KR101076419B1 - Project management method using activity based project management system - Google Patents

Project management method using activity based project management system Download PDF

Info

Publication number
KR101076419B1
KR101076419B1 KR1020090060737A KR20090060737A KR101076419B1 KR 101076419 B1 KR101076419 B1 KR 101076419B1 KR 1020090060737 A KR1020090060737 A KR 1020090060737A KR 20090060737 A KR20090060737 A KR 20090060737A KR 101076419 B1 KR101076419 B1 KR 101076419B1
Authority
KR
South Korea
Prior art keywords
activity
project management
project
output
change
Prior art date
Application number
KR1020090060737A
Other languages
Korean (ko)
Other versions
KR20110003126A (en
Inventor
김정수
김희자
이동권
Original Assignee
주식회사 아이비케이시스템
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 아이비케이시스템 filed Critical 주식회사 아이비케이시스템
Priority to KR1020090060737A priority Critical patent/KR101076419B1/en
Publication of KR20110003126A publication Critical patent/KR20110003126A/en
Application granted granted Critical
Publication of KR101076419B1 publication Critical patent/KR101076419B1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Engineering & Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

본 발명은 하나의 프로젝트를 세부업무개선요건, Task(업무요건정의), 작업, 일련번호를 나타내는 번호체계를 가지며, 담당자, 담당자 역할, 기간, 시스템이라는 요건을 갖는 액티비티로 구분하여 효율적으로 관리하기 위한 프로젝트 관리서버, 상기 프로젝트 관리 서버와 서로 떨어져 있는 참여인력의 단말기를 연결하는 데이터통신망, 및 상기 프로젝트 관리서버로부터 상기 데이터통신망을 통해 상기 참여인력의 단말기에 제공되는 액티비티 프로젝트 관리 프로그램을 포함하는 프로젝트 관리시스템을 이용한 프로젝트 관리방법에 있어서, 상기 액티비티 정보와 참여인력 정보를 상기 액티비티 프로젝트 관리프로그램을 통해 상기 관리서버에 연결된 액티비티데이터베이스와 참여인력데이터베이스에 신규등록하는 단계와, 상기 액티비티데이터베이스에 등록된 액티비티에 새로운 액티비티를 신규등록, 수정, 변경, 시스템 변경, 삭제 중 적어도 하나를 상기 참여인력데이터베이스에 저장된 참여인력이 상기 프로젝트관리프로그램을 통해 수행하는 단계와, 상기 액티비티데이터베이스에 등록된 액티비티의 신규등록, 수정, 변경, 시스템 변경, 삭제 중 적어도 하나의 변동사항이 상기 참여인력의 로그인시 표시되는 단계를 포함하는 것을 특징으로 하여, 복수의 참여인력이 시간적, 공간적 제약 없이 프로젝트를 수행할 수 있으며, 이와 같이 수행되는 프로젝트를 총괄적으로 관리할 수 있다.

Figure R1020090060737

프로젝트 관리, 액티비티(Activity), 선/후행, 산출물

The present invention has a number system representing a detailed task improvement requirements, tasks (task requirements definition), tasks, serial numbers, and effectively manages a project by dividing it into activities having the requirements of person in charge, person in charge, period, and system. A project management server, a data communication network connecting terminals of participant personnel separated from the project management server, and an activity project management program provided to the terminal of the participant through the data communication network from the project management server. A project management method using a management system, the method comprising: registering the activity information and participant information into an activity database and a participant database connected to the management server through the activity project management program; At least one of a new activity, a new activity, a new activity, a system change, and a deletion of an activity registered in the project, by the participant stored in the participant database through the project management program, and the activity registered in the activity database. At least one change of the new registration, modification, change, system change, deletion of the participant is displayed at the time of login of the participant, the plurality of participant can perform the project without time and space constraints It is possible to manage the overall project.

Figure R1020090060737

Project Management, Activity, Leading / Terminating, Deliverables

Description

액티비티 프로젝트 관리시스템을 이용한 프로젝트 관리방법{PROJECT MANAGEMENT METHOD USING ACTIVITY BASED PROJECT MANAGEMENT SYSTEM}PROJECT MANAGEMENT METHOD USING ACTIVITY BASED PROJECT MANAGEMENT SYSTEM}

본 발명은 액티비티 프로젝트 관리시스템을 이용한 프로젝트 관리방법에 관한 것으로, 보다 상세하게는 프로젝트를 액티비티를 기준으로 관리함으로써 복수의 작업자들이 서로 다른 장소에서 자신의 시스템을 이용해서 하나의 프로젝트를 원활하게 수행할 수 있도록 하기 위한 액티비티 프로젝트 관리시스템을 이용한 프로젝트 관리방법에 관한 것이다.The present invention relates to a project management method using an activity project management system, and more particularly, by managing a project based on an activity, a plurality of workers can smoothly execute a project using their system in different places. It is about project management method using activity project management system.

일반적으로, 프로젝트란 소정 기간 동안 여러 사람이 작업을 진행하여 어떤 결과물을 달성하는 것을 의미한다.In general, a project means that several people work for a certain period of time to achieve something.

따라서, 이러한 프로젝트는 어떠한 세부 업무를 얼마큼의 기간 내에 완성해야 하는지, 예산은 얼마로 할 것인지, 세부 업무를 누가 담당하는 게 좋은지, 책임자는 누구로 할 것인지 등 세부 요건이 먼저 결정되고, 이러한 계획에 따라서 참여인력이 결정되고 참여인력에게 세부 업무가 분담되고, 기간 내에 참여인력이 세부 업무를 얼마나 잘 수행하고 있는 지 여부 등을 주간 또는 월간 업무보고 등을 통해서 관리되었다.Therefore, the detailed requirements of such a project are determined first, in what time frame, how much budget should be completed, who should be in charge of the details, and who will be in charge? Therefore, the participant was decided, the detailed work was divided among the participant, and how well the participant was performing the detailed work within the period was managed through weekly or monthly work reports.

그러나, 이러한 프로젝트 관리방법은, 참여인력이 많거나 참여인력의 산출물이 방대한 경우에 관리의 허점을 항상 가질 뿐만 아니라 객관적으로 프로젝트가 얼마나 진행되고 있는지를 명확하게 알 수 없는 문제점이 있었다.However, such a project management method has a problem in that when there are a large number of participants or the output of the participants, not only has a loophole of management but also it is impossible to clearly know how the project is progressing objectively.

또한, 많은 경우 참여인력 사이에 원활하게 의사소통이 되지 않거나, 어느 한 사람이 자기에게 주어진 업무과제를 제대로 수행하지 못하면, 전체적으로 프로젝트수행 기간을 맞추지 못하는 문제점이 있었다. In addition, in many cases, there is a problem in that it is not able to communicate smoothly among the participating personnel, or if one person does not properly perform the task assigned to him, the overall project execution period is not met.

또한, 프로젝트를 완성하기 위해서 업무 및 참여인력이 정해졌지만, 프로젝트를 수행하는 과정에서 예상치 못한 새로운 문제가 발생하여, 새로운 업무가 추가되거나 참여인력의 변경 또는 새로운 참여인력의 추가가 필요한 경우에 이러한 변경, 수정 등이 원활하게 수행되지 못하고 시간적, 공간적으로 낭비가 일어나는 문제점이 있었다.In addition, although tasks and participants have been assigned to complete the project, such changes may occur when an unexpected new problem occurs in the course of carrying out the project and a new task is added, or a change in the participant is required or the addition of a new participant is required. There was a problem that the modification was not performed smoothly and wasted time and space.

또한, 일반적으로 하나의 프로젝트를 수행하기 위해서 복수의 작업자가 하나의 공간에 모여서 하나의 시스템을 이용하여 작업할 것을 요구하거나, 경우에 따라서는 적어도 일주일에 한번씩 주간업무 보고 형식으로 보고자료를 만들어야 전체 작업의 일정 등을 관리하여야 하므로 공간적 시간적으로 많은 제약을 받는 문제점이 있었다.In addition, in order to carry out a project in general, a plurality of workers are required to gather in one space and work with one system, or in some cases, report data should be generated in a weekly business report format at least once a week. Since the schedule of the work must be managed, there was a problem that a lot of time and space are restricted.

또한, 프로젝트를 구성하는 많은 업무의 경우에 다른 시스템을 이용하여 만들어진 다양한 결과물을 이용할 수 있음에도 불구하고, 이러한 기존 결과물을 재사용하는데 있어서 많은 시간과 노력이 필요하거나, 새로 만드느라 많은 노력과 시간을 솟아야 하는 문제점이 있었다.In addition, although many of the tasks that make up a project can use a variety of outputs made using other systems, it takes a lot of time and effort to reuse these existing outputs, or a lot of effort and time to create new ones. There was a problem.

특히, 참여인력이 서로 멀리 떨어져 있어서 원활한 의사소통이 되지 않는 경우에 제공한 산출물의 내용이 미흡하여 재 작성이 필요하다고 판단되는 경우에 신속하게 재 작성할 수 없었으며, 또한, 제 3 자가 참여인력의 산출물을 보고 새로운 산출물 생성 작업을 하고 있는 경우에 프로젝트 전체의 신뢰성이 떨어지는 문제점이 있었다. In particular, if the participant is not far from each other and communication is not successful, if the contents of the provided product are insufficient and it is necessary to rewrite it, the third party could not recreate it quickly. There was a problem that the reliability of the whole project was deteriorated when working on the output and creating a new output.

본 발명은 상술한 문제점을 해결하기 위한 것으로, 본 발명의 목적은 프로젝트를 액티비티를 기준으로 관리함으로써 액티비티의 신규등록, 변경, 수정, 삭제 등이 용이하며, 다른 참여인력과의 의사소통이 원활하게 수행될 수 있어서 복수의 작업자들이 서로 다른 장소에서 자신의 시스템을 이용해서 하나의 프로젝트를 원활하게 수행할 수 있도록 하기 위한 액티비티 프로젝트 관리시스템을 이용한 프로젝트 관리방법을 제공하는 것이다.The present invention is to solve the above-mentioned problems, the object of the present invention is to manage the project based on the activity, it is easy to register, change, modify, delete activities, etc., and smoothly communicate with other participants It provides a project management method using an activity project management system that can be carried out so that a plurality of workers can smoothly execute a project using their system in different places.

