j) 상기 노즐은 노즐, 주입재노즐(30, 31), 압축수노즐(32), 압축공기노즐(32), 압축수압축공기노즐(32), 측면노즐, 선단노즐, 수평노즐, 수직노즐, 경사노즐, 상향노즐, 하향노즐, 1∼90도방향노즐 중 하나 이상인 장치(10)에 의하여 상기 주입재 또는 재료가 지중에 분사 또는 주입되어 지중에 또는 상기 주입재 또는 재료의 주입체, 인젝션체, 그라우팅체, 고결체, 고화체, 기둥체 중 하나(90)가 형성되는 인젝션, 그라우팅, 주입공사 중 하나에 있어서, Claim 5 is directed to a process for the production of a gas mixture comprising a) a reservoir 11, a hopper 12, a blender 13, pumps 14,15,16, a hose 17, a swivel 18, a rod 22, a monitor 26, Wherein at least one of the nozzles (30, 31, 32) formed in one or more of the nozzles (27, 27) is configured in a sequential or non-sequential manner; b) The mixing unit 13 mixes the raw materials to produce an injection material or a material during injection, grouting, or injection work, and e) the raw material is mixed with the raw material, At least one of the injection material 1, the compressed water 2 and the compressed air 3 is pumped, pressurized, supplied, or discharged at a low pressure of 10 kg / cm 2 or less, 100 kg / A small amount of not more than 10 l / min, a large amount of not less than 100 l / min, a weight between the two, and a free amount other than 50 to 300 L / min. F) the rod 22 is a double pipe having a single pipe, a double pipe, a triple pipe, a multi pipe, a hollow pipe, an inner pipe 23 and an outer pipe 24, G) the rod (22) is at least one of intrusion, stop and drawing in the ground (5), and h) the inner pipe (24) 23) is supplied with or introduced into the outer pipe (24) of the double pipe as compressed water or compressed air, the middle pipe (24) of the triple pipe as compressed water and the compressed air as the outer pipe (25) (17, 19, 20), a rotary motor as one of the rotary motors, teeth, and belts connected thereto, at least one of the inlet, the inlet, the inlet, the inlet, J) the nozzle comprises a nozzle, filler nozzles 30 and 31, a compressed water nozzle 32, a compressed air nozzle 32, a compressed water compressed air nozzle 32, a side nozzle, a tip nozzle, Number The injection material or material is injected or injected into the ground by an apparatus 10 that is at least one of a nozzle, a vertical nozzle, an inclined nozzle, an upward nozzle, a downward nozzle, and a 1-90 degree directional nozzle, , Injection, grouting, and injection work in which one of the injection body, the grouting body, the solidified body, the solid body, and the column body is formed,

A) 상기 주입재 또는 재료 분사 또는 주입 후, 양생 중, 전, 후 중 하나에 a) 직경, 외경, 공칭 직경, 공칭 외경, 하나 직경, 하나 외경, 군 직경, 군 외경 중 하나가 상기 주입공사 보링공, 인젝션공, 그라우팅공 중 하나 직경 또는 내경의 10∼100%, 두께가 1∼30mm, 강도 또는 극한강도가 250∼3000MPa 중 하나 이상이면서 b) 돌출물, 이의 하나인 핀, 봉, 대, 돌기, 고리, 요철, 막대, 앵카, 볼트, T볼트, Ⅰ볼트, 용접물, 부착물, 스터드볼트, 길이 또는 돌출길이가 상기 직경 또는 외경의 1∼90%인 상기 돌출물, 마찰력 또는 주면마찰력 증가를 위한 상기 돌출물 중 하나가 부착 또는 용접된 보강재, 이의 하나인 강관, 빔, 철근, 철근망, 케이싱, 중공관, 다중관, 중첩관, 파일, 중공파일, 스크류파일, 철근케이지 중 하나가 a) 매입, 인입, 삽입, 압입, 항타, b) 삽입 또는 압입 후 항타, c) 자중으로 삽입 후 압력, 진동, 충격, 타격, 해머 중 하나로 압입 또는 항타, d) 크레인으로 삽입 후 해머 또는 항타기로 항타, e) 크레인으로 삽입 후 바이브레이터로 압입, f) 삽입 또는 압입 후 암반부 또는 상기 보링공 선단부 하향으로 또는 속으로 10∼150cm까지 압입 또는 항타, g) 지지력 또는 선단지지력 증가를 위한 상기 압입, 항타, B) 상기 주입재 또는 주입부에 상기 보강재 내지 중첩체 중 하나가 보강, C) 상기 주입재의 고결체와 보강재 내지 중첩체 중 하나의 결합체 형성, D) 상기 보강재가 인입 또는 보강된 주입재 고결체 형성 중 하나에 의하여,A) one of diameter, outer diameter, nominal diameter, nominal diameter, one diameter, one outer diameter, group diameter, group outer diameter of the injection material or material after injection or injection, curing, before, B) at least one of a ball, an injection hole, a grouting ball, a diameter or an inner diameter of 10 to 100%, a thickness of 1 to 30 mm, and a strength or an ultimate strength of 250 to 3000 MPa, A stud, a bolt, a stud, a bolt, a weld, an attachment, a stud bolt, a protrusion having a length or protrusion length of 1 to 90% of the diameter or the outside diameter, a frictional force or a frictional force One of the projections is attached or welded, one of which is steel pipe, beam, reinforcing bar, reinforcing net, casing, hollow pipe, multi pipe, superstructure pipe, pile, hollow file, screw file, Insertion, insertion, indentation, stabbing, b) insertion or indentation D) insert into a crane and hammers or hammers; e) insert into a crane and press in with a vibrator; f) insert or indent into a crane; G) pushing or hitching to increase the bearing force or the end bearing capacity, B) one of the reinforcement material or the superimposed material to the injection material or the injection part, C) forming a solidified body of the injection material and one of a reinforcing material or a superimposed material, and D) forming the reinforcing material into the reinforcing material or the superimposed material,

상기 주입체, 인젝션체, 그라우팅체, 고결체, 고화체, 기둥체 중 하나가 상기 보강재로 보강된 보강그라우팅파일(RGP), 이의 하나인 주입체, 인젝션체, 그라우팅체, 보강재체, 주입체파일, 인젝션파일, 그라우팅파일, 주입체기초, 인젝션기초, 그라우팅기초, 현장타설말뚝, 건물기초, 구조물기초, 고결체와 보강재의 복합기초, 보강그라우팅기초(RGF) 중 하나인 것을 특징으로 하는 인젝션, 그라우팅, 주입공사와 보강재 이용 보강그라우팅파일에 관한 것이다. Wherein the reinforcement grouting pile (RGP) reinforced by one of the main body, the injection body, the grouting body, the solidification body, the solid body, and the column body is reinforced by the reinforcing material, the injection body, the injection body, the grouting body, Wherein the injection grouting is one of injection grooving, injection grouting, grooving foundation, injection foundation, grouting foundation, ground penetrating pile, building foundation, structure foundation, composite foundation of solidification and reinforcement, and reinforcement grouting foundation (RGF) Grouting, injection work and reinforcement grouting using reinforcing materials.

본 고안의 인젝션, 그라우팅, 주입공사 등의 장치(10)는 저장고(11), 호퍼(12), 배합기(13), 펌프(14, 15, 16), 호스(17), 스위벨(18), 로드(22), 모니터(26), 비트(27), 이중 하나 이상에 형성된 노즐(30, 31, 32) 중 하나 이상이 순차적 또는 무순으로 구성된 주입장치, 분사장치 등이 해당된다. 본 고안의 인젝션, 그라우팅, 주입공사 장치를 구성하는 저장고, 호퍼, 배합기, 펌프, 호스, 스위벨, 로드, 모니터, 비트, 이중 하나 이상에 형성된 노즐 등은 1종 이상이 1개 이상 개수로 또는 이의 1세트, 2세트, 다세트 등으로 구비, 거치, 구성 등이 되게 된다. The apparatus 10 of the present invention for injection, grouting and injection works comprises a reservoir 11, a hopper 12, a blender 13, pumps 14, 15 and 16, a hose 17, a swivel 18, An injection device or an injection device in which at least one of the rod 22, the monitor 26, the bit 27, and the nozzles 30, 31, and 32 formed in at least one of them is configured in a sequential or non-sequential manner. One or more of the nozzles formed in one or more of the injection, grouting, injection molding apparatus, reservoir, hopper, blender, pump, hose, swivel, rod, monitor, One set, two sets, multiple sets, and so on.

여기서 상기 회전수단, 이의 하나인 회전모터, 이에 연결된 톱니, 벨트 등은 로드(22)를 회전(21)시키는 하나의 수단이고, 로드(22)의 회전(21)에 의하여 로드 하단의 모니터(26) 등에 구비된 비트(27)의 회전에 의하여 지반이 굴착 등이 되고, 그리고 로드 하부 모니터에 형성된 노즐(30)로부터 분사되는 주입재가 로드의 회전에 의하여 회전되면서 360도 방향으로 분사, 주입 등이 된다. 여기서 로드의 회전은 회전수단, 로드에 장착된 회전모터, 로드로부터 이격된 회전모터(40)에 구비된 톱니, 벨트 등(41)에 연결되어 회전모터(40)의 회전에 의하여 회전되는 톱니, 벨트 등(41)에 의한 로드의 회전(21) 등에 의한다. 그리고 펌프는 주입재 펌프(14), 압축수 펌프(15), 압축공기 펌프(16) 등으로 구분되고, 그리고 노즐은 주입재의 측면 노즐, 수평 노즐, 상향 노즐, 하향 노즐, 모니터 노즐 등(30), 주입재의 수직 노즐, 하향 노즐, 비트 노즐 등(31), 그리고 압축수, 압축공기 중 하나 이상 노즐(32) 등으로 구분된다. The rotation means, one of which is a rotary motor, teeth or belts connected thereto, is one means for rotating the rod 22, and the rotation 21 of the rod 22 causes the monitor 26 And the injection material injected from the nozzle 30 formed on the lower monitor of the rod is rotated by the rotation of the rod to inject and inject in the 360 degree direction do. Here, the rotation of the rod includes rotation means, a rotation motor mounted on the rod, a saw tooth provided on the rotation motor 40 spaced from the rod, a saw tooth rotated by the rotation of the rotation motor 40, The rotation of the rod 21 by the belt 41 or the like. The pump is divided into a side nozzle, a horizontal nozzle, an upward nozzle, a downward nozzle, a monitor nozzle, etc. of the injection material, and the pump is divided into a feed pump 14, a pressurized water pump 15, a compressed air pump 16, A vertical nozzle of the injection material, a downward nozzle, a bit nozzle 31, and at least one nozzle 32 of compressed water or compressed air.

청구항 6은 주입공사, 이의 하나인 인젝션, 그라우팅, 분사주입공사, 제트주입공사, 제트그라우팅공사, 고압분사주입공사, 저압분사주입공사, RCD(reverse circulation drill)공사, PRD(percussion rotary drill)공사, JSP(jumbo special pattern method)공사, AGS(auto grouting system)공사, ARC(acrylic resin chemical)공사, CJM(column jet method)공사, MJM(motar jet method)공사, SRC(slime reused column jet grouting)공사 중 하나에 있어서,Claim 6 of the present invention relates to an injection molding machine, which is an injection molding machine, which is one of the injection molding, grouting, injection molding, jet injection molding, jet grouting, high pressure injection molding, low pressure injection molding, reverse circulation drill (RCD), percussion rotary drill ARJ (acrylic resin chemical) construction, CJM (column jet method) construction, MJM (motar jet method) construction, SRC (slime reused column jet grouting) construction, AGS (auto grouting system) construction, In one of the works,

주입재, 인젝션재, 그라우팅재, 이중 하나인 밀크, 몰탈, 약액, 현탁액, 페이스트, 레미콘, 콘크리트, 시멘트밀크, 시멘트몰탈, 시멘트페이스트, 시멘트콘크리트, 섬유 또는 화이버 함유 상기 재료 중 하나가 주입, 분사주입, 지중주입 중 하나 이상이 된 후에, 또는 하나 이상 적용에 더하여, 또는 상기 중 하나 이상에 의하여 시공 또는 조성되는 상기 주입재 또는 재료의 주입체, 인젝션체, 그라우팅체, 고결체, 고화체, 기둥체 중 하나 대신에, One of the above materials including injection material, injection material, grouting material and one of the two materials including milk, mortar, chemical solution, suspension, paste, remicon, concrete, cement milk, cement mortar, cement paste, cement concrete, Injecting body, grouting body, solidification body, solid body, and column body of the above-mentioned injection material or material which is to be constructed or prepared by at least one of the above, Instead of one,

A) 상기 주입재 또는 재료 분사 또는 주입 후, 양생 중, 전, 후 중 하나에 a) 직경, 외경, 공칭 직경, 공칭 외경, 하나 직경, 하나 외경, 군 직경, 군 외경 중 하나가 상기 주입공사 보링공, 인젝션공, 그라우팅공 중 하나 직경 또는 내경의 10∼100%, 두께가 1∼30mm, 강도 또는 극한강도가 250∼3000MPa 중 하나 이상이면서 b) 돌출물, 이의 하나인 핀, 봉, 대, 돌기, 고리, 요철, 막대, 앵카, 볼트, T볼트, Ⅰ볼트, 용접물, 부착물, 스터드볼트, 길이 또는 돌출길이가 상기 직경 또는 외경의 1∼90%인 상기 돌출물, 마찰력 또는 주면마찰력 증가를 위한 상기 돌출물 중 하나가 부착 또는 용접된 보강재, 이의 하나인 강관, 빔, 철근, 철근망, 케이싱, 중공관, 다중관, 중첩관, 파일, 중공파일, 스크류파일, 철근케이지 중 하나가 a) 매입, 인입, 삽입, 압입, 항타, b) 삽입 또는 압입 후 항타, c) 자중으로 삽입 후 압력, 진동, 충격, 타격, 해머 중 하나로 압입 또는 항타, d) 크레인으로 삽입 후 해머 또는 항타기로 항타, e) 크레인으로 삽입 후 바이브레이터로 압입, f) 삽입 또는 압입 후 암반부 또는 상기 보링공 선단부 하향으로 또는 속으로 10∼150cm까지 압입 또는 항타, g) 지지력 또는 선단지지력 증가를 위한 상기 압입, 항타, A) one of diameter, outer diameter, nominal diameter, nominal diameter, one diameter, one outer diameter, group diameter, group outer diameter of the injection material or material after injection or injection, curing, before, B) at least one of a ball, an injection hole, a grouting ball, a diameter or an inner diameter of 10 to 100%, a thickness of 1 to 30 mm, and a strength or an ultimate strength of 250 to 3000 MPa, A stud, a bolt, a stud, a bolt, a weld, an attachment, a stud bolt, a protrusion having a length or protrusion length of 1 to 90% of the diameter or the outside diameter, a frictional force or a frictional force One of the projections is attached or welded, one of which is steel pipe, beam, reinforcing bar, reinforcing net, casing, hollow pipe, multi pipe, superstructure pipe, pile, hollow file, screw file, Insertion, insertion, indentation, stabbing, b) insertion or indentation D) insert into a crane and hammers or hammers; e) insert into a crane and press in with a vibrator; f) insert or indent into a crane; G) Depressing, hoeing, or hoeing to increase bearing capacity or tip bearing capacity,

B) 상기 주입재 또는 주입부에 상기 보강재 내지 중첩체 중 하나가 보강, C) 상기 주입재의 고결체와 보강재 내지 중첩체 중 하나의 결합체 형성, D) 상기 보강재가 인입 또는 보강된 주입재 고결체 형성 중 하나가 되는 주입공사, 인젝션, 그라우팅, 분사주입공사, 제트주입공사, 제트그라우팅공사, 고압분사주입공사, 저압분사주입공사, 주입공법, 분사주입공법 중 하나에 의하여,B) reinforcing one of the reinforcing material or the superimposed material to the injection material or the injection part, C) forming a solidified material of the injection material and one of a reinforcing material or a superimposed material, D) forming the reinforcing material, By one of injection molding, injection, grouting, injection injection, jet injection, jet grouting, high pressure injection, low pressure injection, injection, injection injection,

조성되는 고결체와 보강재의 복합기초인 보강그라우팅파일(RGP), 이의 하나인 주입체, 인젝션체, 그라우팅체, 보강재체, 주입체파일, 인젝션파일, 그라우팅파일, 주입체기초, 인젝션기초, 그라우팅기초, 현장타설말뚝, 건물기초, 구조물기초, 고결체와 보강재의 복합기초, 보강그라우팅기초(RGF) 중 하나인 것을 특징으로 하는 인젝션, 그라우팅, 주입공사와 보강재 이용 보강그라우팅파일에 관한 것이다. A reinforcement grouting pile (RGP) which is a composite machine of a high consolidation material and a reinforcement material to be formed; an injection body, an injection body, a grouting body, a reinforcement body, a main body file, an injection file, a grouting file, a main body foundation, an injection base, Grouting, injection work and reinforcement grouting using reinforcing material, characterized in that the reinforcing grouting pile is one of a ground drilling pile, a building foundation, a structure foundation, a composite foundation of solidification and reinforcement, and a reinforced grouting foundation (RGF).

