KR20170093590A - NB-IoT를 위한 하향링크 자원을 할당하는 방법 및 장치 - Google Patents

NB-IoT를 위한 하향링크 자원을 할당하는 방법 및 장치 Download PDF

Info

Publication number
KR20170093590A
KR20170093590A KR1020160015178A KR20160015178A KR20170093590A KR 20170093590 A KR20170093590 A KR 20170093590A KR 1020160015178 A KR1020160015178 A KR 1020160015178A KR 20160015178 A KR20160015178 A KR 20160015178A KR 20170093590 A KR20170093590 A KR 20170093590A
Authority
KR
South Korea
Prior art keywords
resource allocation
pdsch
pdcch
iot
subframe
Prior art date
Application number
KR1020160015178A
Other languages
English (en)
Other versions
KR102452865B1 (ko
Inventor
리지안준
박동현
윤성준
Original Assignee
주식회사 아이티엘
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 아이티엘 filed Critical 주식회사 아이티엘
Priority to KR1020160015178A priority Critical patent/KR102452865B1/ko
Publication of KR20170093590A publication Critical patent/KR20170093590A/ko
Application granted granted Critical
Publication of KR102452865B1 publication Critical patent/KR102452865B1/ko

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/0091Signaling for the administration of the divided path
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/0001Arrangements for dividing the transmission path
    • H04L5/0003Two-dimensional division
    • H04L5/0005Time-frequency
    • H04L5/0007Time-frequency the frequencies being orthogonal, e.g. OFDM(A), DMT
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/003Arrangements for allocating sub-channels of the transmission path

Landscapes

  • Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

본 발명은 무선 통신에 관한 것으로서, 보다 상세하게는 NB-IoT 통신을 위한 하향링크 자원을 할당하는 방법 및 장치에 관한 것이다.
이러한 본 발명은 단말에게 NB-PDSCH 전송을 위한 자원을 할당하고, 상기 NB-PDSCH 전송을 위한 주파수 영역 자원 할당에 대한 CCE 인덱스와, NB-PDSCH 전송을 위한 시간 영역 자원 할당을 위한 DCI 포맷을 결정하는 구성을 포함한다.