이러한 목적을 달성하기 위하여 본 발명은, 하나의 프로젝트를 세부업무개선요건, Task(업무요건정의), 작업, 일련번호의 번호체계를 가지며, 담당자, 담당자 역할, 기간, 시스템이라는 요건을 갖는 액티비티로 구분하여 효율적으로 관리하기 위한 프로젝트 관리서버, 상기 프로젝트 관리 서버와 서로 떨어져 있는 참여인력의 단말기를 연결하는 데이터통신망, 및 상기 프로젝트 관리서버로부터 상기 데이터통신망을 통해 상기 참여인력의 단말기에 제공되는 액티비티 프로젝트 관리 프로그램을 포함하는 프로젝트 관리시스템을 이용한 프로젝트 관리방법에 있어서, 상기 액티비티 정보와 참여인력 정보를 상기 액티비티 프로젝트 관리프로그램을 통해 상기 관리서버에 연결된 액티비티데이터베이스와 참여인력데이터베이스에 신규등록하는 단계와, 상기 액티비티데이터베이스에 등록된 액티비티에 새로운 액티비티를 신규등록, 수정, 변경, 시스템 변경, 삭제 중 적어도 하나를 상기 참여인력데이터베이스에 저장된 참여인력이 상기 프로젝트관리프로그램을 통해 수행하는 단계와, 상기 액티비티데이터베이스에 등록된 액티비티의 신규등록, 수정, 변경, 시스템 변경, 삭제 중 적어도 하나의 변동사항이 상기 참여인력의 로그인시 표시되는 단계를 포함하며, 상기 액티비티데이터베이스에 등록된 액티비티에 새로운 액티비티를 신규등록, 수정, 변경, 시스템 변경, 삭제하는 단계는, 상기 참여인력이 상기 프로젝트관리프로그램을 통해 로그인하는 단계와, 상기 프로젝트관리서버의 액티비티관리모듈의 지원을 받는 상기 프로젝트 프로그램 화면 상에서 상기 액티비티데이터베이스에 등록된 액티비티에 새로운 액티비티를 신규등록, 수정, 변경, 시스템 변경, 삭제 신호를 입력하는 단계와, 상기 액티비티 신규등록, 수정, 변경, 시스템 변경, 삭제 시에 승인권자가 자동으로 지정되어 전송되는 단계와, 상기 액티비티의 신규등록, 수정, 변경, 시스템 변경, 삭제에 대한 승인권자의 승인 신호 입력하는 단계와, 상기 액티비티 신규등록, 수정, 변경, 시스템 변경, 삭제가 상기 액티비티데이터베이스에 저장등록되는 단계를 포함하는 것을 특징으로 합니다.In order to achieve this purpose, the present invention is an activity that has a project system of detailed task improvement requirements, tasks, tasks, serial numbers, and has the requirements of person in charge, staff role, period, and system. A project management server for classifying and efficiently managing, a data communication network connecting terminals of participating personnel separated from the project management server, and an activity project provided to the terminals of the participating personnel through the data communication network from the project management server. A project management method using a project management system including a management program, comprising: newly registering the activity information and participant information in an activity database and a participant database connected to the management server through the activity project management program; At least one of a new activity, a new activity, a new activity, a system change, and a deletion of an activity registered in an activity database is performed by the participant stored in the participant database through the project management program, and registered in the activity database. At least one change of the registered activity, new registration, modification, change, system change, deletion of the activity is displayed at the time of login of the participant, and the new activity is added to the activity registered in the activity database, newly registered, modified, The step of changing, modifying or deleting the system may include the steps of the participant logging in through the project management program and an activity registered in the activity database on the project program screen supported by the activity management module of the project management server. Inputting a new activity registration, modification, change, system change, and delete signal, a step in which an approver is automatically assigned and transmitted when the activity is newly registered, modified, changed, changed, or deleted; And inputting an approval signal of an approver for new registration, modification, change, system change, and deletion, and storing and registering the activity new registration, modification, change, system change, and deletion in the activity database. It is.

이상에서 설명한 바와 같이 본 발명의 일 실시예에 의하면, 프로젝트를 복수의 액티비티, 즉, 각 작업자가 각자의 독립된 시스템을 통해서 수행하여 얻을 수 있는 최소 산출물 단위로 관리하여 복수의 참여자가 한 장소에서 작업을 하지 않더라도 프로젝트를 총괄적으로 관리할 수 있다.As described above, according to an embodiment of the present invention, a plurality of participants work in one place by managing a project in a plurality of activities, that is, a minimum output unit that can be obtained by each worker through their own independent system. You can manage the project as a whole without having to do it.

또한, 본 발명의 일 실시예에 의하면, 참여자 간의 책임 한계가 명확히 정의되며, 프로젝트 진행 시 발생되는 문제에 대해서 액티비티 단위로 변경, 수정, 삭제, 등록 등을 통해서 유동적으로 대응할 수 있다.In addition, according to one embodiment of the present invention, the limits of responsibility between the participants are clearly defined, and the problems occurring during the project can be flexibly responded through the change, modification, deletion, registration, etc. on an activity basis.

또한, 본 발명의 일 실시예에 의하면, 주간업무보고 등을 거치지 않더라도 시스템상에서 전체 참여인력의 업무진행사항, 액티비티별 업무진행사항, 기간별 업무진행사항 등을 한 눈에 파악할 수 있다.In addition, according to an embodiment of the present invention, even without going through the weekly work report, it is possible to grasp the work progress, the work progress for each activity, the work progress for each period and the like at a glance on the system.

또한, 본 발명의 일 실시예에 의하면, 액티비티별 참조 산출물이 제공되어 액티비별 산출물 생성이 용이하며, 액티비티 변경요청권자와 승인권자 사이의 원활한 의사소통이 이루어질 수 있다.In addition, according to an embodiment of the present invention, a reference output for each activity is provided to facilitate generation of output for each activity ratio, and smooth communication between the activity change requester and the approver can be made.

또한 본 발명의 일 실시예에 따르면, 참여인력은 자신의 로그인 만으로 자신의 액티비티의 변경사항과 관련하여 신속하게 알 수 있다.In addition, according to an embodiment of the present invention, the participant can quickly know in relation to the change of his activity only by his login.

또한, 본 발명의 일 실시예에 따르면, 참여인력이 수행한 액티비티를 제 3 의 참여인력이 참조할 수 있을 뿐만 아니라, 참조한 자의 이력이 저장 및 표시되므로 프로젝트 보안이 확실이 유지될 수 있고, 액티비티 단위의 투명하면서도 신속하게 공로를 인정 받을 수 있어서 참여인력의 성취동기를 높여줄 수 있다.In addition, according to an embodiment of the present invention, not only the third-participant can refer to the activity performed by the participant, but also the history of the referrer can be stored and displayed, so that the project security can be securely maintained. The transparency of the unit can be recognized quickly and can increase the motivation for the participation of the workforce.

또한, 본 발명의 일 실시예에 의하면, 데이터베이스에 저장된 산출물이 변경되어 데이터베이스에 갱신되는 경우, 변경된 산출물에 관련된 참여자 간에 크로스 체크가 가능함에 따라 최신 산출물을 공유를 하고, 이에 따라, 최종적으로 담당자에게 보고되는 산출물이 신뢰성을 가지는 효과가 있다.In addition, according to an embodiment of the present invention, when a product stored in the database is changed and updated in the database, the latest product may be shared according to the participants involved in the changed product. The output reported has the effect of reliability.

또한, 본 발명의 일 실시예에 의하면, 복수의 작업자가 한 공간에 모이지 않더라도 자기에게 편한 시간, 편한 시스템에서 액티비티를 수행하여 하나의 프로젝트 관리시스템에 의하여 총괄적으로 관리 받을 수 있어서 프로젝트 수행이 효율적이다.In addition, according to an embodiment of the present invention, even if a plurality of workers are not gathered in one space, it is possible to perform activities in a system that is convenient for them and to be managed by one project management system so that project execution is efficient. .

이하, 본 발명의 바람직한 실시예를 첨부된 도면들을 참조하여 상세히 설명한다. 우선 각 도면의 구성요소들에 참조부호를 부가함에 있어서, 동일한 구성요소 들에 대해서는 비록 다른 도면상에 표시되더라도 가능한 한 동일한 부호를 가지도록 하고 있음에 유의해야 한다. 또한, 본 발명을 설명함에 있어, 관련된 공지 구성 또는 기능에 대한 구체적인 설명이 본 발명의 요지를 흐릴 수 있다고 판단되는 경우에는 그 상세한 설명은 생략한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings. First of all, in adding reference numerals to the components of each drawing, it should be noted that the same reference numerals are designated as much as possible even if displayed on different drawings. In the following description of the present invention, a detailed description of known functions and configurations incorporated herein will be omitted when it may make the subject matter of the present invention rather unclear.

본 명세서에 있어서, 액티비티란 각 작업자가 각자의 독립된 시스템을 통해서 프로젝트의 요건정의에 따라 산출물을 낼 수 있는 프로젝트 관리단위를 의미한다.In this specification, an activity refers to a project management unit in which each worker can produce an output according to a project's requirements definition through a separate system.

도 1은 본 발명의 일 실시예에 따른 프로젝트 관리시스템을 도시한 블록도이다.1 is a block diagram showing a project management system according to an embodiment of the present invention.

도 1을 참조하면, 본 발명의 일 실시예에 따른 프로젝트 관리시스템은 하나의 프로젝트를 효율적으로 관리하기 위한 프로젝트 관리서버(100), 상기 프로젝트 관리 서버(100)에 대해 원격지에서 복수의 작업자가 액세스 할 수 있도록 하기 위한 인트라넷 또는 인터넷과 같은 데이터통신망(200), 및 상기 데이터통신망(200)을 통해 상기 프로젝트 관리 서버(100)로부터 프로젝트 관리 서비스를 수신하는 적어도 1 이상의 작업자 단말기(300)를 포함한다.1, a project management system according to an embodiment of the present invention, a project management server 100 for efficiently managing a single project, a plurality of workers in remote access to the project management server 100 Data communication network 200, such as an intranet or the Internet for enabling, and at least one worker terminal 300 for receiving a project management service from the project management server 100 via the data communication network 200. .