청구항 7은 a) 장비조립, 장비셋팅, 비트 구비 로드 회전, 지반 천공, 재료 분사주입, 이토처리, 보강재매입, 장비해체, b) 상기 천공시 1개 로드 이상 깊이를 천공하는 경우 추가 로드 연결, c) 상기 분사주입 후 로드 분해, d) 상기 분사주입 후 지상으로 배출된 슬라임 제거, e) 상기 중 하나 이상 또는 상기 장비셋팅 내지 보강재매입 중 하나 이상 반복 중 하나 이상을 함에 있어서, 또는 하나 이상을 하는 인젝션, 그라우팅, 분사공사, 주입공사 중 하나에 있어서, 이는 도 2 등 참조,Claim 7 is a method of making an additional load connection when drilling a depth of one load or more at the time of drilling, a) installing the equipment, setting the equipment, rotating the bit load rod, drilling the ground, injecting the material, c) removing the slides after the injecting injection, d) removing the slime discharged to the ground after injection injection, e) at least one of the above, or at least one of the equipment setting or the stiffener acquisition, Injection, grouting, injection work, injection work, which is shown in Fig. 2,

상기 보강재 매입이 a) 직경, 외경, 공칭 직경, 공칭 외경, 하나 직경, 하나 외경, 군 직경, 군 외경 중 하나가 상기 주입공사 보링공, 인젝션공, 그라우팅공 중 하나 직경 또는 내경의 10∼100%, b) 두께가 1∼30mm, c) 강도 또는 극한강도가 250∼3000MPa 중 하나 이상이면서 a) 돌출물, 이의 하나인 핀, 봉, 대, 돌기, 고리, 요철, 막대, 앵카, 볼트, T볼트, Ⅰ볼트, 용접물, 부착물, 스터드볼트, b) 길이 또는 돌출길이가 상기 직경 또는 외경의 1∼90%인 상기 돌출물, c) 마찰력 또는 주면마찰력 증가를 위한 상기 돌출물 중 하나가 부착 또는 용접된 보강재, 이의 하나인 강관, 빔, 철근, 철근망, 케이싱, 중공관, 다중관, 중첩관, 파일, 중공파일, 스크류파일, 철근케이지 중 하나가 a) 매입, 인입, 삽입, 압입, 항타, b) 삽입 또는 압입 후 항타, c) 자중으로 삽입 후 압력, 진동, 충격, 타격, 해머 중 하나로 압입 또는 항타, d) 크레인으로 삽입 후 해머 또는 항타기로 항타, e) 크레인으로 삽입 후 바이브레이터로 압입, f) 삽입 또는 압입 후 암반부 또는 상기 보링공 선단부 하향으로 또는 속으로 10∼150cm까지 압입 또는 항타, g) 지지력 또는 선단지지력 증가를 위한 상기 압입, 항타 중 하나 이상이 되어, The reinforcing material embedding is carried out such that one of a diameter, an outer diameter, a nominal diameter, a nominal diameter, a diameter, an outer diameter, a group diameter, and a group outer diameter of one of the injection work boring hole, the injection hole and the grouting hole is 10 to 100 b) Thickness of 1 ~ 30mm, c) Strength or extreme strength of 250-3000MPa or more, a) Extrusion, one of these pins, rods, stands, projections, rings, ridges, rods, anchors, bolts, T Bolts, bolts, welds, attachments, stud bolts, b) the protrusions whose length or protrusion length is 1 to 90% of the diameter or outer diameter, c) one of the protrusions for increasing frictional force or main surface frictional force is attached or welded One of the reinforcing material, the steel pipe, beam, reinforcing bar, reinforcing net, casing, hollow tube, multi tube, superimposed tube, pile, hollow file, screw file or reinforced cage is a) embedded, b) hinge after insertion or indentation, c) insertion after self-weight, pressure, vibration, D) insert into a crane and hammers or hammers; e) insert into a crane and then press into the vibrator; f) insert or press into the rock or part of the boring ball downwards or inwards; G) pushing or hitching to increase the bearing capacity or end bearing capacity,

조성되는 상기 재료의 고결체와 상기 보강재의 복합기초인 보강그라우팅파일(RGP), 이의 하나인 주입체, 인젝션체, 그라우팅체, 보강재체, 주입체파일, 인젝션파일, 그라우팅파일, 주입체기초, 인젝션기초, 그라우팅기초, 현장타설말뚝, 건물기초, 구조물기초, 또는 500, 800, 1000, 1200, 1500, 1800, 2000 중 하나 공경 또는 직경 또는 유효직경을 가지는 상기 체, 파일, 기초 중 하나인 것을 특징으로 하는 인젝션, 그라우팅, 주입공사와 보강재 이용 보강그라우팅파일에 관한 것이다. A reinforcement grouting file (RGP) which is a composite machine superstructure of the above-mentioned reinforcing material and a solidification of the above-mentioned material to be formed, a injection body, an injection body, a grouting body, a reinforcement body, a main body file, an injection file, a grouting file, It is one of the above-mentioned sieve, pile, foundation having pore diameter, diameter or effective diameter of one of the foundations, grouting bases, ground drilled piles, building foundations, foundation foundations, or 500, 800, 1000, 1200, 1500, 1800, Injection grouting, injection work, and reinforcement grouting using reinforcing materials.

상기 주입재 노즐(30)은 주입재(1)를 수평, 하향, 상향, 경사 등의 방향으로 분사하는 노즐 등이고, 압축수 및 압축공기 분사노즐(32)은 수평 방향 등으로 압축수(2) 및 압축공기(3)를 분사하여 지반(9) 등을 절삭, 파쇄 등을 하는 노즐 등이다. 여기서 비트(27)와 모니터(26) 장착 로드(22)의 예를 들면 로드(22)의 회전(21)에 의하여 로드에 구비된 비트(27)에 의하여 지반이 굴착되고, 로드의 인발시 모니터(26)에 형성된 노즐 구멍을 통하여 주입재, 압축수, 압축공기 등이 분사 등이 된다. 상기의 분사 노즐, 2개 노즐, 3개 노즐, 다수 노즐, 상중하 노즐, 이중 하나인 홀, 구멍(30, 31, 32)에서 a) 2개 노즐은 주입재 노즐, 압축수 노즐 등의 2개 노즐 등, b) 3개 노즐은 주입재 노즐, 압축수 노즐, 압축공기 노즐 등의 3개 노즐 등, c) 다수 노즐은 2개 이상 노즐, d) 상중하 노즐은 로드, 모니터 등에 상중하의 3단으로 배치되는 노즐 등, e) 이중 하나인 홀, 구멍은 노즐이 되는 홀, 구멍 등이 해당된다. The injection nozzle 30 is a nozzle for injecting the injection material 1 in the horizontal, downward, upward, and oblique directions, and the compressed water and the compressed air injection nozzle 32 are arranged in the horizontal direction, A nozzle for spraying the air 3 to cut and crush the ground 9, and the like. Here, the ground 27 is excavated by the bit 27 provided on the rod by the rotation 21 of the rod 22, for example, of the mounting rod 22 of the monitor 26, Compressed water, compressed air, and the like are injected through the nozzle holes formed in the nozzle 26. The two nozzles in the above-described nozzles, two nozzles, three nozzles, a plurality of nozzles, a large-diameter nozzle, one of the two holes, holes 30, 31 and 32 have two nozzles such as an injection nozzle, B) three nozzles are three nozzles such as injection nozzle, compressed water nozzle and compressed air nozzle, c) two or more nozzles are used for a plurality of nozzles, and d) upper nozzles are arranged in three stages E) a single hole, and the hole corresponds to a hole or a hole to be a nozzle.

상기 주입재(1), 압축수(2), 압축공기(3)는 주입재 펌프 등에 의하여 공급되고, 압축공기(3)는 펌프(12), 압축공기펌프(12), 공기통 등에 의하여 공급 등이 된다. 여기서 2중관은 일정의 중공관 또는 외관(7) 내부에 1개의 중공관 또는 내관(5)이 매입된 것 등이고, 3중관은 일정의 중공관 또는 외관(7) 내부에 1개의 중공관 또는 중관(6), 이의 내부에 다른 1개 중공관 또는 내관(5)이 매입된 것 등이 해당된다. 상기의 2중관의 내관(5)으로 주입재(1), 외관(7)으로 압축수(2) 또는 압축공기(3), 또는 3중관의 내관(5)으로 주입재(1), 중관(6)으로 압축수(2), 외관(7)으로 압축공기(3) 중 하나 이상이 공급되고는 2중관의 내관(5)에 연결된 노즐(30, 31) 등으로 주입재(1), 외관(7)에 연결된 노즐(32) 등으로 압축수(2) 또는 압축공기(3), 또는 3중관의 내관(5)에 연결된 노즐(30, 31) 등으로 주입재(1), 중관(6)에 연결된 노즐(32) 등으로 압축수(2), 외관(7)에 연결된 노즐(32) 등으로 압축공기(3) 등이 공급되는 것 등이 해당된다. The injection material 1, the compressed water 2 and the compressed air 3 are supplied by a feed pump or the like and the compressed air 3 is supplied or the like by the pump 12, the compressed air pump 12, . Here, the double pipe is a hollow pipe or a hollow pipe or an inner pipe 5 embedded in the outer pipe 7, and the triple pipe is a hollow pipe or a hollow pipe or a pipe (6), another one hollow tube or an inner tube (5) is embedded therein. The injection material 1 and the middle pipe 6 are injected into the inner pipe 5 of the double pipe as the compressed water 2 or the compressed air 3 or the inner pipe 5 of the triple pipe as the outer pipe 7, The injection material 1 and the outer pipe 7 are supplied to the nozzles 30 and 31 or the like connected to the inner pipe 5 of the double pipe by supplying at least one of the compressed air 3 with the compressed water 2 and the external pipe 7, The nozzle 1 connected to the compressed water 2 or the compressed air 3 or the nozzle 30 connected to the inner pipe 5 of the triple pipe is connected to the nozzle 6 connected to the middle pipe 6, The compressed air 3 and the like are supplied to the nozzle 32 connected to the compressed water 2 and the outer pipe 7 by the nozzle 32 or the like.

청구항 8은 인젝션, 그라우팅, 주입공사, 인젝션재 분사, 그라우팅재 분사, 주입재 분사 중 하나의 시행 중 또는 후에, A) 크레인으로 a) 직경, 외경, 공칭 직경, 공칭 외경, 하나 직경, 하나 외경, 군 직경, 군 외경 중 하나가 상기 주입공사 보링공, 인젝션공, 그라우팅공 중 하나 직경 또는 내경의 10∼100%, b) 두께가 1∼30mm, c) 강도 또는 극한강도가 250∼3000MPa 중 하나 이상이면서 a) 돌출물, 이의 하나인 핀, 봉, 대, 돌기, 고리, 요철, 막대, 앵카, 볼트, T볼트, Ⅰ볼트, 용접물, 부착물, 스터드볼트, b) 길이 또는 돌출길이가 상기 직경 또는 외경의 1∼90%인 상기 돌출물, c) 마찰력 또는 주면마찰력 증가를 위한 상기 돌출물 중 하나가 부착 또는 용접된 보강재, 이의 하나인 강관, 빔, 철근, 철근망, 케이싱, 중공관, 다중관, 중첩관, 파일, 중공파일, 스크류파일, 철근케이지 중 하나를 들어 올리고, 이를 인젝션재, 그라우팅재, 주입재 중 하나의 주입공에 삽입, B) 상기 삽입된 상기 보강재 내지 중첩체 중 하나를 해머, 드롭해머, 바이브레이터, 항타기 중 하나로 항타 중 하나 이상을 하여 Claim 8 is characterized in that during or after the execution of one of injection, grouting, injection work, injection re-injection, grouting re-injection, injection material injection, A) the crane has a diameter, outer diameter, nominal diameter, nominal diameter, B) a thickness of 1 to 30 mm; c) a strength or an ultimate strength of 250 to 3,000 MPa; one of the group diameter, the group diameter, and the group outer diameter is 10 to 100% of the diameter or inner diameter of one of the boring hole, injection hole, B) the length or protruding length is not equal to or greater than the diameter or the length of the protrusion; a) the protrusion, one of which is a pin, rod, bar, protrusion, ring, ridge, bar, anchor, bolt, T-bolt, C) a stiffener to which one of the projections for increasing the frictional force or the main surface frictional force is attached or welded; a steel pipe, a beam, a reinforcing bar, a reinforcing net, a casing, a hollow tube, Nested pipes, files, hollow files, screw files, reinforcing bars One of the inserts, the grouting material, and the filler, and B) inserting one of the inserted reinforcement material or the superimposed material into one of a hammer, a drop hammer, a vibrator, By

조성된 상기 인젝션재, 그라우팅재, 주입재 중 하나의 고결체와 보강재의 복합기초인 보강그라우팅파일(RGP), 이의 하나인 주입체, 인젝션체, 그라우팅체, 보강재체, 주입체파일, 인젝션파일, 그라우팅파일, 주입체기초, 인젝션기초, 그라우팅기초, 현장타설말뚝, 건물기초, 구조물기초, 고결체와 보강재의 복합기초, 보강그라우팅기초(RGF) 중 하나인 것을 특징으로 하는 인젝션, 그라우팅, 주입공사와 보강재 이용 보강그라우팅파일에 관한 것이다. A reinforcement grouting file (RGP), which is one of the injection material, the grouting material, and the injection material, which is a combined device of the solidification material and the reinforcing material, and the injection material, the injection material, the grouting material, the reinforcement material, the injection molding material, Grouting, pouring work, which is characterized in that it is one of a pile foundation, an injection foundation, an injection foundation, a grouting foundation, a cast-in-place pile, a building foundation, The present invention relates to a reinforcement grouting file using a reinforcing material.

본 고안의 인젝션, 그라우팅, 주입공사는 주입재(1), 압축수(2), 압축공기(3) 중 하나 이상이 분사 또는 지중 분사되는 비트(27), 굴착비트, 로드(22) 또는 이의 하부 모니터(26)에 장착된 비트, 또는 상기 분사를 위한 홀, 구멍, 노즐 중 하나(31)가 형성된 비트(27), 굴착비트, 로드 또는 이의 하부 모니터에 장착된 비트 중 하나가 구비 또는 사용되는 인젝션, 그라우팅, 주입공사 등이 포함된다. 상기 주입재, 압축수, 압축공기 등이 분사되는 비트는 비트, 이의 면, 사이, 공간 등에 노즐, 홀, 구멍 등이 형성되어 천공, 이의 전, 후, 동시 등에 주입재, 압축수, 압축공기 등이 분사되는 비트 등이 해당된다. 여기서 주입재는 지반 고결용, 그리고 압축수, 압축공기 등은 비트의 천공효율, 지반절삭, 주입재의 주입효율 등의 향상을 위한 것이다. 통상적으로 비트는 로드 또는 이의 하부 모니터 등에 장착되어 로드, 모니터 등의 회전에 의하여 회전하여 지반이 굴착되고, 이에 의하여 로드, 모니터 등이 지중에 관입되고, 이후 로드, 모니터 등이 인발되며, 상기 굴착, 관입, 인발 등에 로드, 모니터, 비트 등에 형성된 노즐, 홀, 구멍 등으로 주입재, 압축수, 압축공기 등이 분사되어 인젝션, 그라우팅, 주입공사 등이 수행된다. 이에 더하여 본 고안에서는 상기 주입재 분사, 이후, 양생, 이전, 이후 등에 보강재를 삽입하여 보강재가 보강된 고결체, 기둥체 등을 형성하여 이를 파일, 피어 등의 기초 등으로 사용하는 것이다. 여기서 로드(22), 모니터(26), 비트(27) 등은 상호 일체화되거나 탈부착이 가능한 구조를 가진다. Injection, grouting and injection work of the present invention can be carried out in the form of a bit 27 in which at least one of the injection material 1, the compressed water 2 and the compressed air 3 is injected or ground, the excavation bit, the rod 22, One of the bits mounted on the monitor 26, or the bit 27 formed with one of the holes, holes, or nozzles for the injection, the excavation bit, the bit mounted on the rod or its lower monitor is used or used Injection, grouting, and injection work. The injected material, the compressed water, the compressed air, and the like are injected into the bit, the surface, the space, and the like through the nozzle, the hole, the hole, And a bit to be ejected. The injection material is used for soil consolidation, compressed water, compressed air, etc. to improve the drilling efficiency of the bit, the ground cutting, and the injection efficiency of the injection material. Typically, a bit is attached to a rod or a lower monitor or the like, and the ground is excavated by rotation of a rod, a monitor or the like by rotation thereof, whereby a rod, a monitor or the like is intruded into the ground, Injection, compressed water, compressed air, etc. are injected into a nozzle, a hole, a hole, etc. formed in a rod, a monitor, a bit or the like through penetration, drawing, etc., and injection, grouting and injection work are performed. In addition, in the present invention, a reinforcing material is reinforced to form a solid body, a column body, and the like by inserting a reinforcing material into the injection material, after curing, after curing, before, after, and used as a foundation for piles and peers. Here, the rod 22, the monitor 26, the bit 27 and the like have a structure in which they are mutually integrated or detachable.

