KR20130082682A - Plumbing floor plan management system and method thereof using enterprise resource planning - Google Patents
Plumbing floor plan management system and method thereof using enterprise resource planning Download PDFInfo
- Publication number
- KR20130082682A KR20130082682A KR1020110134561A KR20110134561A KR20130082682A KR 20130082682 A KR20130082682 A KR 20130082682A KR 1020110134561 A KR1020110134561 A KR 1020110134561A KR 20110134561 A KR20110134561 A KR 20110134561A KR 20130082682 A KR20130082682 A KR 20130082682A
- Authority
- KR
- South Korea
- Prior art keywords
- pipe
- design
- piping
- terminal
- production work
- Prior art date
Links
- 238000007726 management method Methods 0.000 title claims abstract description 102
- 238000000034 method Methods 0.000 title claims abstract description 16
- 238000009428 plumbing Methods 0.000 title claims description 9
- 238000004519 manufacturing process Methods 0.000 claims abstract description 101
- 238000013461 design Methods 0.000 claims abstract description 96
- 238000004891 communication Methods 0.000 claims abstract description 17
- 238000010586 diagram Methods 0.000 description 6
- 238000012986 modification Methods 0.000 description 4
- 230000004048 modification Effects 0.000 description 4
- 238000012217 deletion Methods 0.000 description 3
- 230000037430 deletion Effects 0.000 description 3
- 238000010276 construction Methods 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 230000008676 import Effects 0.000 description 1
- 238000010295 mobile communication Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Marketing (AREA)
- Theoretical Computer Science (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Data Mining & Analysis (AREA)
- Health & Medical Sciences (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Information Retrieval, Db Structures And Fs Structures Therefor (AREA)
Abstract
Description
The present invention is to copy the piping manufacturing drawings for ship manufacturing in the design department to register in the ERP server without distributing to the production department, so that the field production work department can download and print the drawings at any time when needed, and also When the drawings are registered, the materials required for the drawings are also registered, so that the drawings for the pipe production and the materials required for the drawings are always connected and used together or managed with respect to the system and method.
Looking at the general flow of ship construction, first, the initial design is made according to the type and size of the order received, and the production schedule of the large schedule accordingly. Subsequently, a detailed design, a purchase schedule of the material is established, and a middle schedule production plan is established to be linked with the corresponding purchase schedule. As a final step, the production design and production schedule of small schedules are established by department and by sector, and when the goods are received, actual production proceeds.
In addition, in order to build a ship, the drawings of the ship are designed, the designed drawings are copied from the copy room and distributed to the field production work department. When the drawings are distributed to production production departments in this way, the field production operations department keeps the received drawings in the workplace and delivers them to the workers at the time of work.
Therefore, before the drawings are delivered to the workers in the field production work department, the drawings should be sorted and laid out or laid out according to the types of drawings in the storage stage in the workshop. It will take a long time to find it again.
In this case, the location of the archived drawings must be marked in advance in order to find the necessary drawings immediately when needed, and the drawings are searched while going through the stacked drawings. This process wastes time and does not find the required drawings. There is also the risk of delayed or missing work. In addition, in order to eliminate such risks, there are actually cases in which copies must be kept more than the amount of drawings to be delivered to the actual worker.
Therefore, in distributing the plumbing drawings to the field work department, the drawings are copied and distributed in the copy room, and the drawings are stacked in the field work department. There is a need for a system and method in the work department that ensures that only the drawings are needed when needed.
An object of the present invention for solving the above-mentioned disadvantages and requirements, if the registration of the piping manufacturing for ship manufacturing in the ERP server without copying from the design department and distributed to the production department, the on-site production work department when necessary At any time, the drawings can be downloaded, printed and used, and the materials required for the drawings are also registered when the drawings are registered, so that the drawings for piping production and the materials required for the drawings are always connected and used together or managed. To provide a piping drawing management system and method using the ERP.
According to an aspect of the present invention for achieving the above object, a drawing design terminal for creating a piping design drawings and uploading (Upload) to the ERP server; When uploading the piping design drawing from the drawing design terminal, the materials required for the piping drawing are also registered, and the piping design drawing is generated and saved as drawing text data and drawing image data, and the corresponding drawing in each work department through the search page. ERP server to manage the search to be provided; And a production drawing terminal connected to the EPR server and inputting a search condition through a search page to download drawing-related information required for a site production operation.
