KR20130082869A - Construction work management system for which a matrix technique related to building information modeling - Google Patents

Construction work management system for which a matrix technique related to building information modeling Download PDF

Info

Publication number
KR20130082869A
KR20130082869A KR1020110139028A KR20110139028A KR20130082869A KR 20130082869 A KR20130082869 A KR 20130082869A KR 1020110139028 A KR1020110139028 A KR 1020110139028A KR 20110139028 A KR20110139028 A KR 20110139028A KR 20130082869 A KR20130082869 A KR 20130082869A
Authority
KR
South Korea
Prior art keywords
construction
work
information
classification system
management
Prior art date
Application number
KR1020110139028A
Other languages
Korean (ko)
Inventor
황희석
Original Assignee
(주) 명진소프트컨설팅
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주) 명진소프트컨설팅 filed Critical (주) 명진소프트컨설팅
Priority to KR1020110139028A priority Critical patent/KR20130082869A/en
Publication of KR20130082869A publication Critical patent/KR20130082869A/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/40Information retrieval; Database structures therefor; File system structures therefor of multimedia data, e.g. slideshows comprising image and additional audio data
    • G06F16/44Browsing; Visualisation therefor
    • G06F16/444Spatial browsing, e.g. 2D maps, 3D or virtual spaces
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Data Mining & Analysis (AREA)
  • General Business, Economics & Management (AREA)
  • Economics (AREA)
  • General Engineering & Computer Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Databases & Information Systems (AREA)
  • Multimedia (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

In the present invention, the work classification system for displaying the entire work items to be performed in the construction work to be progressed, and the space of the work items in which the actual work is carried out among the total work items to be performed in the construction work to be displayed is displayed. The work performed in the space of the work category in which the actual work is performed among all the work items indicated on the work classification system axis, which is the area of the spatial classification system where the facility classification system axis and the facility classification system axis intersect the facility classification system axis. It is easy to identify and manage the construction conditions, construction period, pre and post-relationship of the construction site, and the photographic scale through the matrix technique based on the object for displaying the construction work of the construction. Ability to model and guide multi-dimensional such as 2D or 3D using BIM information in addition to zoom It relates to a matrix-based construction construction management device linked to the BIM information to be linked, the entire work items to be carried out in the construction to be carried out displayed on the work classification system axis 111, the construction to proceed The space of the work item in which the actual work is to be carried out among all the work items to be performed in the construction is displayed in the facility classification system axis 112 and the displayed work classification system axis 111 and the facility classification system axis. The construction-related information of the corresponding work item performed in the space of the work item in which the actual work is carried out among all the work items displayed on the axis of the work classification system as being an area of the spatial coordinates where 112 crosses. Information storage means (100) in which the construction sheet management matrix sheet (110) represented by the displayed construction work display object (113) is stored. )and; The output request of the construction construction management matrix sheet 110 stored in the information storage means 100, to proceed to the work classification system axis 111 of the construction construction management matrix sheet 110 output by the output request Request input of all work item information to be performed in construction work, and space information of work item in which actual work is performed among all work items to be performed in construction project to proceed to facility classification system axis 112 Information input means for requesting input of the construction work and requesting input of construction work related information of the corresponding work item to the object construction object display object 113 in which the work classification system axis 111 and the facility classification system axis 112 intersect. 200; Information output means (300) for outputting construction-related information including a matrix sheet (110) for construction construction management; The construction construction management matrix sheet 110 stored in the information storage means 100 is extracted by the output request of the construction construction management matrix sheet 110 requested through the information input means 100, and then the information is extracted. Output control through the output means 300, input request information of the work classification system axis 111 of the construction sheet management matrix sheet 110 requested through the information input means 100, facility classification system axis 112 Main control means for controlling the input request information and the construction request for the construction work related information of the corresponding work item of the performing construction work display object 113 and outputs it through the output information output means (300) Is made of, but the corresponding construction BIM information associated with the construction work related information of the corresponding work item that is input to the performing construction work display object 113 of the construction construction management matrix sheet 110 is In case of carrying out the construction work display object 113 of the construction management matrix sheet 110, which is output through the information output means 300, the corresponding construction work BIM information associated with the construction work related information of the corresponding work item The work item modeling request icon 105 for requesting to be output by multidimensional modeling is displayed.

Description

Construction work management system for which a matrix technique related to Building Information Modeling}

In the present invention, the work classification system for displaying the entire work items to be performed in the construction work to be progressed, and the space of the work items in which the actual work is carried out among the total work items to be performed in the construction work to be displayed is displayed. The work performed in the space of the work category in which the actual work is performed among all the work items indicated on the work classification system axis, which is the area of the spatial classification system where the facility classification system axis and the facility classification system axis intersect the facility classification system axis. It is easy to identify and manage the construction conditions, construction period, pre and post-relationship of the construction site, and the photographic scale through the matrix technique based on the object for displaying the construction work of the construction. Ability to model and guide multi-dimensional such as 2D or 3D using BIM information in addition to zoom It relates to the construction of the matrix management system based on information that was associated with BIM links.

In general, the schedule management of construction works is a technique that classifies and defines construction details for construction contracts into activities to be actually implemented, and manages the defined tasks to achieve a given goal within a given period of time. (Program Evaluation & Review Technique) / CPM (Critical Path Method) method or Bar-Chart method is used for process control chart.

