KR20170052200A - Apparatus for loading topside and method therefor - Google Patents
Apparatus for loading topside and method therefor Download PDFInfo
- Publication number
- KR20170052200A KR20170052200A KR1020150154372A KR20150154372A KR20170052200A KR 20170052200 A KR20170052200 A KR 20170052200A KR 1020150154372 A KR1020150154372 A KR 1020150154372A KR 20150154372 A KR20150154372 A KR 20150154372A KR 20170052200 A KR20170052200 A KR 20170052200A
- Authority
- KR
- South Korea
- Prior art keywords
- semi
- carrier
- top side
- topside
- submerged float
- Prior art date
Links
Images
Classifications
-
- B63B9/00—
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B15/00—Superstructures, deckhouses, wheelhouses or the like; Arrangements or adaptations of masts or spars, e.g. bowsprits
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/003—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for for transporting very large loads, e.g. offshore structure modules
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B43/00—Improving safety of vessels, e.g. damage control, not otherwise provided for
- B63B43/02—Improving safety of vessels, e.g. damage control, not otherwise provided for reducing risk of capsizing or sinking
- B63B43/04—Improving safety of vessels, e.g. damage control, not otherwise provided for reducing risk of capsizing or sinking by improving stability
- B63B43/06—Improving safety of vessels, e.g. damage control, not otherwise provided for reducing risk of capsizing or sinking by improving stability using ballast tanks
-
- B63B9/065—
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B17/04—Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction
- E02B17/08—Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for raising or lowering
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/44—Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
- B63B2035/448—Floating hydrocarbon production vessels, e.g. Floating Production Storage and Offloading vessels [FPSO]
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Ocean & Marine Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Transportation (AREA)
- Foundations (AREA)
Abstract
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a top-side installation apparatus and method, and more particularly, to a float-over construction method, instead of lifting a large top side by a crane, The present invention relates to an apparatus and a method for installing a topside, which is low in installation cost and high in stability, by fixing a semi-submerged float by a foundation supporting member capable of being moved to the top of the tower.
A top side installation apparatus according to the present invention comprises: a plurality of fixing members fixed to a seabed; A plurality of legs formed to be serrated in the longitudinal direction and connected to each other perpendicularly to the plurality of fixing members and arranged side by side; And a foundation supporting member connected to the plurality of legs and moving up and down; Wherein the semi-submerged floating body is seated on the foundation supporting member when the top side is mounted on the semi-submerged floating body.
Description
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a top-side installation apparatus and method, and more particularly, to a float-over construction method, instead of lifting a large top side by a crane, The present invention relates to an apparatus and a method for installing a topside, which is low in installation cost and high in stability, by fixing a semi-submerged float by a foundation supporting member capable of being moved to the top of the tower.
In general, Liquefied Natural Gas (LNG) is a colorless transparent cryogenic liquid which is cooled to a temperature of -162 ° C at atmospheric pressure to reduce the volume of methane-based natural gas to one- , It is known that it is more economical for long-distance transportation because of better transportation efficiency than the gas state.
Floating production facilities installed in the deep sea have either column-type or semi-submerged column-stabilized types such as pontoon-columns.
Semi-submerged float type is classified into Hull with pontoon-column at the bottom and Topside with production facility at the upper part. Deck weight and facility of deep-sea production equipment required in market are getting bigger As the length of the crane boom is limited and the modules for loading are divided into dozens of units, it is becoming more and more uneconomical to mount the topside using the crane on the quay,
In order to solve the above problems, the applicant of the present invention has proposed a float-over method, not a lifting method using a crane, for a large top side, The present invention aims to reduce the installation cost and increase the stability by mounting the semi-submerged float on the upper part and mounting the top side thereon.
According to an aspect of the present invention, A plurality of legs formed to be serrated in the longitudinal direction and connected to each other perpendicularly to the plurality of fixing members and arranged side by side; And a foundation supporting member connected to the plurality of legs and moving up and down; Wherein the semi-submerged floating body is seated on the foundation supporting member when the top side is mounted on the semi-submerged floating body.
The semi-submerged float may include a pontoon forming a buoyancy and a column vertically installed on the pontoon, wherein the pontoon and the column include a ballast tank.
And a carrier for moving the topside dried over the land to an installation site.