본 고안의 인젝션, 그라우팅, 주입공사, 이중 하나 장치, 재료 등은 일반, 기존 등의 인젝션, 그라우팅, 주입공사, 이중 하나 장치, 재료, 또는 본 고안, 청구항 등에 기재된 인젝션, 그라우팅, 주입공사, 이중 하나 장치, 재료 등이 해당된다. 여기서 본 고안, 청구항 등에 기재된 인젝션, 그라우팅, 주입공사, 이중 하나 장치, 재료 등은 청구항 1의 a) 드릴, 천공기, 보링기, 굴착기, 비트 구비 로드, 유압식 크롤러드릴, 100∼150kw 용량의 드릴, 천공기, 보링기, 굴착기, 비트 구비 로드, 유압식 크롤러드릴, b) 상기 중 하나 이용 지반 천공, 보링공 형성, c) 믹서, 배합기, 믹서플랜트, 0.3∼1.0㎥ 용량의 믹서, 배합기, 믹서플랜트, d) 이로 주입재, 인젝션재, 그라우팅재, 이중 하나인 밀크, 몰탈, 약액, 현탁액, 페이스트, 레미콘, 시멘트밀크, 콘크리트 중 하나 재료 혼합, 제조, e) 압력 펌프, 200∼500kg/㎠ 압력의 펌프, f) 이에 의한 상기 재료 가압, 펌핑, 공급, g) 상기 공급 재료가 호스, 로드, 주입노즐을 통하여 지반에 주입, 분사주입, h) 수펌프, 공기압축기, 5∼10㎥/min 용량의 수펌프, 공기압축기, i) 상기 장치에 의한 압축수, 압축공기 중 하나 이상이 상기 로드, 이의 모니터, 이중 하나에 형성된 노즐을 통하여 상기 재료 주입 이전에 지반에 분사, 이에 의하여 지반 절삭, 이에 의하여 상기 재료의 주입량, 주입효율, 주입속도 중 하나 이상 향상 등을 하는 인젝션, 그라우팅, 주입공사, 청구항 2의 a) 주입체, 인젝션체, 그라우팅체 중 하나의 직경 또는 유효직경 500, 800, 1000, 1200, 1500, 1800, 2000 중 하나 mm에 대한 a) 분사주입시간이 각각 0.5∼1.3, 1.5∼3.6, 2.3∼5.7, 3.5∼9.0, 6.5∼13.0, 8.0∼18.0, 11∼23.0 중 하나 min/m, b) 평균분사량 또는 단위분사량이 150∼300 L/min 등이 적용되는 인젝션, 그라우팅, 주입공사, 청구항 3의 지층별 천공시간 또는 천공속도가 점성토 3.5 min/m, 사질토 5.0 min/m, 자갈 9.0 min/m, 전석 또는 호박돌 11.0 min/m 중 하나로 천공 등이 되는 인젝션, 그라우팅, 주입공사, 청구항 4의 T1 : 천공시간 = (∑(L1 × t1) + t2) / f1, 상기 L1 : 지층별 천공길이, t1 : 지층별 천공시간, t2 : 로드연결시간 = 3 min (개소당), 상기 로드연결은 천공시 시행되며 천공 중 로드연결이 필요한 경우에 적용, f1 : 작업계수 = 0.8, T2 : 분사주입시간 = (∑(L2 × t3) + t4) / f2, 상기 L2 : 유효직경별 분사주입 길이, t3 : 유효직경별 분사주입시간 = 주입체, 인젝션체, 그라우팅체 중 하나의 유효직경 500, 800, 1000, 1200, 1500, 1800, 2000 중 하나 mm에 대하여 각각 0.5∼1.3, 1.5∼3.6, 2.3∼5.7, 3.5∼9.0, 6.5∼13.0, 8.0∼18.0, 11∼23.0 중 하나 min/m, t4 : 로드분해시간 = 3 min (개소당), 상기 로드분해는 로드 인발시 시행되며 로드인발 중 로드분해가 필요한 경우에 적용, f2 : 작업계수 = 0.8 중 하나 이상이 적용되어 작업소요시간이 T = T1 + T2로 산정되는 또는 소요되는 인젝션, 그라우팅, 주입공사, 청구항 5의 배합기에서 배합된 주입재, 인젝션재, 그라우팅재 중 하나 재료가 로드, 이의 모니터, 이의 선단 비트 중 하나 이상에 구비된 노즐 또는 1단, 2단, 다단 중 하나로 구비된 노즐을 통하여 수평, 수직, 경사, 상향, 하향, 1∼89도 경사 중 하나 이상 방향으로 주입, 분사, 이의 물질 고결, 이에 의하여 지중에 주입체, 인젝션체, 그라우팅체, 고결체, 고화체, 기둥체 중 하나 형성 등이 되는 인젝션, 그라우팅, 주입공사, 청구항 6의 a) 10㎏/㎠ 이하의 저압, 100㎏/㎠ 이상의 고압, 이둘 사이의 중압, 이외 자유압, 200∼600㎏/㎠압력 중 하나 압력으로 펌핑 또는 가압하는 펌프로 공급되는 주입재, 인젝션재, 그라우팅재, 이중 하나인 밀크, 몰탈, 약액, 현탁액, 페이스트, 레미콘, 콘크리트, 시멘트밀크, 시멘트몰탈, 시멘트페이스트, 시멘트콘크리트, 섬유 또는 화이버 함유 상기 재료 중 하나가 지중에 주입, 분사주입, 지중주입, b) 이중 하나 전에 펌프로부터 상기 압력 중 하나 압력으로 공급되는 압축수, 압축공기 중 하나 이상이 지중에 주입, 분사주입, 지중주입, 이에 의하여 지반절삭 중 하나 이상 등이 되는 인젝션, 그라우팅, 주입공사, 청구항 7의 원료 저장용 저장고, 원료 투입용 호퍼, 재료 혼합용 배합기, 재료 가압용 펌프, 재료 공급용 호스, 지반 굴착 및 재료 이송용 로드, 이 또는 이의 모니터, 비트 등에 구비된 노즐이 순차적 또는 무순으로 구성된 주입장치를 이용하여 주입재, 인젝션재, 그라우팅재, 이중 하나인 밀크, 몰탈, 약액, 현탁액, 페이스트, 레미콘, 콘크리트, 시멘트밀크, 시멘트몰탈, 시멘트페이스트, 시멘트콘크리트, 섬유 또는 화이버 함유 상기 재료 중 하나가 주입, 분사주입, 지중주입 등이 되는 인젝션, 그라우팅, 주입공사 등이 해당된다. Injection, grouting, injection work, injection, grouting, injecting work, injection, grouting, injection work, double injection, grouting, One device, material, and so on. Injection, grouting, injection work, etc., one of the devices, materials, and the like described in the present invention, claims, and the like are the same as those of claim 1, C) mixer, mixer, mixer plant, mixer, mixer plant, mixer plant, mixer plant, mixer plant, mixer plant, d) Mixing and manufacturing of one of injection material, injection material, grouting material, milk, mortar, chemical liquid, suspension, paste, concrete, concrete, cement milk and concrete. e) Pressure pump, pump with a pressure of 200 to 500 kg / h) a water pump, an air compressor, a pump having a capacity of 5 to 10 m < 3 > / min, Water pump, air compressor, i) At least one of compressed water by compressed air and compressed air is injected into the ground before the material is injected through the nozzle formed in the rod, its monitor, or one of the two, thereby grounding, A diameter of one of the injected body, the injected body and the grouting body, or an effective diameter of 500, 800, 1000, 1200, 1500, 1800, 2000 of claim 2, mm for a) injection injection time of 0.5 to 1.3, 1.5 to 3.6, 2.3 to 5.7, 3.5 to 9.0, 6.5 to 13.0, 8.0 to 18.0 and 11 to 23.0, respectively, b) average injection quantity or unit injection quantity Injection, grouting, and injection work to which 150-300 L / min is applied, and the perforation time or perforation speed of each stratum according to claim 3 is 3.5 m / m for clay, 5.0 min / m for sand, 9.0 min / m for gravel, 11.0 min / m. Injection, grouting, T1: perforation time per stratum, t2: load connection time = 3 min (per site), T1: perforation time of claim 4 = (Σ (L1 × t1) + t2) / f1, L1: perforation length per stratum, F1: work coefficient = 0.8, T2: injection injection time = (Σ (L2 × t3) + t4) / f2, L2: valid Injection injection length per effective diameter = 0.5 to 1.3 times the effective diameter of one of the main body, the injection body and the grouting body for one of the effective diameters of 500, 800, 1000, 1200, 1500, 1800, One of min / m, t4: rod decomposition time = 3 min (per site), and the rod disassembly is performed at the time of rod pulling F2 is applied when at least one of the work coefficient = 0.8 is applied, and the time required for the operation is calculated as T = T1 + T2, or the injection or grouting , Injection work, injecting material blended in the blender of claim 5, injecting material, nozzle material having at least one of a nozzle, a first stage, a second stage, and a multi-stage provided in at least one of a rod, Injection, spraying, or solidification of the material in at least one of horizontal, vertical, inclined, upward, downward, and inclined at 1 to 89 degrees, whereby the injection, injection, grouting, consolidation, A) a high pressure of not less than 10 kg / cm 2, a high pressure of not less than 100 kg / cm 2, a middle pressure of the two, a free pressure of not more than 200 kg / cm 2 and a pressure of 200 kg / Mortar, chemical solution, suspension, paste, remicon, concrete, cement milk, cement mortar, cement paste, cement concrete, etc., which are supplied to a pump for pumping or pressurizing by one pressure, One of said materials containing fibers or fibers is injected into the ground, injection injection, underground injection, b) one or more of compressed water supplied from the pump to one of said pressures, compressed air, An underground injection, an injection, a grouting, an injection work which is one or more of the ground cutting by this, a reservoir for storing raw materials of claim 7, a hopper for inputting raw materials, a compounder for mixing materials, a material pressurizing pump, Injecting material, grouting material, milk, mortar, chemical liquid, suspension, paste, remicon, etc., using an injection device composed of a nozzle, a nozzle, Concrete, cement milk, cement mortar, cement paste, cement concrete, fiber or fiber containing one of the above ingredients, This, such as injection which is injected underground, grouting, injection, Ltd. and the like are applicable.

그리고 청구항 5의 저장고, 호퍼, 배합기, 펌프, 호스, 스위벨, 로드, 모니터, 비트, 이중 하나 이상에 형성된 노즐 중 하나 이상이 순차적 또는 무순으로 구성되는 인젝션, 그라우팅, 주입공사 장치, 또는 밀크, 몰탈, 약액, 현탁액, 시멘트밀크, 시멘트몰탈 중 하나 재료 배합, 비트 달린 수단 또는 로드를 매입 또는 압입하면서 지반 굴착, 보링 굴착, 상기 수단 또는 로드를 인발, 상기 인발시 상기 수단, 로드, 이에 부착된 모니터, 이중 하나에 형성된 홀, 구멍, 노즐 중 하나를 통하여 지반 내 상기 재료 분사, 주입, 인젝션, 그라우팅, 상기 수단 또는 로드와 보링공, 굴착공 사이를 통하여 지면으로 배출되는 슬라임 처리, 상기 분사 또는 주입 재료의 고결, 고화, 양생, 상기 중 하나에 의한 지반내 고결체, 고화제, 기둥체, 인젝션체, 그라우팅체 중 하나 형성 등을 하는 인젝션, 그라우팅, 주입공사, 또는 원료가 투입되는 호퍼 구비 혼합기 또는 교반기에 의하여 밀크, 몰탈, 약액, 현탁액, 시멘트밀크, 시멘트몰탈 중 하나 재료 배합, 펌프 또는 콤프레샤를 이용하여 10㎏/㎠ 이하의 저압, 100㎏/㎠ 이상의 고압, 이둘 사이의 중압, 이외 자유압, 200∼600㎏/㎠압력 중 하나로 상기 재료 펌핑, 가압, 공급, 이외 드릴, 천공기, 착정기, 천공기, 보링기, 인젝션기, 그라우팅기, 유압식 크롤러드릴, 100∼150kw 용량의 유압식 크롤러드릴 중 하나를 이용하여 비트 달린 수단 또는 로드를 매입 또는 압입하면서 지반 굴착, 보링 굴착, 또는 500, 800, 1000, 1200, 1500, 1800, 2000 중 하나 공경 또는 직경 또는 유효직경을 가지는 보링공 굴착, 상기 수단 또는 로드를 인발, 또는 1sec, 1min, 1hour 당 0.1∼100 mm, cm, m 중 하나 속도로 인발, 상기 인발시 상기 수단, 로드, 이에 부착된 모니터, 이중 하나에 형성된 홀, 구멍, 노즐 중 하나를 통하여 지반 내 상기 재료 분사, 주입, 인젝션, 그라우팅, 또는 1분 당 150∼300 L 양 분사, 주입, 인젝션, 그라우팅, 이외 상기 수단 또는 로드와 보링공, 굴착공 사이를 통하여 지면으로 배출되는 슬라임 처리, 상기 분사 또는 주입 재료의 고결, 고화, 양생, 이외 상기 중 하나에 의한 지반내 고결체, 고화제, 기둥체, 인젝션체, 그라우팅체 중 하나 형성 등이 되는 인젝션, 그라우팅, 주입공사, 또는 장비조립, 장비셋팅, 비트 구비 로드 회전, 지반 천공, 재료 분사주입, 이토처리, 보강재매입, 장비해체, 상기 천공시 1개 로드 이상 깊이를 천공하는 경우 추가 로드 연결, 상기 분사주입 후 로드 분해, 상기 분사주입 후 지상으로 배출된 슬라임 제거, 상기 중 하나 이상 또는 상기 장비셋팅 내지 보강재매입 중 하나 이상 반복 등이 되는 인젝션, 그라우팅, 주입공사, 또는 주입재에 더하여, 압축수, 압축공기 중 하나 이상 분사 노즐, 2개 노즐, 3개 노즐, 다수 노즐, 상중하 노즐, 이중 하나인 홀, 구멍, 이의 구비 비트, 모니터, 상기 중 하나 이상 구비 로드, 회전로드, 비트 장착 로드, 모니터 장착 로드, 비트와 모니터 장착 로드, 중공 또는 단관 로드, 2중관 로드, 내관 및 외관의 로드, 3중관 로드, 내관 및 중관 및 외관의 로드, 다중관 로드, 이중 하나에 연결된 호스, 이에 주입재 또는 재료를 공급하는 펌프, 이에 연계된 배합기, 이에 연계된 호퍼, 저장고, 상기 중 하나 이상 구비 장치, 인젝션장치, 그라우팅장치, 주입공사장치 중 하나 이상을 이용하는 인젝션, 그라우팅, 주입공사, 청구항 8의 2중관의 내관으로 주입재, 외관으로 압축수 또는 압축공기, 또는 3중관의 내관으로 주입재, 중관으로 압축수, 외관으로 압축공기 중 하나 이상이 공급되고, 상기 주입재, 압축수, 압축공기 중 하나 이상이 노즐, 2개 노즐, 3개 노즐, 다수 노즐, 개별 노즐, 상중하 노즐 중 하나 이상에 의하여 분사되는 작업, 단계, 공정 중 하나가 적용되는 인젝션, 그라우팅, 주입공사, 또는 상기 적용되는 장치, 인젝션장치, 그라우팅장치, 주입공사장치 중 하나 이상을 이용하는 인젝션, 그라우팅, 주입공사, 또는 주입재, 압축수, 압축공기 중 하나 이상이 분사 또는 지중 분사되는 비트, 굴착비트, 로드 또는 이의 하부 모니터에 장착된 비트, 또는 상기 분사를 위한 홀, 구멍, 노즐 중 하나가 형성된 비트, 굴착비트, 로드 또는 이의 하부 모니터에 장착된 비트 중 하나가 구비 또는 사용되는 인젝션, 그라우팅, 주입공사 등이 해당된다. Grouting, injection equipment, or milk, mortar, or the like, in which one or more of the reservoir, hopper, blender, pump, hose, swivel, rod, monitor, , A chemical solution, a suspension, a cement mortar, a cement mortar, a material combination, a bit excavation or boring, a boring excavation, a boring excavation, a pulling out of said means or a load, Injection, injection, grouting, slime treatment to be discharged to the ground through the means or between the rod and boring hole, and the excavation hole through the material injection, injection, injection, grouting, Solidification of material, solidification, curing, consolidation in the ground by any of the above, solidification agent, column, injection, or grouting body Mortar, chemical liquid, suspension, cement milk or cement mortar by using a mixer, a pump or a compressor in an injection, grouting, injection work, or a hopper into which a raw material is injected. The above material pumping, pressurization, supply, other drills, perforators, drilling machines, drilling machines, drilling machines, boring machines, and the like in one of the following low pressures, high pressures of 100 kg / cm 2 or more, intermediate pressures, 1000, 1200, 1500, 500, 800, 1000, 1200, 1500, 1500, 1500, 1500, 1500, 1500, 1500, 1500, 1000, 1200, 1500, 500, 800, 1000, 1000, 1000, 1200, 1500, 1000, 1800, 2000, or a boring ball having a diameter or effective diameter, drawing the means or the rod, or drawing at a speed of 1 to 100 mm, cm, m per 1 second, 1 min, 1 hour, Injection, injection, grouting, or injection of 150 to 300 L per minute through one of the means, the rod, the monitor attached thereto, the hole formed in one of the two, the hole or the nozzle, Grouting, slime treatment to be discharged to the ground through the above means or between the rod and the boring hole and the excavation hole, solidification of the injection or injection material, solidification of the injection material, solidification in the ground by any other than the above, Injection molding, injection molding, injection molding, injection molding, injection molding, injection molding, injection molding, injection molding, injection molding, At least one or more of the above, when the depth is drilled at a depth equal to or greater than one load, additional rod connection, disassembly of the rod after injection injection, removal of slime discharged to the ground after injection injection, A nozzle, a plurality of nozzles, a plurality of nozzles, a plurality of nozzles, and a plurality of nozzles, in addition to injection, grouting, injection work, or injection material, One or more of a hole, a hole, a bearing bit, a monitor, a load of at least one of the above, a rotating rod, a bit mounting rod, a monitor mounting rod, a bit and a monitor mounting rod, a hollow or single tube rod, , A triple-tube rod, an inner tube and a rod of a tube and an outer tube, a plurality of tube rods, a hose connected to one of the two, a pump for supplying a material or material thereto, a blender associated therewith, , Injection, grouting, injection molding, injection, grouting, injection work, injecting material into the inner pipe of the double pipe of claim 8, pressure by external appearance Wherein at least one of an injecting material, a compressed air, a compressed air, and a compressed air is supplied to the inner pipe of the inner pipe, the axial pipe, the compressed air or the inner pipe of the triple pipe, , An injection, a grouting, an injection, or an applied device, an injection device, a grouting device, or an injection device, to which one of the operations, steps, and processes injected by one or more of plural nozzles, individual nozzles, Or a bit mounted on a lower monitor of the load, or a hole or hole for injection, at least one of injection, submerged injection, injection, injection, grouting, injection work, Grouting, grooves, grooves, etc., in which one of the nozzles is formed, the excavation bit, the bit mounted on the rod or its lower monitor is used or used LTD, etc. are applicable.

