KR20170114141A - System and method for controlling operation equipments - Google Patents

System and method for controlling operation equipments Download PDF

Info

Publication number
KR20170114141A
KR20170114141A KR1020160041423A KR20160041423A KR20170114141A KR 20170114141 A KR20170114141 A KR 20170114141A KR 1020160041423 A KR1020160041423 A KR 1020160041423A KR 20160041423 A KR20160041423 A KR 20160041423A KR 20170114141 A KR20170114141 A KR 20170114141A
Authority
KR
South Korea
Prior art keywords
facility
movable
facilities
movable facility
control device
Prior art date
Application number
KR1020160041423A
Other languages
Korean (ko)
Other versions
KR101842896B1 (en
Inventor
이태규
Original Assignee
이태규
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이태규 filed Critical 이태규
Priority to KR1020160041423A priority Critical patent/KR101842896B1/en
Publication of KR20170114141A publication Critical patent/KR20170114141A/en
Application granted granted Critical
Publication of KR101842896B1 publication Critical patent/KR101842896B1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D21/00Measuring or testing not otherwise provided for
    • G01D21/02Measuring two or more variables by means not covered by a single other subclass
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R11/00Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption
    • G01R11/30Dynamo-electric motor meters
    • G01R11/32Watt-hour meters
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L51/00User-to-user messaging in packet-switching networks, transmitted according to store-and-forward or real-time protocols, e.g. e-mail
    • H04L51/04Real-time or near real-time messaging, e.g. instant messaging [IM]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L9/00Cryptographic mechanisms or cryptographic arrangements for secret or secure communications; Network security protocols
    • H04L9/32Cryptographic mechanisms or cryptographic arrangements for secret or secure communications; Network security protocols including means for verifying the identity or authority of a user of the system or for message authentication, e.g. authorization, entity authentication, data integrity or data verification, non-repudiation, key authentication or verification of credentials
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W4/00Services specially adapted for wireless communication networks; Facilities therefor
    • H04W4/12Messaging; Mailboxes; Announcements

Abstract

본 발명은 가동 시설 제어 시스템 및 그 제어 방법에 관한 것이다. 가동 시설은 예를 들어, 생산 시설과, 폐수 배출 시설, 대기 배출 시설 등의 환경 시설 및, 냉난방 시설, 보일러 시설, 발전 시설 등의 기타 시설 등 다양하게 구비된다. 가동 시설 제어 시스템은 복수 개의 가동 시설과, 가동 시설을 원격 제어하는 제어 장치와, 제어 장치로부터 가동 시설의 운전 현황에 따른 다양한 정보를 전송받아서 가동 시설의 운전 상태를 모니터링하는 관리자 단말기 및, 제어 장치로부터 다양한 계측 정보를 전송받아서 통계 분석 처리하고, 이를 통해 가동 시설들을 통합 관리하는 가동 시설 통합 관리 서버를 포함한다. 본 발명에 의하면, 제어 장치를 이용하여 가동 시설들을 원격 제어하여 최적의 운전 상태를 유지하게 함으로써, 운전 비용 절감 및 에너지 절약 효과를 얻을 수 있다.The present invention relates to a movable facility control system and a control method thereof. The operation facilities include various facilities such as production facilities, wastewater discharge facilities, environmental facilities such as air discharge facilities, and other facilities such as air conditioning and heating facilities, boiler facilities, and power generation facilities. And a control unit for controlling the operation of the movable facility by receiving various information according to the operation status of the movable facility from the control unit, And a moving facility integrated management server for collectively managing the moving facilities through the statistical analysis process. According to the present invention, the operation facilities can be remotely controlled by using the control device to maintain the optimum operation state, so that the operation cost reduction and the energy saving effect can be obtained.

Figure P1020160041423
Figure P1020160041423

Description

가동 시설 제어 시스템 및 그 방법{SYSTEM AND METHOD FOR CONTROLLING OPERATION EQUIPMENTS}[0001] SYSTEM AND METHOD FOR CONTROLLING OPERATION EQUIPMENTS [0002]

본 발명은 가동 시설 제어 시스템에 관한 것으로, 좀 더 구체적으로 컴퓨터 통신망을 이용하여 다양한 가동 시설의 운전 현황 기록 정보와 운전 결과 정보를 전송하고, 운전 결과 정보를 연산 처리하며, 가동 시설과 이에 연결된 방지 시설을 효율적으로 운전하도록 가동 시설을 통합 관리하여, 최적의 운전 상태를 유지하고 개인 및 기업의 생산성 향상을 도모하여 에너지를 절약할 수 있도록 처리하는 가동 시설 제어 시스템 및 그의 제어 방법에 관한 것이다.More particularly, the present invention relates to a control system for a movable facility, and more particularly, it relates to a system and method for controlling the operation of the movable facility, And more particularly, to an operation control system and a control method thereof, in which an operation facility is integratedly managed so as to efficiently operate the facility, an optimal operation state is maintained, productivity of an individual and an enterprise is improved, and energy is saved.

가동 시설은 예를 들어, 하수, 폐수 처리 시설 및 분뇨 처리 시설, 가축 분뇨 처리 시설, 폐기물 처리 시설 등의 환경 시설, 건물 냉난방 시설, 공장 가동 시설, 발전 시설 등에 필요한 지원 시설로서, 일상 생활이나 생산 시설 운영을 위해 직간접적으로 운영된다. 가동 시설의 주 영업 대상은 개인 및 기업체 환경 시설, 생산 지원 시설, 중앙 냉난방 시설 등으로 법적 자격을 갖춘 근로자가 관리해야 한다. 그러나 이러한 가동 시설은 현재 규제 완화로 인해 해당 업무 경험자가 관리하는 등 그 관리 업무의 대처가 가능하다.Operation facilities are, for example, support facilities for sewage, wastewater treatment facilities and manure treatment facilities, livestock manure treatment facilities, environmental facilities such as waste treatment facilities, building heating and cooling facilities, factory operation facilities and power generation facilities, It operates directly or indirectly for facility operation. The main operation target of the operation facility is to be managed by a legally qualified worker, such as personal and business environment facility, production support facility, and central heating and cooling facility. However, such an operation facility can cope with the duties such as deregulation, which is managed by the experienced worker.

실질적으로 가동 시설은 전문적인 교육을 받고 운전 경험이 있는 관리인이 필요하나, 공공 기관, 대기업 및 중견기업 등 소수 사업장을 제외한 다수의 사업장에는 최소의 관리자가 여러 가동 시설들을 관리하여, 전문성이 떨어져 운전 미숙 등으로 업무 생산성이 떨어지고, 그로 인해 가동 시설 관리가 부실해 감독 기관으로부터 과태료 처분을 받아 기업 운영에 따른 비용 증가와 함께 기업 이미지 하락 등 심각한 문제가 발생되고 있다.Actually, the operation facility needs a manager who has a professional education and driving experience. However, in case of a small number of workplaces except a small number of workplaces such as public institutions, large corporations and midsize companies, a minimum manager manages various operation facilities, In addition, there is a serious problem such as a decline in corporate image due to an increase in costs due to the operation of the enterprise due to the failure of management of the operation facility due to inadequate socioeconomic status.

아울러 관리자는 시설 관리 증가로 인한 정신적, 육체적 압박이 가중되고 있으며, 이로 인한 생산성 하락으로 이어지고 있다.In addition, managerial mental and physical pressure is increasing due to increased management of facilities, resulting in a decrease in productivity.

기존의 중소기업의 가동 시설 관리자는 공무부 즉, 제품 생산에 직접 참여하지는 않으나 생산 공정에 필요한 전기, 기계, 보일러, 대기 및 수질 등의 환경 오염 방지 시설 등을 관리 보수하는 업무를 총칭하는 부서의 근무자로, 단일 업무를 수행하는 것이 아니라 여러 업무를 복합적으로 수행한다.Existing SME operation facility managers are employees of the department that collectively refers to the Ministry of Public Management, which does not directly participate in the production of products but also manages and repairs facilities for preventing environmental pollution such as electricity, machinery, boilers, , It does not perform a single task, but performs multiple tasks in a complex way.

이러한 가동 시설 관리자는 자격을 갖춘 전문가가 관리해야 하나, 업무의 규모가 작다는 이유와, 중소기업의 인력 수급의 어려움과, 기업 경영에 도움을 주고자 해당 업무 경력자 또는 일정 규모 이하의 사업장은 누구나 관리자로 지정하여 대처할 수 있도록 법적 기준을 완화하였다.Such an operation facility manager should be managed by a qualified specialist. However, in order to provide a reason for the small size of the work, difficulty in supplying and supplying labor for SMEs, and business operation, And the legal standard has been relaxed so that it can cope with it.

그 결과, 대부분의 영세 및 소기업에서는 회사 대표나 직원 중 관련 업무 경력자를 가동 시설의 관리자로 임명하여 가동 시설 관리 업무를 수행함으로 그 전문성이 떨어져 일부 업체에서는 전문 관리 업체에 위탁하는 경우가 빈번하다. 이 경우, 그 위탁 비용이 회사 경영에 부담되므로 대부분의 업체에서는 한명이 여러 가동 시설들을 관리하게 되며, 이로 인해 가동 시설의 부실한 관리로 관련 법률도 위반하고 있는 실정이다.As a result, in most small and medium enterprises, it is often the case that some companies are entrusted to a professional management company because of their lack of expertise in appointing a company representative or an employee who has related business experience as the manager of the operation facility. In this case, since the consignment cost is borne by the management of the company, most companies manage one or more of the operation facilities, thereby violating related laws due to poor management of the operation facilities.

이로 인해 규모가 작은 가동 시설이라도 전문 관리자가 운영하여야 하나, 경제적, 인적 문제와 법적 규제 완화로 본연의 업무 외의 근로자가 가동 시설을 운전하고 있어 필연적으로 전문성이 떨어져 관리가 부실해지고, 이와 더불어 한 명의 근로자가 여러 가동 시설들을 관리함으로서 더 많은 문제점을 야기시키고 있다.As a result, even small-scale operation facilities need to be operated by professional managers. However, due to economic and human problems and legal deregulation, workers other than the original work are driving the operation facilities, which inevitably leads to poor professionalism and poor management. Workers are causing more problems by managing the various facilities.