On the other hand, according to another aspect of the present invention for achieving the above object, a communication unit for communicating via a communication network with the drawing design terminal and production operation management terminal; A drawing information database storing piping drawing related information uploaded from the drawing design terminal; A drawing search providing unit for providing the pipe drawing related information to a production work management terminal through a search function; Piping drawing ERP including a pipe drawing management unit that manages to upload and store the pipe drawing related information from the drawing design terminal, or to provide the pipe drawing information stored in the drawing information database to the production work management terminal through a search function A server is provided.
Here, the pipe drawing related information is uploaded together with the original file for the pipe design drawing uploaded from the drawing design terminal, the drawing text data and the drawing image data generated separately for the pipe design drawing, and the pipe design drawing. Include material information needed in the piping drawings received.
In addition, the drawing search providing unit provides a search page to the production work management terminal, receives the search conditions through the search page to search the pipe drawings related information corresponding to the search conditions, original files, manual drawings, modified drawings, drawings It can be provided as one of the images, or it can provide the printout function of the pipe drawing related information.
The pipe drawing management unit, when providing the pipe drawing related information to the production work management terminal, takes the material information required for the pipe drawing from the drawing information database and includes the pipe drawing related information including material information connected to the pipe drawing. Can provide.
On the other hand, according to another aspect of the present invention for achieving the above object, a pipe drawing management method using the ERP of the system including a drawing design terminal, a pipe drawing ERP server and a production work management terminal, (a) the drawing Uploading, by the design terminal, a piping design drawing to a piping drawing ERP server together with material information; (b) generating and storing drawing text data and drawing image data with respect to the pipe design drawing uploaded by the pipe drawing ERP server; (c) the production work management terminal inputting a search condition through a search page to request a piping drawing required for a site production work; And (d) the pipe drawing ERP server provides a pipe drawing management method using the ERP comprising the step of providing the production information management terminal information related to the field production work corresponding to the search conditions through the search page.
On the other hand, according to another aspect of the present invention for achieving the above object, a pipe drawing management method using the ERP of the pipe drawing management server to communicate via a communication network with a drawing design terminal and production operation management terminal, (a) the Uploading piping drawing related information from a drawing design terminal; (b) generating and storing drawing text data and drawing image data of the pipe design drawing from the uploaded pipe drawing related information; (c) receiving a search condition from the production work management terminal and requesting a search of a pipe design drawing; And (d) retrieving pipe drawing related information corresponding to the search condition and providing the pipe drawing related information to the production work management terminal.
Here, in the step (a), the pipe drawing related information may include an original file for the pipe design drawing uploaded from the drawing design terminal, drawing text data and drawing image data generated separately for the pipe design drawing, Includes material information required for the uploaded piping drawings with piping design drawings.
In addition, the step (a) provides a search page to the production work management terminal, receives a search condition through the search page is requested to search the piping design drawings, the step (d) is a pipe corresponding to the search condition Searching for the drawing-related information may be provided as one of an original file, a manual drawing, a modified drawing, or a drawing image, or may provide a printout function of the piping drawing related information.
In the step (d), when the pipe drawing related information is provided to the production work management terminal, pipe drawing related information including material information connected to the pipe drawing by taking material information necessary for the pipe drawing from a drawing information database. Can be provided as
According to the present invention, in distributing the piping production drawings to the field production work department, copying and distributing the drawings in the copy room to stack the drawings in the field production work department, and inconvenient to find and work in the field production work department again. Eliminate the cumbersome way of working.
In addition, the field production department can only be provided with the necessary plumbing drawings when needed.
In addition, piping production drawings for ship production can be created and registered in the server, and the drawings can be downloaded and printed at any time when needed in the field production work department.
When the piping design drawing is registered, the materials required for the piping drawing are also registered, so that the drawing for the piping production and the material information required for the drawing can be used together.
1 is a configuration diagram schematically showing the overall configuration of a piping drawing management system using ERP according to an embodiment of the present invention.
2 is a block diagram schematically showing a functional block of a pipe drawing management server according to an embodiment of the present invention.
3 is a diagram illustrating an overall flowchart for explaining a pipe drawing management method using ERP according to an embodiment of the present invention.
4 is a flowchart illustrating a pipe drawing management method using ERP of a pipe drawing management server according to an exemplary embodiment of the present invention.
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Reference will now be made in detail to the preferred embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to the like elements throughout. Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.
1 is a configuration diagram schematically showing the overall configuration of a piping drawing management system using ERP according to an embodiment of the present invention.
Referring to Figure 1, the pipe
The
The
When the piping
The production
2 is a block diagram schematically showing a functional block of a pipe drawing management server according to an embodiment of the present invention.
2, the pipe
The
The
The drawing search providing unit 230 provides the pipe drawing related information to the production work management terminal through a search function. That is, the drawing search providing unit 230 provides a search function so that the production
The piping
3 is a diagram illustrating an overall flowchart for explaining a pipe drawing management method using ERP according to an embodiment of the present invention.
3, in the piping
Accordingly, the piping drawing
On the other hand, the production
Accordingly, the piping drawing
4 is a flowchart illustrating a pipe drawing management method using ERP of a pipe drawing management server according to an exemplary embodiment of the present invention.
Referring to FIG. 4, the pipe
Here, the piping drawing related information is uploaded together with the original file for the piping design drawing uploaded from the drawing
At this time, the drawing
In addition, the piping
In addition, the pipe
Subsequently, the pipe
Thereafter, the pipe
Accordingly, the pipe
In addition, when the pipe
In addition, the piping
Therefore, the workers or managers in the plumbing work site, through the production
As described above, according to the present invention, when the piping manufacturing drawings for ship manufacturing are copied from the design department and registered in the ERP server without being distributed to the production department, the drawings are printed and output at any time by the on-site production work department. Piping drawings using ERP, which make it possible to use and also register the materials required for the drawings when registering the drawings, so that the drawings for piping production and the materials required for the drawings are always connected and used together or managed. The management system and the method can be realized.
It will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the present invention as defined by the following claims and their equivalents. Only. The scope of the present invention is defined by the appended claims rather than the detailed description and all changes or modifications derived from the meaning and scope of the claims and their equivalents are to be construed as being included within the scope of the present invention do.
The present invention can be applied to a system to create a pipe manufacturing drawing for ship manufacturing and register it on the server, and to download and print the drawing at any time in the field production work department when needed.
In addition, when registering the piping design drawings, the materials required for the piping drawings are also registered, so that the drawings for piping production and the materials required for the drawings can be applied to the system that is always used together.
100: piping drawing management system 110: drawing design terminal
120: communication network 130: piping drawing management server
140: production work management terminal 210: communication unit
220: Drawing information DB 230: Drawing search provider
240: pipe drawing management unit
Claims (10)
When uploading the piping design drawing from the drawing design terminal, the materials required for the piping drawing are also registered, and the piping design drawing is generated and saved as drawing text data and drawing image data, and the corresponding drawing in each work department through the search page. ERP server to manage the piping drawing to be provided by searching; And
A production work management terminal which accesses the EPR server and inputs a search condition through a search page to download drawing-related information required for a field production work;
Plumbing drawing management system using ERP including.
A drawing information database storing piping drawing related information uploaded from the drawing design terminal;
A drawing search providing unit for providing the pipe drawing related information to a production work management terminal through a search function;
A pipe drawing management unit which manages uploading and storing pipe drawing related information from the drawing design terminal or providing pipe drawing information stored in a drawing information database to a production work management terminal through a search function;
Plumbing drawings including ERP server.
The pipe drawing-related information, the original file for the pipe design drawing uploaded from the drawing design terminal, the drawing text data and drawing image data generated separately for the pipe design drawing, the pipe uploaded with the pipe design drawing Piping drawing ERP server, characterized in that it contains the necessary material information in the drawing.
The drawing search providing unit provides a search page to the production work management terminal, receives a search condition through a search page, and searches for piping drawing information corresponding to the search condition, among original files, hand drawings, modified drawings, and drawing images. Piping drawing ERP server, characterized in that provided as one, or provides a printout function of the pipe-related information.
When the pipe drawing management unit provides the pipe drawing related information to the production work management terminal, the pipe drawing related information including material information connected to the pipe drawing is obtained by obtaining material information required for the pipe drawing from a drawing information database. Piping drawing ERP server, characterized in that.
(a) the drawing design terminal creating a piping design drawing and uploading it to a piping drawing ERP server together with material information;
(b) generating and storing drawing text data and drawing image data with respect to the pipe design drawing uploaded by the pipe drawing ERP server;
(c) the production work management terminal inputting a search condition through a search page to request a piping drawing required for a site production work; And
(d) providing, by the pipe drawing ERP server, drawing-related information required for a site production work corresponding to a search condition to a production work management terminal through a search page;
Pipe drawing management method using the ERP comprising a.
(a) receiving piping drawing related information from the drawing design terminal;
(b) generating and storing drawing text data and drawing image data of the pipe design drawing from the uploaded pipe drawing related information;
(c) receiving a search condition from the production work management terminal and requesting a search of a pipe design drawing; And
(d) retrieving piping drawings related information corresponding to the search condition and providing the same to the production work management terminal;
Pipe drawing management method using the ERP of the pipe drawing management server comprising a.
The pipe drawing related information in the step (a), the original text file for the pipe design drawings uploaded from the drawing design terminal, the drawing text data and the drawing image data generated separately for the pipe design drawings, the pipe design Piping drawing management method using the ERP of the pipe drawing management server, characterized in that it includes material information required for the pipe drawing uploaded with the drawing.
The step (a) provides a search page to the production work management terminal, receives a search condition through a search page, and receives a search for a pipe design drawing. The step (d) relates to a pipe drawing corresponding to the search condition. A method of managing a pipe drawing using ERP of a pipe drawing management server, wherein the information is provided by searching for information and provided as one of an original file, a manual drawing, a modified drawing, and a drawing image, or providing a printout function of information related to the pipe drawing.
In the step (d), when the pipe drawing related information is provided to the production work management terminal, material information required for the pipe drawing from the drawing information database is obtained and provided as pipe drawing related information including material information connected to the pipe drawing. Piping drawing management method using the ERP of the piping drawing management server, characterized in that.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020110134561A KR20130082682A (en) | 2011-12-14 | 2011-12-14 | Plumbing floor plan management system and method thereof using enterprise resource planning |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020110134561A KR20130082682A (en) | 2011-12-14 | 2011-12-14 | Plumbing floor plan management system and method thereof using enterprise resource planning |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20130082682A true KR20130082682A (en) | 2013-07-22 |
Family
ID=48993879
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020110134561A KR20130082682A (en) | 2011-12-14 | 2011-12-14 | Plumbing floor plan management system and method thereof using enterprise resource planning |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20130082682A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20210023410A (en) * | 2019-08-23 | 2021-03-04 | 주식회사 창림 | Method Of Lightening A Ship Component 3D Drawing |
KR102597643B1 (en) | 2023-02-16 | 2023-11-02 | (주)예신뷰 | Erp system for design works |
-
2011
- 2011-12-14 KR KR1020110134561A patent/KR20130082682A/en not_active Application Discontinuation
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20210023410A (en) * | 2019-08-23 | 2021-03-04 | 주식회사 창림 | Method Of Lightening A Ship Component 3D Drawing |
KR102597643B1 (en) | 2023-02-16 | 2023-11-02 | (주)예신뷰 | Erp system for design works |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9064219B2 (en) | System and method for managing facility content and equipment information | |
US20100174656A1 (en) | System And Method For Coordinating Building And Construction Activities | |
US20180332102A1 (en) | Cloud-based system for collaborating engineering, operations, maintenance, project management, procurement and vendor data and activities | |
US20160071033A1 (en) | Methods and apparatus for tracking construction material delivery | |
CN109961264A (en) | A kind of enterprise information management system and management method | |
JP2009238191A (en) | Web application system | |
US10204088B2 (en) | System and method for content sharing in enterprise content management | |
US20140129585A1 (en) | Information management systems and methods | |
US11775561B2 (en) | Extensible file synchronization | |
JP5578379B2 (en) | Plant deliverable management system | |
JP6507514B2 (en) | INFORMATION PROCESSING APPARATUS, INFORMATION PROCESSING SYSTEM, INFORMATION PROCESSING METHOD, AND PROGRAM | |
KR20130082682A (en) | Plumbing floor plan management system and method thereof using enterprise resource planning | |
KR20020038502A (en) | Selective distribution of electronic files via a common access platform | |
JP6650174B1 (en) | Intellectual property management device, intellectual property management program, and intellectual property management method | |
EP3639225A1 (en) | Managing review of a design document | |
CN105378709A (en) | Systems and methods for file management by mobile computing devices | |
CN116167730A (en) | BIM collaborative visual management method | |
JP6758167B2 (en) | Data processing equipment, data processing method and data processing program | |
US20140244330A1 (en) | System and method for assessing and managing a facility | |
Hartman | Evaluating lightweight 3D graphics formats for product visualization and data exchange | |
JP6626327B2 (en) | Gantt chart generation program, Gantt chart generation device, and Gantt chart generation method | |
KR20190122462A (en) | Method and apparatus for providing contract management service | |
US20240037468A1 (en) | Method of monitoring project process and outcome | |
JP2005092620A (en) | Business process management system | |
Klein et al. | An Approach to DevOps and Microservices |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
WITN | Withdrawal due to no request for examination |