Description

NB-IoT를 위한 하향링크 자원을 할당하는 방법 및 장치{METHOD AND APPARATUS of RESOURCE ALLOCATION for NB-IoT DL TRANSMISSION}
본 발명은 무선 통신에 관한 것으로서, 보다 상세하게는 NB-IoT 통신을 위한 하향링크 자원을 할당하는 방법 및 장치에 관한 것이다.
E-UTRA(Evolved Universal Terrestrial Radio Access)의 비역호환 변형(non-backward-compatible variant) 상의 큰 확장을 기반으로 셀룰러(cellular) 사물 인터넷(internet of things, 이하 IoT)에 대한 무선 접속(radio access)을 위해 NB(Narrowband)-IoT(Internet of Things)가 연구되고 있다.
상기 NB-IoT를 통해 실내(indoor)에서의 커버리지 증진, 낮은 처리량(throughput)의 거대한 숫자의 디바이스들, 낮은 딜레이 감도(delay sensitivity), 엄청나게 낮은 디바이스 가격, 낮은 디바이스 파워 소비 및 최적화된 네트워크 구조(architecture)를 지원할 수가 있다.
상기 NB-IoT는 하나의 RB(Resource Block)에 해당하는 대역폭 등 매우 좁은 대역폭(narrowband)을 사용하기에 기존 LTE(Long Term Evolution) 등 E-UTRA에서 쓰였던 물리 채널 및 신호 등을 다시 설계할 필요가 있다.
이와 관련하여 하향링크 자원을 할당하기 위한 방안이 요구되는 실정이다.
본 발명은 NB-IoT 통신을 위한 하향링크 자원을 할당하는 방법 및 장치를 제공함에 있다.
The objectives of this application is to be effefciently operate the DLBy the proposed mechanisms in this patent, the DL transmission of NB-IoT can be effectively operated with high reliability and low power consumption.
본 발명의 일 양상에 따르면, NB-IoT 통신을 위한 하향링크 자원을 할당하는 방법에 있어서, 단말에게 스케줄링 주기 또는 기간을 포함하는 RRC 메시지를 설정하여 전송하는 단계와, NB-PDSCH 전송을 위한 자원을 할당하고, 상기 NB-PDSCH 전송을 위한 주파수 영역 자원 할당에 대한 CCE 인덱스를 단계와, 상기 NB-PDSCH 전송을 위한 시간 영역 자원 할당을 위한 DCI 포맷을 결정하는 단계와, 상기 주파수/ 시간 영역 자원에 대한 정보를 포함하는 NB-PDCCH 구성하고, 이를 상기 단말로 전송하는 단계를 포함함을 특징으로 한다.
본 발명에 따르면, NB-IoT를 서비스를 위한 자원할당이 용이해지는 장점을 가진다. By the proposed mechanisms in this patent, the DL transmission of NB-IoT can be effectively operated with high reliability and low power consumption.
Figure 1 shows the frequency spectrum for NB-IoT of all these three modes according to one or more exemplary embodiments.
Figure 2 shows one example of the scheduling period configuration where each period is 5 radio frames according to one or more exemplary embodiments.
Figure 3 shows the detail constitute of Both CCE1/BRU1 and CCE2/BRU2 in Definition 1 according to one or more exemplary embodiments.
Figure 4 shows the detail constitute of Both CCE1/BRU1 and CCE2/BRU2 in Definition 2 according to one or more exemplary embodiments.
Figure 5 shows one example of the frequency domain resource allocation where two NB-PDSCH of two UEs multiplexing in each subframe according to one or more exemplary embodiments.
Figure 6 shows the constitute of the subcarrier group with 3 subcarriers according to one or more exemplary embodiments.
Figure 7 shows the constitute of the subcarrier group with 6 subcarriers according to one or more exemplary embodiments.
Figure 8 shows one example of the flowchart of the eNodeB according to one or more exemplary embodiments.
Figure 9 shows one example of the flowchart of the UE operation according to one or more exemplary embodiments.
도 10은 본 발명의 실시예에 따라 장치 블록도를 개략적으로 도시한 도면이다.
이하, 본 명세서에서는 본 발명과 관련된 내용을 본 발명의 내용과 함께 예시적인 도면과 실시 예를 통해 상세하게 설명한다. 각 도면의 구성 요소들에 참조 부호를 부가함에 있어서, 동일한 구성 요소들에 대해서는 비록 다른 도면상에 표시되더라도 가능한 한 동일한 부호를 가지도록 하고 있음에 유의해야 한다. 또한, 본 명세서의 실시 예를 설명함에 있어, 관련된 공지 구성 또는 기능에 대한 구체적인 설명이 본 명세서의 요지를 흐릴 수 있다고 판단되는 경우에는 그 상세한 설명은 생략한다.
또한 본 명세서는 무선 통신 네트워크를 대상으로 설명하며, 무선 통신 네트워크에서 이루어지는 작업은 해당 무선 통신 네트워크를 관할하는 시스템(예를 들어 기지국)에서 네트워크를 제어하고 데이터를 송신하는 과정에서 이루어지거나, 해당 무선 네트워크에 결합한 단말에서 작업이 이루어질 수 있다.
This is about NB IoT (narrow band Internet of Things) operation in wireless communication system. It is mainly for LTE advance Rel.13 system, especially for the NB IoT DL transmission.
Machine to Machine (M2M) communication represents a significant growth opportunity for the 3GPP ecosystem. To support the so called 'Internet of Things' (IoT), 3GPP operators have to address usage scenarios with devices that are power efficient (with battery life of several years), can be reached in challenging coverage conditions e.g. indoor and basements and, more importantly, are cheap enough so that they can be deployed on a mass scale and even be disposable. This effectively means that indoor coverage should be readily available and reliable. It should be possible to achieve an extended coverage of 20 dB compared to commercially available legacy devices.
The objectives of the NB-IoT were: improved indoor coverage, support for massive number of low throughput devices, low delay sensitivity, ultra-low device cost, low device power consumption and (optimised) network architecture.
Figure 1 shows the frequency spectrum for NB-IoT of all these three modes according to one or more exemplary embodiments.
Referring fig, 1, In NB-IoT, 180 kHz UE RF bandwidth is used for both downlink and uplink. So only 1 LTE physics resource block (PRB) in frequency domain is possible for communication which have 12 subcarrier with spacing 15kHz.
Based on the frequency spectrum resource, there are total three operation mode. Figure 1 shows the frequency spectrum for NB-IoT of all these three modes. The detail of each mode are described as follows:
- Stand-alone operation
Utilizing for example the spectrum currently being used by GERAN (GSM EDGE Radio Access Networ) systems as a replacement of one or more GSM (Global System for Mobile Communications) carriers
- Guard band operation
Utilizing the unused resource blocks within a LTE carrier??s guard-band
- In-band operation
Utilizing resource blocks within a normal LTE carrier
In NB-IoT, NB-PBCH (narrow band physics broadcasting channel) transmits the system information which always use subframe 0. To Support NB-IoT DL transmission, two different channels are required: One is the NB-PDSCH (narrow band physics downlink shared channel) which transmit DL data traffic; The other is the NB-PDCCH (narrow band physics downlink control channel) which transmit down link control information (DCI) Including resource allocation for NB-PDSCH. In this patent, we investigate the resource allocation for NB-PDSCH and the corresponding indication in DCI format.
본 발명은 NB-IoT를 위한 NB-PDSCH 자원 할당 방법과 그것을 위한 스케줄링 방법에 관한 것이다。
본 발명에서는 NB-PDSCH 를 스케쥴링 하기 위한 스케쥴링 주기(periodicity)와 시간구간(time duration)을 정의한다. 또한 그것은 기지국으로부터 단말에게 설정될 수 있다. 시간도메인의 자원을 지시하는 것에 관해, 두 가지 정보가 DCI format을 통해서 지시될 수 있다. 그 두가지 정보는 시작 서브프레임(starting subframe)과 시작 서브프레임을 포함한 NB-PDSCH들이 전송될 수 있는 연속적인 서브프레임들의 수이다. 시간 도메인에 해당하는 위의 두 가지 정보를 지시하기 위한 두 가지 시그널링 방법이 제안된다. 그 중 하나 시그널링 방법은 시작 서브프레임과 그 연속적인 서브프레임의 수를 한번에(Joint) 지시하는 것이고 나머지 시그널링 방법은 독립적으로 지시하는 것이다.