그로 인해 가동 시설의 유지 관리 즉 시설 운전, 예방 정비, 기계 정비가 부실해지며 법적으로 수행해야 하는 시설 운영 일지 작성 및 보관, 시설물 정기 검사, 배출 물질 측정 등 관리자 업무가 누락되었을 경우, 지도 감독 기관으로부터 행정 처분, 법적으로 고발 대상이 되어질 수 있으며, 일부에서는 이러한 일들이 빈번히 일어나고 있다.Therefore, if the maintenance work of the operating facility, such as facility operation, preventive maintenance, maintenance of the machine is poor, and the administrator's duties such as the preparation and storage of the facility operation log, Administrative dispositions, legal charges, and in some cases these things are happening frequently.

공공 기관, 대기업 및 중견 기업과 중소 기업을 포함한 사업장 및 개인이 이러한 문제점을 해소하기 위하여, 기존 일정 규모 이하의 가동 시설들은 전문 관리 업체가 위탁받아 전문 관리자가 종류별 여러 가동 시설을 현장 방문하여 용역을 수행한다. 이 경우, 전문 관리자를 채용하여 관리하는 것보다 비용은 저렴하나, 특정일 시간에 방문하여 점검하는 것이라 법적으로 수행해야 하는 업무 외에 시설 운전이 무인화되어, 비상 시 대처가 안되므로, 대부분의 사업장은 기존 업무 경력자를 시설 운전에 배치하여 운영하는 등 여전히 전문적인 관리가 미흡하고 비용만 증가하게 되는 등 불합리한 현상이 반복된다.In order to solve these problems, public institutions, large corporations, midsize companies, and SMEs and small and medium-sized enterprises are required to work on various facilities under the existing scale. . In this case, it is cheaper than the management by employing a professional manager, but it is visited at a certain time of day to check, and since the operation of the facility is unmanned in addition to the work to be performed legally, It is unreasonable to repeat the unusual phenomenon that professional management is insufficient and the cost is increased only by arranging the worker to operate the facility.

이에 본 발명에서는 상술한 문제점들을 개선 및 보완하고, 나아가 언제 어디에서나 증강 현실(AR) 기기 등을 포함한 휴대용 모바일 단말기를 이용하여 가동 시설에 대한 운전 상태 감시 및/또는 전산 조작을 통한 관리자가 원격 제어하고자 한다.Accordingly, the present invention improves and compensates for the above-mentioned problems, and furthermore, it is an object of the present invention to provide a remote control system and a remote control system for a mobile terminal, I want to.

한국 등록특허공보 제10-1194728호(공고일 2012년 10월 25일)Korean Registered Patent No. 10-1194728 (Published on October 25, 2012) 한국 등록특허공보 제10-1441082호(공고일 2014년 09월 17일)Korean Registered Patent No. 10-1441082 (Published on September 17, 2014) 한국 공개특허공보 제10-2015-0110876호(공개일 2015년 10월 05일)Korean Patent Publication No. 10-2015-0110876 (published on October 05, 2015) 한국 등록특허공보 제10-0972594호(공고일 2010년 07월 27일)Korean Patent Registration No. 10-0972594 (Published on July 27, 2010)

본 발명의 목적은 공공 기관, 대기업 및 중견 기업과 중소 기업을 포함한 사업장 및 개인에서, 법적 또는 자체 규정에 따라 수행해야 하는 업무에 대하여 가동 시설 기록과 업로드 그리고 가동 시설을 효율적으로 운전하여 에너지 절약하기 위한 가동 시설 제어 시스템 및 그 제어 방법을 제공하는 것이다.The object of the present invention is to efficiently operate the recording and uploading facilities of the movable facilities, and the operation facilities, to the businesses and individuals including the public enterprises, large enterprises and medium enterprises and small and medium enterprises, And a method of controlling the same.

본 발명의 다른 목적은 가동 시설을 원격 관리하며, 컴퓨터 통신망을 통하여 관리자 단말기로 다양한 가동 시설 운영에 따른 각종 운전 현황 정보를 제공하여 통계 분석 처리하도록 하는 가동 시설 제어 시스템 및 그 제어 방법을 제공하는 것이다.Another object of the present invention is to provide a movable facility control system and a control method thereof for remotely managing a movable facility and providing statistical analysis processing by providing various kinds of operating status information according to various movable facility operations to an administrator terminal through a computer communication network .

본 발명의 또 다른 목적은 다양한 가동 시설들의 운전 현황 및 운전 현황에 따른 분석 결과를 통합 관리하여 효율적인 운전 시간 예측, 운전 비용 절감 및 에너지 절약이 가능하도록 처리하는 가동 시설 제어 시스템 및 그 제어 방법을 제공하는 것이다.Another object of the present invention is to provide an operating facility control system and a control method thereof for efficiently operating time prediction, operating cost reduction, and energy saving by integrally managing analysis results according to operating status and operating status of various operating facilities .

상기 목적들을 달성하기 위한, 본 발명의 가동 시설 제어 시스템은, 복수 개의 가동 시설들의 운전을 통신망을 이용하여 원격 제어하고, 가동 시설들의 계측 장치로부터 다양한 계측 정보를 전송받아서 관리자 단말기로 제공하는 제어 장치를 구비하는데 그 한 특징이 있다.In order to achieve the above objects, a movable facility control system of the present invention includes: a control unit that remotely controls operation of a plurality of movable facilities using a communication network, receives various measurement information from a measuring device of the movable facilities, Which is one of the characteristics.

이 특징에 따른 본 발명의 가동 시설 제어 시스템은, 복수 개의 가동 시설들과; 통신망에 연결되고 상기 가동 시설의 관리자가 구비하는 관리자 단말기와; 상기 가동 시설들로부터 운전 상태에 따른 다양한 계측 정보를 측정하는 복수 개의 계측 장치와; 통신망을 통하여 상기 가동 시설들 각각을 운전하도록 원격 제어하고, 상기 계측 장치로부터 상기 계측 정보를 전송받아서 저장하고, 상기 관리자 단말기로 상기 계측 정보를 전송하고, 상기 가동 시설 중 어느 하나로부터 운전 중 이상이 발생되면, 상기 관리자 단말기로 상기 가동 시설에 이상 발생되었음을 알려주는 제어 장치 및; 상기 제어 장치로부터 상기 계측 정보를 받아서 통계 분석 처리하여 상기 가동 시설들을 통합 관리하는 가동 시설 통합 관리 서버를 포함한다.According to another aspect of the present invention, there is provided a movable facility control system including: a plurality of movable facilities; An administrator terminal connected to a communication network and provided by an administrator of the movable facility; A plurality of measurement devices for measuring various measurement information according to operation states from the movable facilities; Wherein the control unit is configured to remotely control each of the movable facilities through a communication network to receive and store the measurement information from the measuring device, transmit the measurement information to the manager terminal, A controller for informing the manager terminal of abnormality in the movable facility; And a movable facility integrated management server that receives the measurement information from the controller and performs statistical analysis processing to integrally manage the movable facilities.

이 특징의 한 실시예에 있어서, 상기 제어 장치는; 통신망을 통해 상기 가동 시설들과 상기 관리자 단말기 및 상기 가동 시설 통합 관리 서버와 상호 연결되어, 상호 간에 데이터 통신이 가능하도록 처리하는 통신부와; 상기 제어 장치의 구동 전원을 공급하는 전원 공급부와; 상기 제어 장치의 관리자 또는 담당자에 대한 사용자 인증을 위한 비밀 번호를 입력하는 입력 장치와; 상기 가동 시설의 운전 상태와 운전 현황 정보를 실시간으로 표시하는 디스플레이 장치와; 상기 가동 시설의 가동 현황 정보를 문서로 출력하는 프린터와; 통신망에 연결되어 상기 가동 시설의 다양한 계측 장치와 전동기들로부터 계측 정보를 받아들이거나 상기 전동기로 원격 제어 신호를 출력하는 신호 포트 및; 상기 통신부, 상기 전원 공급부, 상기 입력 장치, 상기 디스플레이 장치, 상기 프린터 및 상기 신호 포트를 제어하는 제어부를 포함한다.In one embodiment of this aspect, the control device comprises: A communication unit which is interconnected with the movable facilities, the manager terminal and the movable facility integrated management server through a communication network so as to enable data communication with each other; A power supply for supplying driving power to the control device; An input device for inputting a password for user authentication to an administrator or a person in charge of the control device; A display device for displaying the operating state and operation state information of the movable facility in real time; A printer for outputting the operation status information of the movable facility as a document; A signal port connected to a communication network for receiving measurement information from various measuring devices and motors of the movable facility or outputting a remote control signal to the electric motor; And a control unit for controlling the communication unit, the power supply unit, the input device, the display device, the printer, and the signal port.

다른 실시예에 있어서, 상기 가동 시설의 상기 계측 장치에는; 적어도 상기 가동 시설의 전기 사용량에 대한 계측 정보를 상기 제어 장치로 전송하는 적산 전력계, 상기 가동 시설의 용수 사용량에 대한 계측 정보를 상기 제어 장치로 전송하는 유량계 및, 상기 가동 시설의 운전 현황에 따른 측정값을 상기 제어 장치로 전송하는 계측기를 포함한다.In another embodiment, the metering device of the movable facility includes: A flowmeter for transmitting measurement information on the amount of electricity used by the movable facility to the control device, a meter for transmitting measurement information on the water usage amount of the movable facility to the control device, Value to the control device.

또 다른 실시예에 있어서, 상기 가동 시설의 운전 현황 정보는; 적어도 상기 가동 시설의 운전에 필요한 전력 사용량, 용수 사용량, 연료 사용량, 약품 사용량과, 상기 가동 시설에 장착된 상기 전동기의 가동 시간, 전력 부하량 및 상기 가동 시설에 부착된 계측기의 계측 신호를 포함하고, 상기 제어 장치가 일정 기간 동안에 저장하며 상기 일정 기간이 경과된 이후에는 저장매체에 기록한다.In another embodiment, the operating status information of the movable facility includes: And a measurement signal of a meter attached to the movable facility, wherein the measurement signal includes at least a power consumption amount, a water consumption amount, a fuel consumption amount, a medicine consumption amount, and an operation time and an electric power load amount of the motor mounted on the movable facility, The controller stores the data for a predetermined period of time, and records the data on the storage medium after the predetermined period of time elapses.