이하 도면을 이용하여 본 고안 및 청구항을 추가 설명하면 아래와 같다. 도 1은 본 고안에 의한 인젝션, 그라우팅, 주입공사와 보강재 이용 현장타설기초 조성 공정을 나타낸 모식도에 관한 것이다. 본 발명의 현장타설기초 조성 공정은 a) 밀크, 몰탈, 약액, 현탁액, 시멘트밀크, 시멘트몰탈 등의 재료 배합, b) 비트 달린 수단 또는 로드를 매입 또는 압입하면서 지반 굴착, 보링 굴착, c) 상기 수단 또는 로드를 인발, d) 상기 인발시 상기 수단, 로드, 이에 부착된 모니터, 이중 하나에 형성된 홀, 구멍, 노즐 중 하나를 통하여 지반 내 상기 재료 분사, 주입, 인젝션, 그라우팅, e) 상기 재료 분사, 주입, 인젝션, 그라우팅 부위에 보강재 삽입, f) 상기 분사 또는 주입 재료의 고결, 고화, 양생, g) 이에 의하여 보강재로 보강된 고결체, 고화제, 기둥체, 인젝션체, 그라우팅체 등 형성, h) 이에 의하여 보강재 보강 현장타설기초, 현장타설파일, RGF, RGP 조성 등이 해당된다. Hereinafter, the present invention and claims will be described with reference to the drawings. Fig. 1 is a schematic view showing the injection molding, grouting, injection molding, and basic casting process using a stiffener according to the present invention. The basic casting step of the present invention can be carried out by a) mixing materials such as milk, mortar, chemical liquid, suspension, cement milk and cement mortar, b) ground excavation or boring excavation while embedding or press fitting a bited means or rod, c) Injecting, injecting, grouting in the ground through one of the means, the rod, the monitor attached to it, the hole, the hole or the nozzle formed in one of the two at the time of drawing, e) F) injecting, injecting, injecting, inserting stiffener into the grouting area, f) solidification, solidification and curing of the injected or injected material, g) formation of solidified material, solidification agent, columnar body, injection body, grouting body reinforced with the reinforcing material , h) By this, the foundation of reinforcement site installation, site pile, RGF, RGP composition, etc.

도 2는 본 고안에 의한 인젝션, 그라우팅, 주입공사와 보강재 이용 현장타설기초 조성 공정을 나타낸 모식도에 관한 것이다. 본 발명의 현장타설기초 조성 공정은 a) 장비조립, 장비셋팅, 비트 구비 로드 회전, 지반 천공, 재료 분사주입, 이토처리, 보강재매입, 장비해체, b) 상기 천공시 1개 로드 이상 깊이를 천공하는 경우 추가 로드 연결, c) 상기 분사주입 후 로드 분해, d) 상기 분사주입 후 지상으로 배출된 슬라임 제거, e) 상기 중 하나 이상 또는 상기 장비셋팅 내지 보강재매입 중 하나 이상 반복 등의 공정, 단계로 시행되게 된다. Fig. 2 is a schematic view showing the injection molding process, the grouting process, the injection molding process, and the basic casting process using the reinforcing material according to the present invention. The method of the present invention is characterized in that it comprises the steps of: a) assembling the equipment, setting the equipment, rotating the beating rod, drilling the ground, injecting the material, injecting the reinforcement, disassembling the equipment, b) D) removing the slime discharged to the ground after injection injection, e) at least one of the above or at least one of the equipment setting and the stiffener filling, .

도 3은 본 고안에 의한 현장타설기초, 현장타설파일, RGF, RGP을 나타낸 모식도에 관한 것이다. 본 발명의 보강그라우팅파일(RGP), 이의 하나인 주입체, 인젝션체, 그라우팅체, 보강재체, 주입체파일, 인젝션파일, 그라우팅파일, 주입체기초, 인젝션기초, 그라우팅기초, 현장타설말뚝, 건물기초, 구조물기초, 고결체와 보강재의 복합기초, 보강그라우팅기초(RGF) 등은 지반, 지중, 지하, 사면, 법면, 비탈면, 건물, 교량, 구조물, 시설물, 지하벽, 차수벽, 연약지반, 불량지반 중 하나(9)를 보강, 개량, 보호, 보수, 지지, 지보, 지탱, 기초설치 등을 한다. 도 3의 좌측 그림은 본 발명의 기초가 지중벽 등으로 사용되는 것이고, 중앙 그림은 본 발명의 기초가 교량 기초로 사용되는 것이고, 우측 그림은 본 발명의 기초가 건물 기초로 사용되는 것을 보여준다. FIG. 3 is a schematic diagram showing a scene installation basis, a scene installation file, RGF, and RGP according to the present invention. The reinforced grouting pile (RGP) of the present invention, the injection body, the injection body, the grouting body, the reinforcement body, the main body file, the injection file, the grouting file, the injection body foundation, the injection foundation, the grouting foundation, Underground, underground, slope, slope, slope, building, bridge, structure, facilities, underground wall, water wall, soft ground, defective foundation, reinforced grouting foundation (RGF) One of the grounds (9) is reinforced, improved, protected, repaired, supported, supported, supported, and installed. The left side of FIG. 3 shows that the foundation of the present invention is used as an underground wall or the like, the center view shows that the foundation of the present invention is used as a bridge foundation, and the right side shows the foundation of the present invention as a building foundation.

도 4은 본 고안에 의한 보강재 보강 인젝션체, 그라우팅체, 주입공사체를 나타낸 모식도를 나타낸다. 이는 도 4의 좌측으로부터 우측으로 보강재 중 하나(110)인 강관(111), 철근케이지(112), 스크류파일(113), 돌기(101)보강재 등이 삽입된, 등으로 보강된 인젝션체, 그라우팅체, 주입공사체, 고결체, 기둥체 등(90)를 보여준다. 이와 같이 본 고안은 인젝션체, 그라우팅체, 주입공사체, 고결체, 기둥체 등(90)의 내부에 강관(111), 철근케이지(112), 스크류파일(113), 돌기(101)보강재 등이 삽입되거나, 등으로 보강된 보강형 인젝션체, 그라우팅체, 주입공사체, 고결체, 기둥체 등(90)를 특징으로 한다. 이의 보강재 보강 인젝션체, 그라우팅체, 주입공사체, 고결체, 기둥체 등(90)은 하나의 보강그라우팅파일(RGP : Reinforced Grouting Pile), 이의 하나인 주입체, 인젝션체, 그라우팅체, 보강재체, 주입체파일, 인젝션파일, 그라우팅파일, 주입체기초, 인젝션기초, 그라우팅기초, 현장타설말뚝, 건물기초, 구조물기초, 고결체와 보강재의 복합기초, 보강그라우팅기초(RGF : Reinforced Grouting Foundation) 등으로 사용이 가능한 특징이 있다. 이는 기존 인젝션체, 그라우팅체, 주입공사체, 고결체, 기둥체 등(90)의 경우 강도, 강성 등이 낮기 때문에 기초로 사용되기 어려운 문제점을 보강재를 삽입하여 강도, 강성 등을 증진시켜 이를 기초로 사용하도록 하는 특징이 있다. Fig. 4 is a schematic view showing a reinforcing material reinforcement injecting body, a grouting body, and an injection work body according to the present invention. 4 is a perspective view showing an example of an injection body reinforced with a steel pipe 111, a reinforcing cage 112, a screw pile 113, a projection 101, Sieve, injection work body, solid body, column body, etc. (90). As described above, the present invention is characterized in that a steel pipe 111, a reinforcing cage 112, a screw pile 113, a projection 101 reinforcement material, and the like are provided in an injection body, a grouting body, an injection molding body, A reinforcement-type injection body, a grouting body, an injected construction body, a solidification body, a column body, and the like, which are inserted or reinforced. The reinforcing material reinforcement injecting body, the grouting body, the injection molding body, the solidified body, the column body 90 and the like are formed by one reinforcing grouting pile (RGP), a main body, an injection body, a grouting body, (RGF: Reinforced Grouting Foundation), Injection file, Injection file, Grouting file, Injection foundation, Injection foundation, Grouting foundation, Site casting pile, Building foundation, Structure foundation, Combined foundation of consolidation and reinforcement There is a feature that can be used as. In the case of existing injectors, grouting bodies, injected construction bodies, solidified bodies, column bodies, etc. (90), the strength and stiffness are low, As well as the ability to use it.

도 5는 본 고안에 의한 2중관 사용 인젝션, 그라우팅, 주입공사를 나타낸 모식도를 나타낸다. 도 6은 본 고안에 의한 3중관 사용 인젝션, 그라우팅, 주입공사를 나타낸 모식도를 나타낸다. 상기 도 5, 6은 본 고안에 의한 보강재 적용 인젝션, 그라우팅, 주입공사의 하나 예를 도시한 것으로 이는 인젝션, 그라우팅, 주입공사 장치(10)를 이용하여 주입재(1) 주입, 분사 후에 크레인, 항타기 등의 장비(110)를 이용하여 주입재 주입부, 분사부 등에 보강재(100)를 삽입하여 보강재(100) 보강형 인젝션체, 그라우팅체, 주입체, 고결체, 기둥체 등(90)을 형성하여 하나의 기초, 건물기초, 구조물기초 등을 형성하는 것을 보여준다. Fig. 5 is a schematic view showing the use of the double pipe according to the present invention, grouting, and injection work. Fig. 6 is a schematic view showing the triple-pipe use injection, grouting, and injection work according to the present invention. 5 and 6 show one example of injecting, grouting and injecting the reinforcing material according to the present invention. Injection, grouting, injection of the injection material (1), injection of the injection material (1) The reinforcing member 100 is inserted into the injecting material injecting unit and the injecting unit by using the equipment 110 such as the reinforcing member 100 to form the reinforcing injecting body, the grouting body, the injection body, the solidification body, A foundation, a building foundation, a structure foundation, and so on.

본 고안의 인젝션, 그라우팅, 주입공사 장치(10)의 예로는 a) 저장고(11), 호퍼(12), 배합기(13), 펌프(14, 15, 16), 호스(17), 스위벨(18), 로드(22), 모니터(26), 비트(27), 이중 하나 이상에 형성된 노즐(30, 31, 32) 중 하나 이상이 순차적 또는 무순으로 구성되고, b) 상기 저장고(11)에는 인젝션, 그라우팅, 주입공사 중 하나 원료가 저장되고, c) 상기 호퍼(12)에 상기 또는 다른 원료가 투입되어 배합기로 유입되고, d) 상기 배합기(13)는 상기 원료를 배합하여 인젝션, 그라우팅, 주입공사 중 하나 주입재 또는 재료를 제조하고, e) 상기 펌프(14, 15, 16)에 의하여 주입재(1), 압축수(2), 압축공기(3) 중 하나 이상이 펌핑, 가압, 공급, 또는 10㎏/㎠ 이하의 저압, 100㎏/㎠ 이상의 고압, 이둘 사이의 중압, 이외 자유압, 200∼600㎏/㎠압, 10ℓ/min 이하의 소량, 100ℓ/min 이상의 대량, 이 둘 사이의 중량, 이외 자유량, 50∼300ℓ/min 중 하나 이상으로 펌핑, 가압, 공급 중 하나가 되고, f) 상기 로드(22)는 단관, 2중관, 3중관, 다중관, 중공관, 내관(23)과 외관(24)이 구비된 2중관, 내관(23)과 중관(24)과 외관(25)이 구비된 3중관 중 하나이고, g) 상기 로드(22)는 지중(5)에서 관입, 정지, 인발 중 하나 이상이 되고, h) 상기 내관(23)으로 주입재, 2중관의 외관(24)으로 압축수 또는 압축공기, 3중관의 중관(24)으로 압축수, 외관(25)으로 압축공기 중 하나 이상이 공급 또는 유입되고, i) 상기 스위벨(18)에 주입재, 압축수, 압축공기 중 하나 이상 유입구, 유입수단, 이의 하나인 호스, 파이프(17, 19, 20), 상기 로드 회전수단, 이의 하나인 회전모터, 이에 연결된 톱니, 벨트 중 하나 이상이 구비되고, j) 상기 노즐은 노즐, 주입재노즐(30, 31), 압축수노즐(32), 압축공기노즐(32), 압축수압축공기노즐(32), 측면노즐, 선단노즐, 수평노즐, 수직노즐, 경사노즐, 상향노즐, 하향노즐, 1∼90도방향노즐 중 하나 이상인 장치(10) 등이 해당된다. Examples of injection, grouting and injection equipment 10 of the present invention include a) a reservoir 11, a hopper 12, a blender 13, pumps 14,15 and 16, a hose 17, a swivel 18 And at least one of the nozzles 30, 31, and 32 formed in one or more of the load 22, the monitor 26, and the bit 27 is configured in a sequential or non-sequential manner, and b) C) feeding the above or other raw materials into the hopper 12 and flowing into the blending machine; d) the blending machine 13 blending the raw materials to perform injection, grouting, injection, At least one of the injection material (1), the compressed water (2), and the compressed air (3) is pumped, pressurized, supplied, or supplied by the pump (14, 15, 16) A pressure of not more than 10 kg / cm 2, a high pressure of not less than 100 kg / cm 2, a medium pressure of two or more, a free pressure of not more than 200 to 600 kg / cm 2, a small amount of not more than 10 l / min, And the other one of pumping, pressurization, and supply is carried out at least one of the weight of the rod (22) and the free amount of 50 to 300 L / min. 23) and an outer tube (24), and a triple tube having an inner tube (23), a middle tube (24) and an outer tube (25), g) the rod (22) H) the injection material as the inner pipe 23, the compressed water or the compressed air as the outer pipe 24 of the double pipe, the compressed water as the middle pipe 24 of the triple pipe, At least one of the compressed air, i) at least one inlet of the filling material, compressed water, compressed air, inlet means, hose, pipe (17, 19, 20) J) the nozzle comprises at least one of a nozzle, filler nozzles (30, 31), a compressed water nozzle (32), a compressed air nozzle (32) Pressure Can compress the air nozzle 32, the nozzle side, the tip nozzle, the nozzle level, the vertical nozzle, the nozzle slant, upward nozzle, downstream the nozzle, and also from 1 to 90 the device 10 at least one of the nozzle direction is appropriate.

