KR20150096059A - Prefabricated building block for building use and construction method using it - Google Patents
Prefabricated building block for building use and construction method using it Download PDFInfo
- Publication number
- KR20150096059A KR20150096059A KR1020140017006A KR20140017006A KR20150096059A KR 20150096059 A KR20150096059 A KR 20150096059A KR 1020140017006 A KR1020140017006 A KR 1020140017006A KR 20140017006 A KR20140017006 A KR 20140017006A KR 20150096059 A KR20150096059 A KR 20150096059A
- Authority
- KR
- South Korea
- Prior art keywords
- block
- base
- mat
- piping
- corner
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/01—Flat foundations
- E02D27/016—Flat foundations made mainly from prefabricated concrete elements
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/20—Miscellaneous comprising details of connection between elements
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/02—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
Abstract
Description
The present invention relates to a foundation construction structure of a building and a construction method using the same, and more particularly, to a foundation construction of a building, And the like.
In general, the foundation is constructed to support the load and the wind pressure of the building when the building is constructed. Generally, the foundation 11 is excavated to the depth of the
However, in the prior art, it is possible to dry only the line foundation method (the method of placing the PC block only on the outer wall of the building), so that the mat type method (concrete pouring and curing method in the same area as the building) Therefore, the mat type method is difficult to implement in the meantime. In the field, it includes the process of laying, laying out, grounding, building exterior wall, reinforcing steel reinforcement, building inner wall concrete, casting concrete concrete, demolishing formwork, The construction period, the construction time, the work force and the equipment are greatly increased.
In such a reality, the mat type basic dry process method is able to manufacture the prefabricated PC block by forming the perforation hole for various piping, so that the whole process is completed within one day. Especially, in the case of the prefabricated and light- Simple and fast basic building technology is required.
The present invention has been proposed in order to solve the problems in the conventional foundation work described above. In the prior art, various processes have to be carried out only in the outer wall edge part (line foundation method) in the foundation work, The mat type basic block method is not possible by using the structures of the prefabricated
The method of the present invention for achieving the above object is a method for finishing a frozen ground surface (10) having a surface waveguide below a freezing line, comprising the steps of compaction and horizontal grinding using a machine; The ground base terraces and the preformed preformed
The present invention has the effect of maximizing the construction efficiency of the foundation portion since the building foundation structure is manufactured in a standardized form and moved and assembled in the field.
Especially, it can be made by mutual parts by combining stable anchor bolts of basic PC block and mat PC block, which are assembled in the field, so that it is possible to install piping equipments that are difficult in structural stability and dry mat type construction. The foundation construction process is completed, and the construction is completed in one day in any region and any condition, and there is also the effect that the construction cost reduction and the manpower and equipment are drastically reduced.
FIG. 1 is a schematic view of an individual structure of a foundation structure according to an embodiment of the present invention.
2 is a sectional view of a foundation structure according to an embodiment of the present invention;
3 is a finished perspective view of a foundation structure according to an embodiment of the present invention.
4 is a plan view of a foundation structure according to an embodiment of the present invention.
Fig. 5 is a flowchart of the dry process method of the present invention
FIG. 6 is a flowchart
Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.
First, a structure of a basic building PC block and a mat PC block, which are a concrete foundation structure manufactured by a PC method in a factory so as to be used in a dry process method capable of a piping facility according to an embodiment of the present invention, will be described .
The base
Also, the mat PC
5 and the process diagram of FIG. 6 will be referred to as " dry concrete construction method " in the following. Referring to FIG. 5, Let's take a look.
<Compaction and Leveling> (ST 1)
First, the bottom surface disposal work is performed on the indices 11 and 12 to which the foundation structure is to be installed to a depth of the frozen
At this time, in order to increase the grounding force in the compaction process, it is necessary to use a machine to sufficiently consolidate the ground subsidence.
