KR20140056909A - The heavy equipment business manegement system and method - Google Patents

The heavy equipment business manegement system and method Download PDF

Info

Publication number
KR20140056909A
KR20140056909A KR1020120123371A KR20120123371A KR20140056909A KR 20140056909 A KR20140056909 A KR 20140056909A KR 1020120123371 A KR1020120123371 A KR 1020120123371A KR 20120123371 A KR20120123371 A KR 20120123371A KR 20140056909 A KR20140056909 A KR 20140056909A
Authority
KR
South Korea
Prior art keywords
heavy equipment
owner
computer
data
relay server
Prior art date
Application number
KR1020120123371A
Other languages
Korean (ko)
Inventor
김기신
Original Assignee
김기신
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김기신 filed Critical 김기신
Priority to KR1020120123371A priority Critical patent/KR20140056909A/en
Publication of KR20140056909A publication Critical patent/KR20140056909A/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/0601Electronic shopping [e-shopping]
    • G06Q30/0613Third-party assisted
    • G06Q30/0619Neutral agent
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/0601Electronic shopping [e-shopping]
    • G06Q30/0633Lists, e.g. purchase orders, compilation or processing
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/0645Rental transactions; Leasing transactions
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • General Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Marketing (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Economics (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Primary Health Care (AREA)
  • Tourism & Hospitality (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a system and method for managing and managing a business for a heavy equipment lease business, which is characterized by providing general data to enable a heavy equipment owner and leasing business operator to operate the business by converting the information of equipment operation, management, System and method,
A lease carrier relay server, a heavy equipment owner computer, and a construction machine computer; The rental server relay server includes a program code for presenting various input items so as to receive data from the heavy equipment owner computer and the construction equipment computer at the time of collecting the information about the heavy equipment, The program code that calculates the economic value according to the degree of use of the equipment and calculates the expected management cost according to the degree of use of the equipment and the net profit that the heavy equipment owner can obtain when the leasing of the heavy equipment is analyzed by analyzing the information of the construction company desiring to lease the heavy equipment , Program code for recommending optimal lease information, calculating monthly profit and loss based on average rental income through owner's expenditure statistics, and presenting achievable target profit through analyzing owner's income data and rental request data Including program code ; The heavy equipment owner computer receives the program codes to access the rental server relay server through the Internet, the number of the heavy equipment owned by the owner in the data input field of the rental server, Program code to be transmitted to the relay server, program code for receiving periodical equipment management information of the owner, and fuel consumption information; The construction machine computer includes a program code for accessing the lease carrier relay server through the Internet, a program code for transmitting data to the lease carrier relay server by receiving equipment and period required for construction in a data input field of the relay server, And a control unit.

Description

BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a heavy equipment business management system,

The present invention relates to a system and method for operating and managing a business for a heavy equipment lease business operator. In particular, the present invention relates to a system and method for operating and managing a business system for a heavy equipment lease business operator, The present invention relates to a business operation and management system and method for a heavy equipment lease business operator.

Conventional heavy equipment owners have pursued profits by winning construction orders by visiting customers, personal connections or advertisements. However, since most of the heavy equipment owners are very small, it is difficult for one company to operate with various heavy equipments. Since the types and specifications of the heavy equipment required for each construction are different, it is necessary to lease the heavy equipment suitable for the nature and the scale of each construction.

In addition, it was difficult to rent a building if the location of the heavy equipment and the construction site were far from each other. And even if a heavy equipment owner enters a lease order, he can not lease if heavy equipment is in operation, and the construction company has to find a company that owns a heavy equipment that can work right away I had to.

In addition, it is difficult to find a suitable heavy equipment because it is necessary to contact the owner of the heavy equipment in order to find a company that has the equipment suitable for the construction. In other words, it is difficult for heavy equipment owners to provide suitable equipment for construction companies, and at the same time, construction companies have difficulty in finding suitable heavy equipment for construction. Therefore, the owner of the heavy equipment can not lease, and the loss of the expensive heavy equipment is caused, and the construction company can not lease the heavy equipment suitable for the construction.

The present invention aims at solving the above-mentioned problems, and it is possible to connect heavy equipment owners and construction companies through the Internet to increase the utilization rate of heavy equipment to the heavy equipment owners, and to allow the construction companies to easily select suitable heavy equipment, It is aimed to maximize the mutual benefit between the heavy equipment owner and the construction company by collecting detailed information and maintenance status of the equipment and notifying the construction company so that the construction company can easily select the heavy equipment.

As means for achieving the above object,

The present invention comprises a rental server relay server (100), a heavy equipment owner computer (200), and a construction company computer (300); The rental server relay server 100 includes a program code for presenting various input items for receiving data from the heavy equipment owner computer and the construction equipment computer at the time of collecting the information about the heavy equipment, A program code for transmitting data of mutually matching types, specifications, regions, and dates, and a plurality of time intervals for each day of the week, and a time group for each day of the week is grouped into one group, A plurality of program codes for supporting multiple scheduling; The heavy equipment owner computer 200 receives program codes to access the rental server relay server through the Internet, the number of heavy equipment owned by the owner in the data input field of the rental server relay server, Program code to be transmitted to a leasing company relay server, program code for receiving periodical equipment management information of the owner, and fuel consumption information; The construction machine computer 300 receives program codes for accessing the rental server relay server through the Internet, equipment and period required for construction in the data input field of the relay server, and transmits data to the rental server relay server And a program code for executing the program.

The rental server relay server 100 may also include a program code for calculating an economic value according to a used price of a heavy equipment based on data analysis data, calculating a predicted management cost according to the degree of equipment use and transmitting the estimated value to the owner computer, It is characterized by having a program code for analyzing the information input from a construction company computer which desires to lease a heavy equipment and calculating the net profit of the heavy equipment owner when the leasing of the heavy equipment is executed and transmitting the profit to the owner computer.

In addition, the rental server relay server 100 calculates the monthly profit and loss based on the average rental income based on the owner's expenditure statistics, extracts the achievable target profit through the analysis of the owner's rental data and rental request data, And a program code for transmitting the program code to the computer.

Also, the heavy equipment owner computer accesses to the leasing company relay server through the Internet, receives the number of the heavy equipment owned by the owner, the model year and the maintenance status in the data input field of the leasing company relay server, Receiving periodic equipment management information and oil spending information of the owner; The construction machine computer accesses the lease carrier relay server through the Internet, receives data and equipment required for construction in a data input field of the relay server, and transmits data to the lease carrier relay server; A lease carrier relay server transmits to the owner computer and the builder computer transmitting the matching data of the type, standard, area, and date of the heavy equipment of the heavy equipment owner computer and the builder, and it is possible to set a plurality of time intervals for each day And grouping the time settings for each day of the week into one group and setting the group to a plurality of groups so as to support multiple scheduling and transmitting the group scheduling to each owner computer and each constructor computer .

In addition, the step of transmitting data to the owner computer by the relay server for leasing company calculates the economic value according to the used price of the heavy equipment based on the data analysis data transmitted by the heavy equipment owner computer, To the owner computer; Calculating the monthly break-even point based on the average rental income through the owner's expenditure statistics and extracting the achievable target profit through the analysis of the owner's income data and the rental request data of the builder and presenting it to the owner computer; And analyzing the information of the construction company wishing to lease the heavy equipment based on the data transmitted by the contractor computer, and calculating the net profit of the heavy equipment owner and transferring it to the owner computer .

As described above, the present invention connects the heavy equipment owner and the construction company through the Internet, thereby increasing the utilization rate of the heavy equipment to the heavy equipment owner and allowing the construction company to easily select the appropriate heavy equipment. However, It is effective to maximize the mutual benefit between the heavy equipment owner and the construction company by collecting the status and notifying the construction company of the fact that the construction company can easily select the heavy equipment.

1 is a block diagram of a configuration of the present invention;
FIG. 2 is a flow chart of an operation for inputting a heavy equipment history using the heavy equipment owner computer of the present invention. FIG.
FIG. 3 is an operational flowchart for inputting heavy equipment maintenance information using the heavy equipment owner computer of the present invention. FIG.
FIG. 4 is a flowchart illustrating an operation of arranging data in a lease carrier relay server according to the present invention; FIG.
FIG. 5 is a flowchart illustrating an operation using information input through a construction company computer in the present invention. FIG.
FIG. 6 is an operation flow chart of processing various kinds of information and notifying a user of the present invention. FIG.

Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. In the drawings, like reference numerals refer to the like elements throughout. The same elements are denoted by the same reference numerals even though they are shown in different drawings. In the following description of the present invention, detailed description of known functions and configurations incorporated herein will be omitted when it may make the subject matter of the present invention rather unclear.

It is to be understood that both the foregoing general description and the following detailed description are exemplary and explanatory and are intended to provide further explanation of the invention as claimed.

1 is a block diagram of a configuration of the present invention;

FIG. 2 is a flow chart of an operation for inputting a heavy equipment history using the heavy equipment owner computer of the present invention. FIG.

FIG. 3 is an operational flowchart for inputting heavy equipment maintenance information using the heavy equipment owner computer of the present invention. FIG.

FIG. 4 is a flowchart illustrating an operation of arranging data in a lease carrier relay server according to the present invention; FIG.

FIG. 5 is a flowchart illustrating an operation using information input through a construction company computer in the present invention. FIG.

FIG. 6 is an operation flow chart of processing various kinds of information and notifying a user of the present invention,

Hereinafter, the present invention will be described in more detail.

(1) System configuration

The system configuration of the present invention comprises a rental server relay server 100, a heavy equipment owner computer 200, and a construction company computer 300.

The rental server relay server 100 presents various input items for receiving data from the heavy equipment owner computer 200 and the construction equipment computer 300 at the time of collecting the information about the heavy equipment. And, the type, standard, area, and date of the heavy equipment of the heavy equipment owner computer and the constructor are matched with each other. In addition, a plurality of time intervals can be set for each day of the week, a time group for each day of the week is grouped into one group, and multiple groups can be set to support multiple scheduling.

Also, the rental server relay server 100 calculates the economic value according to the used price of the heavy equipment based on the data analysis data, calculates the estimated management cost according to the degree of use of the equipment, and transmits it to the owner computer. If the lease of the heavy equipment is analyzed, the net profit of the heavy equipment owner is calculated and transmitted to the owner computer. It then calculates the monthly breakeven point based on the average rental income through the owner's expenditure statistics and presents the achievable profit to the owner's computer through analysis of the owner's income data and lease request data.

That is, the rental server relay server 100 is provided with a program code for presenting various input items for receiving data from the heavy equipment owner computer and the construction equipment computer at the time of collecting the information about the heavy equipment, The server further includes a program code for transferring data of mutually matching types, specifications, regions, and dates of the heavy equipment of the heavy equipment owner computer and the construction equipment, and also allows a plurality of time intervals to be set for each day of the week, The setting is grouped into a group of one week, and the group is set to be plural, so that the program code supporting multi-scheduling is provided. That is, it supports multi-scheduling, which groups heavy equipment owners and manages them, and provides these groups to the builders in various configurations.

The rental server relay server 100 calculates the economic value of the used equipment based on the data analysis data, calculates the estimated management cost according to the degree of use of the equipment, and transmits the program code to the owner computer, When the lease of the heavy equipment is analyzed, the program code that calculates the net profit of the owner of the heavy equipment and transmits it to the owner computer is analyzed based on the average rental income based on the owner expenditure statistics And program code for calculating the monthly breakeven point and extracting the achievable target profit through analysis of the owner's income data and lease request data and transmitting it to the owner's computer.

The heavy equipment owner computer 200 accesses the lease carrier relay server through the Internet and receives the number of heavy equipment owned by the owner and the year and maintenance status in the data entry field of the lease carrier relay server, To the relay server, and receives the owner's periodic equipment management information and the oil spending information.

That is, the heavy equipment owner computer 20 stores program codes for accessing the rental server relay server through the Internet, the number of heavy equipment owned by the owner in the data input field of the rental server relay server, A program code to be received and transmitted to a leasing company relay server, and a program code to receive periodic equipment management information and oil spending information of the owner.

The construction contractor computer 300 accesses the rental server relay server through the Internet, receives equipment and period required for construction in the data input field of the relay server, and transmits the data to the rental server relay server.

That is, the construction company computer 30 receives program codes to access the rental server relay server through the Internet, equipment and period required for construction in a data input field of the relay server, And a program code for transmitting the program code.

Hereinafter, the heavy equipment rental method using the rental server's relay server 100 will be described in order.

1. Steps to gather basic information of heavy equipment owners

In this step, the rental server relay server receives the basic data from the heavy equipment owner computer at the initial stage such as the detailed information of the heavy equipment owner and the heavy equipment of the heavy equipment owner and the maintenance status. That is, the heavy equipment owner computer connects with the lease carrier relay server, accesses the corresponding homepage, and receives data according to the type, standard, region, and operating condition of the heavy equipment input by the owner, and transfers the data to the lease carrier relay server.

2. Steps to collect operating information of heavy equipment owners

In this step, the rental server relay server continuously receives the owner's periodic equipment management information and the information related to the oil spending from the heavy equipment owner computer at a predetermined time interval. That is, the user inputs data in a predetermined unit through the owner computer, or invokes the data in a predetermined unit from the leasing company relay server, and receives information updated in a predetermined unit through the owner computer.

3. Steps to collect construction company information

In this step, the status data of the equipment necessary for the construction is inputted from the construction company computer, and the type of the heavy equipment, the specification, and the necessary dates are inputted.

4. Matching step

The data of the heavy equipment of the heavy equipment owner computer and the construction equipment are matched and transmitted to the owner computer and the construction machine computer, respectively. At this time, a plurality of time intervals can be set for each day of the week, The time setting is grouped into a group of one week and it is possible to set multiple groups so that multiple scheduling is supported. Accordingly, the heavy equipment owners are grouped and managed, and these groups are set variously and provided to the builder To support multiple schedules.

5. Analysis of expenditure data of heavy equipment owners and calculation of expected expenditure

The above step is an additional service step, in which the rental server relay server consolidates the data collected in the first and second steps and provides the information rearranged after the information of the heavy equipment owner is viewed at a glance, The system calculates the economic value according to the used price of the heavy equipment, calculates the estimated management cost according to the degree of equipment usage, and transmits the calculated information to the heavy equipment owner computer.

6. Analysis of rental business information and analysis of income from economic point of view

In this step, when information is received from a construction company computer that desires to lease a heavy equipment as an additional service step and corresponding information is analyzed, a net profit to be obtained by the heavy equipment owner is calculated to recommend the best rental information to be. That is, the rental server server analyzes the data input from the construction company computer and provides the optimal information that the owner of the heavy equipment can obtain.

7. Analyze income and expenditure to calculate monthly break-even point and target revenue generation step

The above step is an additional service step, which calculates monthly break-even points based on the average rental income through the expenditure statistics of the heavy equipment owner and analyzes the demand data of the heavy equipment owner and the leasing request data of the contractor, To the builder computer. That is, matching the interests of the heavy equipment owner with the interests of the contractor to maximize each other.

Hereinafter, the step of comparing the profit from the economic point of view by analyzing the rental business information will be described in detail as follows.

(Economic gain calculation process)

Match the data entered from the heavy equipment owner's computer with the leasing requirements entered from the builder's computer to determine the matching data.

Then, the estimated net profit is calculated by comparing the details of the data calculated in the above step.

In other words, the server for leasing company grasps the following contents.

1) Determine the distance to move based on the data input from the heavy equipment owner computer and the construction equipment computer, and calculate the fuel ratio calculated by the fuel consumption of the owner equipment, and also determine whether it is provided.

2) Calculate the average labor cost of equipment operators if necessary.

3) And, when the work of the construction company is carried out, the additional profit that can occur is calculated.

4) In case of half-day, which is not on-date, it is judged whether additional lease is possible based on the business end point and point of view and surrounding lease request data.

5) Calculate the expected net profit by calculating the profit and expenditure using the information calculated in the above step.

6) Provide the data through the above steps within the range (date, time, place, net income, etc.) desired by the construction company.

Hereinafter, the process of calculating the monthly breakeven point and the target profit by analyzing the income and expenditure will be described as follows.

(Calculation formula)

1) average lease income; It is the average value of the past average net profit of the business.

2) average maintenance cost; This is the average value of past maintenance costs.

3) Deportation triangle

 A) New: Triangulate the value based on the average year of use.

 B) Used: Calculate the average year of use in the first half of the year.

 C) Labor cost calculation: Calculate the average labor cost of the equipment manpower.

D) Break-even point: Calculate break-even point based on average monthly maintenance cost and lease net income data.

(Target revenue)

1) Expectation revenue presentation: Based on the user statistics data of last month, we present the average profit of other companies in similar situation.

2) Heavy Equipment Owners Enter Target Revenue: Provide the amount of lease that should be performed for the target period for the target profit set by the user, and present the progress level and the amount of lease remaining based on the net profit of the lease going on.

100: Rental server relay server
200: heavy-duty owner computer
300: Contractor computer

Claims (5)

A rental server relay server 100, a heavy equipment owner computer 200, and a construction company computer 300;
The rental server relay server (100)
A program code for presenting various input items so as to receive data from the heavy equipment owner computer and the construction equipment computer when collecting information on the heavy equipment and the type of the heavy equipment of the heavy equipment owner computer and the construction company, The program code that transmits each piece of data, and the multiple time intervals for each day of the week are enabled, and the time setting for each day is grouped into a single group, and multiple groups can be set up to support multiple scheduling ≪ / RTI >
The heavy equipment owner computer 200 receives program codes to access the rental server relay server through the Internet, the number of heavy equipment owned by the owner in the data input field of the rental server relay server, Program code to be transmitted to a leasing company relay server, program code for receiving periodical equipment management information of the owner, and fuel consumption information;
The construction machine computer 300 receives program codes for accessing the rental server relay server through the Internet, equipment and period required for construction in the data input field of the relay server, and transmits data to the rental server relay server And a program code for executing the program for the heavy equipment rental business.
The method according to claim 1,
The rental server relay server (100)
Based on the data analysis data, it calculates the economic value according to the used price of the heavy equipment, calculates the estimated management cost according to the degree of use of the equipment, and transmits the program code to the owner computer. And a program code for calculating the net profit of the owner of the heavy equipment and transmitting the same to the owner computer when the lease of the heavy equipment is analyzed.
The method according to claim 1,
The rental server relay server (100)
And program code for calculating the monthly break-even point based on the average rental profit through the owner's expenditure statistics, extracting the achievable target profit through the analysis of the owner's income data and lease request data, and transmitting it to the owner computer Business operation and management system for heavy equipment leasing companies.
The heavy equipment owner computer accesses to the lease carrier relay server through the Internet, receives the number of the heavy equipment owned by the owner, the yearly maintenance status and the maintenance status in the data field of the lease carrier relay server and transmits the data to the lease carrier relay server Receiving periodic equipment management information and oil spending information of the owner;
The construction machine computer accesses the lease carrier relay server through the Internet, receives data and equipment required for construction in a data input field of the relay server, and transmits data to the lease carrier relay server;
A lease carrier relay server transmits to the owner computer and the builder computer transmitting the matching data of the type, standard, area, and date of the heavy equipment of the heavy equipment owner computer and the builder, and it is possible to set a plurality of time intervals for each day And grouping the time setting for each day of the week into one group and setting the group to a plurality of groups so as to support multiple scheduling and transmitting the group scheduling to each owner computer and each constructor computer. How to operate and manage business for heavy equipment rental companies.
5. The method of claim 4,
Wherein the step of transmitting data to the owner computer by the rental server relay server comprises:
Calculating the economic value according to the used price of the heavy equipment based on the data analysis data transmitted from the heavy equipment owner computer, calculating the estimated management cost according to the degree of equipment usage, and transmitting it to the owner computer;
Calculating the monthly break-even point based on the average rental income through the owner's expenditure statistics and extracting the achievable target profit through the analysis of the owner's income data and the rental request data of the builder and presenting it to the owner computer;
And analyzing the information of the construction company wishing to lease the heavy equipment based on the data transmitted by the contractor computer, and calculating the net profit of the heavy equipment owner and transferring it to the owner computer And a method for managing and operating a business for a leasing company of a heavy equipment.
KR1020120123371A 2012-11-02 2012-11-02 The heavy equipment business manegement system and method KR20140056909A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120123371A KR20140056909A (en) 2012-11-02 2012-11-02 The heavy equipment business manegement system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120123371A KR20140056909A (en) 2012-11-02 2012-11-02 The heavy equipment business manegement system and method

Publications (1)

Publication Number Publication Date
KR20140056909A true KR20140056909A (en) 2014-05-12

Family

ID=50887970

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120123371A KR20140056909A (en) 2012-11-02 2012-11-02 The heavy equipment business manegement system and method

Country Status (1)

Country Link
KR (1) KR20140056909A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016115525A1 (en) * 2015-01-15 2016-07-21 Bigrentz Inc. Enterprise resource management
KR20190011130A (en) * 2017-07-24 2019-02-01 임종현 Construction equipment sharing service system
KR20220086140A (en) 2020-12-16 2022-06-23 김성민 Heavy Equipment Lease Management System

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016115525A1 (en) * 2015-01-15 2016-07-21 Bigrentz Inc. Enterprise resource management
KR20190011130A (en) * 2017-07-24 2019-02-01 임종현 Construction equipment sharing service system
KR20220086140A (en) 2020-12-16 2022-06-23 김성민 Heavy Equipment Lease Management System

Similar Documents

Publication Publication Date Title
US11200528B2 (en) Data integrated analysis system
Park* An integrated approach for production and distribution planning in supply chain management
US8571922B2 (en) Method, technology, and system for displaying, measuring, assessing, and improving the operating and financial performance of metered energy and water consuming systems
Bohn et al. Benefits and barriers of construction project monitoring using high-resolution automated cameras
Altmann A supply chain design approach considering environmentally sensitive customers: the case of a German manufacturing SME
CN107942886B (en) Water purifier user side based on thing networking
US20150149257A1 (en) Systems and methods for enterprise profit optimization
CN105474247A (en) Location inference
Kumar et al. A heuristic-based approach to integrate the product line selection decision to the supply chain configuration
Zou et al. Hierarchical evaluation of on-site environmental performance to enhance a green construction operation
Eun et al. Integration of life cycle assessment in the environmental information system
KR20140056909A (en) The heavy equipment business manegement system and method
JP2004323162A (en) Maintenance business simulator, maintenance service planning support system and maintenance business support system
JP2003288476A (en) Line capacity integrated evaluation/management operation system for production line and line capacity integrated evaluation/management operation method for the production line
Sinha et al. Assessing the economic sustainability of gig work: A case of hyper-local food delivery workers in Kolkata, India
US20140222527A1 (en) Apparatus, system, and method for oil and gas benchmarking
Motegi et al. Introduction to web-based energy information systems for energy management and demand response in commercial buildings
KR20190084739A (en) Apparatus and method for synthetically managing resource for cost accounting
KR20150053313A (en) Method for a customized information collection and efficient communication
Kramer et al. Moving beyond data paralysis to effective use of building analytics
Guye et al. Price incentives and unmonitored deforestation: evidence from indonesian palm oil mills
Mukaddes et al. Developing a model for preventive maintenance management system and application database software
Sibley Centralizing Energy Consumption Data in State Energy Data Centers
KR20230061160A (en) Business operation and management system necessary for heavy equipment rental business operators
Alriabi et al. Developing a cost-predictive model for hospital construction projects

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application