여기서 a) 주입재노즐은 상기 내관 등, b) 압축수노즐은 상기 2중관의 외관, 상기 3중관의 중관 등, c) 압축공기노즐은 상기 2중관의 외관, 상기 3중관의 외관 등에 연계 등이 되어 a) 상기 내관으로 공급되는 주입재(1), b) 상기 2중관의 외관, 상기 3중관의 중관 등으로 공급되는 압축수, c) 상기 2중관의 외관, 상기 3중관의 외관 등으로 공급되는 압축공기 등을 분사한다. 여기서 압축수노즐(32), 압축공기노즐(32)은 1개의 공동 노즐, 2개의 별도 노즐 등이 모두 가능한 특징이 있다. 그리고 측면노즐은 로드, 모니터 등의 측면에 형성된 노즐, 홀, 구멍 등이고, 선단노즐은 모니터, 비트 등의 선단, 하단 등에 형성된 노즐, 홀, 구멍 등이고, 수평노즐은 로드, 모니터 등의 측면에 수평방향으로 형성된 노즐, 홀, 구멍 등이고, 수직노즐은 모니터, 비트 등의 선단, 하단 등에 수직으로 형성된 노즐, 홀, 구멍 등이고, 그리고 경사노즐, 상향노즐, 하향노즐, 1∼90도방향노즐 등은 로드, 모니터 등의 측면에 경사, 상향, 하향, 1∼90도방향 등으로 형성된 노즐, 홀, 구멍 등이다. 여기서 경사, 상향, 하향, 1∼90도방향 등의 기준은 해당 노즐이 형성되는 지점 또는 수직으로 거치되는 로드, 모니터 등 지점의 수평, 수평면 등에 대한 경사, 상향, 하향, 1∼90도방향 등이 해당된다. 이의 예로서 모니터에 형성된 45도 경사노즐의 경우 노즐이 형성되는 모니터의 수평면에 대하여 45도 상향 또는 하향 방향으로 경사지게 노즐이 형성되는 것 등이 해당된다. 통상적으로 로드, 이에 구비된 모니터 등은 연직, 수직으로 지중에 관입, 인발되므로 연직, 수직으로 거치되는 여기서는 로드, 모니터의 수평, 수평면에 대한 각도를 노즐의 경사각도로 본다. The compressed air nozzle is connected to the outer surface of the double pipe, the outer surface of the triple pipe, etc., and the like. B) the outer surface of the double pipe, the compressed water supplied to the middle pipe of the triple pipe, etc., c) the outer pipe of the double pipe, the outer pipe of the triple pipe, etc. Compressed air or the like. Here, the compressed water nozzle 32 and the compressed air nozzle 32 are all characterized by a single common nozzle and two separate nozzles. The side nozzles are nozzles, holes, or holes formed on the sides of the rod, monitor, etc., and the end nozzles are nozzles, holes, holes, etc. formed at the front and bottom ends of monitors, Holes, holes and the like formed in the vertical direction, and the vertical nozzles are nozzles, holes, holes and the like vertically formed at the front and bottom of the monitor, bit, etc., and the oblique nozzle, the upward nozzle, the downward nozzle, A nozzle, a hole, a hole, and the like formed on the side surface of the rod, monitor, and the like by inclination, upward, downward, 1 to 90 degrees, and the like. Here, the reference such as inclination, upward direction, downward direction, 1 to 90 degree direction may be inclined, upward, downward, 1 to 90 degree direction, etc. with respect to the horizontal or horizontal surface of the point where the nozzle is formed or vertically mounted rod, . As an example of this, in the case of a 45-degree tilted nozzle formed on a monitor, a nozzle is formed to be inclined upward by 45 degrees or downward with respect to the horizontal plane of the monitor on which the nozzle is formed. Normally, the rod and the monitor provided therein are vertically and vertically penetrated into the ground. Therefore, the angle of the horizontal and horizontal surfaces of the rod, the monitor, and the vertical and vertical mount is viewed as the inclination angle of the nozzle.

본 고안에서 비트는 회전형, 굴착형, 천공형, 보링형, 탈부착형, 콘형, 삼각콘형, 스크류형, 콘스크류형, 나선형, 말굽형, 볼록형, 평면볼록형, 확공형, 역삼각형, 다이아몬드형, 선단전면형, 선단중앙형, 선단외주형, 중공통형, 링형, 날개형, 십자형, 일자형 등의 비트, 그리고 주입재, 압축수, 압축공기 등이 분사되는 비트 등이 해당된다. 여기서 회전형 비트는 자가 회전, 또는 로드, 모니터 등의 회전에 의하여 회전하는 비트 등이고, 상기에 기재된 모든 비트는 거의 대부분 회전에 의하여 굴착, 천공 등을 하는 비트 등이다. 그리고 굴착형 비트는 지반, 암반 등의 굴착용 비트 등이고, 천공형 비트는 지반, 암반 등의 천공용 비트 등이고, 보링형 비트는 지반, 암반 등의 보링용 비트 등이고, 탈부착형 비트는 로드, 모니터 등에 탈착, 부착 등이 가능한 비트 등이고, 콘형 비트는 콘형상의 비트 등이고, 삼각콘형 비트는 삼각콘형상의 비트 등이고, 스크류형 비트는 스크류형상의 비트 등이고, 콘스크류형 비트는 콘의 외면에 스크류가 형성된 비트 등이고, 나선형 비트는 나선형상의 비트 등이고, 말굽형 비트는 말굽형상의 비트 등이고, 볼록형 비트는 로드, 모니터 등의 면, 선단에 볼록하게 형성된 비트 등이고, 평면볼록형 비트는 로드, 모니터 등의 선단 평면에 볼록하게 형성된 비트 등이고, 확공형 비트는 로드, 모니터 등의 선단면보다 큰 단면을 가짐으로 확공이 가능한 비트 등이고, 역삼각형 비트는 역삼각형상의 비트 등이고, 다이아몬드형 비트는 재질이 다이아몬드 등인 비트 등이고, 그리고 선단전면형, 선단중앙형, 선단외주형은 로드, 모니터 등의 선단 전면, 중앙, 외주 등에 형성된 비트 등이고, 그리고 중공통형, 링형은 중공통, 링의 선단에 비트가 형성된 것 등이고, 그리고 날개형 비트는 날개형상 또는 십자형상, 스크류형상 등의 날개형 비트 등이고, 십자형 비트는 십자형상을 가진 비트 등이고, 일자형 비트는 일자형상을 가진 비트 등이고, 그리고 주입재, 압축수, 압축공기 등이 분사되는 비트는 비트, 이의 면, 사이, 공간 등에 노즐, 홀, 구멍 등이 형성되어 천공, 이의 전, 후, 동시 등에 주입재, 압축수, 압축공기 등이 분사되는 비트 등이 해당된다. 여기서 주입재는 지반 고결용, 그리고 압축수, 압축공기 등은 비트의 천공효율, 지반절삭, 주입재의 주입효율 등의 향상을 위한 것이다.
In the present invention, the bit may be a rotary, an excavation, a boring, a boring, a detachable, a cone, a triangle, a screw, a screw, a spiral, a horseshoe, a convex, a flat convex, , A front surface type, a tip center type, a tip peripheral type, a hollow tube type, a ring type, a wing type, a cruciform type, a straight type, and a bit injected with injected material, compressed water and compressed air. Here, the rotatable bit is a self-rotation or a bit that rotates by rotation of a rod, a monitor or the like, and all the bits described above are bits that are excavated, drilled, etc. by almost rotation. The boring bit is the boring bit of the ground, the rock, etc. The boring bit is the boring bit of the ground, the rock, etc. The boring bit is the boring bit of the ground, Shaped bit is a cone type bit or the like, a triangular cone type bit is a triangular cone type bit or the like, a screw type bit is a screw type bit or the like, and a screw type bit is formed by forming a screw on the outer surface of the cone Bit, etc., the helical bit is a helical bit, etc., the horseshoe-shaped bit is a horseshoe-shaped bit or the like, the convex bit is a surface such as a rod, a monitor or the like, And the expandable bit has a larger cross section than the tip end face of the rod, monitor or the like, And the like. The inverse triangle bit is a bit on an inverted triangle, and the diamond type bit is a bit or the like made of diamond or the like. The tip front surface type, the tip center type, and the tip outer circumferential type are bits formed on the front surface, Or the like, and a hollow cylinder, a ring-shaped hollow cylinder, a bit formed at the tip of the ring, etc., and the winged bit may be a winged shape such as a wing shape, a cross shape, a screw shape, etc., and a crossed bit may be a cross- And the bit where the injected material, the compressed water, the compressed air and the like are injected is formed by the nozzle, the hole, the hole and the like in the bit, the surface, the space, A bit injected simultaneously with the injection material, compressed water, compressed air, and the like. The injection material is used for soil consolidation, compressed water, compressed air, etc. to improve the drilling efficiency of the bit, the ground cutting, and the injection efficiency of the injection material.

1 : 주입재 2: 압축수 3: 압축공기
5 : 지반, 지하, 사면, 법면, 비탈면, 건물, 교량, 구조물, 시설물
10 : 그라우팅 장치 12: 호퍼 13 : 배합기
22 : 로드 90 : 고결체 100 : 보강재
101 : 돌출물 110 : 크레인, 항타기
1: Injection material 2: Compressed water 3: Compressed air
5: ground, underground, slope, slope, slope, building, bridge, structure, facility
10: grouting device 12: hopper 13: blender
22: Rod 90: Solidification 100: Stiffener
101: overhang 110: crane,

Claims (8)

