KR20170005565A - Site installation heavy(Demolition of reinforced Con'c member) lifting eye - Google Patents

Site installation heavy(Demolition of reinforced Con'c member) lifting eye Download PDF

Info

Publication number
KR20170005565A
KR20170005565A KR1020150095739A KR20150095739A KR20170005565A KR 20170005565 A KR20170005565 A KR 20170005565A KR 1020150095739 A KR1020150095739 A KR 1020150095739A KR 20150095739 A KR20150095739 A KR 20150095739A KR 20170005565 A KR20170005565 A KR 20170005565A
Authority
KR
South Korea
Prior art keywords
lifting
construction
demolition
hole
work
Prior art date
Application number
KR1020150095739A
Other languages
Korean (ko)
Inventor
황규석
Original Assignee
황규석
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 황규석 filed Critical 황규석
Priority to KR1020150095739A priority Critical patent/KR20170005565A/en
Publication of KR20170005565A publication Critical patent/KR20170005565A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/142Means in or on the elements for connecting same to handling apparatus
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/167Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

본 발명은 건설현장에서의 기존 철근콘크리트 구조물의 철거 부재 및 지장 암괴의 인양, 이동, 거치작업에서 기존의 부재걸이 방식의 불안 요인을 줄이고, 접근이 불가하거나 위치적 제약으로 부재걸이가 곤란한 위치의 부재에 직접 케미칼 과 와이어로프를 사용 인양고리(들고리)를 시공하여, 기존의 부재 걸이방식에 비교하여 작업의 간소화, 공사비 절감, 환경오염 저감 및 안전한 중량물 인양작업을 도모하기 위한 현장시공 중량부재 매립형 인양고리의 시공방법에 관한 것이다.
본 발명의 시공을 위하여 인양고리용 홀 천공, 홀 내부 청소, 케미칼주입 및 와이어로프 매입, 경화의 단계를 거처 설치되며, 케미칼 종류에 따라 수중부재의 작업 또한 가능한 특징이 있다.
The present invention reduces the anxiety factor of the existing member hanger in the lifting, moving and mounting operation of the existing members of the reinforced concrete structure at the construction site, In-house construction weight is used to simplify work, reduce construction costs, reduce environmental pollution, and safely weigh lifting work by constructing lifting hooks using chemicals and wire ropes directly on members. To a method of constructing a buried lifting loop.
For the construction of the present invention, there is a feature that it is installed through the steps of perforating the hole for the lifting ring, cleaning the inside of the hole, injecting the chemical and filling the wire rope, and hardening, and also working the underwater member according to the type of the chemical.

Description

현장설치 중량물(콘크리트 철거 부재 및 암괴) 인양 고리{Site installation heavy(Demolition of reinforced Con'c member) lifting eye}Site installation heavy (Demolition of reinforced Con'c member) lifting eye}

본 발명은, 건설현장에서 기존 철근콘크리트 부재의 철거 및 지장 암괴의 이동, 거치를 위하여 철거 작업 전 중량 부재에 미리 케미칼 과 와이어로프를 사용 매입형식의 인양 고리를 설치, 크레인 인양 고리에 바로 체결하여 사용할 수 있는 현장설치 인양 고리에 관한 것이다. In the present invention, in order to dismantle existing reinforced concrete members at the construction site and to move and mount the rock masses, a lifting ring of a fill-in type using chemical and wire ropes is installed on the weight member before demolition work and directly fastened to the crane lifting ring To a field-installed lifting ring that can be used.

일반적으로, 건설현장의 노후 구조물 철거 및 개축공사 시 발생되는 콘크리트 부재 및 암괴를 이동하기 위하여 대형크레인을 사용 [도2의 (가), (나)] 부재를 감싸 인양 작업을 실시하고 있다.       Generally, a large crane is used to move concrete members and rock masses generated during the demolition and reconstruction of old structures at a construction site (Fig. 2 (a) and (b)).