보다 상세하게, 상기 프로젝트 관리 서버(100)는 해당 프로젝트 관리 시스템을 총괄적으로 관리하고 프로젝트의 보안을 유지하기 위하여 인터넷 익스플로러를 설정하고 사용자 진위 및 사용자의 사용범위를 확인 하기 위한 환경설정 및 로그인 모듈(110), 프로젝트를 구성하는 액티비티를 조회, 신규등록요청, 삽입, 변경, 시스템추가, 산출물등록, 수정, 삭제요청, 요청취소, 상세조회, 산출물참조 액티비티 조회, 승인검토, 일괄승인/일괄불승인, 승인/불승인취소하기 위한 액티비티 관리모듈(120), 프로젝트와 관련된 액티비티를 대량으로 액셀을 이용해서 신규등록하기 위한 액티비티엑셀등록모듈(130), 담당자별, 기간별, 업무별, 또는 이들의 조합에 의하여 액티비티를 조회할 수 있도록 지원하기 위한 액티비티조회모듈(140), 산출물을 조회/등록/수정/삭제를 지원하기 위한 산출물관리모듈(150), 참여인력 조회/등록/수정/삭제하기 위한 참여인력관리모듈(160), 및 변동사항이나 공지사항을 조회할 수 있는 변동사항 및 공지사항 조회모듈(170)을 포함한다.In more detail, the project management server 100 manages the project management system as a whole and configures the Internet explorer to maintain the security of the project, and configures and checks the module for checking the authenticity of the user and the user's range of use. 110) Inquiry of activities constituting the project, new registration request, insertion, change, system addition, output registration, modification, deletion request, request cancellation, detail inquiry, output reference activity inquiry, approval review, batch approval / batch disapproval, By activity management module 120 to approve / disapprove, activity excel registration module 130 to newly register activities related to the project in bulk using excel, by contact person, period, task, or a combination thereof Activity inquiry module 140 for supporting activity inquiry, inquiry / registration / modification / deletion of output Output management module 150 to support the participant manpower management module 160 for querying / registering / modifying / deleting the participating personnel, and changes and announcements inquiry module 170 to query changes or announcements ).

또한, 이러한 각각의 모듈 등은 참여인력이 저장 등록된 참여인력데이터베이스(180)와, 상기 액티비티엑셀등록모듈(130)에 의하여 프로젝트와 관련하여 대량으로 등록되어, 수정 변경되며, 최종 산출물이 저장 등록된 액티비티데이터베이스(190)와 연동할 수 있도록 구성된다.In addition, each such module is registered in large quantities in connection with the project by the participation personnel database 180, the activity personnel registration module 130, and the activity Excel registration module 130 is stored, registered and modified, the final output is stored and registered It is configured to work with the activity database 190.

도 2는 본 발명의 일 실시예에 따른 프로젝트 관리시스템 중 액티비티관리모듈의 내부 구성을 보이기 위한 상세 블록도이며, 도 3a 내지 도 3n은 이러한 액티비티관리모듈의 내부 구성에 의하여 지원되는 화면예시도이다.2 is a detailed block diagram illustrating an internal configuration of an activity management module in a project management system according to an embodiment of the present invention, and FIGS. 3A to 3N are screen examples supported by the internal configuration of the activity management module. .

먼저, 본 발명의 일 실시예에 따른 액티비티관리모듈(120)을 도 2 및 도 3a내지 도 3n을 참조하여 자세히 설명한다.First, the activity management module 120 according to an embodiment of the present invention will be described in detail with reference to FIGS. 2 and 3A to 3N.

본 발명의 일 실시예에 따른 액티비티관리모듈(120)은 작업해야 할 액티비티를 조회할 화면을 제공하기 위한 조회부(121a)를 포함한다.The activity management module 120 according to an embodiment of the present invention includes an inquiry unit 121a for providing a screen for inquiring an activity to be worked on.

본 발명의 일 실시예에 따르면, 액티비티는 예를 들어, J8.1.1.1과 같이 번호 체계가 붙여져 총괄적으로 관리되며 이들 액티비티가 모두 완성되었을 때 프로 젝트가 완성될 수 있는 것으로, 상기 액티비티의 번호들은 예를 들어 아래와 같이 정의된다.According to one embodiment of the invention, the activities are collectively managed by numbering, for example J8.1.1.1, and the project can be completed when all of these activities are completed. For example, they are defined as follows.

세부업무개선요건 : J8 파생상품의 공정가치 평가 Detailed job improvement requirements: Fair value evaluation of J8 derivatives

Task : 1 업무요건정의Task: 1 Define requirements

작업 : 1 파생상품 평가 Bid/Ask 조정 요건 정의Task: 1 Define Derivative Valuation Bid / Ask Adjustment Requirements

일련번호 : 1Serial number: 1

따라서, 도 3a에 도시된 바와 같이 진행상태를 전체로 선택하고, 본인업무에 해당하는 업무개선과제와, 업무개선과제 중 세부업무에 해당하는 세부업무, 기존에 공통적으로 등록한 Task정보, 및 업무개선과제와 세부업무와 Task구분 중 하나를 선택한 경우 그에 연관된 작업구분과 같이 다양하게 조회할 수 있다.Therefore, as shown in FIG. 3A, the progress status is selected as a whole, and the task improvement task corresponding to one's own task, the detailed task corresponding to the detailed task among task improvement tasks, task information registered in common in the past, and task improvement If one of the tasks, subtasks, and task categories is selected, they can be searched in various ways, such as the task category associated with them.

또한, 하나의 프로젝트와 관련하여 구축될 예정이거나 운영중인 시스템이 있다면, 이를 선택하여 조회할 수도 있으며, 현업, 현운영자, 회계사, 설계자, 개발자 중 하나와 같이 역할 구분에 따라서도 조회할 수 있으며, 완료예정일자와, 산출물담당자를 입력하여 조회할 수도 있다.In addition, if there is a system that is going to be built or operated in relation to one project, it can be selected and inquired, and can be inquired according to the role classification such as one of the business, current operator, accountant, designer, and developer. You can also enter the date of completion and the person in charge of the product.

따라서, 별도로 주간업무보고서 또는 월간업무보고서와 같이 프로젝트관리를 위한 별도의 자료를 만들거나 회의를 하느라 많은 시간과 노력을 들이지 않더라도, 참여인력 전체의 액티비티 산출물, 진행여부 등을 총괄적으로 관리할 수 있다.Therefore, even if you do not spend a lot of time and effort to create separate data for project management or meetings such as weekly work report or monthly work report, you can manage activity output and progress of all participants. .

또한, 액티비티 기준으로 산출물의 등록여부가 표시되기 때문에 작업의 투명성이 보장될 수 있다.In addition, the transparency of the work can be guaranteed since the output is displayed on the basis of activity.

특히, 본인버튼을 클릭하면 로그인한 사람의 이름이 담당자란에 표시되어 쉽게 담당자의 액티비티를 검색할 수 있으며, 전체버튼을 클릭하면 지워짐으로써 다른 조건을 입력하여 검색을 할 수 있도록 할 수 있다.In particular, if the user button is clicked, the name of the person logged in is displayed in the person in charge field so that the user can easily search for the activity of the person in charge. If the user clicks the entire button, the user can enter a different condition to search.

또한 조회된 자료에 대해서도 액셀파일로 출력하여, 참여인력의 다른 액티비티에 대한 산출물 생성에 재이용할 수 있다.In addition, the inquired data can be output as an Excel file, which can be reused to generate outputs for other activities of participants.

본 발명의 일 실시예에 따른 액티비티관리모듈(120)은 액티비티 신규등록요청부(121b)를 더 포함하여 액티비티를 신규등록 할 수 있다.The activity management module 120 according to an embodiment of the present invention may further register an activity by further including an activity new registration request unit 121b.

상기 액티비티 신규등록요청부(121b)는 업무개선과제, 세부업무, Task구분, 작업구분, 시스템 등이 입력된다. 이 때, 시스템은 경우에 따라서 특정 시스템을 이용하여야 할 경우에 선택적으로 입력될 수 있다.The activity new registration request unit 121b receives a task improvement task, a detailed task, a task segment, a task segment, a system, and the like. In this case, the system may be selectively input when a specific system needs to be used in some cases.

상기 액티비티 신규등록요청부(121b)는 도 3b에 도시된 바와 같이, 액티비티에 대한 설명, 요청한 사유, 및 승인권자를 입력할 수 있는 화면을 지원한다. 또한, 상기 승인권자가 업무개선과제를 선택한 경우 그 업무를 맡고 있는 승인담당자를 상기 참여인력데이터베이스(180)로부터 조회하여 이를 표시한다.As illustrated in FIG. 3B, the activity new registration request unit 121b supports a screen for inputting a description of the activity, a reason for request, and an approver. In addition, when the approver selects a task for improvement, the approver in charge of the task is inquired from the participant database 180 to display it.

또한 상기 액티비티 신규등록요청부(121b)는 산출물담당자가 입력되면 자동적으로 그 산출물담당자의 역할을 상기 참여인력데이터베이스(180)를 조회하여 표시한다.In addition, the activity new registration request unit 121b automatically displays and displays the participant's role when the person in charge of the product is inputted.

또한, 상기 액티비티 신규등록요청부(121b)는 참조자료(INPUT)가 입력될 수있도록 INPUT자료등록 팝업을 지원하며, 해당하는 자료가 선택되어 입력되면 이를 상기 산출물입력데이터베이스(190)에 저장 등록한다.In addition, the activity new registration request unit 121b supports the INPUT data registration pop-up so that a reference material (INPUT) can be input, and when the corresponding data is selected and input, the new data registration request unit 121b stores and registers it in the output input database 190. .

또한, 상기 액티비티 신규등록요청부(121b)는 산출물(OUTPUT)이 입력되면이 를 상기 산출물입력데이터베이스(190)에 저장 등록한다.In addition, the activity new registration request unit 121b stores and registers the output in the output input database 190 when the output OUTPUT is input.

따라서, 참여인력들은 다른 참여인력이 저장한 산출물을 재사용할 수 있으며, 또한 산출물과 함께 입력된 참조자료를 이용하여 보다 효율적으로 액티비티를 수행할 수 있다.Therefore, participants can reuse the output stored by other participants, and can perform activities more efficiently by using the reference data input with the output.

또한, 산출물(OUTPUT)에 대해서 액티비티마다 담당자가 입력되기 때문에 프로젝트의 과업달성에 있어서 참여인력의 기여도를 보다 투명하게 제공할 수 있다.In addition, since the person in charge is inputted to the output (OUTPUT) for each activity, the contribution of the participant in the achievement of the project can be more transparently provided.