<Installation of prefabricated basic PC block> (ST 2)
The base PC block 20 (21) previously formed and molded in the factory is raised along the outer wall edge on the above-mentioned ground compaction, and the surface on which the earth pressure supporting jaw 27 is formed faces inward of the rim and the inclined outer surface faces the opposite side And the base PC
<Installing PE film and mesh> (ST3)
The
<Mat PC block installation> (ST 4)
The
<Filling around and finishing mortar of mortar> (ST 5)
When the connected base PC block and the mat PC block are both connected to each other, the outer periphery of the outer periphery of the outer periphery of the outer periphery of the outer surface of the
Accordingly, the base structure is completed in the same manner as in FIGS. 3 and 4 through fixing operation between the base PC block and the mat PC block with anchor bolts and nuts.
Then, general construction, prefabricated building, lightweight building, etc. are installed and installed on the upper part of the foundation structure.
The present invention in which the construction is carried out by such a method includes the steps of forming a foundation PC block and a mat PC block on a site, forming a concrete on a concrete floor, curing and curing a concrete, Installation, curing, etc. can be omitted, so that the working period can be greatly reduced and the working efficiency can be improved.
Particularly, since the base PC block and the mat PC block, which are assembled in the field, can be stably engaged, the structural stability can be ensured.
In addition, when the structure is dismantled or replaced after the construction, the base PC block and the mat PC block can be separated and reused, thereby enabling eco-friendly construction and productivity improvement.
It will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the present invention as defined by the appended claims. But is not limited to the example.
10: freezing line surface 11: internal index
12: External indicator
20: Basic PC corner block 21: Basic PC date block
22: Matt PC block anti-skid jaw 23: Anchor bolt for fixing the base PC block
24: Primary piping installation hole 25: Extrusion bar for connection of basic PC block
26: groove for connecting the basic PC block 27: earth pressure supporting jaw
28: Primary piping pipe
30: Matte PC frame corner block 31: Matte PC frame edge block
32: Mat PC border inside block 33: Waterproof chin
34: Basic PC block fixing nut hole 35: Anchor bolt for fixing the mat PC block
36: Matte PC block fixing nut hole 37: Groove for piping equipment
38: Pore hole for primary piping system 39: Pore hole for secondary piping system
40: secondary piping pipe 41: insulation
Claims (4)
The base PC corner block 30 and the base PC dowel block 31 are formed in a perforation hole 24 for the primary piping system at the lower end of the center of the side wall for piping equipment and a mat PC corner corner block 30 has a groove 37 for the piping equipment from the center to the bottom of the upper surface, a piercing hole 38 for the primary piping is formed on the bottom of the bottom, and a piercing hole 39 for the secondary piping is formed on the side of the side wall And the mat PC block block 31 has punch holes 38 and 39 for the first and second pipings on the bottom surface and three sides of the side wall and the second side And a piercing hole (39) for a piping system is formed.
And a heat insulating material (41) is attached to the bottom of the mat PC frame block (30) (31) and the bottom of the mat PC inner block (32) .
The base PC blocks 20 and 21 formed in advance in the factory along the outer wall rim on the compaction of the freezing line paper surface 10, (ST 2)
The base PC blocks 20 and 21 are placed on the rubble masonry compaction and placed on the sidewalls of the base PC blocks 20 and 21, The base PC block 20 and the foundation PC blocks 20 and 21 are ground and ground with the soil around the earth pressure support trough 27 and the base PC blocks 20 and 21, (A) and the anti-jamming netting (B) including the inner sheet surface (21) and the inner sheet surface (11); (ST 3)
A mat PC corner corner block 30 and a mat PC corner straight block 31 protruding from the already installed basic PC block are fixed to the groove 37 for piping equipment, Fastening with a nut by a fixing nut hole (34); (ST 4)
When both of the connected basic PC block and the mat PC block are seated, the outer surface 12 is backed up with soil. Then, according to the drawing position, the perforated hole for the primary pipe in the bottom of the groove 37 for the mat PC block piping installation The secondary piping 40 is carried out with the pumping hole 38 for the piping equipment in the side wall and the secondary piping 40 is connected to the primary piping pipe 28 provided in the piercing hole 37 for the primary piping facility (C) finishing step inside the groove (37) for the matte PC block piping system and at the same height as the watertight jaw (33) at the top plate portion; (ST 5). The dry method using the foundation construction structure of the building.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020140017006A KR20150096059A (en) | 2014-02-14 | 2014-02-14 | Prefabricated building block for building use and construction method using it |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020140017006A KR20150096059A (en) | 2014-02-14 | 2014-02-14 | Prefabricated building block for building use and construction method using it |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20150096059A true KR20150096059A (en) | 2015-08-24 |
Family
ID=54058641
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020140017006A KR20150096059A (en) | 2014-02-14 | 2014-02-14 | Prefabricated building block for building use and construction method using it |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20150096059A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20180067065A (en) | 2016-12-12 | 2018-06-20 | 주식회사 져스틴하우스 | Foundation structure for movable house |
CN113862004A (en) * | 2021-10-28 | 2021-12-31 | 新兴铸管股份有限公司 | Installation method for coke oven lower nozzle module |
-
2014
- 2014-02-14 KR KR1020140017006A patent/KR20150096059A/en not_active Application Discontinuation
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20180067065A (en) | 2016-12-12 | 2018-06-20 | 주식회사 져스틴하우스 | Foundation structure for movable house |
CN113862004A (en) * | 2021-10-28 | 2021-12-31 | 新兴铸管股份有限公司 | Installation method for coke oven lower nozzle module |
CN113862004B (en) * | 2021-10-28 | 2023-10-03 | 新兴铸管股份有限公司 | Method for installing lower spray pipe module of coke oven |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101904692B1 (en) | Method for the final working to the slab hole and mold | |
US20140223851A1 (en) | Prefabricated reinforced concrete wall panel and installation method | |
CN104328790B (en) | Cast-in-situ sprayed concrete hidden bearing platform and hidden ground beam molding bed | |
CN110004974B (en) | Prefabricated waterproof retaining wall plate structure and construction method thereof | |
CN104088473A (en) | Construction structure and method used for underpinning load-bearing wall | |
KR20160000702A (en) | Fastening member used in concrete filled steel tube and its using concrete filled steel tube mounting structure and method and its includes build underground structure and method | |
US20210017755A1 (en) | Composite wall and methods of constructing a composite wall | |
CA2673876A1 (en) | Shoring free excavation and basement construction apparatus and method | |
KR20150096059A (en) | Prefabricated building block for building use and construction method using it | |
KR20160039456A (en) | A construction method of concrete | |
JP6420090B2 (en) | Ground liquefaction countermeasure method | |
JP2018031131A (en) | Low-rise building and anchor holder for foundation construction | |
KR200428388Y1 (en) | Power transmission manhole | |
KR101808833B1 (en) | Floor structure of underground floor with reduced floor height using shear reinforcement and the construction method thereof | |
JP4228308B2 (en) | Reinforcement method for existing floors and seismic isolation method for existing buildings | |
CN109137887B (en) | Underground continuous wall structure penetrating through karst cave, construction method and supporting device | |
CN107460949B (en) | Chassis system of light steel structure assembly and decoration integrated building | |
KR20030040687A (en) | panel for external underground wall of building, structure and construction method using the same | |
CN204199302U (en) | The dark cushion cap of cast-in-place sprayed mortar and secretly beam loose tool | |
KR20160004627A (en) | The slope reinforcement method | |
KR101415867B1 (en) | Precast concrete structure construction method for downward construction of underground structures | |
KR100403566B1 (en) | Reinforced earth revetment established irregular natural stones on its skin | |
CN115522561B (en) | Construction method for foundation soil mold of tower crane of building engineering | |
JPH09111776A (en) | Basement and construction method thereof | |
JP2011236666A (en) | Building method of protection concrete body for septic tank |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E601 | Decision to refuse application |