또 다른 실시예에 있어서, 상기 사용량들 각각은 적산되며, 실시간 사용량, 일일 사용량, 주간 사용량 및 월간 사용량으로 저장되고, 상기 가동 시설 통합 관리 서버가 상기 사용량의 변화를 통계 분석 처리한다.In yet another embodiment, each of the usage amounts is accumulated and stored in real time usage amount, daily usage amount, weekly usage amount, and monthly usage amount, and the operational facility integrated management server statistically analyzes the change in the usage amount.

또 다른 실시예에 있어서, 상기 가동 시설 통합 관리 서버는; 상기 가동 시설의 운전 현황 정보 중 가동 시간과 효율과의 연관 관계를 통계 수치로 연산한다.In another embodiment, the movable facility integrated management server comprises: And calculates the relationship between the operation time and the efficiency among the operation state information of the movable facility as statistical values.

또 다른 실시예에 있어서, 상기 가동 시설 통합 관리 서버는; 상기 가동 시설들의 상기 운전 현황 정보를 감시 기관 시스템으로 제공한다.In another embodiment, the movable facility integrated management server comprises: And provides the operation status information of the movable facilities to the monitoring agency system.

본 발명의 다른 특징에 따르면, 본 발명의 가동 시설 제어 시스템의 제어 방법이 제공된다.According to another aspect of the present invention, there is provided a control method of the movable facility control system of the present invention.

이 특징에 따른 본 발명의 가동 시설 제어 시스템의 제어 방법은, 가동 시설의 다양한 계측 장치들로부터 통신망을 통하여 상기 가동 시설의 운전 현황에 따른 다양한 계측 정보를 전송받아서 수집 및 저장하는 단계와; 상기 계측 정보를 이용하여 상기 가동 시설 운전 현황을 실시간으로 모니터링하는 단계와; 상기 가동 시설의 운전 시간과 운전 결과에 따른 정보를 통계 분석 처리하여, 분석 결과를 통해 상기 가동 시설의 가동 효율을 연산하는 단계 및; 연산 결과를 가동 시설 통합 관리 서버와 관리자 단말기로 전송하는 단계를 포함한다.According to another aspect of the present invention, there is provided a control method for a movable facility control system, comprising: receiving and collecting various measurement information according to a running state of the movable facility from a variety of measurement devices of the movable facility through a communication network; Monitoring the moving facility operation status in real time using the measurement information; Statistically analyzing information according to the operation time and the operation result of the movable facility, and calculating the operation efficiency of the movable facility through the analysis result; And transmitting the operation result to the movable facility integrated management server and the manager terminal.

이 특징의 한 실시예에 있어서, 상기 방법은; 모니터링 중 어느 하나의 상기 가동 시설에서 이상이 발생되면, 관리자 단말기로 이상이 발생되었음을 알려주는 문자 메시지를 전송하는 단계를 더 포함한다.In one embodiment of this aspect, the method further comprises: And transmitting a text message indicating that an abnormality has occurred to the administrator terminal if an abnormality occurs in any one of the movable facilities during monitoring.

다른 실시예에 있어서, 상기 가동 효율을 연산하는 것은; 상기 가동 시설의 상기 계측 정보에 따른 운전 현황 정보 중 가동 시간과 효율과의 연관 관계를 통계 수치로 연산한다.In another embodiment, computing the operational efficiency comprises: And calculates a correlation between the operation time and the efficiency of the operation state information according to the measurement information of the movable facility, using statistical values.

상술한 바와 같이, 본 발명의 가동 시설 제어 시스템은, 다양한 가동 시설 및 그 방지 시설에 대한 운전 현황 및 분석 결과를 관리자 단말기로 실시간 제공함으로써, 다양한 업무를 수행하는 관리자가 다수의 가동 시설로 인한 업무 부담을 경감시켜 효율적으로 관리할 수 있다.As described above, the movable facility control system of the present invention provides the operating status and the analysis results of the various movable facilities and their prevention facilities in real time to the manager terminal, The burden can be alleviated and it can be efficiently managed.

또 본 발명의 가동 시설 제어 시스템은 가동 시설의 운전 시간을 효율적으로 조절하여 운전 비용을 경감시켜 생산성을 향상시킨다.In addition, the movable facility control system of the present invention improves the productivity by reducing the operation cost by efficiently controlling the operation time of the movable facility.

또 본 발명의 가동 시설 제어 시스템은 기존 위탁 용역에 의한 방식이 전문 관리자가 해당 가동 시설들을 순회 관리하므로 일일 관리수가 한정되는데 반해, 가동 시설 통합 관리 서버를 이용하여 가동 시설 기록과 업로드 그리고 가동 시설 및 방지 시설을 효율적으로 운전하도록 함으로써, 전문 관리자의 이동 시간이 없어 가동 시설의 관리 업무 처리가 처리 가능하다.In addition, while the operation control system according to the present invention limits the number of daily operations since the conventional management service manages the operation facilities by the professional manager, the operation facility recording, uploading, By efficiently operating the preventive facility, there is no moving time of the professional manager, and the management task processing of the movable facility can be processed.

또한 본 발명의 가동 시설 제어 시스템의 비용 측면에서 보면, 가동 시설 경력자만 관리했을 시의 관리 비용을 100이라고 하면, 가동 시설 경력자와 위탁업체를 이용하는 경우에는 130 정도이고, 가동 시설 경력자와 가동 시설 기록과 업로드 그리고 시설을 효율적으로 운전하여 에너지 절약하는 제어 장치를 이용하는 경우에는 관리 비용 만은 105 정도로, 장치 설치비가 200 정도로 별도 비용이 소요되고 있으나, 위탁 용역 업체와 비교하면 약 1 ~ 2 년 정도면 복구될 수 있으므로, 경제적인 효과를 얻을 수 있다.Also, from the viewpoint of the cost of the movable facility control system of the present invention, when the management cost is 100 when only the experienced operator of the movable facility is managed, it is about 130 when using the experienced facility operator and the consignee, When the energy saving control device is used by efficiently operating the uploading and the facility, the management cost is only about 105, and the installation cost is about 200, which is extra cost. However, when it is compared with the consigning service company, So that an economical effect can be obtained.

따라서 본 발명에 의하면, 공공 기관, 대기업 및 중견 기업과 중소 기업을 포함한 사업자 및 개인의 가동 시설 관리자는 법적 의무 사항이 해결되어 가동 시설 운전 및 보수 업무에 전념할 수 있어 생산성이 향상되고, 가동 시간을 효율적으로 운전하므로 경제적인 효과는 약 20 % 이상으로 향상되어, 문제 발생시 과태료, 벌금으로 인한 경제적 손실과 대외 이미지를 생각하면 그 효과는 더욱 클 수 있다.Therefore, according to the present invention, it is possible to improve the productivity of a facility manager of a public institution, a large corporation, a medium-sized enterprise, and a business operator including an SME and an individual by concentrating on the operation and maintenance of the movable facility by resolving legal obligations, , The economic effect is improved to more than 20%, and the effect can be even bigger considering the economic loss due to penalties, fines and the external image.

도 1은 본 발명에 따른 가동 시설 제어 시스템의 개념을 설명하기 위한 도면;
도 2 및 도 3은 본 발명에 따른 가동 시설 제어 시스템의 네트워크 구성을 도시한 블럭도들;
도 4는 도 3에 도시된 제어 장치와 가동 시설들 간의 상세한 구성을 도시한 블럭도;
도 5는 본 발명에 따른 가동 시설 제어 시스템의 처리 수순을 도시한 흐름도; 그리고
도 6 내지 도 9는 본 발명의 실시예에 따른 다양한 가동 시설의 운전 현황을 설명하기 위한 계통도들이다.
1 is a view for explaining a concept of a movable facility control system according to the present invention;
2 and 3 are block diagrams showing a network configuration of a movable facility control system according to the present invention;
FIG. 4 is a block diagram showing a detailed configuration between the control apparatus and the movable facilities shown in FIG. 3; FIG.
5 is a flowchart illustrating a processing procedure of a movable facility control system according to the present invention; And
6 to 9 are schematic diagrams for explaining the operation status of various movable facilities according to the embodiment of the present invention.

본 발명의 실시예는 여러 가지 형태로 변형될 수 있으며, 본 발명의 범위가 아래에서 서술하는 실시예로 인해 한정되어지는 것으로 해석되어서는 안된다. 본 실시예는 당업계에서 평균적인 지식을 가진 자에게 본 발명을 보다 완전하게 설명하기 위해서 제공되는 것이다. 따라서 도면에서의 구성 요소의 형상 등은 보다 명확한 설명을 강조하기 위해서 과장되어진 것이다.The embodiments of the present invention can be modified into various forms and the scope of the present invention should not be interpreted as being limited by the embodiments described below. The present embodiments are provided to enable those skilled in the art to more fully understand the present invention. Therefore, the shapes and the like of the components in the drawings are exaggerated in order to emphasize a clearer explanation.

이하 첨부된 도 1 내지 도 9를 참조하여 본 발명의 실시예를 상세히 설명한다.Hereinafter, embodiments of the present invention will be described in detail with reference to FIGS. 1 to 9 attached hereto.

도 1은 본 발명에 따른 가동 시설 제어 시스템의 개념을 설명하기 위한 도면이다.1 is a view for explaining a concept of a movable facility control system according to the present invention.

도 1을 참조하면, 본 발명은 다양한 가동 시설들의 운전 상태를 통합 관리하기 위하여, 가동 시설 보유업체와, 가동 시설 통합 관리 서버의 관리업체와, 가동 시설 관리업체 및 가동 시설 제어 시스템의 제어 장치를 공급하는 제조업체들 간에 가동 시설의 제반 업무를 상호 연동하여 처리하도록 제공된다.Referring to FIG. 1, the present invention provides a control system for a movable facility management company, an operation facility management company, and an operation facility control system, It is provided to interoperate with all the operations of the operation facilities among supplying manufacturers.