또한 동일한 액티비티가 중복되거나 선후관계가 명확하지 않다면 참여인력 사이에 원활한 의사소통이 안될 뿐만 아니라 액티비티 중복으로 시간 및 노력을 낭비할 수 있으므로, 상기 액티비티 번호는 신규(삽입 포함)로 등록하는 경우에 자동적으로 채번되도록 되어 있다.In addition, if the same activity is duplicated or the relationship is not clear, not only can the communication be seamless, but the duplication of activities can waste time and effort, so the activity number is automatically registered when registering as new (including inserts). It is supposed to be replaced with.

본 발명의 일 실시예에 따른 액티비티관리모듈(120)은 삽입요청부(122)를 더포함한다.The activity management module 120 according to an embodiment of the present invention further includes an insertion request unit 122.

상기 삽입요청부(122a)는 액티비티를 삽입요청하는 화면을 지원하여 기존에 등록되어 있는 액티비티 중간에 새로운 액티비티를 삽입하고자 하는 경우에 사용된다.The insertion request unit 122a is used to insert a new activity in the middle of an existing activity by supporting a screen for inserting an activity.

도 3d에 도시된 바와 같이, 상기 삽입요청부(122a)는 기존에 등록되어 있는 액티비티 외에 새로운 액티비티가 등록될 수 있도록 팝업창을 지원하며, 기존 액티비티가 선택되고 새로운 액티비티가 입력을 완료하면 선택한 액티비티 이전번호로 신규로 상기 액티비티데이터베이스(190)에 저장 등록한다.As shown in FIG. 3D, the insertion request unit 122a supports a popup window to register a new activity in addition to the previously registered activity, and transfers the selected activity when the existing activity is selected and the new activity completes input. The number is newly registered and stored in the activity database 190.

이 때, 액티비티를 보다 편리하게 삽입할 수 있도록 삽입하고자 하는 액티비 티를 조회할 수 있으며, 조회된 액티비티 중 삽입하고자 하는 액티비티의 다음 액티비티를 선택하고, 삽입버튼을 클릭하며, 완료예정일자 등 입력하고자 하는 내용을 입력하고, 변경요청버튼을 클릭하여 등록을 할 수 있다.At this time, you can search for the activity you want to insert so that you can insert the activity more conveniently.Select the next activity of the activity that you want to insert, click the Insert button, enter the due date, etc. Enter the contents you want and click the Change Request button to register.

본 발명의 일 실시예에 따른 액티비티관리모듈(120)은 변경요청부(122b)를 더 포함한다.The activity management module 120 according to an embodiment of the present invention further includes a change request unit 122b.

상기 변경요청부(122b)는 액티비티를 변경 요청하는 화면을 지원하여, 기존에 승인 되었거나 불승인된 액티비티를 변경해서 승인권자에게 승인을 요청할 수 있는 화면을 지원한다.The change request unit 122b supports a screen for requesting to change an activity, and supports a screen for requesting approval from an approver by changing an previously approved or disapproved activity.

도 3e에 도시된 바와 같이, 상기 변경요청부(122b)는 변경요청하고자 하는 액티비티를 조회조건에 맞게 검색하여 변경요청버튼에 의하여 선택 입력되고, 변경요청하고자 하는 항목을 선택하고, 변경하고자 하는 항목이 입력되면, 액티비티 데이터베이스(190)에 등록이 되도록 한다. As shown in FIG. 3E, the change request unit 122b searches for an activity to be changed according to a search condition and is input by a change request button, selects an item to be changed, and selects an item to be changed. If is input, it is to be registered in the activity database 190.

본 발명의 일 실시예에 따른 액티비티관리모듈(120)은 시스템추가요청부(122c)를 더 포함한다.The activity management module 120 according to an embodiment of the present invention further includes a system addition request unit 122c.

상기 시스템추가요청부(122c)는 기존에 등록된 액티비티에서 시스템을 추가하는 화면을 지원하며, 따라서 액티비티 번호는 변하지 않고, 시스템과 산출물(OUTPUT)담당자만 변경될 수 있다.The system addition request unit 122c supports a screen for adding a system from an existing registered activity. Therefore, the activity number does not change, and only a system and an OUTPUT manager can be changed.

즉, 상기 시스템추가요청부(122c)는 시스템을 추가하고자 하는 액티비티가 조회된 경우에 시스템추가버튼 클릭하면 도 3f에 도시된 화면을 지원하여, 추가하고자 하는 시스템이 입력되고, 산출물(OUTPUT)담당자로서 해당 시스템에 대한 담당 자가 입력되어 상기 액티비티데이터베이스(190)에 저장 등록되게 한다.That is, the system add request unit 122c supports the screen shown in FIG. 3F when the system add button is clicked when the activity to add the system is inquired, and the system to be added is inputted, and the person in charge of the output (OUTPUT) is in charge. As a person in charge for the system is input to be stored and registered in the activity database (190).

본 발명의 일 실시예에 따른 액티비티관리모듈(120)은 산출물등록부(123)를 더 포함한다.The activity management module 120 according to an embodiment of the present invention further includes a product registration unit 123.

상기 산출물등록부(123)는 액티비티에 산출물을 등록하는 도 3g에 도시된 화면을 지원하며, 산출물을 액티비티 데이터베이스(190)에 등록 저장하다.The output registration unit 123 supports the screen shown in FIG. 3G for registering the output in the activity, and registers and stores the output in the activity database 190.

조회조건에 따라 액티비티를 검색하여, 해당하는 액티비티를 선택하여 추가하고자 하는 산출물을 업로드할 수 있다.You can search for an activity according to the search condition, select the corresponding activity, and upload the output to add.

이 때, 산출물을 현재 참고하고 있는 참여인력이 산출물의 오른쪽에 표시되며, 산출물 파일을 업로드한 후 참조자가 조회해서 사용하고 있다면 조회여부가 Y로 표시되고, 담당자가 재업로드를 하려면 참조하고 있는 사람에게 재업로드를 할 수 있도록 UPLOAD승인을 요청과 사유를 입력하고 바뀐 내용에 대해서 설명하도록 되어 있다. At this time, the participant who is currently referencing the output is displayed on the right side of the output, and if the referrer is using it after uploading the output file, the inquiry is displayed as Y, and the person who is referring to the re-upload In order to allow the user to re-upload, the user is asked for UPLOAD approval, input the reason and explain the change.

산출물을 재업로드 할 수 있도록 승인요청을 받은 경우 UPLOAD승인여부를 Y로 변경함으로써 상대방이 파일을 재업로드 할 수 있다.If the approval is requested to re-upload the output, the counterpart can re-upload the file by changing the UPLOAD approval status to Y.

상기 UPLOAD승인여부는 산출물등록 화면에서 변경될 수 있다.Whether the UPLOAD is approved may be changed on the product registration screen.

즉, 도 3h에 도시된 바와 같이, 참조자료(INPUT)의 액티비티를 클릭하면 오른쪽에 UPLOAD승인여부가 표시된다.That is, as shown in FIG. 3H, if the activity of the reference material INPUT is clicked, UPLOAD approval is displayed on the right side.

따라서, 해당 프로젝트의 보안을 유지할 수 있으며, 참여인력들이 원활하게 자기의 액티비티를 수행할 수 있으며, 서로 크로스 체크할 수 있다.Therefore, the security of the project can be maintained, the participants can perform their activities smoothly, and they can cross check each other.

본 발명의 일 실시예에 따른 액티비티관리모듈(120)은 수정부(124)를 더 포 함한다.The activity management module 120 according to an embodiment of the present invention further includes a correction unit 124.

상기 수정부(124)는 이미 승인 요청된 액티비티를 수정하는 화면을 지원하며, 수정은 승인요청단계에서만 가능하도록 제한한다.The correction unit 124 supports a screen for modifying an activity already requested for approval, and the modification is limited to being possible only in the approval request step.

도 3i에 도시된 바와 같이, 상기 수정부(124)는 검색조건에 따라 액티비티가 조회되고, 수정부(124)에 수정될 액티비티가 선택 수정이 입력되면, 수정하는 항목이 입력될 수 있는 팝업창을 지원한다.As shown in FIG. 3I, the revising unit 124 displays a popup window in which an activity is inquired according to a search condition, and when an activity to be modified is selected and entered into the revising unit 124, an item to be modified is entered. Support.

본 발명의 일 실시예에 따른 액티비티관리모듈(120)은 삭제요청부(125)를 더 포함한다. 상기 삭제요청부(125)는 기존에 승인된 액티비티에 대해서 삭제를 하고자 하는 경우 승인요청하는 화면을 지원한다.The activity management module 120 according to an embodiment of the present invention further includes a deletion request unit 125. The deletion request unit 125 supports a screen for requesting approval when a deletion of the previously approved activity is desired.

따라서, 상기 삭제요청부(125)는 도 3j에 도시된 바와 같이, 조회된 자료 중에서 삭제하고자 하는 액티비티가 선택되고, 삭제요청 버튼이 클릭되면 승인권자에게 삭제요청이 전송되게 한다.Accordingly, as shown in FIG. 3J, the deletion request unit 125 selects an activity to be deleted from the inquired data, and when the deletion request button is clicked, the deletion request is transmitted to the approver.

한편, 본 발명의 일 실시예에 따른 액티비티관리모듈(120)은 요청취소부(126)를 더 포함한다. 상기 요청취소부(126)는 기존에 승인요청한 액티비티에 대해서 취소를 하고자 하는 경우 요청취소하는 화면을 지원한다.On the other hand, the activity management module 120 according to an embodiment of the present invention further includes a request canceling unit 126. The request canceling unit 126 supports a screen for canceling a request when a user wants to cancel an activity previously requested for approval.

따라서, 조회된 자료 중에서 요청취소하고자 하는 액티비티가 도 3k에 도시된 바와 같이 선택되고, 요청취소 버튼이 클릭되면 상기 액티비티 데이터베이스(190)로부터 요청취소가 되도록 한다.Accordingly, the activity to cancel the request is selected from the inquired data as shown in FIG. 3K, and when the cancel request button is clicked, the request is canceled from the activity database 190.

본 발명의 일 실시예에 따른 액티비티관리모듈(120)은 상세조회부(127a)를 더 포함한다.The activity management module 120 according to an embodiment of the present invention further includes a detail inquiry unit 127a.