According to another aspect of the present invention, there is provided a method of installing a top side, comprising: a foundation step connected to a plurality of column members fixed to a seabed and equipped with a foundation supporting member movable up and down; A semi-submerged float seating step in which the semi-submerged float is seated on the foundation support member by ballasting; And a top-side mounting step of mounting the top-side to the semi-submerged float.
The top side mounting step preferably includes a top side moving step of drying the top side on the land and moving to the installation place by a carrier.
Preferably, the topside mounting step further includes a first carrier removing step of filling the ballast tank of the carrier on which the top side has been moved with seawater to sink the carrier to remove the carrier from the top side.
Preferably, the topside mounting step further includes a second carrier removing step of raising the foundation supporting member to remove the carrier from the top side, in which the carrier having moved the top side is removed.
Preferably, the semi-submerged float seating is seated on the foundation support member by filling seawater in a balancing tank inside the semi-submerged float.
According to the present invention, by applying a float-over method instead of a lifting method using a crane to a large top side, a semi-submerged float And the top side is mounted on the upper part, the installation cost is reduced and the stability is improved.
1 is a side view showing a top side installation apparatus according to the present invention.
2 is a plan view showing a top side installation apparatus according to the present invention.
3 is a flowchart showing a top side installation method according to the present invention.
Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. In the drawings, the same reference numerals are used to designate the same or similar components throughout the drawings. In the following description of the present invention, a detailed description of known functions and configurations incorporated herein will be omitted when it may make the subject matter of the present invention rather unclear.
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. In addition, the following embodiments can be modified into various other forms, and the scope of the present invention is not limited to the following embodiments.
FIG. 1 is a side view showing a top side installing apparatus according to the present invention, and FIG. 2 is a top view showing a top side installing apparatus according to the present invention.
1 and 2, the top-side installing
The top
A plurality of
The
The pontoon-column-based
Semi-submerged float (200) is drifted onshore and can be moved to the installation area by wet towing method while floated at sea via barge or carrier. The
The
The
When the
3 is a flowchart showing a top side installation method according to the present invention.
3, in the top side installation method, a plurality of column members fixed to the sea floor, that is, a member including the
The semi-submerged float seating step S200 can be seated on the
The top side mounting step S300 may include a top side moving step in which the
In the top side mounting step S300, the
Alternatively, the topside mounting step S300 may include lifting the
In order to apply the float-over method instead of lifting the large top side by the crane, according to the apparatus and method for installing the top side according to the present invention, The semi-submerged float is fixed by a foundation supporting member as much as possible, and the top side is mounted on the semi-submerged float, whereby the installation cost is reduced and the stability is improved.
The foregoing description is merely illustrative of the technical idea of the present invention, and various changes and modifications may be made by those skilled in the art without departing from the essential characteristics of the present invention. Therefore, the embodiments disclosed in the present invention are not intended to limit the scope of the present invention but to limit the scope of the technical idea of the present invention. The scope of protection of the present invention should be construed according to the following claims, and all technical ideas within the scope of equivalents should be construed as falling within the scope of the present invention.
It will be apparent to those skilled in the art that various modifications and variations can be made in the present invention without departing from the spirit and scope of the invention. It is.
100: Top side mounting device 110: Fixing member
120: Leg 130: Foundation supporting member
200: semi-submerged float 210: pontoon
220: Column 300: Topside
310: Carrier 320: Support means
Claims (8)
A plurality of legs formed to be serrated in the longitudinal direction and connected to each other perpendicularly to the plurality of fixing members and arranged side by side; And
A foundation supporting member connected to the plurality of legs and moving up and down; / RTI >
Wherein the semi-submerged float is seated on top of the foundation support member when the topside is mounted on top of the semi-submerged float.
The semi-
The pontoons that form buoyancy and
And a column vertically installed on the pontoon,
Wherein the pontoon and the column include a ballast tank.
And a carrier for moving the topside dried over the land to the installation site.
A foundation step connected to a plurality of column members fixed to the seabed and equipped with a foundation supporting member movable up and down;
A semi-submerged float seating step in which the semi-submerged float is seated on the foundation support member by ballasting; And
And a top side mounting step of mounting the top side to the semi-submerged float.
Wherein the topside mounting comprises:
And a top side moving step of drying the top side on land and moving to a setting location by a carrier.
