KR20130112354A - Apparatus for interfacing project management tool and systems engineering tool - Google Patents

Apparatus for interfacing project management tool and systems engineering tool Download PDF

Info

Publication number
KR20130112354A
KR20130112354A KR1020120034655A KR20120034655A KR20130112354A KR 20130112354 A KR20130112354 A KR 20130112354A KR 1020120034655 A KR1020120034655 A KR 1020120034655A KR 20120034655 A KR20120034655 A KR 20120034655A KR 20130112354 A KR20130112354 A KR 20130112354A
Authority
KR
South Korea
Prior art keywords
tool
project management
system engineering
information
management tool
Prior art date
Application number
KR1020120034655A
Other languages
Korean (ko)
Other versions
KR101348608B1 (en
Inventor
한석윤
김주욱
박기준
이안호
정락교
Original Assignee
한국철도기술연구원
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국철도기술연구원 filed Critical 한국철도기술연구원
Priority to KR1020120034655A priority Critical patent/KR101348608B1/en
Publication of KR20130112354A publication Critical patent/KR20130112354A/en
Application granted granted Critical
Publication of KR101348608B1 publication Critical patent/KR101348608B1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/101Collaborative creation, e.g. joint development of products or services

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Game Theory and Decision Science (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PURPOSE: An interface device between a project management tool and a system engineering tool is provided to enable mutual examination between the project management tool and the system engineering tool about PM items. CONSTITUTION: When the inquiry on PM items transmitted from a project management tool is completed, SE data transfer is selected (S10). When the SE data transfer is selected, the issue information is stored in an interface data storage unit (S20). According to the batch schedule, a PM conversion unit generates a PM meta file and a PM share file about the issue information and stores the files into a share storage unit (S30, S40). According to the batch schedule in a system engineering tool, an SE conversion unit is automatically run every fifteen minutes. The SE conversion unit accesses a PM interface file, converts the file, and provides the converted file to the system engineering tool (S50). The issue information of the project management tool is stored and registered into an SE database by the system engineering tool so that the issue information managed in the project management tool can be inquired from the system engineering tool (S60). [Reference numerals] (AA) Start; (BB) End; (S10) Select the transmission of SE data; (S20) Store interface information; (S30) Execute a PM conversion unit; (S40) Generate a PM interface file; (S50) Execute an SE conversion unit; (S60) Register SE

Description

프로젝트관리 도구와 시스템엔지니어링 도구간 인터페이스 장치{APPARATUS FOR INTERFACING PROJECT MANAGEMENT TOOL AND SYSTEMS ENGINEERING TOOL}Interface device between project management tool and system engineering tool {APPARATUS FOR INTERFACING PROJECT MANAGEMENT TOOL AND SYSTEMS ENGINEERING TOOL}

본 발명은 프로젝트관리 도구와 시스템엔지니어링 도구간 인터페이스 장치에 관한 것으로서, 보다 상세하게는 프로젝트관리 도구와 시스템엔지니어링 도구에서 발생된 산출물 정보를 상호 공유할 수 있도록 변환하여 전송하고 등록할 수 있도록 하는 프로젝트관리 도구와 시스템엔지니어링 도구간 인터페이스 장치에 관한 것이다.
The present invention relates to an interface device between a project management tool and a system engineering tool, and more particularly, a project management to convert, transmit, and register output information generated by the project management tool and the system engineering tool to be shared. The interface device between the tool and the system engineering tool.

일반적으로 시스템 엔지니어링(SE ; Systems Engineering)은 조직이나 사회의 현상과 같이 인간, 물건, 정보, 기술, 시간과 같은 여러 요소가 복잡하게 조립되어 움직이는 시스템을 과학적으로 해명하고 그것을 유효하게 구성 및 조작하고자 발전하였다. In general, Systems Engineering (SE) seeks to scientifically explain and effectively construct and manipulate a moving system in which various elements such as humans, objects, information, technology, and time are complex, such as phenomena in an organization or society. Developed.

이러한 시스템 엔지니어링은 4가지 공통적인 요건을 가지고 있다. This system engineering has four common requirements.

첫번째는 전체적인 관점에서 시스템 하향(top-down) 분석과 상향(bottom-up) 통합 접근방법으로 이루어진다는 것이다. The first is a holistic approach to system top-down analysis and bottom-up integration.

두번째는 시스템 설계, 개발, 생산이나 건설, 분배, 운용, 유지 및 지원, 폐기 및 처분 등 모든 단계에 걸친 요구사항을 도출하고 이를 획득하고 운용하는 수명주기(life-cycle) 관점에서 다루어진다는 것이다.The second is addressed from the life-cycle perspective of deriving, acquiring and operating requirements at all stages of system design, development, production or construction, distribution, operation, maintenance and support, disposal and disposal. .

세번째는 특정설계목표와 적합한 설계기준을 제시하고 설계 프로세스에 보다 빨리 효과적인 방법으로 의사를 결정하고 분석할 수 있도록 미리 식별되어야 한다는 것이다. Third, it must be identified in advance so that specific design goals and appropriate design criteria can be presented and decisions can be analyzed and analyzed in a faster and more effective way in the design process.

네번째는 시스템 설계 및 개발 프로세스는 다분야(interdesciplinary) 협력활동을 통하여 요구하는 설계목표를 달성할 수 있다는 것이다. Fourth, the system design and development process can achieve the desired design goals through interdesciplinary collaboration.

이러한 시스템 엔지니어링은 최근에 들어 모델을 기반으로 하고 많은 시스템 엔지니어링 컴퓨터 도구를 활용하는 MBSE(Model Based Systems Engineering)으로 발전하고 있으며, 모델을 기반으로 한 획득, 모델링 및 시뮬레이션 그리고 동시공학과 통합제품 침 프로세스 개발 기법으로 제품개발 기간 단축과 비용절감 그리고 설계변경과 제품하자 발생을 감소해 오고 있다. This system engineering has recently evolved into Model Based Systems Engineering (MBSE), which is model-based and utilizes many system engineering computer tools, and has developed model-based acquisition, modeling and simulation, and concurrent engineering and integrated product needle processes. Techniques have shortened product development time, reduced costs, and reduced design changes and product defects.

