KR20120111056A - Drainage board for ballast of railway bridge and construction method of improving drainage using the same - Google Patents

Drainage board for ballast of railway bridge and construction method of improving drainage using the same Download PDF

Info

Publication number
KR20120111056A
KR20120111056A KR1020110029324A KR20110029324A KR20120111056A KR 20120111056 A KR20120111056 A KR 20120111056A KR 1020110029324 A KR1020110029324 A KR 1020110029324A KR 20110029324 A KR20110029324 A KR 20110029324A KR 20120111056 A KR20120111056 A KR 20120111056A
Authority
KR
South Korea
Prior art keywords
plate
drainage
bridge
drain
gravel
Prior art date
Application number
KR1020110029324A
Other languages
Korean (ko)
Inventor
임경혁
Original Assignee
한국철도공사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국철도공사 filed Critical 한국철도공사
Priority to KR1020110029324A priority Critical patent/KR20120111056A/en
Publication of KR20120111056A publication Critical patent/KR20120111056A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B19/00Protection of permanent way against development of dust or against the effect of wind, sun, frost, or corrosion; Means to reduce development of noise
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/08Damp-proof or other insulating layers; Drainage arrangements or devices ; Bridge deck surfacings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

PURPOSE: A drain board for a railway bridge and a method for improving drainage using the same are provided to prevent damage to a sleeper, a rail, and a rail fastening device by installing the drain board under a ballast bed of a railway bridge. CONSTITUTION: A drain board for a railway bridge comprises a rugged plate(210) and a porous geotextile(220). The rugged plate is formed by forming multiple protrusions(212) on the top surface of a flat plate(211). The porous geotextile is attached to the top surface of the protrusions of the rugged plate, and the edge thereof is coupled to the edge of the flat plate of the rugged plate.

Description

철도 유도상 교량용 배수판 및 이를 이용한 배수 개선 공법 {Drainage board for ballast of railway bridge and construction method of improving drainage using the same}Drainage board for ballast of railway bridge and construction method of improving drainage using the same}

본 발명은 철도 유도상 교량용 배수판 및 이를 이용한 배수 개선 공법에 관한 것으로서, 철도 교량의 자갈도상 하부에 배수판을 설치하여 우천시 유입되는 우수를 교량에 구성되는 배수 배관으로 원활하게 배출할 수 있도록 함으로서, 철도의 도상 또는 레일로 세립자분이 물과 함께 분출되는 분니 현상을 억제하여 분니 방지를 위한 작업에 소요되는 인력과 비용을 절감할 수 있으며, 레일, 체결장치 및 침목 등의 파손을 방지하고 내구 년한을 증가시킬 수 있는 철도 유도상 교량용 배수판 및 이를 이용한 배수 개선 공법에 관한 것이다.
The present invention relates to a drainage plate for railroad guided bridges and a drainage improving method using the same, by installing a drainage plate at the bottom of a gravel road of a railroad bridge so that rainwater flowing in rainy weather can be smoothly discharged into a drainage pipe formed in a bridge. It can reduce manpower and cost required to prevent Bunny by suppressing Bunny phenomenon in which fine particles are ejected together with water on the road or rail of railroad, and prevent the damage of rails, fasteners and sleepers, etc. The present invention relates to a drainage plate for railroad guided bridges that can increase the level, and a drainage improvement method using the same.

일반적으로 철도의 레일은 콘크리트 바닥 또는 지반을 돋우거나 깎아 다진 노반에 자갈도상을 깔고 그 위에 침목을 일정한 간격으로 나란히 매설한 후 레일이 침목상에 고정된다. 그리고 철도 레일의 분기기 및 신축이음장치 부분에는 레일을 고정하기 위해 침목 상면에 레일 체결장치를 결합하고 그 위에 레일이 고정되도록 구성된다.In general, a rail of a railroad is laid with gravel on a concrete floor or ground which has been cut or chopped, and the sleepers are laid side by side at regular intervals, and then the rails are fixed on the sleepers. And the splitter and expansion joint portion of the rail rail is configured to couple the rail fastener to the upper surface of the sleeper to secure the rail and the rail is fixed thereon.

특히, 유도상 교량 구간에 설치되는 철도 레일은 교량을 구성하는 구조물인 교각과 보가 노반이 되며, 보의 슬라브 콘크리트 상면에 자갈도상을 깔고 그 위에 침목을 매설한 후 레일이 침목상에 고정되는 구조를 이룬다.In particular, the railway rails installed in the bridge section of the induction phase become bridges and beams that constitute the bridges, and the rails are fixed on the sleepers after laying gravel on the upper surface of the slab concrete and laying the sleepers thereon. To achieve.

그리고 철도 유도상 교량은 도 1과 같이 교각(12)의 상부에 교량의 보가 구성되며, 상기 보는 강재 거더, 강재 박스형 거더 또는 콘크리트 합성 거더 등에 철근 등을 결합하고 슬라브 콘크리트(10)를 타설?양생하여 기본적인 교량이 형성된다.And the railway guide bridge is composed of the beam of the bridge on the top of the pier 12 as shown in Figure 1, the beam is bonded to the steel girder, steel box-type girder or concrete composite girder, etc. and cast slab concrete (10)? The basic bridge is formed.

그리고 상기 슬라브 콘크리트(10)의 양측에는 우수를 배출하기 위한 배수구(11)가 형성되고 상기 슬라브 콘크리트(10)의 상면에 자갈도상(20)이 채워지며 그 위에 침목(30)이 묻히도록 설치되고 그 위에 레일(40)이 설치되어 체결장치에 의해 고정된다.And the both sides of the slab concrete 10 is formed with a drain hole 11 for discharging rainwater, the gravel phase 20 is filled on the upper surface of the slab concrete 10 is installed so that the sleeper 30 is buried thereon The rail 40 is installed thereon and fixed by the fastening device.

그리하여 우천시 유입되는 우수는 상기 자갈도상(20)의 공극을 따라 흘러 내려가고 상기 배수구(11)로 유입되어 교량의 밖으로 배출된다.Thus, the rainwater flowing in the rain flows down along the pores of the gravel island 20 and flows into the drain 11 to be discharged out of the bridge.

이때, 철도 유도상 교량의 도상은 자갈도상이 주를 이루고 있으며, 도상은 철도 궤도에서 침목이 받는 열차의 하중을 노반에 넓게 분산시키는 역할을 한다.At this time, the phase of the railroad induction phase bridge is mainly composed of gravel phase, and the phase plays a role of distributing the load of the train which the sleeper receives on the railroad track widely on the roadbed.