즉, 가동 시설 보유업체들 각각에는 다양한 가동 시설들 예를 들어, 생산 시설과, 폐수 배출 시설, 대기 배출 시설 등의 환경 시설 및, 냉난방 시설, 보일러 시설 등의 기타 시설 등이 구비된다. 가동 시설 보유업체는 본 발명에 따른 제어 시스템의 제조업체로부터 가동 시설을 제어하는 제어 장치를 설치받고, 유지보수 등을 관리받는다. 또 가동 시설 보유업체는 가동 시설과 가동 시설 통합 관리 서버들 간에 통신망으로 연결시키고, 가동 시설의 운전 현황 기록과, 운전 결과 정보를 가동 시설 통합 관리 서버로 제공한다.In other words, each of the operating facility-owned companies is provided with various operating facilities such as production facilities, wastewater discharge facilities, environmental facilities such as air discharge facilities, and other facilities such as heating and cooling facilities and boiler facilities. The operator having the movable facility installs the control device for controlling the movable facility from the manufacturer of the control system according to the present invention, and manages maintenance and the like. In addition, a company having a movable facility connects the movable facility with the integrated management server of the movable facility through a communication network, and records the operation state of the movable facility and provides the operation result information to the integrated facility management server.

제어 시스템 제조업체는 가동 시설의 제어 장치를 가동 시설 보유업체에 설치 및 유지 보수를 제공하고, 가동 시설 통합 관리 서버의 관리업체로 제어 장치를 공급한다. 가동 시설 관리업체는 가동 시설 보유업체의 가동 시설을 관리하고, 긴급 상황 발생 시, 보유업체로 현장 출동한다.The control system manufacturer provides installation and maintenance of the control facilities of the operation facility to the owners of the operation facilities, and supplies the control unit to the management of the operation facility integrated management server. The operating facility management company manages the operating facilities of the operating facility owners and, in the event of an emergency, sends them onsite to the owner company.

가동 시설 통합 관리 서버의 관리업체는 가동 시설 관리업체로 가동 시설 관리 및 가동 시설에 대한 교육을 담당하고, 긴급 상황 발생 시 긴급 상황이 발생되었음을 전달한다.The management company of the integrated management server of the operation facility is the operation facility management company, which manages the operation of the operation facility and manages the operation facility, and informs that an emergency occurs when an emergency occurs.

따라서 본 발명은 가동 시설 통합 관리 서버의 관리업체와 가동 시설 보유업체들 간에 상호 가동 시설의 운전 현황에 따른 다양한 관리 업무를 처리하기 위하여, 가동 시설 통합 관리 서버와 가동 시설들 간에 통신망을 통해 연결되고, 가동 시설의 운전 현황 기록과 운전 결과에 따른 다양한 정보들을 가동 시설 통합 관리 서버로 제공하고, 가동 시설 통합 관리 서버는 운전 현황 기록을 저장, 통계 및 분석 처리한다.Therefore, in order to process various management tasks according to the operating status of the mutual operation facility between the management company of the integrated facility management server of the movable facility and the companies having the movable facility, , Various information according to the operation status record of the operation facility and the operation result is provided to the operation facility integrated management server, and the operation facility integrated management server stores the driving situation record, and analyzes statistics and analysis.

구체적으로, 도 2 및 도 3은 본 발명에 따른 가동 시설 제어 시스템의 네트워크 구성을 도시한 블럭도들이며, 그리고 도 4는 도 3에 도시된 제어 장치와 가동 시설들 간의 상세한 구성을 도시한 블럭도이다.2 and 3 are block diagrams showing a network configuration of a movable facility control system according to the present invention, and FIG. 4 is a block diagram showing a detailed configuration between the control apparatus and the movable facilities shown in FIG. 3 to be.

도 2 내지 도 4를 참조하면, 본 발명의 가동 시설 제어 시스템은 복수 개의 가동 시설(400)들과, 제어 장치(300)와, 관리자 단말기(200) 및, 가동 시설 통합 관리 서버(100)를 포함한다. 이러한 가동 시설 제어 시스템은 가동 시설(400)들과, 제어 장치(300)와, 관리자 단말기(200) 및, 가동 시설 통합 관리 서버(100)들이 통신망을 통해 상호 연결된다.2 to 4, the movable facility control system of the present invention includes a plurality of movable facilities 400, a controller 300, an administrator terminal 200, and a movable facility integrated management server 100 . In this movable facility control system, the movable facilities 400, the control device 300, the manager terminal 200, and the movable facility integrated management server 100 are interconnected through a communication network.

가동 시설(400)에는 예를 들어, 생산 시설과, 폐수 배출 시설, 대기 배출 시설 등의 환경 시설 및, 냉난방 시설, 보일러 시설 등의 기타 시설 등 다양하게 구비될 수 있다.The movable facility 400 may be provided with various facilities such as, for example, a production facility, a wastewater discharge facility, an environmental facility such as an air discharge facility, and other facilities such as an air-conditioning facility and a boiler facility.

제어 장치(300)는 통신망을 통하여 가동 시설(400)들의 운전을 원격 제어한다. 제어 장치(300)는 통신망을 통해 가동 시설(400)의 운전 상태에 따른 가동 상황 정보를 전송받아서 데이터베이스(310)에 저장한다. 또 제어 장치(300)는 가동 시설(400)의 다양한 계측 장치들로부터 운전 현황에 따른 다양한 계측 정보를 전송받아서 데이터베이스(310)에 저장한다. 제어 장치(300)는 관리자 단말기(200) 즉, 퍼스널 컴퓨터(210)로 가동 시설(400)의 운전 현황에 대한 기록과, 운전 결과에 따른 정보를 제공한다. 또 제어 장치(300)는 가동 시설(400)의 운전 상태에 따른 가동 상황 정보를 3 차원 영상으로 생성하여 관리자 단말기 예컨대, 모바일 단말기로 제공할 수 있다. The control device 300 remotely controls the operation of the movable facilities 400 through a communication network. The control device 300 receives the operation status information according to the operation state of the movable facility 400 through the communication network and stores the received information in the database 310. In addition, the control device 300 receives various measurement information according to the operation status from various measurement devices of the movable facility 400, and stores the measurement information in the database 310. The control device 300 provides the administrator terminal 200, that is, the personal computer 210 with information on the operation status of the movable facility 400 and information according to the operation result. In addition, the control device 300 can generate the three-dimensional moving state information according to the driving state of the movable facility 400 and provide the generated moving state information to the administrator terminal, for example, the mobile terminal .

관리자 단말기(200)는 퍼스널 컴퓨터(210), 스마트폰, 태블릿 PC 등과 같은 모바일 단말기(220)로 구비된다. 모바일 단말기(220)에는 가동 시설(400)의 운전 상태에 따른 가동 상황 정보를 3 차원 영상을 이용하여 실시간 모니터링 할 수 있는 증강 현실 기기가 포함될 수 있다. 퍼스널 컴퓨터(210)와 모바일 단말기(220) 각각은 제어 장치(300)로부터 가동 시설(400)의 운전 현황에 따른 다양한 계측 정보를 전송받아서 관리자가 실시간으로 모니터링한다. 퍼스널 컴퓨터(210)는 제어 장치(300)로부터 긴급 상황이 발생되었음을 알려주면, 모바일 단말기(220)로 긴급 상황이 발생되었음을 전달한다. 또 모바일 단말기(220)는 가동 시설 통합 관리 서버(100)로부터 긴급 상황이 발생되었음을 전달받을 수 있다.The administrator terminal 200 is provided as a mobile terminal 220 such as a personal computer 210, a smart phone, a tablet PC, and the like. The mobile terminal 220 may include an augmented reality device capable of real-time monitoring of the operation status information according to the operation state of the operation facility 400 using a three-dimensional image. Each of the personal computer 210 and the mobile terminal 220 receives various measurement information according to the operation status of the movable facility 400 from the control device 300 and monitors the real time monitoring by the administrator. The personal computer 210 informs the control unit 300 of the occurrence of an emergency, and informs the mobile terminal 220 that an emergency has occurred. In addition, the mobile terminal 220 may receive notification that an emergency has occurred from the operation-center integrated management server 100.

그리고 가동 시설 통합 관리 서버(100)는 제어 장치(300)로부터 가동 시설(400)의 운전 현황에 따른 다양한 계측 정보를 전송받아서, 통계 분석 처리하여 다양한 가동 시설(400)들을 통합 관리한다. 가동 시설 통합 관리 서버(100)는 제어 장치(300)로부터 가동 시설(400)의 운전 현황에 따른 다양한 정보 즉, 운전 현황 정보(112)를 전송받아서 데이터베이스(110)에 저장하고, 운전 현황 정보(112) 중 가동 시간과 효율과의 연관 관계를 통계 수치로 연산 처리하여 통계 정보(114)를 생성하고, 이를 데이터베이스(110)에 저장한다. 가동 시설 통합 관리 서버(100)는 제어 장치(300)로부터 긴급 상황이 발생되었음을 알려주면, 모바일 단말기(220)로 긴급 상황이 발생되었음을 전달한다. 뿐만 아니라, 가동 시설 통합 관리 서버(100)는 각종 가동 시설(400)들의 운전 현황에 따른 운전 현황 정보를 감시 기관 시스템(미도시됨)으로 제공한다.The movable facility integrated management server 100 receives various measurement information according to the operation status of the movable facility 400 from the controller 300 and performs statistical analysis processing to integrally manage the various movable facilities 400. The integrated facility management server 100 receives various information according to the operation status of the movable facility 400 from the control unit 300 and stores the information in the database 110 and displays driving status information The statistical information 114 is generated and stored in the database 110. In this case, The integrated facility management server 100 informs the control unit 300 of the occurrence of an emergency, and informs the mobile terminal 220 that an emergency has occurred. In addition, the operating-facility integrated management server 100 provides operating status information according to operating status of the various operating facilities 400 to a monitoring system (not shown).