한편, 프로젝트는 소정 기간 동안 여러 사람이 작업을 진행하여 어떤 결과물을 달성하는 것을 의미한다. 따라서, 이러한 프로젝트는 어떠한 세부 업무를 얼마큼의 기간 내에 완성해야 하는지, 예산은 얼마로 할 것인지, 세부 업무를 누가 담당하는 게 좋은지, 책임자는 누구로 할 것인지 등 세부 요건이 먼저 결정되고, 이러한 계획에 따라서 참여인력이 결정되고 참여인력에게 세부 업무가 분담되고, 기간 내에 참여인력이 세부 업무를 얼마나 잘 수행하고 있는 지 여부 등을 주간 또는 월간 업무보고 등을 통해서 관리된다. On the other hand, a project means that several people work for a certain period of time to achieve a certain result. Therefore, the detailed requirements of such a project are determined first, in what time frame, how much budget should be completed, who should be in charge of the details, and who will be in charge? Therefore, the participant is determined, the detailed work is divided among the participant, and how well the participant is performing the detailed work within the period is managed through weekly or monthly work reports.

그러나, 프로젝트의 참여인력이 많거나 참여인력의 산출물이 방대한 경우에 관리의 허점을 항상 가질 뿐만 아니라 객관적으로 프로젝트가 얼마나 진행되고 있는지를 명확하게 알 수 없으며, 많은 참여인력 사이에 원활하게 의사소통이 되지 않거나, 어느 한 사람이 자기에게 주어진 업무과제를 제대로 수행하지 못하면, 전체적으로 프로젝트수행 기간을 맞추지 못하는 등 프로젝트를 완성하기 위해서 업무 및 참여인력이 정해졌지만, 프로젝트를 수행하는 과정에서 예상치 못한 새로운 문제가 발생하여, 새로운 업무가 추가되거나 참여인력의 변경 또는 새로운 참여인력의 추가가 필요한 경우에 이러한 변경, 수정 등이 원활하게 수행되지 못하고 시간적, 공간적으로 낭비가 일어나는 문제점이 있다. However, when there are a large number of participants in the project or the output of the participants is not only a loophole in management, but also it is not clear how objectively the project is going. If no one is able to perform the task assigned to him or her, the task and participant have been assigned to complete the project. When a new task is added or when a change of participant is required or a new participant is required, such a change, modification, etc. are not smoothly performed and there is a problem in that time and space are wasted.

따라서 이러한 문제점들을 해결하기 위해 프로젝트 전반에 걸친 관리를 통합적으로 수행하는 프로젝트관리 도구가 구축되어 보고자료 및 다양한 결과물을 관리하여 프로젝트를 원활하게 수행할 수 있도록 함으로써 프로젝트 전체의 신뢰성을 높이도록 하고 있다. Therefore, in order to solve these problems, a project management tool that integrates the management of the entire project is established to manage the report materials and various outputs so that the project can be executed smoothly, thereby increasing the overall reliability of the project.

관련 선행기술로는 대한민국 공개특허 10-2011-0003126호(2011.01.11.) "액티비티 프로젝트 관리시스템을 이용한 프로젝트 관리방법"이 있다.
Related prior art is Korean Patent Publication No. 10-2011-0003126 (2011.01.11.) "Project management method using the activity project management system".

대형 사업을 효율적으로 수행하기 위한 과학적 관리방법으로 시스템엔지니어링과 프로젝트관리 기법이 사용되고 있으나, 현재의 사업환경은 날로 복잡해 지고 첨단화 되고 있어서 활용되는 과학적 관리기법에서 발생하는 방대한 자료를 효율적으로 공유하고 관리하는 수단에 현실적으로 많은 애로를 겪고 있다. Although system engineering and project management techniques are used as the scientific management methods for efficiently carrying out large-scale projects, the current business environment is becoming more complex and sophisticated, so it is possible to efficiently share and manage the vast amount of data generated by the scientific management techniques used. Sudan suffers a lot in reality.

특히, 경량전철사업현장에서는 프로젝트관리에서 발생한 정보와 시스템엔지니어링에서 발생하는 정보를 각각 별도로 관리하거나 수동적인 방법으로 한 곳의 자료보관시스템에 보관하여 자료간의 추적성 또는 자료간 연계활용이 매우 어려운 구조로 되어 있어서 이의 통합 연계의 필요성이 증가하고 있다. Particularly, in the light rail project site, information generated from project management and system engineering are managed separately or stored in one data storage system by manual method, making it very difficult to use traceability or linkage between data. Increasingly, there is an increasing need for integrated integration.

본 발명은 상기와 같은 필요성에 따라 창작된 것으로서, 프로젝트관리(PM ; Project Management) 도구에서 관리되는 PM(Project Management) 항목에 대해 시스템엔지니어링(SE ; Systems Engineering) 도구로 전송하여 확인할 수 있도록 할 뿐만 아니라 시스템엔지니어링 도구에서 관리되는 SE(Systems Engineering) 항목에 대해 프로젝트관리 도구에서 확인할 수 있도록 상호 변환하여 전송하고 등록할 수 있도록 한 프로젝트관리 도구와 시스템엔지니어링 도구간 인터페이스 장치를 제공하는데 그 목적이 있다.
The present invention was created in accordance with the necessity as described above, and can be transmitted to the Systems Engineering (SE) tool for the PM (Project Management) item managed by the Project Management (PM) tool. It aims to provide an interface device between the project management tool and the system engineering tool that can convert and transfer the SE (Systems Engineering) items managed by the system engineering tool so that the project management tool can be converted and registered.