주파수 도메인에서 자원 할당을 위해, 두 가지 다른 방법이 본 발명에서 제안된다.
첫 번째 방법은 BRU(Basic Resource Unit) 기반 방법이다. 이 방법에서는 하나의 PRB-pair (하나의 서브프레임내)가 2개의 BRU로 나뉘고 각 BRU 인덱스는 NB-PDSCH의 스케쥴링 정보를 제공하는 NB-PDCCH의 CCE index 값에 의해 지시된다. 두 번째 방법은 하나의 PRB 내의 subcarrier 그룹을 기반으로 자원을 할당하는 방법이다. NB-IOT 시스템이 사용하는 주파수 자원(e.g. 1PRB)는 몇 개의 subcarrier 그룹으로 나뉜다. 적어도 하나의 subcarrier로 구성된 subcarrier 그룹은 NB-PDCCH가 전송하는 DCI format에 의해서 지시되어 사용된다.
In this patent, the mechanism of PDSCH resource allocation and scheduling for NB-IoT is investigated.
To scheduling the NB-PDSCH, at first, the scheduling period/duration is defined and configured. For time domain resource allocation, the resource allocation field in DCI format indicate two information, the starting subframe, the number of subframe of NB-PDSCH within one scheduling period/duration. To indication these information, two different methods are proposed. One is Joint indication of the starting subframe and the number of subframe. The other is Separate indication of the starting subframe and the number of subframe.
For frequency domain resource allocation, two different kind of methods are proposed. One is the basic resource unit based method. In this method, One PRB pair (1 subframe) is divided into 2 BRU which BRU is used can be indicate by the CCE index of NB-PDCCH who schedule this NB-PDSCH. The other is subcarrier group based method. In this method, the whole PRB is divided into several subcarrier group. Which subcarrier group is used is indicated by DCI format.
Figure 2 shows one example of the scheduling period configuration where each period is 5 radio frames according to one or more exemplary embodiments.
In this patent, the mechanism of NB-PDSCH resource allocation and scheduling for NB-IoT is investigated. Since only one PRB resource can be use for NB-IoT, one NB-PDSCH need occupy several subframes. If multiple NB-PDSCHs can be multiplexed in one subframe, the resource allocation can include frequency domain resource allocation and time domain resource allocation; Otherwise, the resource allocation only include time domain resource allocation.
1. Scheduling and Time domain resource allocation:
To scheduling the NB-PDSCH, Two different method are defined.
Method 1: None periodic NB- PDCCH scheduling
For none period NB-PDCCH scheduling, one scheduling duration is defined which may be several subframes immediately follow the NB-PDCCH subframe. The exact number of subframes for 1 scheduling duration will be discussed later. DCI format in NB-PDCCH indicate the starting subframe and the number of subframe of the NB-PDSCH within the scheduling duration. Once this NB-PDSCH transmission is finished, then the UE need to blind detect the new NB-PDCCH.
Method 2: periodic NB- PDCCH scheduling
For period NB-PDSCH scheduling, at first, the scheduling period is defined and configured which may be several radio frames. During one scheduling period, there are two parts. The first part is NB-PDCCH region which start from the beginning of the one scheduling period and cover several subframes. The remain part is NB-PDCCH region which use the remain subframes. Figure 2 shows one example of the scheduling period configuration where each period is 5 radio frames.
Time domain resource allocation:
The resource allocation field in DCI format indicate two information, the starting subframe and the number of subframe of NB-PDSCH within one scheduling period/duration.
Based on the UL resource allocation discussion, the number of resource allocation of UL can be 5 bits for 15KHz carrier spacing and 8 bits for 3.75 KHz carrier spacing. DL DCI format should have the same DCI format size as UL. So it is better that same number of bits for resource allocation field.
If carrier spacing of UL is 15KHz, resource allocation field in DL grant is also 5 bits. If carrier spacing of UL is 3.75KHz, resource allocation field in DL grant is also 8 bits. To indicate the time domain time domain resource allocation (the starting subframe and the number of subframe of NB-PDSCH within one scheduling period/duration), two different methods are proposed:
Method 1: Joint indication of the starting subframe and the number of subframe
In this method, there is only one resource allocation field named as resource indication value (RIV) corresponding to a starting subframe(
Figure pat00001
) and the number of subframes
Figure pat00002
. If the number of subframe of the scheduling period/duration is
Figure pat00003
, the resource indication value is defined by Equation 1:
Figure pat00004
For this method, the required number of bits for resource allocation is
Figure pat00005
.
If carrier spacing of UL is 15KHz, resource allocation field in DL grant is also 5 bits. The scheduling duration will be 7 subframes. If carrier spacing of UL is 3.75KHz, resource allocation field in DL grant is also 8 bits. The scheduling duration will be 22 subframes.
Method 2: Separate indication of the starting subframe and the number of subframe
In this method, there are two fields for the resource allocation. One is the starting subframe indicator which indicate the starting subframe within the scheduling period/duration. The other is the number of subframe indicator which indicate how many consecutive subframes are used for NB-PDSCH transmission.
If carrier spacing of UL is 15KHz, resource allocation field in DL grant is also 5 bits. The scheduling duration will be 8 subframes. The detail content is shown in table 1.
Field Number of bits value
the starting subframe indicator 3 0~7
the number of subframe indicator 2 1~4
Table 1 is DL resource allocation field for 15KHz carrier spacing of UL
If carrier spacing of UL is 3.75KHz, resource allocation field in DL grant is also 8 bits. The scheduling duration will be 32 subframes. The detail content is shown in table 2.
Field Number of bits value
the starting subframe 5 0~31
the number of subframe 3 1~8
Table 2 DL is resource allocation field for 3.75KHz carrier spacing of UL