그리고 도상은 하중을 노반으로 전달하는 것 이외에도 레일의 신축으로 인해 나타날 수 있는 침목의 이동을 방지하고 열차의 이동에 의해 발생하는 진동을 흡수하여 승차감을 좋게 하며, 그 밖에 우천시 유입되는 우수의 배출을 용이하게 하는 역할을 한다.In addition to transferring the load to the roadbed, the roadway prevents the movement of sleepers that may appear due to the expansion and contraction of rails, absorbs vibrations caused by the movement of trains, and improves the ride quality. It serves to facilitate.

또한, 풀이 자라지 못하게 하며, 겨울철 서릿발로 인해 레일이 솟아오르는 것을 막는 역할을 한다.It also prevents grass from growing and prevents rails from rising due to winter frost.

그런데 자갈도상은 장기간 열차의 반복적인 이동에 따라 진동 및 하중에 의해 마모되어 세립분이 형성되고, 열차의 탄분, 오물 또는 바람에 의해 운반된 먼지 등으로 인해 교량의 배수구가 막혀, 우천시 유입되는 우수가 자갈도상의 공극을 통해 흘러 배수구로 배출되지 못하고 자갈도상 내부에 고여있게 된다.However, gravel roads are worn by vibration and loads due to repeated movement of trains for long periods of time, and fine grains are formed, and drainage of bridges is blocked due to bullets, dirt, or wind carried by trains. It flows through the pores on the gravel and is not discharged to the drain, but stays inside the gravel.

이로 인해 열차의 이동시 진동에 의해 자갈도상 내부에 고여있던 물과 함께 세립분이 자갈도상의 표면으로 상향 분출되는 현상인 분니(mud pumping)가 발생한다.As a result, mud pumping, a phenomenon in which fine grains are ejected upwards to the surface of the gravel road with water accumulated inside the gravel road due to the vibration of the train, is generated.

즉, 우천시 유입되는 우수의 배수가 원활히 이루어지지 않아 분니가 발생하고, 이러한 분니 현상에 의해 자갈도상, 침목 및 레일의 상면으로 세립분이 분출되고 건조되어 고착됨으로 인해 많은 문제점이 발생된다.That is, the rainwater flowing in rainy weather is not made smoothly, the bunnies are generated, and the fine grains are ejected to the upper surface of the gravel bed, sleepers and rails by the Bunny phenomenon, and many problems are caused by the dryness and fixation.

이러한 분니 현상에 의한 문제점으로, 침목 주변의 자갈도상이 고착되어 탄성이 떨어짐으로 인해 침목이 파손되거나 레일의 변형을 초래하고 레일 표면이 마모되며 레일 체결장치가 파손되게 된다.As a problem due to the Bunny phenomenon, the gravel around the sleeper is fixed and the elasticity is reduced, the sleeper is broken or the rail is deformed, the rail surface is worn and the rail fastener is broken.

또한, 레일의 변형, 침하 또는 좌굴이 발생되어 열차의 탈선을 조장하는 중대한 사고를 발생시킬 수 있다.In addition, deformation, sinking or buckling of the rail may occur, which may result in a serious accident that facilitates derailment of the train.

또한, 분니 방지를 위한 자갈도상의 제거 및 되 메우기 작업을 시행함으로 많은 인력과 비용이 소모되는 문제점이 있다.In addition, there is a problem in that a lot of manpower and cost is consumed by performing the removal and backfilling of the gravel to prevent bunny.

그러므로 분니 발생을 방지하기 위해서는 배수가 원활하게 이루어지도록 해야하며 교량의 배수구가 막히지 않도록 해야 한다.Therefore, in order to prevent the generation of bunnies, drainage should be made smoothly and the drains of bridges should not be blocked.

그런데 종래의 건축 지하층 배수용으로 사용되고 있는 배수판은 도 2와 같이 슬라브 콘크리트(50)에서 침투되는 지하수를 차단하여 바닥 콘크리트(70)으로 유입되지 않도록 하기위해 중간에 배수판(60)을 설치하여 집수조(80)로 지하수가 모이는 구조로 형성되며, 이는 철도 유도상 교량의 배수를 위해 적용하기 어려운 문제점이 있다.
By the way, the drainage plate used for drainage of the conventional building basement is installed in the water tank by installing the drainage plate 60 in the middle so as not to enter the floor concrete 70 by blocking the groundwater penetrated in the slab concrete 50 as shown in FIG. 80) is formed as a structure in which groundwater is collected, which is difficult to apply for drainage of bridges on railway induction.

본 발명은 상술한 바와 같은 문제점을 해결하기 위하여 안출된 것으로서, 본 발명의 목적은 철도 유도상 교량의 자갈도상 하부에 구성하여 세립자분은 걸러지고 물은 원활이 배수될 수 있도록 하여 배수구가 막히지 않아 자갈도상 내부에 우수가 고여 있지 않도록 하여 분니 현상을 방지할 수 있는 철도 유도상 교량용 배수판을 제공하는 것이다.The present invention has been made in order to solve the problems as described above, the object of the present invention is to be configured in the lower gravel of the railway guide bridge to fine particles are filtered and the water can be drained smoothly so that the drain is not clogged It is to provide a drainage plate for railroad guided phase bridges that can prevent the Bunny phenomenon by preventing rainwater from accumulating inside the gravel road.

또한, 철도 유도상 교량에 상기 배수판을 자갈도상 하부에 설치하여 배수를 원활히 할 수 있도록 시공하여 분니 현상을 방지함으로서, 이로 인한 침목 파손, 레일의 변형, 레일 표면 마모 및 레일 체결장치의 파손을 방지할 수 있는 철도 유도상 교량용 배수판을 이용한 배수 개선 공법을 제공하는 것이다.In addition, by installing the drainage plate in the lower section of the gravel on the railway guide bridge to prevent drainage by installing the drainage smoothly, thereby preventing sleeper damage, deformation of the rail, wear of the rail surface, and damage of the rail fastening device. It is to provide a drainage improvement method using a drainage plate for railway guided bridges.

또한, 분니를 방지하여 자갈도상의 제거 및 되 메우기 작업에 소요되는 인력과 비용을 절감할 수 있는 철도 유도상 교량용 배수판을 이용한 배수 개선 공법을 제공하는 것이다.
In addition, it is to provide a drainage improvement method using the drainage plate for railroad guided bridge that can reduce the manpower and cost required to remove and backfill gravel road by preventing bunny.

상기한 바와 같은 목적을 달성하기 위한 본 발명의 철도 유도상 교량용 배수판은, Drain plate for railroad guided bridge of the present invention for achieving the above object,

평판형의 플레이트(211) 상면에 수개의 돌출부(212)가 형성되어 이루어지는 요철 플레이트(210); 및 상기 요철 플레이트(210)의 돌출부(212)들의 상면에 밀착되고 가장자리가 상기 플레이트(211)의 외곽에 결합되는 다공성의 토목섬유(220); 를 포함하여 이루어지는 것을 특징으로 한다.An uneven plate 210 having several protrusions 212 formed on an upper surface of the flat plate 211; And porous geotextiles 220 which are in close contact with the top surfaces of the protrusions 212 of the uneven plate 210 and whose edges are coupled to the outer side of the plate 211. And a control unit.