본 발명의 일 측면에 따른 프로젝트관리 도구와 시스템엔지니어링 도구간 인터페이스 장치는 프로젝트관리 도구와 시스템엔지니어링 도구간 공유되는 산출물에 대해 상호 공유할 수 있는 PM(Project Management) 인터페이스 파일 및 SE(Systems Engineering) 인터페이스 파일로 저장하는 공유저장부; 프로젝트관리 도구에서 관리되는 PM항목에 대해 시스템엔지니어링 도구에서 조회할 수 있도록 PM 인터페이스 파일로 변환하여 공유저장부에 저장하고, 공유저장부에 저장된 SE 인터페이스 파일을 변환하여 프로젝트관리 도구로 제공하는 PM변환부; 및 시스템엔지니어링 도구에서 관리되는 SE항목에 대해 프로젝트관리 도구에서 조회할 수 있도록 SE 인터페이스 파일로 변환하여 공유저장부에 저장하고, 공유저장부에 저장된 PM 인터페이스 파일을 변환하여 시스템엔지니어링 도구로 제공하는 SE변환부를 포함하는 것을 특징으로 한다. The interface device between the project management tool and the system engineering tool according to an aspect of the present invention is a PM (Project Management) interface file and a SE (Systems Engineering) interface that can be mutually shared about the outputs shared between the project management tool and the system engineering tool. Shared storage unit for storing as a file; PM conversion managed by the project management tool to convert the PM interface file into the shared storage so that it can be viewed by the system engineering tool. part; SE, which is managed by the system engineering tool, is converted into SE interface file and stored in the shared storage so that the project management tool can be searched, and the PM interface file stored in the shared storage is converted and provided as the system engineering tool. It characterized in that it comprises a conversion unit.

본 발명에서 PM 인터페이스 파일은 프로젝트관리 도구에서 시스템엔지니어링 도구로 인터페이스하기 위한 PM항목에 대해 각각 할당되는 PM 메타파일과 PM 공유파일인 것을 특징으로 한다. In the present invention, the PM interface file is a PM metafile and a PM shared file, which are allocated to PM items for interfacing from the project management tool to the system engineering tool.

본 발명에서 SE 인터페이스 파일은 시스템엔지니어링 도구에서 프로젝트관리 도구로 인터페이스하기 위한 SE항목에 대해 각각 할당되는 SE 메타파일과 SE 공유파일인 것을 특징으로 한다. In the present invention, the SE interface file is an SE metafile and an SE shared file, which are allocated to SE items for interfacing from the system engineering tool to the project management tool.

본 발명에서 PM항목은 SEMS(Systems Engineering Master Schedule)정보, SEDS(Systems Engineering Detailed Schedule)정보, 이슈정보, 회의록정보 및 문서정보 중 어느 하나 이상을 포함하는 것을 특징으로 한다. In the present invention, the PM item is characterized in that it includes any one or more of SEMS (Systems Engineering Master Schedule) information, SEDS (Systems Engineering Detailed Schedule) information, issue information, meeting minutes information and document information.

본 발명에서 SE항목은 자료보고정보, 요구사항정보, 이슈정보, 리스크정보, 용어정보 중 어느 하나 이상을 포함하는 것을 특징으로 한다. In the present invention, the SE item is characterized in that it includes any one or more of the data reporting information, requirements information, issue information, risk information, terminology information.

본 발명에서 PM변환부는 프로젝트관리 도구에서 시스템엔지니어링 도구로의 전송이 선택된 PM항목에 대해 설정된 주기 단위로 실행되어 변환 및 전송하고 전송결과를 기록하는 것을 특징으로 한다. In the present invention, the PM conversion unit is characterized in that the transmission from the project management tool to the system engineering tool is executed in the unit of the set period for the selected PM item is converted and transmitted and records the transmission result.

본 발명에서 프로젝트관리 도구에서 시스템엔지니어링 도구로의 전송이 선택된 PM항목을 저장하는 인터페이스정보 저장부를 더 포함하는 것을 특징으로 한다. In the present invention, characterized in that it further comprises an interface information storage unit for storing the PM item selected for transmission from the project management tool to the system engineering tool.

본 발명에서 SE변환부는 시스템엔지니어링 도구에서 프로젝트관리 도구로 전송할 전송대상이 전송되지 않은 경우 설정된 주기 단위로 실행되어 변환 및 전송하고 전송결과를 기록하는 것을 특징으로 한다.
In the present invention, the SE conversion unit is executed in a set cycle unit when the transmission target to be transmitted from the system engineering tool to the project management tool is characterized in that the conversion and transmission and recording the transmission result.

본 발명은 프로젝트관리 도구에서 관리되는 PM 항목에 대해 시스템엔지니어링 도구로 전송하여 확인할 수 있도록 할 뿐만 아니라 시스템엔지니어링 도구에서 관리되는 SE 항목에 대해 프로젝트관리 도구에서 확인할 수 있도록 상호 변환하여 전송하고 등록할 수 있도록 함으로써 과학적 관리를 위한 서로 다른 시스템에서 발생되는 산출물들을 효과적으로 공유하고 정보를 교환하여 대형 사업을 효율적으로 관리할 수 있도록 한다.
The present invention not only can transmit and check PM items managed by the project management tool to the system engineering tool, but also converts and transmits and registers each other so that the project management tool can check the SE items managed by the system engineering tool. By effectively sharing outputs and exchanging information from different systems for scientific management, it is possible to efficiently manage large projects.

