KR20130119044A - 전력 계통 감시 및 제어시스템에서 고장전류 제어 방법 - Google Patents
전력 계통 감시 및 제어시스템에서 고장전류 제어 방법 Download PDFInfo
- Publication number
- KR20130119044A KR20130119044A KR1020120041880A KR20120041880A KR20130119044A KR 20130119044 A KR20130119044 A KR 20130119044A KR 1020120041880 A KR1020120041880 A KR 1020120041880A KR 20120041880 A KR20120041880 A KR 20120041880A KR 20130119044 A KR20130119044 A KR 20130119044A
- Authority
- KR
- South Korea
- Prior art keywords
- data
- fault current
- circuit breaker
- rated capacity
- fault
- Prior art date
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/327—Testing of circuit interrupters, switches or circuit-breakers
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/001—Methods to deal with contingencies, e.g. abnormalities, faults or failures
- H02J3/0012—Contingency detection
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R19/00—Arrangements for measuring currents or voltages or for indicating presence or sign thereof
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/327—Testing of circuit interrupters, switches or circuit-breakers
- G01R31/333—Testing of the switching capacity of high-voltage circuit-breakers ; Testing of breaking capacity or related variables, e.g. post arc current or transient recovery voltage
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2203/00—Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
- H02J2203/20—Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
- Y04S40/20—Information technology specific aspects, e.g. CAD, simulation, modelling, system security
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
본 발명은 차단기, 개폐기, 발전기, 송전선로, 변압기 등에 대한 정보를 데이터베이스로 구축하고 전력 에너지 생산, 전달, 소비에 대한 정보를 취득 및 제어하기 위한 시스템에서 정격용량 산정 및 고장전류 저감방법에 관한 것이다.
원격제어 시스템으로부터 데이터를 취득하는 단계, 상기 취득된 데이터와 데이터베이스에 기 저장된 데이터를 비교하는 단계, 상기 비교 결과에 따라 미취득된 데이터의 추정값을 연산하는 단계, 상기 연산된 추정값에 다라 고장 전류해석 또는 상정고장 해석을 수행하여 차단기의 정력용량을 산정하는 단계를 포함한다.
원격제어 시스템으로부터 데이터를 취득하는 단계, 상기 취득된 데이터와 데이터베이스에 기 저장된 데이터를 비교하는 단계, 상기 비교 결과에 따라 미취득된 데이터의 추정값을 연산하는 단계, 상기 연산된 추정값에 다라 고장 전류해석 또는 상정고장 해석을 수행하여 차단기의 정력용량을 산정하는 단계를 포함한다.
Description
본 발명은 차단기, 개폐기, 발전기, 송전선로, 변압기 등에 대한 정보를 데이터베이스로 구축하고 전력 에너지 생산, 전달, 소비에 대한 정보를 취득 및 제어하기 위한 시스템에서 정격용량 산정 및 고장전류 저감방법에 관한 것이다.
취득 데이터 및 제어 시스템(EMS, SCADA, AMI 등)을 구축하기 위해서는 하드웨어 RTU, 데이터베이스, 해석용 어플리케이션, 시스템 보안의 개발이 필수적이다. 특히, 국가 전력계통의 안정성과 경제성 확보를 위해 첨단 IT기술과 고급 전력계통 응용기술이 통합된 EMS는 천만 KW이상의 전력 계통 운영에 반드시 필요하며, 스마트 그리드의 요소기술이자 정보 집합체이다
전력계통 광역화, 대규모 발전설비 연계, 기상이변 등 실시가 계통운영 취약성은 가속화와 복잡화로 전통적인 방법에 의한 국가 송전망 운영과 검토는 한계에 이르렀다. 이러한 한계를 극복하고 시시각각 변화하는 전력 계통의 운전 상태를 반영하여 계통의 건전성을 평가하고 취약부분에 대한 대책을 수립하여 국가 송전망 운용에 있어서 필수적인 기능(상태 추정, 조류계산 등이다.