상기의 작업방법으로 중량물 인양을 위한 인양줄 설치를 하려면 철거 부재의 하부에 작업자의 접근성이 확보되어야 하며, 인양 부재의 형상이 구형이거나 변화단면을 가지고 있을시 상당한 시간과 비용이 발생 된다. 또한 절단면과 같이 날카로운 면[도3]에 접하는 인 양로프의 손상에 대한 위험요소가 상제하고 있다.      In order to install a lifting line for lifting heavy objects by the above-mentioned working method, the operator must be accessible to the lower part of the demolition member, and considerable time and expense are incurred when the lifting member has a spherical shape or a changed section. There is also a risk of damage to the phosphorus rope in contact with a sharp surface such as a cut surface [Fig. 3].

[문헌1] Fischer 주입식 케미컬 앙카 시방서. Anchor Tech(서울화스닝)     [Reference 1] Fischer injection chemical anchor specification. Anchor Tech (Seoul Fine Arts) [문헌2] HILTI 주입식몰타르 기술자료 및 시방서. HILTI Korea     [Document 2] Technical data and specifications of HILTI injection mortar. HILTI Korea [문헌3] 아산 산업 기지 항만 시설의 실시 설계 (2 회) 보고서 .1991.     [Document 3] Report on the design of the port facility of Asan Industrial Base (twice). 1.8.3. BLOCK 들고리 계산 1.10.2. CON'C BLOCK 들고리 계산서.              1.8.3. BLOCK Holding and Calculation 1.10.2. CON'C BLOCK holding bill. 인천 지방 해양과 인천항 건설사무소              Incheon Regional Ocean and Incheon Port Construction Office [문헌4] 화순항 1단계 부두축조 및 기타공사 실시설계 용역 구조계산서.     [Literature 4] Construction of the first phase wharf construction and other construction works of Hwasun-Song Port. 1999. 5. BLOCK 들고리 계산 재주지방해양수산청      1999. 5. BLOCK Holding Recalculation Land, Marine and Fisheries Bureau

본 발명은, 크레인을 이용한 기존 철근콘크리트 구조물의 철거 부재 및 지장 암괴의 이동, 거치를 용이하게 하기 위하여, 현장에서 중량의 부재에 직접 들고리를 설치, 중량물 인양 작업시 접근성이 곤란하거나, 인양 로프의 감싸기 방식의 설치가 곤란한 부정형의 부재 등의 인양을 용이하고 안전하게 하는데 그 목적이 있다. The present invention relates to a reinforced concrete structure using a crane, in which it is difficult to access the reinforced concrete structure by moving the reinforced concrete structure directly or by moving the reinforced concrete structure, And it is an object of the present invention to make it possible to easily and safely lift a member of an irregular shape which is difficult to be installed by a wrapping method of the present invention.

본 발명은, 크레인을 이용한 기존 철근콘크리트 구조물의 철거 부재 및 지장 암괴의 이동, 거치작업에서 중량의 부재에 직접 케미칼 과 와이어로프를 사용 인양 고리(들고리)를 시공하여 크레인 고리 및 인양 로프 고리에 체결, 중량 부재의 인양 및 이동을 안전하고 용이하게 사용할 수 있는 현장 설치방식의 부재 매립형 인양 고리를 제공한다.   The present invention relates to a method for constructing a crane ring and a lifting rope ring by using a chemical and a wire rope directly on the absence of a weight in a moving and mounting operation of a dismantling member and a retaining mass of a conventional reinforced concrete structure using a crane, And the lifting and moving of the weight member can be safely and easily used.

본 발명에 따른 현장설치 인양 고리의 경우, 기존의 중량물 인양방법에서의 문제점인 부재를 인양 로프로 감싸야하는 번거로움, 인양로프 설치에 대한 접근이 곤란한 작업 부재, 인양 부재 무게중심 판단오류에 의한 부재의 쏠림, 강제 러그의 불안요소(인발, 부재의 인발 쇄기파쇄), 작업의 조잡함을 해결 중량부재의 인양 및 적치를 안전하고 용이하게 할 수 있으며, 스라브 부재 철거의 경우 인양로프 설치를 위한 인양 홀 천공에 따른 비용절감, 환경오염요소(슬러지) 발생 저감과 작업의 공정의 간소화로 안전성을 확보 할 수 있다.   In the case of the on-site set-up ring according to the present invention, it is necessary to wrap the member, which is a problem in the conventional lifting method, with a lifting rope, a work member having difficulty in approaching the lifting rope, (Pulling out of the member, breakage of the punching of the member) and the roughness of the work can be secured and facilitated. In the case of the removal of the slab member, the lifting of the lifting rope It is possible to secure safety by reducing cost due to hole drilling, reducing the generation of environmental pollutants (sludge) and simplifying the process of the work.

도 1은 본 발명의 실시 예에 따른 설치 상태도이다.
(가) 현장설치 인양고리 대표도
(나) 설치 사진
도 2는 철근콘그리트 구조물 철거 작업시 일반적인 인양로프 설치 예
(가) 부재를 인양로프 사용 일반적으로 감싸는 경우
(나) 코아 천공 작업 후 인양홀을 사용 부재를 인양하는 경우
도 3은 절단부재의 날카로운 면에 접하면서 부재가 손상이 우려되는 경우
도 4(사진)는 구조물 철거작업 중 일반적인 절단부재 인양 방법 예
(가) 인양로프로 부재를 감싸는 경우
단점 : 무게중심의 계산이 확실하여야하며, 주재의 절단면 등에 로프의
마찰로 절단 위험발생, 부재를 감싸기 위한 작업자의 공간 접근성
확보되어야 함.
(나) 인양홀에 인양로프를 관통 하는 경우
단점 : 주재의 절단면 등에 로프의 마찰로 절단 위험발생, 공사비과다,
환경오염물질(슬러지) 발생량 많음, 부재를 감싸기 위한 작업자의
공간 접근성 확보되어야 함.
(다) 인양부재에 강재의 리프팅러그(강재러그+앙카볼트)를 설치하는 경우
단점 : 강재(LUG) 제작비용 발생, 앙카볼트 설치위한 홀 천공 작업시
철근 및 골재의 간섭에 따른 시공이 조잡할 수 있으며, 그로 인한
앙카의 부착력 불확실
(라) 코아 천공홀에 환공을 관입 인양로프 고리로 사용하는 경우
단점 : 공사비 과다, 환경오염물질(슬러지) 발생량 많음, 무게중심
계산이 확실하여야하며 환봉의 반복 사용에 따른 변형 및 천공홀
과 환봉의 유격으로 모재의 파괴에 따른 사고발생 우려 큼
도 5(사진)는 잠실 지하상가 구조물 하부의 공동 현상 확인을 위한 구조물
하부 진입 개구부 절단작업 중 절단부재 인양 고리 미설치로 콘크리트
절단부재 지하 공동 부분으로 떨어진 내용의 방송 자료
도 6(사진)은 본 발명품인 현장설치 중량물(철근콘크리트 철거부재) 인양고리
시공 순서
(가) 홀 천공(함마드릴)
(나) 홀 내부 세척(압축공기)
(다) 케미칼 주입 및 와이어로프 매입
(라) 인양고리 인발 및 모재 파단시험
도 7(사진)은 본 발명품 시공 사례(한국중부발전 보령화력본부 제1소수력
발전설비)
도 8(사진)은 본 발명품 시공 사례(한국남동발전 영흥화력본부 제1해양수력
발전설비)
도 9(사진)는 본 발명품 시공 사례(부정형 단면 인양)
1 is an installation state diagram according to an embodiment of the present invention.
(A) On-site installation
(B) Installation photograph
Fig. 2 is a schematic view of a typical lifting rope installation example
(A) Use of lifting rope for members
(B) In the case of lifting a used member after lifting the core hole
Fig. 3 is a cross-sectional view showing a state in which the member is in contact with the sharp surface of the cutting member
Fig. 4 (photograph) shows an example of a general method of lifting a cutting member
(A) When we enclose professional member in salvage
Disadvantages: The calculation of the center of gravity should be reliable,
Risk of cutting by friction, worker's space access to cover member
Must be secured.
(B) When the lifting rope passes through the lifting hole
Disadvantages: There is a risk of cutting by the rubbing of the rope,
The amount of environmental pollutants (sludge) generated, the worker's
Space access should be secured.
(C) When lifting lugs (steel lugs + anchor bolts) of steel are installed on the lifting members
Disadvantages: Cost of production of steel (LUG), hole drilling for anchor bolt installation
The construction due to the interference of reinforcing bars and aggregates may be coarse,
Uncertainty of adhesion of anchor
(D) In the case of using a rope loop to penetrate the hole in the core hole
Disadvantages: excessive construction cost, high amount of pollutants (sludge) generated, center of gravity
The calculation should be assured and the deformation and perforation holes
And round bar gap, it is likely to be caused by the destruction of base metal.
5 (photo) shows a structure for confirming cavitation below the Jamsil underground mall structure
Bottom entry opening Cutting member during cutting operation Convex
The contents of the broadcast material falling to the underground joint part of the cutting member
Fig. 6 (photograph) shows an example of the present invention, in which the on-site installation weight (the reinforced concrete demolition member)
Construction order
(A) Hole drilling (Hammer drill)
(B) Internal cleaning of holes (compressed air)
(C) Chemical injection and wire rope purchase
(D) Pulling of lifting hooks and test of breaking test of base material
Fig. 7 (photograph) shows the construction example of the present invention (the first small hydro-
Power plant)
8 (photograph) shows an example of construction of the present invention (Korea South-East Power Co., Ltd. Youngheung Thermal Power Division,
Power plant)
Fig. 9 (photograph) shows a construction example (irregularly sectioned relief)

본 발명을 첨부의 도면을 참고하여 상세히 설명하면 다음과 같다.    The present invention will now be described in detail with reference to the accompanying drawings.

도 1에서와 같이 와이어로프를 설치하기 위하여 부재의 최소 압축강도는 20Mpa 이상이 확보되어야 하며, 사용 와이어로프의 경우 인발하중에 대한 단면(굵기) 변화가 없어야 하며, 천공 홀 사이의 간격은 인발에 따른 모재의 파괴각[도 1. 120]에 간섭이 발생하지 않도록 이격하여야 한다. 홀 천공 후 홀 내부 청소는 철저히 하여야 하며, 케미칼 주입량은 와이어로프 관입 시 흘러넘칠 정도의 충분한 양이어야 한다. 와이어로프는 설치 전 충분한 세척을 통하여 표면의 유분을 제거하여야 하며, 설치 후 케미칼 경화시간은 각 제조사 관리기준을 따른다.As shown in FIG. 1, the minimum compressive strength of the member should be at least 20 MPa in order to install the wire rope. In the case of the wire rope to be used, there should be no change in section (thickness) The breaking angle of the base material [Fig. 1. 120] shall be such that interference does not occur. After drilling the hole, the inside of the hole should be thoroughly cleaned, and the amount of chemical injected should be sufficient to overflow the wire rope penetration. Wire rope should be thoroughly cleaned before installation to remove oil from the surface, and chemical curing time after installation should follow the manufacturer's management standards.

1. 육상 및 수중에서도 작업이 가능하며 철거 부재의 경우 인양 로프 걸이를 위한 별도의 인양 홀 천공작업이 불필요하기에 공사비 절감(약 1/3)효과 및 부재 절단에 따른 슬러지 발생량을 감소할 수 있으며, 또한 일반 강재 러그와 달리 와이어로프는 인장강도가 우수하고 인성 및 연성이 좋아 반복적인 사용(적치, 이적)에도 용이하다.1. It is possible to work in land and underwater. In case of demolition members, it is unnecessary to drill a separate lifting hole for lifting rope hook, so it is possible to reduce the construction cost (about 1/3) and reduce the amount of sludge Unlike ordinary steel lugs, wire ropes are excellent in tensile strength, toughness and ductility, and are easy to use repeatedly (stacking and demounting).

2. 인양로프로 부재를 감싸기 위한 부재 배면으로의 이동이 불필요하기에 작업의 간소화 및 줄 걸이 작업을 위한 부재 배면 접근이 곤란한 곳에서의 작업이 가능하며, 부재 절단 작업시 절단부재의 추락 및 전도에 대한 위험요인을 줄일 수 있다.2. It is not necessary to move to the back of the member to cover the pro member with lifting, so that it is possible to work in a place where it is difficult to approach the back side of the member for simplification of work and for hooking work, The risk factors for

3. 시가지의 암반 굴착 작업 중 발파 및 파쇄 후 운반차량에 적재하기 위하여 적정 크기로 브레이커(소할) 작업을 시행함으로 소음에 따른 민원이 야기되나, 현장설치 인양고리를 설치 큰 부재의 암괴를 인양 덤프트럭이 아닌 일반트럭에도 적제가 가능하며, 적제 이동 후 후속작업인 브레이커(소할) 작업으로 소음에 따른 민원을 최소화할 수 있다.3. After the blasting and crushing during the rock excavation work of the city area, the crushing work is carried out with the appropriate size to load on the transportation vehicle. However, the civil complaints are caused by the noise, but the crane of field installation is installed. It can be applied to general trucks as well as trucks, and complaints due to noise can be minimized by the operation of a breaker (Subaru), which is a follow-up operation after loading.

4. 붕괴 등 재난현장에서의 잔재 처리4. Disposal of disasters such as collapses

5. 해상 이형블럭의 개보수 작업시 기존 들고리 부식에 의한 대체 시공으로 사용이 용이하다.5. It is easy to use as an alternative construction due to re-corrosion when repairing marine deformation block.

6. 채석장의 채석 이적 전치 운반 작업을 용이하게 할 수 있다.6. Quarrying of quarries can facilitate transposition work.

100 : 현장설치 인양고리 (인양중, 인발력 작용)
110 : 현장설치 인양고리 (설치 직 후 인발력 미작용)
120 : 콘크리트 모재 인발 파괴각
130 : 천공홀(Wire rope 지름 보다2~5mm 크게 천공)
200 : 인양 로프(Wire rope or Load chain) 210 : 인양로프 마찰부위
300 : 인양부재
100: On-site installation lifting hook (lifting force, pulling force action)
110: On-site installation lifting ring (no pulling force immediately after installation)
120: Extraction angle of concrete base material
130: Perforated hole (2 ~ 5mm larger than wire rope diameter)
200: Wire rope or load chain 210: Lifting rope friction zone
300:

Claims (1)

중량의 콘크리트 부재 및 암괴의 인양 및 이동을 용이하게 하는 현장 설치
인양고리 시공방법
On-site installation to facilitate the lifting and movement of heavy concrete members and carcass
Construction method of lifting ring
KR1020150095739A 2015-07-06 2015-07-06 Site installation heavy(Demolition of reinforced Con'c member) lifting eye KR20170005565A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020150095739A KR20170005565A (en) 2015-07-06 2015-07-06 Site installation heavy(Demolition of reinforced Con'c member) lifting eye

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020150095739A KR20170005565A (en) 2015-07-06 2015-07-06 Site installation heavy(Demolition of reinforced Con'c member) lifting eye

Publications (1)

Publication Number Publication Date
KR20170005565A true KR20170005565A (en) 2017-01-16

Family

ID=57993518

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020150095739A KR20170005565A (en) 2015-07-06 2015-07-06 Site installation heavy(Demolition of reinforced Con'c member) lifting eye

Country Status (1)

Country Link
KR (1) KR20170005565A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20220045377A (en) 2020-10-05 2022-04-12 (주)피시코리아 Concrete unit with lifting hole and method for lifting concrete unit using the same
KR20230089279A (en) * 2021-12-13 2023-06-20 충청개발(주) Method for installation of the on-site lifting lug

Non-Patent Citations (7)

* Cited by examiner, † Cited by third party
Title
[문헌1] Fischer 주입식 케미컬 앙카 시방서. Anchor Tech(서울화스닝)
[문헌2] HILTI 주입식몰타르 기술자료 및 시방서. HILTI Korea
[문헌3] 아산 산업 기지 항만 시설의 실시 설계 (2 회) 보고서 .1991.
[문헌4] 화순항 1단계 부두축조 및 기타공사 실시설계 용역 구조계산서.
1.8.3. BLOCK 들고리 계산 1.10.2. CON'C BLOCK 들고리 계산서.
1999. 5. BLOCK 들고리 계산 재주지방해양수산청
인천 지방 해양과 인천항 건설사무소

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20220045377A (en) 2020-10-05 2022-04-12 (주)피시코리아 Concrete unit with lifting hole and method for lifting concrete unit using the same
KR20230089279A (en) * 2021-12-13 2023-06-20 충청개발(주) Method for installation of the on-site lifting lug

Similar Documents

Publication Publication Date Title
CN104404965A (en) Method for removing reinforced concrete support beams in foundation pit support
CN106545007B (en) The method of pile in the stratum that lower part is hard rock stratum
CN104213509B (en) A kind of cable hoisting anchor cable formula anchorage construction method
KR101095496B1 (en) Reconstruction method of old retirement quay and board pile quay of gravity structure
CN105696808A (en) Reinforced concrete supporting structure and dismantling method
CN105155553A (en) Green dismantling construction method combining concrete support static crush and splitting method
CN102839672B (en) A kind of foundation pit supporting method preventing the displacement of soft base cement mixing pile from transfiniting
KR20170005565A (en) Site installation heavy(Demolition of reinforced Con'c member) lifting eye
CN108411803B (en) Integral bridge pier pushing method
CN105862862B (en) A kind of large diameter pile buries hammer Refloatation method
CN110318388B (en) Underground continuous wall excavation grooving method
CN112726434B (en) Three-span deck reinforced concrete arch bridge dismantling method
JP6873718B2 (en) How to dismantle floor slab members
JP2016023540A (en) Environmentally-considerate pile head processing method
JP2019148070A (en) Construction method of underground structure
CN205713210U (en) Reinforced concrete support structure
KR101471058B1 (en) Construction method of filling gap portion of earth retaining wall of temporary facility
CN217871016U (en) Hoisting tool for concrete supporting beam
JP5154850B2 (en) External reinforcement method for underground structures
JP2016223084A (en) Construction method of underground structure in reverse driving method
EP1473413A1 (en) Pile cap removal
CN106906838B (en) Detachable foundation structure suitable for soft soil and backfill soil and structure installation method
Bevan South Deep–The Challenges
JP7122203B2 (en) Embankment body drilling method and discharge pipe construction method
JP6211322B2 (en) How to remove existing human holes

Legal Events

Date Code Title Description
A201 Request for examination
PA0109 Patent application

Patent event code: PA01091R01D

Comment text: Patent Application

Patent event date: 20150706

PA0201 Request for examination
E902 Notification of reason for refusal
PE0902 Notice of grounds for rejection

Comment text: Notification of reason for refusal

Patent event date: 20160818

Patent event code: PE09021S01D

PG1501 Laying open of application
E601 Decision to refuse application
PE0601 Decision on rejection of patent

Patent event date: 20170221

Comment text: Decision to Refuse Application

Patent event code: PE06012S01D

Patent event date: 20160818

Comment text: Notification of reason for refusal

Patent event code: PE06011S01I

E601 Decision to refuse application
E801 Decision on dismissal of amendment
PE0601 Decision on rejection of patent

Patent event date: 20170508

Comment text: Decision to Refuse Application

Patent event code: PE06012S01D

Patent event date: 20160818

Comment text: Notification of reason for refusal

Patent event code: PE06011S01I

PE0801 Dismissal of amendment

Patent event code: PE08012E01D

Comment text: Decision on Dismissal of Amendment

Patent event date: 20170508

Patent event code: PE08011R01I

Comment text: Amendment to Specification, etc.

Patent event date: 20170315