도 1은 본 발명의 일 실시예에 따른 프로젝트관리 도구와 시스템엔지니어링 도구간 인터페이스 장치를 나타낸 블록구성도이다.
도 2는 본 발명의 일 실시예에 따른 프로젝트관리 도구와 시스템엔지니어링 도구간 인터페이스 장치의 동작을 설명하기 위한 흐름도이다.
도 3은 본 발명의 일 실시예에 따른 프로젝트관리 도구와 시스템엔지니어링 도구간 인터페이스 장치의 프로젝트관리 도구에서의 이슈정보 화면이다.
도 4는 본 발명의 일 실시예에 따른 프로젝트관리 도구와 시스템엔지니어링 도구간 인터페이스 장치의 인터페이스정보 저장부의 저장상태를 나타낸 화면이다.
도 5는 본 발명의 일 실시예에 따른 프로젝트관리 도구와 시스템엔지니어링 도구간 인터페이스 장치의 프로젝트관리 도구에서 제공되는 배치 스케줄 관리 화면이다.
도 6은 본 발명의 일 실시예에 따른 프로젝트관리 도구와 시스템엔지니어링 도구간 인터페이스 장치의 PM 인터페이스 파일을 생성 상태를 나타낸 화면이다.
도 7은 본 발명의 일 실시예에 따른 프로젝트관리 도구와 시스템엔지니어링 도구간 인터페이스 장치의 시스템엔지니어링 도구에서 등록된 이슈정보를 나타낸 화면이다.
1 is a block diagram illustrating an interface device between a project management tool and a system engineering tool according to an exemplary embodiment of the present invention.
2 is a flowchart illustrating an operation of an interface device between a project management tool and a system engineering tool according to an embodiment of the present invention.
3 is an issue information screen of the project management tool of the interface device between the project management tool and the system engineering tool according to an embodiment of the present invention.
4 is a screen illustrating a storage state of an interface information storage unit of an interface device between a project management tool and a system engineering tool according to an exemplary embodiment of the present invention.
5 is a batch schedule management screen provided in a project management tool of an interface device between a project management tool and a system engineering tool according to an embodiment of the present invention.
6 is a screen illustrating a generation state of a PM interface file of an interface device between a project management tool and a system engineering tool according to an exemplary embodiment of the present invention.
7 is a screen illustrating issue information registered in a system engineering tool of an interface device between a project management tool and a system engineering tool according to an embodiment of the present invention.

이하, 첨부된 도면을 참조하여 본 발명에 따른 프로젝트관리 도구와 시스템엔지니어링 도구간 인터페이스 장치의 일 실시예를 설명한다. 이 과정에서 도면에 도시된 선들의 두께나 구성요소의 크기 등은 설명의 명료성과 편의상 과장되게 도시되어 있을 수 있다. 또한, 후술되는 용어들은 본 발명에서의 기능을 고려하여 정의된 용어들로서 이는 사용자, 운용자의 의도 또는 관례에 따라 달라질 수 있다. 그러므로, 이러한 용어들에 대한 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 할 것이다.Hereinafter, an embodiment of an interface device between a project management tool and a system engineering tool according to the present invention will be described with reference to the accompanying drawings. In this process, the thicknesses of the lines and the sizes of the components shown in the drawings may be exaggerated for clarity and convenience of explanation. In addition, the terms described below are defined in consideration of the functions of the present invention, which may vary depending on the intention or custom of the user, the operator. Therefore, definitions of these terms should be made based on the contents throughout this specification.

도 1은 본 발명의 일 실시예에 따른 프로젝트관리 도구와 시스템엔지니어링 도구간 인터페이스 장치를 나타낸 블록구성도이다. 1 is a block diagram illustrating an interface device between a project management tool and a system engineering tool according to an exemplary embodiment of the present invention.

도 1에 도시된 바와 같이 본 발명의 일 실시예에 따른 프로젝트관리(PM ; Project Management) 도구와 시스템엔지니어링(SE ; Systems Engineering) 도구간 인터페이스 장치는 공유저장부(40), PM변환부(20) 및 SE변환부(50)를 포함한다. As shown in FIG. 1, an interface device between a Project Management (PM) tool and a Systems Engineering (SE) tool according to an embodiment of the present invention includes a shared storage unit 40 and a PM conversion unit 20. ) And the SE conversion unit 50.

공유저장부(40)는 프로젝트관리 도구(10)와 시스템엔지니어링 도구(60)간 공유되는 산출물에 대해 상호 공유할 수 있는 PM(Project Management) 인터페이스 파일 및 SE(Systems Engineering) 인터페이스 파일로 저장한다. The shared storage unit 40 stores the shared output between the project management tool 10 and the system engineering tool 60 as a PM (Project Management) interface file and a SE (Systems Engineering) interface file.

PM(Project Management) 인터페이스 파일은 프로젝트관리 도구(10)에서 시스템엔지니어링 도구(60)로 인터페이스하기 위한 프로젝트관리 도구(10)에서 관리되는 PM항목에 대해 각각 할당되는 PM 메타파일과 PM 공유파일이다. The PM (Project Management) interface file is a PM metafile and a PM shared file which are allocated to PM items managed by the project management tool 10 for interfacing from the project management tool 10 to the system engineering tool 60.

PM항목은 SEMS(Systems Engineering Master Schedule)정보, SEDS(Systems Engineering Detailed Schedule)정보, 이슈정보(Issure), 회의록정보(Meeting) 및 문서정보(Document)로써 PM 메타파일과 PM 공유파일은 표 1에 나타낸 바와 같이 정의된다. The PM items are SEMS (Systems Engineering Master Schedule) information, SEDS (Systems Engineering Detailed Schedule) information, issue information (Issure), meeting minutes information (Meeting) and document information (Document). It is defined as shown.

표 1에 나타낸 바와 같이 PM 메타파일은 연계대상의 이름을 갖는 csv(Comma separated values) 파일로 정의되고, PM 공유파일은 PM 공유폴더에 저장된다. As shown in Table 1, the PM metafile is defined as a csv (Comma separated values) file having the name of the association object, and the PM shared file is stored in the PM shared folder.

