KR20130083042A - Report managrment method - Google Patents

Report managrment method Download PDF

Info

Publication number
KR20130083042A
KR20130083042A KR1020110144367A KR20110144367A KR20130083042A KR 20130083042 A KR20130083042 A KR 20130083042A KR 1020110144367 A KR1020110144367 A KR 1020110144367A KR 20110144367 A KR20110144367 A KR 20110144367A KR 20130083042 A KR20130083042 A KR 20130083042A
Authority
KR
South Korea
Prior art keywords
coating
report form
module
special
operator
Prior art date
Application number
KR1020110144367A
Other languages
Korean (ko)
Inventor
추창수
Original Assignee
현대중공업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 현대중공업 주식회사 filed Critical 현대중공업 주식회사
Priority to KR1020110144367A priority Critical patent/KR20130083042A/en
Publication of KR20130083042A publication Critical patent/KR20130083042A/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Development Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Application Of Or Painting With Fluid Materials (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

PURPOSE: A marine construction special painting and a coating process report integrated management method, which can manage in good quality while increasing quality of work according to a standardized checking report form and which can reduce the frequency of erroneous work, are provided. CONSTITUTION: A check report form in which a special painting coated on a module and a result of a coating agent can be inputted is produced beforehand and stored into a database. The check report form is distributed, and the check report form is collected from an operator, and thereby the special painting coated on the module and the coating states are managed together. [Reference numerals] (AA) Start; (BB) Check report form in which a special painting coated on a module and a result of a coating agent can be inputted is produced beforehand and stored into a database; (CC) Check report form is distributed; (DD) Report form is collected from an operator; (EE) Special painting coated on the module and the coating states are managed together; (FF) End

Description

Integrated management method for offshore construction special coating and coating work {Report managrment method}

The present invention relates to the integrated management method of marine coatings special coating and coating work report, and more specifically, to the worker to submit the state of the special coating and coating applied to the MODULE in the standardized inspection report form Therefore, it is possible to collectively manage the state of special coatings and coatings, thereby improving the quality of the special coatings and coatings applied to the offshore construction module, while maintaining high quality conditions, and reducing the frequency of malfunctions in the field. It is about the integrated management method of marine coating special coating and coating work report.

In general, special coatings, coatings and paints play an important role in producing modules.

Special painting, coating, and painting go through various processes.

1. Surface treatment and pretreatment

Surface treatment occupies an important position that is not an exaggeration to say whether it affects the success or failure of painting. No matter how good paint equipment is used, the coating will fail if the surface treatment is not appropriate. Surface treatment must be carefully selected in terms of method, depending on the environment, cost and level of the subject.

The main purpose of painting is to protect material (increasing corrosion resistance) and aesthetics (color and gloss).

Depending on the material and processing method of the material, the surface of the material is covered with a deteriorated layer, an oxide layer, etc., and dirt, such as fat, oil, moisture, rust, and dust, is attached. In addition to lowering the adhesion between the paint and the paint, dryness, swelling and cracking of the coating film occur, which causes the coating film to peel off.

In particular, when painting with rust remaining on the surface of the material, rust continuously occurs under the coating film, and its area gradually increases, and swelling or cracking occurs in the coating film, which eventually destroys the coating film.

Therefore, it is possible to obtain the desired coating by completely removing all these foreign substances before coating and coating the corrosion resistant chemical film so that rust does not occur under the coating. The whole operation is called surface preparation. It is also called pretreatment.

The surface treatment is first performed during the degreasing process to remove fats and oils, and then degreasing after the degreasing process is performed to remove the oxide or hydroxide layer formed on the metal surface. Degreasing is mainly carried out with blast cleaning.

2. Standards and grades for surface treatment

As a method of determining the removal lowness of black skin of a steel surface and red blue red, the method of comparing with the degreasing treatment reference board manufactured with the color photographic sample board is widely used. The most famous of these descaling reference pins is the SIS 055900 standard established by the Swedish Standards Association, which has been applied in the United States, Germany and many other countries.

As described above, a special coating or coating is a very important process to influence the life of the module to be manufactured when manufacturing the offshore construction.

The overall coating process for the offshore construction is carried out in the order of steel loading, pretreatment, pretreatment coating, production, secondary surface treatment, prescribed number of coating thickness, and finish coating.

However, in the past, since there was no method for integrating management of special coating and coating work performed at the time of module production, a worker manually prepared and provided a report by grasping the state of special coating and coating. The reports produced by them were provided in an inconsistent format, resulting in problems that could not be managed by integrating special coating and coating conditions.

In addition, due to the conventional management of the state of special coating and coating can not be integrated, the quality of the special coating and coating applied to the module could not be improved, and the frequency of misoperation in the field increases the workability significantly decreased. This is happening.

Therefore, the present invention is to improve the conventional problems as described above, the integrated management of the special coating and coating state as the operator submits the state of the special coating and coating applied to the module on the standardized inspection report form It can improve the quality of special coatings and coatings applied to the module, manage them in good condition, and reduce the frequency of misoperation on site. The purpose is to provide an integrated management method.

In order to achieve the above object, the present invention of the marine engineering special coating and coating work report integrated management method, a database for pre-production of the inspection report form to fill in the application results of the special coating and coating agent applied to the module (MODULE) by item Storing in a first step; Distributing the inspection report form at the request of the worker; A third step of collecting and collecting the inspection report form from the operator to manage the special coating and coating state applied to the module; .

In addition, the inspection report form includes a SURFACE PREPARATION CONDITION base part for describing the surface treatment state, and an APPLICATION CONDITION base part for describing the inspection environment.

In addition, the SURFACE PREPARATION CONDITION base part includes KINDS OF ABRASIVE, GRADE, ANCHOR PROFILE, SALT TEST, DUST LEVEL, REPAIR METHOD, KINDS OF PAINT FOR SEALER COAT, POROSITY TEST, BEND TEST, SEALER VISUAL.

As described above, the present invention allows the operator to submit the special coating and coating state applied to the module in a standardized inspection report form, thereby integrating and managing the special coating and coating state, and thus the special coating applied to the module. It can improve the quality of painting and coating, can be managed in good quality, and can be expected to reduce the frequency of misoperation on site.

1 is a block diagram showing the hardware configuration for the implementation of the present invention.
Figure 2 is a flowchart showing the integrated management method of the marine coatings and coating work report of the present invention.
Figure 3 illustrates a standardized check report form applied to the present invention.

Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings.

Figure 1 shows a hardware configuration for the implementation of the present invention, the operator 1 for downloading the inspection report form stored in the database (3) through the management server (2); The inspection report form, which is connected to the terminal 1 through a communication network and is stored in the database 3 at the request of the terminal 1, is distributed, and the inspection report form transmitted from the terminal 1 is received. A management server (2) for analyzing and managing the contents of the inspection report form after the integrated management of the special coating and coating state of the offshore construction; And a database (3) for storing an inspection report form in which items of application of the special coating and coating agent applied to the module can be written for each item.

At this time, the integrated management method of the marine engineering special coating and coating work report of the present invention implemented by the hardware configuration is to proceed, including the first to third steps, the first step is applied to the module Preliminary check report form that can fill in the application results of special coatings and coatings is stored in the database.

The second step is to distribute the inspection report form at the request of the operator, and the third step is to collect and manage the inspection report form from the operator to integrate and manage the special coating and coating state applied to the module.

Here, the inspection report form includes a SURFACE PREPARATION CONDITION base part for describing the surface treatment state, and an APPLICATION CONDITION base part for describing the inspection environment.

In addition, the SURFACE PREPARATION CONDITION base part is to include KINDS OF ABRASIVE, GRADE, ANCHOR PROFILE, SALT TEST, DUST LEVEL, REPAIR METHOD, KINDS OF PAINT FOR SEALER COAT, POROSITY TEST, BEND TEST, SEALER VISUAL.

That is, in the integrated management method of the ship special coating and coating work report according to an embodiment of the present invention, as shown in Figures 1 to 3 attached, first, the administrator to write the application results of the special coating and coating agent applied to the module by item An inspection report form can be prepared in advance and stored in the database (3).

The inspection report form stored in the database 3 includes a SURFACE PREPARATION CONDITION base part for describing the surface treatment state and an APPLICATION CONDITION base part for describing the inspection environment, as shown in FIG. 3.

In addition, the SURFACE PREPARATION CONDITION base part describing the surface treatment state is KINDS OF ABRASIVE, GRADE (grade), ANCHOR PROFILE, SALT TEST, DUST LEVEL (dust level), REPAIR METHOD (repair method), KINDS OF PAINT FOR SEALER COAT (Paint Type), POROSITY TEST, BEND TEST, and SEALER VISUAL items are included so that when the operator fills out each item in the inspection report form, the user can grasp the state of special coating and coating applied to the module using the input items. .

At this time, in the state in which the inspection report form which can check and describe the application state of the special coating and coating agent is stored in the database 3 as described above, the operator uses the terminal 1 to the management server 2. Upon requesting the inspection report form, the management server 2 distributes the inspection report form stored in the database 3 to the worker through the terminal 1.

Then, the operator writes the information grasping the state of the special coating and coating of the offshore construction to each item of the inspection report form distributed through the terminal 1, and re-transmits the inspection report form containing the information to the management server (2).