도 1은 종래의 데이터 취득 및 제어 시스템에서 고장전류 해석을 위한 동작 흐름도이다.
데이터 취득 시스템은 SCADA(Supervisor Control and Data Acquisition)와 발전소 및 변전소에 설치된 RTU(Remote Terminal Unit)로부터 아날로그 및 디지털의 실시간 데이터를 취득하고 상기 취득된 데이터는 실시간 데이터 베이스에 저장된다.(105단계)
실시간 데이터베이스에 저장된 데이터는 계통해석 데이터베이스로 이동하여 해석을 위한 물리적 노드 기반의 정보를 전기적 모선 기반으로 변경하여 토폴로지 해석을 수행한다.(110단계)
토폴로지 해석된 데이터는 현장 데이터 취득용 RTU, 모뎀, 통신장비의 오류로 인한 부정확한 데이터를 보정하고 미취득 자료의 추정값을 제공하기 위한 상태추정을 수행한다.(115단계)
임의의 계통에 의해 평형 및 불평형 사고를 가정하여 고장 점 및 그 외 모선 또는 선로에 기대되는 전아 및 전류를 계산하여 (120단계) 차단기의 정격 용량을 산정한다.(125단계)
상기 산정된 차단기의 정격 용량에 대하여 기 설정된 용량을 초과하였는지 판단하고,(130단계) 판단 결과에 따른 알람을 수행한다.(135단계)
상기와 같이 종래의 시스템에 설치된 취득 데이터 관리 및 제어 시스템은 고장전류 해석을 통해 차단기 정력용량을 선정하였으며 선정 결과에 따른 차단기 용량에 따른 알람을 발생하도록 하고 있다.
종래의 시스템은 설비 탈락, 차단기 동작 등에 따른 이벤트 발생에 대한 차단기의 정격용량을 산정할 수 없다. 또한 다양한 고장을 고려하여 정격용량을 산정할 수 없기 때문에 고장 발생시 이를 해결할 수 있는 권고 방안을 제안할 수 없다.
본 발명은 다양한 고장을 고려하여 차단기의 정격용량을 산정할 수 있도록 하기 위한 전력 계통 감시 및 제어시스템에서 고장전류 저감 방법을 제공한다.
또한 본 발명은 다양한 고장 발생을 고려하여 고장 발생의 원인 및 그에 따른 해결 방안을 용이하게 획득할 수 있도록 하기 위한 전력 계통 감시 및 제어시스템에서 고장전류 저감 방법을 제공한다.
본 발명이 일 실시 예에 따른 전력 계통 감시 및 제어시스템에서 고장전류 제어 방법은 원격 제어 시스템으로부터 데이터를 취득하는 단계, 상기 취득된 데이터와 데이터베이스에 기 저장된 데이터를 비교하는 단계, 상기 비교 결과에 따라 미취득된 데이터의 추정값을 연산하는 단계, 상기 연산된 추정값에 따라 고장 전류해석 또는 상정고장 해석을 수행하여 차단기의 정격용량을 산정하는 단계를 포함할 수 있다.
본 발명에 따르면, 취득 데이터 장치를 통해 취득된 데이터를 이용하여 고장전류 해석을 수행하고, 그에 따른 차단기의 정격용량을 산정하여 발생 가능한 고장들에 상정고장 및 고장전류 해석을 통해 고장용량을 저감할 수 있도록 하는 효과를 가지고 있다.
또한 본 발명은 발생 가능한 고장들에 해당하는 권고 방안을 선정하여 차단기의 보호협조를 고려하며 계전기의 동작값 설정을 용이하게 할 수 있는 효과를 가지고 있다.
도 1은 종래의 데이터 취득 및 제어 시스템에서 고장전류 해석을 위한 동작 흐름도이다.
도 2는 본 발명의 실시 예에 따른 차단기 정격용량 산정을 위한 동작 흐름도이다.
도 3은 본 발명의 실시 예에 따른 고장전류 저감을 위한 권고방안 선정 동작 흐름도이다.
도 2는 본 발명의 실시 예에 따른 차단기 정격용량 산정을 위한 동작 흐름도이다.
도 3은 본 발명의 실시 예에 따른 고장전류 저감을 위한 권고방안 선정 동작 흐름도이다.
이하 도면을 참조하여 본 발명의 실시 예를 상세히 설명한다.
도 2는 본 발명의 실시 예에 따른 차단기 정격용량 산정을 위한 동작 흐름도이다.
도 2를 참조하면, 데이터 취득 시스템은 상위 시스템인 SCADA, RTU, AMI등으로부터 아날로그 및 디지털 데이터를 취득하고 상기 취득된 데이터를 데이터베이스에 저장한다.(202단계)
시스템은 상기 저장된 취득데이터와 데이터베이스에 기 저장된 취득 데이터를 기초하여 물리적 기반의 시스템 정보로 구성한다.(204단계)
시스템은 상기 취득 데이터를 참조하여 상위 시스템에 연결된 장비의 오류로 인한 부정확한 측정데이터를 보정하고, 미취득된 데이터의 추정값을 연산한다.(206단계)
시스템은 상기 추정된 미취득 데이터의 추정값에 따라 고장전류해석을 통해(208단계) 차단기의 정격용량을 산정한다.(214단계)
시스템은 기 설정된 상정고장 리스트를 이용하여 개별 상정고장에 대한 해석을 수행한다.(210단계)
상기 해석된 상정고장에 대하여 시스템은 고장전류를 해석하고(212단계) 상기 고장전류에 따른 차단기 용량을 산정한다.(214단계)
시스템은 상기 계산된 차단기 정격용량이 설치된 차단기의 정격용량의 초과여부를 판단하고(216단계) 기준 정격용량이 초과된 경우 알람을 발생한다.(218단계) 시스템은 상2기 알람 발생 시 고장전류 해석에 다른 정격용량 초과에 대한 정보(save case)를 저장할 수 있다.(220단계)
도 3은 본 발명의 실시 예에 따른 고장전류 저감을 위한 권고방안 선정 동작 흐름도이다,
도 3을 참조하면, 시스템은 도 2에서 산출된 차단기 정격용량이 발생하면 상정고장 리스트 중 우선순위의 상정고장을 선택한다.(302단계) 즉, 기 설정된 상정고장 리스트 중 상정고장의 레벨이 설정된 경우 최상위의 상정고장 레벨을 가지는 상정고장을 선택할 수 있다.
시스템은 상기 선택된 우선순위의 상정고장에 대하여 상기 상정고장의 원인으로 작용하는 설비를 확인한다.(304단계) 시스템은 상기 우선순위의 상정고장을 포함하는 설비에 대한 파라미터 값을 조정하게 된다.(306단계)
반면 시스템은 상기 선택된 우선순위 상정고장에 따른 차단기 조합을 변경 조작을 수행한다. 즉, 시스템은 상기 선택된 상정고장에 따른 차단기의 조합 형태를 확인하고, 조합을 변경하고자 하는 차단기를 선택한다.(308단계) 시스템은 상기 선택된 차단기의 조합을 변경한다.(310단계)
시스템은 상기 파라미터 값이 조정된 상정고장을 포함하는 설비 및 조합이 변경된 차단기에 대한 토폴로지 해석(312단계) 및 조류 해석(314단계)를 수행한다.
상기 토폴로지 해석 및 조류 해석 결과에 따라 고장 전류 해석을 수행하고(316단계) 상기 고장전류해석을 통해 차단기의 정격용량을 산정한다.(318단계)
시스템은 상기 계산된 차단기의 정격용량이 설치된 차단기이 정격용량을 초과하였는지를 판단한다.(320단계) 시스템은 상기 차단기가 정격용량이 초과된 경우 상기 초과된 정격용량의 정보 및 해당 차단기의 상태 정보를 상기 차단기를 포함하는 시스템 및 모니터링 시스템으로 전송할 수 있다.(322단계)
이상의 설명은 본 발명의 기술 사상을 예시적으로 설명한 것에 불과한 것으로서, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자라면 본 발명의 본질적인 특성에서 벗어나지 않는 범위에서 다양한 수정 및 변형이 가능할 것이다.
따라서, 본 발명에 개시된 실시 예들은 본 발명의 기술 사상을 한정하기 위한 것이 아니라 설명하기 위한 것이고, 이러한 실시 예에 의하여 본 발명의 기술 사상의 범위가 한정되는 것은 아니다.
본 발명의 보호 범위는 아래의 청구범위에 의하여 해석되어야 하며, 그와 동등한 범위 내에 있는 모든 기술 사상은 본 발명의 권리범위에 포함되는 것으로 해석되어야 할 것이다.
Claims (6)
- 원격제어 시스템으로부터 데이터를 취득하는 단계;
상기 취득된 데이터와 데이터베이스에 기 저장된 데이터를 비교하는 단계;
상기 비교 결과에 따라 미취득된 데이터의 추정값을 연산하는 단계;
상기 연산된 추정값에 따라 고장 전류해석 또는 상정고장 해석을 수행하여 차단기의 정격용량을 산정하는 단계;를 포함하는
고장전류 제어 방법. - 제1항에 있어서,
상기 상정고장 해석을 수행하는 단계는
기 설정된 상정고장 리스트를 이용하여 개별 상정고장에 대한 해석을 수행하는 단계;
상기 해석된 상정고장에 대하여 시스템의 고장전류를 해석하는 단계;를 포함하는
고장전류 제어 방법. - 제1항에 있어서,
상기 산정된 차단기의 정격용량에 대하여 기 설정된 차단 정격용량 기준값을 초과하는 지를 판단하는 단계;
상기 산정된 차단기의 정격용량이 상기 기준값을 초과하면 알람을 발생하는 단계;를 더 포함하는
고장전류 제어 방법. - 제1항에 있어서,
상기 산정된 차단기의 정격용량 및 차단기의 상태 정보(savecase)를 데이터베이스화 하여 저장하는 단계;를 더 포함하는
고장전류 제어 방법. - 원격제어시스템으로부터 데이터를 취득하고 상기 취득된 데이터로부터 산정된 차단기의 정격용량을 기초하여 기 설정된 상정고장 리스트 중 우선순위의 상정고장을 선택하는 단계;
상기 선택된 상정고장에 따라 상기 상정고장의 원인 설비를 검색하는 단계;
상기 검색된 설비에 대한 파라미터값을 조정하거나 차단기의 조합을 변경하는 단계;
상기 파라미터값이 조정된 설비 또는 조합이 변경된 차단기에 대한 토폴로지 해석 및 조류해석을 수행하는 단계;
상기 토폴로지 해석 및 조류해석에 따른 고장전류를 산정하는 단계;를 포함하는
고장전류 제어 방법. - 제5항에 있어서,
상기 산정된 고장전류에 따라 차단기의 정격용량이 기 설정된 차단기 정격용량을 초과하였는지를 판단하는 단계;
상이 판단결과에 따른 정보를 포함하는 알람을 발생하는 단계;
상기 알람을 해당 원격제어시스템으로 전송하는 단계;를 더 포함하는
고장전류 제어 방법.
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020120041880A KR101667832B1 (ko) | 2012-04-23 | 2012-04-23 | 전력 계통 감시 및 제어시스템에서 고장전류 제어 방법 |
US13/856,388 US20130282317A1 (en) | 2012-04-23 | 2013-04-03 | Method of controlling fault current in system for monitoring and controlling power system |
CN201310143387.1A CN103376348B (zh) | 2012-04-23 | 2013-04-23 | 在用于监控电力系统的系统中控制故障电流的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020120041880A KR101667832B1 (ko) | 2012-04-23 | 2012-04-23 | 전력 계통 감시 및 제어시스템에서 고장전류 제어 방법 |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20130119044A true KR20130119044A (ko) | 2013-10-31 |
KR101667832B1 KR101667832B1 (ko) | 2016-10-20 |
Family
ID=49380904
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020120041880A KR101667832B1 (ko) | 2012-04-23 | 2012-04-23 | 전력 계통 감시 및 제어시스템에서 고장전류 제어 방법 |
Country Status (3)
Country | Link |
---|---|
US (1) | US20130282317A1 (ko) |
KR (1) | KR101667832B1 (ko) |
CN (1) | CN103376348B (ko) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20180032173A (ko) * | 2016-09-21 | 2018-03-29 | 주식회사 대흥기전 | Uvr 신호 기반의 화면 절환 기능을 제공하는 스마트폰 연동형 비상발전기 원격모니터링시스템 |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103915840B (zh) * | 2014-04-08 | 2016-01-20 | 国家电网公司 | 一种基于Givens正交增量行变换的大电网状态估计方法 |
CN104242774B (zh) * | 2014-09-17 | 2016-11-30 | 中国第一汽车股份有限公司 | 一种电机相电流预测与诊断方法 |
CN107451715A (zh) * | 2017-06-27 | 2017-12-08 | 国网浙江省电力公司温州供电公司 | 一种电网网格化运维管理系统制定方法及其应用终端 |
CN108256687B (zh) * | 2018-01-30 | 2024-07-26 | 中国电力科学研究院有限公司 | 一种基于大事件驱动的在线连锁故障分析方法及装置 |
CN109246215B (zh) * | 2018-09-10 | 2021-07-30 | 西门子电力自动化有限公司 | 用于获取电力系统中继电器的故障数据的方法与终端 |
CN109921515B (zh) * | 2019-03-12 | 2020-11-03 | 上海荷福人工智能科技(集团)有限公司 | 一种综合配电管理系统 |
CN111914404B (zh) * | 2020-07-09 | 2022-11-11 | 东南大学 | 一种基于实测数据的空调系统冷机性能曲线的获取方法 |
CN114362149B (zh) * | 2021-12-16 | 2024-04-16 | 广东电网有限责任公司 | 一种新能源发电承载力的评估方法、系统、设备和介质 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20020017390A (ko) * | 2000-08-30 | 2002-03-07 | 이승재 | 병행 2회선 송전선로상에서의 고장점 표정방법 및 장치 |
KR20050040394A (ko) * | 2003-10-28 | 2005-05-03 | 한국전력공사 | 차단기 적정 차단 용량 계산 방법 및 그 시스템 |
KR20060015150A (ko) * | 2004-08-13 | 2006-02-16 | 한국전력공사 | 상정고장 검토기준 수립 시스템 및 그 방법 |
Family Cites Families (33)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1466257A (en) * | 1973-10-04 | 1977-03-02 | Dorman Smith Switchgear Ltd | Electrical circuit breaker |
US3982158A (en) * | 1974-07-15 | 1976-09-21 | Hughes Aircraft Company | Power distribution control system |
US4335437A (en) * | 1980-04-15 | 1982-06-15 | Westinghouse Electric Corp. | Circuit interrupter with energy management functions |
US4767996A (en) * | 1986-01-20 | 1988-08-30 | Kabushiki Kaisha Toshiba | Fault current detection device for a D.C. network |
SE468691B (sv) * | 1991-06-26 | 1993-03-01 | Asea Brown Boveri | Metod foer att skapa en logisk beskrivning av en signal genom identifiering av dennas tillstaand samt en aendring av tillstaandet |
US5359711A (en) * | 1992-12-18 | 1994-10-25 | Vectra Technologies, Inc. | Determination of load flow in direct current electrical systems |
US5600526A (en) * | 1993-10-15 | 1997-02-04 | The Texas A & M University System | Load analysis system for fault detection |
JPH08315666A (ja) * | 1995-05-12 | 1996-11-29 | Mitsubishi Electric Corp | 遮断器および遮断装置 |
US5943204A (en) * | 1998-01-12 | 1999-08-24 | Eaton Coroporation | Electronic trip unit with dedicated override current sensor |
US6195243B1 (en) * | 1998-05-05 | 2001-02-27 | George Auther Spencer | Method and apparatus for adaptive configuration and control in a network of electronic circuit breakers |
US6313975B1 (en) * | 1998-05-08 | 2001-11-06 | Square D Company | Self-sourcing, isolated zone selective interlocking system for use with electronic trip circuit breakers |
JP4030217B2 (ja) * | 1999-03-12 | 2008-01-09 | トヨタ自動車株式会社 | 組電池の異常判定装置および異常判定方法 |
US6426634B1 (en) * | 1999-03-29 | 2002-07-30 | George A. Spencer | Circuit breaker with integrated self-test enhancements |
US6546342B1 (en) * | 2001-12-10 | 2003-04-08 | General Electric Company | Adaptive algorithm to prevent nuissance tripping |
US6892115B2 (en) * | 2002-02-25 | 2005-05-10 | General Electric Company | Method and apparatus for optimized centralized critical control architecture for switchgear and power equipment |
US20050135034A1 (en) * | 2003-12-19 | 2005-06-23 | Caterpillar, Inc. | Resettable circuit breaker |
JP2007028792A (ja) * | 2005-07-15 | 2007-02-01 | Yamatake Corp | コンバータ |
GB2435135B (en) * | 2006-02-11 | 2008-05-21 | Rolls Royce Plc | Fault current limiting within an electrical power network |
US8126685B2 (en) * | 2006-04-12 | 2012-02-28 | Edsa Micro Corporation | Automatic real-time optimization and intelligent control of electrical power distribution and transmission systems |
US7460929B2 (en) * | 2006-05-01 | 2008-12-02 | Agere Systems Inc. | Integrated current fault controller |
US7844440B2 (en) * | 2006-07-07 | 2010-11-30 | Edsa Micro Corporation | Systems and methods for real-time dynamic simulation of uninterruptible power supply solutions and their control logic systems |
US8229722B2 (en) * | 2007-05-16 | 2012-07-24 | Power Analytics Corporation | Electrical power system modeling, design, analysis, and reporting via a client-server application framework |
CN201069608Y (zh) * | 2007-08-03 | 2008-06-04 | 湖南省电力公司试验研究院 | 输电线路灾情监测系统 |
US8155943B2 (en) * | 2007-10-12 | 2012-04-10 | Power Analytics Corporation | Systems and methods for automatically converting CAD drawing files into intelligent objects with database connectivity for the design, analysis, and simulation of electrical power systems |
EP2304452A4 (en) * | 2008-04-14 | 2014-12-03 | Corp Nuvolt Inc | METHOD AND SYSTEM FOR DETECTING ELECTRICAL ANOMALIES |
US8892375B2 (en) * | 2008-05-09 | 2014-11-18 | Accenture Global Services Limited | Power grid outage and fault condition management |
JP4760869B2 (ja) * | 2008-07-11 | 2011-08-31 | パナソニック株式会社 | ガス遮断装置 |
CN101907663A (zh) * | 2009-06-03 | 2010-12-08 | 珠海市伊特高科技有限公司 | 用于变电站的在线监测系统 |
US20120022713A1 (en) * | 2010-01-14 | 2012-01-26 | Deaver Sr Brian J | Power Flow Simulation System, Method and Device |
CN101859409A (zh) * | 2010-05-25 | 2010-10-13 | 广西电网公司电力科学研究院 | 基于风险评估的输变电设备状态检修体系 |
US8817444B2 (en) * | 2010-06-04 | 2014-08-26 | Abb Technology Ag | Control arrangement |
US8798803B2 (en) * | 2011-06-28 | 2014-08-05 | General Electric Company | Control system for an electric power system |
CN102354174B (zh) * | 2011-07-30 | 2012-12-26 | 山东电力研究院 | 基于变电站移动式巡检装置的巡检系统及其巡检方法 |
-
2012
- 2012-04-23 KR KR1020120041880A patent/KR101667832B1/ko active IP Right Grant
-
2013
- 2013-04-03 US US13/856,388 patent/US20130282317A1/en not_active Abandoned
- 2013-04-23 CN CN201310143387.1A patent/CN103376348B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20020017390A (ko) * | 2000-08-30 | 2002-03-07 | 이승재 | 병행 2회선 송전선로상에서의 고장점 표정방법 및 장치 |
KR20050040394A (ko) * | 2003-10-28 | 2005-05-03 | 한국전력공사 | 차단기 적정 차단 용량 계산 방법 및 그 시스템 |
KR20060015150A (ko) * | 2004-08-13 | 2006-02-16 | 한국전력공사 | 상정고장 검토기준 수립 시스템 및 그 방법 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20180032173A (ko) * | 2016-09-21 | 2018-03-29 | 주식회사 대흥기전 | Uvr 신호 기반의 화면 절환 기능을 제공하는 스마트폰 연동형 비상발전기 원격모니터링시스템 |
Also Published As
Publication number | Publication date |
---|---|
CN103376348B (zh) | 2016-04-27 |
KR101667832B1 (ko) | 2016-10-20 |
US20130282317A1 (en) | 2013-10-24 |
CN103376348A (zh) | 2013-10-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR20130119044A (ko) | 전력 계통 감시 및 제어시스템에서 고장전류 제어 방법 | |
US10833507B2 (en) | Island detection and control of a microgrid | |
US10333301B2 (en) | Transient simulation modeling for dynamic remedial action schemes using real-time protection setting updates | |
US9021431B2 (en) | System and method for developing, deploying and implementing power system computer applications | |
US9383735B2 (en) | Distributed coordinated electric power delivery control system using component models | |
US9819227B2 (en) | State trajectory prediction in an electric power delivery system | |
KR101247088B1 (ko) | 스마트 배전 운영시스템의 보호기기 자동정정 장치 및 방법 | |
US20140104738A1 (en) | Coordinated high-impedance fault detection systems and methods | |
US10826324B2 (en) | Mitigation of gratuitous conditions on electric power delivery systems | |
US20130073108A1 (en) | System and method for real-time monitoring of power system | |
Lin et al. | Adaptive distance protection for microgrids | |
KR20220053551A (ko) | 전력 그리드의 전기 파라미터들을 결정하는 시스템 | |
Chromik et al. | What's under the hood? Improving SCADA security with process awareness | |
US10782328B2 (en) | Configuration of testing modes in substation devices | |
Daboul et al. | Testing protection relays based on IEC 61850 in substation automation systems | |
Lu et al. | Validation of real-time system model in western interconnection | |
Balakrishna et al. | Analysis on AMI system requirements for effective convergence of distribution automation and AMI systems | |
US11682890B2 (en) | Electronic protection device for electric power distribution grids | |
Chopade et al. | Novel Smart Grid and SCADA system interdependency networks for future's clean, sustainable and green energy | |
Arghandeh et al. | Synchronized measurements and their applications in distribution systems: An update | |
CN209786876U (zh) | 一种基于分层控制的交流微电网保护系统 | |
KR101759890B1 (ko) | 전력계통 부하 제어 시스템 및 방법 | |
Behera et al. | Developments in Wide-Area Monitoring for Major Renewables: Wind and Solar Energy | |
Yaghoobi | NOJA Power Intelligent Switchgear | |
Julie | Development of an IEC 61850 standard-based automation system for a distribution power network |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E90F | Notification of reason for final refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20191001 Year of fee payment: 4 |