대상object 전송
단위
send
unit
PM 메타파일PM metafile PM
공유파일
PM
Shared file
PM 공유파일
폴더명
PM shared file
Folder name
SE
연계정보
SE
Linked Information
SEMSSEMS 프로젝트project EP_SEMS.csvEP_SEMS.csv ×× SEMSSEMS SEDSSEDS 프로젝트project EP_SEDS.csvEP_SEDS.csv EXF_SEDSEXF_SEDS SEDSSEDS 문서document 건별Case by case EP_Document.csvEP_Document.csv EXF_DocumentEXF_Document DocumentDocument 이슈issue 건별Case by case EP_Issue.csvEP_Issue.csv EXF_IssueEXF_Issue IssueIssue 회의록meeting log 건별Case by case EP_Meeting.csvEP_Meeting.csv EXF_MeetingEXF_Meeting proceedingproceeding

이때 SEMS정보와 SEDS정보는 경량전철사업의 시스템엔지니어링 활동을 위해 시스템엔지니어링 관리계획(SEMP)에 상세일정에 관한 사항을 정의하며, 정의된 상세일정에 따라 시스템엔지니어링 활동을 관리하는 정보로써 프로젝트 단위로 전송되고, 문서정보, 이슈정보, 회의록정보는 건별로 전송된다. At this time, SEMS information and SEDS information define the detailed schedule in the System Engineering Management Plan (SEMP) for the system engineering activities of the light railroad project and manage the system engineering activities according to the defined detailed schedule. The document information, the issue information, and the minutes information are transmitted on a case-by-case basis.

회의록정보는 프로젝트관리 도구(10)에서 배포처리된 회의록을 대상으로 전송되고, 이슈정보는 프로젝트관리 도구(10)에서 완료처리된 이슈를 대상으로 전송된다. Minutes information is sent to the meeting minutes distributed in the project management tool 10, the issue information is sent to the subjects processed in the project management tool (10).

SE(Systems Engineering) 인터페이스 파일은 시스템엔지니어링 도구(60)에서 프로젝트관리 도구(10)로 인터페이스하기 위한 시스템엔지니어링 도구(60)에서 관리되는 SE항목에 대해 각각 할당되는 SE 메타파일과 SE 공유파일이다. The SE (Systems Engineering) interface file is an SE metafile and an SE shared file which are allocated to SE items managed by the system engineering tool 60 for interfacing from the system engineering tool 60 to the project management tool 10.

SE항목은 자료보고정보(Document), 요구사항정보(Requirement), 이슈정보(Issue), 리스크정보(Risk), 용어정보(DefinedTerm)로써 SE 메타파일과 SE 공유파일은 표 2에 나타낸 바와 같이 정의된다. SE items are documented report information, requirements information, issues information, risk information, risk information, and term information defined terms. The SE metafile and SE shared file are defined as shown in Table 2. do.

표 2에 나타낸 바와 같이 SE 메타파일은 연계대상의 이름을 갖는 csv(Comma separated values) 파일로 정의되고, SE 공유파일은 SE 공유폴더에 저장된다. As shown in Table 2, the SE metafile is defined as a csv (Comma separated values) file with the name of the association object, and the SE shared file is stored in the SE shared folder.

대상object 전송
단위
send
unit
SE 메타파일SE metafile SE
공유파일
SE
Shared file
SE 공유파일
폴더명
SE shared file
Folder name
PM
연계정보
PM
Linked Information
DocumentDocument 건별Case by case SE_Document.csvSE_Document.csv EXF_DocumentEXF_Document 자료보고Report RequirementRequirement 건별Case by case SE_Requirement.csvSE_Requirement.csv EXF_RequirementEXF_Requirement 요구사항Requirements IssueIssue 건별Case by case SE_Issue.csvSE_Issue.csv EXF_IssueEXF_Issue 이슈관리Issue Management RiskRisk 건별Case by case SE_Risk.csvSE_Risk.csv EXF_RiskEXF_Risk 이슈관리Issue Management DefinedTermDefinedTerm 건별Case by case SE_DefinedTerm.csvSE_DefinedTerm.csv EXF_DefinedTermEXF_DefinedTerm 용어집Glossary

자료보고정보는 시스템엔지니어링 도구(60)에서 문서정보를 결재하기 위해 전송하고 프로젝트관리 도구(10)에서 결재기능에 의해 승인된 문서의 경우는 승인결과가 다시 시스템엔지니어링 도구(60)로 전송되며, 건별로 전송된다. The data report information is transmitted to the system engineering tool 60 for payment of document information, and in the case of documents approved by the payment function in the project management tool 10, the approval result is transmitted to the system engineering tool 60 again. It is sent on a case-by-case basis.

PM변환부(20)는 프로젝트관리 도구(10)에서 관리되는 PM항목에 대해 시스템엔지니어링 도구(60)에서 조회할 수 있도록 PM 인터페이스 파일로 변환하여 공유저장부(40)에 저장하고, 공유저장부(40)에 저장된 SE 인터페이스 파일을 변환하여 프로젝트관리 도구(10)로 제공함으로써 프로젝트관리 도구(10)에서 SE항목을 PM 데이터베이스(15)에 저장하도록 한다. The PM conversion unit 20 converts the PM interface file so that the system engineering tool 60 can be inquired about the PM items managed by the project management tool 10, and stores them in the shared storage unit 40 and stores the shared storage unit 40. By converting the SE interface file stored in the (40) and provided to the project management tool 10, the project management tool 10 to store the SE item in the PM database (15).

인터페이스정보 저장부(30)는 프로젝트관리 도구(10)에서 시스템엔지니어링 도구(60)로의 전송이 선택된 PM항목을 저장한다. The interface information storage unit 30 stores the PM item selected for transmission from the project management tool 10 to the system engineering tool 60.