2. Frequency domain resource allocation:
For frequency domain resource allocation, two different methods are proposed. One is the basic resource unit based method; the other is subcarrier based method.
Figure 3 shows the detail constitute of Both CCE1/BRU1 and CCE2/BRU2 in Definition 1 according to one or more exemplary embodiments. Figure 4 shows the detail constitute of Both CCE1/BRU1 and CCE2/BRU2 in Definition 2 according to one or more exemplary embodiments.
Method 1: the basic resource unit based
For this method, at first we define the basic resource unit (BRU). In LTE, the basic resource unit is in frequency is 1 PRB, and in time domain is 1 subfram. For NB-IoT, there is only one PRB in frequency domain. In one subframe, 1 PRB pair is the only resource for scheduling. To increase multiplexing flexibility, the one PRB pair (1 subframe) is divided into 2 BRU. So that two NB-IoT UEs can be scheduled in one subframe/with different BRU.
For NB-PDCCH, within a PRB pair, 2 Control Channel Elements (CCE) are also defined which is the basic resource unit for NB-PDCCH where One CCE consists of 6 subcarriers per OFDM symbol in a subframe. In this patent, we define CCE of NB-PDCCH and BRU for NB-PDSCH with the same structure. That is the resource for one CCE equal to 1 BRU. In one PRB pair, there are two CCEs/BRUs which can be numbered as CCE1 and CCE2/BRU1 and BRU2.
For the CCE and BRU, two different definitions are proposed:
Definition 1)CCE1/BRU1 use lower 6 subcarrier in PRB of first slot and use upper 6 subcarriers in PRB of second slot. CCE2/BRU2 use upper 6 subcarrier in PRB of first slot and use lower 6 subcarriers in PRB of second slot. Figure 3 shows the detail constitute of Both CCE1/BRU1 and CCE2/BRU2 in Definition 1.
2)CCE1/BRU1 use 6 odd subcarrier in PRB of first slot and use 6 even subcarriers in PRB of second slot. CCE2/BRU2 use upper 6 even subcarrier in PRB of first slot and use 6 odd subcarriers in PRB of second slot. Figure 4 shows the detail constitute of Both CCE1/BRU1 and CCE2/BRU2 in Definition 2.
Since only one PRB resource can be use for NB-IoT. One NB-PDSCH need occupy several subframes. The resource for NB-PDSCH is multiple of the BRUs in different subframes. So the resource allocation can include frequency domain resource allocation and time domain resource allocation.
For frequency domain resource allocation, here we consider the difference of two cases. For normal coverage case, for NB-PDSCH transmission, it is possible that only 1 BRU is used in one subframe. However, for enhanced coverage and extend coverage, it is better that the whole PRB pair in one subframe is used for one NB-PDSCH. So for frequency domain resource allocation, there are total three cases. 1)BRU1 is selected for NB-PDSCH. 2) BRU2 is selected for NB- PDSCH. 3)The whole subframe (1 PRB pair) is selected for NB-PDSCH.
To indicate the frequency domain resource allocation, DCI format is one candidate. However, to reduce the DCI format overhead, in this patent, the CCE index of the NB-PDCCH is employed. The detail method is:
1)If only CCE1 is used in one subframe for NB-PDCCH to schedule the NB-PDSCH, then BRU1 is allocated to this NB-PDSCH. It should be noted that if more than 1 subframe is used for NB-PDCCH, only CCE1 in all the subframes are used for this NB-PDCCH.
2)If only CCE2 is used in one subframe for NB-PDCCH to schedule the NB-PDSCH, then BRU2 is allocated to this NB-PDSCH. It should be noted that if more than 1 subframe is used for NB-PDCCH, only CCE2 in all the subframes are used for this NB-PDCCH.
3)If both CCE1 and CCE2 are used in one subframe (whole PRB pair) for NB-PDCCH to schedule the NB-PDSCH, then the whole PRB pair is allocated to this NB-PDSCH. It should be noted that if more than 1 subframe is used for NB-PDCCH, the whole PRB pair in all the subframes are used for this NB-PDCCH.
Figure 5 shows one example of the frequency domain resource allocation where two NB-PDSCH of two UEs multiplexing in each subframe.
Method 2: Subcarrier based method
For this method, we can refer to the UL principle where number of subcarriers for frequency domain resource allocation can be 1,3,6 and 12. For DL, 3,6 and 12 subcarriers can be considered. To reduce the overhead, we can define several subcarrier groups. The frequency domain resource allocation is to select one of this subcarrier groups.
Figure 6 shows the constitute of the subcarrier group with 3 subcarriers. In this case, 4 groups can be defined which are indexed as group0~group3.
Figure 7 shows the constitute of the subcarrier group with 6 subcarriers. In this case, 2 groups can be defined which are indexed as group4~group5.
For subcarrier group with 12 subcarriers, it will use the whole PRB pair. So only one group indxd as group6. Totally there can be 7 subcarrier groups. So 3 bits are required to indicated the frequency domain resource allocation. The detail indication of these 3 bits is shown in table 3.
subcarrier group indicator Subcarrier group for NB-PDSCH
0 0
1 1
2 2
3 3
4 4
5 5
6 6
7 reserved
Table 3: subcarrier group indicator in frequency domain resource allocation field
By the proposed mechanisms, the DL transmission of NB-IoT can be effectively operated with high reliability and low power consumption.
The flowchart of the eNodeB operation and UE operation are shown as follows:
Figure 8 shows one example of the flowchart of the eNodeB according to one or more exemplary embodiments.
For NB-IoT DL transmission, at first the eNodeB Configures scheduling period/duration to UE by radio resource control (RRC) like figure 2 (S810). Based on the scheduling period, the eNodeB schedule and allocate the resource for the NB-PDSCH transmission (S820). Based on the frequency allocation result, the eNodeB can get the CCE index for the NB-PDCCH transmission like figure 5 (S830). Based on time domain resource allocation, the eNodeB generates the resource allocation field of the DCI format by Equation 1 or table 2/3 (S840). Finally, eNodeB transmit NB-PDCCH (S850) and NB-PDSCH (S860) based on the result of resource allocation.
Figure 9 shows one example of the flowchart of the UE operation according to one or more exemplary embodiments.