상기 상세조회부(127a)는 선택한 액티비티에 대해서 최종 승인된 정보를 조회하는 화면으로, 신규등록요청인 경우에는 승인요청한 정보가 최종정보로 표시된다.The detailed inquiry unit 127a is a screen for inquiring the final approved information about the selected activity. In the case of a new registration request, the information requested for approval is displayed as final information.

따라서, 조회조건에 따라서 액티비티가 조회되고, 상세조회 하고자 하는 액티비티가 선택되고, 상세조회버튼을 클릭하면 상세조회 팝업창을 도 3l에 도시된 바와 지원하여 액티비티에 대한 상세 내용을 조회할 수 있도록 한다.Therefore, according to the inquiry condition, the activity is inquired, the activity to be viewed in detail is selected, and when the detail inquiry button is clicked, the detail inquiry popup window is supported as shown in FIG. 3L so that the details of the activity can be inquired.

본 발명의 일 실시예에 따른 액티비티관리모듈(120)은 산출물참조액티비티조회부(127b)를 더 포함한다.The activity management module 120 according to an embodiment of the present invention further includes a product reference activity inquiry unit 127b.

상기 산출물참조액티비티조회부(127b)는 액티비티를 참조하고 있는 액티비티를 조회하는 화면을 지원한다. 따라서, 검색조건에 맞게 조회한 후 산출물 참조 액티비티텝을 클릭하면 상기 액티비티 데이터베이스(190)로부터 참조하는 액티비티가 조회될 수 있도록 한다.The output reference activity inquiry unit 127b supports a screen for inquiring an activity that refers to the activity. Therefore, if the user clicks on the product reference activity step after inquiring according to the search condition, the activity referred to from the activity database 190 can be inquired.

본 발명의 일 실시예에 따른 액티비티관리모듈(120)은 승인검토부(128)를 더 포함한다.The activity management module 120 according to an embodiment of the present invention further includes an approval review unit 128.

상기 승인검토부(128)는 승인요청한 액티비티를 승인 또는 불승인하는 화면을 지원하여, 조회하고자 하는 검색조건에 따라 액티비티가 검색되면, 승인 또는 불승인 하고자 하는 액티비티를 선택하고, 승인검토 버튼, 이어서 승인 또는 불승인 버튼을 클릭하여 승인 또는 불승인된다.The approval review unit 128 supports a screen for approving or disapproving a request for approval, and when an activity is searched according to a search condition to be inquired, selects an activity to be approved or disapproved, the approval review button, and then approved or Click the Disapprove button to approve or disapprove.

만약 불승인인 경우에는 도 3n에 도시된 바와 같이, 불승인코드나 불승인 사유를 입력함로써 요청자에게 사유를 알 수 있도록 하여 참여인력이 꼭 같은 공간에 있지 않더라도 원활하게 액티비티를 수행할 수 있다.If the disapproval, as shown in Figure 3n, by entering the disapproval code or the reason for disapproval so that the requester can know the reason, it is possible to perform the activity smoothly even if the participating personnel are not in the same space.

본 발명의 일 실시예에 따른 액티비티관리모듈(120)은 일괄승인/일괄불인정부(129a)를 더 포함한다.The activity management module 120 according to an embodiment of the present invention further includes a batch approval / unauthorization unit 129a.

상기 일괄승인/일괄불인정부(129a)는 승인요청한 액티비티에 대해서 일괄적으로 승인 또는 불승인하는 화면을 지원한다.The collective approval / unauthorized government 129a supports a screen for collectively approving or disapproving the activity requested for approval.

따라서, 조회하고자 하는 검색조건에 따라 액티비티가 검색되고, 일괄승인 또는 일괄불승인 하고자 하는 액티비티들이 선택되고, 일괄승인 또는 일괄불승인 버튼이 클릭되면, 일괄승인 또는 일괄불승인된다.Therefore, when the activity is searched according to the search condition to be queried, the activities to be collectively approved or disapproved are selected, and the batch approved or batch disapproved button is clicked, the batch approved or batch disapproved is received.

이 때, 이러한 일괄승인 또는 일괄불승인은 시스템 별로 선택되는 것이 시스템간의 장애를 방지할 수 있기 때문에 바람직하다.At this time, it is preferable that such collective approval or collective disapproval be selected for each system because the failure between systems can be prevented.

본 발명의 일 실시예에 따른 액티비티관리모듈(120)은 승인/불승인취소부(129b)를 더 포함한다.The activity management module 120 according to an embodiment of the present invention further includes an approval / disapproval cancellation unit 129b.

상기 승인/불승인취소부(129b)는 승인 또는 불승인된 액티비티에 대해서 취소하는 화면을 지원한다.The approval / disapproval cancellation unit 129b supports a screen for canceling an approved or disapproved activity.

이 때, 한번 더 최종적으로 의사를 묻는 화면이 제시되어 취소가 되고, 액티비티는 승인요청단계로 변경될 수 있다.At this time, the screen for asking the doctor is finally presented again and canceled, and the activity may be changed to the approval request step.

다시 도 1에 도시된 바와 같이, 프로젝트 관리서버(100)는 액티비티엑셀등록모듈(120)을 더 포함하여, 액티비티를 대량으로 엑셀을 이용해서 신규등록 할 수 있도록 한다.As shown in FIG. 1 again, the project management server 100 further includes an activity Excel registration module 120, so that a new activity can be newly registered using a large amount of Excel.

이때 자동으로 액티비티 번호를 체크하여 기존에 존재하거나 엑셀자료에 문 제가 있는 경우 등록이 안되도록 하여 중복된 액티비티 발생 등의 문제점을 해결하였다.At this time, it automatically checks the activity number, and if there is a problem in the existing or Excel data, it is not registered and solved the problem of duplicated activity.

상기 액티비티 엑셀등록모듈(120)은 사용자가 엑셀양식을 다운로드 받아 작성하고 이를 업로드하면 상기 액티비티 데이터베이스(190)에 대하여 등록된다.The activity Excel registration module 120 registers with the activity database 190 when a user downloads an Excel form, fills it in, and uploads it.

이와 같이 액티비티 데이터베이스(190)에 등록된 액티비티들은 상기 액티비티 조회모듈(140)을 통해서, 담당자별, 기간별 또는 담당자별업무별로 액티비티를 조회될 수 있다.As such, the activities registered in the activity database 190 may be searched for activities by person in charge, period, or work by person through the activity inquiry module 140.

이와 같이, 상기 액티비티 조회모듈(140)을 통하여 총괄책임자는 원격지에서 액티비티를 수행하는 기간별담당자별 또는 기간별업무별로 액티비티를 조회할 수 있으며, 업무별담당자별 또는 업무별기간별로 액티비티를 조회할 수도 있기 때문에 주간업무보고 등이 없더라도 프로젝트 진행사항을 총괄적으로 관리할 수 있다.As such, through the activity inquiry module 140, the general manager can inquire the activities by the person in charge per period or task by period performing the activity at a remote location, and can also look up the activity by person in charge or period by task. Therefore, even if there is no weekly business report, project progress can be managed collectively.

또한, 산출물 모듈(150)은 상기 액티비티데이터베이스(190)에 상기 산출물 등록부(123)에 의해서 등록된 산출물을 조회/등록/수정/삭제할 수 있도록 지원한다.In addition, the output module 150 supports the inquiry / registration / modification / deletion of the output registered by the output registration unit 123 in the activity database 190.

상기 산출물 모듈(150)은 조회조건에 맞게 등록한 내용이 조회가 될 수 있도록 규정되는데, 산출물구분은 Task구분과 동일하며, 산출물명은 산출물명칭을 의미하며, 결과방식은 완결인지 미결인지 여부판단을 하는 방식이며, 파일업로드방식과 통보방식이 있다.The output module 150 is defined so that the contents registered according to the inquiry condition can be inquired, the output classification is the same as the Task classification, the output name means the name of the output, and the result method is to determine whether it is complete or undecided. Method, file upload method and notification method.

한편, 상기 참여인력모듈(160)은 참여인력데이터베이스(180)에 저장된 참여인력을 조회/등록/수정/삭제할 수 있도록 한다.On the other hand, the participant manpower module 160 allows to query / register / modify / delete the participant stored in the participant manpower database 180.

상기 참여인력모듈(160)을 통해서 상기 참여인력데이터베이스(180)로부터 업무구분, 시스템명, 참여인력이름이 조회될 수 있으며, 참여 인력이 등록될 수도 있다.Through the participant manpower module 160, the work classification, system name, participant manpower name can be inquired from the participant manpower database 180, and a participant manpower may be registered.

상기 참여인력등록은 참여인력을 대량으로 엑셀을 이용해서 신규등록 할 수 있으며, 참여인력이 기존에 존재하거나 엑셀자료에 문제가 있는 경우 등록이 안되도록 하여 참여인력 이외의 제3자가 프로젝트 관리시스템에 접근하는 것을 방지할 수 있다. 이 때 액셀서식을 다운로드받아 참여인력을 기재하고 이를 다시 업로드하여 상기 참여인력 데이터베이스(180)에 등록한다.Participants can be newly registered using excel in large quantities.If there is a participant in the existing or there is a problem with the Excel data, a third party other than the participant can enter the project management system. You can prevent access. At this time, download the Accel form, list the participating personnel and upload it again to register in the participating personnel database 180.

한편, 참여인력을 수정하고자 하는 항목을 입력한 후 수정버튼을 클릭하여 수정할 수도 있으며, 삭제할 수도 있습니다 다만, 이러한 참여인력에 대한 삭제, 수정, 등록 등에 대해서는 일정한 권한을 가진 자 만이 수행할 수 있도록 구성될 수 있다.On the other hand, after entering the item to modify the participant can be modified by clicking the edit button, or can be deleted, but only those with a certain authority can delete, modify, register, etc. Can be.

한편, 본 발명의 일 실시예에 따르면, 작업자가 자기의 액티비티와 관련된 액티비티 등을 조회해 보지 않더라도 상기 공지사항 및 변동사항조회모듈(170)을 통해서 로그인한 사람이 산출물담당자로 지정된 액티비티에 대해서 신규, 변경에 대해서 승인된 경우 이를 로그인 화면에서 알려서 상세조회부를 통해서 액티비티 내용을 확인할 수 있도록 되어 있다.On the other hand, according to an embodiment of the present invention, even if the worker does not look up the activity related to his activity, etc., the person logged in through the announcement and change inquiry module 170 is new to the activity designated as the person in charge of the output In addition, if the change is approved, it is notified on the login screen so that the contents of the activity can be checked through the detailed inquiry unit.