Accordingly, the management server 2 is to collect the inspection report form transmitted from the terminal 1 to integrally manage the state of special coating and coating of the module currently being produced based on the description of each item.

Here, the integrated management of the special coating and coating state is to the operator by comprehensively grasping the state of the special coating and coating state of the module being manufactured, what kind of paint is painted, and the surface treatment state. It can be provided so that the operator can check the special coating and coating state of the module at any time.

With this data, the operator will not make mistakes when performing special painting and coating work on site, and the condition of painting and coating will be managed optimally.

That is, the present invention can describe the items of the SURFACE PREPARATION CONDITION base part for describing the surface treatment state and the APPLICATION CONDITION base part for describing the inspection environment, as shown in FIG. According to the description items it will be possible to integrated management of the special coating and coating status of the offshore construction.

Although the technical concept of the marine engineering special coating and coating work report integrated management method of the present invention has been described with the accompanying drawings, this is illustrative of the best embodiment of the present invention, but is not intended to limit the present invention.

Accordingly, it is a matter of course that various modifications and variations of the present invention are possible without departing from the scope of the present invention. And are included in the technical scope of the present invention.

1: terminal 2: management server
3: Database

Claims (2)

A first step of pre-producing and storing in a database an inspection report form in which application results of the application of special coatings and coating agents applied to the offshore construction module can be written for each item;
Distributing the inspection report form at the request of an operator; And
A third step of collecting and collecting the inspection report form from the operator to manage the special coating and coating state applied to the module; Integrated management and coating work report integrated management method of marine engineering, characterized in that the progress including.
The method of claim 1, wherein the inspection report form,
SURFACE PREPARATION CONDITION base part for describing the surface treatment state, and APPLICATION CONDITION base part for describing the inspection environment integrated management method for marine coating and coating work report.
KR1020110144367A 2011-12-28 2011-12-28 Report managrment method KR20130083042A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110144367A KR20130083042A (en) 2011-12-28 2011-12-28 Report managrment method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110144367A KR20130083042A (en) 2011-12-28 2011-12-28 Report managrment method

Publications (1)

Publication Number Publication Date
KR20130083042A true KR20130083042A (en) 2013-07-22

Family

ID=48994205

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110144367A KR20130083042A (en) 2011-12-28 2011-12-28 Report managrment method

Country Status (1)

Country Link
KR (1) KR20130083042A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20230049461A (en) * 2021-10-06 2023-04-13 효성티앤에스 주식회사 Method and apparatus for producing of elecronic document, computer-readable storage medium and computer program

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20230049461A (en) * 2021-10-06 2023-04-13 효성티앤에스 주식회사 Method and apparatus for producing of elecronic document, computer-readable storage medium and computer program

Similar Documents

Publication Publication Date Title
Christopher et al. Leaning
Lee et al. Reducing mold changing time by implementing Lean Six Sigma
US9576252B2 (en) Test operation and reporting system
CN106567981A (en) On-line repairing method for nuclear power station metal pipeline
AT516188A3 (en) Service and information system for buildings and procedures for this
Memon et al. Controlling the defects of paint shop using seven quality control tools in an automotive factory
KR20130083042A (en) Report managrment method
Rewers et al. Impact of kaizen solutions on production efficiency
Romano et al. Lean Maintenance model to reduce scraps and WIP in manufacturing system: Case study in power cables factory
Dağsuyu et al. Integrated process capability and multi-criteria decision-making approach
KR20230055630A (en) Method for improving the quality of iron plate
Cisneros et al. Maintenance management in an industrial process: Case study in a company of the Industrial Pole of Manaus
JP6726697B2 (en) Method and system for optimizing criteria in the value chain of the system under investigation
DE102019111947A1 (en) Method for determining a parameter characterizing the surface roughness of at least one surface of a component
Ruan et al. A Matrix Model for Effective of Project Management
DE102010043399A1 (en) Method for testing adhesive strength and layer strength of surface layer, involves generating recess in substrate and inserting pressure body into recess
Bauman Why Hire an Independent, Third-Party Inspector on High Performance Coatings Projects?
CN112439664A (en) Fireproof door coating process
Paprocka et al. A numerical example of total production maintenance and robust scheduling application for a production system efficiency increasing
Gurumurthy et al. Performance value analysis for the justification of lean manufacturing systems
Gursch et al. Parameter Forecasting for Vehicle Paint Quality Optimisation
KR101320227B1 (en) Evaluating method for paintability using test sample plate
Rigo Issues and Challenges of Field Surface Preparation
Trimber Painting Bolted Bridge Connections
Straw et al. Cadmium-Free Alternatives for Brush Plating Repair Operations

Legal Events

Date Code Title Description
WITN Withdrawal due to no request for examination