구체적으로, 도 4를 참조하면, 가동 시설(400)은 운전 상태, 운전 상황 등을 감지하기 위한 다양한 계측 장치 예를 들어, 복수 개의 적산 전력계(410), 복수 개의 유량계(420), 복수 개의 계측기(430)와, 가동 시설(400)을 구동시키는 복수 개의 각종 전동기(440)를 포함한다. 적산 전력계(410)는 가동 시설(400)의 전기 사용량에 대한 계측 정보를 제어 장치(300)로 전송한다. 유량계(420)는 가동 시설(400)의 용수 사용량에 대한 계측 정보를 제어 장치(300)로 전송한다. 계측기(430)는 가동 시설의 운전 현황에 따른 측정값을 제어 장치(300)로 전송한다. 그리고 전동기(440)는 제어 장치(300)로부터 가동 시설(400)의 가동 시간을 원격 제어하는 제어 신호를 받아들여서 가동하고, 가동 시설(400)의 가동 시간을 제어 장치(300)로 전송한다.4, the movable facility 400 includes a plurality of measurement devices for detecting the operation state, the operation state, and the like, for example, a plurality of integrated meter 410, a plurality of flow meters 420, And a plurality of electric motors 440 for driving the movable facility 400. [ The integrated meter 410 transmits measurement information on the amount of electricity used by the movable facility 400 to the control device 300. The flow meter 420 transmits the measurement information on the water usage amount of the movable facility 400 to the control device 300. The meter 430 transmits the measurement value according to the operation status of the movable facility to the controller 300. [ The electric motor 440 receives and operates the control signal for remotely controlling the operation time of the movable facility 400 from the controller 300 and transmits the operation time of the movable facility 400 to the controller 300. [

이러한 계측 장치(410 ~ 430)와 전동기(440)들은 제어 장치(300)의 신호 포트(350)를 통해 유선 또는 무선으로 상호 연결된다. 즉, 계측 장치(410 ~ 430)들 각각은 측정된 다양한 계측 정보를 유선 또는 무선 통신망을 통해 제어 장치(300)로 전송하고, 각종 전동기(440)들은 전자 접촉기(Magnetic Contactor : MC)와 제어 장치(300)의 신호 포트(350)를 통해 연결되고, 제어 장치(300)로 전동기 운전 현황에 따른 정보를 전송한다.The measuring devices 410 to 430 and the electric motors 440 are interconnected through a signal port 350 of the control device 300 by wire or wirelessly. That is, each of the measuring devices 410 to 430 transmits the measured measurement information to the control device 300 via a wired or wireless communication network, and the various motors 440 are connected to a magnetic contactor (MC) And is connected to the controller 300 through the signal port 350 of the controller 300 to transmit information according to the motor operation status.

제어 장치(300)는 제어부(310)와, 입력 장치(320)와, 디스플레이 장치(330)와, 프린터(340)와, 신호 포트(350)와, 통신부(360) 및 전원 공급부(370)를 포함한다.The control device 300 includes a control unit 310, an input device 320, a display device 330, a printer 340, a signal port 350, a communication unit 360, and a power supply unit 370 .

제어부(310)는 제어 장치(300)의 제반 동작을 처리하도록 제어한다. 즉, 제어부(310)는 입력 장치(320)와, 디스플레이 장치(330)와, 프린터(340)와, 신호 포트(350)와, 통신부(360) 및 전원 공급부(370)를 제어한다.The control unit 310 controls the control device 300 to process all operations. That is, the control unit 310 controls the input device 320, the display device 330, the printer 340, the signal port 350, the communication unit 360, and the power supply unit 370.

입력 장치(320)는 제어 장치(300)의 관리자 또는 담당자에 대한 사용자 인증을 위한 비밀 번호(또는 작동 번호)를 입력한다. 디스플레이 장치(330)는 가동 시설(400)의 운전 상태와 운전 현황 정보를 실시간으로 표시한다. 프린터(340)는 가동 시설(400)의 가동 현황 정보를 문서로 출력한다. 이 실시예에서 프린터(340)는 가동 시설(400)의 운전 일치를 문서로 출력한다. 신호 포트(350)는 가동 시설(400)의 다양한 계측 장치(410 ~ 430)와 전동기(440)들과 연결되어, 유선 또는 무선 통신망을 통해 계측 정보를 받아들인다. 통신부(360)는 유선 또는 무선 통신망을 통해 다양한 가동 시설(400)들과 퍼스널 컴퓨터 및 가동 시설 통합 관리 서버(100)와 상호 연결되어, 이들 상호 간에 데이터 통신이 가능하도록 한다. 전원 공급부(370)는 제어 장치(300)의 구동 전원을 공급한다.The input device 320 inputs a password (or an operation number) for user authentication to the administrator or the person in charge of the control device 300. [ The display device 330 displays the operating state and operation state information of the movable facility 400 in real time. The printer 340 outputs the operation status information of the movable facility 400 as a document. In this embodiment, the printer 340 outputs the driving agreement of the movable facility 400 as a document. The signal port 350 is connected to various measuring devices 410 to 430 and the electric motors 440 of the movable facility 400 and receives measurement information through a wired or wireless communication network. The communication unit 360 is interconnected with the various mobile facilities 400, the personal computer, and the mobile facility integration management server 100 through a wired or wireless communication network so that data communication between the mobile facilities and the personal computer and the mobile facility integrated management server 100 is possible. The power supply unit 370 supplies the driving power of the controller 300.

따라서 본 발명의 가동 시설 제어 시스템은 각종 가동 시설들의 운영 일지를 자동 기록 및 출력하고, 각종 가동 시설들의 운전 상태에 대한 통계 자료 생산하고, 각종 가동 시설들의 이상 발생 시, 표시 및 관리자 단말기로 문자 전송하고, 각종 가동 시설들을 감독 및 감시 기관에 자료 업로드하며, 각종 가동 시설들의 운전 상태를 연산하여 운전 기계를 제어할 수 있다.Accordingly, the movable facility control system of the present invention automatically records and outputs the operation logs of various movable facilities, generates statistical data on the operating states of various movable facilities, and displays and displays texts And uploads various operation facilities to supervision and monitoring agencies, and controls the operation machinery by calculating the operation state of various operation facilities.

이러한 본 발명에 의하면, 가동 시설의 각종 전동기, 계측기에서 보내는 계측 신호를 실시간으로 전송받아서 일정 기간 예컨대, 24 시간을 기준으로 기록 및 저장하며, 저장 기간은 90 일로 이후 기록된 데이터를 별도의 저장매체 즉 컴퓨터에 저장한다.According to the present invention, measurement signals sent from various motors and meters of a moving facility are transmitted in real time and recorded and stored for a predetermined period of time, for example, 24 hours. The data recorded after 90 days are stored in a separate storage medium That is, it is stored in a computer.

또 본 발명은 가동 시설의 운전 현황을 실시간으로 감시하며, 시설이 고장 또는 이상 현상이 발생 시, 관리자에게 모바일로 문자 전송하여 원격지에서도 가동 시설의 운전 상황을 감시하여 긴급 상황 발생시 즉시 조치가 가능하게 한다.In addition, the present invention monitors the operation status of a moving facility in real time, and when a facility is broken or an abnormal phenomenon occurs, a manager transmits a character to a mobile station to monitor the operation status of the moving facility at a remote location, do.

또한 본 발명은 과거 기록으로 가동 시설 운전 시간과 계측기에서 보내는 운전 결과의 상호값을 통계로 분석하여, 가동 효율을 연산하며 그 결과값을 관리자에게 제공할 수 있다.Also, the present invention can statistically analyze the mutual values between the operation time of the operation facility and the operation result sent from the meter, and calculate the operation efficiency and provide the result to the administrator.

그리고 도 5는 본 발명에 따른 가동 시설 제어 시스템의 처리 수순을 도시한 흐름도이다. 이 수순은 가동 시설 제어 시스템의 제어 장치(300)가 처리하는 것으로, 이 수순은 제어 장치(300)와, 관리자 단말기(200) 및 가동 시설 통합 관리 서버(100)가 상호 연동해서 처리된다.And FIG. 5 is a flowchart showing the processing procedure of the movable facility control system according to the present invention. This procedure is performed by the control device 300 of the movable facility control system. This procedure is performed by interlocking the control device 300, the administrator terminal 200, and the movable facility integrated management server 100.

도 5를 참조하면, 본 발명의 가동 시설 제어 시스템은 단계 S500에서 가동 시설의 다양한 계측 장치들로부터 통신망을 통하여 가동 시설의 운전 현황에 따른 다양한 계측 정보를 전송받아서 수집 및 저장한다. 단계 S510에서 제어 장치(300)는 다양한 계측 정보를 이용하여 가동 시설 운전 현황을 실시간으로 모니터링한다.Referring to FIG. 5, in step S500, the movable facility control system of the present invention receives various measurement information according to the operation status of the movable facility, collects and stores the measurement information from various measurement devices of the movable facility through the communication network. In step S510, the control device 300 monitors the operation status of the movable facility in real time using various measurement information.

단계 S520에서 제어 장치(300)는 모니터링 중 긴급 상황 등 이상이 발생되면, 단계 S560으로 진행하여 퍼스널 컴퓨터(210)를 통해 모바일 단말기(220)의 관리자에게 긴급 상황이 발생되었음을 알려주는 문자 메시지를 전송한다.If an emergency such as an emergency occurs during monitoring, the control device 300 proceeds to step S560 and transmits a text message to the manager of the mobile terminal 220 through the personal computer 210 to inform the manager of the occurrence of an emergency do.

그러나 이상이 발생되지 않으면, 단계 S530에서 가동 시설의 운전 시간과 운전 결과에 따른 정보를 통계 분석 처리하고, 단계 S540에서 분석 결과를 통해 가동 효율을 연산하여 단계 S550에서 연산 결과를 가동 시설 통합 관리 서버(100)와 관리자 단말기(200)로 전송한다.If the abnormality does not occur, the information on the operation time and the operation result of the movable facility is statistically analyzed in step S530, and the operation efficiency is calculated on the basis of the analysis result in step S540. In step S550, To the manager terminal (100) and the manager terminal (200).

계속해서 도 6 내지 도 9는 본 발명의 실시예에 따른 다양한 가동 시설의 운전 현황을 설명하기 위한 계통도들이다.6 to 9 are flowcharts for explaining the operation status of various movable facilities according to the embodiment of the present invention.

도 6을 참조하면, 이 실시예의 가동 시설은 환경 시설로서, 폐수 배출 시설과 수질 오염 방지 시설을 포함한다. 폐수 배출 시설은 용수와 원료를 공급받아서 폐수를 수질 오염 방지 시설로 발생한다. 수질 오염 방지 시설은 전력과 약품을 공급받고, 폐수 배출 시설로부터 발생된 폐수를 받아서 약품을 처리하여 재이용수와 폐수로 분리하고, 재이용수와 폐수를 다른 배출 경로를 통해 배출하거나 방류한다.Referring to FIG. 6, the operation facility of this embodiment is an environmental facility, including a waste water discharge facility and a water pollution prevention facility. Wastewater discharge facility receives water and raw materials, and wastewater is generated as water pollution prevention facility. The water pollution prevention facility receives the power and medicine, receives the wastewater generated from the wastewater discharge facility, separates it into reused water and wastewater by treating the medicine, and discharges or discharges the reused water and wastewater through the other discharge route.