For NB-IoT DL reception at the UE side, at first, the UE gets scheduling period Configuration by RRC like figure 2 (S910). Then, based on the scheduling period, the UE blind detect the NB-PDCCH (S920). Once the NB-PDCCH is correctly detected, the UE gets the frequency domain resource allocation based on the CCE index of the NB-PDCCH transmission like figure 5(S930). At the same time, the UE detects the DCI format for time domain resource allocation by Equation 1 or table 2/3 (S940). Based on the resource allocation information, the UE can detect NB-PDSCH (S950).
도 10은 본 발명의 실시예에 따라 장치 블록도를 개략적으로 도시한 도면이다.
도 10을 참조하면, 제1 통신장치(1000)와 제2 통신장치(1050)가 통신을 수행한다. 제1 통신장치(1000)는 프로세서(1010), RF 모듈(1020) 및 메모리(1025)를 포함한다. 여기서, 상기 제1통신장치(1000)은 기지국이 될 수 있다. 상기 제1통신장치(1000)은 제2통신장치(1050)을 제어한다. 상기 제2통신장치(1050)은 NB-IoT 단말(UE)들이 될 수 있다. 상기 제1통신장치(1000)는 제2통신장치(1050)들 정보 교환 또는 상기 제1통신장치(r00)을 통한 제2통신장치(1050)과 NB-IoT 서버 간의 정보 교환을 포함할 수가 있다. 즉, NB-IoT와 관련된 애플리케이션을 실행/제어하고, NB-IoT 특정 서비스를 제공한다.
우선, 프로세서(1010)는 자원 생성부(1011) 및 자원 매핑부(1012)로 구성될 수 있다.. 프로세서(1010)는 본 명세서에서 제안된 기능, 과정 및/또는 방법을 구현한다. 구체적으로 프로세서(1010)는 본 명세서에서 게시된 도 1 내지 9에 개시된 단말의 NB-IoT 모든 동작 및, 실시예에 따라 자원할당에 해당하는 정보를 구성 및 전송하는 동작을 수행하는 절차를 사용하여 제2 통신장치(1050)로 하여금 NB-IoT와 관련된 애플리케이션을 실행하여, NB-IoT 특정 서비스를 제공받도록 한다.
보다 구체적으로, 프로세서(1010)은 본 발명의 일 예에 설명한 바와 같이, 단말에게 RRC로 스케줄링 주기 또는 기간을 설정할 수 있다. 또한, 본 발명에 따른 NB-PDSCH 전송을 위한 자원을 할당한다. 이때, NB-PDSCH 전송을 위한 주파수 영역 자원 할당을 위한 CCE 인덱스를 할당한다. 또한 시간 영역 자원 할당을 위한 DCI 포맷을 결정한다. 결정된 주파수/ 시간 영역 자원에 대한 정보를 포함하는 NB-PDCCH 구성하고, 이를 단말로 전송한다. 그후, NB-PDSCH를 전송한다.
The processor (1010) operates a method of PDSCH resource allocation and scheduling for NB-IoT where the scheduling period/duration is defined and configured. The resource allocation field in DCI format indicate two information, the starting subframe, the number of subframe of NB-PDSCH within one scheduling period/duration. The processor (1010) operates to indicate this information in 1, two different methods are proposed. One is Joint indication of the starting subframe and the number of subframe. The other is Separate indication of the starting subframe and the number of subframe. The processor (1010) operates a method for frequency domain resource allocation where one PRB pair (1 subframe) is divided into 2 BRU which BRU is used can be indicate by the CCE index of NB-PDCCH who schedule this NB-PDSCH. The processor (1010) operates a method for frequency domain resource allocation where the whole PRB is divided into several subcarrier group. Which subcarrier group is used is indicated by DCI format. The processor (1010) operates a method of PDSCH resource allocation and scheduling for NB-IoT where the scheduling period/duration is defined and configured. The resource allocation field in DCI format indicate two information, the starting subframe, the number of subframe of NB-PDSCH within one scheduling period/duration.
메모리(1025)는 프로세서(1010)와 연결되어, 프로세서(1010)를 구동하기 위한 다양한 정보를 저장한다. 본 발명에 따라 주파수/ 시간 자원 영역에 대한 다양한 정보들을 저장할 수 있다.
RF모듈(1020)은 프로세서(1010)와 연결되어, 무선 신호를 송신 및/또는 수신한다. 예를 들어, RF 모듈(1020)는 본 발명에 따른 적어도 하나 이상의 자원 신호를 전송하고, 상기 프로세서(1010)에 의해 제어되는 선택된 NB-PDCCH/ NB-PDSCH 및 NB-Iot에 대한 정보를 제2 통신장치(1050)로 전송할 수 있다.
제2 통신장치(1050)는 제1 통신장치(1000)과 동일한 구조를 가질 수 있으며, 제1 통신장치(1000)로부터 전송되는 NB-PDCCH/ NB-PDSCH 및 NB-Iot에 대한 정보를 수신할 수 있다. 제2 통신장치(1050)는 프로세서(10100), RF 모듈(1070) 및 메모리(1075)를 포함한다.
우선, 프로세서(1060)는 자원 복호부(1061) 및 자원정보 획득부(1062)로 구성될 수 있다. 상기 자원 복호부(1061)는 할당된 주파수/시간 자원에 대한 정보 및 해당 정보를 위한 시퀀스 생성 및 생성된 시퀀스를 확인하는 동작을 수행한다. 자원정보 획득부(1062)는 시스템 정보 및 NB-PDCCH/ PDSCH에 대한 정보를 확인한다.
The processor (1060) checks a method of PDSCH resource allocation and scheduling for NB-IoT where the scheduling period/duration is defined and configured. The resource allocation field in DCI format indicate two information, the starting subframe, the number of subframe of NB-PDSCH within one scheduling period/duration. The processor (1060) checks to indicate this information in 1, two different methods are proposed. One is Joint indication of the starting subframe and the number of subframe. The other is Separate indication of the starting subframe and the number of subframe. The processor (1060) checks a method for frequency domain resource allocation where one PRB pair (1 subframe) is divided into 2 BRU which BRU is used can be indicate by the CCE index of NB-PDCCH who schedule this NB-PDSCH. The processor (1060) checks a method for frequency domain resource allocation where the whole PRB is divided into several subcarrier group. Which subcarrier group is used is indicated by DCI format. The processor (1060) checks a method of PDSCH resource allocation and scheduling for NB-IoT where the scheduling period/duration is defined and configured. The resource allocation field in DCI format indicate two information, the starting subframe, the number of subframe of NB-PDSCH within one scheduling period/duration.
즉, 프로세서(1010)는 본 명세서에서 제안된 기능, 과정 및/또는 방법을 구현한다. 구체적으로 프로세서(1010)는 본 명세서에서 게시된 도 1 내지 도 9에 개시된 단말의 NB-IoT 모든 동작 및, 실시예에 따라 NB-PDCCH/ PDSCH에 해당하는 확인하고, 그에 대한 자원 정보의 대맵핑하는 동작을 수행하는 절차를 사용하여 제2 통신장치(1050)로 하여금 NB-IoT와 관련된 애플리케이션을 실행하여, NB-IoT 특정 서비스를 제공받도록 한다.
상기 프로세서(1060)은 RF모듈(1070)을 통해 기지국으로부터 RRC를 통해 스케줄링 주기 또는 기간을 확인한다. 프로세서(1060)은 NB-PDCCH 블라인드 검측을 수행한다. NB-PDCCH 전송의 CCE-Index로 주파수 영역 자원 할당을 획득한다. DCI 포맷을 통해 시간 영역 자원 할당을 획득한다. 상기 획득된 주파수/시간 정보를 통해 NB-PDSCH를 검측한다.
메모리(1075)는 프로세서(100)와 연결되어, 프로세서(1060)를 구동하기 위한 다양한 정보를 저장한다. 본 발명에 따라 동기 신호와 관련된 시퀀스에 대한 다양한 정보들을 저장할 수 있다.
RF모듈(1070)은 프로세서(1060)와 연결되어, 무선 신호를 송신 및/또는 수신한다. 예를 들어, RF 모듈(1070)는 본 발명에 따른 적어도 하나 이상의 동기 신호를 수신한다.
이상의 설명은 본 발명의 기술 사상을 예시적으로 설명한 것에 불과한 것으로서, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자라면 본 발명의 본질적인 특성에서 벗어나지 않는 범위에서 다양한 수정 및 변형이 가능할 것이다. 따라서, 본 발명에 개시된 실시 예들은 본 발명의 기술 사상을 한정하기 위한 것이 아니라 설명하기 위한 것이고, 이러한 실시 예에 의하여 본 발명의 기술 사상의 범위가 한정되는 것은 아니다.
상술한 예시적인 장치에서, 방법들은 일련의 단계 또는 블록으로써 순서도를 기초로 설명되고 있지만, 본 발명은 단계들의 순서에 한정되는 것은 아니며, 어떤 단계는 상술한 바와 다른 단계와 다른 순서로 또는 동시에 발생할 수 있다. 또한, 당업자라면 순서도에 나타낸 단계들이 배타적이지 않고, 다른 단계가 포함되거나 순서도의 하나 또는 그 이상의 단계가 본 발명의 범위에 영향을 미치지 않고 삭제될 수 있음을 이해할 수 있을 것이다.