이제 도 4 및 도 5를 참조하여 본 발명의 일 실시예에 따른 프로젝트 관리시스템을 이용하여 프로젝트 참여자가 시간적 공간적 제약 없이 프로젝트에 참여할 수 있는 방법에 대해서 간단히 설명한다.4 and 5, a description will be given of a method in which a project participant can participate in a project without time and space constraints by using a project management system according to an embodiment of the present invention.

도 4 및 도 5에 도시된 바와 같이, 프로젝트 구축단계에 있어서, 프로젝트의 요건 등이 정의되고 이러한 요건 등이 분석 설계되어 구현할 액티비티와 해당 액티비티의 참여 인력 정보가 상기 액티비티액셀등록모듈(130)과 참여인력모듈(140)을 이용하여 상기 액티비티데이터베이스(190)과 참여인력데이터베이스(180)에 각각 저장 등록된다.As shown in FIG. 4 and FIG. 5, in the project construction step, the requirements of the project are defined, the activities to be analyzed and designed and implemented, and the information on the participation personnel of the corresponding activities are displayed in the activity accelerator registration module 130. The participant manpower module 140 is stored and registered in the activity database 190 and the participant manpower database 180, respectively.

액티비티 담당자는 액티비티관리모듈(120)의 액티비티조회부(121a)를 이용하여 자신이 처리해야 할 액티비티를 조회하고 해당 액티비티를 시간적 공간적 제약을 크게 받지 않고, 정해진 기간 내에 자신의 시스템에서 구현한다.The activity manager uses the activity inquiry unit 121a of the activity management module 120 to search for an activity to be handled and implements the corresponding activity in his system within a predetermined period without being greatly restricted in time and space.

구현된 산출물을 액티비티 담당자는 산출물등록부(123)를 이용하여 액티비티데이터베이스(190)에 등록한다.The person in charge of the implemented product registers the generated product in the activity database 190 using the product registration unit 123.

이에 대하여 액티비티에 대하여 액티비티 신규등록, 삽입, 삭제, 변경, 또는 시스템 추가 등이 필요한 경우에는 상기 액티비티 신규등록요청부(121b), 삽입요청부(122a), 변경요청부(122b), 시스템 추가부(122c), 삭제요청부(125)를 통해서 상기 참여인력데이터베이스(180)를 근거로 승인권한을 가진 자에게 액티비티의 신규등록, 삽입, 삭제, 변경 또는 시스템 추가 등의 승인요청이 전달된다.On the other hand, when an activity is newly registered, inserted, deleted, changed, or added to the system, the activity new registration request unit 121b, insertion request unit 122a, change request unit 122b, and system add unit are required. The request for approval of new registration, insertion, deletion, change, or system addition of an activity is transmitted to a person having approval authority based on the participation human resource database 180 through the deletion request unit 125.

상기 승인권자가 승인한 경우에 새로운 액티비티가 신규등록, 삽입, 삭제, 변경, 또는 시스템 추가되고 이에 대하여 액티비티 담당자는 산출물등록부(123)을 통해 산출물을 업로드하여 상기 액티비티데이터베이스(190)에 저장등록한다.If approved by the approver, the new activity is newly registered, inserted, deleted, changed, or added to the system. The activity manager uploads the product through the product register 123 and stores and registers the product in the activity database 190.

상기 승인권자가 불승인한 경우에 상기 승인검토부(128)를 통하여 승인하지 않은 이유와 함께 액티비티요청을 취소할 수 있다.If the approver is disapproved, the activity request can be canceled along with the reason for not approving through the approval review unit 128.

이 때 상기 승인권자 또는 액티비티 요청권자는 액티비티에 대해서 변경요청할 수 있다.At this time, the approver or the activity requesting party may request a change to the activity.

한편, 액티비티담당자가 산출물에 요류가 있거나 기타 사유로 인하여 산출물을 재업로드 하고자 할 경우에 산출물을 참조한 사람이 있는지 여부를 상기 산출물 참조 액티비티 조회부(127b)를 이용하여 해당 산출물을 선택하여 조회할 수 있다.On the other hand, if the person in charge of the activity has a mainstream in the output or wants to re-upload the output due to other reasons, the output reference activity inquiry unit 127b may select and display the output whether or not there is a person who referred the output. have.

만약 산출물을 참조한 사람이 없다면 수정 산출물을 재업로드 할 수 있으나, 산출물을 참조한 참조자가 있는 경우에 참조자에게 재업로드 승인요청을 할 수 있다.If no one has referenced the output, you can re-upload the modified output, but if there is a referrer who referenced the output, you can request a re-upload approval from the reference.

상기 참조자 들이 재업로드를 승인요청한 경우에 액티비티 담당자가 산출물을 재업로드함으로써 서로 선후행관계에 있는 액티비티 사이의 원활한 처리를 수행할 수 있으며, 산출물에 대한 작업자 사이의 크로스 체킹을 통하여 액티비티 산출물의 결함을 줄일 수 있다. When the above referees request approval for re-uploading, the activity manager re-uploads the output to perform smooth processing between activities that are preceded by each other, and defects in the activity output through cross-checking between workers on the output. Can be reduced.

또한, 작업자가 자신의 액티비티를 수행하는 중에 INPUT으로 참조하고 있는 산출물의 내용이 미흡하여 재작성이 필요하다고 판단된 경우, 반려부를 통해 INPUT Activity를 강제로 미결 상태로 되돌릴 수 있다.In addition, when the worker performs his activity and determines that the content of the output referenced by the INPUT is insufficient and needs to be rewritten, the INPUT Activity can be forcibly returned to the open state through the companion unit.

이 경우 별도의 승인절차가 필요 없기 때문에 자유롭게 작업자간의 크로스체크가 가능하다.In this case, no separate approval procedure is required, so cross-checking between workers is freely possible.

다만, 선택한 액티비티가 반드시 본인이 담당자로 지정된 액티비티여서 해당 액티비티에 대한 전문성을 기하고 있으며, 선택한 내 액티비티의 산출물 즉, OUTPUT이 [결과통보] 또는 [협의]인 경우로 지정하여 최종 결과물의 신뢰성을 높이 기 위한 것이다.However, since the selected activity is the activity designated as the person in charge, the expert is specialized in the activity, and the output of the selected activity, that is, the OUTPUT is designated as [notification of result] or [consultation], to confirm the reliability of the final result. It is to raise.

또한, 선택한 내 액티비티가 완결 되지 않은 상태여야 한다.In addition, the selected My Activities must be incomplete.

왜냐하면, 내 액티비티가 완결된 상태에서는 승인권자의 승인을 받아서 처리하는 것이 내 액티비티의 산출물을 참조하는 참조자의 액티비티에 영향을 주지 않을 수 있으며 프로젝트의 안정성을 기할 수 있다.Because, when my activity is completed, processing with the approval of the approver may not affect the activities of the referrer who refers to the output of my activity and may make the project stable.

한편, 반려하려는 액티비티가 반드시 참조INPUT으로 지정되어 있는 경우여서 전체 프로젝트의 산출물에는 영향을 주지 않는 것인지 여부를 판단한다.On the other hand, since the activity to be returned is necessarily designated as the reference INPUT, it is determined whether it does not affect the output of the entire project.

또한, 반려하려는 액티비티가 산출물등록이 완료되어 완결 상태여야 한다.In addition, the activity to be returned must have been completed and completed.

이와 관련하여 도 6a 및 도 6b를 참조하여 상세히 설명하겠다.This will be described in detail with reference to FIGS. 6A and 6B.

도 6a는 액티비티 조회의 화면예시화면이고, 도 6b는 참조액티비티를 반려하기 위한 팝업창의 예시도이다.6A is a screen example screen of an activity inquiry, and FIG. 6B is an exemplary diagram of a popup window for returning a reference activity.

도 7은 참조 액티비티의 반려 순서를 나타내는 플로우챠트이다.7 is a flowchart showing a return order of reference activities.

도 6a 내지 도 7을 참조하면, 예를 들어 액티비티 F2.1.4.6 조회하면, 액티비티 OUTPUT이 결과통보이고 참조INPUT이 있는 경우에, 참조INPUT을 상세조회할 수 있다(S10).Referring to FIGS. 6A to 7, for example, if activity F2.1.4.6 is queried, when the activity OUTPUT is notified of the result and there is a reference INPUT, the reference INPUT may be looked up in detail (S10).

이 때, 참조INPUT의 산출물이 재작성이 필요하다고 판단되면(S20), 선택한 액티비티가 반드시 본인이 담당자로 지정된 액티비티인지 판단하고(S30), OUTPUT이 [결과통보] 또는 [협의]인지 여부를 판단하고(S40), 선택한 내 액티비티가 완결 되지 않은 상태인지여부를 판단하며(S50), 액티비티의 OUTPUT 이 [결과통보]이고, 참조INPUT을 가진 경우에 참조 INPUT을 상세조회한다.At this time, if it is determined that the output of the reference INPUT needs to be rewritten (S20), it is determined whether the selected activity is the activity designated as the person in charge (S30), and whether the OUTPUT is [Notification of Result] or [Consultation]. (S40), it is determined whether the selected My Activity is incomplete (S50), and if the OUTPUT of the Activity is [Notification of Result] and has a Reference INPUT, the Reference INPUT is looked up in detail.

만약, INPUT Activity(F2.1.4.5)의 산출물을 재작성할 필요가 있다고 판단되어 반려하고자 할 경우는, 본인의 Activity를 선택하고 반려부를 이용하여 반려를 입력한다(S60).If it is determined that the output of the INPUT Activity (F2.1.4.5) needs to be rewritten, the user may select his Activity and input the return using the return unit (S60).

이 때 상기 반려부는 반려를 위한 팝업창이 나타내고(S70), INPUT 액티비티가 참조 INPUT으로 지정되어 있는지 판단하고(S80) 반려하려는 액티비티가 산출물등록이 완료되어 "완결"상태인지를 판단한다(S90).At this time, the companion unit displays a pop-up window for the companion (S70), determines whether the INPUT activity is designated as the reference INPUT (S80), and determines whether the activity to be returned has been completed by registering the product (S90).