또한, 상기 배수판(200)은 상기 플레이트(211)의 돌출부(212)가 형성되지 않은 부분에 관통구멍(213)이 형성되는 것을 특징으로 한다.In addition, the drain plate 200 is characterized in that the through-hole 213 is formed in a portion where the protrusion 212 of the plate 211 is not formed.

또한, 상기 토목섬유(220)는 화이논(FINON)인 것을 특징으로 한다.In addition, the geotextiles 220 is characterized in that the FINON (FINON).

철도 유도상 교량용 배수판을 이용한 배수 개선 공법에 있어서,In the drainage improvement method using the drainage plate for railway guided bridge,

교량구간(A10)의 침목(400) 양측의 자갈도상(300)을 제거하는 단계(S10); 교량의 막힌 배수구(110)를 천공하는 단계(S20); 상기 침목(400)의 양측으로 슬라브 콘크리트(100) 상면에 배수판(200)을 배치하는 단계(S30); 및 상기 배수판(200) 위에 양질의 자갈도상(300)을 채우는 단계(S40); 를 포함하여 이루어지는 것을 특징으로 한다.Removing the gravel phase 300 on both sides of the sleeper 400 of the bridge section A10 (S10); Drilling the blocked drain hole 110 of the bridge (S20); Disposing a drain plate (200) on the upper surface of the slab concrete (100) to both sides of the sleeper (400) (S30); And filling the gravel phase 300 of the high quality on the drainage plate 200 (S40); And a control unit.

또한, 교량과 접하는 접속부(B10)의 침목(400) 양측의 자갈도상(300)을 제거하는 단계(S50); 상기 침목(400)의 양측으로 노반(600) 상면에 배수판(200)을 배치하는 단계(S60); 및 상기 배수판(200) 위에 양질의 자갈도상(300)을 채우는 단계(S70); 가 더 수행되는 것을 특징으로 한다.In addition, the step (S50) of removing the gravel phase 300 on both sides of the sleeper 400 of the connecting portion (B10) in contact with the bridge; Disposing a drain plate (200) on an upper surface of the bedside (600) to both sides of the sleeper (400) (S60); And filling step (S70) of the high quality gravel phase 300 on the drain plate (200); Is further performed.

또한, 상기 침목(400)의 양측으로 노반(600) 상면에 배수판(200)을 배치하는 단계(S60)는, 상기 배수판(200)이 수평부(B11) 및 수직부(B12)로 연장 배치되는 것을 특징으로 한다.
In addition, in the step (S60) of disposing the drain plate 200 on the upper surface of the roadbed 600 to both sides of the sleeper 400, the drain plate 200 is extended to the horizontal portion (B11) and the vertical portion (B12) It is characterized by.

본 발명은 상술한 바와 같은 문제점을 해결하기 위하여 안출된 것으로서, 본 발명의 철도 유도상 교량용 배수판 및 이를 이용한 배수 개선 공법은,The present invention has been made to solve the problems as described above, the drainage plate for railroad guided bridge of the present invention and drainage improving method using the same,

철도 유도상 교량의 자갈도상 하부에 배수판을 설치하여 세립자분은 걸러지고 물은 원활이 배수될 수 있도록 하여 배수구가 막히지 않아 자갈도상 내부에 우수가 고여 있지 않도록 하여 분니 현상을 방지할 수 있는 장점이 있다.The drainage plate is installed at the lower part of the gravel road of the railroad in the railroad to filter out fine particles and the water can be drained smoothly so that the drain hole is not blocked. have.

또한, 철도 유도상 교량의 자갈도상 하부에 배수판을 설치하여 배수를 원활히 할 수 있도록 시공하여 분니 현상을 방지함으로서, 이로 인한 침목 파손, 레일의 변형, 레일 표면 마모 및 레일 체결장치의 파손을 방지할 수 있는 장점이 있다.In addition, by installing the drainage plate at the bottom of the gravel on the bridge in order to prevent drainage by preventing drainage, it is possible to prevent sleeper damage, rail deformation, rail surface wear, and rail fastening device. There are advantages to it.

또한, 분니를 방지하여 자갈도상의 제거 및 되 메우기 작업이 감소되므로 이에 소요되는 인력 및 자재가 절감되고 작업 인력의 근골격계 질환을 감소시킬 수 있는 장점이 있다.
In addition, there is an advantage that can reduce the manpower and materials required for reducing the removal and backfilling of the gravel by preventing the bunny and reduce the musculoskeletal disorders of the workforce.

도 1은 종래의 철도 유도상 교량의 배수 구조를 나타낸 단면도.
도 2는 종래의 건물 지하층 바닥 콘크리트에 배수판이 설치된 단면도.
도 3은 본 발명의 철도 유도상 교량용 배수판을 나타낸 단면도.
도 4a는 본 발명에 따른 배수판의 요철 플레이트 사시도.
도 4b는 본 발명에 따른 배수판의 다른 실시예의 요철 플레이트 사시도.
도 5a는 본 발명에 따른 철도 유도상 교량의 배수 개선 공법 시공전 단면도.
도 5b는 본 발명에 따른 침목 양측의 자갈도상을 제거한 상태의 단면도.
도 5c는 본 발명에 따른 배수구를 천공하고 배수판을 설치한 단면도.
도 5d는 본 발명에 따른 배수판 위에 자갈도상을 채운 단면도.
도 6은 본 발명에 따른 배수 흐름을 나타낸 도 5d의 부분 확대도.
도 7은 본 발명에 따른 배수 흐름을 나타낸 상측 평면도.
도 8은 본 발명에 따른 접속부에 추가로 배수판을 설치한 상태를 나타낸 상측 평면도.
1 is a cross-sectional view showing a drainage structure of a conventional railroad guided bridge.
Figure 2 is a cross-sectional view of the drainage plate is installed on the basement floor concrete of the conventional building.
3 is a cross-sectional view showing a drain plate for induction bridge bridge of the present invention.
Figure 4a is a perspective view of the uneven plate of the drain plate according to the present invention.
Figure 4b is a perspective view of the concave-convex plate of another embodiment of the drain plate according to the present invention.
Figure 5a is a cross-sectional view before construction of the drainage improvement method of the railroad guided bridge according to the present invention.
Figure 5b is a cross-sectional view of the state removing the gravel phase of both sides of the sleeper according to the present invention.
Figure 5c is a cross-sectional view of the perforated drain and installing a drain plate in accordance with the present invention.
Figure 5d is a cross-sectional view filled with gravel on the drain plate according to the present invention.
6 is a partially enlarged view of FIG. 5d showing a drainage flow according to the present invention;
7 is a top plan view showing the drainage flow according to the present invention.
8 is a top plan view showing a state in which a drain plate is additionally installed in a connection unit according to the present invention;

이하, 상기한 바와 같은 본 발명의 철도 유도상 교량용 배수판 및 이를 이용한 배수 개선 공법을 첨부된 도면을 참고하여 상세하게 설명한다.Hereinafter, with reference to the accompanying drawings, the drainage plate for railroad guided bridges and drainage improving method using the same of the present invention as described above will be described in detail.