Claims (2)

  1. NB-IoT 통신을 위한 하향링크 자원을 할당하는 방법에 있어서,
    단말에게 스케줄링 주기 또는 기간을 포함하는 RRC 메시지를 설정하여 전송하는 단계와,
    NB-PDSCH 전송을 위한 자원을 할당하고, 상기 NB-PDSCH 전송을 위한 주파수 영역 자원 할당에 대한 CCE 인덱스를 단계와,
    상기 NB-PDSCH 전송을 위한 시간 영역 자원 할당을 위한 DCI 포맷을 결정하는 단계와,
    상기 주파수/ 시간 영역 자원에 대한 정보를 포함하는 NB-PDCCH 구성하고, 이를 상기 단말로 전송하는 단계를 포함하는 하향링크 자원 할당 방법.
  2. NB-IoT 통신을 위한 하향링크 자원을 할당받는 방법에 있어서,
    기지국으로부터 RRC를 통해 스케줄링 주기 또는 기간에 대한 정보를 수신하는 단계와,
    NB-PDCCH 블라인드 검측을 수행하는 단계와,
    상기 NB-PDCCH 전송의 CCE-Index로 주파수 영역 자원 할당을 획득하는 단계와,
    상기 블라인드 검측을 통해 획득된 NB-PDCCH의 DCI 포맷을 통해 시간 영역 자원 할당을 획득하는 단계와,
    상기 획득된 주파수/시간 정보를 통해 NB-PDSCH를 검측하는 단계를 포함하는 하향링크 자원 획득 방법.