작업자가 팝업창 표시된 반려대상을 선택하고 반려사유를 입력한 후, 마지막에 반려버튼을 눌러서 완료한다.The worker selects the companion object displayed in the popup window, inputs the reason for the companion, and finally presses the companion button to complete.

반려가 완료되면 INPUT 액티비티에 등록되어 있던 산출물이 삭제된다(S100). When the return is completed, the output registered in the INPUT activity is deleted (S100).

이 때 반려된 액티비티의 담당자로 로그인하는 경우 해당 로그인 화면에는 첫 화면에 반려되었음을 알리는 상기 공지사항 및 변동상황부를 통해서 표시된다.In this case, when the user logs in as the person in charge of the returned activity, the corresponding log-in screen is displayed through the above-mentioned notice and the change situation unit indicating that the screen is returned.

상기 참고사항을 클릭하면 반려된 액티비티의 상세조회 화면이 표시되고, 요청사유를 통해 반려사유를 확인할 수 있다. If you click the above reference, the detailed inquiry screen of the returned activity is displayed, and you can confirm the reason of the request through the reason for request.

이 때, 담당자는 반려된 액티비티를 조회 시 진행상태가 [미결], 승인상태가 [반려]로 표시되는데, 기등록된 산출물 파일은 삭제되었으므로 산출물을 재 업로드하고, 담당자가 반려된 Activity에 다시 산출물등록을 하면 아래와 같이 진행상태가 [완결]로 분류된다.At this time, the person in charge displays the progress status as [open] and the approval status as [return] when checking the returned activity. Since the registered product file has been deleted, upload the product again, and the person in charge returns the product to the returned activity. After registration, the progress status is classified as [Complete] as below.

반려권자가 자신의 액티비티를 완결 처리하면, 반려됐던 참조INPUT 의 승인상태가 [승인]으로 표시되어 반려절차가 완료된다.When the licensor completes his or her activity, the approval status of the returned reference INPUT is marked as [approval] and the return process is completed.

한편, 내 액티비티를 완결에서 미결로 되돌릴 수 있다.On the other hand, I can revert my activity from complete to open.

1) 파일을 업로드하여 완결한 경우에는 해당 Activity를 선택하고 산출물등록 버튼을 누른 후, 아래와 같이 등록했던 파일명만 지운 후에 등록 버튼을 누르면 미착수 또는 진행 중 또는 미결 상태로 바뀔 수 있으며, 1) If the file is uploaded and completed, select the relevant activity, click the register product button, delete only the registered file name as shown below, and press the register button to change to unstarted or in progress or open.

2) 결과통보, 협의 등 통보여부에 체크한 경우에도 파일명을 지우는 것과 같은 방법으로 산출물등록 버튼을 누른 후, 표시되는 팝업창에서 통보여부의 체크를 해제한 후, 등록 버튼을 누르면 미착수 또는 진행중 또는 미결 상태로 바뀔 수 있다.2) Even if it is checked whether or not the result notification, consultation, etc. are notified, press the product registration button in the same way as deleting the file name, and then uncheck the notification in the pop-up window that appears, and then press the registration button is not started or in progress or Can be changed to open.

3) 다시 완결 처리하려면, 파일을 업로드 하거나 통보여부에 체크하면 된다.3) To complete the process again, upload the file or check the notification.

또한, 참조INPUT 도 변경할 수 있다.You can also change the reference INPUT.

1) 변경하려는 액티비티를 선택한 후, 변경요청 버튼을 누르면 <Activity변경요청> 팝업 화면이 표시되며, 이미 변경요청 중인 액티비티에 대해서 변경요청 버튼을 누른 경우는 <액티비티 수정> 화면이 표시되며, 기능은 동일하다.1) Select the activity you want to change and press the Change Request button to display the <Activity Change Request> popup screen.If you press the Change Request button for an activity that has already been changed, the <Edit Activity> screen is displayed. same.

2) 참조자료(INPUT)의 추가/삭제 버튼을 이용하여 참조자료를 추가하거나 삭제한 후, 요청구분과 요청사유를 입력하고, 최종적으로 변경요청을 눌러서 변경조작을 마친다.2) After adding or deleting reference materials by using Add / Delete button of INPUT, input request classification and reason, and finally press change request to complete the change operation.

3) 변경 요청한 내용은 최종 승인을 득할 때까지는 액티비티 조회 화면에 반영되지 않고, 승인상태가 [승인요청]으로 표시된다.3) The change request is not reflected in the activity inquiry screen until the final approval is obtained, and the approval status is displayed as [Request for approval].

다만, 완결된 액티비티는 변경요청이 불가능하며, 시작일과 종료예정일, 담당자, 산출물 등도 같은 방법으로 변경할 수 있기 때문에 승인 전까지는 변경요청 버튼을 눌러서 여러 번 수정할 수 있으며, 승인 전까지는 요청취소 버튼을 눌러서 변경요청을 취소할 수 있다.However, the completed activity cannot be changed, and the start date, end date, contact person, and deliverables can be changed in the same way, so you can modify it several times by pressing the change request button until approval. You can cancel the change request.

이상의 설명은 본 발명의 기술 사상을 예시적으로 설명한 것에 불과한 것으로서, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자라면 본 발명의 본질적인 특성에서 벗어나지 않는 범위에서 다양한 수정 및 변형이 가능할 것이다. 따라서, 본 발명에 개시된 실시예들은 본 발명의 기술 사상을 한정하기 위한 것이 아니라 설명하기 위한 것이고, 이러한 실시예에 의하여 본 발명의 기술 사상의 범위가 한정되는 것은 아니다. 본 발명의 보호 범위는 아래의 청구범위에 의하여 해석되어야 하며, 그와 동등한 범위 내에 있는 모든 기술 사상은 본 발명의 권리범위에 포함되는 것으로 해석되어야 할 것이다.The foregoing description is merely illustrative of the technical idea of the present invention, and various changes and modifications may be made by those skilled in the art without departing from the essential characteristics of the present invention. Therefore, the embodiments disclosed in the present invention are not intended to limit the technical idea of the present invention but to describe the present invention, and the scope of the technical idea of the present invention is not limited by these embodiments. The protection scope of the present invention should be interpreted by the following claims, and all technical ideas within the equivalent scope should be interpreted as being included in the scope of the present invention.

도 1은 본 발명의 일 실시예에 따른 프로젝트 관리시스템을 도시한 블록도이다.1 is a block diagram showing a project management system according to an embodiment of the present invention.

도 2는 본 발명의 일 실시예에 따른 프로젝트 관리시스템 중 액티비티관리모듈의 내부 구성을 보이기 위한 상세 블록도이다.2 is a detailed block diagram illustrating an internal configuration of an activity management module of a project management system according to an embodiment of the present invention.

도 3a 내지 도 3n은 이러한 액티비티관리모듈의 내부 구성에 의하여 지원되는 화면예시도이다.3A to 3N illustrate screen examples supported by the internal configuration of the activity management module.

도 4는 본 발명의 일 실시예에 따른 액티비티 프로젝트 관리시스템을 이용한 프로젝트 관리방법을 설명하는 플로우챠트이다.4 is a flowchart illustrating a project management method using an activity project management system according to an embodiment of the present invention.

도 5는 본 발명의 일 실시예에 따른 액티비티 프로젝트 관리시스템을 이용한 산출물재업로드방법을 설명하는 플로우챠트이다.5 is a flowchart illustrating a method for reloading a product using an activity project management system according to an embodiment of the present invention.

도 6a는 액티비티 조회의 화면예시화면이고, 도 6b는 참조액티비티를 반려하기 위한 팝업창의 예시도이다.6A is a screen example screen of an activity inquiry, and FIG. 6B is an exemplary diagram of a popup window for returning a reference activity.

도 7은 참조 액티비티의 반려 순서를 나타내는 플로우챠트이다.7 is a flowchart showing a return order of reference activities.

Claims (12)

하나의 프로젝트를 세부업무개선요건, Task(업무요건정의), 작업, 일련번호의 번호체계를 가지며, 담당자, 담당자 역할, 기간, 시스템이라는 요건을 갖는 액티비티로 구분하여 효율적으로 관리하기 위한 프로젝트 관리서버, 상기 프로젝트 관리 서버와 서로 떨어져 있는 참여인력의 단말기를 연결하는 데이터통신망, 및 상기 프로젝트 관리서버로부터 상기 데이터통신망을 통해 상기 참여인력의 단말기에 제공되는 액티비티 프로젝트 관리 프로그램을 포함하는 프로젝트 관리시스템을 이용한 프로젝트 관리방법에 있어서, Project management server for efficient management by dividing a project into activities with detailed task improvement requirements, tasks, tasks, and serial numbering systems, and having requirements such as person in charge, role of role, period, and system A project management system comprising an activity project management program provided to a terminal of the participating personnel through the data communication network from the project management server, and a data communication network connecting the terminals of the participating personnel separated from the project management server. In the project management method, 상기 액티비티 정보와 참여인력 정보를 상기 액티비티 프로젝트 관리프로그램을 통해 상기 관리서버에 연결된 액티비티데이터베이스와 참여인력데이터베이스에 각각 대량으로 신규등록하는 단계와, Registering the activity information and the participant information in large quantities in an activity database and a participant database connected to the management server through the activity project management program, respectively; 상기 액티비티데이터베이스에 등록된 액티비티에 새로운 액티비티를 신규등록, 수정, 변경, 시스템 변경, 삭제 중 적어도 하나를 상기 참여인력데이터베이스에 저장된 참여인력이 상기 낵티비티 프로젝트 관리 프로그램을 통해 수행하는 단계와, Performing at least one of a new activity, a new activity, a new activity, a system change, and a deletion of an activity registered in the activity database through the NAC project management program; 상기 액티비티데이터베이스에 등록된 액티비티의 신규등록, 수정, 변경, 시스템 변경, 삭제 중 적어도 하나의 변동사항이 상기 참여인력의 로그인시 표시되는 단계를 포함하며, At least one change of the new registration, modification, change, system change, deletion of the activity registered in the activity database includes the step of displaying at the login of the participating personnel, 상기 액티비티데이터베이스에 등록된 액티비티에 새로운 액티비티를 신규등록, 수정, 변경, 시스템 변경, 삭제하는 단계는, The step of newly registering, modifying, changing, changing, or deleting a new activity in an activity registered in the activity database, 상기 참여인력이 상기 프로젝트관리프로그램을 통해 로그인하는 단계와,Logging the participant through the project management program; 상기 프로젝트관리서버의 액티비티관리모듈의 지원을 받는 상기 프로젝트 프로그램 화면 상에서 상기 액티비티데이터베이스에 등록된 액티비티에 새로운 액티비티를 신규등록, 수정, 변경, 시스템 변경, 삭제 신호를 입력하는 단계와,Inputting new registration, modification, change, system change, and delete signals to an activity registered in the activity database on the project program screen supported by the activity management module of the project management server; 상기 액티비티 신규등록, 수정, 변경, 시스템 변경, 삭제 시에 승인권자가 자동으로 지정되어 전송되는 단계와,Authorization holder is automatically designated and transmitted when the activity is newly registered, modified, changed, changed or deleted; 상기 액티비티의 신규등록, 수정, 변경, 시스템 변경, 삭제에 대한 승인권자의 승인 신호 입력하는 단계와,Inputting the approval signal of the approver for the new registration, modification, change, system change, and deletion of the activity; 상기 액티비티 신규등록, 수정, 변경, 시스템 변경, 삭제가 상기 액티비티데이터베이스에 저장등록되는 단계를 포함하는 액티비티 프로젝트 관리시스템을 이용한 프로젝트 관리방법.And registering the activity, registering, modifying, changing, changing, and deleting the system in the activity database. 삭제delete 제 1 항에 있어서,The method of claim 1, 상기 프로젝트 관리 프로그램에 로그인시 상기 액티비티 로그인 자의 액티비티의 수정, 변경, 시스템 변경, 삭제가 표시되는 단계를 포함하는 액티비티 프로젝트 관리시스템을 이용한 프로젝트 관리방법.And modifying, changing, changing, and deleting an activity of the activity login user when logging in to the project management program. 제 1 항에 있어서,The method of claim 1, 상기 액티비티에 대응하는 산출물을 산출물등록부를 이용하여 상기 액티비티데이터베이스에 등록하는 단계를 포함하는 액티비티 프로젝트 관리시스템을 이용한 프로젝트 관리방법.And registering the output corresponding to the activity in the activity database using a product registration unit. 제 4 항에 있어서,The method of claim 4, wherein 상기 산출물 등록 시 참조물이 등록되는 액티비티 프로젝트 관리시스템을 이용한 프로젝트 관리방법.A project management method using an activity project management system in which a reference is registered when the output is registered. 제 5 항에 있어서,The method of claim 5, 상기 산출물 조회시 상기 산출물을 조회한 사람이 표시되는 액티비티 프로젝트 관리시스템을 이용한 프로젝트 관리방법.A project management method using an activity project management system in which a person who inquires the output is displayed when the output is inquired. 제 5 항에 있어서,The method of claim 5, 상기 산출물 등록시 등록한 참조물의 내용이 미흡하여 재작성이 필요하다고 판단되는 경우 상기 산출물 등록권자 또는 승인권자가 선택된 액티비티가 본인이 담당자로 지정된 액티비티인지 판단하는 단계와,Determining whether an activity selected by the product registration right holder or the approver authority is the activity designated as the person in charge when it is determined that the content of the reference registered during the product registration is insufficient and the rewriting is necessary; 상기 액티비티가 본인이 담당자로 지정된 액티비티인경우 선택한 내 액티비INPUT 산출물을 강제로 미결 상태로 되돌리는 반려단계를 포함하는 액티비티 프로젝트 관리시스템을 이용한 프로젝트 관리방법.And a return step for forcibly returning the selected My Activity INPUT output to an open status when the activity is an activity designated by the person in charge. 제 5 항에 있어서,The method of claim 5, 작업자가 내 액티비티를 완결에서 미결로 돌리는 단계를 포함하며,Includes the steps that a worker turns your activity from complete to open, 시작일과 종료예정일, 담당자, 산출물 등도 같은 방법으로 변경할 수 있기 때문에 승인 전까지는 변경요청 버튼을 눌러서 여러 번 수정할 수 있으며, 승인 전까지는 요청취소 버튼을 눌러서 변경요청을 취소가능한 액티비티 프로젝트 관리시스템을 이용한 프로젝트 관리방법.Since the start date and the scheduled end date, the person in charge, and the output can be changed in the same way, it can be modified several times by pressing the change request button until approval, and the project can be canceled by pressing the cancel request button until approval. How to manage. 제 5 항에 있어서,The method of claim 5, 파일을 업로드하여 완결한 경우에는 해당 액티비티를 선택하고 산출물등록 버튼을 누른 후, 아래와 같이 등록했던 파일명만 지운 후에 등록 버튼을 눌러 미착수 또는 진행 중 또는 미결 상태로 바꾸는 액티비티 프로젝트 관리시스템을 이용한 프로젝트 관리방법.If you uploaded the file and completed it, select the activity, click the Product Registration button, delete the file name registered as shown below, and then click the Register button to change the project to unstarted, in progress, or pending. Way. 제 8 항에 있어서,The method of claim 8, 결과통보, 협의 등 통보여부에 체크한 경우, 산출물등록 버튼을 누른 후, 표시되는 팝업창에서 통보여부의 체크를 해제한 후, 등록 버튼을 눌러서 미착수 또는 진행중 또는 미결 상태로 바꾸는 액티비티 프로젝트 관리시스템을 이용한 프로젝트 관리방법.If you check the result notification, consultation, etc. notification, press the product registration button, uncheck the notification in the pop-up window that appears, and then press the registration button to change the activity project management system to unstarted or in progress or pending status. Project management method. 제 4 항에 있어서,The method of claim 4, wherein 상기 액티비티담당자가 산출물에 요류가 있거나 기타 사유로 인하여 산출물을 재업로드 하고자 할 경우에 산출물을 참조한 사람이 있는지 여부를 판단하는 단계와,Determining whether there is a person who referred to the output when the activity manager wants to upload the output again due to the flow of the output or for other reasons; 산출물을 참조한 사람이 있는 경우 상기 산출물을 참조한 참조자에게 재업로드 승인요청이 전송되는 단계를 포함하는 액티비티 프로젝트 관리시스템을 이용한 프로젝트 관리방법.If there is a person who refers to the output, the project management method using the activity project management system comprising the step of transmitting a re-upload approval request to the referr referring to the output. 제 11 항에 있어서,The method of claim 11, 상기 산출물을 재업로드 할 수 있도록 승인요청을 받은 경우 UPLOAD승인여부를 Y로 변경함으로써 상대방이 파일을 재업로드하게 하는 단계와,Allowing the counterpart to re-upload the file by changing the UPLOAD approval to Y when receiving the approval request to upload the output again; 상기 UPLOAD승인여부를 산출물등록 화면에 표시하는 단계를 포함하는 액티비티 프로젝트 관리시스템을 이용한 프로젝트 관리방법.Project management method using the activity project management system comprising the step of displaying the approval of the upload on the output registration screen.
KR1020090060737A 2009-07-03 2009-07-03 Project management method using activity based project management system KR101076419B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090060737A KR101076419B1 (en) 2009-07-03 2009-07-03 Project management method using activity based project management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090060737A KR101076419B1 (en) 2009-07-03 2009-07-03 Project management method using activity based project management system

Publications (2)

Publication Number Publication Date
KR20110003126A KR20110003126A (en) 2011-01-11
KR101076419B1 true KR101076419B1 (en) 2011-10-25

Family

ID=43611162

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090060737A KR101076419B1 (en) 2009-07-03 2009-07-03 Project management method using activity based project management system

Country Status (1)

Country Link
KR (1) KR101076419B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102258163B1 (en) * 2020-08-31 2021-05-27 주식회사 케이비손해보험 Method, System and Apparatus of Cooperation Service Provision for Hierarchical Organizational Structure

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101685213B1 (en) * 2011-06-08 2016-12-21 매그나칩 반도체 유한회사 Apparatus and method for managing new product and technology introductions based on work process
KR101348608B1 (en) * 2012-04-03 2014-01-10 한국철도기술연구원 Apparatus for interfacing project management tool and systems engineering tool
KR20220075877A (en) 2020-11-30 2022-06-08 전성훈 Enterprise project management method
KR102412088B1 (en) * 2021-11-08 2022-06-22 (주) 바우디움 Method for managing the progress of tasks by state machine, and apparatus using the same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102258163B1 (en) * 2020-08-31 2021-05-27 주식회사 케이비손해보험 Method, System and Apparatus of Cooperation Service Provision for Hierarchical Organizational Structure

Also Published As

Publication number Publication date
KR20110003126A (en) 2011-01-11

Similar Documents

Publication Publication Date Title
JP5694200B2 (en) Method and system for workflow integration
US8880436B2 (en) Automation system and method for a web-based implementation portal
Kautz et al. Knowledge, learning and IT support in a small software company
US20220172149A1 (en) System of standardized api interpretation for inter application communication
US20040030992A1 (en) System and method for management of a virtual enterprise
US20020169649A1 (en) Methods and systems for performing acquisition integration
US20080103871A1 (en) Company project management system
US20050159968A1 (en) Organizationally interactive task management and commitment management system in a matrix based organizational environment
KR101076419B1 (en) Project management method using activity based project management system
US8645180B1 (en) Automated impact assessment and updates of compliance response plans pursuant to policy changes
US10785224B2 (en) System and method for event management
CN111523812A (en) Model life cycle management method and system, equipment and storage medium
US20040167790A1 (en) Method of conducting business in a system requiring frequency up-dates and corrections
CN111523810A (en) Enterprise-level model management method, system, device and storage medium
Abrantes et al. Preparing project based organizations for change
CN108764673B (en) Patent hosting service platform and data interaction method based on platform
KR20230012229A (en) Collaborative project management platform and method of the same
US20210357841A1 (en) Method and System for Monitoring Accountability and Fairness for An Enterprises
KR101076420B1 (en) Activity based project management apparatus and method
US20190266544A1 (en) Techniques for managing process-flows across an enterprise
CN111523808B (en) Model centralized management method, system, equipment and storage medium
JP4121344B2 (en) License management apparatus, method and program
Mohamed et al. Quantifying the time and cost associated with the request for information (RFI) process in construction
Andersson et al. Integration of Business Process Support with Knowledge Management–A Practical Perspective
US20220358466A1 (en) Systems, methods, and apparatuses for employment management

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20141016

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20151008

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20161124

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20170921

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20180823

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20190822

Year of fee payment: 9