이 경우, 폐수 배출 시설의 용수 사용량은 예를 들어, 상수, 공업용수, 지하수, 하천수 등을 유량계에서 1 톤 단위로 사용량을 측정하고, 이를 무선 또는 유선 통신망을 통해 제어 장치(300)로 전송한다. 원료 사용량은 인력을 투입하는 시설을 제외하여, 가동 시설로 투입하는 원료 사용량을 의미하고, 가동 시간 당 원료 공급량을 적산하여 가동 시간으로 원료 사용량을 정량하며, 그 가동 시간을 무선 또는 유선 통신망을 통해 제어 장치(300)로 전송한다. 또 폐수 배출 시설의 폐수 발생량은 수질 오염 방지 시설에 부착된 폐수 유입 유량계에서 단위 사용량을 측정하고, 이를 무선 또는 유선 통신망을 통하여 제어 장치(300)로 전송한다.In this case, the amount of water used in the wastewater discharge facility is measured by the flow meter in units of 1 ton, for example, constant water, industrial water, ground water, river water and the like, and is transmitted to the controller 300 through the wireless or wired communication network . Raw material consumption refers to the amount of raw material to be supplied to the operation facility excluding the facility to which the labor is inputted. The raw material supply amount is accumulated per operation time to quantify the raw material consumption amount by the operation time, and the operation time is transmitted through wireless or wired communication network To the control device (300). In addition, the amount of waste water generated in the waste water discharge facility is measured by the waste water flow meter attached to the water pollution prevention facility and transmitted to the control device 300 through the wireless or wired communication network.

수질 오염 방지 시설의 폐수 배출량은 수질 오염 방지 시설에 부착된 폐수 배출 유량계에서 단위 사용량을 측정하고, 이를 무선 또는 유선 통신망을 통해 제어 장치(300)로 전송한다. 또 재이용수에 대한 재사용량은 수질 오염 방지 시설에 부착된 중수도 유량계에서 단위 사용량을 측정하고, 이를 무선 또는 유선 통신망을 통해 제어 장치(300)로 전송한다. 그리고 기타 사용량은 용수 사용량에서 수질 오염 방지 시설에 부착된 각종 유량계 적산량을 이용하여 측정 및 연산한다.The amount of wastewater discharged from the water pollution prevention facility is measured by the waste water discharge meter attached to the water pollution prevention facility and transmitted to the control device 300 through the wireless or wired communication network. Also, the reused amount of the reused water is measured by the water-circulating flow meter attached to the water pollution prevention facility and transmitted to the control device 300 through the wireless or wired communication network. And the other usage amount is measured and calculated by using the flow meter total amount attached to the water pollution prevention facility in the water use amount.

또 폐수 배출 시설에서의 슬러지 발생량은 탈수기 가동 시간 당 슬러지 발생량으로 적산하여 가동 시간으로 슬러지 발생량을 정량하며, 그 가동 시간을 무선 또는 유선 통신망을 통해 제어 장치(300)로 전송한다. 또 슬러지 처리량은 슬러지 보관 장소에 부착된 감지 센서에서 측정하고, 이를 제어 장치(300)로 전송하면, 전송된 감지 신호를 통해 누적된 적산량을 산출한다.Also, the amount of sludge generated in the waste water discharge facility is accumulated as the amount of sludge generated per dehydrator operation time, and the amount of sludge generated is calculated by the operation time, and the operation time is transmitted to the control device 300 through the wireless or wired communication network. The sludge processing amount is measured by a detection sensor attached to the sludge storage place, and transmitted to the control device 300, and the accumulated amount accumulated through the transmitted detection signal is calculated.

수질 오염 방지 시설의 전력 사용량은 적산 전력계로부터 단위 사용량을 측정하고, 이를 무선 또는 유선 통신망을 통해 제어 장치(300)로 전송한다. 이 때, 소모 전력량은 일일 단위로 적산된 폐수 처리량과 전력 사용량을 제어 장치(300)가 연산하며 그 자료를 통해 통계 분석 처리한다.The electric power consumption of the water pollution prevention facility measures the unit usage amount from the integrated electric power meter and transmits it to the control device 300 through the wireless or wired communication network. At this time, the amount of consumed power is calculated by the control device 300, and the statistical analysis process is performed through the data.

또 수질 오염 방지 시설의 약품 사용량은 수질 오염 방지 시설에 부착된 약품 공급 유량계에서 단위 사용량을 측정하고, 이를 무선 또는 유선 통신망을 통해 제어 장치(300)로 전송하거나, 약품 공급 펌프 가동시간으로 약품 사용량을 정량하여 그 가동 시간을 무선 또는 유선 통신망을 통해 제어 장치(300)로 전송한다. 약품 재고량은 일일 단위로 적산된 약품 사용량을 전일 재고량에서 제어 장치(300)가 연산하여 그 자료를 통계 분석 처리한다.The amount of chemical used in the water pollution prevention facility is measured by measuring the unit usage amount in the chemical supply flow meter attached to the water pollution prevention facility and transmitting it to the control device 300 through the wireless or wired communication network, And transmits the operation time to the control device 300 through the wireless or wired communication network. The drug inventory quantity is calculated by the control device 300 in the inventory quantity of the previous day, and the statistical analysis process of the data is performed.

그리고 수질 오염 방지 시설의 운전 상태는 시설 운전 상황과, 폐수 배출수 수질 상황으로 구분된다. 시설 운전 상황은 수질 오염 방지 시설에 부착된 각종 계측기의 계측값을 측정하여 무선 또는 유선 통신망을 통해 제어 장치(300)로 전송한다. 폐수 배출수 수질 상황은 수질 오염 방지 시설에 부착된 수질 자동 측정기를 이용하여 측정하고, 그 측정값을 무선 또는 유선 통신망을 통해 제어 장치(300)로 전송한다.The operation status of the water pollution prevention facility is divided into the facility operation status and the waste water discharge water quality status. The facility operation state measures the measurement values of various instruments attached to the water pollution prevention facility and transmits them to the control device 300 through a wireless or wired communication network. The water quality of the wastewater effluent water is measured using a water quality automatic meter attached to a water pollution prevention facility, and the measured value is transmitted to the controller 300 through a wireless or wired communication network.

도 7을 참조하면, 이 실시예의 가동 시설은 환경 시설로서, 대기 배출 시설과 대기 오염 방지 시설을 포함한다. 대기 배출 시설은 팬(FAN)을 가동하여 오염된 공기를 대기 오염 방지 시설로 제공하고, 대기 오염 방지 시설은 전력과 약품을 공급받어 팬(FAN)을 가동하고, 대기 배출 시설로부터 오염된 공기를 받아서 약품 처리하여 정화된 공기를 대기 배출한다.Referring to FIG. 7, the movable facility of this embodiment is an environmental facility, including an air discharge facility and an air pollution prevention facility. The air discharge facility operates the fan (FAN) to provide contaminated air to the air pollution control facility. The air pollution control facility operates the fan (FAN) by receiving power and chemicals, And the purified air is discharged to the air by chemical treatment.

이 경우, 대기 배출 시설의 가동 시간은 주요 대기 오염 배출구에 부착된 적산 전력계로부터 단위 사용량을 측정하고, 이를 무선 또는 유선 통신망을 통해 제어 장치(300)로 전송한다. 대기 오염 방지 시설의 가동 시간은 대기 오염 방지 시설에 부착된 적산 전력계로부터 단위 사용량을 측정하고, 이를 무선 또는 유선 통신망을 통해 제어 장치(300)로 전송한다.In this case, the operation time of the air discharge facility measures the unit usage amount from the integrated electric power meter attached to the main air pollution outlet and transmits it to the control device 300 through the wireless or wired communication network. The operation time of the air pollution prevention facility measures the unit usage amount from the integrated power meter attached to the air pollution prevention facility and transmits it to the control device 300 through the wireless or wired communication network.

대기 오염 방지 시설에서의 약품 사용량은 대기 오염 방지 시설에 부착된 약품 공급 유량계에서 단위 사용량을 측정하고, 이를 무선 또는 유선 통신망을 통해 제어 장치(300)로 전송하거나, 약품 공급 펌프의 가동 시간으로 약품 사용량을 정량하며 그 가동 시간을 산출하여 무선 또는 유선 통신망을 통해 제어 장치(300)로 전송한다. 이 때, 약품 재고량은 제어 장치(300)가 일일 단위로 적산된 약품 사용량을 전일 재고량에서 연산하고 그 자료를 통계 분석 처리한다.The amount of the chemical used in the air pollution prevention facility can be measured by measuring the unit usage amount in the chemical supply flow meter attached to the air pollution prevention facility and transmitting it to the control device 300 through the wireless or wired communication network, Calculates the usage time, calculates the operation time, and transmits the calculated operation time to the control device 300 through the wireless or wired communication network. At this time, the drug inventory amount is calculated by the control device 300 on a daily basis, and the statistical analysis processing of the data is performed.

또 대기 오염 방지 시설의 운전 상태는 대기 배출 시설의 운전 상황과, 대기 배출 시설의 대기질 상황으로 구분된다. 즉, 시설 운전 상황은 대기 오염 방지 시설에 부착된 각종 계측기를 이용하여 측정된 계측값을 무선 또는 유선 통신망을 통해 제어 장치(300)로 전송하고, 배출 시설 대기질 상황은 대기 오염 방지 시설에 부착된 대기 자동 측정기를 이용하여 측정된 측정값을 무선 또는 유선 통신망을 통해 제어 장치(300)로 전송한다.The operation status of the air pollution control facility is divided into the operation status of the air discharge facility and the air quality status of the air discharge facility. That is, the facility operation state transmits measured values measured by various instruments attached to the air pollution prevention facility to the control device 300 through a wireless or wired communication network, and the air quality of the exhaust facility is attached to the air pollution prevention facility And transmits the measurement value measured by the automatic waiting meter to the control device 300 through the wireless or wired communication network.

도 8을 참조하면, 이 실시예의 가동 시설은 기타 시설로서, 냉난방 시설을 포함한다. 냉난방 시설은 난방 시설, 냉방 시설로 나뉘어질 수 있다. 냉난방 시설은 예를 들어, 보일러, 빙축열 시설, 축열 시설 등을 포함한다. 냉난방 시설은 용수와 연료를 공급받아서 각 수요처로 스팀을 공급하거나, 냉수, 온수를 공급하고, 각 수요처에서 냉수, 온수, 응축수를 회수한다.Referring to Fig. 8, the movable facility of this embodiment is an other facility, including an air-conditioning facility. Air-conditioning and heating facilities can be divided into heating and air-conditioning facilities. The heating and cooling facilities include, for example, boilers, ice storage facilities, storage facilities, and the like. The heating and cooling facilities receive water and fuel to supply steam to each customer, supply cold water and hot water, and recover cold water, hot water and condensate from each customer.

이 경우, 냉난방 시설의 가동 시간은 난방 가동 시간과 냉방 가동 시간으로 구분된다. 난방 가동 시간은 냉난방 시설 또는 난방 시설에 부착된 적산 전력계로부터 단위 사용량을 측정하고, 이를 무선 또는 유선 통신망을 통해 제어 장치(300)로 전송한다. 냉방 가동 시간은 냉난방 시설 또는 냉방 시설에 부착된 적산 전력계로부터 단위 사용량을 측정하고, 이를 무선 또는 유선 통신망을 통해 제어 장치(300)로 전송한다.In this case, the operating time of the heating and cooling facility is divided into the heating operation time and the cooling operation time. The heating operation time measures a unit usage amount from an integrated power meter attached to a heating / cooling facility or a heating facility, and transmits the measured unit usage amount to the control device 300 through a wireless or wired communication network. The cooling operation time measures the unit usage amount from the integrated electric power meter attached to the cooling / heating facility or the air conditioning facility and transmits it to the control device 300 through the wireless or wired communication network.

냉난방 시설의 연료 사용량은 연료 소모량으로, 냉난방 시설에 부착된 연료공급 유량계에서 단위 사용량을 측정하고, 이를 통신망을 통해 제어 장치(300)로 전송하거나, 연료 공급 펌프의 가동 시간으로 연료 사용량을 정량하며 그 가동 시간을 무선 또는 유선 통신망을 통해 제어 장치(300)로 전송한다. 이 때, 연료 재고량은 제어 장치(300)가 일일 단위로 적산된 연료 사용량을 전일 재고량에서 연산하며 그 자료를 통계 분석 처리한다.The amount of fuel used in the heating / cooling facility is the amount of fuel consumed, the unit usage amount is measured in the fuel supply flow meter attached to the cooling / heating facility and transmitted to the control device 300 through the communication network or the fuel consumption amount is measured by the operation time of the fuel supply pump And transmits the operation time to the control device 300 through a wireless or wired communication network. At this time, the fuel inventory amount is calculated by the control device 300 in the daily amount of the fuel usage accumulated in the daily amount, and statistical analysis processing of the data is performed.

냉난방 시설의 운전 상태는 시설 운전 상황과, 냉난방 상황으로 구분된다. 즉, 시설 운전 상황은 냉난방 시설에 부착된 각종 계측기로부터 측정된 계측값을 무선 또는 유선 통신망을 통해 제어 장치(300)로 전송한다. 냉난방 상황은 냉난방 시설에 부착된 온도 측정기로부터 측정된 측정값을 무선 또는 유선 통신망을 통해 제어 장치(300)로 전송한다.The operating state of the heating and cooling facility is divided into the facility operation state and the heating and cooling state. That is, the facility operation state transmits measured values measured from various instruments attached to the heating / cooling facility to the control device 300 through a wireless or wired communication network. In the heating / cooling situation, the measurement value measured from the temperature measuring device attached to the heating / cooling facility is transmitted to the control device 300 through the wireless or wired communication network.

그리고 도 9를 참조하면, 이 실시예의 가동 시설은 기타 시설로서, 보일러 시설을 포함한다. 보일러 시설은 용수와 연료를 공급받아서 각 수요처로 스팀을 공급하거나, 각 수요처로부터 응축수를 회수한다.Referring to FIG. 9, the operation facility of this embodiment is a boiler facility including other facilities. The boiler facilities receive water and fuel to supply steam to each customer or collect condensate from each customer.

이 경우, 보일러 가동 시간은 보일러 시설에 부착된 적산 전력계로부터 단위로 사용량을 측정하고, 이를 무선 또는 유선 통신망을 통해 제어 장치(300)로 전송한다.In this case, the boiler operation time measures the usage amount from the integrated power meter attached to the boiler facility, and transmits the measured usage amount to the control device 300 through the wireless or wired communication network.

또 보일러 시설의 연료 사용량은 보일러 시설에 부착된 연료 공급 유량계에서 단위 사용량을 측정하고, 이를 무선 또는 유선 통신망을 통해 제어 장치(300)로 전송하거나, 연료 공급 펌프의 가동 시간으로 연료 사용량을 정량하며 그 가동 시간을 무선 또는 유선 통신망을 통해 제어 장치(300)로 전송한다. 연료 재고량은 제어 장치(300)가 일일 단위로 적산된 연료 사용량을 전일 재고량에서 연산하며 그 자료를 통계 분석 처리한다.The fuel consumption of the boiler facility can be measured by measuring the unit usage amount in the fuel supply flow meter attached to the boiler facility and transferring it to the control unit 300 through the wireless or wired communication network or by measuring the fuel consumption by the operation time of the fuel supply pump And transmits the operation time to the control device 300 through a wireless or wired communication network. The fuel amount of the fuel is calculated by the control unit 300 on the previous day in terms of the fuel amount accumulated in the daily amount, and the data is statistically analyzed.

또 보일러 시설의 운전 상태는 보일러 운전 상황과, 증기 상황으로 구분된다. 즉, 보일러 운전 상황은 보일러 시설에 부착된 각종 계측기의 계측값을 측정하여 이를 무선 또는 유선 통신망을 통해 제어 장치(300)로 전송한다. 증기 상황은 보일러 시설에 부착된 온도 및 압력 측정기로부터 측정된 측정값을 무선 또는 유선 통신망을 통해 제어 장치(300)로 전송한다.The operating status of the boiler facility is divided into the boiler operation status and the steam status. That is, the boiler operation state measures measured values of various instruments attached to the boiler facility and transmits the measured values to the controller 300 through the wireless or wired communication network. The steam condition transfers the measured values measured from the temperature and pressure gauges attached to the boiler facility to the control device 300 via a wireless or wired communication network.

따라서 본 발명의 가동 시설 제어 시스템은 각종 가동 시설에 대한 가동 시간, 용수 사용량 등을 유량계, 적산 전력계 등의 측정 신호를 받아서 가동 시설의 여러 기계 즉, 전동기 작동 시간, 계측기의 측정값을 감시하고 기록하는 제어 장치를 이용하여, 관리자 단말기 즉, 퍼스널 컴퓨터와 모바일 단말기로 가동 시설 운전 상황에 대한 문자 메시지를 전송하며, 해당 기관에 각종 가동 시설에 대한 가동 상황을 업로드 하고, 계측기 수치와 가동 시설 가동 기준 범위 내에 연산하여 전동기 운전 시간을 제어한다.Therefore, the movable facility control system of the present invention receives the measurement signals of the flow meter, the integrated power meter, and the like for the operation time and the water consumption for various movable facilities, and monitors the various operation machines of the movable facility, A text message on the operation status of the movable facility is transmitted to the administrator terminal, that is, the personal computer and the mobile terminal, the operation status of various movable facilities is uploaded to the relevant institution, And the operation time of the motor is controlled.

이상에서, 본 발명에 따른 가동 시설 제어 시스템의 구성 및 작용을 상세한 설명과 도면에 따라 도시하였지만, 이는 실시예를 들어 설명한 것에 불과하며, 본 발명의 기술적 사상을 벗어나지 않는 범위 내에서 다양한 변화 및 변경이 가능하다.While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is to be understood that the invention is not limited to the disclosed embodiments, but, on the contrary, This is possible.

100 : 가동 시설 통합 관리 서버
200 : 관리자 단말기
210 : 퍼스널 컴퓨터
220 : 모바일 단말기(증강 현실 기기 포함)
300 : 제어 장치
400 : 가동 시설
100: Operation facility integrated management server
200: administrator terminal
210: personal computer
220: Mobile terminal (including augmented reality device)
300: Control device
400: Operation facility

Claims (10)

가동 시설 제어 시스템에 있어서:
복수 개의 가동 시설들과;
통신망에 연결되고 상기 가동 시설의 관리자가 구비하는 관리자 단말기와;
상기 가동 시설들로부터 운전 상태에 따른 다양한 계측 정보를 측정하는 복수 개의 계측 장치와;
통신망을 통하여 상기 가동 시설들 각각을 운전하도록 원격 제어하고, 상기 계측 장치로부터 상기 계측 정보를 전송받아서 저장하고, 상기 관리자 단말기로 상기 계측 정보를 전송하고, 상기 가동 시설 중 어느 하나로부터 운전 중 이상이 발생되면, 상기 관리자 단말기로 상기 가동 시설에 이상 발생되었음을 알려주는 제어 장치 및;
상기 제어 장치로부터 상기 계측 정보를 받아서 통계 분석 처리하여 상기 가동 시설들을 통합 관리하는 가동 시설 통합 관리 서버를 포함하는 것을 특징으로 하는 가동 시설 제어 시스템.
A movable facility control system comprising:
A plurality of movable facilities;
An administrator terminal connected to a communication network and provided by an administrator of the movable facility;
A plurality of measurement devices for measuring various measurement information according to operation states from the movable facilities;
Wherein the control unit is configured to remotely control each of the movable facilities through a communication network to receive and store the measurement information from the measuring device, transmit the measurement information to the manager terminal, A controller for informing the manager terminal of abnormality in the movable facility;
And a movable facility integrated management server for receiving the measurement information from the controller and performing statistical analysis processing to integrally manage the movable facilities.
제 1 항에 있어서,
상기 제어 장치는;
통신망을 통해 상기 가동 시설들과 상기 관리자 단말기 및 상기 가동 시설 통합 관리 서버와 상호 연결되어, 상호 간에 데이터 통신이 가능하도록 처리하는 통신부와;
상기 제어 장치의 구동 전원을 공급하는 전원 공급부와;
상기 제어 장치의 관리자 또는 담당자에 대한 사용자 인증을 위한 비밀 번호를 입력하는 입력 장치와;
상기 가동 시설의 운전 상태와 운전 현황 정보를 실시간으로 표시하는 디스플레이 장치와;
상기 가동 시설의 가동 현황 정보를 문서로 출력하는 프린터와;
통신망에 연결되어 상기 가동 시설의 다양한 계측 장치와 전동기들로부터 계측 정보를 받아들이거나 상기 전동기로 원격 제어 신호를 출력하는 신호 포트 및;
상기 통신부, 상기 전원 공급부, 상기 입력 장치, 상기 디스플레이 장치, 상기 프린터 및 상기 신호 포트를 제어하는 제어부를 포함하는 것을 특징으로 가동 시설 제어 시스템.
The method according to claim 1,
The control device comprising:
A communication unit which is interconnected with the movable facilities, the manager terminal and the movable facility integrated management server through a communication network so as to enable data communication with each other;
A power supply for supplying driving power to the control device;
An input device for inputting a password for user authentication to an administrator or a person in charge of the control device;
A display device for displaying the operating state and operation state information of the movable facility in real time;
A printer for outputting the operation status information of the movable facility as a document;
A signal port connected to a communication network for receiving measurement information from various measuring devices and motors of the movable facility or outputting a remote control signal to the electric motor;
And a control unit for controlling the communication unit, the power supply unit, the input device, the display device, the printer, and the signal port.
제 2 항에 있어서,
상기 가동 시설의 상기 계측 장치에는;
적어도 상기 가동 시설의 전기 사용량에 대한 계측 정보를 상기 제어 장치로 전송하는 적산 전력계, 상기 가동 시설의 용수 사용량에 대한 계측 정보를 상기 제어 장치로 전송하는 유량계 및, 상기 가동 시설의 운전 현황에 따른 측정값을 상기 제어 장치로 전송하는 계측기를 포함하는 것을 특징으로 하는 가동 시설 제어 시스템.
3. The method of claim 2,
The measuring device of the movable facility includes:
A flowmeter for transmitting measurement information on the amount of electricity used by the movable facility to the control device, a meter for transmitting measurement information on the water usage amount of the movable facility to the control device, Value to the control device. ≪ Desc / Clms Page number 21 >
제 2 항에 있어서,
상기 가동 시설의 운전 현황 정보는;
적어도 상기 가동 시설의 운전에 필요한 전력 사용량, 용수 사용량, 연료 사용량, 약품 사용량과, 상기 가동 시설에 장착된 상기 전동기의 가동 시간, 전력 부하량 및 상기 가동 시설에 부착된 계측기의 계측 신호를 포함하고, 상기 제어 장치가 일정 기간 동안에 저장하며 상기 일정 기간이 경과된 이후에는 저장매체에 기록하는 것을 특징으로 하는 가동 시설 제어 시스템.
3. The method of claim 2,
The operating status information of the movable facility includes:
And a measurement signal of a meter attached to the movable facility, wherein the measurement signal includes at least a power consumption amount, a water consumption amount, a fuel consumption amount, a medicine consumption amount, and an operation time and an electric power load amount of the motor mounted on the movable facility, Wherein the controller stores the data in the storage medium for a predetermined period of time and records the data in the storage medium after the predetermined period of time elapses.
제 4 항에 있어서,
상기 사용량들 각각은 적산되며, 실시간 사용량, 일일 사용량, 주간 사용량 및 월간 사용량으로 저장되고, 상기 가동 시설 통합 관리 서버가 상기 사용량의 변화를 통계 분석 처리되는 것을 특징으로 하는 가동 시설 제어 시스템.
5. The method of claim 4,
Wherein each of the usage amounts is accumulated and stored in a real time usage amount, a daily usage amount, a weekly usage amount, and a monthly usage amount, and the movable facility integrated management server statistically analyzes the change in the usage amount.
제 1 항 또는 제 5 항에 있어서,
상기 가동 시설 통합 관리 서버는;
상기 가동 시설의 운전 현황 정보 중 가동 시간과 효율과의 연관 관계를 통계 수치로 연산하는 것을 특징으로 하는 가동 시설 제어 시스템.
6. The method according to claim 1 or 5,
Wherein the movable facility integrated management server comprises:
And calculating a correlation between the operation time and the efficiency of the operation state information of the movable facility by a statistical value.
제 6 항에 있어서,
상기 가동 시설 통합 관리 서버는;
상기 가동 시설들의 상기 운전 현황 정보를 감시 기관 시스템으로 제공하는 것을 특징으로 하는 가동 시설 제어 시스템.
The method according to claim 6,
Wherein the movable facility integrated management server comprises:
And provides the operation status information of the movable facilities to a monitoring agency system.
가동 시설 제어 시스템의 제어 방법에 있어서:
가동 시설의 다양한 계측 장치들로부터 통신망을 통하여 상기 가동 시설의 운전 현황에 따른 다양한 계측 정보를 전송받아서 수집 및 저장하는 단계와;
상기 계측 정보를 이용하여 상기 가동 시설 운전 현황을 실시간으로 모니터링하는 단계와;
상기 가동 시설의 운전 시간과 운전 결과에 따른 정보를 통계 분석 처리하여, 분석 결과를 통해 상기 가동 시설의 가동 효율을 연산하는 단계 및;
연산 결과를 가동 시설 통합 관리 서버와 관리자 단말기로 전송하는 단계를 포함하는 것을 특징으로 하는 가동 시설 제어 시스템의 제어 방법.
A control method for a movable facility control system comprising:
Receiving and collecting various measurement information according to the operating status of the movable facility from various measurement devices of the movable facility through a communication network;
Monitoring the moving facility operation status in real time using the measurement information;
Statistically analyzing information according to the operation time and the operation result of the movable facility, and calculating the operation efficiency of the movable facility through the analysis result;
And transferring the calculation result to the movable facility integrated management server and the manager terminal.
제 8 항에 있어서,
상기 방법은;
모니터링 중 어느 하나의 상기 가동 시설에서 이상이 발생되면, 관리자 단말기로 이상이 발생되었음을 알려주는 문자 메시지를 전송하는 단계를 더 포함하는 것을 특징으로 하는 가동 시설 제어 시스템의 제어 방법.
9. The method of claim 8,
The method comprising:
Further comprising the step of transmitting a text message indicating that an abnormality has occurred to the administrator terminal if an abnormality occurs in any one of the movable facilities during monitoring.
제 8 항 또는 제 9 항에 있어서,
상기 가동 효율을 연산하는 것은;
상기 가동 시설의 상기 계측 정보에 따른 운전 현황 정보 중 가동 시간과 효율과의 연관 관계를 통계 수치로 연산하는 것을 특징으로 하는 가동 시설 제어 시스템의 제어 방법.
10. The method according to claim 8 or 9,
Calculating the operation efficiency includes:
And calculating a correlation between the operation time and the efficiency of the operation state information according to the measurement information of the movable facility, using statistical values.
KR1020160041423A 2016-04-05 2016-04-05 System and method for controlling operation equipments KR101842896B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020160041423A KR101842896B1 (en) 2016-04-05 2016-04-05 System and method for controlling operation equipments

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020160041423A KR101842896B1 (en) 2016-04-05 2016-04-05 System and method for controlling operation equipments

Publications (2)

Publication Number Publication Date
KR20170114141A true KR20170114141A (en) 2017-10-13
KR101842896B1 KR101842896B1 (en) 2018-05-14

Family

ID=60139655

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020160041423A KR101842896B1 (en) 2016-04-05 2016-04-05 System and method for controlling operation equipments

Country Status (1)

Country Link
KR (1) KR101842896B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20200094694A (en) * 2019-01-30 2020-08-07 권도균 Virtual reality realization system and method for remote controlling the machinery using the augmented reality and management system thereof
KR20230055453A (en) * 2021-10-18 2023-04-26 서울과학기술대학교 산학협력단 Apparatus for inspecting construction site safety based on augmented reality

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101452384B1 (en) * 2013-12-09 2014-10-22 김영기 Energy management system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20200094694A (en) * 2019-01-30 2020-08-07 권도균 Virtual reality realization system and method for remote controlling the machinery using the augmented reality and management system thereof
KR20230055453A (en) * 2021-10-18 2023-04-26 서울과학기술대학교 산학협력단 Apparatus for inspecting construction site safety based on augmented reality

Also Published As

Publication number Publication date
KR101842896B1 (en) 2018-05-14

Similar Documents

Publication Publication Date Title
EP1450923B1 (en) Regulatory compliance system and method
AU2002348737B2 (en) An energy efficient data acquisition system and a computer controlled energy monitoring system incorporating the same
JP7145130B2 (en) Casting support system
CN111340948A (en) BIM-based water treatment plant operation and maintenance system
CN104331770A (en) Intelligent management system of flexible production enterprise
WO2005122046A2 (en) Monitoring system and method
KR101842896B1 (en) System and method for controlling operation equipments
CN104764595A (en) Remote diagnostic system
KR102484018B1 (en) AI IoT-based Elevator Predictive Maintenance System Project
JP4236022B2 (en) Monitoring, diagnosis and sales system for machine parts
JP4037065B2 (en) Water treatment management center and network system
TWI380226B (en) System and method of prognostic analysis and resource planning for apparatu
JP6123361B2 (en) Maintenance support system and method
CN112036589A (en) Feed factory production facility operation and maintenance system based on standardization
KR100584903B1 (en) System for real time controlling driving data of power plant
KR20160108883A (en) System for managing facilities of builings
Ramani et al. Predictive analysis for industrial maintenance automation and optimization using a smart sensor network
RU15520U1 (en) AUTOMATED CITY MANAGEMENT SYSTEM
CN108596418B (en) Environmental protection fortune pipe system
Dusi et al. Energy management and efficiency—a systems approach
RU2493596C1 (en) System and method of managing maintenance of buildings and structures
Chen et al. The environmental implications of digitalization in manufacturing: a case study
CN109507957A (en) Cloud Intelligent power saving system for water process industry
Istrate et al. Efficiency of maintenance in steel making industry
JP2006338286A (en) Energy management system

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant