KR20170001899U - Hull damage prevention apparatus for ship to ship LNG transferring - Google Patents
Hull damage prevention apparatus for ship to ship LNG transferring Download PDFInfo
- Publication number
- KR20170001899U KR20170001899U KR2020150007599U KR20150007599U KR20170001899U KR 20170001899 U KR20170001899 U KR 20170001899U KR 2020150007599 U KR2020150007599 U KR 2020150007599U KR 20150007599 U KR20150007599 U KR 20150007599U KR 20170001899 U KR20170001899 U KR 20170001899U
- Authority
- KR
- South Korea
- Prior art keywords
- lng
- storage member
- hull
- pipe
- ship
- Prior art date
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B59/00—Hull protection specially adapted for vessels; Cleaning devices specially adapted for vessels
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B17/00—Vessels parts, details, or accessories, not otherwise provided for
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B27/00—Arrangement of ship-based loading or unloading equipment for cargo or passengers
- B63B27/24—Arrangement of ship-based loading or unloading equipment for cargo or passengers of pipe-lines
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B27/00—Arrangement of ship-based loading or unloading equipment for cargo or passengers
- B63B27/30—Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures
- B63B27/34—Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures using pipe-lines
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B67—OPENING, CLOSING OR CLEANING BOTTLES, JARS OR SIMILAR CONTAINERS; LIQUID HANDLING
- B67D—DISPENSING, DELIVERING OR TRANSFERRING LIQUIDS, NOT OTHERWISE PROVIDED FOR
- B67D9/00—Apparatus or devices for transferring liquids when loading or unloading ships
- B67D9/02—Apparatus or devices for transferring liquids when loading or unloading ships using articulated pipes
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17D—PIPE-LINE SYSTEMS; PIPE-LINES
- F17D1/00—Pipe-line systems
- F17D1/005—Pipe-line systems for a two-phase gas-liquid flow
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17D—PIPE-LINE SYSTEMS; PIPE-LINES
- F17D5/00—Protection or supervision of installations
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Ocean & Marine Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
The present invention relates to a hull damage prevention system for LNG transport, and more particularly, to a system for preventing leakage of LNG from an offloading LNG piping connection used for ship to ship LNG transferring, And a drip tray at the bottom of each LNG pipe to protect the hull even if the LNG leaks through the LNG pipe.
According to the present invention, there is provided an apparatus for preventing damage to a hull in an LNG transporting from a first position to a second position in the ocean, comprising: an LNG pipe for transferring the LNG from the first position to the second position; A connecting portion connecting between the LNG pipes; A first LNG storage member surrounding the connection portion and storing the LNG leaking from the connection portion; And a first outlet for discharging vaporized gas in the first LNG storage member.
Description
The present invention relates to a hull damage prevention system for LNG transportation, and more particularly, to a system for preventing leakage of LNG from an offloading LNG piping connection used for ship to ship LNG transferring, And a drip tray at the bottom of each LNG pipe to protect the hull even if the LNG leaks through the LNG pipe.
Generally, LNG is a methane-based natural gas cooled to approximately -163 ° C, reducing its volume by one-sixth, and is suitable for long distance transportation through the sea. In addition to the LNG carriers, there are LNG RVs (Regasification Vessels), which are loaded with LNG and arrive at the land area after landing on land, reloading the stored LNG and unloading it as natural gas. There is a growing demand for floating marine structures such as LNG FPSO (Floating, Production, Storage and Offloading) and LNG FSRU (Floating, Storage and Regasification Unit).
Also, as a technique related to the conventional transfer of the line-by-line LNG, there is a pre-liquefied liquefied gas transfer system and method of Korean Patent Laid-Open No. 10-2011-0097090. This is a line-by-line liquefied gas delivery system for transferring liquefied gas between an anchored first vessel and a second vessel forming an interval, the system comprising: a messenger line being thrown from the first vessel to the second vessel; A support hose installed on the first vessel and connected to one end of the messenger line in an intermediate region to be pulled from the first vessel to the second vessel by the messenger line and to which seawater or fresh water is injected or discharged; And a cryogenic flexible hose supported and moved by the support hose connecting the first vessel and the second vessel to connect the first vessel and the second vessel.
However, when the LNG leaks from the connecting portion of the LNG pipeline in the process of transferring the LNG pipeline to the hull, the conventional techniques cause damage to the hull due to brittle fracture due to the cryogenic LNG (-100 ° C or less) .
In order to solve these conventional problems, the present invention has been made to solve the above-mentioned problems by installing a storage member for storing LNG leaking from an offloading LNG pipe connection portion used for ship to ship LNG transferring, The purpose is to protect the hull even if the LNG leaks through the LNG piping by providing the trays respectively.
According to an aspect of the present invention, there is provided an apparatus for preventing damage to a hull in an ocean from a first position to a second position, the apparatus comprising: an LNG conveying LNG from the first position to the second position; pipe; A connecting portion connecting between the LNG pipes; A first LNG storage member surrounding the connection portion and storing the LNG leaking from the connection portion; And a first outlet for discharging vaporized gas in the first LNG storage member.
An on-off valve for controlling the LNG transport to the LNG pipe; An engaging portion for engaging the LNG pipe with the opening / closing valve; A second storage member surrounding the coupling portion and storing the LNG leaking from the coupling portion; And a second discharge port for discharging vaporized gas in the second storage member.
The first and second storage members are preferably made of silicone rubber capable of withstanding LNG at extremely low temperatures.
It is preferable that the first storage member and the second storage member are provided so that there is no part to be opened except for the discharge port so that the leaked LNG is not dispersed, and the first discharge port and the second discharge port are provided so as to discharge only gas .
The first storage member and the second storage member may be removably coupled to the LNG pipe.
It is preferable that a drip tray is installed along the LNG pipe in order to prevent damage to the hull when the LNG leaks from the first storage member or the second storage member and the drip tray is installed for each of the LNG pipes Do.
The present invention has the effect of protecting the hull even if the LNG leaks by installing a storage member for storing the LNG leaking from the offloading LNG pipe connection used in the ship to ship LNG transferring.
In addition, by providing a drip tray at the bottom of each LNG pipe, a single drip tray fixed to the hull is installed to prevent cracking due to fatigue at the welded portion where the drip tray and the hull are connected, And the number of times is reduced.
1 is a view schematically showing the delivery of a line-by-line LNG according to the present invention.
2 is a view showing a hull damage preventing device in an lNG piping according to the present invention.
3 is a cross-sectional view taken along the line AA 'of the hull damage preventing device provided at the coupling portion of the LNG piping and the open / close valve according to the present invention.
4 is a cross-sectional view of the BB 'of the hull damage prevention device provided at the LNG piping connection portion according to the present invention.
Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. In describing the present invention, a detailed description of the related known structure or function is omitted or simplified in order to clarify the gist of the present invention.
The hull damage preventing apparatus in the LNG transport according to the present invention will be described with reference to Figs. 1 to 4. Fig.
FIG. 1 is a view schematically showing the delivery of a line-by-line LNG according to the present invention, FIG. 2 is a view showing an apparatus for preventing hull damage in an LNG piping according to the present invention, FIG. 3 is a cross- 4 is a sectional view taken along the line BB 'of the hull damage preventing apparatus provided at the LNG piping connection portion according to the present invention.
The hull damage prevention apparatus in the LNG transfer between the
Here, the
As shown in FIG. 1, as shown in FIG. 1, the transfer of the LNG line is carried out between the
The
According to the present invention, a first
In the present invention, the
The
The
The
The
Conventionally, a single drip tray having one side fixed to the hull is installed under a plurality of LNG pipes used for off-loading. However, hogging and sagging are repeated due to the marine environment conditions, There is a problem that cracks due to fatigue occur in the welded portion to be connected.
In the present invention, a single drip tray is not provided for a plurality of LNG pipes in order to prevent a cracking problem due to fatigue damage, and to reduce material and time, but each
As a result, the
The hull damage prevention device in the LNG transfer between the first position and the second position in the ocean according to the present invention constructed as described above is capable of preventing leakage of the offloaded LNG piping connection used in the ship to ship LNG transferring It is possible to protect the hull even if the LNG leaks through the LNG piping by installing a storage member for storing the LNG and providing a drip tray at the bottom for each LNG piping.
In addition, when the pressurized LNG leaks in an arbitrary direction, it is possible to prevent damage to the surrounding hull or equipment to prevent damage thereof, and to maintain safety. Also, The safety can be maintained and the joints can be easily separated, which makes it easy to inspect, repair and replace valves, flanges, etc., which may leak liquefied gas.
Although the present invention has been described with reference to the drawings, it is to be understood that the invention is not limited to the embodiments and drawings described above, It will be understood by those skilled in the art that various changes and modifications may be made therein without departing from the spirit and scope of the invention.
100: first position 110: hull
120: drip tray 130: welded portion
150: LNG piping 160: opening / closing valve
165: second storage member 168: first outlet
170: connection portion 175: first storage member
178: second outlet 200: second position
250: LNG supply pipe 260: Flexible piping
Claims (6)
An LNG piping for transporting the LNG from the first location to the second location;
A connecting portion connecting between the LNG pipes;
A first LNG storage member surrounding the connection portion and storing the LNG leaking from the connection portion; And
And a first outlet for discharging vaporized gas inside the first LNG storage member.
An on-off valve for controlling the LNG transport to the LNG pipe;
An engaging portion for engaging the LNG pipe with the opening / closing valve;
A second storage member surrounding the coupling portion and storing the LNG leaking from the coupling portion; And
And a second outlet for discharging the vaporized gas inside the second storage member.
Wherein the first and second storage members are silicone rubber materials capable of withstanding cryogenic LNG.
The first storage member and the second storage member may include a first storage member,
So that the leaked LNG is not dispersed.
Wherein the first outlet and the second outlet are provided so as to discharge only gas.
The first storage member and the second storage member may include a first storage member,
And is detachably coupled to the LNG piping.
A drip tray is installed along the LNG pipe to prevent damage to the hull when the LNG leaks from the first storage member or the second storage member,
Wherein the drip tray is installed for each of the LNG pipelines.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2020150007599U KR20170001899U (en) | 2015-11-23 | 2015-11-23 | Hull damage prevention apparatus for ship to ship LNG transferring |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2020150007599U KR20170001899U (en) | 2015-11-23 | 2015-11-23 | Hull damage prevention apparatus for ship to ship LNG transferring |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20170001899U true KR20170001899U (en) | 2017-05-31 |
Family
ID=59021917
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR2020150007599U KR20170001899U (en) | 2015-11-23 | 2015-11-23 | Hull damage prevention apparatus for ship to ship LNG transferring |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20170001899U (en) |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20110097090A (en) | 2010-02-24 | 2011-08-31 | 삼성중공업 주식회사 | System and method for ship-to-ship transferring liquefied gas |
-
2015
- 2015-11-23 KR KR2020150007599U patent/KR20170001899U/en not_active Application Discontinuation
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20110097090A (en) | 2010-02-24 | 2011-08-31 | 삼성중공업 주식회사 | System and method for ship-to-ship transferring liquefied gas |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2446981C1 (en) | Liquefied-gas carrier with gas loading and unloading system | |
CN106170657B (en) | Including the floating structure of sealing heat-insulation storage tank and the method for running the floating structure | |
US7726359B2 (en) | Method for transferring a cryogenic fluid | |
US10359229B2 (en) | Floating liquefied natural gas commissioning system and method | |
JP2014525366A (en) | Marine platform with outer vessel | |
US8006724B2 (en) | Apparatus for transferring a cryogenic fluid | |
KR20180092828A (en) | Gas dome structure for a sealed and thermally insulating tank | |
KR20180133861A (en) | Thermal sealing tank | |
US7726358B2 (en) | Method for loading LNG on a floating vessel | |
JP2021530651A (en) | Load and / or unload tower with equipment for spraying liquefied gas | |
KR100779779B1 (en) | Method for treating offshore lng regasification system for lng regasification ship | |
KR102177572B1 (en) | Regasification System of liquefied Gas and ship having the same | |
KR20170001899U (en) | Hull damage prevention apparatus for ship to ship LNG transferring | |
KR101378797B1 (en) | Unloading System For LNG Carrier | |
KR20220149473A (en) | Storage facility for liquefied gas | |
KR20170050382A (en) | Marine offloading system | |
KR100701398B1 (en) | Spray device arranged in a turret of a lng regasification ship and method for preventing hull deformation using the spray device | |
KR20210050035A (en) | Storage tank cooling system of ship | |
KR20170037081A (en) | Water curtain equipment and marine structure including the same | |
KR102631184B1 (en) | Bunkering line cooling system of ship | |
KR20150081542A (en) | Apparatus for protecting leakage of liquefied gas | |
KR102262123B1 (en) | Transportation system for Liquefied Natural Gas | |
KR102234868B1 (en) | Deck protecting apparatus and ship having the same | |
KR101973817B1 (en) | Wall structure for protection in lng fsru | |
KR100678842B1 (en) | Lng regasification ship with fire-fighting device arranged in a turret and method for extinguishing a fire using the fire-fighting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E601 | Decision to refuse application |