However, if you want to manage your work in ordinary construction work, you need to express it as a two-dimensional process control chart by PERT / CPM or Bar-Chart method for every hundred or thousands of activities. Due to the large number of management charts, it is difficult to grasp the construction conditions, construction period, post-relationship relationship of construction site, and construction scale through the two-dimensional process control chart by PERT / CPM or Bar-Chart technique. There is a problem in that it is impossible to model and guide a construction section to be modeled in 2D or 3D in multiple dimensions using BIM (Building Information Modeling) information.

In addition, since construction-related information related to activity expressed in the two-dimensional process control chart by PERT / CPM technique or Bar-Chart technique is only one-dimensional work information over time, Construction construction detail code information, construction construction detailed name information, construction worker name information, construction construction detailed schedule information, construction materials information, construction construction detailed specifications information, construction CAD drawing information, construction construction construction cost details information, construction construction It is also difficult to express various construction-related information such as process information.

The present invention is to solve the problems of the prior art, the object of the present invention is the axis of the classification system that displays the entire work item that should be performed in the construction work to proceed, the entire work to be performed in the construction work to proceed Actual among all work items displayed on the facility classification system axis, where the space of the work item in which the actual work is being carried out, and on the classification system axis, which is the area of the spatial coordinates where the work classification axis and the facility classification system axis intersect. Construction conditions or construction period of the construction site through the matrix technique based on the object for displaying construction work for the construction work of the relevant work item performed in the space of the work item in which the work is carried out. In addition, it facilitates the identification and management of post-relationship relations and photographic scales. Using a management apparatus to provide a construction of the matrix associated with BIM-based information to establish a link between function to guide the multi-dimensional modeling such as 2D or 3D.

Another object of the present invention is the work item that is performed in the space of the work item in which the actual work is carried out among all the work items displayed on the work classification system axis, which is the spatial coordinate area where the work classification system axis and the facility classification system axis intersect. Construction construction construction related information, construction order number code information, construction construction detail name information, construction worker name information, construction construction schedule information, construction material information, construction specification information, construction CAD information, construction work It is to provide a matrix-based construction construction management device linked with BIM information that displays a variety of construction-related information, such as construction cost breakdown information, construction process information.

As a technical concept for achieving the present invention, the matrix-based construction work management device linked to the BIM information of the present invention is displayed such that the entire work items to be performed in the construction work to be proceeded are displayed on the work classification system axis. The space of the work item in which the actual work is carried out among all the work items to be carried out in the construction work to be carried out is displayed in the facility classification system axis, and the displayed work classification system axis and the facility classification system axis intersect. Performed construction work in which the construction work-related information of the corresponding work item that is performed in the space of the work item in which the actual work is performed among all the work items displayed on the axis of the work classification system is displayed in the area of the spatial coordinates. Information storage means in which the matrix sheet for construction construction management indicated by the display object is stored .; Output of the construction request management matrix sheet stored in the information storage means, input of the entire work item information to be performed in the construction work to proceed to the work classification system axis of the construction construction management matrix sheet output by the output request Request the input of the space information of the work item in which the actual work is performed among all the work items to be performed in the construction work to be carried out on the facility classification system axis, and the work classification system axis and the facility classification system axis. Information input means for requesting the intersecting performance work display object to input construction work related information of the work item; Information output means for outputting construction-related information including a matrix sheet for construction construction management; According to the output request of the construction construction management matrix sheet requested through the information input means, the construction construction management matrix sheet stored in the information storage means is extracted and output-controlled through the information output means, and the information input means After processing and controlling the input request information of the work classification system axis of the construction sheet management matrix sheet requested through The main control means for controlling the output through the output information output means; consisting of, the construction associated with the construction work related information of the corresponding work item that is input to the performing construction work display object of the construction construction management matrix sheet If the construction BIM information exists, the output is output through the information output means. The management task display object of the company management matrix sheet is characterized in that the icon for requesting the corresponding work item modeling request for outputting the corresponding construction BIM information linked to the construction related information of the corresponding work item to the multi-dimensional modeling is displayed. do.

The present invention is the axis of the work classification system in which the entire work items to be carried out in the construction work to proceed, the facility classification is displayed in the space of the work items in which the actual work is carried out of the total work items to be carried out in the construction work to proceed Information related to the construction work of the relevant work item that is carried out in the space of the work item in which the actual work takes place among the total work items displayed on the work classification system axis, which is the spatial coordinate area where the system axis and the work classification system axis and the facility classification system axis intersect. Since it is expressed by matrix technique based on the object for displaying work on the construction work, it is easy to intuitively grasp the construction conditions, construction period, post-relationship relationship of construction work, and photographic scale, and accordingly management is convenient. In addition, by using the BIM information, multi-dimensional images such as 2D or 3D By linking the function of ringing and guiding, the manager expands from simply expressing the designed architectural space to the design drawing in carrying out the construction work, and the spatial topological relationship between the construction space and the objects that constitute the space. It is effective to be guided by multi-dimensional modeling information including two-dimensional or three-dimensional to express.

In addition, the present invention of the work item that is carried out in the space of the work item in which the actual work is carried out of the total work items displayed on the work classification system axis, which is the spatial coordinate area where the work classification system axis and the facility classification system axis intersect Construction construction related information, construction code number, construction construction detail name information, construction construction worker name information, construction construction schedule information, construction materials information, construction specifications, construction CAD information, construction CAD construction cost Various construction-related information such as breakdown information and construction process process information can be controlled to be displayed in a layer, so that various construction-related information can be recognized.

In addition, the present invention has an effect that can be modified in the form of a pop-up window of the two-dimensional (including three-dimensional) CAD drawings linked to the object for performing construction work display of the matrix sheet for construction construction management.