PM변환부(20)는 설정된 주기로 자동 배치 스케줄이 실행되어 인터페이스정보 저장부(30)에 저장된 PM항목을 변환하여 PM 메타파일과 PM 공유파일을 생성하여 공유저장부(40)에 저장하고 전송결과를 기록한다. The PM converting unit 20 executes an automatic batch schedule at a set cycle to convert PM items stored in the interface information storage unit 30 to generate PM metafiles and PM shared files, and store them in the shared storage unit 40. Record it.

SE변환부(50)는 시스템엔지니어링 도구(60)에서 관리되는 SE항목에 대해 프로젝트관리 도구(10)에서 조회할 수 있도록 SE 인터페이스 파일로 변환하여 공유저장부(40)에 저장하고, 공유저장부(40)에 저장된 PM 인터페이스 파일을 변환하여 시스템엔지니어링 도구(60)로 제공함으로써 시스템엔지니어링 도구(60)에서 PM항목을 SE 데이터베이스(65)에 저장하도록 한다. The SE conversion unit 50 converts the SE interface file so that the project management tool 10 can be inquired about the SE items managed by the system engineering tool 60, and stores them in the shared storage unit 40, and stores the shared storage unit. By converting the PM interface file stored in (40) and providing it to the system engineering tool (60), the system engineering tool (60) stores PM items in the SE database (65).

SE변환부(50)는 설정된 주기로 자동 배치 스크립트가 실행되어 시스템엔지니어링 도구(60)에서 프로젝트관리 도구(10)로 전송할 SE항목이 전송대상이 전송되지 않은 경우 변환하여 SE 메타파일과 SE 공유파일을 생성하여 공유저장부(40)에 저장한 후 전송결과를 기록한다. The SE conversion unit 50 executes an automatic batch script at a set cycle, and converts the SE items to be transmitted from the system engineering tool 60 to the project management tool 10 when the transmission target is not transferred to convert the SE metafile and the SE shared file. After generating and storing in the shared storage unit 40 records the transmission result.

도 2는 본 발명의 일 실시예에 따른 프로젝트관리 도구와 시스템엔지니어링 도구간 인터페이스 장치의 동작을 설명하기 위한 흐름도이고, 도 3은 프로젝트관리 도구에서의 이슈정보 화면이며, 도 4는 인터페이스정보 저장부의 저장상태를 나타낸 화면이고, 도 5는 프로젝트관리 도구에서 제공되는 배치 스케줄 관리 화면이며, 도 6은 PM 인터페이스 파일을 생성 상태를 나타낸 화면이고, 도 7은 시스템엔지니어링 도구에서 등록된 이슈정보를 나타낸 화면이다. 2 is a flowchart illustrating an operation of an interface device between a project management tool and a system engineering tool according to an embodiment of the present invention, FIG. 3 is an issue information screen of the project management tool, and FIG. 4 is an interface information storage unit. 5 is a screen showing a storage state, FIG. 5 is a batch schedule management screen provided by a project management tool, FIG. 6 is a screen showing a state of generating a PM interface file, and FIG. 7 is a screen showing issue information registered by a system engineering tool. to be.

도 2내지 도 7에서는 프로젝트관리 도구에서 시스템엔지니어링 도구로의 전송을 예시로 설명한다. 2 to 7 illustrate the transmission from the project management tool to the system engineering tool by way of example.

먼저 프로젝트관리 도구(10)에서 전송한 PM항목을 조회하여 완료된 경우 시스템엔지니어링 도구(60)로의 전송 즉, SE자료전송을 선택한다(S10). First, when the PM items transmitted from the project management tool 10 are inquired, the transmission to the system engineering tool 60, that is, SE data transmission is selected (S10).

도 3은 프로젝트관리 도구(10)에서의 이슈정보 조회화면으로 이슈처리가 완료된 경우 SE자료전송을 선택하거나 전송된 이력을 조회할 수 있다. 3 is an issue information inquiry screen in the project management tool 10, when the issue processing is completed can select the SE data transmission or query the transmitted history.

이렇게 SE자료전송이 선택된 경우에는 이슈정보는 인터페이스정보 저장부(30)에 저장된다(S20). When the SE data transmission is selected in this way, the issue information is stored in the interface information storage unit 30 (S20).

도 4에 나타낸 바와 같이 자료전송을 선택함에 따라 해당 정보가 인터페이스정보 저장부(30)에 저장된 결과를 확인할 수 있다. As shown in FIG. 4, as the data transmission is selected, the corresponding information may be checked in the interface information storage unit 30.

이후 배치 스케줄에 따라 PM 변환부(20)에서 이슈정보에 대해 PM 메타파일과 PM 공유파일을 생성하여 공유저장부(40)에 저장한다(S30)(S40). Afterwards, according to the batch schedule, the PM converter 20 generates the PM metafile and the PM shared file with respect to the issue information and stores it in the shared storage 40 (S30) (S40).

도 5는 프로젝트관리 도구(10)에서 제공되는 배치 스케줄 관리화면으로 프로젝트관리 도구(10)에서 시스템엔지니어링 도구(60)로의 전송이 15분 간격으로 자동 실행되도록 스케줄 관리되고 있음을 볼 수 있다. 5 is a batch schedule management screen provided by the project management tool 10, it can be seen that the schedule management so that the transmission from the project management tool 10 to the system engineering tool 60 is automatically executed every 15 minutes.

이렇게 배치 스케줄에 따라 PM 변환부(20)에서 생성된 PM 메타파일과 PM 공유파일을 도 6에 나타낸 바와 같이 확인할 수 있다. As described above, the PM metafile and the PM shared file generated by the PM converter 20 may be checked according to the batch schedule.

예를 들어, 이슈정보인 경우 EP_Issue.csv의 PM 메타파일과, EXF_Issue의 PM 공유파일이 생성되었음을 확인할 수 있다. For example, in case of the issue information, it can be confirmed that the PM metafile of EP_Issue.csv and the PM shared file of EXF_Issue are generated.

이후 시스템엔지니어링 도구(60)에서의 배치 스케줄에 따라 15분 간격으로 SE 변환부(50)가 자동 실행되어 공유저장부(40)에 저장된 PM 인터페이스 파일에 억세스하여 이를 변환하고 시스템엔지니어링 도구(60)으로 제공한다(S50). Thereafter, the SE conversion unit 50 is automatically executed at intervals of 15 minutes according to the arrangement schedule of the system engineering tool 60 to access and convert the PM interface file stored in the shared storage unit 40, and to convert the system engineering tool 60. Provided by (S50).

이렇게 제공된 프로젝트관리 도구(10)의 이슈정보는 시스템엔지니어링 도구(60)에서 SE 데이터베이스(65)에 저장하여 등록함으로써 도 7에 나타낸 바와 같이 시스템엔지니어링 도구(60)에서 프로젝트관리 도구(10)에서 관리되는 이슈정보를 확인할 수 있다(S60). The issue information of the project management tool 10 provided as described above is stored and registered in the SE database 65 in the system engineering tool 60 and managed in the project management tool 10 in the system engineering tool 60 as shown in FIG. 7. The issue information can be confirmed (S60).

이와 같이 본 발명에 의한 프로젝트관리 도구와 시스템엔지니어링 도구간 인터페이스 장치에 따르면, 프로젝트관리 도구(10)에서 관리되는 PM 항목과 시스템엔지니어링 도구(60)에서 관리되는 SE 항목에 대해 상호 변환하여 전송하고 등록할 수 있도록 함으로써 과학적 관리를 위한 서로 다른 시스템에서 발생되는 산출물들을 효과적으로 공유하고 정보를 교환하여 대형 사업을 효율적으로 관리할 수 있도록 한다.
As described above, according to the interface device between the project management tool and the system engineering tool according to the present invention, the PM items managed by the project management tool 10 and the SE items managed by the system engineering tool 60 are mutually converted and transmitted and registered. It enables the effective management of large projects by effectively sharing and exchanging information of outputs from different systems for scientific management.

본 발명은 도면에 도시된 실시예를 참고로 하여 설명되었으나, 이는 예시적인 것에 불과하며, 당해 기술이 속하는 분야에서 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 타 실시예가 가능하다는 점을 이해할 것이다. 따라서 본 발명의 기술적 보호범위는 아래의 특허청구범위에 의해서 정하여져야 할 것이다.
While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it will be understood by those of ordinary skill in the art that various changes in form and details may be made therein without departing from the spirit and scope of the invention as defined by the appended claims. I will understand. Accordingly, the technical scope of the present invention should be defined by the following claims.

10 : 프로젝트관리 도구 15 : PM 데이터베이스
20 : PM 변환부 30 : 인터페이스정보 저장부
40 : 공유저장부 50 : SE 변환부
60 : 시스템엔지니어링 도구 65 : SE 데이터베이스
10: project management tool 15: PM database
20: PM conversion unit 30: interface information storage unit
40: shared storage unit 50: SE conversion unit
60: System Engineering Tools 65: SE Database

Claims (8)