KR1020160015178A 2016-02-05 2016-02-05 NB-IoT를 위한 하향링크 자원을 할당하는 방법 및 장치 KR102452865B1 (ko)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020160015178A KR102452865B1 (ko) 2016-02-05 2016-02-05 NB-IoT를 위한 하향링크 자원을 할당하는 방법 및 장치

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020160015178A KR102452865B1 (ko) 2016-02-05 2016-02-05 NB-IoT를 위한 하향링크 자원을 할당하는 방법 및 장치

Publications (2)

Publication Number Publication Date
KR20170093590A true KR20170093590A (ko) 2017-08-16
KR102452865B1 KR102452865B1 (ko) 2022-10-11

Family

ID=59752481

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020160015178A KR102452865B1 (ko) 2016-02-05 2016-02-05 NB-IoT를 위한 하향링크 자원을 할당하는 방법 및 장치

Country Status (1)

Country Link
KR (1) KR102452865B1 (ko)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110870248A (zh) * 2018-06-19 2020-03-06 联发科技(新加坡)私人有限公司 在移动通信中为不同服务类型配置时域资源分配的方法和装置
CN111818646A (zh) * 2019-07-30 2020-10-23 维沃移动通信有限公司 一种dci传输方法和通信设备
CN113766538A (zh) * 2021-08-19 2021-12-07 深圳技术大学 NB-IoT无线资源分配方法、装置及可读介质