a) 드릴, 천공기, 보링기, 굴착기, 비트 구비 로드, 유압식 크롤러드릴, 100∼150kw 용량의 드릴, 천공기, 보링기, 굴착기, 비트 구비 로드, 유압식 크롤러드릴 중 하나 이용 지반 천공 또는 보링공 형성되고,
b) 믹서, 배합기, 믹서플랜트, 0.3∼1.0㎥ 용량의 믹서, 배합기, 믹서플랜트 중 하나에 의한 주입재, 인젝션재, 그라우팅재, 이중 하나인 밀크, 몰탈, 약액, 현탁액, 페이스트, 레미콘, 시멘트밀크, 콘크리트 중 하나 재료 혼합 또는 제조되고,
c) 압력 펌프 또는 200∼500kg/㎠ 압력의 펌프에 의하여 상기 재료가 가압, 펌핑, 공급 중 하나가 되는 주입공사, 인젝션, 그라우팅, 분사주입공사, 제트주입공사, 제트그라우팅공사, 고압분사주입공사, 저압분사주입공사, 주입공법, 분사주입공법 중 하나에 있어서,
상기 재료 또는 주입재 분사 또는 주입 후, 양생 중, 전, 후 중 하나에,
또는 상기 공급에 의하여 시공 또는 조성되는 상기 주입재 또는 재료의 주입체, 인젝션체, 그라우팅체, 고결체, 고화체, 기둥체 중 하나 대신에,
A) a) 직경, 외경, 공칭 직경, 공칭 외경, 하나 직경, 하나 외경, 군 직경, 군 외경 중 하나가 상기 주입공사 보링공, 인젝션공, 그라우팅공 중 하나 직경 또는 내경의 10∼100%, b) 두께가 1∼30mm, c) 강도 또는 극한강도가 250∼3000MPa 중 하나 이상이면서 a) 돌출물, 이의 하나인 핀, 봉, 대, 돌기, 고리, 요철, 막대, 앵카, 볼트, T볼트, Ⅰ볼트, 용접물, 부착물, 스터드볼트, b) 길이 또는 돌출길이가 상기 직경 또는 외경의 1∼90%인 상기 돌출물, c) 마찰력 또는 주면마찰력 증가를 위한 상기 돌출물 중 하나가 부착 또는 용접된 보강재, 이의 하나인 강관, 빔, 철근, 철근망, 케이싱, 중공관, 다중관, 중첩관, 파일, 중공파일, 스크류파일, 철근케이지 중 하나가 a) 매입, 인입, 삽입, 압입, 항타, b) 삽입 또는 압입 후 항타, c) 자중으로 삽입 후 압력, 진동, 충격, 타격, 해머 중 하나로 압입 또는 항타, d) 크레인으로 삽입 후 해머 또는 항타기로 항타, e) 크레인으로 삽입 후 바이브레이터로 압입, f) 삽입 또는 압입 후 암반부 또는 상기 보링공 선단부 하향으로 또는 속으로 10∼150cm까지 압입 또는 항타, g) 지지력 또는 선단지지력 증가를 위한 상기 압입, 항타 ,
B) 상기 주입재 또는 주입부에 상기 보강재가 보강,
C) 상기 주입재의 고결체와 보강재의 결합체 형성,
D) 상기 보강재가 인입 또는 보강된 주입재 고결체 형성 중 하나가 되어,
조성되는 상기 주입재 또는 재료의 주입체, 인젝션체, 그라우팅체, 고결체, 고화체, 기둥체 중 하나와 보강재의 복합기초인 보강그라우팅파일(RGP : Reinforced Grouting Pile), 이의 하나인 주입체, 인젝션체, 그라우팅체, 보강재체, 주입체파일, 인젝션파일, 그라우팅파일, 주입체기초, 인젝션기초, 그라우팅기초, 현장타설말뚝, 건물기초, 구조물기초, 보강그라우팅기초(RGF : Reinforced Grouting Foundation) 중 하나인 것을 특징으로 하는 인젝션, 그라우팅, 주입공사와 보강재 이용 보강그라우팅파일
a) Use of drill, perforator, boring machine, excavator, bit load rod, hydraulic crawler drill, drill of 100-150kw capacity, boring machine, boring machine, excavator, bit load rod, hydraulic crawler drill ,
b) Milk, mortar, medicinal solution, suspension, paste, remicon, cement milk, injection material, injecting material, grouting material by one of mixer, blender, mixer plant, mixer of the capacity of 0.3~1.0㎥, , One of the concrete materials is mixed or manufactured,
c) Injection work, injection, grouting, injection injection work, jet injection work, jet grouting work, high pressure injection work such as pressurization, pumping or supply of the material by a pressure pump or a pump having a pressure of 200 to 500 kg / , Low pressure injection injection work, injection work method, injection injection work method,
After the material or injection material injection or injection, during curing, before or after curing,
Injecting material, grouting material, solidification material, solid material, and columnar material of the injection material or material to be constructed or prepared by the above-mentioned supply,
A) a) one of diameter, outer diameter, nominal diameter, nominal diameter, one diameter, one outer diameter, group diameter, group outer diameter is 10-100% of the diameter or inner diameter of one of the injection molding boring holes, injection holes, grouting holes, b) Thickness of 1 ~ 30mm, c) One or more of strength or ultimate strength of 250 ~ 3000MPa, a) Projection, one of these pins, rods, stands, protrusions, rings, ridges, rods, anchors, bolts, B) the protrusion with a length or protrusion length of 1 to 90% of the diameter or outer diameter, c) a stiffener to which one of the protrusions for increasing frictional force or main surface friction is attached or welded, One of them is a) Steel pipe, beam, reinforcing steel, reinforcing net, casing, hollow pipe, multiple pipe, superstructure pipe, pile, hollow file, screw file, C) After insertion by self weight, pressure, vibration, shock, impact, hammer D) Insert into cranes and hammers or hammers; e) Insert into crane and press in with vibrator; f) After insertion or press-in, press down to the inside of the rock or part of the boring ball downwards or inwards to 10-150 cm Or h) g) for the purpose of increasing the bearing capacity or end bearing capacity,
B) reinforcing the reinforcing material in the injection material or injection part,
C) forming a solidified body of the injection material and a reinforcing material,
D) the reinforcement is one of the inlet rigid formation,
A reinforcing grouting pile (RGP: Reinforced Grouting Pile), which is a composite material of one of a casting body, an injection body, a grouting body, a solidification body, a solid body, (RGF: Reinforced Grouting Foundation), which is one of the grouting material, reinforcement material, main body file, injection file, grouting file, injection foundation, injection foundation, grouting foundation, Features of Injection, Grouting, Injection and Stiffening Grouting Files
a) 주입체, 인젝션체, 그라우팅체 중 하나의 직경 또는 유효직경 500, 800, 1000, 1200, 1500, 1800, 2000 중 하나 mm에 대한 a) 분사주입시간이 각각 0.5∼1.3, 1.5∼3.6, 2.3∼5.7, 3.5∼9.0, 6.5∼13.0, 8.0∼18.0, 11∼23.0 중 하나 min/m, b) 평균분사량 또는 단위분사량이 150∼300 L/min 중 하나가 되도록 주입재, 인젝션재, 그라우팅재 중 하나 재료의 주입, 분사주입, 지중주입 중 하나 이상 후에, 또는 하나 이상 적용에 더하여, 또는 상기 중 하나 이상에 의하여 시공 또는 조성되는 상기 주입재 또는 재료의 주입체, 인젝션체, 그라우팅체, 고결체, 고화체, 기둥체 중 하나 대신에,
A) 상기 주입재 또는 재료 분사 또는 주입 후, 양생 중, 전, 후 중 하나에 a) 보강재, 이의 하나인 강관, 빔, 철근, 철근망, 케이싱, 중공관, 다중관, 중첩관, 파일, 중공파일, 스크류파일, 철근케이지, b) 이외 직경, 외경, 공칭 직경, 공칭 외경, 하나 직경, 하나 외경, 군 직경, 군 외경 중 하나가 상기 주입공사 보링공, 인젝션공, 그라우팅공 중 하나 직경 또는 내경의 10∼100%, 두께가 1∼30mm, 강도 또는 극한강도가 250∼3000MPa 중 하나 이상인 상기 보강재, c) 또는 돌출물, 이의 하나인 핀, 봉, 대, 돌기, 고리, 요철, 막대, 앵카, 볼트, T볼트, Ⅰ볼트, 용접물, 부착물, 스터드볼트, 길이 또는 돌출길이가 상기 직경 또는 외경의 1∼90%인 상기 돌출물, 마찰력 또는 주면마찰력 증가를 위한 상기 돌출물 중 하나가 부착 또는 용접된 상기 보강재 내지 철근케이지 중 하나가 a) 매입, 인입, 삽입, 압입, 항타, b) 삽입 또는 압입 후 항타, c) 자중으로 삽입 후 압력, 진동, 충격, 타격, 해머 중 하나로 압입 또는 항타, d) 크레인으로 삽입 후 해머 또는 항타기로 항타, e) 크레인으로 삽입 후 바이브레이터로 압입, f) 삽입 또는 압입 후 암반부 또는 상기 보링공 선단부 하향으로 또는 속으로 10∼150cm까지 압입 또는 항타, g) 지지력 또는 선단지지력 증가를 위한 상기 압입, 항타,
B) 상기 주입재 또는 주입부에 상기 보강재 내지 철근케이지 중 하나가 보강,
C) 상기 주입재의 고결체와 보강재 내지 철근케이지 중 하나의 결합체 형성,
D) 상기 보강재가 인입 또는 보강된 주입재 고결체 형성,
E) 상기 중 하나가 되는 또는 상기 주입과 매입 내지 항타 중 하나가 되는 주입공사, 인젝션, 그라우팅, 분사주입공사, 제트주입공사, 제트그라우팅공사, 고압분사주입공사, 저압분사주입공사, 주입공법, 분사주입공법 중 하나에 의하여,
조성되는 고결체와 보강재의 복합기초인 보강그라우팅파일(RGP), 이의 하나인 주입체, 인젝션체, 그라우팅체, 보강재체, 주입체파일, 인젝션파일, 그라우팅파일, 주입체기초, 인젝션기초, 그라우팅기초, 현장타설말뚝, 건물기초, 구조물기초, 고결체와 보강재의 복합기초, 보강그라우팅기초(RGF) 중 하나인 것을 특징으로 하는 인젝션, 그라우팅, 주입공사와 보강재 이용 보강그라우팅파일
a) the diameter of one of the injected body, the injected body or the grouting body or the diameter of one of the effective diameters 500, 800, 1000, 1200, 1500, 1800, 2000, a) injection injection time is 0.5 to 1.3, 1.5 to 3.6, Injection material, grouting material, or the like so that the average injection amount or the unit injection amount is one of 150 to 300 L / min, one of min / m among 2.3 to 5.7, 3.5 to 9.0, 6.5 to 13.0, 8.0 to 18.0, Injecting material, grouting material, solidification material, or the like of the above-mentioned injection material or material to be constructed or prepared by at least one of the injection of one material, injection injection, underground injection, Instead of one of solid, solid,
A) One or more of: a) steel, beam, reinforcing bar, reinforcing net, casing, hollow tube, multiple tube, superstructure tube, pile, hollow tube One of diameter, outer diameter, nominal diameter, nominal diameter, one diameter, one outer diameter, group diameter, group outer diameter of the injection molding boring ball, injection hole, grouting ball, The reinforcing material having an inner diameter of 10 to 100%, a thickness of 1 to 30 mm, and a strength or an ultimate strength of 250 to 3000 MPa, c) or the projecting material, the pin, the rod, the stand, the projection, the ring, , The bolt, the T-bolt, the I bolt, the weld, the attachment, the stud bolt, the protrusion having a length or protrusion length of 1 to 90% of the diameter or outer diameter, the protrusion for increasing frictional force or main surface friction, One of the stiffener to the reinforcing cage b) insertion or indentation after indentation; c) indentation or hammering into one of pressure, vibration, impact, striking, or hammer after insertion with self weight; d) hammer or anti- E) insertion into a crane and press fitting with a vibrator, f) press-in or hitching to a depth of 10 to 150 cm downward or inward into the rock portion or the forward end of the boring ball after insertion or press-fitting, g) , Horseshoe,
B) one of the reinforcing material or reinforcing cage is reinforced in the injection material or injection part,
C) forming a solidified body of the above-mentioned injection material and one of a reinforcing material and a reinforcing cage,
D) Injection material consolidation formation in which the reinforcing material is drawn or reinforced,
E) Injection work, injection, grouting, injection injection work, jet injection work, jet grouting work, high pressure injection work, low pressure injection work, injection work, By one of the injection injection techniques,
A reinforcement grouting pile (RGP) which is a composite machine of a high consolidation material and a reinforcement material to be formed; an injection body, an injection body, a grouting body, a reinforcement body, a main body file, an injection file, a grouting file, a main body foundation, an injection base, , A reinforced grouting foundation (RGF), a reinforced grouting foundation (RGF), a reinforced grouting pile, an injection grouting, and an injection reinforcing grouting pile
지층별 천공시간 또는 천공속도가 점성토 3.5 min/m, 사질토 5.0 min/m, 자갈 9.0 min/m, 전석 또는 호박돌 11.0 min/m 중 하나로 천공되고,
상기 천공부에 주입수단 또는 노즐 구비 로드가 인입되어 주입재, 인젝션재, 그라우팅재 중 하나 재료가 주입, 분사주입, 지중주입 중 하나 이상이 된 후에, 또는 하나 이상 적용되면서, 또는 상기 중 하나 이상에 의하여 시공 또는 조성되는 상기 주입재 또는 재료의 주입체, 인젝션체, 그라우팅체, 고결체, 고화체, 기둥체 중 하나 대신에,
A) 상기 주입재 또는 재료 분사 또는 주입 후, 양생 중, 전, 후 중 하나에 a) 보강재, 이의 하나인 강관, 빔, 철근, 철근망, 케이싱, 중공관, 다중관, 중첩관, 파일, 중공파일, 스크류파일, 철근케이지, b) 이외 직경, 외경, 공칭 직경, 공칭 외경, 하나 직경, 하나 외경, 군 직경, 군 외경 중 하나가 상기 주입공사 보링공, 인젝션공, 그라우팅공 중 하나 직경 또는 내경의 10∼100%, 두께가 1∼30mm, 강도 또는 극한강도가 250∼3000MPa 중 하나 이상인 상기 보강재, c) 상기 중 둘 이상 복합체, 다중체, 중첩체, d) 또는 돌출물, 이의 하나인 핀, 봉, 대, 돌기, 고리, 요철, 막대, 앵카, 볼트, T볼트, Ⅰ볼트, 용접물, 부착물, 스터드볼트, 길이 또는 돌출길이가 상기 직경 또는 외경의 1∼90%인 상기 돌출물, 마찰력 또는 주면마찰력 증가를 위한 상기 돌출물 중 하나가 부착 또는 용접된 상기 보강재 내지 중첩체 중 하나가 a) 매입, 인입, 삽입, 압입, 항타, b) 삽입 또는 압입 후 항타, c) 자중으로 삽입 후 압력, 진동, 충격, 타격, 해머 중 하나로 압입 또는 항타, d) 크레인으로 삽입 후 해머 또는 항타기로 항타, e) 크레인으로 삽입 후 바이브레이터로 압입, f) 삽입 또는 압입 후 암반부 또는 상기 보링공 선단부 하향으로 또는 속으로 10∼150cm까지 압입 또는 항타, g) 지지력 또는 선단지지력 증가를 위한 상기 압입, 항타,
B) 상기 주입재 또는 주입부에 상기 보강재 내지 중첩체 중 하나가 보강,
C) 상기 주입재의 고결체와 보강재 내지 중첩체 중 하나의 결합체 형성,
D) 상기 보강재가 인입 또는 보강된 주입재 고결체 형성,
E) 상기 중 하나가 되는 또는 상기 주입과 매입 내지 항타 중 하나가 되는 주입공사, 인젝션, 그라우팅, 분사주입공사, 제트주입공사, 제트그라우팅공사, 고압분사주입공사, 저압분사주입공사, 주입공법, 분사주입공법 중 하나에 의하여,
조성되는 고결체와 보강재의 복합기초인 보강그라우팅파일(RGP), 이의 하나인 주입체, 인젝션체, 그라우팅체, 보강재체, 주입체파일, 인젝션파일, 그라우팅파일, 주입체기초, 인젝션기초, 그라우팅기초, 현장타설말뚝, 건물기초, 구조물기초, 고결체와 보강재의 복합기초, 보강그라우팅기초(RGF) 중 하나인 것을 특징으로 하는 인젝션, 그라우팅, 주입공사와 보강재 이용 보강그라우팅파일
The perforation time or perforation rate per stratum was drilled into one of clay soil 3.5 min / m, sandy soil 5.0 min / m, gravel 9.0 min / m, oval stone or amber stone 11.0 min / m,
Injecting means or nozzle-carrying rod is drawn into the perforation so that the material of one of the injection material, the injection material and the grouting material is at least one of injection, injection injection, underground injection, or one or more of them, Instead of one of injection molding material, injecting material, grouting material, solidification material, solid material, and columnar material of the injection material or material to be constructed or to be formed,
A) One or more of: a) steel, beam, reinforcing bar, reinforcing net, casing, hollow tube, multiple tube, superstructure tube, pile, hollow tube One of diameter, outer diameter, nominal diameter, nominal diameter, one diameter, one outer diameter, group diameter, group outer diameter of the injection molding boring ball, injection hole, grouting ball, A reinforcing material having an inner diameter of 10 to 100%, a thickness of 1 to 30 mm and a strength or an extreme strength of 250 to 3000 MPa, c) a composite material of two or more of the above, a composite material, a superimposed material, d) A bolt, a weld, an attachment, a stud bolt, a projection or a projection having a length or protrusion length of 1 to 90% of the diameter or outer diameter, One of the projections for increasing the frictional force on the main surface is attached or welded B) insertion or indentation after indentation; c) indentation or insertion into one of pressure, vibration, impact, impact or hammer after insertion by self weight; d) Insert into crane and hammers or hammers; e) Insert into crane and press into vibrator; f) Insert or press into the rock or part of the boring ball downwards or inwards to 10-150cm, g) For the purpose of increasing the bearing capacity or the end bearing capacity,
B) one of the reinforcement material or the superimposed material is reinforced in the injection material or injection part,
C) forming a solidified body of the injection material and one of a reinforcement material and a superimposed material,
D) Injection material consolidation formation in which the reinforcing material is drawn or reinforced,
E) Injection work, injection, grouting, injection injection work, jet injection work, jet grouting work, high pressure injection work, low pressure injection work, injection work, By one of the injection injection techniques,
A reinforcement grouting pile (RGP) which is a composite machine of a high consolidation material and a reinforcement material to be formed; an injection body, an injection body, a grouting body, a reinforcement body, a main body file, an injection file, a grouting file, a main body foundation, an injection base, , A reinforced grouting foundation (RGF), a reinforced grouting foundation (RGF), a reinforced grouting pile, an injection grouting, and an injection reinforcing grouting pile
T1 : 천공시간 = (∑(L1 × t1) + t2) / f1,
상기 L1 : 지층별 천공길이, t1 : 지층별 천공시간, t2 : 로드연결시간 = 3 min (개소당), 상기 로드연결은 천공시 시행되며 천공 중 로드연결이 필요한 경우에 적용, f1 : 작업계수 = 0.8,
T2 : 분사주입시간 = (∑(L2 × t3) + t4) / f2,
상기 L2 : 유효직경별 분사주입 길이, t3 : 유효직경별 분사주입시간 = 주입체, 인젝션체, 그라우팅체 중 하나의 유효직경 500, 800, 1000, 1200, 1500, 1800, 2000 중 하나 mm에 대하여 각각 0.5∼1.3, 1.5∼3.6, 2.3∼5.7, 3.5∼9.0, 6.5∼13.0, 8.0∼18.0, 11∼23.0 중 하나 min/m, t4 : 로드분해시간 = 3 min (개소당), 상기 로드분해는 로드 인발시 시행되며 로드인발 중 로드분해가 필요한 경우에 적용, f2 : 작업계수 = 0.8,
중 하나 이상이 적용되어 작업소요시간이 T = T1 + T2로 산정되는 또는 소요되는 주입공사, 이의 하나인 인젝션, 그라우팅, 분사주입공사, 제트주입공사, 제트그라우팅공사, 고압분사주입공사, 저압분사주입공사 중 하나에 있어서,
주입재, 인젝션재, 그라우팅재 중 하나 재료가 주입, 분사주입, 지중주입 중 하나 적용에 더하여, 또는 상기 중 하나 이상에 의하여 시공 또는 조성되는 상기 주입재 또는 재료의 주입체, 인젝션체, 그라우팅체, 고결체, 고화체, 기둥체 중 하나 외에,
A) 상기 주입재 또는 재료 분사 또는 주입 후, 양생 중, 전, 후 중 하나에 a) 보강재, 이의 하나인 강관, 빔, 철근, 철근망, 케이싱, 중공관, 다중관, 중첩관, 파일, 중공파일, 스크류파일, 철근케이지, b) 이외 직경, 외경, 공칭 직경, 공칭 외경, 하나 직경, 하나 외경, 군 직경, 군 외경 중 하나가 상기 주입공사 보링공, 인젝션공, 그라우팅공 중 하나 직경 또는 내경의 10∼100%, 두께가 1∼30mm, 강도 또는 극한강도가 250∼3000MPa 중 하나 이상인 상기 보강재, c) 상기 중 둘 이상 복합체, 다중체, 중첩체, d) 또는 돌출물, 이의 하나인 핀, 봉, 대, 돌기, 고리, 요철, 막대, 앵카, 볼트, T볼트, Ⅰ볼트, 용접물, 부착물, 스터드볼트, 길이 또는 돌출길이가 상기 직경 또는 외경의 1∼90%인 상기 돌출물, 마찰력 또는 주면마찰력 증가를 위한 상기 돌출물 중 하나가 부착 또는 용접된 상기 보강재 내지 중첩체 중 하나가 a) 매입, 인입, 삽입, 압입, 항타, b) 삽입 또는 압입 후 항타, c) 자중으로 삽입 후 압력, 진동, 충격, 타격, 해머 중 하나로 압입 또는 항타, d) 크레인으로 삽입 후 해머 또는 항타기로 항타, e) 크레인으로 삽입 후 바이브레이터로 압입, f) 삽입 또는 압입 후 암반부 또는 상기 보링공 선단부 하향으로 또는 속으로 10∼150cm까지 압입 또는 항타, g) 지지력 또는 선단지지력 증가를 위한 상기 압입, 항타, B) 상기 주입재 또는 주입부에 상기 보강재 내지 중첩체 중 하나가 보강, C) 상기 주입재의 고결체와 보강재 내지 중첩체 중 하나의 결합체 형성, D) 상기 보강재가 인입 또는 보강된 주입재 고결체 형성 중 하나 이상에 의하여,
조성되는 고결체와 보강재의 복합기초인 보강그라우팅파일(RGP), 이의 하나인 주입체, 인젝션체, 그라우팅체, 보강재체, 주입체파일, 인젝션파일, 그라우팅파일, 주입체기초, 인젝션기초, 그라우팅기초, 현장타설말뚝, 건물기초, 구조물기초, 고결체와 보강재의 복합기초, 보강그라우팅기초(RGF) 중 하나인 것을 특징으로 하는 인젝션, 그라우팅, 주입공사와 보강재 이용 보강그라우팅파일
T1: puncturing time = (? (L1.times.t1) + t2) / f1,
L1: perforation length per stratum, t1: perforation time per stratum, t2: load connection time = 3 min (per site), the load connection is applied when drilling, = 0.8,
T2: injection injection time = (? (L2 x t3) + t4) / f2,
For one mm of the effective diameter 500, 800, 1000, 1200, 1500, 1800, 2000 of one of the main body, the injection body and the grouting body, L2 is the injection injection length per effective diameter, t3 is injection injection time per effective diameter. One of min / m and t4: rod decomposition time = 3 min (per site), and the rod disassembly F2: Work factor = 0.8, when the load is broken,
, Injection work, grouting, jet injection work, jet injection work, jet grouting work, high pressure injection work, low pressure injection, or the like, in which the work time is calculated as T = T1 + In one of the infusion works,
Injection material, injection material, grouting material, grouting material, injection material, injection material, grouting material, injection material, injecting material, underground material injection, In addition to one of solidification, solidification, and columnar structure,
A) One or more of: a) steel, beam, reinforcing bar, reinforcing net, casing, hollow tube, multiple tube, superstructure tube, pile, hollow tube One of diameter, outer diameter, nominal diameter, nominal diameter, one diameter, one outer diameter, group diameter, group outer diameter of the injection molding boring ball, injection hole, grouting ball, A reinforcing material having an inner diameter of 10 to 100%, a thickness of 1 to 30 mm and a strength or an extreme strength of 250 to 3000 MPa, c) a composite material of two or more of the above, a composite material, a superimposed material, d) A bolt, a weld, an attachment, a stud bolt, a projection or a projection having a length or protrusion length of 1 to 90% of the diameter or outer diameter, One of the projections for increasing the frictional force on the main surface is attached or welded B) insertion or indentation after indentation; c) indentation or insertion into one of pressure, vibration, impact, impact or hammer after insertion by self weight; d) Insert into crane and hammers or hammers; e) Insert into crane and press into vibrator; f) Insert or press into the rock or part of the boring ball downwards or inwards to 10-150cm, g) (B) reinforcing one of the reinforcing material or the superimposed material to the injection material or the injection part, (C) forming a solidified material of the reinforcing material or the superimposed material, (D) The reinforcement material may be formed by at least one of the drawn or reinforced injection material consolidation formation,
A reinforcement grouting pile (RGP) which is a composite machine of a high consolidation material and a reinforcement material to be formed; an injection body, an injection body, a grouting body, a reinforcement body, a main body file, an injection file, a grouting file, a main body foundation, an injection base, , A reinforced grouting foundation (RGF), a reinforced grouting foundation (RGF), a reinforced grouting pile, an injection grouting, and an injection reinforcing grouting pile
저장고, 호퍼, 배합기, 펌프, 호스, 스위벨, 로드, 모니터, 비트, 이중 하나 이상에 형성된 노즐 중 하나 이상이 순차적 또는 무순으로 구성되고,
상기 저장고에는 인젝션, 그라우팅, 주입공사 중 하나 원료가 저장되고,
상기 호퍼에 상기 또는 다른 원료가 투입되어 배합기로 유입되고,
상기 배합기는 상기 원료를 배합하여 인젝션, 그라우팅, 주입공사 중 하나 주입재 또는 재료를 제조하고,
상기 펌프에 의하여 주입재, 압축수, 압축공기 중 하나 이상이 펌핑, 가압, 공급, 또는 10㎏/㎠ 이하의 저압, 100㎏/㎠ 이상의 고압, 이둘 사이의 중압, 이외 자유압, 200∼600㎏/㎠압, 10ℓ/min 이하의 소량, 100ℓ/min 이상의 대량, 이 둘 사이의 중량, 이외 자유량, 50∼300ℓ/min 중 하나 이상으로 펌핑, 가압, 공급 중 하나가 되고,
상기 로드는 단관, 2중관, 3중관, 다중관, 중공관, 내관과 외관이 구비된 2중관, 내관과 중관과 외관이 구비된 3중관 중 하나이고,
상기 로드는 지중에서 관입, 정지, 인발 중 하나 이상이 되고,
상기 내관으로 주입재, 2중관의 외관으로 압축수 또는 압축공기, 3중관의 중관으로 압축수, 외관으로 압축공기 중 하나 이상이 공급 또는 유입되고,
상기 스위벨에 주입재, 압축수, 압축공기 중 하나 이상 유입구, 유입수단, 이의 하나인 호스, 파이프, 상기 로드 회전수단, 이의 하나인 회전모터, 이에 연결된 톱니, 벨트 중 하나 이상이 구비되고,
상기 노즐은 노즐, 주입재노즐, 압축수노즐, 압축공기노즐, 압축수압축공기노즐, 측면노즐, 선단노즐, 수평노즐, 수직노즐, 경사노즐, 상향노즐, 하향노즐, 1∼90도방향노즐 중 하나 이상인
장치에 의하여 상기 주입재 또는 재료가 지중에 분사 또는 주입되어 지중에 상기 주입재 또는 재료의 주입체, 인젝션체, 그라우팅체, 고결체, 고화체, 기둥체 중 하나가 형성되는 인젝션, 그라우팅, 주입공사 중 하나에 있어서,
A) 상기 주입재 또는 재료 분사 또는 주입 후, 양생 중, 전, 후 중 하나에 a) 직경, 외경, 공칭 직경, 공칭 외경, 하나 직경, 하나 외경, 군 직경, 군 외경 중 하나가 상기 주입공사 보링공, 인젝션공, 그라우팅공 중 하나 직경 또는 내경의 10∼100%, 두께가 1∼30mm, 강도 또는 극한강도가 250∼3000MPa 중 하나 이상이면서 b) 돌출물, 이의 하나인 핀, 봉, 대, 돌기, 고리, 요철, 막대, 앵카, 볼트, T볼트, Ⅰ볼트, 용접물, 부착물, 스터드볼트, 길이 또는 돌출길이가 상기 직경 또는 외경의 1∼90%인 상기 돌출물, 마찰력 또는 주면마찰력 증가를 위한 상기 돌출물 중 하나가 부착 또는 용접된 보강재, 이의 하나인 강관, 빔, 철근, 철근망, 케이싱, 중공관, 다중관, 중첩관, 파일, 중공파일, 스크류파일, 철근케이지 중 하나가 a) 매입, 인입, 삽입, 압입, 항타, b) 삽입 또는 압입 후 항타, c) 자중으로 삽입 후 압력, 진동, 충격, 타격, 해머 중 하나로 압입 또는 항타, d) 크레인으로 삽입 후 해머 또는 항타기로 항타, e) 크레인으로 삽입 후 바이브레이터로 압입, f) 삽입 또는 압입 후 암반부 또는 상기 보링공 선단부 하향으로 또는 속으로 10∼150cm까지 압입 또는 항타, g) 지지력 또는 선단지지력 증가를 위한 상기 압입, 항타,
B) 상기 주입재 또는 주입부에 상기 보강재 내지 중첩체 중 하나가 보강,
C) 상기 주입재의 고결체와 보강재 내지 중첩체 중 하나의 결합체 형성,
D) 상기 보강재가 인입 또는 보강된 주입재 고결체 형성 중 하나에 의하여,
상기 주입체, 인젝션체, 그라우팅체, 고결체, 고화체, 기둥체 중 하나가 상기 보강재로 보강된 보강그라우팅파일(RGP), 이의 하나인 주입체, 인젝션체, 그라우팅체, 보강재체, 주입체파일, 인젝션파일, 그라우팅파일, 주입체기초, 인젝션기초, 그라우팅기초, 현장타설말뚝, 건물기초, 구조물기초, 고결체와 보강재의 복합기초, 보강그라우팅기초(RGF) 중 하나인 것을 특징으로 하는 인젝션, 그라우팅, 주입공사와 보강재 이용 보강그라우팅파일
At least one of a nozzle, a reservoir, a hopper, a blender, a pump, a hose, a swivel, a rod, a monitor,
The raw material is stored in the reservoir, such as injection, grouting,
The above or other raw materials are introduced into the hopper and introduced into the blender,
Wherein the compounder is prepared by mixing the raw materials to produce an injection material or a material which is one of injection, grouting, and injection work,
Wherein at least one of the injection material, the compressed water, and the compressed air is pumped, pressurized, supplied, or pressurized by the pump at a low pressure of 10 kg / cm 2 or less, a high pressure of 100 kg / cm 2 or more, / Cm < 2 > pressure, a small amount of 10 l / min or less, a large amount of 100 l / min or more,
The rod is one of a single pipe, a double pipe, a triple pipe, a multi pipe, a hollow pipe, a double pipe having an inner pipe and an outer pipe, an inner pipe, and a triple pipe having a middle pipe and an outer pipe,
Wherein the load is at least one of intrusion, suspension,
Wherein at least one of the injection material, the compressed water or compressed air as the outer surface of the double pipe, the compressed water as the middle pipe of the triple pipe, and the compressed air as the outer pipe are supplied or introduced into the inner pipe,
Wherein the swivel is provided with at least one of an injection material, at least one inlet of compressed water, compressed air, an inlet means, a hose, a pipe, a rod rotating means,
The nozzle may be a nozzle, an injection nozzle, a compressed water nozzle, a compressed air nozzle, a compressed water compressed air nozzle, a side nozzle, a tip nozzle, a horizontal nozzle, a vertical nozzle, an inclined nozzle, More than one
Grouting, and injection work in which one of the injection material, the injection body, the grouting body, the solidification body, the solid body, and the column body of the injection material or the material is formed in the ground by injecting or injecting the injection material or the material by the apparatus In this case,
A) one of diameter, outer diameter, nominal diameter, nominal diameter, one diameter, one outer diameter, group diameter, group outer diameter of the injection material or material after injection or injection, curing, before, B) at least one of a ball, an injection hole, a grouting ball, a diameter or an inner diameter of 10 to 100%, a thickness of 1 to 30 mm, and a strength or an ultimate strength of 250 to 3000 MPa, A stud, a bolt, a stud, a bolt, a weld, an attachment, a stud bolt, a protrusion having a length or protrusion length of 1 to 90% of the diameter or the outside diameter, a frictional force or a frictional force One of the projections is attached or welded, one of which is steel pipe, beam, reinforcing bar, reinforcing net, casing, hollow pipe, multi pipe, superstructure pipe, pile, hollow file, screw file, Insertion, insertion, indentation, stabbing, b) insertion or indentation D) insert into a crane and hammers or hammers; e) insert into a crane and press in with a vibrator; f) insert or indent into a crane; G) Depressing, hoeing, or hoeing to increase bearing capacity or tip bearing capacity,
B) one of the reinforcement material or the superimposed material is reinforced in the injection material or injection part,
C) forming a solidified body of the injection material and one of a reinforcement material and a superimposed material,
D) the reinforcement is formed by one of the drawn or reinforced filler solidification,
Wherein the reinforcement grouting pile (RGP) reinforced by one of the main body, the injection body, the grouting body, the solidification body, the solid body, and the column body is reinforced by the reinforcing material, the injection body, the injection body, the grouting body, Wherein the injection grouting is one of injection grooving, injection grouting, grooving foundation, injection foundation, grouting foundation, ground penetrating pile, building foundation, structure foundation, composite foundation of solidification and reinforcement, and reinforcement grouting foundation (RGF) Grouting, injection work and reinforcement grouting using reinforcing materials
주입공사, 이의 하나인 인젝션, 그라우팅, 분사주입공사, 제트주입공사, 제트그라우팅공사, 고압분사주입공사, 저압분사주입공사, RCD(reverse circulation drill)공사, PRD(percussion rotary drill)공사, JSP(jumbo special pattern method)공사, AGS(auto grouting system)공사, ARC(acrylic resin chemical)공사, CJM(column jet method)공사, MJM(motar jet method)공사, SRC(slime reused column jet grouting)공사 중 하나에 있어서,
주입재, 인젝션재, 그라우팅재, 이중 하나인 밀크, 몰탈, 약액, 현탁액, 페이스트, 레미콘, 콘크리트, 시멘트밀크, 시멘트몰탈, 시멘트페이스트, 시멘트콘크리트, 섬유 또는 화이버 함유 상기 재료 중 하나가 주입, 분사주입, 지중주입 중 하나 이상이 된 후에, 또는 하나 이상 적용에 더하여, 또는 상기 중 하나 이상에 의하여 시공 또는 조성되는 상기 주입재 또는 재료의 주입체, 인젝션체, 그라우팅체, 고결체, 고화체, 기둥체 중 하나 대신에,
A) 상기 주입재 또는 재료 분사 또는 주입 후, 양생 중, 전, 후 중 하나에 a) 직경, 외경, 공칭 직경, 공칭 외경, 하나 직경, 하나 외경, 군 직경, 군 외경 중 하나가 상기 주입공사 보링공, 인젝션공, 그라우팅공 중 하나 직경 또는 내경의 10∼100%, 두께가 1∼30mm, 강도 또는 극한강도가 250∼3000MPa 중 하나 이상이면서 b) 돌출물, 이의 하나인 핀, 봉, 대, 돌기, 고리, 요철, 막대, 앵카, 볼트, T볼트, Ⅰ볼트, 용접물, 부착물, 스터드볼트, 길이 또는 돌출길이가 상기 직경 또는 외경의 1∼90%인 상기 돌출물, 마찰력 또는 주면마찰력 증가를 위한 상기 돌출물 중 하나가 부착 또는 용접된 보강재, 이의 하나인 강관, 빔, 철근, 철근망, 케이싱, 중공관, 다중관, 중첩관, 파일, 중공파일, 스크류파일, 철근케이지 중 하나가 a) 매입, 인입, 삽입, 압입, 항타, b) 삽입 또는 압입 후 항타, c) 자중으로 삽입 후 압력, 진동, 충격, 타격, 해머 중 하나로 압입 또는 항타, d) 크레인으로 삽입 후 해머 또는 항타기로 항타, e) 크레인으로 삽입 후 바이브레이터로 압입, f) 삽입 또는 압입 후 암반부 또는 상기 보링공 선단부 하향으로 또는 속으로 10∼150cm까지 압입 또는 항타, g) 지지력 또는 선단지지력 증가를 위한 상기 압입, 항타,
B) 상기 주입재 또는 주입부에 상기 보강재 내지 중첩체 중 하나가 보강,
C) 상기 주입재의 고결체와 보강재 내지 중첩체 중 하나의 결합체 형성,
D) 상기 보강재가 인입 또는 보강된 주입재 고결체 형성 중 하나가 되는 주입공사, 인젝션, 그라우팅, 분사주입공사, 제트주입공사, 제트그라우팅공사, 고압분사주입공사, 저압분사주입공사, 주입공법, 분사주입공법 중 하나에 의하여,
조성되는 고결체와 보강재의 복합기초인 보강그라우팅파일(RGP), 이의 하나인 주입체, 인젝션체, 그라우팅체, 보강재체, 주입체파일, 인젝션파일, 그라우팅파일, 주입체기초, 인젝션기초, 그라우팅기초, 현장타설말뚝, 건물기초, 구조물기초, 고결체와 보강재의 복합기초, 보강그라우팅기초(RGF) 중 하나인 것을 특징으로 하는 인젝션, 그라우팅, 주입공사와 보강재 이용 보강그라우팅파일
Injection, grouting, injection injection, jet injection, jet grouting, high pressure injection, low pressure injection, RCD (reverse circulation drill) construction, PRD (percussion rotary drill) construction, JSP One of the jumbo special pattern method construction, AGS (auto grouting system) construction, ARC (acrylic resin chemical) construction, CJM (column jet method) construction, MJM (motar jet method) construction, SRC (slime reused column jet grouting) In this case,
One of the above materials including injection material, injection material, grouting material and one of the two materials including milk, mortar, chemical solution, suspension, paste, remicon, concrete, cement milk, cement mortar, cement paste, cement concrete, Injecting body, grouting body, solidification body, solid body, and column body of the above-mentioned injection material or material which is to be constructed or prepared by at least one of the above, Instead of one,
A) one of diameter, outer diameter, nominal diameter, nominal diameter, one diameter, one outer diameter, group diameter, group outer diameter of the injection material or material after injection or injection, curing, before, B) at least one of a ball, an injection hole, a grouting ball, a diameter or an inner diameter of 10 to 100%, a thickness of 1 to 30 mm, and a strength or an ultimate strength of 250 to 3000 MPa, A stud, a bolt, a stud, a bolt, a weld, an attachment, a stud bolt, a protrusion having a length or protrusion length of 1 to 90% of the diameter or the outside diameter, a frictional force or a frictional force One of the projections is attached or welded, one of which is steel pipe, beam, reinforcing bar, reinforcing net, casing, hollow pipe, multi pipe, superstructure pipe, pile, hollow file, screw file, Insertion, insertion, indentation, stabbing, b) insertion or indentation D) insert into a crane and hammers or hammers; e) insert into a crane and press in with a vibrator; f) insert or indent into a crane; G) Depressing, hoeing, or hoeing to increase bearing capacity or tip bearing capacity,
B) one of the reinforcement material or the superimposed material is reinforced in the injection material or injection part,
C) forming a solidified body of the injection material and one of a reinforcement material and a superimposed material,
D) Injection work, injection, grouting, injection injection, jet injection work, jet grouting work, high pressure injection work, low pressure injection work, injection work, spraying, in which the reinforcing material is one of the injection material consolidation forming By one of the injection techniques,
A reinforcement grouting pile (RGP) which is a composite machine of a high consolidation material and a reinforcement material to be formed; an injection body, an injection body, a grouting body, a reinforcement body, a main body file, an injection file, a grouting file, a main body foundation, an injection base, , A reinforced grouting foundation (RGF), a reinforced grouting foundation (RGF), a reinforced grouting pile, an injection grouting, and an injection reinforcing grouting pile
장비조립, 장비셋팅, 비트 구비 로드 회전, 지반 천공, 재료 분사주입, 이토처리, 보강재매입, 장비해체,
상기 천공시 1개 로드 이상 깊이를 천공하는 경우 추가 로드 연결,
상기 분사주입 후 로드 분해,
상기 분사주입 후 지상으로 배출된 슬라임 제거,
상기 중 하나 이상 또는 상기 장비셋팅 내지 보강재매입 중 하나 이상 반복,
중 하나 이상을 함에 있어서, 또는 하나 이상을 하는 인젝션, 그라우팅, 분사공사, 주입공사 중 하나에 있어서,
상기 보강재 매입이 a) 직경, 외경, 공칭 직경, 공칭 외경, 하나 직경, 하나 외경, 군 직경, 군 외경 중 하나가 상기 주입공사 보링공, 인젝션공, 그라우팅공 중 하나 직경 또는 내경의 10∼100%, b) 두께가 1∼30mm, c) 강도 또는 극한강도가 250∼3000MPa 중 하나 이상이면서 a) 돌출물, 이의 하나인 핀, 봉, 대, 돌기, 고리, 요철, 막대, 앵카, 볼트, T볼트, Ⅰ볼트, 용접물, 부착물, 스터드볼트, b) 길이 또는 돌출길이가 상기 직경 또는 외경의 1∼90%인 상기 돌출물, c) 마찰력 또는 주면마찰력 증가를 위한 상기 돌출물 중 하나가 부착 또는 용접된 보강재, 이의 하나인 강관, 빔, 철근, 철근망, 케이싱, 중공관, 다중관, 중첩관, 파일, 중공파일, 스크류파일, 철근케이지 중 하나가 a) 매입, 인입, 삽입, 압입, 항타, b) 삽입 또는 압입 후 항타, c) 자중으로 삽입 후 압력, 진동, 충격, 타격, 해머 중 하나로 압입 또는 항타, d) 크레인으로 삽입 후 해머 또는 항타기로 항타, e) 크레인으로 삽입 후 바이브레이터로 압입, f) 삽입 또는 압입 후 암반부 또는 상기 보링공 선단부 하향으로 또는 속으로 10∼150cm까지 압입 또는 항타, g) 지지력 또는 선단지지력 증가를 위한 상기 압입, 항타 중 하나 이상이 되어,
조성되는 상기 재료의 고결체와 상기 보강재의 복합기초인 보강그라우팅파일(RGP), 이의 하나인 주입체, 인젝션체, 그라우팅체, 보강재체, 주입체파일, 인젝션파일, 그라우팅파일, 주입체기초, 인젝션기초, 그라우팅기초, 현장타설말뚝, 건물기초, 구조물기초, 또는 500, 800, 1000, 1200, 1500, 1800, 2000 중 하나 공경 또는 직경 또는 유효직경을 가지는 상기 체, 파일, 기초 중 하나인 것을 특징으로 하는 인젝션, 그라우팅, 주입공사와 보강재 이용 보강그라우팅파일
Equipment assembly, equipment setting, bit rotation of the rod, ground penetration, injection of material injection, soil treatment, purchase of stiffener,
When drilling a depth of more than one load during the drilling, additional load connection,
After the injection injection,
Removing the slime discharged to the ground after injection injection,
At least one of the above or at least one of the equipment setting and the stiffener purchase,
, One or more of injection, grouting, spraying, or injection work,
The reinforcing material embedding is carried out such that one of a diameter, an outer diameter, a nominal diameter, a nominal diameter, a diameter, an outer diameter, a group diameter, and a group outer diameter of one of the injection work boring hole, the injection hole and the grouting hole is 10 to 100 b) Thickness of 1 ~ 30mm, c) Strength or extreme strength of 250-3000MPa or more, a) Extrusion, one of these pins, rods, stands, projections, rings, ridges, rods, anchors, bolts, T Bolts, bolts, welds, attachments, stud bolts, b) the protrusions whose length or protrusion length is 1 to 90% of the diameter or outer diameter, c) one of the protrusions for increasing frictional force or main surface frictional force is attached or welded One of the reinforcing material, the steel pipe, beam, reinforcing bar, reinforcing net, casing, hollow tube, multi tube, superimposed tube, pile, hollow file, screw file or reinforced cage is a) embedded, b) hinge after insertion or indentation, c) insertion after self-weight, pressure, vibration, D) insert into a crane and hammers or hammers; e) insert into a crane and then press into the vibrator; f) insert or press into the rock or part of the boring ball downwards or inwards; G) pushing or hitching to increase the bearing capacity or end bearing capacity,
A reinforcement grouting file (RGP) which is a composite machine superstructure of the above-mentioned reinforcing material and a solidification of the above-mentioned material to be formed, a injection body, an injection body, a grouting body, a reinforcement body, a main body file, an injection file, a grouting file, It is one of the above-mentioned sieve, pile, foundation having pore diameter, diameter or effective diameter of one of the foundations, grouting bases, ground drilled piles, building foundations, foundation foundations, or 500, 800, 1000, 1200, 1500, 1800, Injection, grouting, injection work and reinforcement grouting using reinforcing materials
인젝션, 그라우팅, 주입공사, 인젝션재 분사, 그라우팅재 분사, 주입재 분사 중 하나의 시행 중 또는 후에
크레인으로 a) 직경, 외경, 공칭 직경, 공칭 외경, 하나 직경, 하나 외경, 군 직경, 군 외경 중 하나가 상기 주입공사 보링공, 인젝션공, 그라우팅공 중 하나 직경 또는 내경의 10∼100%, b) 두께가 1∼30mm, c) 강도 또는 극한강도가 250∼3000MPa 중 하나 이상이면서 a) 돌출물, 이의 하나인 핀, 봉, 대, 돌기, 고리, 요철, 막대, 앵카, 볼트, T볼트, Ⅰ볼트, 용접물, 부착물, 스터드볼트, b) 길이 또는 돌출길이가 상기 직경 또는 외경의 1∼90%인 상기 돌출물, c) 마찰력 또는 주면마찰력 증가를 위한 상기 돌출물 중 하나가 부착 또는 용접된 보강재, 이의 하나인 강관, 빔, 철근, 철근망, 케이싱, 중공관, 다중관, 중첩관, 파일, 중공파일, 스크류파일, 철근케이지 중 하나를 들어 올리고, 이를 인젝션재, 그라우팅재, 주입재 중 하나의 주입공에 삽입,
상기 삽입된 상기 보강재 내지 중첩체 중 하나를 해머, 드롭해머, 바이브레이터, 항타기 중 하나로 항타 중 하나 이상을 하여
조성된 상기 인젝션재, 그라우팅재, 주입재 중 하나의 고결체와 보강재의 복합기초인 보강그라우팅파일(RGP), 이의 하나인 주입체, 인젝션체, 그라우팅체, 보강재체, 주입체파일, 인젝션파일, 그라우팅파일, 주입체기초, 인젝션기초, 그라우팅기초, 현장타설말뚝, 건물기초, 구조물기초, 고결체와 보강재의 복합기초, 보강그라우팅기초(RGF) 중 하나인 것을 특징으로 하는 인젝션, 그라우팅, 주입공사와 보강재 이용 보강그라우팅파일
During or after one of injection, grouting, injection work, injection re-injection, grouting re-injection, injection material injection
A) one of diameter, outer diameter, nominal diameter, nominal diameter, one diameter, one outer diameter, group diameter, group outer diameter is 10 to 100% of the diameter or inner diameter of one of the injection boring hole, injection hole, grouting hole, b) Thickness of 1 ~ 30mm, c) One or more of strength or ultimate strength of 250 ~ 3000MPa, a) Projection, one of these pins, rods, stands, protrusions, rings, ridges, rods, anchors, bolts, B) the protrusion with a length or protrusion length of 1 to 90% of the diameter or outer diameter, c) a stiffener to which one of the protrusions for increasing frictional force or main surface friction is attached or welded, One of the steel pipe, the beam, the reinforcing bar, the reinforcing net, the casing, the hollow pipe, the multiple pipe, the superimposed pipe, the pile, the hollow file, the screw file and the reinforcing cage is lifted and inserted into one of the injection material, grouting material, Injection into the ball,
One of the inserted stiffener or superimposed body is hammered into one of a hammer, a drop hammer, a vibrator, and an anti-
A reinforcement grouting file (RGP), which is one of the injection material, the grouting material, and the injection material, which is a combined device of the solidification material and the reinforcing material, and the injection material, the injection material, the grouting material, the reinforcement material, the injection molding material, Grouting, pouring work, which is characterized in that it is one of a pile foundation, an injection foundation, an injection foundation, a grouting foundation, a cast-in-place pile, a building foundation, Reinforced grouting
KR2020170004307U 2017-08-14 2017-08-14 Reinforced grouting pile using injection, grouting and reinforced material KR20180003017U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020170004307U KR20180003017U (en) 2017-08-14 2017-08-14 Reinforced grouting pile using injection, grouting and reinforced material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020170004307U KR20180003017U (en) 2017-08-14 2017-08-14 Reinforced grouting pile using injection, grouting and reinforced material