프로젝트관리 도구와 시스템엔지니어링 도구간 공유되는 산출물에 대해 상호 공유할 수 있는 PM(Project Management) 인터페이스 파일 및 SE(Systems Engineering) 인터페이스 파일로 저장하는 공유저장부;
상기 프로젝트관리 도구에서 관리되는 PM항목에 대해 상기 시스템엔지니어링 도구에서 조회할 수 있도록 상기 PM 인터페이스 파일로 변환하여 상기 공유저장부에 저장하고, 상기 공유저장부에 저장된 상기 SE 인터페이스 파일을 변환하여 상기 프로젝트관리 도구로 제공하는 PM변환부; 및
상기 시스템엔지니어링 도구에서 관리되는 SE항목에 대해 상기 프로젝트관리 도구에서 조회할 수 있도록 상기 SE 인터페이스 파일로 변환하여 상기 공유저장부에 저장하고, 상기 공유저장부에 저장된 상기 PM 인터페이스 파일을 변환하여 상기 시스템엔지니어링 도구로 제공하는 SE변환부를 포함하는 것을 특징으로 하는 프로젝트관리 도구와 시스템엔지니어링 도구간 인터페이스 장치.
A shared storage unit for storing the outputs shared between the project management tool and the system engineering tool as a PM (Project Management) interface file and a Systems Engineering (SE) interface file that can be shared with each other;
The PM item managed by the project management tool is converted into the PM interface file to be viewed by the system engineering tool and stored in the shared storage, and the SE interface file stored in the shared storage is converted into the project. PM conversion unit provided by the management tool; And
The SE item managed by the system engineering tool is converted into the SE interface file to be viewed by the project management tool and stored in the shared storage, and the PM interface file stored in the shared storage is converted into the system. An interface device between a project management tool and a system engineering tool, comprising an SE conversion unit provided as an engineering tool.
제 1항에 있어서, 상기 PM 인터페이스 파일은 상기 프로젝트관리 도구에서 상기 시스템엔지니어링 도구로 인터페이스하기 위한 상기 PM항목에 대해 각각 할당되는 PM 메타파일과 PM 공유파일인 것을 특징으로 하는 프로젝트관리 도구와 시스템엔지니어링 도구간 인터페이스 장치.
The project management tool and system engineering of claim 1, wherein the PM interface file is a PM metafile and a PM shared file which are allocated to the PM items for interfacing from the project management tool to the system engineering tool. Tool-to-tool interface device.
제 1항에 있어서, 상기 SE 인터페이스 파일은 상기 시스템엔지니어링 도구에서 상기 프로젝트관리 도구로 인터페이스하기 위한 상기 SE항목에 대해 각각 할당되는 SE 메타파일과 SE 공유파일인 것을 특징으로 하는 프로젝트관리 도구와 시스템엔지니어링 도구간 인터페이스 장치.
The project management tool and system engineering of claim 1, wherein the SE interface file is an SE metafile and an SE shared file which are allocated to the SE items for interfacing from the system engineering tool to the project management tool. Tool-to-tool interface device.
제 1항에 있어서, 상기 PM항목은 SEMS(Systems Engineering Master Schedule)정보, SEDS(Systems Engineering Detailed Schedule)정보, 이슈정보, 회의록정보 및 문서정보 중 어느 하나 이상을 포함하는 것을 특징으로 하는 프로젝트관리 도구와 시스템엔지니어링 도구간 인터페이스 장치.
The project management tool according to claim 1, wherein the PM item includes at least one of Systems Engineering Master Schedule (SEM) information, Systems Engineering Detailed Schedule (SEDS) information, issue information, meeting minutes information, and document information. Interface device between system engineering tools.
제 1항에 있어서, 상기 SE항목은 자료보고정보, 요구사항정보, 이슈정보, 리스크정보, 용어정보 중 어느 하나 이상을 포함하는 것을 특징으로 하는 프로젝트관리 도구와 시스템엔지니어링 도구간 인터페이스 장치.
The apparatus of claim 1, wherein the SE item comprises at least one of data report information, requirement information, issue information, risk information, and terminology information.
제 1항에 있어서, 상기 PM변환부는 상기 프로젝트관리 도구에서 상기 시스템엔지니어링 도구로의 전송이 선택된 상기 PM항목에 대해 설정된 주기 단위로 실행되어 변환 및 전송하고 전송결과를 기록하는 것을 특징으로 하는 프로젝트관리 도구와 시스템엔지니어링 도구간 인터페이스 장치.
The project management according to claim 1, wherein the PM converting unit executes the transmission from the project management tool to the system engineering tool in a set cycle unit for the selected PM item to convert, transmit, and record a transmission result. Interface device between tool and system engineering tool.
제 1항에 있어서, 상기 프로젝트관리 도구에서 상기 시스템엔지니어링 도구로의 전송이 선택된 상기 PM항목을 저장하는 인터페이스정보 저장부를 더 포함하는 것을 특징으로 하는 프로젝트관리 도구와 시스템엔지니어링 도구간 인터페이스 장치.
The interface device according to claim 1, further comprising an interface information storage unit for storing the PM item selected from the project management tool to the system engineering tool.
제 1항에 있어서, 상기 SE변환부는 상기 시스템엔지니어링 도구에서 상기 프로젝트관리 도구로 전송할 전송대상이 전송되지 않은 경우 설정된 주기 단위로 실행되어 변환 및 전송하고 전송결과를 기록하는 것을 특징으로 하는 프로젝트관리 도구와 시스템엔지니어링 도구간 인터페이스 장치. The project management tool according to claim 1, wherein the SE conversion unit is executed in a set cycle unit when the transmission target to be transmitted from the system engineering tool to the project management tool is not transmitted. Interface device between system engineering tools.
KR1020120034655A 2012-04-03 2012-04-03 Apparatus for interfacing project management tool and systems engineering tool KR101348608B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120034655A KR101348608B1 (en) 2012-04-03 2012-04-03 Apparatus for interfacing project management tool and systems engineering tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120034655A KR101348608B1 (en) 2012-04-03 2012-04-03 Apparatus for interfacing project management tool and systems engineering tool

Publications (2)

Publication Number Publication Date
KR20130112354A true KR20130112354A (en) 2013-10-14
KR101348608B1 KR101348608B1 (en) 2014-01-10

Family

ID=49633365

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120034655A KR101348608B1 (en) 2012-04-03 2012-04-03 Apparatus for interfacing project management tool and systems engineering tool

Country Status (1)

Country Link
KR (1) KR101348608B1 (en)

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008084051A (en) 2006-09-28 2008-04-10 Toshiba Corp Plant multidiscipline engineering support system
KR101076419B1 (en) * 2009-07-03 2011-10-25 주식회사 아이비케이시스템 Project management method using activity based project management system

Also Published As

Publication number Publication date
KR101348608B1 (en) 2014-01-10

Similar Documents

Publication Publication Date Title
Munir et al. Business value of integrated BIM-based asset management
CN101446897B (en) Resource management system based on net system business structure platform
Fernández et al. A case study on the application of an artefact-based requirements engineering approach
CN103646154A (en) Three-dimensional digitization final assembly technology collaborative design system
CN107729668A (en) Technological design coordination management system and its method based on threedimensional model
Lee et al. Concurrent material flow analysis by P3R-driven modeling and simulation in PLM
CN101853438A (en) Management system for product test information of electric energy meter
Leong et al. A core manufacturing simulation data information model for manufacturing applications
CN111738674A (en) Contract mobile approval implementation method and system
CN112884455A (en) Task plan processing system, method and device
CN115169011A (en) Editing system and application system of airplane assembly outline
Haartman et al. Lean practices and the adoption of digital technologies in production
Ashworth et al. BIM guidance to optimise the operational phase: defining information requirements based on ISO 19650
Chen et al. A structured methodology for implementing engineering data management
Rabbi et al. YAWL2DVE: An automated translator for workflow verification
CN108681888A (en) It is a kind of towards the manufacturing execution system for remanufacturing full process stream journey
KR101348608B1 (en) Apparatus for interfacing project management tool and systems engineering tool
Välimäki et al. Patterns for distributed scrum—a case study
Masior Design requirements on the integration of technology databases
Lee et al. A study on design of virtual desktop infrastructure (VDI) system model for cloud computing BIM service
Antonov et al. Current state of MES systems development in the digital economy
CN111797084A (en) Data coding through mark inspection method and system based on weapon equipment test process
Monfared et al. An application of CIMOSA concepts in the development of change capable manufacturing cells
Wang et al. Holistic scenarios by using platform technologies for small batch-sized production
Osornio et al. Optimizing Productivity Indicators through the Implementation of Industry 4.0 Technologies

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20161005

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20171205

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20190909

Year of fee payment: 7