Wherein the topside mounting comprises:
Further comprising a first carrier removing step of filling seawater in the ballast tanks of the carrier in which the top side has been moved to sink the carrier to remove the carrier from the top side.
Wherein the topside mounting comprises:
Further comprising a second carrier removal step for lifting the foundation support member to remove the carrier from the topside to remove the carrier from which the topside has been moved.
Wherein the semi-submerged float seating comprises:
Wherein the bottom support tank is seated in the foundation support member by filling seawater in a balancing tank inside the semi-submerged float.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020150154372A KR20170052200A (en) | 2015-11-04 | 2015-11-04 | Apparatus for loading topside and method therefor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020150154372A KR20170052200A (en) | 2015-11-04 | 2015-11-04 | Apparatus for loading topside and method therefor |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20170052200A true KR20170052200A (en) | 2017-05-12 |
Family
ID=58740213
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020150154372A KR20170052200A (en) | 2015-11-04 | 2015-11-04 | Apparatus for loading topside and method therefor |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20170052200A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019059534A1 (en) * | 2017-09-21 | 2019-03-28 | 한국해양과학기술원 | Topside deck-installation guide device, and operation method and installation method therefor |
WO2019059533A1 (en) * | 2017-09-21 | 2019-03-28 | 한국해양과학기술원 | Topside deck coupling guiding apparatus having increased reliability, method for operating same, and method for installing same |
CN113353202A (en) * | 2020-03-04 | 2021-09-07 | 中国电建集团华东勘测设计研究院有限公司 | Floating-supporting type installation structure and method for offshore converter station |
-
2015
- 2015-11-04 KR KR1020150154372A patent/KR20170052200A/en unknown
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019059534A1 (en) * | 2017-09-21 | 2019-03-28 | 한국해양과학기술원 | Topside deck-installation guide device, and operation method and installation method therefor |
WO2019059533A1 (en) * | 2017-09-21 | 2019-03-28 | 한국해양과학기술원 | Topside deck coupling guiding apparatus having increased reliability, method for operating same, and method for installing same |
CN113353202A (en) * | 2020-03-04 | 2021-09-07 | 中国电建集团华东勘测设计研究院有限公司 | Floating-supporting type installation structure and method for offshore converter station |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6942427B1 (en) | Column-stabilized floating structure with telescopic keel tank for offshore applications and method of installation | |
TWI624406B (en) | Semi-submersible support platform and positioning method thereof | |
US4266887A (en) | Self-elevating fixed platform | |
CA2916763A1 (en) | Platform for tidal turbines | |
KR20170052200A (en) | Apparatus for loading topside and method therefor | |
KR102630564B1 (en) | Hexadecimal method | |
CN101781887A (en) | Overhang installation method for upper structure of offshore platform | |
SG182091A1 (en) | Spar hull load out method | |
AU2010216206B2 (en) | Skid beam assembly for loading and transporting large structures | |
RU2012113262A (en) | MOBILE DRILLING RIG | |
US8733264B2 (en) | Method and apparatus for variable floating structures | |
WO2005123499A1 (en) | Offshore vessels for supporting structures to be placed on or removed from the seabed or offshore installations | |
US20180230662A1 (en) | Self-installing offshore platform | |
KR102309460B1 (en) | Port Plants and Methods for Mooring Floating Bodies in Port Plants | |
US5237949A (en) | Floating platform shallow draft hull/deck mating | |
US8398338B2 (en) | Method for installing a topside module on an offshore support structure | |
US20140072371A1 (en) | Platform deck installation and removal method and apparatus | |
US9022693B1 (en) | Rapid deployable floating production system | |
US20170002534A1 (en) | System and Method for Improving A Jack Up Platform with Asymmetric Cleats | |
US20060204340A1 (en) | Floating construction, a platform construction, a method for placing a floating platform construction at sea, and a method for removing a platform construction at sea | |
KR20170026001A (en) | Floating Offshore Plant | |
KR101669260B1 (en) | Structure and method for leg structure installation of self-elevating unit using float over | |
KR101894462B1 (en) | Power plant | |
WO2015077172A1 (en) | Offshore rig installation and removal systems | |
JPH06146250A (en) | Method of laying shallow sea derrick |