In addition, the present invention sequentially the work schedule for the detailed work list corresponding to the object for displaying the construction work performed in the area of the spatial coordinates intersecting the work classification system axis and the facility classification system axis as a matrix on the matrix sheet for construction work management It also has a noticeable effect.

In addition, the present invention can be easily moved and read by allowing the movement to the desired performing construction work display object among the many performing construction work display objects displayed in a matrix form on the matrix sheet for construction construction management through zoom-in, zoom out and panning There is also an effect that makes it possible.

1 is a system configuration diagram showing a matrix-based construction construction management apparatus associated with the BIM information of the present invention,
2 is a view showing a matrix sheet for construction construction management included in the matrix-based construction construction management apparatus associated with the BIM information of the present invention,
3 is a multi-dimensional modeling display at the bottom of the construction construction management matrix sheet by clicking the icon for requesting the corresponding model of construction work on the construction construction management matrix sheet included in the matrix-based construction management device associated with the BIM information of the present invention A drawing showing that the screen is output,
Figure 4 is performed by the construction work management information display objects displayed on the matrix construction management sheet by the construction work management leading information engine included in the matrix-based construction work management apparatus associated with the BIM information of the present invention Drawing showing information displayed,
5 is a view showing that the CAD drawing pop-up window is displayed on the construction sheet management matrix sheet by the construction drawing drawing engine included in the matrix-based construction construction management apparatus associated with the BIM information of the present invention,
6 to 8 are several corresponding jobs stored in the object for displaying construction work performed by the multi-dimensional layer processing engine included in the matrix-based construction work management device linked to the BIM information of the present invention. Drawings displayed in a layer (layer) to display the information related to the construction work of the item superimposed,
9 to 11 are zoomed out, zoomed in, or panned in a matrix sheet for construction construction management by an object moving processing engine for performing construction work display included in a matrix-based construction construction management apparatus associated with BIM information of the present invention. Drawing,
12 is a matrix-based construction construction management device associated with the BIM information of the present invention.

DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, a configuration and an operation of an embodiment of the present invention will be described in detail with reference to the accompanying drawings.

1 is a system configuration diagram showing a matrix-based construction construction management apparatus associated with the BIM information of the present invention, Figure 2 is a construction construction management included in a matrix-based construction construction management apparatus associated with the BIM information of the present invention FIG. 3 is a diagram illustrating a matrix sheet, and FIG. 3 is a matrix for construction construction management by clicking an icon for requesting a corresponding model of construction work on a construction construction management matrix sheet included in a matrix-based construction construction management apparatus linked to the BIM information of the present invention. Figure 4 is a view showing the output of the multi-dimensional modeling display screen at the bottom of the sheet, Figure 4 is a construction construction management matrix by the leading construction leading and trailing guide engine included in the matrix-based construction construction management apparatus associated with the BIM information of the present invention Performed construction work leading objects are displayed on the objects for performing construction work marking on the sheet. 5 is a view showing that the CAD drawing pop-up window is pop-up displayed on the construction sheet management matrix sheet by the construction drawing drawing engine included in the matrix-based construction construction management apparatus associated with the BIM information of the present invention; 6 to 8 are several corresponding stored in the object for displaying the construction work performed by the multi-dimensional layer processing engine included in the matrix-based construction management device associated with the BIM information of the present invention 9 is a diagram illustrating the construction work related information of the work item displayed in a layer, and FIGS. 9 to 11 are carried out construction work included in the matrix-based construction work management device associated with the BIM information of the present invention. Zoom out and zoom in on matrix sheets for construction management by the object movement processing engine for display Or it is a view showing that the panning is implemented, Figure 12 is a matrix-based construction construction management apparatus associated with the BIM information of the present invention.

As shown, the matrix-based construction management apparatus associated with the BIM information of the present invention is largely divided into information storage means 100, information input means 200, information output means 300 and the main control means 400 Is done.

First, the information storage means 100 is displayed so as to be able to input the entire work items to be performed in the construction work to proceed to the work classification system axis 111, the actual work of all work items to be performed in the construction work to proceed The space of the work item in which the work proceeds is displayed in the facility classification system axis 112 so as to be inputted, and the area of the spatial coordinates where the displayed work classification system axis 111 and the facility classification system axis 112 intersect. An object for performing construction work display that displays information related to construction work of the relevant work item that is performed in the space of the work item in which the actual work is carried out among all the work items displayed on the work classification system axis. It is a database in which the matrix sheet 110 for construction construction management indicated by 113 is stored.

Here, in the case of the information displayed on the work classification system axis 111 corresponding to the Y axis of the matrix sheet 110 for construction work management, the entire work item name of the construction work to be progressed is classified into a header node and each lower node. Provide the indication.

In other words, the construction work of the highway No. 40 Chungju-Jecheon Section 2 construction project is displayed as a header node, and the lower part of the header node displays the first subnode such as excavation, gang block processing, and ground stopping, which are ongoing construction items. In the lower part of each first lower node, the subdivided works of the construction work corresponding to the first lower node are represented as the second lower node.

In addition, in the case of the information displayed on the facility classification system axis 112 corresponding to the X-axis of the construction sheet management matrix sheet 110, the space of the work item in which the actual work is carried out among all the work items of the construction work to proceed ( space) The name is divided into the header node and each of the lower nodes, and the marking is provided. As shown in the drawing, the construction work of the highway No. 40 Chungju-Jecheon Section 2 construction work is indicated as the header node, and the lower portion of the header node The first subnode of OPEN TBM tunnel, pilot, and quasi-skills material base, which is a space of construction items, is displayed, and the second subnode, which is a detailed space of the ongoing construction item corresponding to the first lower node, is displayed at the bottom of each first subnode. It has a structure represented by.

Here, the space of the work item in which the actual work is performed among the entire work items of the construction work to be displayed on the facility classification system axis 112 may be divided into a construction area or a construction site.

The header node and each of the lower nodes are processed by the matrix X / Y axis node input information processing engine 410 which will be described later. A pop-up menu (not shown) implemented by an administrator operating the information input means 200 described below. It can be displayed through the node creation menu such as "Add Subnode", "Add Before", and "Add After". Here, adding a subnode is a menu in which a node is added from a current node to a lower node, a previous add is a menu added from a current node to a previous neighbor node, and a subsequent addition is a menu in which a subsequent neighbor node of the current node is added. to be.

In addition, the pop-up menu also includes a “Rename” menu to change the name of the currently selected node. A “Delete Node” menu is also provided to delete the currently selected node. Provides a way to set the properties shown on the screen of each node.

The matrix X / Y axis node input information processing engine 410 controls the size of the object crossing the X axis and the Y axis to be automatically adjusted as the manager adds the node to be reflected in the construction sheet management matrix sheet 110. do.

The detailed configuration of the information storage means 100 for performing such a database function should be performed in the construction classification system axis 111, the work classification system axis 111 is displayed to be able to input the entire work items to be performed in the construction work to proceed The space where the facility classification system axis 112 and the work classification system axis 111 and the facility classification system axis 112 intersect each other, in which the space of the work item in which the actual work is carried out is displayed. A construction work in which the construction work related information of the work item that is performed in the space of the work item in which the actual work is performed among all the work items displayed on the work classification system axis 111 as being an area of coordinates is displayed. A new matrix sheet DB 101 in which a new construction construction management matrix sheet 110 composed of a work display object 113 is stored; Matrix sheet for construction construction management processed by inputting corresponding information into the work classification system axis 111 of the construction sheet management matrix sheet 110, the facility classification system shaft 112, and the object construction object displaying object 113. A processing matrix sheet DB 102 having 110 stored therein,

Of the processed construction sheet management matrix sheet 110 stored in the processing matrix sheet DB 102 as information associated with the construction work related information of the work item stored in the object for performing construction work display (Object), the work item Of the construction modeling DB (103) in which the construction BIM information, which is modeling information of the space corresponding to the construction-related information of the construction, and the processed construction construction management matrix sheet (110) stored in the processing matrix sheet (DB) 102; The information linked to the performing construction work display object (Object), the construction work CAD drawing DB of the construction work CAD drawing information of the work item, which is related to the construction work of the work item is stored.

Here, the construction work related information of the work item stored in the construction work display object 113 of the processed construction work management matrix sheet 110 stored in the processing matrix sheet DB 101 is detailed construction code number construction information, Construction name details, construction worker name information, construction schedule details, construction materials information, construction specifications specifications information, construction CAD drawing information, construction cost details information, construction process information, etc. are stored.

In addition, when there is a corresponding construction BIM information associated with construction-related information of the corresponding work item input to the construction work display object 113 of the construction construction management matrix sheet 110, the processed construction management matrix The object construction object display object 113 of the sheet 110 has an icon 105 for requesting the corresponding work item modeling request to output the corresponding construction BIM information associated with the construction related information of the corresponding work item in multi-dimensional modeling. Are displayed and provided.

Information input means 200 is an output request of the construction sheet management matrix sheet 110 stored in the information storage means 100, the work classification system axis of the construction sheet management matrix sheet 110 output by the output request ( Request input of the total work item information to be performed in the construction work to proceed to 111), and the work item that the actual work is carried out among the total work items to be performed in the construction work to proceed to the facility classification system axis 112. Requests the input of space information of the space, and inputs the construction construction related information of the corresponding work item in the object construction object display 113 for the work classification system axis 111 and the facility classification system axis 112 to intersect. A keyboard, a mouse, a light pen, etc. are provided in combination as an input user interface (UI) for requesting a request.

The information output means 300 is provided with a display as a user interface (UI) for outputting the construction-related information, including the construction sheet management matrix sheet 110.

The main control means 400 is a construction construction management matrix sheet 110 stored in the information storage means 100 by the output request of the construction construction management matrix sheet 110 requested through the information input means 100. After extraction and output control through the information output means 300, input request information of the construction classification system axis 111 of the construction sheet management matrix sheet 110 requested through the information input means 100, facility classification system After processing and controlling the input request information of the shaft 112, the input request of the construction work-related information of the work item of the construction work display object 113 as a control module for output control through the information output means (300) In order to perform these control functions, various engines are operated.

First, the main control means 400 is operated by the main control means 400, the input of the work classification system axis 111 of the matrix sheet 110 for construction construction management requested through the information input means 100 Input to the work classification system axis 111 of the construction sheet management matrix sheet 110 on the basis of the request information by creating, modifying or deleting the entire work item name of the construction work to be requested in the header node and each subnode. Processing and classifying the facilities of the construction management matrix matrix 110 based on the input request information of the facility classification system axis 112 of the construction management matrix matrix 110 requested through the information input means 100. The space name of the work item in which the actual work is performed among all the work items of the construction work requested to be inputted to the system axis 112 is processed by creating, modifying, or deleting the header node and each subnode. Input request information of the matrix construction X / Y axis node input information processing engine 410 and the construction work display object 113 of the construction construction management matrix sheet 110 requested through the information input means 100. Performing the construction sheet management matrix sheet 110 based on the construction Work display space (Space) of the actual work proceeding of the total work items displayed on the work classification system axis 111 requested to be input to the object 113 for display work The object input information processing engine 420 for performing construction work display for processing processing by generating, modifying or deleting the construction construction related information of the corresponding work item to be performed is mounted.

Here, in the case of the object input information processing engine 420 for performing construction work display object, the execution construction work display object 113 which is an area of spatial coordinates where the work classification system axis 111 and the facility classification system axis 112 intersect. ), The construction related information of the relevant work item mentioned above includes construction sequence number code information, construction construction detail name information, construction worker name information, construction construction schedule information, construction material information, construction construction specification information, Controls the output processing of various construction-related information that the manager wants to display, such as construction CAD drawing information, construction construction cost details information, and construction construction process information. That is, it processes not only general text but also an expression that can refer to the values of other cells in the same way as a formula value and a spreadsheet.

In addition, the performing construction work display object input information processing engine 420 processes even when the administrator individually applies the background color, font type, and style of the specific performing construction work display object 113.

In addition, the manager can view the construction BIM information associated with the construction-related information of the work item as spatial information modeled in two-dimensional or three-dimensional multi-dimensional.

To this end, the main control means 400 is equipped with a modeling engine 430 operated by the main control means 400, as described above, the modeling engine 430 operated by the main control means 400 is an information input means ( Performing the construction sheet management 110 processed through the construction sheet 110 Click the icon for requesting the corresponding work item modeling displayed on the construction work display object 113 linked to the construction work related information of the corresponding work item When the output of the corresponding construction BIM information to the multi-dimensional modeling is requested, the modeling engine 430 operated by the main control means 400 is a multi-dimensional modeling display screen 120 at the bottom of the matrix sheet for construction management 110 ) Is controlled to be linked and output, and the corresponding construction BIM information associated with the construction related information of the corresponding work item stored in the construction modeling DB (103) is extracted and modeled in multi-dimensional The processing construction modeling 121, which is the spatial information of the current construction, is inserted into the multi-dimensional modeling display screen 120 and controlled to be output.

In addition, the multi-dimensional modeling display screen 120 connected to the lower end of the construction sheet management matrix sheet 110 output through the information output means 300 is a two-dimensional modeling or three-dimensional modeling of the construction process modeling construction 121 is inserted output A selection multidimensional modeling output request button 122 including a 2D modeling output request button 122a and a 3D modeling output request button 122b for selecting a modeling output is displayed, and the 2D modeling output request button 122a is displayed. When selected, the two-dimensional modeling is displayed so that one of the front, back, left, right, plane, and back surfaces can be selected. The display method is not shown in the combo box (drop-down list) or the drawing as shown in the drawing. However, it can be displayed by utilizing various GUI elements such as checkboxes and radio buttons.

Through this, the modeling engine 430 operated by the main control means 400 controls to output the processing design to output the corresponding two-dimensional modeling requested by the administrator.

In addition, the manager can repeatedly input a number of construction-related information displayed on the object construction object display object 113 of the construction construction management matrix sheet 110 for multiple items in one area for each layer, the desired layer of The selection allows you to view the selected layer.

To this end, the main control means 400 is equipped with a multi-dimensional layer processing engine 460 operated by the main control means 400. As such, the multi-dimensional layer processing engine 460 operated by the main control means 400 is Performance of the construction sheet management matrix sheet 110 construction construction work display information related to the construction work of the corresponding work item stored in the object 113 for construction work display information, construction construction detailed name information, construction worker name information, Detailed construction schedule information, construction material information, construction specification specification information, construction CAD drawing information, construction construction cost history information and construction process process information to be displayed in a layer (layer) overlapping display, and control Through the input means 200, the output display of the construction work related information of any one of the corresponding work items of the desired construction work related information When requested, it performs a function of controlling to display only the construction information related to the construction of any one of the requested work items.

FIG. 6 shows details of construction work among construction work related information of the corresponding work item, in which the multi-dimensional layer processing engine 460 is stored in the performance work display object 113a of the construction sheet management matrix sheet 110 at the request of an administrator. This shows that the name information is controlled to be displayed by layering it.

7 is a construction worker among the construction work related information of the corresponding work item that the multi-dimensional layer processing engine 460 is stored in the performance work display object 113b of the construction sheet management matrix sheet 110 at the request of an administrator This shows that the name information is controlled by being processed by layer processing.

FIG. 8 shows details of construction work among construction work-related information of the corresponding work item in which the multi-dimensional layer processing engine 460 is stored in the performance work display object 113c of the construction sheet management matrix sheet 110 at the request of an administrator. This shows that the construction cost information is controlled by displaying the layer processing.

In addition, the manager corresponds to the object construction work display object 113 which is an area of spatial coordinates where the work classification system axis 111 and the facility classification system axis 112 intersect each other on the matrix sheet 110 for construction work management. Work schedules can be recognized for detailed task lists.

To this end, the main control means 400 is equipped with a leading construction guide engine 440, which is operated by the main control means 400, the matrix sheet 110 for construction construction management through the information input means 200 By requesting the guidance of the predecessor relationship of the construction details of the construction, which is the actual work corresponding to the performing construction work display object 113 by selecting the performing construction work display objects 113 of the), by the main control means 400 The operating construction leading and trailing guidance engine 440 guides the construction construction leading and trailing recognition information 114 for recognizing the input sequence of the selected construction construction work display objects 113 to be requested. Performs a function of controlling to display on the construction work display object 113 of the 110 to be output through the information output means (300).

Here, the performing construction leading and trailing recognition information 114 may be provided in consideration of various leading and trailing identification means, such as shown in the image information such as a leader line, or not shown in the figure, but also displayed as image information such as numbers. Can be.

In addition, the manager may modify a CAD drawing of two-dimensional (including three-dimensional) linked to the performance construction work display object 113 of the construction sheet management matrix sheet 110.

To this end, the main control means 400 is equipped with a construction drawing drawing engine 450 which is operated by the main control means 400, the construction sheet management matrix sheet 110 through the information input means 200 When the request for output of the CAD drawing information of the corresponding work item linked to the performing work display object 113 of the work and the processing of the CAD drawing information output by the output request are requested, the main control means 400 operates. The construction drawing drawing engine 450 is a CAD of the corresponding work item output request from the construction CAD drawing DB 104 by the output request of the CAD drawing information of the corresponding work item requested through the information input means 200 After extracting the drawing information and control it to be output through the information output means 300 in the form of a CAD drawing pop-up window 115, to the processing request of the CAD drawing information of the corresponding work item requested through the information input means 200 Accordingly, the CAD drawing information of the corresponding work item is processed to control the output through the CAD drawing pop-up window 115 of the information input means 200.

At this time, the construction drawing drawing engine 450 is provided to be implemented through a vector-based engine for the processing of the CAD drawing.

In addition, the manager can easily perform the movement to the desired performing construction work display object 113 among the many performing construction work display objects 113 displayed in a matrix form on the construction sheet management matrix sheet 110.

To this end, the main control means 400 is equipped with the object moving processing engine 470 for performing construction work display operation operated by the main control means 400, the performing construction work operated by the main control means 400 The display object movement processing engine 470 may be configured in the construction construction management matrix sheet 110 so as to easily move to the performing construction work display object 113 displayed at the intersection of each axis of the construction construction management matrix sheet 110. When zoom out, zoom in, and panning are controlled and any one of zoom out, zoom in, or panning is requested by the construction sheet management matrix sheet 110 through the information input means 200, the requested zoom out, zoom in, or panning is requested. Any one performs a function of controlling to be implemented in the matrix sheet 110 for construction management.

9 is a construction schedule of the construction construction management matrix sheet 110 by holding the construction construction management matrix sheet 110 in a zoomed out state of the construction construction management matrix sheet 110 performed at the request of the manager; It is used at the time of movement between each performance construction work display object 113 with a big difference in gap.

10 shows the construction work display of the construction construction management matrix sheet 110 in a state where the object movement processing engine 470 for construction work display zooms in on the construction construction management matrix sheet 110 at the request of an administrator. The dragon object 113 is used for management one by one.

11 shows construction performed on one side of the construction sheet management matrix sheet 110 in a state in which a construction work display object movement processing engine 470 performs a panning on the construction sheet management matrix sheet 110 at the request of an administrator. It is used when moving from the work display object 113 to the other performing construction work display object 113.

100: information storage means 101: new matrix sheet DB
102: machining matrix sheet DB 103: construction modeling DB
104: CAD construction drawing DB
105: Icon for requesting modeling work item
110: matrix sheet for construction construction management 111: work classification system axis
112: facility classification system
113: object for displaying construction work
114: precedence of the construction work recognition information 115: CAD drawing pop-up window
120: multi-dimensional modeling display screen
121: Modeling of construction work
122: selection multi-dimensional modeling output request button
122a: 2D modeling output request button
122b: three-dimensional modeling output request button 200: information input means
300: information output means 400: main control means
410: matrix X / Y axis node input information processing engine
420: object input information processing engine for performing construction work display
430: modeling engine
440: Leading Information Engine
450: construction drawing drawing engine
460: Multidimensional Layer Processing Engine
470: Object moving processing engine for performing construction work display

Claims (8)

All the work items to be performed in the construction work to be proceeded are displayed in the work classification system axis 111 so as to be inputted, and the space of the work items in which the actual work is carried out among all the work items to be carried out in the construction work to proceed. Space is displayed on the facility classification system axis 112, and the area of the spatial coordinates at which the displayed classification system axis 111 and the facility classification system axis 112 intersect. Construction work management represented by the object (113) for displaying construction work for the construction work of the relevant work item that is carried out in the space of the work item in which the actual work is carried out among all the work items. Information storage means (100) in which the matrix sheet (110) is stored;
The output request of the construction construction management matrix sheet 110 stored in the information storage means 100, to proceed to the work classification system axis 111 of the construction construction management matrix sheet 110 output by the output request Request input of all work item information to be performed in construction work, and space information of work item in which actual work is performed among all work items to be performed in construction project to proceed to facility classification system axis 112 Information input means for requesting input of the construction work and requesting input of construction work related information of the corresponding work item to the object construction object display object 113 in which the work classification system axis 111 and the facility classification system axis 112 intersect. 200;
Information output means (300) for outputting construction-related information including a matrix sheet (110) for construction construction management;
The construction construction management matrix sheet 110 stored in the information storage means 100 is extracted by the output request of the construction construction management matrix sheet 110 requested through the information input means 100, and then the information is extracted. Output control through the output means 300, input request information of the work classification system axis 111 of the construction sheet management matrix sheet 110 requested through the information input means 100, facility classification system axis 112 Main control means for controlling the input request information and the construction request for the construction work related information of the corresponding work item of the performing construction work display object 113 and outputs it through the output information output means (300) Consisting of (400);
The information output means 300 when the corresponding construction work BIM information associated with the construction work related information of the corresponding work item input to the performing construction work display object 113 of the construction sheet management matrix sheet 110 exists. The construction work display object 113 of the construction management matrix sheet 110 outputted through the corresponding work item requesting to output the corresponding construction BIM information associated with the construction related information of the corresponding work item by multi-dimensional modeling. Matrix-based construction work management device associated with the BIM information, characterized in that the modeling request icon 105 is displayed.
The method of claim 1,
In the information storage means 100, the work classification system axis 111, in which the entire work item to be performed in the construction work to be displayed is displayed, the actual work of all the work items to be performed in the construction work to proceed It is the area of the spatial coordinates where the facility classification system axis 112 and the work classification system axis 111 and the facility classification system axis 112 intersect the space of the work item to be displayed. An object for performing construction work display in which the construction work related information of the corresponding work item performed in the space of the work item in which the actual work is performed among all the work items displayed on the work classification system axis 111 is displayed to be inputable ( A new matrix sheet DB 101 having a new construction construction management matrix sheet 110 formed of an object (113); The construction work related information of the relevant work item is input to the work classification system axis 111, the facility classification system axis 112, and the performing construction work display object 113 of the new construction work management matrix sheet 110, and processed. A processing matrix sheet DB 102 in which the constructed construction sheet management matrix sheet 110 is stored; Of the processed construction sheet management matrix sheet 110 stored in the processing matrix sheet DB 102 as information associated with the construction work related information of the work item stored in the object for performing construction work display (Object), the work item A construction modeling DB (103) storing corresponding construction BIM information, which is modeling information of a space corresponding to construction-related information of the construction unit; Of the processed construction sheet management matrix sheet 110 stored in the processing matrix sheet DB 102 is information linked to the object for performing construction work display (Object), the construction of the corresponding work item of the corresponding work item Construction drawing CAD drawing DB 104 is stored; made of;
The construction work related information of the work item stored in the work construction display object 113 among the processed construction work management matrix sheets 110 stored in the processing matrix sheet DB 101 is detailed construction code information, construction work Construction name information, construction worker name information, construction schedule details, construction materials information, construction specifications specification information, construction CAD drawing information, construction construction cost details information, construction construction process information, etc. are stored.
The main control means 400, which is operated by the main control means 400, of the work classification system axis 111 of the matrix sheet 110 for construction work management requested through the information input means 100. Create, modify, or delete all work item names of the construction work to be requested to be entered into the work classification system axis 111 of the matrix sheet 110 for construction work management based on the input request information. Processing and the facility of the construction sheet management matrix sheet 110 based on the input request information of the facility classification system axis 112 of the construction sheet management matrix sheet 110 requested through the information input means 100. The space name of the work item in which the actual work is performed among all the work items of the construction work requested to be inputted to the classification system axis 112 may be generated, modified, or deleted. A matrix X / Y-axis node input information processing engine 410 for processing with; Display the construction work performed by the construction management matrix sheet 110 on the basis of the input request information of the construction work management display object 113 of the construction construction management matrix sheet 110 requested through the information input means 100. Creating, modifying, or constructing construction-related information of the corresponding work item, which is performed in the space of the work item in which the actual work is performed, among all the work items displayed on the work classification system axis 111 requested for input to the object 113. An object input information processing engine (420) for performing construction work display to be processed by deletion and the like; Matrix-based construction work management device associated with the BIM information, characterized in that it comprises a.
The method of claim 2,
The main control means 400 further includes a modeling engine 430 operated by the main control means 400.
Through the information input means 200 by clicking the icon for requesting the corresponding work item modeling displayed on the construction work display object 113 for the construction work management matrix sheet 110 related to the construction work of the work item When requested to output the construction BIM information associated with the information to multi-dimensional modeling,
The modeling engine 430 operated by the main control means 400 controls the output of the multi-dimensional modeling display screen 120 is linked to the lower end of the matrix sheet 110 for the construction project management, the construction modeling DB The multi-dimensional modeling display screen is a process construction modeling (121), which is the spatial information of the construction work implemented by extracting the relevant construction BIM information associated with the construction-related information of the work item stored in the 103 and multi-modeling it Matrix-based construction work management device associated with the BIM information, characterized in that the control is inserted into the output.
The method of claim 3,
On the multi-dimensional modeling display screen 120, a two-dimensional modeling output request button 122a and a three-dimensional modeling output request button 122b for selecting two-dimensional modeling or three-dimensional modeling output of the inserted construction construction modeling 121. The multi-dimensional modeling output request button 122 consisting of the display is displayed, and the two-dimensional modeling output request button 122a is displayed to select one of the front, back, left, right, plane and back. Matrix-based construction management device associated with the BIM information characterized.
The method of claim 2,
The main control means 400 further includes a leading construction leading and trailing guide engine 440 operated by the main control means 400;
By selecting the performing construction work display object 113 of the construction sheet management matrix sheet 110 through the information input means 200 of the construction details of the construction that is the actual work corresponding to the performing construction work display object 113 If you are asked for guidance,
The performing construction leading and trailing guidance engine 440 operated by the main control means 400 performs performing construction leading and trailing recognition information for guiding recognizing the selection order of the performing construction work displaying objects 113 which have been requested. 114 is displayed on the construction work display object 113 for the construction work management matrix sheet 110 to control the output through the information output means 300 matrix-based linked to the BIM information, characterized in that Construction work management device.
The method of claim 2,
The main control means 400 further includes a construction drawing drawing engine 450 operated by the main control means 400;
CAD output of the CAD drawing information of the corresponding work item linked to the execution construction work display object 113 of the construction construction management matrix sheet 110 through the information input means 200 and the CAD output by the output request When requesting processing of drawing information,
Construction drawing drawing engine 450 operated by the main control means 400 is the construction CAD drawing DB (by the request for output of the CAD drawing information of the corresponding work item requested through the information input means 200 ( After extracting the CAD drawing information of the corresponding work item that is requested to be output in the 104, it is controlled to be output through the information output means 300 in the form of the CAD drawing pop-up window 115, and requested through the information input means 200 BIM information characterized in that the CAD drawing information of the work item is processed in accordance with the processing request of the CAD drawing information of the work item to be output through the CAD drawing pop-up window 115 of the information input means 200. Matrix-based construction management device associated with.
The method of claim 2,
The main control means 400 further includes a multi-dimensional layer processing engine 460 operated by the main control means 400,
The multi-dimensional layer processing engine 460 operated by the main control means 400 is a construction work related information of the corresponding work item stored in the object construction work display object 113 of the construction sheet management matrix sheet 110 Construction construction detailed sequence code information, construction construction detailed name information, construction worker name information, construction construction detailed schedule information, construction materials information, construction construction detailed specification information, construction CAD drawings information and construction construction cost details information, construction construction Control to be displayed in a layer (Layer) to display the process information, such as superimposed, and outputs the construction construction-related information of any one of the desired work item of the construction work related information through the information input means 200 When the display request is made, the information related to the construction work of any one of the requested work items can be activated and displayed. Matrix-based construction work management device associated with the BIM information, characterized in that.
The method of claim 2,
The main control means 400 further includes an object movement processing engine 470 for performing construction work display operation operated by the main control means 400,
The object construction processing object display processing engine 470 operated by the main control means 400 is transferred to the object construction object displaying object 113 displayed at the intersection of each axis of the matrix sheet 110 for construction construction management. Zoom out, zoom in and panning is implemented in the matrix management sheet 110 for construction construction for easy movement, and zooming out, zooming in or panning in the matrix sheet 110 for construction construction management through the information input means 200. When requesting any one, the matrix-based construction construction management apparatus associated with the BIM information, characterized in that any one of the requested zoom out, zoom-in or panning is controlled to be implemented in the construction sheet management matrix sheet (110).
KR1020110139028A 2011-12-21 2011-12-21 Construction work management system for which a matrix technique related to building information modeling KR20130082869A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110139028A KR20130082869A (en) 2011-12-21 2011-12-21 Construction work management system for which a matrix technique related to building information modeling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110139028A KR20130082869A (en) 2011-12-21 2011-12-21 Construction work management system for which a matrix technique related to building information modeling

Publications (1)

Publication Number Publication Date
KR20130082869A true KR20130082869A (en) 2013-07-22

Family

ID=48994047

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110139028A KR20130082869A (en) 2011-12-21 2011-12-21 Construction work management system for which a matrix technique related to building information modeling

Country Status (1)

Country Link
KR (1) KR20130082869A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107563628A (en) * 2017-08-25 2018-01-09 上海建工四建集团有限公司 The method for building up and system of BIM components and construction task incidence relation
CN107562980B (en) * 2017-07-14 2020-04-07 青岛理工大学 Geometric information extraction method based on BIM model
KR102517266B1 (en) * 2021-12-02 2023-04-04 한국건설기술연구원 the improved 3D modeling system using 2D drawing and 3D modeling method using the same

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107562980B (en) * 2017-07-14 2020-04-07 青岛理工大学 Geometric information extraction method based on BIM model
CN107563628A (en) * 2017-08-25 2018-01-09 上海建工四建集团有限公司 The method for building up and system of BIM components and construction task incidence relation
CN107563628B (en) * 2017-08-25 2020-09-29 上海建工四建集团有限公司 Method and system for establishing association relationship between BIM component and construction task
KR102517266B1 (en) * 2021-12-02 2023-04-04 한국건설기술연구원 the improved 3D modeling system using 2D drawing and 3D modeling method using the same

Similar Documents

Publication Publication Date Title
US10248387B2 (en) Integrated system for software application development
Wang et al. 4D dynamic management for construction planning and resource utilization
US10001975B2 (en) Integrated system for software application development
US7042468B2 (en) Text overlay for multi-dimensional construction project models
US8321475B2 (en) System and method for contextual data modeling utilizing tags
US10705806B1 (en) Managing an application variable using variable attributes
JP7463315B2 (en) Facility management method, facility management device, facility management program, and recording medium
JP2011128962A (en) Information processing apparatus and method, and computer program
US20090326921A1 (en) Grammar checker for visualization
JP5496119B2 (en) Screen data editing device for programmable display
KR20130082869A (en) Construction work management system for which a matrix technique related to building information modeling
US20240053860A1 (en) Mobile Viewer Object Statusing
KR101235467B1 (en) Construction work management system with four dimension
KR101199955B1 (en) Method for Input and Look up Damage Information of Facility using 3-Dimension Space Model
KR20130082872A (en) Construction work management system for which a matrix technique was shown to the price of construction materials
KR101204356B1 (en) Construction work management system for which a matrix technique was used and method thereof
KR20130082870A (en) Construction work management system for which a matrix technique was shown to the risk ranking
KR20130040925A (en) Program-producing device and image control system
JP2017120453A (en) Plan management system, method, and recording medium
US20050204304A1 (en) User interface elements of a sheet set manager for a graphics program
JP4959404B2 (en) File management method, file management apparatus, and file management program
JP5084702B2 (en) Analysis data input device, CAE device, analysis data input method, and program
JP4374008B2 (en) General-purpose analysis system
Chang et al. The Research Queuing Package Modeling Environment (RESQME)
US6556227B1 (en) Visualization techniques for constructive systems in a computer-implemented graphics system