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110010681A (ko) * 2009-07-26 2011-02-07 엘지전자 주식회사 무선 통신 시스템에서 수신 확인 수신 방법 및 장치
KR20130113475A (ko) * 2010-12-28 2013-10-15 엘지전자 주식회사 Tdd 기반 무선 통신 시스템에서 신호 송수신 방법 및 장치
KR20140044321A (ko) * 2011-08-04 2014-04-14 엘지전자 주식회사 무선 통신 시스템에서 mtc 단말의 검색 영역 설정 방법 및 이를 위한 장치
KR20140123933A (ko) * 2012-01-30 2014-10-23 엘지전자 주식회사 무선 통신 시스템에서 하향링크 제어 채널을 송수신하는 방법 및 이를 위한 장치
KR20170093647A (ko) * 2016-02-05 2017-08-16 주식회사 아이티엘 동기화 방법 및 장치

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110010681A (ko) * 2009-07-26 2011-02-07 엘지전자 주식회사 무선 통신 시스템에서 수신 확인 수신 방법 및 장치
KR20130113475A (ko) * 2010-12-28 2013-10-15 엘지전자 주식회사 Tdd 기반 무선 통신 시스템에서 신호 송수신 방법 및 장치
KR20140044321A (ko) * 2011-08-04 2014-04-14 엘지전자 주식회사 무선 통신 시스템에서 mtc 단말의 검색 영역 설정 방법 및 이를 위한 장치
KR20140123933A (ko) * 2012-01-30 2014-10-23 엘지전자 주식회사 무선 통신 시스템에서 하향링크 제어 채널을 송수신하는 방법 및 이를 위한 장치
KR20170093647A (ko) * 2016-02-05 2017-08-16 주식회사 아이티엘 동기화 방법 및 장치

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
3GPP R1-16xxxx* *
MCC Support, R1-16xxxx, Draft Report of 3GPP TSG RAN WG1 #AH_NB-IoT v0.2.0 (Budapest, 18th - 20th January 2016), 3GPP TSG RAN WG1 #AH(2016.02.03.).* *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110870248A (zh) * 2018-06-19 2020-03-06 联发科技(新加坡)私人有限公司 在移动通信中为不同服务类型配置时域资源分配的方法和装置
CN110870248B (zh) * 2018-06-19 2022-08-26 联发科技(新加坡)私人有限公司 在移动通信中为不同服务类型配置时域资源分配的方法和装置
CN111818646A (zh) * 2019-07-30 2020-10-23 维沃移动通信有限公司 一种dci传输方法和通信设备
CN111818646B (zh) * 2019-07-30 2021-09-24 维沃移动通信有限公司 一种dci传输方法和通信设备
CN113766538A (zh) * 2021-08-19 2021-12-07 深圳技术大学 NB-IoT无线资源分配方法、装置及可读介质

Also Published As

Publication number Publication date
KR102452865B1 (ko) 2022-10-11

Similar Documents

Publication Publication Date Title
US10602481B2 (en) Method and apparatus of enhanced paging
US10420080B2 (en) Transmission preemption and its indication
EP3383112B1 (en) User terminal, wireless base station, and wireless communication method
CN106717092B (zh) 用户终端、无线基站以及无线通信方法
CN107925538B (zh) 用于窄带系统中的通信的方法和设备
CN107079301B (zh) 用于无线通信的方法和装置
US20200229152A1 (en) Method and apparatus for transmitting and receiving control channel and data channel for nr system
WO2017195721A1 (ja) ユーザ端末及び無線通信方法
JP7107832B2 (ja) 端末、基地局、無線通信方法及びシステム
EP2779768A1 (en) Downlink control information transmission method and device
JPWO2018084137A1 (ja) ユーザ端末及び無線通信方法
CN110915273B (zh) 用户终端以及无线通信方法
KR20180058715A (ko) 유저단말, 무선기지국 및 무선 통신 방법
JP2017513275A (ja) 無線通信システムにおいて低い遅延のための信号送受信方法及びこのための装置
KR20140037251A (ko) 다중 노드 시스템에서 단말의 제어 정보 모니터링 방법 및 상기 방법을 이용하는 단말
CN104955155B (zh) PDSCH数据接收方法、发送方法、用户设备和eNB
US20190174462A1 (en) User terminal and radio communication method
CN108605345B (zh) 用户终端、无线基站以及无线通信方法
WO2015110228A1 (en) Mobile communications network, communications device and methods
KR20140044389A (ko) 다중 노드 시스템에서 단말의 제어 정보 검색 방법 및 장치
JPWO2017217456A1 (ja) ユーザ端末及び無線通信方法
US9642159B1 (en) Use of indication in downlink control information messaging to signal presence of additional downlink control information messaging
KR102452865B1 (ko) NB-IoT를 위한 하향링크 자원을 할당하는 방법 및 장치
KR20120049804A (ko) 무선통신 시스템에서 자원 할당 방법 및 장치
KR20100112286A (ko) 복수 대역을 지원하는 통신 시스템 및 그 피드백 자원 할당 방법

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant