KR20130126775A - System for managing material production - Google Patents
System for managing material production Download PDFInfo
- Publication number
- KR20130126775A KR20130126775A KR1020120037805A KR20120037805A KR20130126775A KR 20130126775 A KR20130126775 A KR 20130126775A KR 1020120037805 A KR1020120037805 A KR 1020120037805A KR 20120037805 A KR20120037805 A KR 20120037805A KR 20130126775 A KR20130126775 A KR 20130126775A
- Authority
- KR
- South Korea
- Prior art keywords
- information
- processing
- post
- group
- work
- Prior art date
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to a material production management system for processing a production management task of materials required for ship construction in a mobile environment, DB group for storing the basic material information, material performance information and material post-processing information; A mobile terminal equipped with an application program module for providing a user interface (UI) for managing the storage information of the DB group; And a server for determining whether to allow the application program module to access the stored information of the DB group, thereby establishing a convenient and efficient production management system.
Description
The present invention relates to a material production management system, and more particularly, to a material production management system that enables a mobile environment to handle the production management of materials required for ship construction.
When a shipbuilder receives an order for a ship, it performs basic design work of the ship, calculates an estimate for the ship's construction using standard data for each ship type according to the basic design, and then uses the calculated quote to refer to the production plan. Establishes, produces materials through operations according to the production plan, and carries out the ship building process of processing, assembling and installing the produced materials to build the ship. For example,
In the case of producing the material during the ship construction process as described above, a variety of materials such as pipes or iron rigs are produced through material production operations for each working group based on the production plan.
On the other hand, for the production of materials during the shipbuilding process, the manager performs performance processing such as assigning production quantities of materials (hereinafter referred to as 'production performance') for each working group or designating work schedules, and checking the production performance status from time to time. Production management must be carried out. This is to accurately manage the supply and demand schedule for the subsequent ship building process such as processing, assembly or installation of the material.
However, the conventional production management system has a problem of causing inconvenience to the manager because the manager must communicate with the various working groups in person or in writing or by telephone and perform the production management work of the material.
The present invention has been made to solve the problems as described above, to provide a material production management system that can handle the production management work of materials required for ship building in a mobile environment, an object thereof.
Material production management system according to the present invention for achieving the above object, DB group for storing the material basic information, material performance information and material post-processing information; A mobile terminal equipped with an application program module for providing a user interface (UI) for managing the storage information of the DB group; And a server for determining whether to allow the application program module to access the stored information of the DB group.
Here, the application module, if the server requests access to the storage information of the DB group, and if the server allows access to the storage information of the DB group, and provides a main UI through a mobile terminal, When various work execution events are input through the main UI, it is preferable to provide a work UI corresponding to the input work execution events through the mobile terminal.
In addition, the application module provides a UI for performance processing work or post-processing work through a mobile terminal, and if material identification information of performance processing target or post-processing material is input through the performance processing business or post-processing business UI. Preferably, the basic information including the input material identification information is searched in the DB group and displayed through the UI for post-processing work or post-processing work.
In addition, the application module, if the performance processing information or post-processing work information is input through the performance processing business or post-processing business UI and the results processing or post-processing execution event is input, the material base searched in the DB group Create new material performance information or new material post-processing information including material identification information and performance processing job information or post-processing job information included in the information, and store the information of the DB group using the generated information. It is desirable to update it.
In this case, it is preferable that the performance processing work information includes a working group, a work history, and a work schedule.
Meanwhile, the post-processing job information preferably includes post-processing job identification information, post-processing job sequence, and job schedule.
When the post-processing job information is input through the post-processing task UI and a post-processing execution event is input, the application module extracts material identification information included in the basic material information searched in the DB group. After generating new material post-processing information including the extracted material identification information and post-processing work information, the existing material post-processing information containing the same material identification information as the material identification information included in the new material post-processing information is recalled. It is determined whether or not exist in the DB group, if the existing material post-processing information does not exist in the DB group, the new material post-processing information is stored in the DB group, while the existing material post-processing information Is present in the DB group, the post-processing operation included in the existing material post-processing information Then the new information after the material contained in the information processing it is desirable to change the processing information.
The application module may provide a pop-up window for inputting information change / change cancellation event through the post-processing business UI when the existing material post-processing information exists in the DB group, and provides the post-processing business UI. When an information change event is inputted, the post-processing job information included in the existing material post-processing information is changed into post-processing job information included in the new material post-processing information, and the information is processed through the post-processing business UI. When a change cancellation event is input, it is preferable to maintain the existing material post-processing information without change.
In addition, when the existing material post-processing information exists in the DB group, the application module preferably displays the fact that the existing material post-processing information exists through the post-processing business UI.
In addition, when the existing material post-processing information exists in the DB group, the application program module may display material identification information included in the existing material post-processing information through the post-processing business UI.
The application module may provide a UI for inquiry task through a mobile terminal and provide the UI for inquiry task. When a query option is input through the query execution event and the query execution event is input, it is preferable to search for information satisfying the query option in the DB group and display the information through the UI for inquiry task.
Here, it is preferable that the inquiry option includes material identification information.
In addition, the inquiry option, it is preferable that the working group, the working date and the line identification information.
The material production management system according to the present invention, by reading a bar code or a QR (Quick Response) code on the material design drawings to obtain the material identification information, and further transfers the code reader for the acquired material identification information to the mobile terminal It is more preferable to comprise.
According to the material production management system according to the present invention, it is possible to build a convenient and efficient production management system by being able to process the production management work of materials required for ship construction in a mobile environment.
1 is a block diagram schematically showing the configuration of a material production management system according to a first embodiment of the present invention.
2 is a flow chart sequentially showing a material production management method according to a first embodiment of the present invention.
3 and 4 is a reference diagram for explaining a material production management method according to a first embodiment of the present invention.
5 is a flowchart sequentially showing a material production management method according to a second embodiment of the present invention.
6 is a reference diagram for explaining a material production management method according to a second embodiment of the present invention.
FIG. 7 is a flowchart sequentially illustrating a procedure of updating stored information of a third information DB in FIG. 5. FIG.
8 is a flowchart sequentially showing a material production management method according to a third embodiment of the present invention.
9 and 10 are reference views for explaining a material production management method according to a third embodiment of the present invention.
Hereinafter, with reference to the accompanying drawings will be described in detail with respect to materials production management system and method according to a preferred embodiment of the present invention.
Referring to FIG. 1, a material production management system according to a first embodiment of the present invention uses a
Here, the
As such, the
Meanwhile, the
The
When the
The
In addition, when the
For example, the main UI may include an input unit for inputting various task execution events, a display unit for displaying a variety of information, and the like. Here, the input unit may include a performance processing task, a post-processing task, a production process progress inquiry task, a product information inquiry task, a drawing inquiry task, and an input button for executing the device initialization. In addition, the display unit may include a notice display area for displaying various announcements provided from the
In addition, when the
In addition, when the user inputs the performance processing task execution event through the main UI, the
In addition, when the user inputs the material identification information of the material to be processed through the performance processing UI through the UI for performance processing business, the
Subsequently, when the user inputs the performance processing job information through the performance processing business UI and inputs the performance processing execution event, the
Specifically, when the user inputs the performance processing job information through the performance processing business UI and inputs the performance processing execution event, the
Thus, the
In addition, the
In addition, when the user inputs the search result initialization execution event through the performance processing UI, the
In addition, when the user inputs the post-processing task execution event through the main UI, the
In addition, when the user inputs the material identification information of the post-processing target material through the post-processing business UI, the
Subsequently, when the user inputs post-processing job information through the post-processing business UI and inputs post-processing execution event, the
Specifically, when the
Thus, the
At this time, the
In addition, when the existing material post-processing information exists in the
In addition, the
In addition, when the user inputs a production process progress inquiry task execution event through the main UI, the
In addition, the
In addition, when the user inputs a product information inquiry task execution event through the main UI, the
In addition, the
In addition, when the user inputs a device initialization execution event through the main UI, the
Meanwhile, the
Here, the material basic information may include material identification information, line identification information, block identification information, material design drawing identification information, material design drawing image, piece identification information, material size (eg, radius, etc.), and work series. And the like. Material performance information may include material identification information, working group, work history (process), production performance, work schedule and W / O date. The post-processing job information may include material identification information, post-processing job identification information, post-processing job schedule, post-processing job series and post-processing work place, and the like.
Meanwhile, the
When the
For example, when the
In addition, the
In the configuration as described above, the material production management method according to the first embodiment of the present invention with reference to Figure 2 as follows.
First, the
After the
The
In the above step S110, the
If the
After the above step S120, the
As illustrated in FIG. 3, the main UI in step S120 may include an input unit for inputting various task execution events, a display unit for displaying various information, and the like. Here, the input unit may include a performance processing task / post-processing task, production process status inquiry task, product information inquiry task, drawing inquiry task, and input button for executing the device initialization. In addition, the display unit includes a notice display area for displaying various announcements provided from the
After the above step S120, when the user inputs various work execution events through the main UI, the work UI corresponding to the input work execution events is provided through the
That is, after the above step S120, when the user inputs the performance processing task execution event through the main UI (S130), the
For example, the performance processing business UI in the above step S140 displays an input unit and an inquiry result for input of material identification information, performance processing job information, performance processing execution event, inquiry result initialization execution event, etc. of the material to be processed. It may be made including a display unit for. In this case, the input unit for inputting the material identification information and the performance processing job information of the performance target material may be implemented by, for example, a keyboard in the form of a pop-up window. In addition, the performance processing work information may include a working group, work history (process) and work schedule. Here, the work history (process) may be divided into input, cutting, assembly, welding, bending, finishing and inspection.
After the above step S140, the
The material identification information in step S160 may be input through the
After the above step S160, when the user inputs the search result initialization execution event through the performance processing business UI, the
After the above step S160, the
According to the success or failure of updating the stored information of the
Upon successful update of the stored information of the
On the other hand, after the above step S120, when the user inputs the device initialization execution event through the main UI, the
Alternatively, in the same configuration as that of the material production management system according to the first embodiment of the present invention, the material production management method according to the second embodiment of the present invention will be described with reference to FIG.
First, the
After the
The
In the above step S210, the
If the
After the above step S220, the
As illustrated in FIG. 3 in the first embodiment of the present invention, the main UI may include an input unit for inputting various task execution events, a display unit for displaying various information, and the like. Here, the input unit may include a performance processing task / post-processing task, production process status inquiry task, product information inquiry task, drawing inquiry task, and input button for executing the device initialization. In addition, the display unit includes a notice display area for displaying various announcements provided from the
After the above step S220, when the user inputs various work execution events through the main UI, the work UI corresponding to the input work execution event is provided through the
That is, after the above step S220, when the user inputs the post-processing task execution event through the main UI (S230), the
For example, as shown in FIG. 6, the UI for post-processing work in step S240 includes an input unit and an inquiry result for input of material identification information, post-processing job information, and post-processing execution event of a post-processing target material. It may be made including a display unit for displaying. In this case, the input unit for inputting the material identification information and the post-processing work information of the post-processing target material may be implemented using a keyboard in the form of a pop-up window. In addition, the post-processing job information may include post-processing job identification information, post-processing job series and job schedule. The post-processing job identification information may include pallets, piles, paintings, plating, and P / L identification information.
After the above step S240, when the user inputs the material identification information of the post-processing target material through the post-processing business UI (S250), the
The material identification information in step S260 may be input through the
After the above step S260, when the user inputs the post-processing job information through the post-processing work UI and inputs the post-processing execution event (S270), the
Referring to FIG. 7 in detail with reference to step S280, the
As a result of the checking through the above-described step S283, when the existing material post-processing information exists in the
That is, as a result of the check through the above-described step S283, when the existing material post-processing information exists in the
On the other hand, when the result of the check through the above-described step S283, if the existing material post-processing information does not exist in the
As a result of the checking through the above-described step S283, when the existing material post-processing information exists in the
According to the success or failure of updating the stored information of the
Upon successful update of the stored information of the
On the other hand, after the above step S220, when the user inputs the device initialization execution event through the main UI, the
Alternatively, in the same configuration as that of the material production management system according to the first embodiment of the present invention, the material production management method according to the third embodiment of the present invention will be described with reference to FIG. 8 as follows. .
First, when the
After the
The
In the above step S310, the
When the
After the above step S320, the
As illustrated in FIG. 3 in the first embodiment of the present invention, the main UI in the step S320 may include an input unit for inputting various task execution events and the like, and a display unit displaying various information. Here, the input unit may include a performance processing task / post-processing task, production process status inquiry task, product information inquiry task, drawing inquiry task, and input button for executing the device initialization. In addition, the display unit includes a notice display area for displaying various announcements provided from the
After the above step S320, when the user inputs various work execution events through the main UI, the work UI corresponding to the input work execution event is provided through the
That is, after the above step S320, when the user inputs the production process progress status / product information inquiry task execution event through the main UI (S330), the
For example, the production process progress status UI for the production process in step S340 as shown in Figure 9, the input unit for inputting the production process progress status query options and query execution events, and the display unit for displaying the query results, etc. It may be made, including. In this case, the production process progress status inquiry option may include a working group, work date and line identification information, etc. The input unit for inputting the production process progress status inquiry option may be implemented as a pop-up window type keyboard.
In addition, as shown in FIG. 10, the product information inquiry business UI in step S340 may include an input unit for inputting a product information inquiry option and an inquiry execution event and a display unit for displaying an inquiry result. have. In this case, the product information inquiry option may include material identification information and the like, and the input unit for inputting the product information inquiry option may be implemented using a keyboard in the form of a pop-up window. In addition, material identification information corresponding to the product information inquiry option may be input through the
After the above step S340, the user is in the production process progress / product information inquiry business UI Input the production process progress status / product information inquiry option, and if you enter the query execution event (S350), the
The production process progress status information at step S350 may include production performance by work group, work date, ship and work history.
In addition, the product information in step S350 may include material basic information, material performance processing information and material post-processing information, including the material identification information input as a product information inquiry option.
On the other hand, after the above step S320, when the user inputs the device initialization execution event through the main UI, the
Material production management system and method according to the present invention is not limited to the above-described embodiment can be carried out in a variety of changes within the scope allowed by the technical idea of the present invention.
10: code reader 20: mobile terminal
22: Application Module 30: DB Group
32: first information DB 34: second information DB
36: third information DB 40: server
50: communication network
Claims (14)
A mobile terminal equipped with an application program module for providing a user interface (UI) for managing the storage information of the DB group; And
And a server for determining whether to allow the application program module to access the stored information of the DB group.
The application module,
When the server requests access to the storage information of the DB group, and when the server allows access to the storage information of the DB group, a main UI is provided through a mobile terminal, and various tasks are executed through the main UI. When the event is input, the material production management system, characterized in that for providing a work UI corresponding to the input business execution event through the mobile terminal.
The application module,
Provides a UI for performance processing work or post-processing work through a mobile terminal, and if material identification information of a material for processing performance or post-processing is input through the UI for performance processing work or post-processing work, the input material identification information is inputted. Material production management system, characterized in that for displaying the basic material information included in the DB group through the performance processing business or post-processing business UI.
The application module,
When performance processing work information or post-processing work information is input through the performance processing work or post-processing work UI, and the performance processing or post-processing execution event is input, material identification information included in basic material information searched in the DB group And generating new material performance processing information or new material post-processing information including performance processing work information or post-processing work information, and updating the storage information of the DB group using the generated information. Management system.
The performance processing work information,
Material production management system comprising a working group, work history and work schedule.
The post-processing work information,
A material production management system comprising post-processing job identification information, post-processing job series and job schedules.
The application module,
When post-processing job information is input through the post-processing business UI and a post-processing execution event is input, material identification information included in the basic material information searched in the DB group is extracted, and the extracted material identification information and post-processing are extracted. After generating new material post-processing information including job information, check whether existing material post-processing information including the same material identification information as included in the new material post-processing information exists in the DB group. And if the existing material post-processing information does not exist in the DB group, the new material post-processing information is stored in the DB group while the existing material post-processing information exists in the DB group. The post-processing work information included in the existing post-processing information Material production management system, characterized in that for changing the post-processing work information contained in the beam.
The application module,
If the existing material post-processing information exists in the DB group, a pop-up window for inputting information change / change cancellation event is provided through the post-processing business UI, and when an information change event is input through the post-processing business UI, When the post-processing job information included in the existing post-processing information is changed into post-processing job information included in the new post-processing information, and an information change cancellation event is input through the post-processing business UI, the Material production management system characterized by maintaining the existing material post-processing information without modification.
The application module,
And when the existing material post-processing information exists in the DB group, displaying the existence of the existing material post-processing information through the post-processing business UI.
The application module,
And when the existing material post-processing information exists in the DB group, displaying material identification information included in the existing material post-processing information through the post-processing business UI.
The application module,
Providing a UI for inquiry work through a mobile terminal, the UI for inquiry work If a query option is input through the query execution event is input, the material production management system, characterized in that to search for information that satisfies the query option in the DB group to display through the UI for inquiry business.
The query option is
Material production management system comprising the material identification information.
The query option is
Material production management system comprising a working group, work date and line identification information.
Material production management system characterized in that it further comprises a code reader for reading the material identification information by reading a barcode or QR (Quick Response) code on the material design drawing, and transfers the obtained material identification information to the mobile terminal .
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020120037805A KR20130126775A (en) | 2012-04-12 | 2012-04-12 | System for managing material production |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020120037805A KR20130126775A (en) | 2012-04-12 | 2012-04-12 | System for managing material production |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20130126775A true KR20130126775A (en) | 2013-11-21 |
Family
ID=49854600
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020120037805A KR20130126775A (en) | 2012-04-12 | 2012-04-12 | System for managing material production |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20130126775A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101461356B1 (en) * | 2014-02-06 | 2014-11-13 | 조병모 | A mobile total management system, and its method |
KR101872933B1 (en) | 2017-11-29 | 2018-07-31 | 김재학 | Production management system |
KR20200126079A (en) | 2019-04-29 | 2020-11-06 | (주)알피네트웍스 | User customized production management service system for heat treatment facility |
KR20200126080A (en) | 2019-04-29 | 2020-11-06 | (주)알피네트웍스 | Production management service system capable of providng optimum management condition |
-
2012
- 2012-04-12 KR KR1020120037805A patent/KR20130126775A/en not_active Application Discontinuation
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101461356B1 (en) * | 2014-02-06 | 2014-11-13 | 조병모 | A mobile total management system, and its method |
WO2015119450A1 (en) * | 2014-02-06 | 2015-08-13 | 조병모 | Mobile total quality control management system for minimizing process delay and test and inspection failures and improving reliability, and method therefor |
KR101872933B1 (en) | 2017-11-29 | 2018-07-31 | 김재학 | Production management system |
KR20200126079A (en) | 2019-04-29 | 2020-11-06 | (주)알피네트웍스 | User customized production management service system for heat treatment facility |
KR20200126080A (en) | 2019-04-29 | 2020-11-06 | (주)알피네트웍스 | Production management service system capable of providng optimum management condition |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5850033B2 (en) | Field device management apparatus, device information display method, computer program, and recording medium | |
KR100846275B1 (en) | Web-based collaboration method and realtime collaboration system for re-organization, re-modeling, innovation of industry and embodiment the virtual manufacturing | |
JP6682223B2 (en) | Plan management system and plan management method | |
CN107111612A (en) | Dynamic load is for the predictive context ontology keyed in | |
CN102982396A (en) | General process modeling framework | |
CN107315393A (en) | Operation indicates system | |
WO2014200797A1 (en) | Systems and methods for operating and managing enterprise systems on a mobile electronic device | |
KR20130126775A (en) | System for managing material production | |
JP2016162178A (en) | Article management device | |
JP2017167701A (en) | Work support system | |
CN112703516A (en) | Reservation device, reservation method, and reservation system | |
KR102304781B1 (en) | Method for inspecting facility and user terminal performing the same | |
KR20220153993A (en) | Electronic device for design and sales for product based on oline to offline and method for operating thereof | |
JP2019099361A (en) | Parts Search Support System | |
CN109074614A (en) | Construction management device, construction management system and execution management method therefor | |
CN107219825A (en) | Self-contr ol | |
JP2020184267A (en) | Three-dimensional cad device and three-dimensional cad program | |
JP5922504B2 (en) | Information processing apparatus, information processing method, and program | |
JP6210108B2 (en) | Field device management apparatus, device information display method, computer program, and recording medium | |
CN110068351A (en) | Information processing equipment, information processing method and computer readable storage medium | |
KR102589260B1 (en) | Electronic device for enrollment of project and partner for projectand method for operating thereof | |
JP7365012B1 (en) | Management device, management system, management method, and program | |
KR20230149769A (en) | Electronic device for enrollment of project and partner for projectand method for operating thereof | |
JP7502140B2 (en) | Construction management system and construction management method | |
US20170270459A1 (en) | Device, System, and Method for Tracking Job Management |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
WITN | Withdrawal due to no request for examination |