도 3은 본 발명에 따른 철도 유도상 교량용 배수판을 나타낸 단면도이다.3 is a cross-sectional view showing a drain plate for induction bridge bridge according to the present invention.

평판형의 플레이트(211) 상면에 수개의 돌출부(212)가 형성되어 이루어지는 요철 플레이트(210); 및 상기 요철 플레이트(210)의 돌출부(212)들의 상면에 밀착되고 가장자리가 상기 플레이트(211)의 외곽에 결합되는 다공성의 토목섬유(220); 를 포함하여 이루어진다.An uneven plate 210 having several protrusions 212 formed on an upper surface of the flat plate 211; And porous geotextiles 220 which are in close contact with the top surfaces of the protrusions 212 of the uneven plate 210 and whose edges are coupled to the outer side of the plate 211. It is made, including.

도 4a와 같이 상기 요철 플레이트(210)는 평판으로 이루어진 상기 플레이트(211)의 상면에 일정한 간격을 두고 길이 및 폭 방향으로 나란하게 상기 수개의 돌출부(212)가 형성되어 이루어진다.As shown in FIG. 4A, the uneven plate 210 includes a plurality of protrusions 212 formed side by side in the length and width directions at regular intervals on an upper surface of the plate 211 formed of a flat plate.

상기 돌출부(212)는 도 4에서 컵 형상으로 나타내었으나 원기둥, 각형기둥 과 같이 다양한 형태로 이루어질 수 있으며, 상기 돌출부(212)의 상면은 자갈도상의 하중 및 토목섬유(220)의 인장강도 등을 고려하여 적정한 단면적을 갖도록 평평한 형태로 이루어지도록 하는 것이 바람직하다.The protrusion 212 is shown as a cup shape in Figure 4 but can be made in various forms such as a cylinder, a square pillar, the upper surface of the protrusion 212 is a gravel load and the tensile strength of the geotextile 220, etc. In consideration, it is desirable to have a flat shape to have an appropriate cross-sectional area.

또한, 상기 돌출부(212)는 컵과 같이 내부가 비어있는 형태로 형성될 수도 있으며 이때에도 자갈도상의 하중을 고려하여 충분한 강도를 갖도록 해야 한다.In addition, the protruding portion 212 may be formed in a hollow shape such as a cup, and in this case, the protrusion 212 should have sufficient strength in consideration of the load on the gravel.

그리고 상기 요철 플레이트(210)에 형성되는 상기 수개의 돌출부(212)들의 상면에 밀착되어 덮어지도록 다공성의 토목섬유(220)가 결합되고 가장자리는 상기 요철 플레이트(210)의 외곽에 결합되도록 구성된다.In addition, the porous geotextiles 220 are coupled to the top surface of the protrusions 212 formed on the uneven plate 210 so as to be in close contact with each other, and an edge thereof is configured to be coupled to the outside of the uneven plate 210.

이때, 상기 토목섬유(220)가 상기 요철 플레이트(210)에 외곽에 결합되는 부분을 도 3에서는 상기 요철 플레이트(210)의 바깥쪽 상면에 상기 토목섬유(220)의 일부분이 결합되도록 도시하였으나 상기 요철 플레이트(210)의 측면에 결합할 수도 있으며 떨어지지 않도록 견고하게 결합해야 한다.At this time, the portion of the geosynthetic fiber 220 is coupled to the outer surface of the uneven plate 210 in Figure 3 is shown to be coupled to a portion of the geotextile 220 on the outer upper surface of the uneven plate 210 It may be coupled to the side of the uneven plate 210 and must be firmly coupled so as not to fall.

그리하여 본 발명의 철도 유도상 교량용 배수판(200)은 상기 다공성의 토목섬유(220)로 물은 통과되지만 세립자분은 걸러지게 되고, 통과된 물은 상기 돌출부(212)들의 사이 공간으로 유동될 수 있게 된다.Thus, the railway drainage plate 200 of the present invention is passed through the porous geosynthetic fiber 220, but fine grains are filtered, and the passed water may flow into the space between the protrusions 212. Will be.

이때, 상기 배수판(200)은 상기 토목섬유(220)가 상측으로 위치되고 상기 요철 플레이트(210)의 플레이트(211)는 막히도록 형성되어, 상기 토목섬유(220)의 상측에서 물과 함께 세립자분이 유입되면 상기 토목섬유(220)에서 세립자분은 걸러지고 물만 통과하여 상기 배수판(200) 내부의 돌출부(212)들 사이로 흐르게 된다. At this time, the drainage plate 200 is formed so that the geotextile 220 is positioned upward and the plate 211 of the uneven plate 210 is blocked, fine particles with water from the top of the geotextile 220 When the minute flows in, the fine particles are filtered from the geotextiles 220, and only water passes through the protrusions 212 inside the drainage plate 200.

그리고 상기 배수판(200)이 연속적으로 배열된 상태에서 상기 돌출부(212)들의 사이로 흐르는 물은 측면의 토목섬유(220)를 통과하여 다시 주변에 구성되는 배수판(200)의 토목섬유(220) 측면으로 유입되어 돌출부(212)들의 사이로 흘러가는 구조를 형성하게 된다.In addition, the water flowing between the protrusions 212 in the state in which the drainage plate 200 is continuously arranged passes through the geotextiles 220 on the side surface to the side surface of the geotextiles 220 of the drainage plate 200. It is introduced to form a structure flowing between the protrusions 212.

또한, 상기 배수판(200)은 도 4b와 같이 요철 플레이트(210)의 플레이트(211)에 관통구멍(213)이 형성될 수 있으며, 상기 관통구멍(213)은 상기 돌출부(212)가 형성되지 않은 부분에 형성된다.In addition, the drainage plate 200 may have a through hole 213 formed in the plate 211 of the uneven plate 210 as shown in FIG. 4B, and the through hole 213 has no protrusion 212 formed therein. Is formed on the part.

이때, 상기 관통구멍(213)은 상기 토목섬유(220)가 상기 요철 플레이트(210)의 외곽에 결합되는 부분의 내측에 형성되어야 한다.In this case, the through hole 213 should be formed inside the portion where the geotextile 220 is coupled to the outer side of the uneven plate 210.

즉, 상기 관통구멍(213)이 형성되는 배수판(200)은 교량의 배수구(110)가 있는 부분에 배치되어 상기 배수판(200) 내부로 흐르는 물이 상기 관통구멍(213)을 따라 상기 배수구(110)로 흐를 수 있도록 하기 위한 것이다.That is, the drain plate 200 in which the through hole 213 is formed is disposed at a portion having the drain hole 110 of the bridge so that water flowing into the drain plate 200 flows along the through hole 213. To flow).

그리고 상기 토목섬유(220)는 세립자분은 걸러지고 물은 통과할 수 있도록 폴리프로필렌(poIypropylene), 폴리에스터(polyester), 폴리에칠렌(polyethylene), 폴리아크릴니트릴(polyacrylonitrile) 또는 나일론(nylon) 등의 합성섬유를 직조하여 형성되는 다공성 제품인 지오텍스타일(geotextile)이 사용될 수 있다.In addition, the geotextile 220 is a composite of polypropylene (poIypropylene), polyester (polyester), polyethylene (polyethylene), polyacrylonitrile or nylon (nylon) to filter fine particles and pass water Geotextiles, which are porous products formed by weaving fibers, can be used.

또한, 상기 토목섬유(220)로 화이논(FINON)이 사용될 수 있다.In addition, FINON may be used as the geotextile 220.

상기 화이논(FINON)은 종래의 단섬유를 소재로 한 단섬유 부직포와는 달리 ㈜코오롱 에서 개발한 폴리에스터 100% 장섬유부직포(spunbond)로서 방사된 폴리에스터 필라멘트가 단일 연속 공정으로 시트를 형성함으로서 기계적 강도와 내후성이 우수한 토목섬유인 지오텍스타일(geotextile) 이다.Unlike the conventional single fiber nonwoven fabric of FONON, FINON is a polyester 100% long fiber nonwoven fabric developed by Kolon Co., Ltd., and spunbonded polyester filaments form a sheet in a single continuous process. Geotextile is a geotextile with excellent mechanical strength and weather resistance.

그리고 상기 화이논(FINON)은 장섬유(filament)가 단일 연속공정으로 시트를 형성하여 인장강도가 높고 내마모성이 좋으며 섬유간 지지력이 탁월하여 장기간 설치하여도 변형 및 물성의 변화가 거의 없다.In addition, the FINON forms a sheet in a single continuous process so that the tensile strength is high, the abrasion resistance is excellent, and the support between the fibers is excellent, and there is almost no change in deformation and physical properties even when installed for a long time.

또한, 각종 합성섬유 중 내후성, 내약품성, 내열성 등이 가장 우수한 폴리에스터 100%로 구성되어 지하의 어려운 조건 하에서도 약해짐이 없이 우수한 기능을 갖는 특징이 있다.In addition, it is composed of 100% polyester having the best weather resistance, chemical resistance, heat resistance and the like among various synthetic fibers, and has a feature of having excellent function without being weak even under difficult conditions underground.

또한, 폴리에스터 필라멘트가 연속적으로 적층된 구조를 유지하여 수직?수평방향으로 우수한 투수 성능을 가지고 있어 뛰어난 배수효과와 필터효과를 나타내며 철도의 자갈도상 하부에 설치하여도 압밀화가 되지 않아 장기간 사용할 수 있는 특징이 있다.In addition, the polyester filament is continuously stacked and has excellent water permeation performance in the vertical and horizontal directions. It shows excellent drainage and filter effects. There is a characteristic.

그리고 본 발명의 철도 유도상 교량용 배수판을 이용한 배수 개선 공법은, 교량구간(A10)의 침목(400) 양측의 자갈도상(300)을 제거하는 단계(S10); 교량의 막힌 배수구(110)를 천공하는 단계(S20); 상기 침목(400)의 양측으로 슬라브 콘크리트(100) 상면에 배수판(200)을 배치하는 단계(S30); 및 상기 배수판(200) 위에 양질의 자갈도상(300)을 채우는 단계(S40); 를 포함하여 이루어진다.And drainage improvement method using the drainage plate for railroad guided phase bridge of the present invention, the step of removing the gravel phase 300 on both sides of the sleeper 400 of the bridge section (A10) (S10); Drilling the blocked drain hole 110 of the bridge (S20); Disposing a drain plate (200) on the upper surface of the slab concrete (100) to both sides of the sleeper (400) (S30); And filling the gravel phase 300 of the high quality on the drainage plate 200 (S40); It is made, including.

기존의 철도 유도상 교량은 배수 개선 시공전 도 5a와 같이 배수구(110) 및 상기 배수구(110) 부근의 자갈도상(300) 사이의 공극이 세립자분에 의해 막히게 되어 배수가 원활히 이루어지지 않는 상태가 된다.Existing railway guided bridge has a state in which the air gap between the drain hole 110 and the gravel diagram 300 near the drain hole 110 is blocked by fine particles as shown in FIG. 5A before the drainage improvement construction. do.

그리하여 교량의 슬라브 콘크리트(100)의 상면 또는 침목(400)의 하부에 물이 고이게 되어 열차의 이동시 레일(500)로 전달되는 하중과 진동에 의해 분니가 발생하게 된다.Thus, water accumulates on the upper surface of the slab concrete 100 of the bridge or the lower part of the sleeper 400, and the Bunny is generated by the load and vibration transmitted to the rail 500 when the train moves.

그러므로 도 5b와 같이 교량구간(A10)의 침목(400) 양측의 자갈도상(300)을 제거하는 단계(S10)를 거쳐 세립자분이 포함된 자갈도상(300)을 제거한다.Therefore, as shown in Figure 5b to remove the gravel phase 300 containing fine particles through the step (S10) of removing the gravel phase 300 on both sides of the sleeper 400 of the bridge section (A10).

이때, 상기 침목(400)의 하부에 구성되는 자갈도상(310)을 제외한 상기 침목(400) 양측의 자갈도상(300)을 제거하며, 분니가 발생되는 부분은 상기 침목(400) 하부 자갈도상(310) 일부를 더 제거할 수도 있다.At this time, except the gravel phase 310 is formed on the lower side of the sleeper 400, removes the gravel phase 300 on both sides of the sleeper 400, the part where bunny is generated is the gravel phase (below the sleeper 400) 310) some may be further removed.

그리고 상기 자갈도상(300)을 제거한 후 교량의 막힌 배수구(110)를 천공하는 단계(S20)를 거쳐 세립자분, 자갈 또는 이물질 등으로 막힌 배수구(110)를 뚫어 교량의 외부로 물이 배출되도록 한다.Then, after removing the gravel phase 300, through the step (S20) for drilling the blocked drain hole 110 of the bridge, the water is discharged to the outside of the bridge by drilling the drain hole 110 blocked with fine-grained particles, gravel or foreign matter. .

그리고 상기 침목(400)의 양측으로 슬라브 콘크리트(100) 상면에 배수판(200)을 배치하는 단계(S30)에서, 도 5c와 같이 수개의 배수판(200)을 나란하게 연속으로 배치하며 상기 배수구(110)를 덮도록 배치한다.And in the step (S30) to arrange the drain plate 200 on the upper surface of the slab concrete (100) to both sides of the sleeper 400, as shown in Figure 5c several drain plates 200 are arranged side by side and the drain hole 110 ) To cover.

이때, 상기 배수판(200)은 토목섬유(220)가 상면을 향하도록 하고 각각의 배수판(200)이 서로 인접하는 부분은 측면이 밀착되도록 배치한다.At this time, the drainage plate 200 is a geotextile 220 facing the upper surface and each drainage plate 200 is disposed so that the side adjacent to each other in close contact.

또한, 상기 배수구(110)를 덮도록 배치되는 배수판(200)은 요철 플레이트(210)에 관통구멍(213)이 형성된 배수판(200)을 사용하고 상기 배구수(110)와 관통구멍(213)이 대응되도록 위치를 조절하여 배치한다. In addition, the drainage plate 200 disposed to cover the drainage port 110 uses a drainage plate 200 having a through hole 213 formed in the uneven plate 210, and the drainage water 110 and the through hole 213 are formed. Adjust the position to correspond.

다른 방법으로, 관통구멍(213)이 형성되지 않은 배수판(200)을 전체적으로 배치한 후 상기 배수구(110) 상부에 배치되는 배수판(200)을 빼내어 배수구(110)의 위치에 대응되도록 상기 배수판(200)의 요철 플레이트(210)에 관통구멍(213)을 형성할 수도 있다.Alternatively, after the drain plate 200 having the through hole 213 is not formed as a whole, the drain plate 200 is removed to remove the drain plate 200 disposed on the drain hole 110 so as to correspond to the position of the drain hole 110. The through hole 213 may be formed in the uneven plate 210 of FIG.

상기와 같이 배수판(200)을 배치한 후 그 위에 도 5d와 같이 양질의 자갈도상(300)을 채우는 단계(S40)를 거쳐 배수 개선 시공이 완료된다.After disposing the drain plate 200 as described above, the drainage improvement construction is completed through the step (S40) of filling the high-quality gravel diagram 300 as shown in FIG. 5D.

이때, 상기 S40 단계에서 채워지는 양질의 자갈도상(300)은 풍화에 강하고 내마모성이 우수하여 열차의 이동에 의한 반복적인 하중과 진동이 작용하더라도 세립자분의 발생이 적어 분니가 발생하지 않는 것을 사용하는 것이 바람직하며, S10 단계에서 제거한 세립자분이 포함된 자갈도상(300)이 아닌 새로운 자갈도상(300)을 사용한다.At this time, the high-quality gravel drawing 300 filled in step S40 is resistant to weathering and wear resistance is excellent, even if the repetitive load and vibration caused by the movement of the train acts as a fine particle is less generated because it does not produce bunny It is preferable to use a new gravel phase (300) instead of the gravel phase (300) containing fine grains removed in step S10.

그런데 새로운 양질의 자갈도상(300)이 아닌 S10 단계에서 제거한 자갈도상(300)을 다시 채우는 경우에는 자갈치기 등을 통해 자갈도상(300)에 포함된 세립자분을 제거한 후 사용해야 한다.By the way, when refilling the gravel phase 300 removed in step S10 rather than the new high-quality gravel phase 300 should be used after removing the fine-grained particles contained in the gravel phase 300 through gravel.

그리하여 도 6과 같이 유입되는 물이 자갈도상(300, 310)의 공극을 따라 흘러 상기 배수판(200)의 토목섬유(220)를 거쳐 세립자분은 걸러지고 물만 통과하여 돌출부(212) 사이를 따라 흘러 관통구멍(213)을 통해 배수구(110)로 유출되도록 구성된다.Thus, the water flowing in as shown in Figure 6 flows along the pores of the gravel island (300, 310) through the geotextile 220 of the drainage plate 200 is filtered fine particles and flows only between the water passing through the projections (212) It is configured to flow into the drain 110 through the through-hole 213.

그리고 도 7과 같이 교량구간(A10)에 연속적으로 배수판(200)을 설치하여 교량의 양측에 구성되는 수개의 배수구(110)를 통해 원활하게 배수가 이루어지게 된다.And the drain plate 200 is continuously installed in the bridge section (A10) as shown in Figure 7 through the several drain holes 110 formed on both sides of the bridge is smoothly made.

또한, 교량과 접하는 접속부(B10)의 침목(400) 양측의 자갈도상(300)을 제거하는 단계(S50); 상기 침목(400)의 양측으로 노반(600) 상면에 배수판(200)을 배치하는 단계(S60); 및 상기 배수판(200) 위에 양질의 자갈도상(300)을 채우는 단계(S70); 가 더 수행될 수 있다.In addition, the step (S50) of removing the gravel phase 300 on both sides of the sleeper 400 of the connecting portion (B10) in contact with the bridge; Disposing a drain plate (200) on an upper surface of the bedside (600) to both sides of the sleeper (400) (S60); And filling step (S70) of the high quality gravel phase 300 on the drain plate (200); May be further performed.

즉, 도 8과 같이 교량구간(A10)과 연결되는 접속부(B10)에서 상기 교량구간(A10)으로 물이 유입되지 않고 상기 접속부(B10)의 철도 궤도의 양측으로 배수되도록 하기 위해, 상기 접속부(B10)의 침목(400) 양측의 자갈도상(300) 하부에 상기 배수판(200)을 추가로 설치할 수 있다.That is, in order to drain water to both sides of the railway track of the connection portion B10 without water flowing into the bridge portion A10 from the connection portion B10 connected to the bridge section A10 as shown in FIG. The drainage plate 200 may be additionally installed at the lower side of the gravel drawing 300 on both sides of the sleeper 400 of B10).

여기에서 상기 노반(600)은 지반 등을 깎거나 돋워 다진 기초이며, 상기 노반(600)의 상부에 깔아놓은 자갈도상(300)중 침목(400) 양측의 자갈도상(300)을 제거하고 상기 교량구간(A10)에 배치한 배수판(200)에 연장되도록 배수판(200)을 상기 노반(600)의 상면에 배치한 후 양질의 자갈도상(300)을 배수판(200)위에 다시 채우게 된다.Here, the roadbed 600 is a foundation cut or raised ground, etc., and removes the gravel bed 300 on both sides of the sleeper 400 of the gravel bed 300 laid on the upper part of the bed 600 and the bridge After the drain plate 200 is disposed on the upper surface of the subgrade 600 so as to extend to the drain plate 200 disposed in the section A10, the high quality gravel drawing 300 is refilled on the drain plate 200.

이때, 상기 양질의 자갈도상(300) 역시 세립자분이 포함되지 않은 새로운 자갈도상(300)을 사용하며, 새로운 양질의 자갈도상(300)이 아닌 S50 단계에서 제거한 자갈도상(300)을 다시 채우는 경우에는 자갈치기 등을 통해 자갈도상(300)에 포함된 세립자분을 제거한 후 사용해야 한다.At this time, the high-quality gravel phase (300) also uses a new gravel phase (300) that does not contain fine-grained particles, when refilling the gravel phase (300) removed in step S50 rather than the new high-quality gravel phase (300) The gravel should be used after removing the fine particles contained in the gravel phase (300).

또한, 상기 침목(400)의 양측으로 노반(600) 상면에 배수판(200)을 배치하는 단계(S60)는, 상기 배수판(200)을 수평부(B11) 및 수직부(B12)로 연장 배치하는 단계로서, 상기 접속부(B10)에서 교량구간(A10)과 접하여 연결되는 부분에 상기 교량구간(A10)에 설치된 상기 배수판(200)과 수평으로 연장하여 상기 수평부(B11)에 일정한 길이만큼 연장 설치될 수 있다.In addition, in the step (S60) of disposing the drain plate 200 on the upper surface of the roadbed 600 to both sides of the sleeper 400, the drain plate 200 is extended to the horizontal portion (B11) and vertical portion (B12) In the step, the connecting portion (B10) in the portion connected to the bridge section (A10) in contact with the drain plate 200 installed in the bridge section (A10) to extend horizontally installed by extending a predetermined length in the horizontal portion (B11) Can be.

이때, 상기 배수판(200)이 연장 설치되는 상기 수평부(B11)의 길이는 5m 내지 10m 범위이며 상기 접속부(B10) 노반(600)의 특성, 배수 환경 및 지역적인 특성 등을 고려하여 연장 길이를 선정할 수 있다.At this time, the length of the horizontal portion (B11) to which the drainage plate 200 is extended is in the range of 5m to 10m and the extension length in consideration of the characteristics of the connection portion (B10) roadbed 600, drainage environment and regional characteristics. Can be selected.

그리고 상기 교량구간(A10)과 접하여 상기 교량과 수직을 이루는 상기 수직부(B12)에 배수판(200)을 연장 설치하여 상기 접속부(B10)로 유입된 물이 상기 교량구간(A10)으로 흘러 들어가지 않고, 상기 수직부(B12)에 설치된 배수판(200)을 따라 노반(600)의 양측으로 배수되도록 구성하여 철도 유도상 교량의 배수를 더욱 원활하게 할 수 있다.In addition, the drain plate 200 is installed in the vertical portion B12 perpendicular to the bridge in contact with the bridge section A10 so that the water flowing into the connection section B10 flows into the bridge section A10. Instead, it is configured to be drained to both sides of the roadbed 600 along the drain plate 200 installed in the vertical portion (B12) to facilitate the drainage of the bridge on the railroad guidance.

그리하여 철도 유도상 교량의 자갈도상 하부에 배수판을 설치함으로서, 세립자분은 걸러지고 물은 원활이 배수될 수 있도록 하여 배수구가 막히지 않아 자갈도상 내부에 물이 고여 있지 않도록 하여 분니 현상을 방지할 수 있다.Thus, by installing a drain plate at the bottom of the gravel road of the railway guide bridge, fine particles can be filtered out and the water can be drained smoothly so that the drain hole is not blocked so that water does not accumulate inside the gravel road to prevent the Bunny phenomenon. .

또한, 철도 유도상 교량에 상기 배수판을 자갈도상 하부에 설치하여 배수를 원활히 할 수 있도록 시공하여 분니 현상을 방지함으로서, 이로 인한 침목 파손, 레일의 변형, 레일 표면 마모 및 레일 체결장치의 파손을 방지할 수 있다.In addition, by installing the drainage plate in the lower section of the gravel on the railway guide bridge to prevent drainage by installing the drainage smoothly, thereby preventing sleeper damage, deformation of the rail, wear of the rail surface, and damage of the rail fastening device. can do.

또한, 분니를 방지하여 자갈도상의 제거 및 되 메우기 작업에 소요되는 인력 및 자재를 절감할 수 있으며, 작업 인력의 근골격계 질환을 감소시킬 수 있다.In addition, it is possible to reduce the manpower and materials required for the removal and backfilling of the gravel by preventing the bunnies, it is possible to reduce the musculoskeletal disorders of the workforce.

그리고 본 발명의 철도 유도상 교량용 배수판 및 이를 이용한 배수 개선 공법은, 기존의 철도 유도상 교량에 적용할 수 있을 뿐만 아니라, 신규로 설치되는 철도 유도상 교량의 상부 슬라브 콘크리트가 완성되고 배수구가 형성된 후 배수판을 슬라브 콘트리트 상면 양측에 배치하고 자갈도상을 채우고 침목과 레일을 설치하여 개선된 배수 구조를 갖도록 시공할 수도 있다.And the drainage plate for railway guided bridge of the present invention and drainage improving method using the same, not only can be applied to the existing railway guided bridge, but also completed the upper slab concrete of the newly installed railway guided bridge and formed a drain hole After that, the drainage plate may be placed on both sides of the slab concrete, filled with gravel, and sleepers and rails may be installed to have an improved drainage structure.

본 발명은 상기한 실시예에 한정되지 아니하며, 적용범위가 다양함은 물론이고, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 본 발명이 속하는 분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형 실시가 가능한 것은 물론이다.
It will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the invention as defined by the appended claims. It goes without saying that various modifications can be made.

100 : 슬라브 콘크리트
110 : 배수구
200 : 배수판
210 : 요철 플레이트 211 : 플레이트
212 : 돌출부 213 : 관통구멍
220 : 토목섬유
300 : 자갈도상 310 : 자갈도상
400 : 침목
500 : 레일
600 : 노반
A10 : 교량구간
B10 : 접속부
B11 : 수평부 B12 : 수직부
100: slab concrete
110: drain hole
200: drain plate
210: uneven plate 211: plate
212: protrusion 213: through hole
220: geotextile
300: gravel statue 310: gravel statue
400: sleeper
500: rail
600: roadbed
A10: Bridge section
B10: connection
B11: horizontal portion B12: vertical portion

Claims (6)

평판형의 플레이트(211) 상면에 수개의 돌출부(212)가 형성되어 이루어지는 요철 플레이트(210); 및 상기 요철플레이트(210)의 돌출부(212)들의 상면에 밀착되고 가장자리가 상기 플레이트(211)의 외곽에 결합되는 다공성의 토목섬유(220); 를 포함하여 이루어지는 것을 특징으로 하는 철도 유도상 교량용 배수판.
An uneven plate 210 having several protrusions 212 formed on an upper surface of the flat plate 211; And porous geotextiles 220 which are in close contact with the top surfaces of the protrusions 212 of the uneven plate 210 and whose edges are coupled to the outside of the plate 211. Drain plate for railroad guided bridge characterized in that comprises a.
제1항에 있어서,
상기 배수판(200)은 상기 플레이트(211)의 돌출부(212)가 형성되지 않은 부분에 관통구멍(213)이 형성되는 것을 특징으로 하는 철도 유도상 교량용 배수판.
The method of claim 1,
The drainage plate 200 is a railway drainage bridge, characterized in that the through-hole 213 is formed in a portion where the protrusion 212 of the plate 211 is not formed.
제1항 또는 제2항에 있어서,
상기 토목섬유(220)는 화이논(FINON)인 것을 특징으로 하는 철도 유도상 교량용 배수판.
The method according to claim 1 or 2,
The geotextile 220 is a drain board for induction bridge bridge, characterized in that the FINON (FINON).
철도 유도상 교량용 배수판을 이용한 배수 개선 공법에 있어서,
교량구간(A10)의 침목(400) 양측의 자갈도상(300)을 제거하는 단계(S10); 교량의 막힌 배수구(110)를 천공하는 단계(S20); 상기 침목(400)의 양측으로 슬라브 콘크리트(100) 상면에 배수판(200)을 배치하는 단계(S30); 및 상기 배수판(200) 위에 양질의 자갈도상(300)을 채우는 단계(S40); 를 포함하여 이루어지는 철도 유도상 교량용 배수판을 이용한 배수 개선 공법.
In the drainage improvement method using the drainage plate for railway guided bridge,
Removing the gravel phase 300 on both sides of the sleeper 400 of the bridge section A10 (S10); Drilling the blocked drain hole 110 of the bridge (S20); Disposing a drain plate (200) on the upper surface of the slab concrete (100) to both sides of the sleeper (400) (S30); And filling the gravel phase 300 of the high quality on the drainage plate 200 (S40); Drainage improvement method using the drainage plate for railroad guided bridge comprising a.
제4항에 있어서,
상기 배수 개선 공법은 연이어서 교량과 접하는 접속부(B10)의 침목(400) 양측의 자갈도상(300)을 제거하는 단계(S50); 상기 침목(400)의 양측으로 노반(600) 상면에 배수판(200)을 배치하는 단계(S60); 및 상기 배수판(200) 위에 양질의 자갈도상(300)을 채우는 단계(S70); 가 더 수행되는 것을 특징으로 하는 철도 유도상 교량용 배수판을 이용한 배수 개선 공법.
The method of claim 4, wherein
The drainage improvement method is a step (S50) to remove the gravel phase (300) on both sides of the sleeper 400 of the connecting portion (B10) in contact with the bridge in succession; Disposing a drain plate (200) on an upper surface of the bedside (600) to both sides of the sleeper (400) (S60); And filling step (S70) of the high quality gravel phase 300 on the drain plate (200); The drainage improvement method using the drainage plate for railroad guided bridge, characterized in that is further performed.
제5항에 있어서,
상기 배수 개선 공법은 상기 침목(400)의 양측으로 노반(600) 상면에 배수판(200)을 배치하는 단계(S60)에서, 상기 배수판(200)이 수평부(B11) 및 수직부(B12)로 연장 배치되는 것을 특징으로 하는 철도 유도상 교량용 배수판을 이용한 배수 개선 공법.
The method of claim 5,
The drainage improving method is in the step (S60) of disposing the drain plate 200 on the upper surface of the bed 600 to both sides of the sleeper 400, the drain plate 200 to the horizontal portion (B11) and vertical portion (B12) Drainage improvement method using the drainage plate for railway guided bridges, characterized in that the extension is arranged.
KR1020110029324A 2011-03-31 2011-03-31 Drainage board for ballast of railway bridge and construction method of improving drainage using the same KR20120111056A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110029324A KR20120111056A (en) 2011-03-31 2011-03-31 Drainage board for ballast of railway bridge and construction method of improving drainage using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110029324A KR20120111056A (en) 2011-03-31 2011-03-31 Drainage board for ballast of railway bridge and construction method of improving drainage using the same

Publications (1)

Publication Number Publication Date
KR20120111056A true KR20120111056A (en) 2012-10-10

Family

ID=47281806

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110029324A KR20120111056A (en) 2011-03-31 2011-03-31 Drainage board for ballast of railway bridge and construction method of improving drainage using the same

Country Status (1)

Country Link
KR (1) KR20120111056A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111535169A (en) * 2020-05-14 2020-08-14 云南阳光道桥股份有限公司 Construction method for longitudinal buried drainage of road bridge asphalt layer

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111535169A (en) * 2020-05-14 2020-08-14 云南阳光道桥股份有限公司 Construction method for longitudinal buried drainage of road bridge asphalt layer
CN111535169B (en) * 2020-05-14 2021-08-24 云南阳光道桥股份有限公司 Construction method for longitudinal buried drainage of road bridge asphalt layer

Similar Documents

Publication Publication Date Title
AU2016231474B2 (en) Rail Track Sleeper Support
DE19503220A1 (en) System for ballastless permanent way of rail track
WO2009121323A1 (en) Fixed track for rail vehicles
KR101232896B1 (en) Reclamation type railway line structure providing vegatation portion using a waterway
CN112030721A (en) Bridge head roadbed reinforcing structure
KR20120111056A (en) Drainage board for ballast of railway bridge and construction method of improving drainage using the same
KR100966468B1 (en) The water run-through-base combine armature mat with invisible water punctured pipe`s construction process
CN110359375A (en) The construction method of precast segment girder precast field under a kind of bridge
KR101083032B1 (en) Pavement
EA000461B1 (en) Railway track and sleeper and gap-covering element therefor
CN210886927U (en) Railway bridge integral steel bridge deck slab ballast groove
CN108842521A (en) The contact layer structure and its laying method of non-fragment orbit and surface layer of subgrade bed
CN209066280U (en) A kind of bridge road structure
CN210621457U (en) Asphalt bridge floor drainage structure
KR100709570B1 (en) Structure for establishing rail track in marshy place
CN209923764U (en) Bridge deck drainage structure across railway bridge
US11021841B2 (en) Railway or tramway track
CN207143613U (en) For afforesting the rail traffic road bed structure of section
KR20210002314A (en) Underwater mat reinforcing a soft ground
CN214940961U (en) Wood platform with drainage device
CN212742022U (en) Track structure on inclined pavement
CN220335692U (en) Prevent bridgehead and jump car structure
CN219951583U (en) Ponding-proof high-strength pavement structure
CN215252077U (en) Telescopic seam type road surface drainage device
CN219280371U (en) Retaining wall structure for railway

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application