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR2020170001791 Division 2017-04-11

Publications (1)

Publication Number Publication Date
KR20180003017U true KR20180003017U (en) 2018-10-19

Family

ID=64049882

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020170004307U KR20180003017U (en) 2017-08-14 2017-08-14 Reinforced grouting pile using injection, grouting and reinforced material

Country Status (1)

Country Link
KR (1) KR20180003017U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109826630A (en) * 2019-02-02 2019-05-31 上海城建水务工程有限公司 A kind of precast concrete open caisson device and its construction method for jacking construction
KR20190110515A (en) * 2019-09-23 2019-09-30 정하익 Eco material, method, equipment, facility, building, structure
CN111851482A (en) * 2020-08-28 2020-10-30 江苏景源万河环境科技有限公司 Prestressed anchor rod pile for reinforcing foundation through rotary spraying, powder spraying or stirring pile and construction method
CN113959920A (en) * 2021-09-17 2022-01-21 北京东方雨虹防水技术股份有限公司 Pressure-stabilizing permeation grouting simulation device and application method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109826630A (en) * 2019-02-02 2019-05-31 上海城建水务工程有限公司 A kind of precast concrete open caisson device and its construction method for jacking construction
CN109826630B (en) * 2019-02-02 2024-04-09 上海城建水务工程有限公司 Precast concrete open caisson device for pipe jacking construction and construction method thereof
KR20190110515A (en) * 2019-09-23 2019-09-30 정하익 Eco material, method, equipment, facility, building, structure
CN111851482A (en) * 2020-08-28 2020-10-30 江苏景源万河环境科技有限公司 Prestressed anchor rod pile for reinforcing foundation through rotary spraying, powder spraying or stirring pile and construction method
CN113959920A (en) * 2021-09-17 2022-01-21 北京东方雨虹防水技术股份有限公司 Pressure-stabilizing permeation grouting simulation device and application method thereof
CN113959920B (en) * 2021-09-17 2024-04-16 北京东方雨虹防水技术股份有限公司 Pressure-stabilizing permeation grouting simulation device and application method thereof

Similar Documents

Publication Publication Date Title
KR20180003017U (en) Reinforced grouting pile using injection, grouting and reinforced material
CN203452083U (en) Rotary expanding pile construction equipment and grout feeding device
JP4796477B2 (en) Steel pipe soil cement pile construction method and composite pile construction method
KR20180114618A (en) Reinforced injection, grouting and in-place or reinforced grouting foundation, pile by them
CN102322058A (en) Construction process and equipment for downhole impacting high-pressure jet grouting pile
KR100762991B1 (en) Precast piling method injected with high-strength mortar
KR101987533B1 (en) A excavation head
JP3850802B2 (en) Steel pile and its construction method
KR20180003014U (en) In-place foundation using reinforced material and injection, grouting
JP2009046896A (en) Soil bearing capacity increasing technique for soft ground
KR101040040B1 (en) Method for constructing pile using spray type excavating bit
CN207260138U (en) Drill rod of high-pressure jet grouting stirring bearing pile and device with drill rod
KR100781492B1 (en) Structure of retaining wall, and construction methods for the same
JP5015558B2 (en) Fiber reinforced cement ground improvement method
KR20180114620A (en) In-place or reinforced grouting foundation, pile and its construction using injection, grouting and reinforced material
KR20180003016U (en) Reinforced grouting foundation using injection, grouting and reinforced material
KR20180003020U (en) In-place foundation by injection, grouting, its works and reinforcing material
KR20180003018U (en) In-place foundation by injection, grouting column inserted reinforcing material
CN103074887A (en) Drilling/spraying integrated foundation treatment method and special drilling rig component
JP5875849B2 (en) Injection stirring ground improvement method
KR20180003015U (en) In-place pile using injection, grouting and reinforced material
JP3673158B2 (en) Pile embedding method and jig
JP3217038B2 (en) Ground drilling equipment and method of forming cylindrical underground structure
KR20220139630A (en) Cast in placed pile wall construction method
JPH1150443A (en) Underground consolidated body construction device and construction method thereof

Legal Events

Date Code Title Description
A201 Request for examination
U106 Divisional application of utility model
E902 Notification of reason for refusal
E902 Notification of reason for refusal